Agenda – West Campus TransportationAgenda West Campus Transportation Elements
1. Overview of Other Transportation Projects in Ward 8
2. Summary of Changes from last version presented to Consulting Parties
3. Traffic Analysis
4. Avoidance Alternatives
5 Alternatives
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
5. Alternatives
2
Overview of Other TransportationOverview of Other Transportation Projects in Ward 8
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 3
Overview of Other Transportation Projects in p jWard 8Projects Currently in Development• 11th Street Bridges• South Capitol Street Corridor• South Capitol Street Trail• South Capitol Street Trail• Streetcar System• Martin Luther King Great Street Improvements
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 4
Summary of Items that have Changed from West C EISCampus EIS
•TPB/MWCOG model update
•Changes to Land Use in the area including Bolling Air Force Base
• TPB/MWCOG Travel Demand Forecast Model• Most recent land use and transportation network versions• Refined network within study area• Refined network within study area
• Background Conditions• Anacostia Naval Station / Bolling Air Force Base
fi ti d l dreconfiguration and land use • Full integration of South Capitol Street and 11th Street projects• East Campus Development (DCOP / DMPED)
• Revised Transportation Demand Management• Strategies included in detailed analysis
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 5
TRAFFIC & TRANSIT ISSUES
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 6
9%
15%
5%
8%
20%
29%29%29%29%
5%
4% 22%22%22%22%
15%
18%
29%29%29%29%2020%%2020%%
9%
9%
St. Elizabeth East & West CampusN
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
13%
10%
Vehicular Distribution
Date: 21 May, 2010
(Distribution does not include Transit & DHS Shuttle Trips)(Graphical Results are based on 2030 Alt-A TDFM Runs)
7
N
DHS Campus Mode Split
Home (Mode of Departure) Destination - St.E's (Mode of Arrival)
M d P t /S lite Percentage/Split Mode Percentage/Split
18% SOV (SOV and Carpool Non-DHS) 21%
DHS 3% Carpool/Vanpool 12%
12% Dropped Off 2%12% Dropped Off 2%
pped Off 2%
xpress Bus 4% Commuter/Express Bus 4%
35% Shuttle 30%
7% Metro-Bus 6%
2%
1% Walk 9%
1% Bicycle 1%
0% Motorcycle 0%
5% Work from Home 5%
2% Didn't Work 2%
k Centers 4% Proposed Telework Center 4%
de 4% Agency Park & Ride 4%
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
100% Total 100%
8
Traffic Analysis2016 Build Level of Service
LEGENDModerately Congested Intersection
Heavily Congested Intersection
Severely Congested Intersection
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 9
N
DHS Campus Employee Access Points
North
100
staf
f10
0 st
affNorth
LEGEND
3131Signalized Intersection
Unsignalized Intersection
DHS Campus Entry Points
4150 staff4150 staff485 staff485 staff
Points
DHS East-West Campus Transfer Point
DHS P d C tiDHS Ped Connections
3900 staff3900 staff
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 10
** Future retail along Pecan St. is shown according to District’s recommendations. It is not part of GSA/DHS project.
Proposed Shuttle AccessLEGENDCongress Heights Station – Pecan St
C H i ht
1
Congress Heights Station – Gate 4
Anacostia Station –Gate 4
Anacostia – Gate 1 1
ecan
St
ate
ecan
St
ate
e 2
e 2
Anacostia – Gate 1 METRO BUS
METRO BUS StopMM
METRO BUSMETRO BUS
DH
DHMM MM
Pe Ga
Pe Ga
Gat
eG
ate
11 HS SH
UTTLE
HS SH
UTTLE
Gat
e 1
Gat
e 1
Gate 4Gate 43 2
EE
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 11
N
Proposed Shuttle Access
Shuttle Trip Calculations
lPassengers
Shuttle Trips(40 person)
ShuttlesTravel Time(min)
Wait Time (min)
1) Congress Heights to Pecan Street1000 25 9 20 2.5
2) Congress Heights to Gate 4300 8 4 30 7.5
3) Anacostia to Gate 4800 20 10 30 3 0800 20 10 30 3.0
TOTAL2100 53 23
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 12
Firth Sterling Avenue
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 13
Firth Sterling Avenue / Access Road
N
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Alternative 1: “T” intersection
14
Alternative 2: “Thru” intersection
N
Access Road
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 15
Access Road Previous Proposed design
(No Bus Parking
Gate 5North
(No Bus Parking Proposed) Bus Turn
Around
South Bus StopGate 4
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 16
p
SITE PLANN
Access Road Previous Proposed Design
45’23’20’
68’- 0”
20’
POND CLEARPOND CLEAR ZONE
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 17
BUS BAY SOUTH - PLAN
SOUTHTURN
SOUTHNORTHBUSN
Access Road Previous Proposed Design
Clear Zone
3’-5”
Pond
45’
11’ 11’11’12’
23’
20’ 20’3’
68’- 0”’
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 18
BUS BAY SOUTH - SECTION
Access Road Previous Proposed Design
33’21’
54’
33’21’20’
CLEAR ZONE
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 19
NORTH – PLAN ( No Buses)
SOUTHTURN SOUTHNORTHN
Access Road Previous Proposed Design
P t l
Clear Zone7’ 6”
Patrol Path41’6 TW
11’ 11’11’
Zone3’-6”
7’-6”
32 BW34 BW
33’21’9’
54’- 0”
20’
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 20
NORTH SECTION ( No Buses)
Access Road Alternative 1 – Sawtooth bus stop
CemeteryCemetery
North Bus StopSouth Bus Stop
Gate 4
Gate 5
7 Bays3 Bays
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 21
7 Bays
SITE PLANN
Access Road Alternative 1 – Sawtooth bus stop
47’25’ 6’ 47’25’ 6’20’
78’- 0”
(+ 10’ -0”)
POND CLEARPOND CLEAR ZONE
BUS BAY SOUTHPrevious Proposed Condition
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 22
Previous Proposed Condition
BUS BAY SOUTH - PLAN
SOUTHTURN
SOUTHNORTHBUSN
Access Road Alternative 1 – Sawtooth bus stop
POND CLEAR ZONE
47’
25’ 6’20’
78’-0”
31’- 0”
11’14’ 11’ 11’
78 0
( +10’-0”)
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 23
BUS BAY SOUTH - SECTION
Access Road Alternative 1 – Sawtooth bus stop
Clear Z
12’-0”
Zone
20’-0”
Previous Proposed Design68’-0”
20’-0” 45’-0”3’-0”
Clear ZoneZone
20’-0”47’-0”
14’-0”
31’-0”
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 24
BUS BAY SOUTHComparative Analysis
Alternate 1 - Sawtooth 78’-0” ( +10’-0”)
31 0
Access Road Alternative 1 – Parallel bus stop
47’16’
63’- 0”
47’16’20’
(+ 9’ )
9’
( )
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 25
BUS BAY NORTH - PLAN
SOUTHTURN
SOUTHNORTHBUSN
Access Road Alternative 1 – Parallel bus stop
Patrol
Clear Zone
Patrol Path
7’-0”8’-0”
42 TW
11’ 11’11’9’
Zone
20’ 14’16’
3’-6”32 BW
34 BW
47’16’
63’- 0”
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 26
BUS BAY NORTH - SECTION
Access Road Alternate 1 - Parallel Bus Stop
Clear 7’ 6”
Patrol Path41’6 TW
9’
Zone3’-6”
20’
7’-6”
32 BW34 BW
9
54’- 0”
0
Patrol P th
54’- 0”Previous Proposed Design
21’ 33’
Clear Zone
Path
3’ 6”
7’-0”
Clear Zone8’-0”
42 TW
9’ 20’
3’-6”32 BW34 BW
16’ 47’
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 27
63’- 0”
BUS BAY NORTHComparative Analysis
(+9’-0”)Alternate 1 – Parallel Bus Stop
47
Access Road Alternative 2 – Parallel bus stop
C tCemetery
North Bus StopSouth Bus Stop
Gate 4
Gate 5
6 Bays4 Bays
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 28
6 Bays
SITE PLANN
Access Road Alternative 2 – Parallel bus stop
47’31’ 473120’
78’- 0”
(+ 10’ )
POND CLEARPOND CLEAR ZONE
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 29
SOUTHTURN
SOUTHNORTHBUS
BUS BAY SOUTHN
Access Road Alternative 2 – Parallel Bus Stop
Clear
3’-5”
Clear Zone
20’-0” 12’-0”
Previous Proposed Design68’-0”
45’-0”20’-0”3’-0”
Clear Zone
3’-5”
20’-0”
47’-0”31’-0”
14’-0”
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 30
BUS BAY SOUTHComparative Analysis
Alternate 1 – Parallel Bus Stop 78’-0” ( +10’)
Access Road Alternative 2 – Parallel bus stop
47’16’
63’- 0”
47’16’20’
(+ 9’ )
9’
( )
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 31
BUS BAY NORTH - PLAN
SOUTHTURN
SOUTHNORTHBUSN
Access Road Alternate 2 - Parallel Bus Stop
Clear 7’ 6”
Patrol Path
41’6 TW
9’
Zone3’-6”
20’
7’-6”
32 BW34 BW
9
54’- 0”
0
Patrol P th
54’- 0”Previous Proposed Design
33’21’
Clear Zone
Path
3’ 6”
7’-0”
Clear Zone8’-0”
42’TW
9’ 20’
3’-6”32’ BW
34’ BW
16’ 47’
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 32
63’- 0”
BUS BAY NORTHComparative Analysis
(+9’-0”)Alternate 2 – Parallel Bus Stop
47
Avoidance/Minimization Alternatives
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 33
•Avoidance Alternative – A2B•Original 4(f)
Avoidance/Minimization Alternatives
•Original 4(f) •Safety issues along I-295 with weave issues at Malcolm X/I-295 and south•Volumes at Firth Sterling/Access Road results in deficient LOS
•Avoidance Alternative – Direct Access•Direct ramps to and from I-295 at West Campus Gate 4
•Violation of AASHTO Design Standards/DDOT Design Standards•FHWA/DDOT Policy Issues
• Minimization Alternative – Alt. 4 Re-alignment of I-295 – Requested by NPS 5-14-2010Minimization Alternative Alt. 4 Re alignment of I 295 Requested by NPS 5 14 2010•Access Roadway and I-295 realigned and move east
•Eliminates future abilities to expand I-295 capacity in the future•Construction/Maintenance operations would impact NPS property•Schedule to complete by 2016 not likelySchedule to complete by 2016 not likely
• Minimization Alternative – Alt. 2 Revised (4-13-2010)•One-way couplet between South Capitol Street and Access Road
•DHS/DDOT Programmatic Issues with heightened securityG t i i•Geometric issues
• Minimization Alternative – Requested by NPS (4-13-2010)•Swap South Capitol Street and I-295
•Geometric issues (Bolling AFB/Anacostia Naval Station, SCS/Suitland, etc)
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
( g )•Schedule to complete by 2016 not likely•Use of DDOT right-of-way not allowed for uses other than interstate facilities
34
Shepherd Parkway Avoidance / Minimization Alternativesat o te at es
Alternative A-2.B
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 35
Shepherd Parkway Avoidance / Minimization Alternatives
Alt ti A 2 B ti dAlternative A-2.B continued
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 36
Avoidance/Minimization AlternativesDirect Access
Features• Direct ramps to and from Interstate 295 at West Campus Gate 4• Attempts to remove/reduce impacts to park land
Issues• Violation of AASHTO Design Standards & DDOT Design Requirements• FHWA Policy / DDOT Policy Issues• Alignment of I‐295 direct ramps constrained by lateral clearance• Significant aerial structures required:Significant aerial structures required:
• view‐shed issues• major order‐of‐magnitude costs• constructability challenges
• Introduces problems safety, traffic operations due to ramp spacing
SummaryDirect Access Alternative will not satisfy Design Standards, Federal/local Policy requirements and has several similar issues to other avoidance alternatives.
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 37
Avoidance/Minimization AlternativesAlternative 4 – Re-alignment of I-295
F tFeatures• Access Roadway
and I-295 realigned and moved east
• Attempts to remove impacts to park landimpacts to park land
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 38
Within parkland Within parkland
Avoidance/Minimization AlternativesAlternative 4 – Re-alignment of I-295 - continued
10’ trail in park land(See Point B)
Realignment into park land
Realignment into park land
(See Point A) (See Point C)NB I-295 off-bound ramp
adjacent to park land (See Point D) – could be
maintenance issue
Begin SB I-295 realignment south
Begin NB I-295 realignment south Point A
Begin NB I-295 realignment north
Begin SB I-295 realignment north
SummaryAvoidance Alternative does not remove impacts to park land and does not meet safety and operations requirements. Due to scheduling issues, inability for DDOT to improve I-295 in the future, nor provide for maintenance of I 295 corridor and order ofnor provide for maintenance of I-295 corridor, and order-of-magnitude costs, to constructability issues this alternative does NOT meet the Purpose and Need.
P i BPoint C Point DPoint BPoint C Point D
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 39
Avoidance/Minimization AlternativesAlternative 2 Revised
Point A (see below)
Features• One way couplet between South Capitol Street and Access Road
Modification shown on next slidePoint A
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 40
Avoidance/Minimization AlternativesAlternative 2 Revised - continued
Point A (see below)
Point B (see below)
Features• Parallel roadway from Gate 4 to Gate 6Parallel roadway from Gate 4 to Gate 6• Minimized road profile
Summary:Alternative 2 Revised (one-way couplet) north of Gate 4 does not meet safety or operation requirements. It cannot provide uninterrupted NB safety or operation requirements. It cannot provide uninterrupted NB traffic in parallel facility. Point A
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 41
Point B
Interchange Alternatives
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 42
NorthAlternative 1
• Same movements as today to/from I-295
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 43
Same movements as today to/from I 295
• Flyover ramp of Malcolm X Avenue for NB direction from Interstate to Access Road
NorthAlternative 3
• Direct access to/from I-295 in all directions
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 44
Direct access to/from I 295 in all directions
• Flyover ramp of Malcolm X Avenue for NB direction from Interstate to Access Road
North Alternative 1 Impacts
12-18-09(I-2 Alt) Draft 1 Draft 2 Draft 3 DEIS
4.4
2.1
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 45
6.5
North Alternative 3 Impacts
12-18-09(I-2 Alt) Draft 1 Draft 2 Draft 3 DEIS
4.4
2.1
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 46
6.5
Next Steps
C t i f th li i D ft EIS June 24
Courtesy copies of the preliminary Draft EIS sent to consulting parties as well as review copies to cooperating agencies
Comments due from cooperating agencies July 7 Comments due from cooperating agencies and consulting parties
July 29 Start of 45-day public comment period for h f SJuly 29 the Draft EIS
September Public hearing and end of public comment period
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
p
47
BACK-UP MATERIALS
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 48
Access Road Alternative 1 – Parallel bus stop
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 49
Access Road Alternative 2 – Sawtooth bus stop
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 50
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Gate 651
5.89’-(3’)
20’-0”9’-0”5’-0” 1’-6” 56’-0”
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Security Patrol path – Access RoadFebruary 19, 2010
LOD 35’-6”(-10’-0”)
52
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Gate 453
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Gate 454
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Gate 455
May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements
Gate 456