DHS Consolidation at St. Elizabeths West Campus Transportation Elements Transportation Analysis Consulting Parties Meeting May 25th, 2010 May 25th, 2010 DHS Consolidation at St. Elizabeths West Campus Transportation Elements 1
Transcript
Page 1: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

DHS Consolidation at St. Elizabeths West Campus Transportation Elements

Transportation AnalysisConsulting Parties MeetingMay 25th, 2010

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

y ,

1

Page 2: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Agenda – West Campus TransportationAgenda West Campus Transportation Elements

1. Overview of Other Transportation Projects in Ward 8

2. Summary of Changes from last version presented to Consulting Parties

3. Traffic Analysis

4. Avoidance Alternatives

5 Alternatives

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

5. Alternatives

2

Page 3: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Overview of Other TransportationOverview of Other Transportation Projects in Ward 8

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 3

Page 4: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Overview of Other Transportation Projects in p jWard 8Projects Currently in Development• 11th Street Bridges• South Capitol Street Corridor• South Capitol Street Trail• South Capitol Street Trail• Streetcar System• Martin Luther King Great Street Improvements

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 4

Page 5: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Summary of Items that have Changed from West C EISCampus EIS

•TPB/MWCOG model update

•Changes to Land Use in the area including Bolling Air Force Base

• TPB/MWCOG Travel Demand Forecast Model• Most recent land use and transportation network versions• Refined network within study area• Refined network within study area

• Background Conditions• Anacostia Naval Station / Bolling Air Force Base

fi ti d l dreconfiguration and land use • Full integration of South Capitol Street and 11th Street projects• East Campus Development (DCOP / DMPED)

• Revised Transportation Demand Management• Strategies included in detailed analysis

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 5

Page 6: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

TRAFFIC & TRANSIT ISSUES

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 6

Page 7: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

9%

15%

5%

8%

20%

29%29%29%29%

5%

4% 22%22%22%22%

15%

18%

29%29%29%29%2020%%2020%%

9%

9%

St. Elizabeth East & West CampusN

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

13%

10%

Vehicular Distribution

Date: 21 May, 2010

(Distribution does not include Transit & DHS Shuttle Trips)(Graphical Results are based on 2030 Alt-A TDFM Runs)

7

N

Page 8: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

DHS Campus Mode Split

Home (Mode of Departure) Destination - St.E's (Mode of Arrival)

M d P t /S lite Percentage/Split Mode Percentage/Split

18% SOV (SOV and Carpool Non-DHS) 21%

DHS 3% Carpool/Vanpool 12%

12% Dropped Off 2%12% Dropped Off 2%

pped Off 2%

xpress Bus 4% Commuter/Express Bus 4%

35% Shuttle 30%

7% Metro-Bus 6%

2%

1% Walk 9%

1% Bicycle 1%

0% Motorcycle 0%

5% Work from Home 5%

2% Didn't Work 2%

k Centers 4% Proposed Telework Center 4%

de 4% Agency Park & Ride 4%

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

100% Total 100%

8

Page 9: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Traffic Analysis2016 Build Level of Service

LEGENDModerately Congested Intersection

Heavily Congested Intersection

Severely Congested Intersection

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 9

N

Page 10: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

DHS Campus Employee Access Points

North

100

staf

f10

0 st

affNorth

LEGEND

3131Signalized Intersection

Unsignalized Intersection

DHS Campus Entry Points

4150 staff4150 staff485 staff485 staff

Points

DHS East-West Campus Transfer Point

DHS P d C tiDHS Ped Connections

3900 staff3900 staff

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 10

** Future retail along Pecan St. is shown according to District’s recommendations. It is not part of GSA/DHS project.

Page 11: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Proposed Shuttle AccessLEGENDCongress Heights Station – Pecan St

C H i ht

1

Congress Heights Station – Gate 4

Anacostia Station –Gate 4

Anacostia – Gate 1 1

ecan

St

ate

ecan

St

ate

e 2

e 2

Anacostia – Gate 1 METRO BUS

METRO BUS StopMM

METRO BUSMETRO BUS

DH

DHMM MM

Pe Ga

Pe Ga

Gat

eG

ate

11 HS SH

UTTLE

HS SH

UTTLE

Gat

e 1

Gat

e 1

Gate 4Gate 43 2

EE

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 11

N

Page 12: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Proposed Shuttle Access

Shuttle Trip Calculations

lPassengers

Shuttle Trips(40 person)

ShuttlesTravel Time(min)

Wait Time (min)

1) Congress Heights to Pecan Street1000 25 9 20 2.5

2) Congress Heights to Gate 4300 8 4 30 7.5

3) Anacostia to Gate 4800 20 10 30 3 0800 20 10 30 3.0

TOTAL2100 53 23

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 12

Page 13: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Firth Sterling Avenue

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 13

Page 14: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Firth Sterling Avenue / Access Road

N

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Alternative 1: “T” intersection

14

Alternative 2: “Thru” intersection

N

Page 15: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 15

Page 16: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Previous Proposed design

(No Bus Parking

Gate 5North

(No Bus Parking Proposed) Bus Turn

Around

South Bus StopGate 4

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 16

p

SITE PLANN

Page 17: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Previous Proposed Design

45’23’20’

68’- 0”

20’

POND CLEARPOND CLEAR ZONE

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 17

BUS BAY SOUTH - PLAN

SOUTHTURN

SOUTHNORTHBUSN

Page 18: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Previous Proposed Design

Clear Zone

3’-5”

Pond

45’

11’ 11’11’12’

23’

20’ 20’3’

68’- 0”’

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 18

BUS BAY SOUTH - SECTION

Page 19: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Previous Proposed Design

33’21’

54’

33’21’20’

CLEAR ZONE

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 19

NORTH – PLAN ( No Buses)

SOUTHTURN SOUTHNORTHN

Page 20: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Previous Proposed Design

P t l

Clear Zone7’ 6”

Patrol Path41’6 TW

11’ 11’11’

Zone3’-6”

7’-6”

32 BW34 BW

33’21’9’

54’- 0”

20’

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 20

NORTH SECTION ( No Buses)

Page 21: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Sawtooth bus stop

CemeteryCemetery

North Bus StopSouth Bus Stop

Gate 4

Gate 5

7 Bays3 Bays

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 21

7 Bays

SITE PLANN

Page 22: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Sawtooth bus stop

47’25’ 6’ 47’25’ 6’20’

78’- 0”

(+ 10’ -0”)

POND CLEARPOND CLEAR ZONE

BUS BAY SOUTHPrevious Proposed Condition

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 22

Previous Proposed Condition

BUS BAY SOUTH - PLAN

SOUTHTURN

SOUTHNORTHBUSN

Page 23: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Sawtooth bus stop

POND CLEAR ZONE

47’

25’ 6’20’

78’-0”

31’- 0”

11’14’ 11’ 11’

78 0

( +10’-0”)

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 23

BUS BAY SOUTH - SECTION

Page 24: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Sawtooth bus stop

Clear Z

12’-0”

Zone

20’-0”

Previous Proposed Design68’-0”

20’-0” 45’-0”3’-0”

Clear ZoneZone

20’-0”47’-0”

14’-0”

31’-0”

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 24

BUS BAY SOUTHComparative Analysis

Alternate 1 - Sawtooth 78’-0” ( +10’-0”)

31 0

Page 25: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Parallel bus stop

47’16’

63’- 0”

47’16’20’

(+ 9’ )

9’

( )

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 25

BUS BAY NORTH - PLAN

SOUTHTURN

SOUTHNORTHBUSN

Page 26: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Parallel bus stop

Patrol

Clear Zone

Patrol Path

7’-0”8’-0”

42 TW

11’ 11’11’9’

Zone

20’ 14’16’

3’-6”32 BW

34 BW

47’16’

63’- 0”

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 26

BUS BAY NORTH - SECTION

Page 27: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternate 1 - Parallel Bus Stop

Clear 7’ 6”

Patrol Path41’6 TW

9’

Zone3’-6”

20’

7’-6”

32 BW34 BW

9

54’- 0”

0

Patrol P th

54’- 0”Previous Proposed Design

21’ 33’

Clear Zone

Path

3’ 6”

7’-0”

Clear Zone8’-0”

42 TW

9’ 20’

3’-6”32 BW34 BW

16’ 47’

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 27

63’- 0”

BUS BAY NORTHComparative Analysis

(+9’-0”)Alternate 1 – Parallel Bus Stop

47

Page 28: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 2 – Parallel bus stop

C tCemetery

North Bus StopSouth Bus Stop

Gate 4

Gate 5

6 Bays4 Bays

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 28

6 Bays

SITE PLANN

Page 29: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 2 – Parallel bus stop

47’31’ 473120’

78’- 0”

(+ 10’ )

POND CLEARPOND CLEAR ZONE

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 29

SOUTHTURN

SOUTHNORTHBUS

BUS BAY SOUTHN

Page 30: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 2 – Parallel Bus Stop

Clear

3’-5”

Clear Zone

20’-0” 12’-0”

Previous Proposed Design68’-0”

45’-0”20’-0”3’-0”

Clear Zone

3’-5”

20’-0”

47’-0”31’-0”

14’-0”

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 30

BUS BAY SOUTHComparative Analysis

Alternate 1 – Parallel Bus Stop 78’-0” ( +10’)

Page 31: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 2 – Parallel bus stop

47’16’

63’- 0”

47’16’20’

(+ 9’ )

9’

( )

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 31

BUS BAY NORTH - PLAN

SOUTHTURN

SOUTHNORTHBUSN

Page 32: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternate 2 - Parallel Bus Stop

Clear 7’ 6”

Patrol Path

41’6 TW

9’

Zone3’-6”

20’

7’-6”

32 BW34 BW

9

54’- 0”

0

Patrol P th

54’- 0”Previous Proposed Design

33’21’

Clear Zone

Path

3’ 6”

7’-0”

Clear Zone8’-0”

42’TW

9’ 20’

3’-6”32’ BW

34’ BW

16’ 47’

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 32

63’- 0”

BUS BAY NORTHComparative Analysis

(+9’-0”)Alternate 2 – Parallel Bus Stop

47

Page 33: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Avoidance/Minimization Alternatives

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 33

Page 34: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

•Avoidance Alternative – A2B•Original 4(f)

Avoidance/Minimization Alternatives

•Original 4(f) •Safety issues along I-295 with weave issues at Malcolm X/I-295 and south•Volumes at Firth Sterling/Access Road results in deficient LOS

•Avoidance Alternative – Direct Access•Direct ramps to and from I-295 at West Campus Gate 4

•Violation of AASHTO Design Standards/DDOT Design Standards•FHWA/DDOT Policy Issues

• Minimization Alternative – Alt. 4 Re-alignment of I-295 – Requested by NPS 5-14-2010Minimization Alternative Alt. 4 Re alignment of I 295 Requested by NPS 5 14 2010•Access Roadway and I-295 realigned and move east

•Eliminates future abilities to expand I-295 capacity in the future•Construction/Maintenance operations would impact NPS property•Schedule to complete by 2016 not likelySchedule to complete by 2016 not likely

• Minimization Alternative – Alt. 2 Revised (4-13-2010)•One-way couplet between South Capitol Street and Access Road

•DHS/DDOT Programmatic Issues with heightened securityG t i i•Geometric issues

• Minimization Alternative – Requested by NPS (4-13-2010)•Swap South Capitol Street and I-295

•Geometric issues (Bolling AFB/Anacostia Naval Station, SCS/Suitland, etc)

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

( g )•Schedule to complete by 2016 not likely•Use of DDOT right-of-way not allowed for uses other than interstate facilities

34

Page 35: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Shepherd Parkway Avoidance / Minimization Alternativesat o te at es

Alternative A-2.B

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 35

Page 36: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Shepherd Parkway Avoidance / Minimization Alternatives

Alt ti A 2 B ti dAlternative A-2.B continued

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 36

Page 37: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Avoidance/Minimization AlternativesDirect Access

Features• Direct ramps to and from Interstate 295 at West Campus Gate 4• Attempts to remove/reduce impacts to park land

Issues• Violation of AASHTO Design Standards & DDOT Design Requirements• FHWA Policy / DDOT Policy Issues• Alignment of I‐295 direct ramps constrained by lateral clearance• Significant aerial structures required:Significant aerial structures required:

• view‐shed issues• major order‐of‐magnitude costs• constructability challenges

• Introduces problems safety, traffic operations due to ramp spacing

SummaryDirect Access Alternative will not satisfy Design Standards, Federal/local Policy requirements and has several similar issues to other avoidance alternatives.

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 37

Page 38: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Avoidance/Minimization AlternativesAlternative 4 – Re-alignment of I-295

F tFeatures• Access Roadway

and I-295 realigned and moved east

• Attempts to remove impacts to park landimpacts to park land

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 38

Page 39: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Within parkland Within parkland

Avoidance/Minimization AlternativesAlternative 4 – Re-alignment of I-295 - continued

10’ trail in park land(See Point B)

Realignment into park land

Realignment into park land

(See Point A) (See Point C)NB I-295 off-bound ramp

adjacent to park land (See Point D) – could be

maintenance issue

Begin SB I-295 realignment south

Begin NB I-295 realignment south Point A

Begin NB I-295 realignment north

Begin SB I-295 realignment north

SummaryAvoidance Alternative does not remove impacts to park land and does not meet safety and operations requirements. Due to scheduling issues, inability for DDOT to improve I-295 in the future, nor provide for maintenance of I 295 corridor and order ofnor provide for maintenance of I-295 corridor, and order-of-magnitude costs, to constructability issues this alternative does NOT meet the Purpose and Need.

P i BPoint C Point DPoint BPoint C Point D

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 39

Page 40: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Avoidance/Minimization AlternativesAlternative 2 Revised

Point A (see below)

Features• One way couplet between South Capitol Street and Access Road

Modification shown on next slidePoint A

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 40

Page 41: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Avoidance/Minimization AlternativesAlternative 2 Revised - continued

Point A (see below)

Point B (see below)

Features• Parallel roadway from Gate 4 to Gate 6Parallel roadway from Gate 4 to Gate 6• Minimized road profile

Summary:Alternative 2 Revised (one-way couplet) north of Gate 4 does not meet safety or operation requirements. It cannot provide uninterrupted NB safety or operation requirements. It cannot provide uninterrupted NB traffic in parallel facility. Point A

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 41

Point B

Page 42: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Interchange Alternatives

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 42

Page 43: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

NorthAlternative 1

• Same movements as today to/from I-295

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 43

Same movements as today to/from I 295

• Flyover ramp of Malcolm X Avenue for NB direction from Interstate to Access Road

Page 44: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

NorthAlternative 3

• Direct access to/from I-295 in all directions

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 44

Direct access to/from I 295 in all directions

• Flyover ramp of Malcolm X Avenue for NB direction from Interstate to Access Road

Page 45: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

North Alternative 1 Impacts

12-18-09(I-2 Alt) Draft 1 Draft 2 Draft 3 DEIS

4.4

2.1

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 45

6.5

Page 46: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

North Alternative 3 Impacts

12-18-09(I-2 Alt) Draft 1 Draft 2 Draft 3 DEIS

4.4

2.1

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 46

6.5

Page 47: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Next Steps

C t i f th li i D ft EIS June 24

Courtesy copies of the preliminary Draft EIS sent to consulting parties as well as review copies to cooperating agencies

Comments due from cooperating agencies July 7 Comments due from cooperating agencies and consulting parties

July 29 Start of 45-day public comment period for h f SJuly 29 the Draft EIS

September Public hearing and end of public comment period

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

p

47

Page 48: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

BACK-UP MATERIALS

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 48

Page 49: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 1 – Parallel bus stop

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 49

Page 50: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

Access Road Alternative 2 – Sawtooth bus stop

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements 50

Page 51: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Gate 651

Page 52: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

5.89’-(3’)

20’-0”9’-0”5’-0” 1’-6” 56’-0”

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Security Patrol path – Access RoadFebruary 19, 2010

LOD 35’-6”(-10’-0”)

52

Page 53: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Gate 453

Page 54: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Gate 454

Page 55: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Gate 455

Page 56: Traffic-Transit Slides CP Presentation May 25 2010 Finalassets.stelizabethsdevelopment.com/documents/document... · 2010. 6. 2. · xpress Bus 4% Commuter/Express Bus 4% 35% Shuttle

May 25th, 2010DHS Consolidation at St. ElizabethsWest Campus Transportation Elements

Gate 456


Recommended