TELKOM IMS Training Report
training material
2nd day
1. Continue SIP Protocol
2. OSTA2.0 Hardware System
3. CGP Introduction
4. CGP General Operation and Maintenance
18 October 2011 1
- Hari Lo
- Zukhri supriyono
- Zulaikah
- Rendy
- Wilvan
Report Date
CN Team
PT.Telekomunikasi Indonesia TbkOperatort Name:
Subject
descriptionmaterial
Header Fields
1.Via
2.Supported
3.Content Length/Content Type
4.Expires
5. Max Forwards and User Agent
6. Extension Header
1. OSTA Platform
2. Rack
3. Hardware Components
4. Full Rack Configuration (Integrated Rack, Service
Rack, Network Rack)
5. T8280 Sub Rack
6. Master Rack Monitoring Unit
Bord Introduction
1.Overview of OSTA board
2.Equipment Management Subsystem
3.Switching Subsystem
4. Processor Subsystem
5. Electromechanical Subsystem
SIP Application in IMS
1.Main Procedure in IMS Application (session
setup,media negotiotian)
2.Route in IMS Signaling Flow
OSTA Indtroduction
4/13/2013 华为机密,未经许可不得扩散 第1页,共13页
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 2/13
Telkomsel IN Daily Report(template) 内部公开
2.3
2.4
2.5
3.1
3.2
3.3
3.4
4.1
4.2
4.3 KVM over IP1. Login KVM over IP
2. Login to the Board
OSTA Hardware O&M
1. Power System Checking
2. Fan Box Checking
3. Board Checking
4. Port Checking
System Architecture
1. CGP Software
2. CGP Software Architecture
3. Operation and Management Nes
iLMT introduction
Alarm Flow
1. Main Panel
2. Device Panel
3. Batch Command Operation
4. Batch Command Setting
5. Batch Command Execute
6. Export ME Configuration File
7. List Event Log File
8. List Alarm Log File
Interfaces
.
2. Northbound Interface
3. Function of the Northbound Interface
Function and Features
1. CGP Function ( Manageing of Configuration,
Performance, security, Log, signaling, and Fault)
2. MML Command Saving
3. FTTPS Function
1. Hardware Alarm Classification
2. Board Alarm Report Path
3. Disk Array Alarm Report Path
4. Software Alarm Classification
5. Software Alarm report Path
Product Positioning
1.Location of the CGP
2.Logging in to The CGP3.Navigation Tree
4.CGP Client Interface
5.CGP Processes
Software Architecture1.Operating System
2. Carrier Grade Platform (CGP)
Signaling Cable
1. System Connection
2. OMU Back Slot Bord Connection
3. Cascading Mode
4. Broadband Signaling Processing Board
5. PDB Monitor Serial Cable Connection
6. Connections Between iCG981/MediaX3600 andS2600F disk Array
7. Connection Between HSS and S2600F Disk Array
4/13/2013 华为机密,未经许可不得扩散 第2页,共13页
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 3/13
Telkomsel IN Daily Report(template) 内部公开
4.4 Serial Over IP 1. Serial over IP Operation
4/13/2013 华为机密,未经许可不得扩散 第3页,共13页
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 4/13
Telkomsel IN Daily Report(template) 内部公开
9.00-10.30
8 October 2011
kongzhigang
time
4/13/2013 华为机密,未经许可不得扩散 第4页,共13页
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 5/13
Telkomsel IN Daily Report(template) 内部公开
10.30-14.30
14.30-17.00
17.00-18.00
4/13/2013 华为机密,未经许可不得扩散 第5页,共13页
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 6/13
Telkomsel IN Daily Report(template) 内部公开
4/13/2013 华为机密,未经许可不得扩散 第6页,共13页
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 7/13
CO site nameSite
type(indoor/outdoor) Actual CO Date
CO
Status(finish/pending)
RL_TJR_kimstar outdoor 1-Aug-11 finish
Tnajung Batu 1 indoor
Tanjung Batu 2 indoor
RW_SPL otdoor 11-12 aug 2011 finish
RBE_sentrum outdoor 22-08-2011 finish
MRT_TJM--
>172.29.47.29outdoor 23-08-2011 finish
MRA_PUBA outdoor 24-08-2011 finsh
JTN Tahap 5 VIP
subscriber indoor 22-08-2011 finish
11-Aug-11 finish
MIGRATION C5
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 8/13
46
45
44
43 0 1 2 3 4 5 6 7 8 9 10 11 12 13
42
41
40
39
38
37
36
35
3433
32
31
30
29 1U
28 1U
27 1U
26 1U
25 1U
24 1U
23 0 1 2 3 4 5 6 7 8 9 10 11 12 13
22
21
20
19
18
17
16
1514
13
12
11
10
9 FAN1
U P B A 5 / G B U 0 1
U P B A 1 / O M U
S W U A 1
S W U A 1
U P B A 5 / G B U 0 1
U P B A 5 / G B U 0 1
U P B A 5 / G B U 0 1
U P B A 0 / G C U 1 0
0
U P B A 0 / G C U 1 0
0
U P B A 0 / G C U 1 0
0
U P B A 0 / G C U 1 0
0
U P B A 1 / O M U
S W I A 1
S W I A 1
U S I A 1
U S I A 1
U S I A 1
U S I A 1
Basic
Subrack (0)14U
U S I A 1
U S I A 1
U S I A 7
U S I A 7
Cabling Trough
LAN Switch (LSW00)
Cabling Trough
Dummy Panel
LAN Switch (LSW01)
Extended
Subrack (1)14U
3U Power Distribution Box
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 9/13
8
7
6
5
4
3
2
1
Air intake vent
SMM1 SMM29U
FAN2
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 10/13
for XPTU to Lig OAM
0 1 2 3 4 5 6
Expansi on 15 august
From 2nd BOQ expansion
F r o n t
U P B A 0 / G C U 1 0
0
U P B A 0 / G C U 1 0
0
U P B A 0 / G C U 1 0
0
U P B A 0 / G C U 1 0
0
U P B A 1 / O M U
U P B A 1 / O M U
S W U A 1
U S I A 7
U S I A 7
S W I A 1
B a c k
U S I A 1
U S I A 1
F r o n t
ignaling to LS/route
B a c k
U S I A 1
U S I A 1
U S I A 7
U S I A 7
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 11/13
.
s l a v e
m a s t e r
s l a v e
m a s t e r
s l a v e
m a s t e r
m a s t e r
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 12/13
to LS/router
Billing center
7 8 9 10 11 12 13
U P B A 5 / G B U 0 1
U P B A 5 / G B U 0 1
U P B A 5 / G B U 0 1
U P B A 5 / G B U 0 1
S W U A 1
U S I A 1
U S I A 1
U S I A 1
S W I A 1
U S I A 1
U S I A 1
U S I A 1
7/28/2019 Training Day 2
http://slidepdf.com/reader/full/training-day-2 13/13
m a s t e r
s l a v e
s l a v e
m a s t e r
s l a v e