+ All Categories
Home > Documents > TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension...

TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension...

Date post: 01-Apr-2015
Category:
Upload: meghan-cotman
View: 214 times
Download: 0 times
Share this document with a friend
15
TRAINING SESSION MACERATA 14 of June 2011
Transcript
Page 1: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

TRAINING SESSION

MACERATA

14 of June 2011

Page 2: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

Civil Protection Provincial Civil Protection Provincial Program Program

Wildfire prevensionWildfire prevension (A.I.B.) 2011(A.I.B.) 2011

14 of Jube 2011

Page 3: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

77 Days in High risk period77 Days in High risk period

fromfrom 01 of July01 of Julytoto 15 15 of of SeptemberSeptember

Page 4: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

Tables: Forest heritage, water availability, wildfire frequency and influence – Tables: Forest heritage, water availability, wildfire frequency and influence – Central table: areas with different risks of forest firesCentral table: areas with different risks of forest fires

Page 5: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.
Page 6: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.
Page 7: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

Watch station(Forest-fires)

Watch station(Forest-fires)

Starting fire

Starting fire

Macerata’s E.O.C.Macerata’s E.O.C.

Fire Fire BrigadesBrigades

Forest Rangers

MOBILE UNITS MOBILE UNITS

CAN EXTINGUISH FIRECAN EXTINGUISH FIRE

END EVENTEND EVENT

MAYORMAYOR

Regional E.O.C.

Regional E.O.C.

PRESIDENT of the Province

PRESIDENT of the Province

assessment

CANNOT EXTINGUISH FIRECANNOT EXTINGUISH FIRE

SUMMONS

COMMITTEE OF COMMITTEE OF

CIVIL PROTECTION CIVIL PROTECTION

AT MACERATA’S AT MACERATA’S

E.O.C.E.O.C.

Alert via radio

In radio contact

ATTENTION – PRE-ALERT

Attention phase

Pre-alert phase

Page 8: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

88SIGHTING POINTSIGHTING POINT

Page 9: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

EQUIPMENT USED BY VOLUNTEERS IN THE SIGHTING POINTEQUIPMENT USED BY VOLUNTEERS IN THE SIGHTING POINT

Binoculars

Compass

Two –way Radio

Mapping and photographic overview of the area

Instructions for performing the service: two-way radio service codes, telephone numbers, complete list of shifts planned

Guidelines for proper and safe stay in the remote mountain village

Page 10: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

11

4466

55

22

33

66MOBILE UNITSMOBILE UNITS

(ZEBRA)(ZEBRA)

Page 11: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

ATTREZZATURE IN USO DAI VOLONTARI NELLEATTREZZATURE IN USO DAI VOLONTARI NELLE

UNITA’ MOBILIUNITA’ MOBILI

Two-way radio

Appropriate equipment (blowers and fire extinguishers) to extinguish small fires.

Instructions to conduction of the program: two-way radio service codes, telephone numbers, complete list of shifts planned

Page 12: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

S.O.I.S.O.I.INTEGRATED OPERATING ROOM INTEGRATED OPERATING ROOM

GARRISON FOR COORDINATIONGARRISON FOR COORDINATION

Page 13: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

4 WEBCAMS4 WEBCAMS

Page 14: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

3

1

2

33

11

22

4466

55 3 (NOS)3 (NOS)First Aid MduleFirst Aid Mdule

Page 15: TRAINING SESSION MACERATA 14 of June 2011. Civil Protection Provincial Program Wildfire prevension (A.I.B.) 2011 (A.I.B.) 2011 14 of Jube 2011.

Monte Vermenone

Monte Gemmo

ZEBRA

ZEBRA CON AIB 2° Level

Mente La Pereta

First Aid Modules First Aid Modules “NOS” CON AIB 2° “NOS” CON AIB 2°

levellevel

Sighting Point

Mobile Mobile Unite: Unite: ZebraZebra

S.O.I.S.O.I.

Estinguish

S.O.U.P.S.O.U.P.

1

Signal

Small fireo

WildfireEvaluationDon’t try to estinguish

Start up

NOS

ORGANIZATION OF VOLUNTEERS


Recommended