Trans-loading Facility and Silos Project Construction Notification Staff Rooms and Winch Shelter November 2, 2017 Dear Community Member: Project construction for Columbia Containers Ltd.’s Grain Trans-loading Facility and Silos project (permit PP 2013-123 from the Vancouver Fraser Port Authority) at 2275 Commissioner Street has been underway since April 2017. An area of 1200sf is being added to the project to house a collection of small staff rooms: a first aid room, change rooms, lunch room, and a single office. A winch shelter has also been added to protect the winch machinery from weather. Staff Rooms Current staff rooms are in temporary trailers New rooms are integrated into a second floor on the receiving shed Design eliminates hazards of crossing tracks at grade Incorporation into receiving shed frees up valuable space in the yard Comment [LC1]: What is the red arrow supposed to be pointing to?
Transcript
Page 1: Trans-loading Facility and Silos Project Construction ... · Trans-loading Facility and Silos Project Construction Notification Staff Rooms and Winch Shelter November 2, 2017 Winch

Trans-loadingFacilityandSilosProjectConstructionNotificationStaffRoomsandWinchShelter

November2,2017

DearCommunityMember:

ProjectconstructionforColumbiaContainersLtd.’sGrainTrans-loadingFacilityandSilosproject(permitPP2013-123fromtheVancouverFraserPortAuthority)at2275CommissionerStreethasbeenunderwaysinceApril2017.Anareaof1200sfisbeingaddedtotheprojecttohouseacollectionofsmallstaffrooms:afirstaidroom,changerooms,lunchroom,andasingleoffice.Awinchshelterhasalsobeenaddedtoprotectthewinchmachineryfromweather.

StaffRooms

• Currentstaffroomsareintemporarytrailers• Newroomsareintegratedintoasecondflooronthereceivingshed• Designeliminateshazardsofcrossingtracksatgrade• Incorporationintoreceivingshedfreesupvaluablespaceintheyard

Comment[LC1]:Whatistheredarrowsupposedtobe

pointingto?

Page 2: Trans-loading Facility and Silos Project Construction ... · Trans-loading Facility and Silos Project Construction Notification Staff Rooms and Winch Shelter November 2, 2017 Winch

Trans-loadingFacilityandSilosProjectConstructionNotificationStaffRoomsandWinchShelter

November2,2017

WinchShelter

• Anaddedshelterisrequiredoverawinchlocatedontopofthereceivingshed• Thewinchisusedtoraisecontainersforunloadingintothereceivinghoppers• Theshelterwillprovideweatherprotectionfortheequipmentandrailshed• Regularmaintenancecanbehandledwithinacontrolledandsafeenvironment

ConstructionImpacts

ThereceivingshedadditionsofthestaffroomandwinchshelterwillbeincorporatedwithintheGrainTrans-loadingFacilityprojectwhichiscurrentlyundergoingconstruction.TheoverallprojectisexpectedtobecompletebyApril30,2018.Specificallythestaffrooms

Page 3: Trans-loading Facility and Silos Project Construction ... · Trans-loading Facility and Silos Project Construction Notification Staff Rooms and Winch Shelter November 2, 2017 Winch

Trans-loadingFacilityandSilosProjectConstructionNotificationStaffRoomsandWinchShelter

November2,2017

andwinchshelterworkwillbegininthelastweekofNovember2017andbecompetedinthefirstquarterof2018.TheworkwillbecarriedoutMondaytoFridayfrom9:00amto5:00pm.

Theworkisnotexpectedtoimpactresidentialtrafficnorresultinanelevationofnoise,dustornightlighting.

Page 4: Trans-loading Facility and Silos Project Construction ... · Trans-loading Facility and Silos Project Construction Notification Staff Rooms and Winch Shelter November 2, 2017 Winch

Trans-loadingFacilityandSilosProjectConstructionNotificationStaffRoomsandWinchShelter

November2,2017

NeighbourhoodImpacts

Oncecompleted,theadditionsareexpectedtohaveminimalviewandlightimpactstothecommunitybecausethefutureelevatortothesouthwillshieldmostoftheadditionsfromview.Furtherthechangesarecontainedwithinthevisualenvelopeoftheelevatorstructure,andwillbeinkeepingwiththecharacterofsuchanindustrialfacility.AddedlightingisminimalandmeetstheEastVancouverPortLandsandLiaisonCommittee(EVPL)lightingpolicies.Thewinchcoverwillshieldanylightingrequiredduringnighttimemaintenance,andassuchitactstoreducelightingemittedfromthefacility.

ContactUs

Ifyouhaveanyconcernsorquestions,pleasedonothesitatetocontactDeanGilesat(604)[email protected],pleasevisithttp://www.columbiacontainers.com/rebuild.ForquestionsregardingtheVancouverFraserPortAuthority’spermittingprocess,pleasecontacttheirPermitCommentsLineat(604)[email protected],GeneralManager ColumbiaContainersConstructionSiteLocation