+ All Categories
Home > Documents > Transformer+repair+pres

Transformer+repair+pres

Date post: 06-Mar-2016
Category:
Upload: tapas
View: 3 times
Download: 0 times
Share this document with a friend
Description:
transformer repair guidelines

of 20

Transcript
  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    -

    5

    /

    1

    5

    /

    2

    0

    0

    6

    ABB Power Products Division

    Product Group Transformer Service

    ABB Transformer On Site Repair

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    2

    -

    On Site Repair of Power Transformers

    Contents ABB brings the factory to the site The true value of site repair Our unique state-of-the-art repair processes Quality assured Site repair references and cases

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    3

    -

    ABB brings the factory to the site

    We bring all the key characteristics of a power transformer factory to the site when carrying out a full winding change:Clean environmentHeavy lifting capacityExperienced teams of skilled workersSpecial tools and fixturesDrying capabilitiesTesting capabilities

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    4

    -

    The true value of On Site RepairReduce down-time and minimize risk No heavy transport involved. The transformer remains on-site so risk of transport

    damage is removed

    Site repair is a faster way to get the unit back into service. Typical time savings range from 30 to 90 days.

    Infrastructure limitations sometimes provide for no other option than site repair

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    5

    -

    ABB has pooled its experience across 36 servicecenters on 5 continents to identify the latest and most practical technology and processes for quality assured site repair

    We commence with an initial customer consultation: Scope of repair up to full winding replacement / core

    rework What environment is available / shall be provided Lifting solutions available / shall be provided Customer preferences e.g. for drying Agree a final test schedule

    ABB unique state-of-the-art processes

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    6

    -

    ABB On Site Repair menu

    Workshop a range of temporary or permanent structures as required

    Lifting mobile solution up to 500 tons

    Core mobile core rework

    Drying using latest Low Frequency Heating technology as an option

    Testing leading edge mobile High Voltage test field

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    7

    -

    Documented depth of process knowledge

    ABBs site repair of power transformers is a global solution. Our experts around the world access the same source of documented process knowledge: Academic articles

    Guidelines

    Method Provisions

    Process descriptions

    Technical standards

    Training modules

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    8

    -

    Quality assured for site repair ABBs TrafoStar philosophy

    is carried over to site repair All possible care is taken to

    minimize moisture content in the active part

    Quality assured means zero failures after more than 200 site repairs

    Test failures are also close to zero

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    9

    -

    The quality requirements must be the same as those used in the factory

    All the materials transported from factory to site must be protected and carefully packaged

    All work must be performed correct first time around, no rework

    All of the procedures and processes must be strictly followed

    The quality rules by which we work - 1

    above: windings in transit

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    0

    -

    The active part assembly area shall be a clean environment controlled access

    controlled environment,

    shoe protection

    The active part assembly area kept at positive air pressure

    The quality and safety requirements shall be rigidly enforced

    Zero failure on all tests

    The quality rules by which we work - 2

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    1

    -

    Site repair references and cases 1

    ABB has repaired more than 200 power transformers on-site globally during the last 15 years

    The largest units have been up to 750 MVA, 800 kV ac and 600 kV dc

    ABB has repaired numerous ABB legacy brands but also many competitors units

    In Western Europe, Eastern Europe, Americas, Middle East & North Africa

    Core type, shell type, single phase, 3-phase, GSU, autotransformers, converter, reactors, HVDC

    Utility and industrial customers

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    2

    -

    Site repair references and cases 2 Ref listsrepairing all brands since more than 15 years

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    3

    -

    Site repair examples

    NEKA IranRepaired by ABB/DETFO4 GSU Transformers520 MVA, 420 kV

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    4

    -

    Site repair examples

    South Steel MalaysiaRepaired by ABB/DETFO

    Rectifier transformer ABB/IT68 MVA, 33 kV

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    5

    -

    Site repair examples

    NASA ArgentinaUHE Rio Grande

    GSU Transformer BBC/DE440 MVA, 550 kV

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    6

    -

    Site repair examples

    NPP, SpainAlmaraz

    GSU Transformer 400 MVA, 420 kV

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    7

    -

    ENEL Italy

    GSU Transformer100 MVA, 240 kV

    Site repair examples

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    8

    -

    Site repair examples

    Furnas BrazilFoz do Iguau

    Convertor Transformer314 MVA, 600 kV

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    1

    9

    -

    Site repair examples

    Light, Rio de JaneiroRefurbishment programRegulating Transformers

    40 MVA, 138 kV

  • A

    B

    B

    B

    A

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    s

    -

    2

    0

    -


Recommended