TRANSFORMING AIR QUALITY COMPLIANCE USING MATERIAL MANAGEMENT SYSTEMS Joint Services Environmental Management Conference & Exposition 2006 David Hansell EMAssist, Inc [email protected] 801-775-6902 Steve Rasmussen 75 ABW/CEG/CEVC [email protected] 801-777-0359 Bonnie Hobster 75 ABW/CEG/CEVC [email protected] 801-777-5041 Kathy Garrett EMAssist, Inc [email protected] 801-777-1866 Glenn Palmer 75 ABW/CEG/CEVOC [email protected] 801-775-6918
Transcript

TRANSFORMING AIR QUALITY COMPLIANCE USING MATERIAL

MANAGEMENT SYSTEMS

Joint Services Environmental ManagementConference & Exposition

2006

David HansellEMAssist, Inc

[email protected]

Steve Rasmussen75 ABW/CEG/CEVC

[email protected]

Bonnie Hobster75 ABW/CEG/CEVC

[email protected] Kathy Garrett

EMAssist, [email protected]

801-777-1866

Glenn Palmer75 ABW/CEG/CEVOC

[email protected]

Ogden Air Logistics Center

Presentation Overview

BackgroundPhase I – Implementation Completed

Project SummaryProject Details

Data SystemsData Cleanup and SetupBusiness PracticesReports and RecordsAudits

Phase II – Implementation In ProgressEnterprise Environmental Safety and Occupational Health Management Information System (EESOH-MIS)

Conclusions

Ogden Air Logistics Center

BackgroundGeography and Location

Ogden Air Logistics Center

BackgroundAir Requirements Related to Materials

Over 50 of the 90 Conditions in the Hill AFB Title V Permit Require Documentation and Monitoring of Materials

Pollutant Concentration LimitsSulfur, Volatile Organic Compounds, and Hazardous Air Pollutants

Vapor Pressure LimitsMaterial Consumption LimitsTiered Process Controls based on Material and Operation Type

Annual Air Emission Inventory Requires Tracking of Material Throughputs by Process for Over 1,000 Processes

Ogden Air Logistics Center

BackgroundExtensive Documentation Required

Documenting Air Compliance using Material Logs was a Major Task at Hill AFB:

> 500,000 Hazardous Material Issues per Year> 7,000 Different Active Hazardous Materials> 1,400 New Hazardous Materials each Year> 1,000 Processes of Concern for AirNumerous Shop Personnel

Logs Required Entry of Various Parameters Daily by Material

Ogden Air Logistics Center

Project SummarySolution

Process 1

Process 2

Process N

Process 1

Process 2

Process N

Process 1

Process 2

Process N

Local Warehouse 1

Local Warehouse 2

Local Warehouse N

Central Warehouse

Material Ordered

Old Approach:

HM Information Recorded on Logs at each Process by Operator

New Approach:

Use existing data systems instead of logs by adding HM tracking to processes, additional HM characterization, and revised business practices.

Industrial Organizations

Request Material

Hazardous Material Group

Supply Group

Authorized -Yes

Authorized -No

Ogden Air Logistics Center

Project SummaryResults

Existing Data Systems were used to Eliminate Material LogsImproved Material ControlReduced Risk of Non-ComplianceReduce Burden on Organizations

e.g., Aerospace NESHAP Surface Coating Recordkeeping Burden Reduced by 250 hrs per month

Requirements vs. Resources

2000 2001 2002 2003 2004 2005 2006 2007

Requirements

Resources

Ogden Air Logistics Center

Unique Process

Chemical DataMaterial ProductMaterial Issues

Source CategoryParameters

Emission Factors

Define Algorithm

Build Algorithm

Emission UnitsEquipment

StacksTanks

Controls

Regulatory Compliance

Regulatory Documents

Applicable Requirements

ChecklistsInspections

NESHAP

Annual AirEmission Inventory

Compliance

Air Management ToolData ManipulationCustom Reports

Data SystemsAir Program Information Management System

(APIMS)

Ogden Air Logistics Center

Data SystemsHazardous Material Management System

(HMMS)

Hazardous Material Management System (HMMS).

HM information populated from Material Data Safety Sheet (MSDS), Manufacturer, Engineering CalculationsHM issues to Zone and Activities/Processes are recorded.

Ogden Air Logistics Center

Data SystemsLinking APIMS and HMMS

Zone 1

Zone 2

Zone 3

Materials in a Zone are Assigned to Bio

Processes/ Activities

Local Warehouse

Issue

HMMS APIMS

Painting Wing

Cleaning

Sealing parts

Chemical Stripping Unit 1

Degreaser 1

Paint Booth 1

BioProcesses/

Activities are Assigned to Air

Processes

Ogden Air Logistics Center

Data System Cleanup/SetupCharacterize Materials

To demonstrate compliance with air regulations various information must be available for each material.

Material TypeHigh Vapor Pressure Solvent, Top Coat, Primer, Specialty Coating, etc

VOC ContentHAP ContentVapor Pressure

Must be calculated at standard temperature which may vary depending on the rule

Ogden Air Logistics Center

Data System Cleanup/SetupIssue to Process

An evaluation of each process is conducted to determine which materials can be used.

Applicable Air Requirements Based on Process Typee.g., Vapor Degreaser, Aerospace Paint Booth, NSPS Boiler, etc.

Other Applicable Requirementse.g., Bio Engineering, Safety, Occupational Health, Waste, etc.

Material link to process is hard coded in the system.

Ogden Air Logistics Center

Business Practices

Mixed Operations Apply Most Stringent Requirements

e.g., Paint Booths which apply coatings to aerospace and non-aerospace items are subject to aerospace controls at all times during operation.

Only Use Hazardous Materials as Specified in the Authorization Request

As Applied Material Characteristics can be Obtained from HMMS

All Hazardous Materials must be Authorized Before Use and Issues must be Recorded in HMMS

Ogden Air Logistics Center

Records/Reports

Monthly Consumption RecordsCoatingsHigh Vapor Pressure Solvents Other SolventsChemical Stripper Process Type

Annual Air Emission Inventory

Ogden Air Logistics Center

Records/ReportsSolvent Example

Ogden Air Logistics Center

Audits

Audits are Necessary to EnsureMaterial Characterization is CorrectMaterials are Getting to the Correct ProcessBusiness Practices are Followed

Hazardous Materials Group Audits (Existing)~95 HDSCs per Semi-Annual Period

Air Group Audits (New)~900 Processes Annually

Ogden Air Logistics Center

A revolutionary change in doing business:Web-based front-end.Greater exchange of information.More consistent data.Minimizes multiple entries of data.

Status of Implementation at Hill AFBHazardous Materials Complete by End of May 2006Hazardous Waste Proposed to Start in Fall 2006Air Proposed to Start in Late 2007/Early 2008

Phase IIEESOH-MIS

Ogden Air Logistics Center

Phase IIEESOH-MIS Single Integrated System

Air Emission

Waste

MaterialRecycle

Sludge

Vapor Degreaser

Distillation Unit

Air Emissions

Ogden Air Logistics Center

Summary

Phase I - Material Logs EliminatedFocus on Primary MissionCost of Documenting and Maintaining Compliance ReducedReduced the Risk of Non-Compliance

Phase II - EESOH-MIS ImplementationIntegration of Multiple Stove Pipe Data Systems

Air, Water, HazMat, HazWaste, EPCRA, Spills, Industrial Hygiene, Public Health, Ground Safety, etc.

HMMS will be replaced by EESOH-MIS HM by May 2006.