1
TRANSFORMING NAVALTRANSFORMING NAVALPOWER PROJECTIONPOWER PROJECTION
2
Developing Joint Seabasing CapabilitiesDeveloping Joint Seabasing CapabilitiesDeveloping Joint Seabasing CapabilitiesDeveloping Joint Seabasing Capabilities
NationalSecurityStrategy
NationalSecurityStrategy
JointJointOperationalOperational
ConceptConceptJointJoint
Seabasing Seabasing ~~
Joint Joint ForcibleForcible EntryEntry
NavalOperational
Concept
Sea Power21
Joint SeabasingJoint Seabasing
ForceNetForceNet
SeaSeaStrikeStrike
~~EMWEMW
SeaSeaShieldShield
SeaSeaBaseBase
~~EMWEMW
Integrating
Jointness... Warfighting... Resource Allocation
• Joint Capabilities Integration & Development System (JCIDS)
• War Plan Needs
• Integrated Priority Lists • Capabilities
• Assessments
NationalDefenseStrategy
NationalDefenseStrategy
•JROC Future Capabilities Boards•Navy Requirements Oversight Council
•Marine Requirements Oversight Council•Navy-Marine Corps Board•Army-Marine Corps Board
•Naval Capabilities Development Process•Expeditionary Force Development System
3
Naval Power 21Naval Power 21Naval Power 21Naval Power 21
Joint SeabasingJoint Seabasing
ForceNetForceNet
SeaSeaStrikeStrikeEMWEMW
SeaSeaShieldShield
SeaSeaBaseBaseEMWEMW
LCSLCSSSNSSNDDGDDG
DD(X)DD(X)CG(X)CG(X)
CVN-21CVN-21LHA(R)LHA(R)LPD-17LPD-17MPF(F)MPF(F)HSCsHSCsT-AKET-AKE
TAOE(X)TAOE(X)
4
JOINT CHALLENGES JOINT CHALLENGES JOINT CHALLENGES JOINT CHALLENGES
Access
Speed of Response
Footprint Ashore
5
Meeting the ChallengeMeeting the ChallengeMeeting the ChallengeMeeting the Challenge
0.0
0.5
1.0
1.5
2.0
2.5
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
MarineExpeditionary
BrigadeEquivalents
Operation Iraqi Freedom
Days
Sea Basing TodaySea Basing Today
6
Meeting the ChallengeMeeting the ChallengeRapid Force ClosureRapid Force Closure
Meeting the ChallengeMeeting the ChallengeRapid Force ClosureRapid Force Closure
Sea Basing TomorrowSea Basing Tomorrow
2015 +Seabasing
Days
MarineExpeditionary
BrigadeEquivalents
0.0
0.5
1.0
1.5
2.0
2.5
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
7
Maritime Force PackagesMaritime Force PackagesMaritime Force PackagesMaritime Force Packages
Rapid – Meeting the Challenge - Crisis Response Across the SpectrumRapid – Meeting the Challenge - Crisis Response Across the Spectrum
24 APR 02 4N75
GLOBAL CONCEPT OF OPERATIONS
CVBG
ARG/MEU(SOC)
Middle East Force SAG
Expeditionary Strike Groups
Carrier Strike Groups
SSGN/SOFStrike Force
Theater BallisticMissile Defense
Surface Action Groups
19 independentStrike groups
Afloat ForwardStaging Base
12
7
37 independentStrike groups
12
12
9
4
4
Critical Regions
Presence with a Purpose
2
Defeat The Efforts
1
Win Decisively
Independent Strike Groups
CSG
SurgeExpeditionary
Strike Force
ESG
SurgeExpeditionary
Strike Force
CSG
ESG
MaritimePrepositioning
Group
MaritimePrepositioning
GroupCSGESG
8
2015 MEB2015 MEB14,400 Marines & Sailors14,400 Marines & Sailors
2015 MEB2015 MEB14,400 Marines & Sailors14,400 Marines & Sailors
Sustained OperationsSustained OperationsAshore Echelon (SOAE)Ashore Echelon (SOAE)
~ 6700~ 6700
Seabased Support Seabased Support ElementElement~ 3400~ 3400
Seabased ManeuverSeabased ManeuverElementElement~ 4300~ 4300
Reduced Footprint...Reduced Footprint...
9
THE JOINT SEA BASETHE JOINT SEA BASEAssuring AccessAssuring Access
THE JOINT SEA BASETHE JOINT SEA BASEAssuring AccessAssuring Access
10
Transforming Defense AcquisitionTransforming Defense AcquisitionTransforming Defense AcquisitionTransforming Defense Acquisition
Old Process - SequentialOld Process - Sequential
MS0
MSI
MSII
MSIII
(Production)
Delivery
MS0
MSA
MSB
MSC (Production)
Delivery
New Process – Concurrent (Spiral)New Process – Concurrent (Spiral)
User needs and technology opportunities
Transformation Requires Risk Management ApproachTransformation Requires Risk Management ApproachTo Technology In System DevelopmentTo Technology In System Development
(DoDI 5000.2, Oct 2000)
(DoDI 5000.2 May 2003)
11
Seabasing TimelineSeabasing TimelineSeabasing TimelineSeabasing Timeline
20152015 20202020 202520252010201020052005
FYDPFYDP
IOCIOC
IOCIOC
IOCIOC
TransformationTransformationTransitionTransition
IOCIOC
IOCIOC
IOCIOC
IOCIOC
IOCIOC
IOCIOC
Class / Qty
CVN-21 / 1CVN-21 / 1
LHA(R) / 1LHA(R) / 1
LPD-17 / 6LPD-17 / 6
MPF(F) / 3MPF(F) / 3
DDX / 7DDX / 7
LCS / 11LCS / 11
2015 MEB2015 MEB
EFV / 96EFV / 96
MV-22 / 124MV-22 / 124
JSF STOVL /58JSF STOVL /58
12
Sea Basing: Joint Power ProjectionSea Basing: Joint Power ProjectionSea Basing: Joint Power ProjectionSea Basing: Joint Power Projection
Access Assurance
Rapid Force Closure
Reduced Footprint Ashore
Anytime... Any PlaceAnytime... Any Place- The Perfect Storm -- The Perfect Storm -
13
??
14
PB05 Ship ProcurementPB05 Ship ProcurementPB05 Ship ProcurementPB05 Ship Procurement
Ships - Qty FY04 FY05 FY06 FY07 FY08 FY09 Total
CVN 21 0 0 0 1 0 0 1SSN 774 1 1 1 1 1 2 7DDG 51 3 3 0 0 0 0 6DD(X) 0 1 0 2 2 3 8LPD 17 1 1 1 1 1 1 6LHA (R) 0 0 0 0 1 0 1LCS 0 1 2 1 3 6 13T-AOE(X) 0 0 0 0 0 2 2T-AKE 2 2 2 1 0 0 7MPF(F) 0 0 0 1 0 2 3MPF Aviation 0 0 0 0 0 1 1Total 7 9 6 8 8 17 55
Total Investment $B as of 28 Jan 04 $12.1 $11.1 $10.1 $14.3 $17.4 $21.1 $73.9
Includes:
RDTEN - New Constuction investement
SCN - New Construction, Conversion/Overhaul, Prior Year & Outfitting
National Defense Sealift Fund - new construction and R&D funded construction
15
PB05 Craft ProcurementPB05 Craft ProcurementPB05 Craft ProcurementPB05 Craft Procurement
Craft - Qty FY04 FY05 FY06 FY07 FY08 FY09 Total
LCAC SLEP 4 5 6 6 6 6 33LCU(R) 0 1 1 3 3 4 12HSV/HSC 0 0 0 0 1 0 1Total 4 6 7 9 10 10 46