The following pages depict the high density development that has occurred within a half-mile walk of rail and Flatiron Flyer stations, both shortly before and following the opening of the transit lines.
2
OverviewP. 3 Central
P. 4 L Line, Part I
P. 5 L Line, Part II
P. 6 Central Platte Valley
P. 7 Southwest
P. 8 Southeast, Part I
P. 9 Southeast, Part II
P. 10 Southeast, Part III
P. 11 W Line
P. 12 CU A Line
P. 13 Northwest
P. 14 G Line
P. 15 Flatiron Flyer
P. 16 R Line
P. 17 Denver Union Station
P. 18 Summary
Central
Downtown Development
Wellington Apartments253 units – Planned 2019
Tapiz100 affordable units – 2013
Arches93 affordable units – 2014
Mariposa87 affordable units – 2014
The Zephyr77 affordable units – 2014
The Aerie94 affordable units – 2014
DHA HQ172k SF office & retail
– Planned 2019
IMT Alameda Station338 units – 2014
The Denizen275 units, 2k SF retail – 2015
PDG Design District354 units – Planned 2019
Alta SOBO Station187 units – Planned 2019
Broadway Junction60 affordable units – 2008
Windsor at Broadway Station419 units – 2009
1000 S. Broadway Apts260 units – 2014
The Henry403 units – Planned 2019
Broadway Station Partners Office, residential, retail – TBD
D
F
H
E
C
3
Platt Park Townhomes30 townhomes - 2015
Hanover Platt Park303 units – 2018
North Lincoln Mid-Rise75 affordable units – 1996
L Line, Part I
Uptown Square696 units – 2003
Tower on the Park168 condos
– 2004
One Lincoln Park184 units – 2007
AMLI Park Ave193 units – 2009
2020 Lawrence231 units – 2012
One City Park302 units – 2014
Point 21212 units – 2014
Renaissance Stout St78 affordable units
– 2014
Radius Uptown372 units – 2016
SkyHouse364 units – 2016
Radiant329 units
– Planned 2019
SOVA211 units
– Planned 2019
Alexan 20th St Station354 units
– Planned 2019
Renaissance Off Broadway Lofts
81 affordable units – 2001
L
4
Portofino Tower54 units – 2003
Beldame Apartments28 affordable units
– 1998
Grant Park112 condos, 3k SF retail – 2008
Renaissance Downtown Lofts
101 affordable units – 2018
Drehmoor Apartments75 affordable units –
2007
5
L
L Line, Part II
Park Ave West122 units – 2003
Benedict Park Place396 affordable units
– 2008
Mile High United Way63k SF – 2014
The Lydian130 units, 25k SF
– 2018
Welton Park223 affordable units
– 2016
Alexan ArapahoeSquare
353 units – 2018
600 Park Ave238 units
– TBD
The Point35 affordable units, 33 condos, 13k SF – 2003
The Brownstones at King Stroud Court
26 townhomes – 2015
The Rossonian102 units, 41 keys, 7k SF retail
– TBD
Downing Sq Apts50 units – 1998
Fourth Quarter36 affordable units
– 2010
29th & Welton50 affordable condos
– Planned 2020
The Wheatley82 affordable units, 14
townhomes – 2016
Blair Caldwell Library
40k SF – 2003
Cornerstone Residences
51 units– 2009
Villages at Curtis Park155 affordable units, 168 market rate units – 2001
Lofts at Downing St Station
33 condos, 8.5k SF – 1998
Posner Center25k SF– 2013
Central Platte Valley
River MileMixed use redevelopment
Planning ongoing
Campus Village at Auraria119 units, 695 beds
– 2005
SpringHill Suites150 keys – 2012
W
E
C
6
Southwest
Evans Station Lofts50 affordable units – 2013
Encore Evans Station224 units – Planned 2018
Cherokee Flats139 units, 5k SF retail – Planned 2020
Englewood Civic Center140k SF office – 2000
ArtWalk CityCenter445 units – 2001
Liv Apartments30 units – 2016
Broadway Acoma Lofts111 affordable units – Planned 2018
Oxford Station Apartments238 units – 2016
Vita160 units – 2017
C
D
7
Berkshire Aspen Grove280 units – 2011
Littleton Station37 condos, 10k SF office– 2008
Nevada Place31 condos – 2011
Southeast, Part I
University Station Apartments
60 senior affordable units – 2014
Colorado Center1987–2018
Tower 1 – 180,000 SF Office Tower 2 – 261,480 SF Office Tower 3 – 216,352 SF Office
Annex – 60,948 SF Office 11,569 SF Retail
Millennium Colorado Station350 units – Planned 2019
Yale Station50 senior affordable units – 2011
Garden Court at Yale Station64 affordable units – 2016
Yale 25 Station112 units – 2018
The District276 units, retail – 2004
Camden Belleview Station270 units – 2009
Cielo201 units – 2009
Milehouse353 units, retail – 2014
Pearl DTC408 units – 2015
The DEN325 units, retail – 2016
Carillon Belleview Station163 senior units – 2018
One Belleview Station
315K SF office – 2018
Denver Tech Center900 acres
25M SF of development150k jobs
Landmark271 condos/apartments,
168k SF retail – 2008
R
F
H
E
8
Monaco Row204 units – 2013
One DTC West75K SF office – 2018
Wash Park Station32 units – 2015
Louisiana StationLofts
29 condos – 2007
6900 Layton385K SF office, 7k retail
– Planned 2020
Southeast, Part II
Wingate by Wyndham86 keys– 2004
Palazzo Verdi300k SF office, 100k
SF event space – 2008
Village Center Station 234k SF office, retail – 2009
360⁰
304 units – 2014CoBank
274k SF office – 2015Granite Place
300k SF office – 2017
Village Ctr Station II324k SF office
– 2018
Panorama Corporate Ctr780k SF office – 1996-2008
The Rail at Inverness220 units – 2008
AMLI at Inverness 308 units – 2009
Capstone at Vallagio272 units – 2013
AMLI Dry Creek256 units
– 2017
169 Inverness 120k SF office
– 2017
The Glenn 306 units – 2018
Elevation 265 units – 2014
R
F
E
9
9151 E Panorama220k SF office – 2017
Bambino Terzo250k SF office
– TBD
Vallagio North90 condos – 2008
Vallagio at Inverness277 condos – 2008
Dry Creek Crossing249 condos – 2009
The Jones District3+ million SF office &
residential – TBD
10
Westview431 units – 2005
Lincoln Square Lofts140 condos
– 2005
One Lincoln Station197k SF office, 10k SF
retail – 2008
Aspect230 units – 2015
Lofts at Lincoln Station101 units – 2015
Camden267 units – 2016
Arcos236 units – 2018
AMLI RidgeGate281 units – 2013
Charles Schwab800k SF office, 45k SF retail
– 2014-2019
IMT RidgeGate219 units – 2018
Lone Tree City Center and East Villages
2,200 acres, 50k jobs, 10k units – TBD
Southeast, Part III
Waterford Lone Tree400 units – 2003
Marriott Denver South279 keys – 2003
Regency at RidgeGate281 units – 2013
Hampton Inn106 keys – 2013
The Marq at RidgeGate244 units, 5k SF retail – 2013
Ovation190 units, 6k SF retail – 2015
R
F
E
W Line
Outlook Golden Ridge172 units– 2015
Beacon 85343 units – 2017
WestLink244 units– 2015
Avenida Senior Living229 units
– Planned 2019
Oak Street Townhomes81 townhomes – 2018
Oak Station Apts291 units
– Planned 2019
Indy Street Flats115 affordable units
– Planned 2019
Pearson Grove82 townhomes – Planned 2020
Zephyr Line95 affordable units
– 2015
Lamar Sta. Crossing138 affordable units
– 2014
West Line Flats155 units– 2017
40-West Residences60 affordable units
– 2017
Flats at Two Creeks78 affordable units
– Planned 2020
West Line Village175 townhomes
– 2018
Sheridan Sta. Apts113 affordable units
– TBD
Brandon Flats104 affordable units
– TBD
Regatta Sloan’s374 units – 2015
Perry Row32 townhomes
– 2018
Arroyo Village130 affordable units
– 2018
Decatur Place106 affordable units
– 2014
Avalon Apts.80 affordable units
– 2014
Corky Gonzales Public Library
25,000 SF – 2015
CDOT HQ175k SF – 2018
Luxe at Mile High382 units – TBD
Stadium District Master Plan
Mixed use redevelopment
– Planning ongoing
W
11
Fairfield Inn128 keys
– Planned 2019
1315 Sheridan15 units – 2011
Ren. West End Flats128 affordable units – 2012
Mulroy Apartments50 affordable units
– 2008
Villas at Sloan’s Lake63 affordable units – 2007
University of Colorado A Line
Larimer Row28 townhomes – 2015
Link 3566 units, 10k SF retail – 2015
Great Divide Brewery65k SF retail – 2016
Zeppelin Station100k SF retail/office
– 2018
Ride at RiNo84 units– 2018
HUB225k SF office, 25k SF retail
– 2018
World Trade Center250k SF office, 30k SF retail,
200 keys – Planned 2020
Catalyst180k SF office
– 2018
Revolution 3600130k SF office, 20k SF retail
– Planned 2018
Camden RiNo233 units, 3,500 SF retail
– Planned 2020
Denver Rock Drill180 units, 318k SF office, 65k
retail, 175 keys – Planned 2020
Village at Central Park Station120 condos,
12 townhomes,54k SF retail
– Planed 2019
FBI Office220k SF office – 2010
Renaissance at N. Colorado Station
103 affordable units – 2016
Park Hill Station Apartments
156 affordable units – 2016
Park Hill 4000192 units – 2014
Panasonic100k SF office, expo – 2014
Peña Station Apts219 units – Planned 2018
Peña Station Hyatt225 keys – Planned 2019
Panasonic NEXT382 acres – TBD
A
12
Factory Flats24 condos
– 2018
Central Park Station One220k SF office – Planned 2020
Dry Ice Factory20k SF office – 2009
Park Hill Town Center Condos28 condos – 2015
Northwest
Alto Apts70 affordable units – 2018
Zia312 units, 119 condos, 7.5k SF retail – Planned 2018
Denver Post Redevelopment3k units, 661k SF office, 85k SF retail – TBD
B
G
13
G Line
Arvada Station Apartments378 units – 2013
Gateway at Arvada Ridge296 units – Planned 2019
Water Tower Flats327 units – 2007
Park Place153 units – 2015
Solana352 units – 2017
Hilton Garden Inn136 keys – 2017
Trammell Crow Phase I252 units – 2020
Trammell Crow Phase IIRetail – TBD
G
14
Flatiron Flyer
Forum Fitzsimons409 units, 29k SF retail – 2018
Ascent Westminster255 affordable units, 22k SF retail – Planned 2019
Eaton St Apts118 affordable units, 22K SF retail – Planned 2019
Alamo Draft House40k SF retail
– Planned 2019
Origin Hotel125 keys, 15k SF retail
– Planned 2019
GRID / Solera80k SF office, 30k SF retail
– Planned 2020
Sherman Apts226 units, 34k SF
Retail – Planned 2020
AMLI Arista524 units – 2008
1st Bank Center60k SF expo – 2010
Arista Uptown272 units – 2013
Harvest Station297 units – 2014
8000 Uptown360 units – 2015
Atria Arista240 units – 2016
Two Nine North238 units – 2010
3060 Pearl Condos113 condos, 3k SF retail – 2012
Griffis 3100 Pearl319 units – 2014
Roadhouse5,500 SF retail – 2015
Depot Square71 affordable units – 2015
Boulder Commons100k SF office
– 2017
Google 200k SF office – Planned 2019
30 + Pearl288 units, 21k SF retail
– TBDSync36
392 units – 2018
FF
15
Hyatt Place Boulder150 keys – 2015
Spark200 units, 140k SF office,
40k SF retail – TBD
Nickel Flats100k SF office
– 2017
The Steelyards90 units, 140k SF – 2004
Venue at Arista 124 units – 2009
aLoft Hotel at Arista139 keys – 2010
Flatiron Marketplace300 units – TBD
R Line
21 Fitzsimons 600 units – 2008
Comfort Suites90 keys – 2016
Forum Fitzsimons409 units, 29k SF retail
– 2018
Holiday Inn Express & Suites
126 keys – Planned 2019
Alta Fitzsimons294 units
– Planned 2019
Legacy at FitzsimonsVillage
364 units– Planned 2019
Citadel on Colfax100 units, 150 condos,
100k SF retail – Planned 2019
Fitzsimons South288 units – 2008
Parkside at City Center 250 units, 25k SF retail
– Planned 2019
Parq at Iliff424 units
– 2018
Iliff Peak316 units, 12k SF retail
– Planned 2019
The Point at Nine Mile Station500+ units, 100k SF retail, 250k SF
commercial – TBD
Village at Hampden Town Ctr.
132 units – 2005
R
H
16
Courtyard by Marriott139 keys
– Planned 2019
The Savoy at Dayton Station372 units – 2012
Town CenterTerrace
169 units – 2005
SpringHill Suites153 keys– 2011
Hyatt Regency249 keys – 2016
Solana Stapleton280 units
– TBD
Fitzsimons 100151k SF office, 15k SF retail
– 2011
Fairfield Inn and Suites
82 keys – 2010
Extended Stay America
82 keys – 2010
DUS Real Estate Development1900 16th STREET
(2009)17 Story Office,
Retail & Living Space
DAVITA WORLD HEADQUARTERS
(2012)14 Story Office
N. WING BUILDING(2013)
5 Story Office, Retail, Restaurants & Parking
S. WING BUILDINGONE UNION STATION
(2014)5 Story Office, Retail
CADENCE APARTMENTS(2013)
13 Story, 219 Apartments, Retail & Parking
DUS HISTORIC BUILDING(2014)
112 Room Crawford Hotel & Retail
ALTA CITY HOUSE(2015)
5 Story, 280 Apartments
PLATFORM(2015)
21 Story, 288 Apartments
1601 WEWATTA(2015)
10 Story Office Building, Retail, Parking
ALARA(2015)
314 Apartments, King Soopers Grocer
TRIANGLE BUILDING(2015)
11 Story Office, Parking, Retail
UNION TOWER WEST(2017)
180 keys, 100K Office, 10K Retail
ASHLEY UNION STATION
(2017)4 Story, 104 Apartments
(Affordable)
HOTEL BORN & 1881 OFFICE
(2017)200 keys, 5 Story
Office & Retail
UNION SQUARE/PIVOT DENVER
(2017)600 Apartments,
Whole Foods Market
16 CHESTNUT(2018)
19 Story Office, Parking, Retail
HILTON GARDEN INN
(2019) 233 keys
THE GRAND1709 CHESTNUT PL.
(2018)12 & 24 stories, 510
Apartments, Retail, Parking
COLORADAN(2019)
345 Condos, 30K Retail
THE PULLMAN(2019)
14 Stories, 4K Retail, 142 Apartments
9 10
11 12
1 2 8543 6 7
19 2014 15 16 17 1813
• 3,000 residential units • 2 million SF office • 375,000 SF retail• 725 hotel rooms
COMPLETED
UNDER CONSTRUCTION
1
2
8
16
9
11
4 3
510
6
15
7
12
14
1718
19
20
13
DUS MET
District
DDA District
TOD Summary
RTD’s transit investment has had a significant impact on development in the region.
Transit-oriented development within ~1/2 mile walk of a high frequency station*:• 42,900 Residential Units• 11,150,000 Square Feet Office• 1,600,000 Square Feet Retail• 3,650 Hotel Rooms
*Denver and Boulder downtowns excluded
18
Lines Resi Units Office S.F. Retail S.F. Hotel KeysCentral 3,110 172,000 18,000 -
Existing TOD 1,913 - 18,000 - Planned TOD 1,197 172,000 - -
Central Platte Valley 119 - - 150 Existing TOD 119 - - 150 Planned TOD - - - -
CU A Line 1,445 1,663,000 272,500 600 Existing TOD 681 775,000 100,000 - Planned TOD 764 888,000 172,500 600
Flatiron Flyer 4,344 610,000 239,700 414 Existing TOD 2,957 440,000 15,700 289 Planned TOD 1,387 170,000 224,000 125
G Line 1,758 - - 136 Existing TOD 1,210 - - 136 Planned TOD 548 - - -
Northwest 3,504 661,000 93,486 - Existing TOD 70 Planned TOD 3,434 661,000 93,486 -
R Line 4,648 401,700 298,500 976 Existing TOD 2,394 151,700 61,000 837 Planned TOD 2,254 250,000 237,500 139
Southeast 8,979 5,302,772 302,427 471 Existing TOD 8,629 2,368,000 238,950 471 Planned TOD 350 2,934,772 63,477 -
Southwest 1,738 155,000 - - Existing TOD 1,375 150,000 - - Planned TOD 363 5,000 - -
L Line 6,759 173,192 107,300 41 Existing TOD 5,120 166,192 107,300 - Planned TOD 1,639 7,000 - 41
W Line 3,713 175,000 - 128 Existing TOD 2,408 175,000 - - Planned TOD 1,305 - - 128
Denver Union Station 2,803 1,836,191 296,404 743 Existing TOD 1,806 1,836,191 254,404 510 Planned TOD 997 42,000 233
Grand Total 42,920 11,149,855 1,628,317 3,659 Existing TOD 28,682 6,062,083 795,354 2,393 Planned TOD 14,238 5,087,772 832,963 1,266