Scope & Overview of Offering - Migration Scenarios & Approach - Migration *TFT: Transition Factory Toolset Transition : Migration Data Transition (Migration & Coexistence) Transition = Migration & Coexistence Migration = When the customer is not going to work anymore with CATIA V5 Coexistence = When the customer needs to maintain CATIA V5
Transcript
Page 1: Transition-Upgrade and Migration Offering_Transition.pdf · Transition : Upgrade Scope & Overview of Offering - Upgrade Approach - Upgrade *Upgrade from N to N+X version with changes

Scope & Overview of Offering - Migration

Scenarios & Approach - Migration

*TFT: Transition Factory Toolset

Transition : Migration

Data Transition (Migration & Coexistence)Transition = Migration & CoexistenceMigration = When the customer is not going to work anymore with CATIA V5Coexistence = When the customer needs to maintain CATIA V5

Page 2: Transition-Upgrade and Migration Offering_Transition.pdf · Transition : Upgrade Scope & Overview of Offering - Upgrade Approach - Upgrade *Upgrade from N to N+X version with changes

Success Stories - Migration

Customer Needs• Migration of Solidworks EPDM to 3DEXPERIENCE• Enterprise Project and Change management process adoption• Social Ideation process adoption

Solution Delivered • OOTB 3DEXPERIENCE Platform deployment › Usage of OOTB Change Management › Unified view of Products catalogue › SWYM Ideation Framework implementation• Use of R&D EDAT Tool for Migration › One centralized, automated, on-demand conversion › Conversion data quality assurance with online monitoring

Customer Needs• First Of A Kind (FOAK) migration project involving File System and SmarTeam Data Migration.• Unique requirement of having the File System Data at Specific Version and Maturity in V6 System.• Presence of CATIA R1 parts in the archive which are not supported by DS migration tools. tools.

Solution Delivered • Migration Approaches explored by Team:- › FBDI, XPDM, DBDI• DBDI approach for both File System and SmarTeam Archive selected.• Automation ToolSet to pre-process the source data developed• Migration Batch Scheduling tool handling parallel execution and supporting multiple workstations at the same time implemented.• Post migration comparison tool depicting result in XML format implemented.

Customer Needs• Migration of CATIA data from SmarTeam to 3DEXPERIENCE • Migration to be executed for 10 sites across the globe• Update Capability on a daily basis • Migration timelines to match business needs • Target 100% migration

Solution Delivered • Cost › Systematic data analysis to reduce errors during production migration › Optimal methodology to reduce data losses

• Quality › Integrated quality check tool. › Dedicated support for manual checks and corrections › Real-time monitoring and reporting

US Camera Equipment OEM Italian Industrial Equipment OEM Swiss Industrial Equipment OEM

Delivery Framework – Migration

Responsibility Matrix Owned by 3DGSOwned by Partner & supported by 3DGS Joint Responsibility

PHASE 4BUSINESS & TECHNICALASSESSMENT

PHASE 5QUALIFICATION

Assessment Stage Execution Stage

PHASE 1QUALIFICATION

PHASE 2BUSINESS & TECHNICAL ASSESSMENT

PHASE 3PROPOSAL

PHASE 4DEVELOPMENT

PHASE 5TESTING

PHASE 6DEPLOYMENT

Value Proposition - Migration

Challenges

ValueProposition

Migration Know How Methodologies

Proven Transition Factory Tools : Scheduling, Monitoring and Reporting tools for mass migration are tools dedicated for Transition Factory

Complex Business Processes :-Global Business traceability

Leverage new product featuresIntegrated Platform Adoption to efficient and standard-ized processes

Risk in Mass migrations

Proximity to DS R&D – Higher success rate for migration

Success rate of migration

Consolidation of Multiple hetero-geneous / legacy systems Adopt to the latest infrastructure as per the market trends

Contact [email protected]

Page 3: Transition-Upgrade and Migration Offering_Transition.pdf · Transition : Upgrade Scope & Overview of Offering - Upgrade Approach - Upgrade *Upgrade from N to N+X version with changes

Transition : Upgrade

Scope & Overview of Offering - Upgrade

Approach - Upgrade *Upgrade from N to N+X version with changes in data model, customization and user interface

Page 4: Transition-Upgrade and Migration Offering_Transition.pdf · Transition : Upgrade Scope & Overview of Offering - Upgrade Approach - Upgrade *Upgrade from N to N+X version with changes

Success Stories - Upgrade

Value Proposition - Upgrade

Challenges

ValueProposition

How to manage technical risks?

• Manage unknown risks with new platform• Legacy environment upgrade history• Heavy customization of OoTB functionalities

Predictable Upgrades

• 3DEXPERIENCE Platform expertise• Matured Upgrade methodology• Joint engagement with clear RASCI• Vast Upgrade Experience

How to protect Margins?

• Customer budget pre-approvals without assessments• Provide estimates without affecting margins?

Cost predictability & Optimization

• Catalogue based Upgrade Effort estimation for budgetary quotes• Cost Optimization by leveraging onsite-off shore Delivery model• Predefined project durations

How to deploy 3DEXPERIENCE platform successfully on time?

• Unpredictability of project duration• Maintain specialized skills for Project Execution

Matured Upgrade Factory Model

• Project Optimization with High Execution Maturity using Upgrade Factory Model• Complexity based work packages• Quality framework

Customer Needs• Assessment of the Enovia 2013x platform towards Upgrade.• Map the current processes and tools to target.• Enterprise Change Process for a full change management • P&O, Security based access.• Platform Monitoring specifications to monitor the essentials of DS platform.

Solution Delivered • Project executed in Onsite Offshore Model with help of tools such as source code repository tool SVN etc.• New features implemented – 6W Tags, Security Context, Dashboard Widget development• New Widget developed for controlled documents where only view access is allowed.• Change Management is mapped with new Change management processes and trained customer to use these new processes• New P&O structure is implemented for access

Customer Needs• Enhance” the DS “My Collection” solution to achieve enhancement of Company Processes for “CMT products”.• “Consolidate” a process for “Commercialized Product-Full package” and “Manufactured Product-CMT”

Solution Delivered • Technical Upgrade to 3DEXPERIENCE R2016x.• Implemented a channel of communication with an external system (SAP FMS) and SAP (SLC)• PDF RPT report generation• Project executed in PERFORM methodology with delivering 6 Sprints..• PERFORM tools like GIT, Atlassian Jira, Jenikins, SonarQube for requirement, issue management, build delivery• Agile based PERFORM delivery model• Weekly demo to customer, Sprint based demo

Customer Needs• ENOVIA Technical Upgrade • Upgrade Merging documentation for GA and FP upgrades• Data Conversion• Convert 13x custom data as per 15x schema changes• P&O – secure data for internal and external users using collaborative space and IP security products• Leverage 3DEXPERIENCE platform set up (3DPassport, 3DDashboard, EXALEAD)Solution Delivered • Upgrade Assessment - Upgrade assessment report Upgrade - Technical Upgrade to 15x.GA• FP upgrades - Fix pack upgrades to FD01, FD02, FD03, FD04, FD05, FD06• Merging Dashboard Documentation - 13x baseline change dashboard, 15x merging dashboard • Gap analysis – Finding GAP between direct OOTB 15x Vs upgraded OOTB 15x and solution for closing the gap

Aero-structures manufacturer in Middle East CPG in Europe CPG manufacturer in NAM

Delivery Framework – Upgrade

PHASE 4BUSINESS & TECHNICALASSESSMENT

PHASE 5QUALIFICATION

PHASE 7POST UPGRADE

Engagement Stage Assessment Stage Execution Stage Execution Stage

PHASE 1BUDGETARY QUOTE

PHASE 0QUALIFICATION

PHASE 2ASSESSMENT

PHASE 3PROPOSAL

PHASE 4UPGRADE

PHASE 5TESTING

PHASE 6DEPLOYMENT

Responsibility Matrix Owned by 3DGSOwned by Partner & supported by 3DGS Joint Responsibility