WellCat
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 2/22
LandMark
one
WellCat
Training Handbook
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 3/22
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 4/22
2
WellCat
LANDMARK
A Halliburton CompanyCopyright © Landmark Graphics Corporation All Rights Reserved Worldwide
This publication has been provided in relation to an agreement containing restrictions on use. This publication is also protected
under the Federal Copyright Act. No part of this document may be copied, distributed, transmitted, transcribed, stored in any
retrieval system or means, or translated into any human or computer language in any form or by any means, electronic, magnetic,
manual, or some other kind; not be disclosed to any third party without the express written permission of:
Landmark Graphics Corporation
15150 Memorial Drive, Houston, TX 7709, USA: Phone: 281-560-1148
Phone: 800526-3004FAX: 281-368-5670 E-mail : [email protected] Internet: www.lgc.com
Trademark Notices
Landmark, Landmark logo, 3DVIEW, ARIES, Automate, BLITZ, BLITZPAK, CasingSeat,
COMPASS, Contouring Assistant, Decision Suite, Decisionarium, DepthTeam, DepthTeam Explorer,
DepthTeam Express, Extreme DepthTeam, DepthTeam Interpreter, DESKTOP-PVT, DESKTOP
VIP, DEX, DFW, Dims, Drillability Suite, DrillModel DSS, EarthCube, EdgeCa $ h, Fastrack, FZAPI,
GeoDataLoad, GEOLINK, GRIDGENR 12 Enterprise, iDims, LogEdit, LogPrep, MathPack,
OpenBooks, OpenExplorer, OpenJournal, OpenSGM, OpenVision, OpenWorks, PAL, Parallel-VIP,PetroWorks, PlotView, Griddiong Plus Point, Pointing Dispatcher, PostStack, PostStack ESP,
PROFILE, ProMAX, ProMAX 2D, 3D ProMAX, ProMAX 3DPSDM , ProMAX MVA, ProMAX
VSP, RAVE, Reservoir Framework Builder, RMS, SafeStart, SeisCube, SeisMap, SeisModel,
SeisWell, SeisWorks, SigmaView, StrataMap, Stratamodel, StratAmp, StrataSim, StratWorks,
StressCheck, SynTool, SystemStart, SystemStart for Clients, SystemStart for Servers, Storage for
SystemStart, T2B, TDQ, TERAS, TOW / cs,
LandMark
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 5/22
3
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 6/22
WellCat
TOW / cs The Oilfield Workstation, Trend Form Gridding, VIP, VIP-COMP, VIP-CORE,
DUAL-VIP, VIP-ENCORE, VIP -EXECUTIVE, VIP-Local Grid Refinement, VIIP-POLYMER,
VIP-THERM, Wwllbase, WELLBOREe Planner, WELLCAT, WELLPLAN, ZAP!, and Z-MAP
Plus are trademarks of Landmark Graphics Corporation. All other trademarks are property of theirrespective owners.
NOTE
The information in this document is subject to change without notice and should not be construed as a
commitment landmrk Graphics Corporation. Landmrk Graphics Corporation assumes no responsibility
for any errors that may appear in this manual. Some states or jurisdictions do not allow disclaimer or
express or implied ignorance of certain transactions; therefore, this statement probably does not apply
ifTeam:..
Supporting Branches Address
1 - License Management (Only for information regarding licensing)
International Web: (http://www.lgc.com ) Telephone Number: USA:
1.281.560.1110, option 6 Outside USA: 44 (0) 932.832100 Email: license
© lgc.comTel:..
2 - Landmark Graphics Corporation
15150 Memorial Dr Houston, TX 77079-4304 +1.281.560.1200 Toll
Free: 1 877 HELP.LGC (435.7542) FAX: 1.281.368.5651Tel:...
LandMark
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 7/22
WellCat
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 8/22
4:
Email support © lgc.com
3 - Landmark Graphics Corporation
Wellheads Crescent Wellheads Industrial Estate Dyce Aberdeen,Scotland AB21 7GA +44.1224. 778500 FAX: +44.1224.778555
pc-support-abereen © lgc.com
Email:.4 - Landmark Graphics Corporation
11th Floor Menera Tan / Tan 207 Jalan Tun Razak 50400 Kuala Lumpur
Malaysia Tel: +60 3 21641121 FAX: +60 3 21641135 24 hrs (Dims): +61
89482-4140 Email: Klsupport © lgc.com
5 - Landmark Graphics Corporation 645 7th Ave # 2200 SW ∙ Calgary,
Alberta Canada Tel T2P4GB. + 1-281.560.1200 Toll free: +
1.877.HOP.LGC (435.7452) © lgc.comsupport
Email:.6- Landmark Graphics International
Level 1, 1 Capital Centre 256 St. George's Terrace Perth, WA 6000
Australia Tel: + 61 8941-4488 FAX: + 61 89481 -1580
LandMark
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 9/22
MayWell
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 10/22
Cat
24 hrs (Dims): +61 89482-4140 Email: ozsupport © lgc.com
7 - Landmark Graphics International Inc. Beijng
officeroom 2208, Capital Mansion Beijing
Chaoyang District, Beijing 100004, China Tel: 86-10-64654501 FAX:
86-1064654819
LandMark
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 11/22
6
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 12/22
WellCat
CONTENTS
1 INTRODUCTION
2 OVERVIEW OF PRACTICE AND THEORY3HOME AS
4 DEFINITIONWELL
menu well
DRILLING5
6PRODUCTION
7CASING
PIPE PRODUCTION 8
9MULTIPLE STRING
10 NOTES
LandMark
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 13/22
7
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 14/22
WellCat
Chapter 1 Introduction
TRAINING COURSE OBJECTIVES
To familiarize each participant with the following:
•
Basic Principles of Design of Tubular
•
Design ConsiderationsTriaxial
•Simulation Theory and Practice temperature and pressure in wells
•
Input well data
•
Specifications and cargo operations
•
Documentation of results
•
Integration programs
•
Special FeaturesAt the end of the course, the participant will be able to:
• Understand the design process of essentially tubular
• Appreciate the complexities of nodal thermal analysis
• Appreciate the transcendent issues facing the engineer design
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 15/22
• Learn how to apply WellCat in designing safe andwells.
cost effective
LandMark
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 16/22
8
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 17/22
WellCat
WHY ARE REQUIRED
TEMPERATURES?
• Termssettlement
• Movements andefforts tubular
LandMark
=
ƒ (AT)
• Buckling
•Design cement
•fluid density and viscosity
=
ƒ (temperatures)
• Limitations team
Preventers (BOP) and elements of
packaging seals
• Increased annular pressure
loads on packaging •
• Loads and movements on wellheads
• Factors in resistance of tubular
^yield strength
f
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 18/22
=(temperature)
• Corrosive environments
^material selection
• Training hydrates and paraffins deposit
S ystem W ell C at
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 19/22
9
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 20/22
WellCat
Production Drilling
Generation
Load
Stress Analysis
Casing
Reliable accurate thermal modeling analysis of the service life of Wells Complex
Critical Design Analysis of movement and efforts tubular Use as stand-alone
applications or integrated sets
APPLICATIONS WELLCAT
LandMark
pipe production
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 21/22
8/12/2019 Translatedcopyof129995047-taclleW
http://slidepdf.com/reader/full/translatedcopyof129995047-tacllew 22/22
WellCat
TEMPERATURE FOR CRITICAL APPLICATIONS
• Wells - at high pressures andelevated temperatures
• Wellsin the Arctic or deep water production • Pipe Insulation
• Designgrout
• Expansionnoise in the annulus (in subsea wells)
• Calculation of undisturbed temperatures from data
log
• Design of wells geotérmios
ADVANCED ANALYSIS
• Buckling advanced andfriction
complex• Terminations
•critical Wells