+ All Categories
Home > Documents > Transportation branch, No.T.296/GM'SANNUALSPECIAL/20-21

Transportation branch, No.T.296/GM'SANNUALSPECIAL/20-21

Date post: 03-Oct-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
4
SOUTH CENTRAL RAILWAY Headquarters office, Transportation branch, Secunderabad. Date:15.02.2021 No.T.296/GM'SANNUALSPECIAL/20-21 DRM/SC, BZA C/-Sr.DOM/SC, BZA eneral Manager's Annual Inspection of Vijayawada Division (GDR - TEL Section) 8& RAYANAPADU workshops DATE TRAIN N0 FROM DEPARTURE TO ARRIVAL 15.02.2021 SC 21:50 (Monday) Special (to be run via Kazipet) GDR 07:00 16.02.2021 (Tuesday) GDR 08:30 TEL 19:00 17.02.2021 (Wednesday) BZA 14:00 SC 19:30 Inspection Special Formation Ex SC (Total formation 13 coaches): TE 01 RA 011214 Window Leading ex.SC 02 AC Chair Car PHoDs, Branch Officers and Inspectors attached to PHoDs 03 SLR CAO/C & PCSC PCEE & PCSTE 04 RA 089951 05 RA 011230 06 RA 011231 PCCM & PCSO GM 07 RA 1 08 RA O11205 PCME RA 0112332 10 RA 011211 CPD/SD & CPTM PCPO& PCMD Supervisors/Inspectors 09 11 ACCN 12 WCB 13 SLR A) Officers required to attend GM's Annual Inspection of BZA division: CAO/C, PCSC, PCEE, PCSTE, PCCM, PCSO, CPTM, CPD/SD, PCPO, PCME, PCMD. B) Officers required to attend RYPS Annual Inspection on 17.02.2021 (Wednesday): PCME, PFA, PCMM, CPD/SD, PCPO, PCMD, CPTM, DRM/BZA. PFA and PCMM may please join the inspection at RYPS on 17" February 2021 @ 09:00 hrs. An Inspection Carriage may be moved on 16t February 2021 for their movement. C) CAO/C, PCSC, PCEE, PCSTE, PCCM, PCSO may return to HQrs after completion of BZA division Annual Inspection.
Transcript

SOUTH CENTRAL RAILWAY Headquarters office,

Transportation branch, Secunderabad.

Date:15.02.2021 No.T.296/GM'SANNUALSPECIAL/20-21 DRM/SC, BZA C/-Sr.DOM/SC, BZA

eneral Manager's Annual Inspection of Vijayawada Division (GDR - TEL Section) 8& RAYANAPADU workshops

DATE TRAIN N0 FROM DEPARTURE TO ARRIVAL

15.02.2021 SC 21:50

(Monday) Special

(to be run via

Kazipet) GDR 07:00

16.02.2021

(Tuesday) GDR 08:30 TEL 19:00

17.02.2021 (Wednesday)

BZA 14:00 SC 19:30

Inspection Special Formation Ex SC (Total formation 13 coaches): TE

01 RA 011214 Window Leading ex.SC

02 AC Chair Car PHoDs, Branch Officers and Inspectors attached to PHoDs

03 SLR CAO/C & PCSC PCEE & PCSTE

04 RA 089951

05 RA 011230 06 RA 011231 PCCM & PCSO

GM 07 RA 1 08 RA O11205 PCME

RA 0112332 10 RA 011211

CPD/SD & CPTM

PCPO& PCMD Supervisors/Inspectors

09

11 ACCN 12 WCB 13 SLR

A) Officers required to attend GM's Annual Inspection of BZA division:

CAO/C, PCSC, PCEE, PCSTE, PCCM, PCSO, CPTM, CPD/SD, PCPO, PCME, PCMD.

B) Officers required to attend RYPS Annual Inspection on 17.02.2021 (Wednesday): PCME, PFA, PCMM, CPD/SD, PCPO, PCMD, CPTM, DRM/BZA.

PFA and PCMM may please join the inspection at RYPS on 17" February 2021 @ 09:00 hrs. An

Inspection Carriage may be moved on 16t February 2021 for their movement.

C) CAO/C, PCSC, PCEE, PCSTE, PCCM, PCSO may return to HQrs after completion of BZA division

Annual Inspection.

VIJAYAWADA DIVISION ANNUAL INSPECIION ON 16.02.2021 SEATING ARRANGEMENT IN OBSERVATION CAR RA 011214 1.

PCOM GM

PCE

DRM Section ADEN

Sr.DOM Secretary to GM Sectional Sr.DEN

PCSO

PCME Sr.DEN/Co-ordn

CAO/Con Passage PCEE

PCSTE Sr.DSO Sr.DSTE

Sr.DEE/TRD Sr.DME

2. In AC Chair Car: The following is the seating arrangement: a) PHoDs: PCPO, PCMD, PCSC, PCCM b) Division: Balance Branch Officers only c) Inspectors attached to PHoDs

The timings are only for general guidance and will be subjected to change depending upon the requirement of inspection. DRM/SC to please arrange to form the Inspection special well in time and ensure that all the coaches are thoroughly attended to and fit in all respects. The special should be berthed well in time at SC station with ROUND BPC covering the journey ex.SC-GDR-SC. The provision of accommodation for PHODs, Branch Officers and Inspectors attached to PHODs and Supervisors/Inspectors in the AC Chair Car and ACCN will be done by Commercial branch.

Selected crew and staff should be detailed to work the special train and suitable loco in good fettle should be provided. The running of the inspection special train should not in any way interfere with the running and punctuality of passenger carrying trains. Please arrange to run the special train accordingly without any hitch duly advising all concerned.

Minimum staff to be accompanied with GM's Annual inspection special from all concerned departments duly wearing facemask and maintaining social distance as per the extant orders by the Govt.

Enclosed; - (Minute to Minute programme of GM's Annual inspection of BZA Division)

STmlc CPTM/SCR 151-l2 Copy to: Secretary to GM

AGM, CRS/SC, PCOM, PCCM, PCME, PCE, PCEE, PCSTE, CAO/C PCPO, PFA, PCMM, PCSo, PCMD, PcSC, CPTM, CPD/SD, CPRO, CRSE, CHC/Central control, Emergency control/HQ

Minute to Minute program of GM's Annual Inspection on 16.02.2021 (Tuesday) GDR-TEL Section

Station Block

Section

S. km Arr Duration Dep

(HH:MM) No

(HH:MM) of halt in Assets Offered Remarks Minutes

136.04 GDR 08:30

2147/4-6 MBL-KMLP Inspection of Bridge No.287A (RUB), Span 1x4.50m

08:45 08:55 10 151.60 KMLP 09.00 09.15 PI02643 15

(ERS-PNBE) Inspection of LC No.106, Class SPL, TVUS-65440.2, Census 02.06.2018, Interlocked

155/12-14KMLP-VKT 09.20 09.30 10

15522- Inspection of Curve no.11 DN line

(1 Degree) 156/4 KMLP-VKT 09:35 09:45 10

Inspection of Minor Bridge No.302DN, Span 1x3.05 m

156/12-14 KMLP-VKT 09:50 10.00 10

Inspection of Venkatachalam station.

157.85 VKT 10.05 10.20 15

157/0- 172/0 VKT-NLR 10.20 10.30 Speod test 120 Kmph for 15 krms

Inspection of Minor Bridge No.443DN, Span 2x5.00 m

206/6-8 AXR-BTTR 10:55 11.05 10

207/39-41 Inspection of SEJ no.6 UP line

Inspection of Pt. No S 16A, South Yard of BTTR yard, Angle 1 in 12. section 60Kg, TWS, FSL

10 207/39-37

Inspection of Bitragunta station.

BTTR Inspection of Gang No.5 of SSE/P.way/BTTR Inauguration of Crew Booking Lobby. Inauguratlon of New Freight Examination Facility and New C&w Office.

11.10 12.10 60

11 208.25

Inspection of Running Room. Progress of BTTR Longer

Loop,

Speed test 120KMPH for Km 30kms

224/0- 12 KVZ-SKM

254/0

Subjected to movement of | trains. 13 256/20-22 UPD-SKM inspeotion of Bridge No.517B

(RUB). Span 1x5.00m PI2390 (MAS

[email protected] P/02249 SBC-NTSK @13.55)

269/22- 14 Inspection of Major Bridge No.533DN, Span 33x12.19 m 270/6 SKM-TNR 12.50 13:10 20

P/2390 (MS- [email protected] 0,P/02249 SBC-NTSK @13.55),028 70 MAS

VSKP 14.05), 02656 CEN-

TNR 272.07 Station 13:15 14:20 Lunch at Respective Saloons 65

[email protected]) Subjectedto movement of train 02870 MAS-VSKP @ 14.05), 02656 CEN-ADI

Inspection of Derailment oil tankers (BTPN) site at km 277/17-19 Up dated 25.06.2020

15 277/18-20 TNR-SDM

@14.12) Inspection of Br.No.608(DN), Romperu river, Span

5x30.48m+1x45.72m, Girder 16 316/6-18 UGD-CJM

17 316/18-20 UGD-CJM 15.00 15:30 30 Inspection of SEJ No. 7A DN line

Inspection of C.No.17 Degree:1.50

Inspection of Gang No.3 of SSE/P.Way/CLX

18 316/20-42 UGD-CJM

19 316/6-18 UGD-CJM

Inspection of PT No.N19B, 1 in 12

60kg PSC fan shaped

P/-02878 ERS-HWH @15.50

20 340/13-9 CLX 15.55 16.15 20

Diversion of track through New

Bridge No.617 Inspection of formation treatment work using stone column method

by RVNL. Inspection of LC no.281, Non

Interlock, C class, TVUs 20,790. Inspection of Health Unit Inspection of staff quarter and

colony Inspection of Electrical (General Service) Sub Station.

21 359/30-38 BPP-APL 16:35 16.45 10

22 371/1-3 APL-NDo 17.00 17.15 15

23 389/34- TSR-TEL 17:40 17:50 10

390

24 397.25 TEL 18.00 18:30 30

25 BZA 19.00 Total 340


Recommended