SOUTH CENTRAL RAILWAY Headquarters office,
Transportation branch, Secunderabad.
Date:15.02.2021 No.T.296/GM'SANNUALSPECIAL/20-21 DRM/SC, BZA C/-Sr.DOM/SC, BZA
eneral Manager's Annual Inspection of Vijayawada Division (GDR - TEL Section) 8& RAYANAPADU workshops
DATE TRAIN N0 FROM DEPARTURE TO ARRIVAL
15.02.2021 SC 21:50
(Monday) Special
(to be run via
Kazipet) GDR 07:00
16.02.2021
(Tuesday) GDR 08:30 TEL 19:00
17.02.2021 (Wednesday)
BZA 14:00 SC 19:30
Inspection Special Formation Ex SC (Total formation 13 coaches): TE
01 RA 011214 Window Leading ex.SC
02 AC Chair Car PHoDs, Branch Officers and Inspectors attached to PHoDs
03 SLR CAO/C & PCSC PCEE & PCSTE
04 RA 089951
05 RA 011230 06 RA 011231 PCCM & PCSO
GM 07 RA 1 08 RA O11205 PCME
RA 0112332 10 RA 011211
CPD/SD & CPTM
PCPO& PCMD Supervisors/Inspectors
09
11 ACCN 12 WCB 13 SLR
A) Officers required to attend GM's Annual Inspection of BZA division:
CAO/C, PCSC, PCEE, PCSTE, PCCM, PCSO, CPTM, CPD/SD, PCPO, PCME, PCMD.
B) Officers required to attend RYPS Annual Inspection on 17.02.2021 (Wednesday): PCME, PFA, PCMM, CPD/SD, PCPO, PCMD, CPTM, DRM/BZA.
PFA and PCMM may please join the inspection at RYPS on 17" February 2021 @ 09:00 hrs. An
Inspection Carriage may be moved on 16t February 2021 for their movement.
C) CAO/C, PCSC, PCEE, PCSTE, PCCM, PCSO may return to HQrs after completion of BZA division
Annual Inspection.
VIJAYAWADA DIVISION ANNUAL INSPECIION ON 16.02.2021 SEATING ARRANGEMENT IN OBSERVATION CAR RA 011214 1.
PCOM GM
PCE
DRM Section ADEN
Sr.DOM Secretary to GM Sectional Sr.DEN
PCSO
PCME Sr.DEN/Co-ordn
CAO/Con Passage PCEE
PCSTE Sr.DSO Sr.DSTE
Sr.DEE/TRD Sr.DME
2. In AC Chair Car: The following is the seating arrangement: a) PHoDs: PCPO, PCMD, PCSC, PCCM b) Division: Balance Branch Officers only c) Inspectors attached to PHoDs
The timings are only for general guidance and will be subjected to change depending upon the requirement of inspection. DRM/SC to please arrange to form the Inspection special well in time and ensure that all the coaches are thoroughly attended to and fit in all respects. The special should be berthed well in time at SC station with ROUND BPC covering the journey ex.SC-GDR-SC. The provision of accommodation for PHODs, Branch Officers and Inspectors attached to PHODs and Supervisors/Inspectors in the AC Chair Car and ACCN will be done by Commercial branch.
Selected crew and staff should be detailed to work the special train and suitable loco in good fettle should be provided. The running of the inspection special train should not in any way interfere with the running and punctuality of passenger carrying trains. Please arrange to run the special train accordingly without any hitch duly advising all concerned.
Minimum staff to be accompanied with GM's Annual inspection special from all concerned departments duly wearing facemask and maintaining social distance as per the extant orders by the Govt.
Enclosed; - (Minute to Minute programme of GM's Annual inspection of BZA Division)
STmlc CPTM/SCR 151-l2 Copy to: Secretary to GM
AGM, CRS/SC, PCOM, PCCM, PCME, PCE, PCEE, PCSTE, CAO/C PCPO, PFA, PCMM, PCSo, PCMD, PcSC, CPTM, CPD/SD, CPRO, CRSE, CHC/Central control, Emergency control/HQ
Minute to Minute program of GM's Annual Inspection on 16.02.2021 (Tuesday) GDR-TEL Section
Station Block
Section
S. km Arr Duration Dep
(HH:MM) No
(HH:MM) of halt in Assets Offered Remarks Minutes
136.04 GDR 08:30
2147/4-6 MBL-KMLP Inspection of Bridge No.287A (RUB), Span 1x4.50m
08:45 08:55 10 151.60 KMLP 09.00 09.15 PI02643 15
(ERS-PNBE) Inspection of LC No.106, Class SPL, TVUS-65440.2, Census 02.06.2018, Interlocked
155/12-14KMLP-VKT 09.20 09.30 10
15522- Inspection of Curve no.11 DN line
(1 Degree) 156/4 KMLP-VKT 09:35 09:45 10
Inspection of Minor Bridge No.302DN, Span 1x3.05 m
156/12-14 KMLP-VKT 09:50 10.00 10
Inspection of Venkatachalam station.
157.85 VKT 10.05 10.20 15
157/0- 172/0 VKT-NLR 10.20 10.30 Speod test 120 Kmph for 15 krms
Inspection of Minor Bridge No.443DN, Span 2x5.00 m
206/6-8 AXR-BTTR 10:55 11.05 10
207/39-41 Inspection of SEJ no.6 UP line
Inspection of Pt. No S 16A, South Yard of BTTR yard, Angle 1 in 12. section 60Kg, TWS, FSL
10 207/39-37
Inspection of Bitragunta station.
BTTR Inspection of Gang No.5 of SSE/P.way/BTTR Inauguration of Crew Booking Lobby. Inauguratlon of New Freight Examination Facility and New C&w Office.
11.10 12.10 60
11 208.25
Inspection of Running Room. Progress of BTTR Longer
Loop,
Speed test 120KMPH for Km 30kms
224/0- 12 KVZ-SKM
254/0
Subjected to movement of | trains. 13 256/20-22 UPD-SKM inspeotion of Bridge No.517B
(RUB). Span 1x5.00m PI2390 (MAS
[email protected] P/02249 SBC-NTSK @13.55)
269/22- 14 Inspection of Major Bridge No.533DN, Span 33x12.19 m 270/6 SKM-TNR 12.50 13:10 20
P/2390 (MS- [email protected] 0,P/02249 SBC-NTSK @13.55),028 70 MAS
VSKP 14.05), 02656 CEN-
TNR 272.07 Station 13:15 14:20 Lunch at Respective Saloons 65
[email protected]) Subjectedto movement of train 02870 MAS-VSKP @ 14.05), 02656 CEN-ADI
Inspection of Derailment oil tankers (BTPN) site at km 277/17-19 Up dated 25.06.2020
15 277/18-20 TNR-SDM
@14.12) Inspection of Br.No.608(DN), Romperu river, Span
5x30.48m+1x45.72m, Girder 16 316/6-18 UGD-CJM
17 316/18-20 UGD-CJM 15.00 15:30 30 Inspection of SEJ No. 7A DN line
Inspection of C.No.17 Degree:1.50
Inspection of Gang No.3 of SSE/P.Way/CLX
18 316/20-42 UGD-CJM
19 316/6-18 UGD-CJM
Inspection of PT No.N19B, 1 in 12
60kg PSC fan shaped
P/-02878 ERS-HWH @15.50
20 340/13-9 CLX 15.55 16.15 20
Diversion of track through New
Bridge No.617 Inspection of formation treatment work using stone column method
by RVNL. Inspection of LC no.281, Non
Interlock, C class, TVUs 20,790. Inspection of Health Unit Inspection of staff quarter and
colony Inspection of Electrical (General Service) Sub Station.
21 359/30-38 BPP-APL 16:35 16.45 10
22 371/1-3 APL-NDo 17.00 17.15 15
23 389/34- TSR-TEL 17:40 17:50 10
390
24 397.25 TEL 18.00 18:30 30
25 BZA 19.00 Total 340