CR 1083 FORK PANTHER CREEK BRANCH OF SOUTH STA. 2+24.56 END PROJECT STA. 0+56.75 BEGIN PROJECT @ 0 SKEW COMPOSITE DECK BRIDGE 1-SPAN CB 12X48 PPC STA. 1+62.28 CONST. CONCRETE COATING 69 EMBANKMENT AT BRIDGE END BENT STRUCTURES SEPIA 027 SEPIA 028 STEEL GUARDRAIL POSTS STEEL BEAM GUARDRAIL ("W" BEAM) SEPIA 032 SEPIA 034 SEPIA 035 DELINEATORS FOR GUARDRAIL GUARDRAIL END TREATMENT TYPE 7 RAILING SYSTEM TYPE II GUARDRAIL TREATMENT RBI-002-07 TYPICAL GUARDRAIL INSTALLATIONS GUARDRAIL COMPONENTS RBR-016-05 TIMBER GUARDRAIL POSTS BGX-006-10 STENCILS FOR STRUCTURES BDP-001-05 BDP-002-03 BDP-003-03 BDP-004-03 BDP-005-05 BJE-001-13 BOX BEAM BEARING DETAILS BOX BEAM GENERAL NOTES & REFERENCES BOX BEAM MISCELLANEOUS DETAILS BOX BEAM TENSION ROD DETAILS RAILING SYSTEM TYPE II NEOPRENE EXPANSION DAM AND ARMORED EDGES RDI-040-01 EROSION CONTROL BLANKET SLOPE INSTALLATION RDX-210-03 TEMPORARY SILT FENCE RDX-220-05 RDX-225-01 SILT TRAP A SILT TRAP B RGX-001-06 MISCELLANEOUS STANDARDS RETAINING WALL GRAVITY TYPE NON-REINFORCED RGX-200-01 ONE POINT PROCTOR FAMILY OF CURVES RGX-002-09 BDP-006-04 BOX BEAM B12 & CB12 DETAILS SEPIA 009 SEPIA 010 TREATMENT OF EMBANKMENT AT END BENTS TREATMENT OF EMBANKMENT AT END BENTS-DETAILS ROLLING STANDARD DRAWINGS E- SHEET NAME: R00100LS Mi croStati on v8. 11 . 7. 443 DESIGN CRITERIA DESIGNED CLASS OF HIGHWAY TYPE OF TERRAIN DESIGN SPEED REQUIRED NPSD REQUIRED PSD LEVEL OF SERVICE DHV D % T % % RESTRICTED SD LEVEL OF SERVICE MAX. DISTANCE W/O PASSING LATITUDE DEGREES LONGITUDE SECONDS WEST SECONDS NORTH DEGREES ADT PRESENT ( ) ADT FUTURE ( ) GEOGRAPHIC COORDINATES RURAL LOCAL 2006 105 MINUTES MINUTES 36 49 38 40 86 37 DATE PLOTTED: USER: FI LE NAME: ... \d0147571 \Layout Sheet. dgn 12: 18: 38 AM agill ey 1 /4/2019 ACTIVE SEPIAS PREPARED BY OHIO 2-10015 Construction. 2012 Standard Specifications for Road and Bridge NUMBER: LETTING DATE: PROJECT COUNTY OF Commonwealth of Kentucky DEPARTMENT OF HIGHWAYS FEBRUARY 22, 2019 ITEM NO. DRAWING NO. 27867 Current Interims. 2017 AASHTO LRFD Bridge Design Specifications with STATE HIGHWAY ENGINEER PROJECT MANAGER RECOMMENDED BY: DATE: DATE: PLAN APPROVED BY: LOCATION MAP INDEX OF SHEETS Sheet No. Description PLAN SHEET PROFILE SHEET GENERAL NOTES LAYOUT SHEET TYPICAL SECTION PILE RECORD PILE END BENTS 1&2 MAINTENANCE OF TRAFFIC R3 R4 S1 S2 S3 S4 S5 S6 TYPICAL SECTION SHEET TITLE SHEET COUNTY OF ITEM NO. SHEET NO. OHIO 2-10015 R1 CONTRACT COMPLETION DATE AND LIQUIDATED DAMAGES TRAFFIC CONTROL PLACING BRIDGE OVERLAY APPROACH PAVEMENT PORTABLE CHANGEABLE MESSAGE SIGNS EROSION PREVENTION AND SEDIMENT CONTROL SPECIAL NOTES SPECIAL PROVISIONS SPECIFICATIONS TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS STA. 1+62.28 BRANCH OF SOUTH FORK PANTHER CREEK ROCKY CREEK LANE (CR 1083) OVER OHIO COUNTY SEPIA 031 ANCHOR GUARDRAIL END TREATMENT TYPE 7 ALTERNATE BPS-003-09 HP12X53 STEEL PILE EXISTING BRIDGE ID: 092C00097N BRIDGE DEMOLITION RBR-005-11 RBM-115-10 CONCRETE BARRIER WALL TYPE 9T (TEMPORARY) SEPIA 024 TYPICAL GUARDRAIL INSTALLATIONS SEPIA 021 CRASH CUSHION TYPE VI-BT R1 R2 R5 TRAFFIC CONTROL PLAN TREE CLEARING RESTRICTION T A C K S Y F T E O N K E T U N E O R S E F O I S C I L P L A R E E D E S N E N I G N 24751 WILLIAM GILLEY ANDREW T A C K N E O R S E F O I S C I L S P L A R E E D E S N E N I G N Y F T E O N K E T U 28391 MICHAEL J. VICKERS
Transcript
Page 1: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

CR 10

83

FORK PANTHER CREEK

BRANCH OF SOUTHSTA. 2+24.56

END PROJECT

STA. 0+56.75

BEGIN PROJECT

@ 0° SKEW

COMPOSITE DECK BRIDGE

1-SPAN CB 12X48 PPC

STA. 1+62.28 CONST.

CONCRETE COATING

69 EMBANKMENT AT BRIDGE END BENT STRUCTURES

SEPIA 027

SEPIA 028 STEEL GUARDRAIL POSTS

STEEL BEAM GUARDRAIL ("W" BEAM)

SEPIA 032

SEPIA 034

SEPIA 035

DELINEATORS FOR GUARDRAIL

GUARDRAIL END TREATMENT TYPE 7

RAILING SYSTEM TYPE II GUARDRAIL TREATMENT

RBI-002-07 TYPICAL GUARDRAIL INSTALLATIONS

GUARDRAIL COMPONENTS

RBR-016-05 TIMBER GUARDRAIL POSTS

BGX-006-10 STENCILS FOR STRUCTURES

BDP-001-05

BDP-002-03

BDP-003-03

BDP-004-03

BDP-005-05

BJE-001-13

BOX BEAM BEARING DETAILS

BOX BEAM GENERAL NOTES & REFERENCES

BOX BEAM MISCELLANEOUS DETAILS

BOX BEAM TENSION ROD DETAILS

RAILING SYSTEM TYPE II

NEOPRENE EXPANSION DAM AND ARMORED EDGES

RDI-040-01 EROSION CONTROL BLANKET SLOPE INSTALLATION

RDX-210-03 TEMPORARY SILT FENCE

RDX-220-05

RDX-225-01

SILT TRAP A

SILT TRAP B

RGX-001-06 MISCELLANEOUS STANDARDS

RETAINING WALL GRAVITY TYPE NON-REINFORCED

RGX-200-01 ONE POINT PROCTOR FAMILY OF CURVES

RGX-002-09

BDP-006-04 BOX BEAM B12 & CB12 DETAILS

SEPIA 009

SEPIA 010

TREATMENT OF EMBANKMENT AT END BENTS

TREATMENT OF EMBANKMENT AT END BENTS-DETAILS

ROLLING

STANDARD DRAWINGSE-S

HE

ET

NA

ME:

R0010

0LS

Micro

Statio

n v8.11.7.443

DESIGN CRITERIA

DESIGNED

CLASS OF HIGHWAY

TYPE OF TERRAIN

DESIGN SPEED

REQUIRED NPSD

REQUIRED PSD

LEVEL OF SERVICE

DHV

D %

T %

% RESTRICTED SD

LEVEL OF SERVICE

MAX. DISTANCE W/O PASSING

LATITUDE DEGREES

LONGITUDE SECONDS WEST

SECONDS NORTH

DEGREES

ADT PRESENT ( )

ADT FUTURE ( )

GEOGRAPHIC COORDINATES

RURAL LOCAL

2006105

MINUTES

MINUTES

36

49

38

4086

37

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME: ...\d014

7571\

Lay

out

Sheet.dgn

12:18:38

AM

agille

y

1/4/2019

ACTIVE SEPIAS

PREPARED BY

OHIO

2-10015

Construction.2012 Standard Specifications for Road and Bridge

NUMBER:

LETTING DATE:

PROJECT

COUNTY OF

Commonwealth of KentuckyDEPARTMENT OF HIGHWAYS

FEBRUARY 22, 2019

ITEM NO.

DRAWING NO.27867

Current Interims.2017 AASHTO LRFD Bridge Design Specifications with

STATE HIGHWAY ENGINEER

PROJECT MANAGER

RECOMMENDED BY:

DATE:

DATE:

PLAN APPROVED BY:

LOCATION MAP

INDEX OF SHEETSSheet No. Description

PLAN SHEET

PROFILE SHEET

GENERAL NOTES

LAYOUT SHEET

TYPICAL SECTION

PILE RECORD

PILE END BENTS 1&2

MAINTENANCE OF TRAFFIC

R3

R4

S1

S2

S3

S4

S5

S6

TYPICAL SECTION SHEET

TITLE SHEET

COUNTY OF ITEM NO. SHEET NO.

OHIO 2-10015 R1

CONTRACT COMPLETION DATE AND LIQUIDATED DAMAGES

TRAFFIC CONTROL

PLACING BRIDGE OVERLAY APPROACH PAVEMENT

PORTABLE CHANGEABLE MESSAGE SIGNS

EROSION PREVENTION AND SEDIMENT CONTROL

SPECIAL NOTES

SPECIAL PROVISIONS

SPECIFICATIONS

TRANSPORTATION CABINETDEPARTMENT OF HIGHWAYS

STA. 1+62.28BRANCH OF SOUTH FORK PANTHER CREEK

ROCKY CREEK LANE (CR 1083) OVEROHIO COUNTY

SEPIA 031ANCHOR

GUARDRAIL END TREATMENT TYPE 7 ALTERNATE

BPS-003-09 HP12X53 STEEL PILE

EXISTING BRIDGE ID: 092C00097N

BRIDGE DEMOLITION

RBR-005-11

RBM-115-10 CONCRETE BARRIER WALL TYPE 9T (TEMPORARY)

SEPIA 024 TYPICAL GUARDRAIL INSTALLATIONS

SEPIA 021 CRASH CUSHION TYPE VI-BT

R1

R2

R5 TRAFFIC CONTROL PLAN

TREE CLEARING RESTRICTION

TA C

K

S Y

F

TEO NKE

TU

N

E

O

R

S

EF

O

ISCI

L

P

LA

RE

E

D

ESN

ENI

GN

24751

WILLIAM

GILLEY

ANDREW

TA C

K

N

E

O

R

S

EF

O

ISCI

L

S

P

LA

RE

E

D

ESN

ENI

GN

Y

F

TEO NKE

TU

28391

MICHAEL J.

VICKERS

Page 2: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

CONVENTIONAL SIGNS

SURVEY LINE

GRADE LINE

GROUND LINE

COUNTY LINE

CORPORATE LIMITS

PROPOSED RIGHT OF WAY

BENCH MARK

RAILROAD

FENCE (CONTROLLED ACCESS)

FENCE (EXCEPT STONE AND HEDGE)

TREES

PIPE CULVERT

CULVERT

BRIDGE

BUILDINGS

LIGHTING POLE

POWER POLE

JOINT POWER & TELEPHONE POLE

TELEPHONE & TELEGRAPH POLE

ANCHOR, POWER OR TELEPHONE

STUB POWER

STUB TELEPHONE

WATER MAIN

GAS MAIN

TELEPHONE DUCT

ELECTRIC DUCT

DIRECT BURIAL ELECTRIC CABLE

DIRECT BURIAL TELEPHONE CABLE

STONE FENCE

HEDGE FENCE

SWAMP OR MARSH

SPRINGS

QUARRY SITE

LAKES OR PONDS

NORTH POINT

GUARDRAIL

SINKHOLE

400’ V.C.

B.M. NO.4

1-S

FRAME

1-S

BRICK SHED

2-S

BRICK

TERMINALSECTION

GUARDRAILEND TREATMENT

EXISTING PROPOSED

E E

T T

EXISTING ROAD

TRAFFIC LIGHTS

T

E

SAN

STORM

DIRECT BURIAL TV CABLE TV

E

T

SANITARY SEWER (WITH MANHOLE)

STORM SEWER (WITH MANHOLE)

GM

WM

T

E

TV

SAN

STORM

EXIST. RIGHT OF WAY & PROPERTY LINE

RIGHT OF WAY MONUMENT

RIGHT OF WAY MONUMENT

WM6"

GM6"

UTILITY TEST HOLE

EXIST. PROPERTY LINE PL

OVERHEAD WIRE

ELECTRIC MANHOLE EMH EMH

BLUE LINE STREAM

OR DITCH

INTERMITTENT STREAM

REGULATED FLOODWAY

EXISTING R/W MARKER

TELEPHONE MANHOLE TMH TMH

TREE LINE

THEXISTING/ PROPOSED

UTILITIES

[email protected]

(502) 867-8240 (office)

Contact Person: Frank Ambrose

Georgetown, KY 40324

894 East Main Street Ext

AT&T

TELEPHONE:

ROCKY CREEK LANE PAVEMENT

1

2

NOTES:

Special Note for Bridge Overlay Approach Pavement

GRANULAR EMBANKMENT in accordance with the

paved area will be measured and paid as

DGA Base needed for shoulders outside of

by the field engineer

Width varies and the location to be determined

4.00" CL2 Asph Base 1.00D PG64-22

4.00" CL2 Asph Base 1.00D PG64-22

8.00" DGA Base

1.25" CL2 Asph Surf 0.38D PG64-22

16.00" Base

1.25" Surface

Detail "A"

!

Varies

NORMAL SECTION

VARIES

Varies Varies

VARIES

Varies

Shld

Grade point

2’-0"2’-0"

Shld

8.0%8.0%

2 2

1 1

8.00" DGA Base

4.00" CL2 Asph Base 1.00D PG64-22

4.00" CL2 Asph Base 1.00D PG64-22

1.25" CL2 Asph Surf 0.38D PG64-22

Detail "A"

1

BEFORE YOU DIG

utility companies have facilities in the area. may be necessary for the contractor to contact the County Court Clerk to determine what excavation with the utility owners, including those whom do not subscribe to KY 811. It members of the KY 811 one-call Before-U-Dig (BUD) service. The contractor must coordinate contractor should be aware that owners of underground facilities are not required to be a minimum of two (2) and no more than ten (10) business days prior to excavation. The for information on the location of existing underground utilities. The call is to be placed The contractor is instructed to call 1-800-752-6007 to reach KY 811, the one-call system

8’-0" to 15’-3" 7’-6" to 15’-3"

EX. R/

W

2:1

5’

Detail "B"

Detail "B"

Non-ReinforcedGravity TypeRetaining Wall

3

3

excavation is incidental to concrete class B

Location to be determined by the field engineer and

BRIDGE TYPICAL SECTION

15’-3’’ 15’-3’’

30’-6’’9’’

32’-0’’

9’’

P/G

CL Bridge

2%2%

2’-0’’

8~CB12 Box Beams @ 4’-0" = 28’-0’’

2’-0’’

Co

nc. Sla

b5’’ Cla

ss "A

A"

and Sepia 035.Std. Dwg. BDP-005-05Railing System Type II. See5’

TYPICAL SECTIONS AND LEGEND

E-S

HE

ET

NA

ME:

R00200

TS

Micro

Statio

n v8.11.7.443

COUNTY OF ITEM NO. SHEET NO.

OHIO 2-10015 R2

ROCKY CREEK LANE (CR 1083) OVER

BRANCH OF SOUTH FORK PANTHER CREEKNTS

PREPARED BY

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME: ...\d014

7571\

Ty

pic

al.

dgn

12:09:56

AM

agille

y

1/4/2019

Page 3: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

0’ 40’ 80’20’

elevation of CP #1 (437.26’)utilizing the KYCORS RTN Network and were adjusted by a closed differential level loop based on the Elevations were established by redundant GPS observations NAVD88 vertical datum, Geoid 12B BASIS OF ELEVATIONS

Coordinates, US Survey Feet. No project datum factor was calculated or used for this project.Feet utilizing the KYCORS RTN GPS Network on October 31, 2018. Coordinates shown are State PlaneGNSS receivers. On the NAD83 Kentucky State Plane Coordinate System, KY Single Zone, US Survey Coordinates for horizontal control were obtained by redundant GPS observations using Trimble R10 PROJECT COORDINATES

MAGAN ROAD

Ditch

Existing R

/W

Existing R/W

Existing R/W

Existin

g

R/

W

Existing R/W

Existin

g R/

W

Panther

Creek

Branch of South Fork

Panther

Creek

Branch of South Fork

Asphalt

CP #3

CP #1

CP #2

E 4608979.33

N 3747689.98

STA. 0+56.75

BEGIN PROJECT

E 4609083.94

N 3747795.30

STA. 2+24.56

END PROJECT

EAST (X)NORTH (Y)

COORDINATE CONTROL POINTS

POINT

ELEV. (Z)

DESCRIPTION

State Plane Coordinates

STATION OFFSET

0+54.67 165.46’ LT.

1+85.21 150.72’ RT.

5/8" REBAR & CAP

1

2

3

3747855.393 4608981.725 437.261

437.539

436.6554609087.055

4609212.0583747696.167

3747713.093 1+52.24 29.09’ RT.

BEGIN APPROACH PAVEMENT

STA. 0+92.00

END APPROACH PAVEMENT

STA. 2+02.73

17"

CM

P

I.E.=434.66

O.E.=433.42

(CR 1083)

ROCKY CREEK LANE

RUSSELL

RALPH & RUBY

CONNECT TO BRIDGE RAIL SYSTEM TYPE II

WITH 1-GUARDRAIL END TREATMENT TYPE 7

25 L.F. GUARDRAIL-STEEL W BEAM-S FACE A

LT. STA. 0+56.75 TO STA. 1+45.53 CONST.

CONNECT TO BRIDGE RAIL SYSTEM TYPE II

WITH 1-GUARDRAIL END TREATMENT TYPE 7

25 L.F. GUARDRAIL-STEEL W BEAM-S FACE A

RT. STA. 1+79.03 TO STA. 1+84.54 CONST.

C

C

0+00

2+33

2+33

4608922.60

3747691.

47

0+00.00

PO

B

4609007.83

3747689.24

0+85.26

PC

4609

087.

37

3747

803.

34

2+33.3

0

POE

PI

1+15.86

MONUMENT W/ALUM. CAP

MONUMENT W/ALUM. CAP

30’ R

50’ R

DIT

CH

e= NC

E= 9.42’

R= 45.00’

L= 53.74’

T= 30.60’

E= 4609038.42

N= 3747688.44

P.I. Sta= 1+15.86

DNDTEL JB

TEL JB

WM

WM

WM WM

4609

050.

41

3747

716.5

9

1+39.0

1

PT

WM8’-0"

7’-6"

EXISTING BRIDGE ID: 092C00097N

BRIDGE

EXISTING

REMOVE

BY OTHERS

TO BE RELOCATED

S 88°29’56" E

N 23°04’2

2"

E

CONNECT TO BRIDGE RAIL SYSTEM TYPE II

WITH 1-GUARDRAIL END TREATMENT TYPE 7

25 L.F. GUARDRAIL-STEEL W BEAM-S FACE A

RT. STA. 0+86.03 TO STA. 1+45.53 CONST.

CATHERINE AND MICHAEL E. RALPH

PLAN

E-S

HE

ET

NA

ME:

R00300

PL

Micro

Statio

n v8.11.7.443

COUNTY OF ITEM NO. SHEET NO.

OHIO 2-10015 R3

ROCKY CREEK LANE (CR 1083) OVER

BRANCH OF SOUTH FORK PANTHER CREEK

PREPARED BY

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME: c:\p

w_

workin

g\d014

7571\

Pla

n.dgn

11:15:16

AM

agille

y

1/4/2019

CONNECT TO BRIDGE RAIL SYSTEM TYPE II

WITH 1-GUARDRAIL END TREATMENT TYPE 7

25 L.F. GUARDRAIL-STEEL W BEAM-S FACE A

LT. STA. 1+79.03 TO STA. 2+24.56 CONST.

30.6 L.F. - 5’ FLAT BOTTOM DITCH

LT. STA. 1+15.84 TO STA. 1+61.36 CONST.

EXCAVATION IS INCIDENTAL

NON-REINFORCED ~ 7.0 CUYD CONCRETE CLASS B

RETAINING WALL GRAVITY TYPE

LT. STA. 1+14.53 TO STA. 1+51.72 CONST.

IP

Page 4: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

410

412

414

416

418

420

422

424

426

428

430

432

434

436

438

440

442

444

446

448448

412

414

416

418

420

422

424

426

428

430

432

434

436

438

440

442

444

446

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40

410

412

414

416

418

420

422

424

426

428

430

432

434

436

438

440

442

444

446

448448

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40

436.8

436.8

436.7

436.8

436.8

436.8

437.1

437.0

431.

0

437.2

436.4

436.0

436.83

437.05

437.27

437.44

437.52

436.33

DATUM

COUNTY OF ITEM NO. SHEET NO.

OHIO 2-10015 R4

DATUM

ROCKY CREEK ROAD (CR 1083) OVER

BRANCH OF SOUTH FORK PANTHER CREEK

PROFILEPREPARED BY

E-S

HE

ET

NA

ME:

R00400

PF

Micro

Statio

n v8.11.7.443

C:\

PW

_W

OR

KIN

G\

D014

7571\

PR

OFIL

E.

DG

NFIL

E

NA

ME:

January

4, 2019

DA

TE P

LO

TT

ED:

agille

yU

SE

R:

0’ 40’ 80’20’

2’

4’

8’

0’

Road

Magan

ELEV 435.51

LOW BEAM

PROPOSED

(CR 1083)

ROCKY CREEK LANE

ELEV 435.19

LOW BEAM

EXISTING

STA. 0+56.75

BEGIN PROJECT

END APPROACH PAVEMENT

STA. 2+02.73

STA. 2+24.56

END PROJECT

BEGIN APPROACH PAVEMENT

STA. 0+92.00

PVI 0

+92.00

Ele

v 436.71

PVI 1+

45.53

Ele

v 437.33

PVI 1+

79.03

Ele

v 437.57

PVI 2

+02.73

Ele

v 436.16

1.16% -5.94%

0.72%

@ 0° S

KE

W

CO

MP

OSIT

E

DE

CK

BRID

GE

1-S

PA

N

CB 12

X48 P

PC

ST

A 1+

62.28

CO

NS

T.

and all appurtenances. Contractor shall final dress all slopes to maximum of 2:1.

structureexisting of removal complete the include shall full in payment sum Lump

abutments.timber (2) two and bridge pipe steel half connected mechanically 23’ (1) one of

consists structure existing The specifications. current the with accordance in of

disposed be shall and contractor the of property the remain shall

bridgeexisting the in material All specifications. the with accordance in

The existing 23’x32’ - one (1) span mechanically connected half steel pipe bridge shall be removed

BRIDGE REMOVAL NOTE

Page 5: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

0’ 40’ 80’20’

MAGAN ROAD

Ditch

Existing R

/W

Existing R/W

Existing R/W

Existin

g

R/

W

Existing R/W

Existin

g R/

W

Panther

Creek

Branch of South Fork

Asphalt

CP #3

CP #1

E 4608979.33

N 3747689.98

STA. 0+56.75

BEGIN PROJECT

E 4609083.94

N 3747795.30

STA. 2+24.56

END PROJECT

17"

CM

P

(CR 1083)

ROCKY CREEK LANE

RUSSELL

RALPH & RUBY

0+00

2+33

2+33

TEL JB

TEL JB

WM

WM

WM WMWM

CATHERINE AND MICHAEL E. RALPH

TEMPORARY TRAFFIC BARRIER

LEGEND

TRAFFIC ONLY

FOR MAINTENANCE OF

LA

NE

SIN

GL

E

6’

10’-6"

BRIDGE CONSTRUCTION

MAGAN ROAD

Ditch

Existing R

/W

Existing R/W

Existing R/W

Existin

g

R/

WExisting R/W

Existin

g R/

W

Panther

Creek

Branch of South Fork

Asphalt

CP #3

CP #1

E 4608979.33

N 3747689.98

STA. 0+56.75

BEGIN PROJECT

E 4609083.94

N 3747795.30

STA. 2+24.56

END PROJECT

17"

CM

P

(CR 1083)

ROCKY CREEK LANE

RUSSELL

RALPH & RUBY

0+00

2+33

2+33

TEL JB

TEL JB

WM

WM

WM WMWM

CATHERINE AND MICHAEL E. RALPH

LA

NE

SIN

GL

E

IP

Asphalt

DIT

CH

CHANNELIZING DEVICES

12’-3"

PHASE 1 & 2 PHASE 3 & 4

CRASH CUSHION

SH

OU

LD

ER

TRAFFIC CONTROL PLAN

E-S

HE

ET

NA

ME:

R00300

PL

Micro

Statio

n v8.11.7.443

COUNTY OF ITEM NO. SHEET NO.

OHIO 2-10015 R5

ROCKY CREEK LANE (CR 1083) OVER

BRANCH OF SOUTH FORK PANTHER CREEK

PREPARED BY

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME: c:\p

w_

workin

g\d014

7571\

MO

T.dgn

11:29:35

AM

agille

y

1/4/2019

PHASE NOTES, DETAILS, AND TYPICAL SECTIONS.

SEE SHEET S6 FOR BRIDGE PARTIAL WIDTH CONSTRUCTION

NOTE:

IP

Page 6: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

E-S

HE

ET

NA

ME:

Micro

Statio

n v8.11.9.459

DRAWING NO.

SHEET NO.

Commonwealth of Kentucky

DEPARTMENT OF HIGHWAYSCOUNTY

ROUTE CROSSING

PREPARED BY

DETAILED BY:

DESIGNED BY:

DATE: CHECKED BY

REVISION DATE

2-10015

S. Weber M. Vickers

C. Quinn M. Vickers

OHIO

CR1083 BRANCH OF S. FORK PANTHER CREEK

GENERAL NOTES

S1

27867

1/19

ITEM NUMBER

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME:

3:10:31

PM

...\d014

7588\

Ge

neral

Notes.dgn

agille

y

1/4/2019

8th edition with interims.

the AASHTO specifications are to the AASHTO LRFD Bridge Design Specifications,

Construction including any current supplemental specifications. All references to

Kentucky Department of Highways Standard Specifications for Road and Bridge

Specifications: References to the specifications are to the current edition of the

This bridge is designed for a future wearing surface of 15 psf.

Design Load: This bridge is designed for KYHL-93 live load, (i.e. 1.25xAASHTO HL93 live load).

Specifications.

than the load and resistance factor design method as specified in the current AASHTO

Design Method: All reinforced concrete members are designed to be equivalent or greater

fy = 60000 psiFor Steel Reinforcement

f’c = 4000 psiFor Class "AA" Reinforced Concrete

f’c = 3500 psiFor Class "A" Reinforced Concrete

Materials Design Specifications:

Grade 60

Deformed and Plain Billet-Steel for Concrete Reinforcement,AASHTO M-31

Premolded Cork Filler, Type IIAASHTO M153

below shall govern the materials furnished.

Material Specifications: AASHTO Specifications or ASTM, current edition, as designated

Specifications.

conform to subsection 807.04.02 (Type II) of the Kentucky Department of Highways Standard

Preformed Cork Expansion Joint Material: Preformed Cork Expansion Joint Material shall

the plans and specifications.

the substructure below the caps. Prestressed beam concrete shall be in accordance with

portions of the substructure above the tops of caps. Class "A" concrete is to be used in

Concrete: Class "AA" Concrete is to be used throughout the superstructure and in the

Bill of Reinforcement shall be considered a stirrup for purposes of bend diameters.

811.10 of the Standard Specifications. Any reinforcing bars designated by suffix "s" in a

bars designated by suffix "e" in the plans shall be epoxy coated in accordance with section

unless otherwise shown. Spacing of bars is from center to center of bars. Any reinforcing

Reinforcement: Dimensions shown from the face of concrete to bars are to center of bars

the work for which no direct payment will be made.

engineer. The contractor shall furnish all plans, equipment and labor necessary to do

shall be imprinted in the concrete with 1 inch letters at a location designated by the

Construction Identification: The names of the Prime Contractor and the Sub-Contractor

specifications.

Beams shall be at the contract unit price per linear foot of beam, in accordance with the

Payment for Precast Concrete Beams: The basis of payment for the Prestressed Concrete

incidental to the unit price bid for Dry Cyclopean Stone Riprap.

Specifications 214 and 843. Payment for Geotextile Fabric, Type I, shall be considered

between the embankment and the slope protection in accordance with Standard

accordance with the plans and specifications. Geotextile Fabric, Type I shall be placed

Slope Protection: Slope Protection at abutments shall be dry cyclopean stone riprap in

labor, or anything else required to complete the structure.

removal of all or parts of existing structures, phase construction, incidental materials,

the work involved. This may include cofferdams, shoring, excavations, backfilling,

operations not otherwise specified, are to be included in the bid item most appropriate to

accordance with the plans and specifications. Material, labor, or construction

Completion of the Structure: The contractor is required to complete the structure in

contractor.

drawings reflecting these changes shall be submitted to the consultant through the

When any changes in the design plans are proposed by the fabricator or supplier, the shop

case by case basis.

paper copies, Construction Management Team reserves the right to require such copies on a

Team" are to be used for fabrication. While this process does not require the submission of

distributed, and only plans electronically stamped "Distributed by Construction Management

for distribution. Only plans submitted directly to the Construction Management Team will be

stamped by the designer and plans will be forwarded to the Construction Management Team

designer’s comments, files shall be returned to the designer. Each sheet will be electronically

submissions as needed and return them to the fabricator. Upon reconciliation of the

either 11" x 17" or 22" x 36" sheets. Designers will make review comments on these electronic

consultant for review. These submissions shall depict the shop plans, in .pdf format, as

Shop Drawings: Fabricators shall submit all required shop plans, by e-mail, to the design

activities that may involve utilities (overhead or underground).

prior to excavation of material or installation of guardrail or other construction

Utilities: The contractor shall be responsible for locating any and all existing utilities

shall be replaced at the contractor’s expense.

material. New material that is unsuitable because of variations in the existing structure

Verifying Field Conditions: The contractor shall field verify all dimensions before ordering

dimensions are horizontal dimensions.

Dimensions: Dimensions are for a normal temperature of 60 degrees fahrenheit. Layout

end of slab before the concrete is allowed to set.

Superstructure Slab: The superstructure slab shall be poured continuously from end to

measurement of payment shall be made.

shall be considered incidental to the unit price bid for concrete class ’AA’ and no separate

The cost of labor, materials, and incidental items for furnishing and installing Mastic Tape

manufacturer’s recommendations with the overlap running downhill.

Mastic Tape shall be spliced by taping a minimum of 6" and in accordance with the

Mastic Tape shall cover the joint continuously unless otherwise shown in the plans.

or approved equal.

Cadilloc by The UP Rubber Co. Inc.

Seal Wrap by Mar Mac Manufacturing Co. Inc.,

EZ-Wrap Rubber by Press-seal Casket Corporation,

Mastic Tape shall be either:

of the joint.

required by the tape manufacturer, shall be applied for a minimum width of 9" on each side

the joint surface shall be clean and free of dirt, debris, or deleterious material. Primer, if

Type I, II, or III. The joint is to be covered with 12" wide mastic tape. Prior to application,

Mastic Tape: Mastic Tape used to seal joints is to meet the requirements of ASTM C-877

when pouring the concrete deck slab or when taking "top of beam" elevations.

Temporary Supports: Temporary Supports or shoring will not be permitted under the beams

end of bridge.

Armored Edge: Fabricate armored edge to match cross slope and parabolic crown at each

of the Specifications.

Foundation Preparation: Foundation Preparation shall be in accordance with Section 603

but shall be included in the Lump Sum Bid for Foundation Preparation.

Contrary to the Specifications, Structural Granular Backfill will not be measured for payment

with Section 805 of the Specifications.

Structural Granular Backfill: Materials for Structural Granular Backfill shall be in accordance

of the specifications and of the type shown on the pile record sheet.

Pile Points: Provide pile points for all piles. Pile points shall be in accordance with Section 604

General Notes

notarized.

Contrary to the standard drawings for steel piling, mill test reports are not required to be

structure.

All test piles shall be accurately located so that they may be used in the finished

required.

Test piles shall be driven where designated on the plans to determine the length of pile

Piling: Piling shall be driven to practical refusal as defined on the pile record sheet.

width end bent construction.

temporary shoring, sheeting, steel traffic plates as needed to maintain traffic and allow partial

information provided within the plans and specifications. The contractor shall provide

use the minimum lap splice lengths or KYTC approved mechanical couplers in accordance with

a minimum of 2" cover to the nearest stirrup reinforcing bar. The contractor has the option to

joints on the endbents shall be located to provide minimum of 1’-0" cover from pile edges, and

extent of partial demolition of the existing bridge structure. The location of the construction

plans for phasing scheme. Endbents and deck exact partial widths shall be dependant on the

Partial Width Construction: Project requires phased partial width construction. Refer to MOT

if the actual quantity is different than this estimate.

contractor to verify this estimate and bid appropriately. No payment adjustments will be made

Concrete Coating: Concrete Coating is estimated at 1215 S.F. It is the responsibility of the

Beveled Edges: All exposed edges shall be beveled �", unless otherwise shown.

Page 7: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

(CR 10

83)

RO

CK

Y

CR

EE

K

LA

NE

MA

GA

N

RD.

2:1 N

ormal

Detail

Toe of Slope

Line

Ground

2’-0"

2’-

0"

2’-

0"

0.72%

Ele

v 437.33

Ditch4

35

435

435

435

435

435

TE

L J

B

Datum Line424

426

428

430

432

434

436

438

440

442

2+00

1+00

WM

BRANCH OF SOUTH FORK PANTHER CREEK

1.16%

PVI 2

+02.73

Ele

v 436.16

PVI 1+

45.53

PVI 1+

79.03

-5.94%

4609

007.

8337

4768

9.24

0+85.

26PC

e= NC

E= 9.42’

R= 45.00’

L= 53.74’

T= 30.60’

E= 4609038.42

N= 3747688.44

P.I. Sta= 1+15.86

1+15.86

PC

4609050.41

3747716.59

1+39.01

PT

4609087.37

3747803.34

2+33.30

PO

E

Existing R/W

DITCH

Ele

v 437.57

PA

NT

HE

R

CR

EE

K

BR

AN

CH

OF S

OU

TH F

OR

K

DEAD END (Residents Only)

E-S

HE

ET

NA

ME:

Micro

Statio

n v8.11.9.459

DRAWING NO.

SHEET NO.

Commonwealth of Kentucky

DEPARTMENT OF HIGHWAYSCOUNTY

ROUTE CROSSING

PREPARED BY

DETAILED BY:

DESIGNED BY:

DATE: CHECKED BY

REVISION DATE

2-10015

S. Weber M. Vickers

C. Quinn M. Vickers

OHIO

CR1083

LAYOUT

S2

27867

1/19

ITEM NUMBER

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME:

3:13:31

PM

...\p

w_

workin

g\d014

7588\

Lay

out.dgn

agille

y

1/4/2019

ELEVATION

PLAN

! Magan Rd.

Sta. 1+79.03

End Bridge

30’-6" Bridge Roadway Width - 0° Skew

Live Load 1.25 x HL-93 (KY HL-93)

32’-0" Single Span CB12 PPC Box Beam

! Bridge

33’-6" Out to Out

32’-0" ! Brg. to ! Brg.

(Superstructure Not Shown)

Type 1

Geotextile Fabric

Stone Rip-Rap over

2’-0" Thick Cyclopean

(Remove)

Abutment

Existing

Elev. 435.70

Low Bridge Seat

Elev. 434.70

Pile Cutoff

2

11

2Elev. 435.47

Low Bridge Seat

Elev. 434.47

Pile Cutoff

Stone Rip-Rap (Typ.)

Limits of Cyclopean

Sta. 1+45.53

Begin Bridge

Local Tangent

Relocate

433.97

Elev.

Berm

434.20

Elev.

Berm

E=4609053.26

N=3747723.28

Sta. 1+46.28

! Brg. E.B.#1

E=4609065.80

N=3747752.72

Sta. 1+78.28

! Brg. E.B.#2

Wall

Gravity

Ex. Ground Line

End Bent #1 End Bent #2

3’-0" Berm (Typ.)

Width (Typ.)3’-0" Berm

(Fix)(Fix)

Page 8: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

2%2%

1’-0" 1’-0" 1’-0" 1’-0" 1’-0" 1’-0"

�"

.0

033’

�"

.0

133’

�"

.0

133’

�"

.0

30

0’

�"

.0

033’

-2.0% -2.0%}{

Concrete Surface Profile Grade

6’-0" Vertical Curve

PARABOLIC CROWN

! Bridge

BRANCH OF SOUTH FORK PANTHER CREEK

TYPICAL SECTION

of bridge to prevent damage to tape.

shall be looped as shown at expansion ends

between beam ends and abutment. Tape

mastic tape to water-proof the joint

Note: Contractor shall provide 12" wide

END OF BEAM DETAIL

To Beam

Measured Parallel

E-S

HE

ET

NA

ME:

Micro

Statio

n v8.11.7.443

DRAWING NO.

SHEET NO.

Commonwealth of Kentucky

DEPARTMENT OF HIGHWAYSCOUNTY

ROUTE CROSSING

PREPARED BY

DETAILED BY:

DESIGNED BY:

DATE: CHECKED BY

REVISION DATE

2-10015

S. Weber M. Vickers

C. Quinn M. Vickers

OHIO

CR1083

TYPICAL SECTION

S3

27867

1/19

ITEM NUMBER

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME:

2:23:51

AM

...\d014

7588\

Ty

pic

al

Sectio

n.dgn

agille

y

1/4/2019

#5 Bars @ 12" Max. Spacing

6’-0" Parabolic Crown

32’-0"

30’-6"9" 9"

15’-3"15’-3"

P/G

! Bridge

"AA" Conc.5" Slab Class

Clr.2�"

Max. Spacing#5 Bar @ 12"

Note: All Slab Reinf. to be Epoxy Coated

Rustication Groove

8~CB12 Box Beams @ 4’-0" = 32’-0"

End of Bridge

Mastic Tape

of Abut.

Back Face

! Bearing

Armored Edge

9" 9"

1�" +/-

Loop

and Sepia 035Std. Dwg. BDP-005-05Railing System Type II. See

Longitudinal Deck Bar.a Minimum of 3" Clear Cover to the NearestLongitudinal Construction Joint Shall ProvideLap Splice Length for #5 Deck Bars is 2’-5". (or Mechanically Coupled). Mininum Required#5 Transverse Deck Bars to be Lap SplicedPhased Partial Width Construction Requires

Page 9: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

No.

Pile

Elevation

Cut-off

Pile

In Place

Length

Pile

As Driven

Elevation

Point of Pile

Load

Axial

Design

PILE RECORD FOR POINT BEARING PILES

FEET FEET FEET TONS

1

2

3

4

5

6

7

8

9

10

Definitions of Terms

Field Data

calculations for Factored LRFD Loadings.

practical refusal.

CALCULATED FIELD BEARING: Contrary to Section 604.03.07 of the Standard Specifications,

in place bearing values are not required for piles bearing on rock when driven to

DESIGN AXIAL LOAD: Load carried by each pile as estimated from structural design

structure.

POINT OF PILE ELEVATION AS DRIVEN: Actual point of pile elevation in the finished

structure.

PILE LENGTH IN PLACE: Actual pile length below the Pile Cut-Off Elevation in the finished

PILE CUT-OFF ELEVATION: Elevation of the top of pile in the finished structure.

Length in Place and Point of Pile Elevation as Driven.

For each pile, the Project Engineer shall record the following on this sheet: Pile

required to keep and submit.

This pile record does not replace other pile records the Project Engineer is

Submit this record to:

DRIVING CRITERIA: Drive point bearing piles to practical refusal.

Frankfort, KY 40622

200 Mero Street

3rd Floor East

Director, Division of Structural Design

Kentucky Transportation Cabinet

3’ -6�

" 4 Spa.

@ 8’-

0"

= 32’ -0"

3’ -6�

"

3’ -6�

" 4 Spa.

@ 8’-

0"

= 32’ -0"

3’ -6�

"

90°0’0"

PILE LAYOUT

103

103

103

103

103

103

103

103

103

103

434.47

434.70

39’ -1"

! Brg. E.B.#1

! Brg. E.B.#2

Ahead

! Bridge

Local Tangent

434.47

434.47

434.47

434.47

434.70

434.70

434.70

434.70

Use HP 12x53 in accordance with BPS-003, c.e.

Pile #1

Pile #2

Pile #3

Pile #4 Pile #9

Pile #10

Pile #8

Pile #6

Pile #7

pile driving procedures.by the Engineer will be subject to satisfactory field performance of the prior to the installation of the first pile. Approval of the pile driving systemContractor shall submit the proposed pile driving system to the Engineerwithout encountering excessive blow counts or damage to the piles. The 27 foot-kips will be required to drive 12x53 steel H-piles to practical refusalA diesel pile driving hammer with a rated energy between 15 foot-kips and

groundwater will be encountered at foundation locations within the floodplain.required to facilitate foundation construction. it should be anticipated that Temporary shoring, sheeting, cofferdams and/or a dewatering method may be

performed in accordance with applicable federal, state, and local guidelines.safety to people working in or around the excavations. Bracing should be Foundation excavations should be properly braced/shored to provide adequate

Pile #5 (Test Pile)

Driving Criteria and Pile Notes

Drive additional production and test piles if directed by the Engineer.specified for practical refusal is required to further advance the pile. Engineer will determine if more blows than the average driving resistance boulder before the pile is advanced to the depth anticipated, the encountered because of dense strata or an obstruction, such as a visibly yields or becomes damaged during driving. If hard driving is subsurface data sheet(s). Immediately cease driving operations if the pile resistances specifed above and to depths determined by test pile(s) and penetration of �" or less. Advance the production piling to the driving is obtained after the pile is struck an additional 10 blows with total penetration becomes �" or less for 10 consecutive blows, practical refusal For this project minimum blow requirements are reached after total

E-S

HE

ET

NA

ME:

Micro

Statio

n v8.11.9.459

DRAWING NO.

SHEET NO.

Commonwealth of Kentucky

DEPARTMENT OF HIGHWAYSCOUNTY

ROUTE CROSSING

PREPARED BY

DETAILED BY:

DESIGNED BY:

DATE: CHECKED BY

REVISION DATE

2-10015

S. Weber M. Vickers

C. Quinn M. Vickers

OHIO

CR1083 BRANCH OF S. FORK PANTHER CREEK

PILE RECORD

S4

27867

1/19

ITEM NUMBER

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME:

10:24:03 P

M...\d014

7588\

Pile

Record.dgn

agille

y

1/7/2019

and Bridge Construction, current edition.accordance with Section 604 of the Kentucky Standard Specifications for Roadmay be encountered is recommended. Installation of pile points should be in of reinforced pile points capable of penetrating boulders and hard layers which used on end bearing piles to allow for embedment into the top of bedrock. UseThe Kentucky Transportation Cabinet recommends that protective pile points be

Construction.Kentucky Department of Highway Standard Specifications for Road and BridgeBridge Design Specifications, and Section 604 of the current edition of the The installation of the pile foundations should conform to current AASHTO LRFD

Page 10: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

"A" 2’-0"

"B"~A1 @ "C" = "D"

A2 A3

6"

1’-6"

3’-

0"

"WV"

"WX"

A5

A6

about this !

reinforcement symetrical

All dimension and

! Bridge

A5 or A6

Trim A4-A6 bars as necessary.

NOTE:

3’-

0"

! Brg. & ! Cap

="F" (Typ.)

"E"~A1 @ 12"

PLAN

ELEVATION

5~A2 as shown

1’-6"

3’-0"

1"

4~A2 Eq. Spa.

B

A

A

B

3’-

0"

5~A2 as shown

3’-

0"

1’-6"

3’-0"

1"

4~A2 Eq. Spa.

Em

b.

Min.

1’-6"

9"

SECTION B-B

SECTION A-A

! Brg. & ! Cap

! Brg. & ! Cap

3" cl.

A6

= "H"

"G"~A4 @ 12"

3" cl.

3" cl.

90°

Varie

s

A4

A4

6"

+

SD

H

6"

+

SD

H(If necessary)

Field Bend

"PE" "PE"

*WL

*16’-0�" (32’ bridge width)

*12’-0�" (24’ bridge width)

*8’-0�" (16’ bridge width)

rolled beam superstructure

*Adjust 9" as necessary for

"L"

joint material (Typ.)

�" expansion

(Ty

p.)

2’-

0"

*"WL"

*"WU"

16

A B C D E F G

3�" 4 2’-3" 7 6’-0" 3

H

2’-0"

WL

3’-6"

WU WV WXL

23’-1"

J

MARK TYPE NO. SIZE LENGTH

A1e 22 5 11- 0

A2e Str. 9 8 22- 9

14s

A3e Str. 4 5 22- 9

A1e 24 5 11- 0

A2e Str. 9 8 25- 5

14s

A3e Str. 4 5 25- 5

A1e 29 5 11- 0

A2e Str. 9 8 30- 5

14s

A3e Str. 4 5 30- 5

WIDTH

BRIDGE

0

24

32

2�" 3 1’-2" 6 5’-0" 5 4’-0"

4�" 4 2’-0" 7 6’-0" 7 6’-0"

7"

8"

4’-10"

7’-4" 3’-3" 4’-1" 2’-1"

25’-9"

30’-9"

0

H1 92

H2

H3 107

87

SIZE TONS

97

122

99

133

PILE LOAD

9" 0

0

3�" 4 2’-3" 7 6’-0" 3 2’-0" 3’-6"31’-1"2 09" 0

4’-10"

7’-4"

3’-6"

4’-10"

7’-4"

3’-3" 4’-1" 2’-1"

00

3’-3" 4’-1" 2’-1"

00

00

33’-9"

38’-9"

39’-1"

41’-9"

46’-9"

2

3

4

3

4

2

3

4

5 4’-0"

7 6’-0"

5 4’-0"

7 6’-0"

3 2’-0"

6 5’-0"

7 6’-0"

7 6’-0"

6 5’-0"

7 6’-0"

3 1’-8"2�" 10"

4�" 4 2’-0"8"

3�" 4 2’-3"9"

4�" 4 2’-0"8"

4�" 4 2’-0"8"

16’-0" BRIDGE WIDTH

MARK TYPE NO. SIZE LENGTH

A1e 29 5 11- 0

A2e Str. 9 8 30- 9

14s

A3e Str. 4 5 30- 9

A1e 30 5 11- 0

A2e Str. 9 8 33- 5

14s

A3e Str. 4 5 33- 5

A1e 36 5 11- 0

A2e Str. 9 8 38- 5

14s

A3e Str. 4 5 38- 5

24’-0" BRIDGE WIDTH

MARK TYPE NO. SIZE LENGTH

A1e 36 5 11- 0

A2e* Str. 9* 8*

14s

Str.

A1e 38 5 11- 0

A2e Str. 9 8 41- 5

14s

A3e Str. 4 5 41- 5

A1e 43 5 11- 0

A2e Str. 9 8 46- 5

14s

A3e Str. 4 5 46- 5

32’-0" BRIDGE WIDTH

DIMENSIONS

A4e Str. 28 5

A5e Str. 16 5 7- 0

A6e Str. 4 6 7- 5

5-11

A4e Str. 20 5

A5e Str. 12 5 4- 6

A6e Str. 4 6 4- 6

4- 8

A4e Str. 12 5

A5e Str. 8 5 3- 2

A6e Str. 4 6 3- 2

4- 0

MARK TYPE NO. SIZE LENGTH

CAP BILL OF REINFORCEMENT

REINFORCEMENT

WING BILL OF

QUANTITIES

CONCRETE (C.Y.) STEEL (LBS.)

H1

H2

H3

H1

H2

H3

H1

H2

H3

2~A3 e.f. @ eq. spa.

2~A3 e.f. @ eq. spa.

(e.f.)

@ e

q. spa.

"J"~

A5

3’-6"

4’-10"

3’-6"

4’-10"

3’-6"

4’-10"

A1

A1

+(haunch+slab) [if applicable]

SDH = Beam+Pad Height

SUPERSTRUCTURE HEIGHT

12" SDH 27"

27" SDH 35"

35" SDH 50"

No. of Piles @ "PS" = "PL"

"L/2"

103

109

End Bent

Back Face of

9.8

12.2

16.8

12.4

14.8

19.4

15.1

17.5

22.1

1175

1527

1297

1469

1833

1787

2139

CAP BILL OF REINFORCEMENT

3

4

4

PS PL

8’-0"

PE

3’-6�" 16’-0"

2’-4�" 7’-0" 21’-0"

3’-4�" 8’-0" 24’-0"

5

5

4

6

6

5

3’-6�" 8’-0" 24’-0"

28’-0"7’-0"2’-10�"

3’-4�" 8’-0" 32’-0"

3’-6�" 8’-0" 32’-0"

3’-4�" 7’-0" 35’-0"

40’-0"8’-0"3’-4�"

PILES

NO.

(typ. each wing).are set and tensioning rods are tightenedbox beams. Wings shall be poured after beamsMandatory Construction joint for side by side

lap

6"

2’-

7"

2’-8"

A1 Bar

~Size #5~

seats with rolled steel beams to maintain proper roadway slope.

Slope cap as necessary with side by side box beams and step cap

NOTE:

(Berm)

2:1

SECTION THRU END BENT

3’-0"

(Showing berm and fill slope)

Min.

1’-0"

before driving piles.

of cap elevation

Fill to bottom

Geotextile Fabric Type I

Cyclopean Stone Rip Rap with

(Typ.)

2’-

0"

A3e** 4** 5**

38- 9*

38- 9**

991

1604***

E-S

HE

ET

NA

ME:

Micro

Statio

n v8.11.9.459

DRAWING NO.

SHEET NO.

Commonwealth of Kentucky

DEPARTMENT OF HIGHWAYSCOUNTY

ROUTE CROSSING

PREPARED BY

DETAILED BY:

DESIGNED BY:

DATE: CHECKED BY

REVISION DATE

2-10015

S. Weber M. Vickers

C. Quinn M. Vickers

OHIO

CR1083 BRANCH OF S. FORK PANTHER CREEK

PILE END BENTS 1 & 2

S5

27867

1/19

ITEM NUMBER

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME:

2:20:13

AM

c:\p

w_

workin

g\d014

7588\.dgn.dgn

agille

y

1/4/2019

use of KYTC approved mechanical couplers.

cover splice lengths required for partial width construction in lieu of the optional

quantities for project have an additional quantity of steel reinforcment included to

***Steel quantity shown here is for single end bent full width constuction. Bid tab

in the contractor’s bid.

for A3e bars shall be 2’-5", accounted for on shop drawings, and included

use of KYTC approved mechanical couplers). The minimum lap splice length

lengths adjusted accordingly to account for lap splices (or the optional

width construction is required for project. Bar counts shall be doubled and

**A3e bar counts and length shown here assume full width construction. Partial

in the contractor’s bid.

for A2e bars shall be 4’-9", accounted for on shop drawings, and included

use of KYTC approved mechanical couplers). The minimum lap splice length

lengths adjusted accordingly to account for lap splices (or the optional

width construction is required for project. Bar counts shall be doubled and

*A2e bar counts and length shown here assume full width construction. Partial

PARTIAL WIDTH CONSTRUCTION STEEL REINFORCEMENT NOTES:

damaged piling.

encountering excessive blow counts or damaging the pile. Contractor shall be responsible for all

10) Contractor shall provide a hammer capable of driving the piling to refusal or capacity without

is required in all circumstances.

must be driven to 10’ below stream bed or to refusal on bedrock. A minimum pile length of 10’

9) Piles must be driven 10’ into existing ground or to refusal on bedrock. Piles at wet crossings

8) Pile load given is Factored Strength Load.

(Pile Load/0.4) using the Gates Method.

7) Piles driven to rock must be driven to Refusal. Friction Piles must be driven to

6) Piles may be HP12x53 or 16" Steel Pipes with �" wall thickness.

H3 - CB33, B42, CB42 or rolled steel beams up to 36" nominal depth.

H2 - CB21, B27, CB27, B33 or rolled steel beams up to 24" nominal depth.

H1 - B12, CB12, B17, CB17, B21 or rolled steel beams up to 16" nominal depth.

steel and concrete beams as shown in the current standards:

5) End Bents are designed for the maximum span of the following

4) Maintain 2" clear cover to reinforcement unless otherwise noted.

3) Rebar to be epoxy coated A615, Grade 60.

2) Concrete to be Class "A", 3500 psi.

1) Conform to KYTC, Standard Specifications, Current Edition.

NOTES:

Page 11: TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS … Relat… · composite deck bridge 1-span cb 12x48 ppc sta. 1+62.28 const. concrete ... bps-003-09 hp12x53 steel pile existing bridge

31’-2�"

2%

P/G

CL Bridge

2%2%

32’-0"

30’-6"9"

15’-3" 15’-3"

9"

2’-0"8~CB12 Box Beams @ 4’-0" = 28’-0"

2’-0"

12’-3"

2’-3"

9"

31’-2�"

1’-7�"3’-8�"18’-5�"7’-5"

1’-7�"

12’-3"2’-3"

9"

16’-0"

1’-7�"3’-8�"18’-5�"7’-5"

1’-7�"

2%

12’-3"2’-3"

9"

16’-0"

C

BridgeL Existing

C

BridgeL Existing

C

BridgeL Existing

C

BridgeL Existing

C

BridgeL Existing

and Sepia 035See Std. Dwg. BDP-005-05 Railing System Type II.

E-S

HE

ET

NA

ME:

Micro

Statio

n v8.11.7.443

DRAWING NO.

SHEET NO.

Commonwealth of Kentucky

DEPARTMENT OF HIGHWAYSCOUNTY

ROUTE CROSSING

PREPARED BY

DETAILED BY:

DESIGNED BY:

DATE: CHECKED BY

REVISION DATE

2-10015

S.Weber M. Vickers

S.Weber M. Vickers

OHIO

CR 1083 BRANCH OF S. FORK PANTHER CR.

M.O.T

S6

27867

1/19

ITEM NUMBER

DA

TE P

LO

TT

ED:

US

ER:

FIL

E

NA

ME:

2:25:23

AM

...\092

C00097

N_

Ty

pic

al

MO

T.dgn

agille

y

1/4/2019

EXISTING TYPICAL SECTION

NOTE: FIELD VERIFY EXISTING DIMENSION

PHASE 1

PHASE 2

PHASE 3

(SINGLE LANE)

TRAFFIC FLOW

2. DEMOLISH REMAINING EXISTING BRIDGE

1. SHIFT TRAFFIC TO PROPOSED BRIDGE. (ONE LANE)

PHASE 4

(SINGLE LANE)

TRAFFIC FLOW

2. REMOVE TEMP BARRIER AND OPEN BRIDGE TO TRAFFIC

1. CONSTRUCT REMAINING PORTION OF BRIDGE.

37’-7�"

(SINGLE LANE)

TRAFFIC FLOW

19’-6" MIN.

6’-0"

(SHOULDER)

10’-6" MIN.2’-3"

9"

(SINGLE LANE)

TRAFFIC FLOW

19’-6" MIN.

6’-0"

(SHOULDER)

10’-6" MIN.2’-3"

9"

INITIATE AT THE JUNCTURE OF TWO EXISTING PIPE BEAMS.

4. REMOVE HATCHED AREA. CARE SHALL BE TAKEN AND REMOVAL SHALL

6’ SHOULDER ACROSS.

3. ADD DGA TO RIGHT SIDE AS NEEDED TO MAINTAIN 10’-6" MIN ROADWAY AND

2. INSTALL WALL TYPE 9T BARRIER.

INCIDENTAL TO MAINTENANCE OF TRAFFIC

1. BRACE EXISTING STRUCTURE THAT IS NOT BEING REMOVED. BRACING TO BE

AND CAP STEEL) OR UTILIZE KYTC APPROVED MECHANICAL COUPLERS.

5. CONTRACTOR HAS THE OPTION TO USE THE MINIMUM LAP SPLICE LENGTHS (BEND

TRAFFIC).

PLATES AS NEEDED TO MAINTAIN TRAFFIC (INCIDENTAL TO MAINTENANCE OF

4. CONTRACTOR SHALL PROVIDE TEMPORARY SHORING/SHEETING/STEEL TRAFFIC

AND A MINIMUM OF 2" COVER TO THE NEAREST STIRRUP REINFORCING BAR.

LOCATED TO PROVIDE MINIMUM OF 1’-0" COVER FROM THE NEAREST PILE EDGE,

3. CONSTRUCTION JOINTS FOR PARTIAL WIDTHS OF END BENTS 1 & 2 SHALL BE

EXISTING ALIGNMENT PER PLANS.)

2. CONSTRUCT 16’ (4 BOX BEAM WIDTHS) OF PROPOSED BRIDGE. (SHIFTED FROM

1. SHIFT TRAFFIC TO EXISTING ROADWAY. (ONE LANE)