Budget Year 20192020 Transportation Improvement and Maintenance Program IMPROVEMENT Project Location Activity Page District Status PROJECT TYPE Total Cost Area Engineer Amber Sunrise Drive Cattle Tank RdGalena Dr PreConstruction $200,000 1 4 New Angeline To Amber Sunrise Drive Estancia DrSaguaro Vista Dr PreConstruction $550,000 2 4 New Angeline To FlorenceKelvin Highway Gardenshire RdApache Kid Rd Construction $700,000 3 1 New Angeline To Gantzel Road Queen Creek (Wash) PreConstruction $50,000 4 2, 5 New Celeste Pemberton Gary Road (Rittenhouse Road) Rittenhouse RdCombs Rd Construction $2,200,000 5 2 New Celeste Pemberton Ghost Rider Street Combs RdStagecoach Pass Av Construction $55,000 6 5 New Celeste Pemberton Hanging Tree Street Hash Knife Draw RdLonesome Dove Tr Construction $35,208 7 5 New Celeste Pemberton Hash Knife Draw Road Schnepf RdSierra Vista Dr Construction $110,000 8 5 New Celeste Pemberton Hunt Highway Arizona Farms RdHiller Rd Construction $11,109,851 9 2 New Celeste Pemberton Jackpot Street Skyline DrRolling Ridge Rd Construction $82,500 10 5 New Celeste Pemberton Judd Road Hunt HwyDrifter Pass Rd PreConstruction/Constru $5,100,000 11 2 New Celeste Pemberton Meridian Road (Mouer Road) Williams Field RdFrye Rd Construction $160,833 12 2 New Celeste Pemberton Ocotillo Road Cambria DrOcotillo Rd Construction $350,000 13 2 New Celeste Pemberton Peddler Road Paisano DrQuartzite Rd Construction $116,458 14 1 New Celeste Pemberton Roberts Road Felix RdJoel Rd Construction $38,542 15 5 New Celeste Pemberton Rolling Ridge Road Schnepf RdSierra Vista Dr Construction $110,000 16 5 New Celeste Pemberton Sage Brush Avenue Schnepf RdSierra Vista Dr Construction $110,000 17 5 New Celeste Pemberton Stagecoach Pass Avenue Schnepf RdSierra Vista Dr Construction $28,333 18 5 New Celeste Pemberton Sunland Gin Road Battaglia DrSunland Gin Rd Safety $350,000 19 4 New Angeline To Tombstone Street Skyline DrRolling Ridge Rd Construction $82,500 20 5 New Celeste Pemberton Twin Hawk Lane Future RdEnda St PreConstruction $300,000 21 4 New Angeline To Val Vista Road Warren RdHidden Valley Rd Construction $520,000 22 4 New John Kraft $22,359,225 SUBTOTAL IMPROVEMENT District 7 = Multiple districts or countywide
Transcript
Page 1: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Budget Year 2019‐2020Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPETotal CostArea Engineer

Amber Sunrise Drive Cattle Tank Rd‐Galena Dr Pre‐Construction $200,000 14NewAngeline ToAmber Sunrise Drive Estancia Dr‐Saguaro Vista Dr Pre‐Construction $550,000 24NewAngeline ToFlorence‐Kelvin Highway Gardenshire Rd‐Apache Kid Rd Construction $700,000 31NewAngeline ToGantzel Road Queen Creek (Wash) Pre‐Construction $50,000 42, 5NewCeleste PembertonGary Road (Rittenhouse Road) Rittenhouse Rd‐Combs Rd Construction $2,200,000 52NewCeleste PembertonGhost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 65NewCeleste PembertonHanging Tree Street Hash Knife Draw Rd‐Lonesome Dove Tr Construction $35,208 75NewCeleste PembertonHash Knife Draw Road Schnepf Rd‐Sierra Vista Dr Construction $110,000 85NewCeleste PembertonHunt Highway Arizona Farms Rd‐Hiller Rd Construction $11,109,851 92NewCeleste PembertonJackpot Street Skyline Dr‐Rolling Ridge Rd Construction $82,500 105NewCeleste PembertonJudd Road Hunt Hwy‐Drifter Pass Rd Pre‐Construction/Constru $5,100,000 112NewCeleste PembertonMeridian Road (Mouer Road) Williams Field Rd‐Frye Rd Construction $160,833 122NewCeleste PembertonOcotillo Road Cambria Dr‐Ocotillo Rd Construction $350,000 132NewCeleste PembertonPeddler Road Paisano Dr‐Quartzite Rd Construction $116,458 141NewCeleste PembertonRoberts Road Felix Rd‐Joel Rd Construction $38,542 155NewCeleste PembertonRolling Ridge Road Schnepf Rd‐Sierra Vista Dr Construction $110,000 165NewCeleste PembertonSage Brush Avenue Schnepf Rd‐Sierra Vista Dr Construction $110,000 175NewCeleste PembertonStagecoach Pass Avenue Schnepf Rd‐Sierra Vista Dr Construction $28,333 185NewCeleste PembertonSunland Gin Road Battaglia Dr‐Sunland Gin Rd Safety $350,000 194NewAngeline ToTombstone Street Skyline Dr‐Rolling Ridge Rd Construction $82,500 205NewCeleste PembertonTwin Hawk Lane Future Rd‐Enda St Pre‐Construction $300,000 214NewAngeline ToVal Vista Road Warren Rd‐Hidden Valley Rd Construction $520,000 224NewJohn Kraft

$22,359,225SUBTOTAL IMPROVEMENT

District 7 = Multiple districts or countywide

Page 2: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Budget Year 2019‐2020Transportation Improvement and Maintenance ProgramMAINTENANCE

Project Location Activity PageDistrictStatus

PROJECT TYPETotal CostArea Engineer

Ashmore Street Passmore Rd‐Baldwin Av Dust Palliative $59,000 233, 4NewJohn KraftBoyd Road Roosevelt St‐Cactus Wren St Dust Palliative $11,000 245NewCeleste PembertonBoyd Road Roosevelt St‐End of road (Scenic St) Dust Palliative $11,000 255NewCeleste PembertonCactus Garden Way Knofler Rd‐Cactus Garden Wy Pavement Preservation $0 264NewAngeline ToCarefree Place State Route 347‐Pepper Pl Dust Palliative $50,000 274NewJohn KraftDolores Place‐Shirley Road Olberg Rd‐Avram Rd Dust Palliative $78,100 282NewCeleste PembertonDonnaloy Road Wilma Rd‐Brenner Pass Rd Dust Palliative $84,700 292NewCeleste PembertonMarlow Road Jacob Waltz St‐End of road Dust Palliative $15,958 305NewCeleste PembertonOlberg Road Arizona Farms Rd‐Brenner Pass Road Dust Palliative $102,083 312NewCeleste PembertonPlaza Drive Moon Vista St‐Goldpoppy St Dust Palliative $6,667 325NewCeleste PembertonRahma Street State Route 238‐Islamic Cemetery Dust Palliative $31,200 334NewJohn KraftRandolph Road Toltec Buttes Rd‐Overfield Rd Dust Palliative $100,000 343NewJohn KraftReed Road Bartlett Rd‐At wash before Cactus Forest Rd Dust Palliative $91,667 351NewCeleste PembertonWhirly Bird Road Amarillo Valley Rd‐Ralston Rd Dust Palliative $200,000 364NewJohn Kraft

$841,375SUBTOTAL MAINTENANCE

$23,200,600GRAND TOTAL 2019‐2020

District 7 = Multiple districts or countywide

Page 3: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Amber Sunrise Drive Cattle Tank Rd‐Galena Dr

Pre‐Construction$200,000$0$200,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 4Project Manager Angeline To E‐mail [email protected]

Comments Requestor:  James BoieRequest:  This one mile request will affect about 50 homeowners with an average of two cars per households. I talked to homeowners/property owners on the south side of Amber Sunrise and found no owners against project. No state property involved.

Status New

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1031

1

Page: 1Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 4: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Amber Sunrise Drive Estancia Dr‐Saguaro Vista Dr

Pre‐Construction$550,000$0$550,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 4Project Manager Angeline To E‐mail [email protected]

Comments Requestor:  Scott SpareRequest:  Road can be at times non‐drivable for emergency and police as well as residents due to its condition

Status New

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 2033

3.4

Page: 2Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 5: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Florence‐Kelvin Highway Gardenshire Rd‐Apache Kid Rd

Construction$700,000$0$700,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 1Project Manager Angeline To E‐mail [email protected]

Comments Requestor:  Angeline ToRequest:  Asphalt Rock Dust Palliative on Florence‐Kelvin Highway the main route to and from Florence and Kelvin area for dust and maintenance reduction

Status New

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 3030

3

Page: 3Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 6: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Gantzel Road Queen Creek (Wash)

Pre‐Construction$50,000$0$50,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 2, 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Chris WalshRequest:  Requesting the addition/extension of a sidewalk over the Queen Creek on the northbound side on Gantzel Road

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 4010

0.07

Page: 4Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 7: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Gary Road (Rittenhouse Road) Rittenhouse Rd‐Combs Rd

Construction$2,200,000$0$2,200,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Virginia NielsonRequest:  Widen the road where it meets Rittenhouse and Combs and southbound make a right hand only turn lane.  The entire road of Rittenhouse needs to be widened to 4 lanes.  Constant breaking due to one lane is very dangerous.

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 5083

0.89

Page: 5Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 8: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Ghost Rider Street Combs Rd‐Stagecoach Pass Av

Construction$55,000$0$55,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Mark SowardsRequest:  Most of the homes south of E. Combs Road and east of Schnepf Road either use north Schnepf Road or north Ghost Rider Street to access E. Combs Road.  N. Schnepf Road is paved with minimal dust generated from traffic.  N. Ghost Rider Street is dirt and traffic generates terrific amounts of dust with normal usage due to the volume of traffic.  All other streets in the area are side streets that channel into N. Schnepf Road or N. Ghost Rider Street and are too short in length to gain enough speeds to generate a lot of dust.  Please help us with this problem by paving N. Ghost Rider Street just as you have N. Schnepf Road.  N. Ghost Rider Street is not simply just another road in this area, but is a major conduit for the local residents to access E. Combs Road. Thank you.

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6123

0.5

Page: 6Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 9: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Hanging Tree Street Hash Knife Draw Rd‐Lonesome Dove Tr

Construction$35,208$0$35,208

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Sherry DeMossRequest:  The road has a name but is just an easement along SRP power poles.  Can we have a real road put in?  Area is a residential area with a lot of homes.  We need to have county maintained roads from Schnepf Road down to Hash Knife Draw Road and North Hanging Tree Street.  There is a lot of dust in the summer time and a lot of mud in the winter.  School buses will not even go down in this area.  Some mail deliveries will not deliver if the road is wet.  Thank you for your consideration.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 7034

0.32

Page: 7Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 10: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Hash Knife Draw Road Schnepf Rd‐Sierra Vista Dr

Construction$110,000$0$110,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Maureen SheaRequest:  Hash Knife Draw is a dirt road that generates incredible amounts of dust throughout the day and night.  As a spokesperson for the residents that live on or near Hash Knife Draw, I can tell you that we all would like to see Hash Knife Draw chip sealed.  Dust is so dangerous to all of us, causing any number of respitory problems.  Our children have to walk this road every morning and afternoon going to and from the school buses.  People speed down this road regardless of the children walking this road.  We have collected the majority of signatures  or consent from the property owners on Hash Knife Draw agreeing to either donate right‐of‐way or grant roadway easement to Pinal County.  We will continue to get 100% participation from the remaining property owners.  We would all benefit from a chip sealed road, having cleaner air to breath being the biggest benefit.  By gathering the needed signatures or consents from the property owners, we feel this is a cost savings to Pinal County as it takes a lot of time and personnel to do this.  Thank you for your consideration.

Status New

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 8125

1

Page: 8Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 11: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Hunt Highway Arizona Farms Rd‐Hiller Rd

Construction$11,109,851$0$11,109,851

ActivityCounty CostNon County Cost

IMPROVEMENT

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Brian FryhoverRequest:  Currently this is a narrow 2 lane highway with high traffic volumes.  There are several safety issues with this 2.5 mile section that could benefit from improvements.  Some of the safety issues are:  a) narrow paved shoulders and minimal roadside recovery area (with exception of the 0.3 mile improved section from Mirage Boulevard northwest to Oasis Boulevard); b) existing cross drainage over roadway (dip section) 500 feet southeast of Walker Granite Road; c) 3 existing golf cart crossings over the highway (200 feet southeast of Oasis Boulevard, just northwest of the railroad, and just southwest of the railroad); d) abrupt and uneven grade change (both directions) at the approach to an existing skewed railroad crossing; e) difficult to pass slower moving vehicles due to single lane in each direction.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 9128

2.5

Page: 9Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 12: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Jackpot Street Skyline Dr‐Rolling Ridge Rd

Construction$82,500$0$82,500

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Maureen SheaRequest:  Jackpot Road is a dirt road that generates incredible amounts of dust throughout the day and night.  As a spokesperson for the residents that live on or near Jackpot, I can tell you that we all would like to see Jackpot Road chip sealed.  Dust is so dangerous to all of us, causing any number of respitory problems.  Our children have to walk this road every morning and afternoon going to and from the school buses.  People speed down this road regardless of the children walking this road.  The road is graded on a monthly basis, sometimes more frequently but it does not help keep the dust down.  We have collected all but 1 signature from the property owners on Jackpot agreeing to either donate right‐of‐way or grant roadway easement to Pinal County.  I am continuing to try to get 100% participation from the remaining  property owner.  We would all benefit from a chip sealed road, having cleaner air to breath being the biggest benefit.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 10116

0.75

Page: 10Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 13: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Judd Road Hunt Hwy‐Drifter Pass Rd

Pre‐Construction/Construction$5,100,000$0$5,100,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Margarete ParrRequest:  The growing community at Copper Basin needs a second exit road.  Opening of the Judd Road (alignment) would provide decreased traffic past the Copper Basin K‐8, which would promote the safety of children, parents, and school staff.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 11009

2

Page: 11Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 14: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Meridian Road (Mouer Road) Williams Field Rd‐Frye Rd

Construction$160,833$0$160,833

ActivityCounty CostNon County Cost

IMPROVEMENT

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Shawn PettyRequest:  The road is continuously being washed away from multiple washes crossing and standing water causes deep road hazards.  When it is not wet the road causes excessive dust.  I would be willing to contribute to improvements and will petition the neighbors to find further contributing parties.  If possible installing two culverts under the driving surface would be ideal to prevent future erosion and expense in maintenance for the area.

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 12013

0.55

Page: 12Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 15: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Ocotillo Road Cambria Dr‐Ocotillo Rd

Construction$350,000$0$350,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Steve SladeRequest:  Street light request for this badly needed intersection!

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 13005

0

Page: 13Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 16: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Peddler Road Paisano Dr‐Quartzite Rd

Construction$116,458$0$116,458

ActivityCounty CostNon County Cost

IMPROVEMENT

District 1Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Despina AnagnostosRequest:  Peddler Road is in extremely poor condition with washboard conditions and deep cracks.  During rain events Peddler Road is not passable and vehicles have gotton stuck.  In the dry season the road is dusty contributing to poor air quality in the area.  The road is an access for many people who live near and work at the monestary including 3 disabled persons and to get to Florence.  Please consider this request.  Thank you, Despina Anagnostos.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 14006

0.33

Page: 14Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 17: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Roberts Road Felix Rd‐Joel Rd

Construction$38,542$0$38,542

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Brad YoungRequest:  To have county chip seal road beginning at the intersection of Roberts Road and Felix Road and extending to Joel Road.  Grading and road base already completed, only needs county to chip seal.  Clark Larson (owner) has paid over $20,000 to the county for road maintenance which has not been satisfied by the county.  MDK Development plans to construct an additional 7 homes in the area therefore the county will be collecting additional impact fees that should go towards road maintenance and improvements.  This roadway has been neglected by the county for over 7 years according to the neighbors despite several written requests to have the roadways maintained.  We propose to work with the county to have the road chip sealed.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 15035

0.35

Page: 15Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 18: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Rolling Ridge Road Schnepf Rd‐Sierra Vista Dr

Construction$110,000$0$110,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Maureen SheaRequest:  Rolling Ridge Road is a dirt road that generates incredible amounts of dust throughout the day and night.  As a spokesperson for the residents that live on or near Rolling Ridge, I can tell you that we all would like to see Rolling Ridge Road chip sealed.  Dust is so dangerous to all of us, causing any number of respitory problems.  Our children have to walk this road every morning and afternoon going to and from the school buses.  People speed down this road regardless of the children walking this road.  The road is graded on a monthly basis, sometimes more frequently but it does not help keep the dust down.  I have collected all but 3 signatures from the property owners on Rolling Ridge agreeing to either donate right‐of‐way or easement to Pinal County.  I am continuing to try to get 100% participation from the remaining 3 property owners.  We would all benefit from a chip sealed road, having cleaner air to breath being the biggest benefit.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 16126

1

Page: 16Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 19: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Sage Brush Avenue Schnepf Rd‐Sierra Vista Dr

Construction$110,000$0$110,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Maureen SheaRequest:  Sage Brush Road is a dirt road that generates incredible amounts of dust throughout the day and night.  As a spokesperson for the residents that live on or near Sage Brush Road, I can tell you that we all would like to see Sage Brush Road chip sealed.  Dust is so dangerous to all of us, causing any number of respitory problems.  Our children have to walk this road every morning and afternoon going to and from the school buses.  People speed down this road regardless of the children walking this road.  We have collected the majority of signatures  or consent from the property owners on Sage Brush Road agreeing to either donate right‐of‐way or grant roadway easement to Pinal County.  We will continue to get 100% participation from the remaining property owners.  We would all benefit from a chip sealed road, having cleaner air to breath being the biggest benefit.  By gathering the needed signatures or consents from the property owners, we feel this is a cost savings to Pinal County as it takes a lot of time and personnel to do this.  Thank you for your consideration.

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 17126

1

Page: 17Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 20: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Stagecoach Pass Avenue Schnepf Rd‐Sierra Vista Dr

Construction$28,333$0$28,333

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Maureen SheaRequest:  Stagecoach Pass Avenue is a dirt road that generates incredible amounts of dust throughout the day and night.  As a spokesperson for the residents that live on or near Stagecoach Pass Avenue, I can tell you that we all would like to see Stagecoach Pass Avenue chip sealed.  Dust is so dangerous to all of us, causing any number of respitory problems.  Our children have to walk this road every morning and afternoon going to and from the school buses.  People speed down this road regardless of the children walking this road.  We have collected the majority of signatures  or consent from the property owners on Stagecoach Pass Avenue agreeing to either donate right‐of‐way or grant roadway easement to Pinal County.  We will continue to get 100% participation from the remaining property owners.  We would all benefit from a chip sealed road, having cleaner air to breath being the biggest benefit.  By gathering the needed signatures or consents from the property owners, we feel this is a cost savings to Pinal County as it takes a lot of time and personnel to do this.  Thank you for your consideration.NOTE:  Stagecoach Pass Avenue from Schnepf Road to Ghost Rider Street is currently programmed on the Transportation Improvement and Maintenance Program Budget Year 2015‐2016

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 18127

1

Page: 18Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 21: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Sunland Gin Road Battaglia Dr‐Sunland Gin Rd

Safety$350,000$0$350,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 4Project Manager Angeline To E‐mail [email protected]

Comments Requestor:  Thomas SniderRequest:  A traffic signal was installed at this intersection a few years ago which helped this intersection considerably.  However at that time there was no right turn lane for southbound traffic turning westbound (Sunland Gin to Battaglia).  As traffic continually increases on this road, I believe a right turn lane would provide both better traffic flow and safety.  I have often watched traffic wanting to make a free right turn try to squeeze past the stopped cars waiting for the light.  The post office, elementary school, and grocery store are all west on Battaglia in addition to the residential homes in that direction, making that a high traffic turn.

Status New

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 19118

0

Page: 19Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 22: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Tombstone Street Skyline Dr‐Rolling Ridge Rd

Construction$82,500$0$82,500

ActivityCounty CostNon County Cost

IMPROVEMENT

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Maureen SheaRequest:  Tombstone Road is a dirt road that generates incredible amounts of dust throughout the day and night.  As a spokesperson for the residents that live on or near Tombstone, I can tell you that we all would like to see Tombstone chip sealed.  Dust is so dangerous to all of us, causing any number of respitory problems.  Our children have to walk this road every morning and afternoon going to and from the school buses.  People speed down this road regardless of the children walking this road.  The road is graded on a monthly basis, sometimes more frequently but it does not help keep the dust down.  We have collected all signatures from the property owners on Tombstone agreeing to either donate right‐of‐way or grant roadway easement to Pinal County.  We would all benefit from a chip sealed road, having cleaner air to breath being the biggest benefit.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 20115

0.75

Page: 20Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 23: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Twin Hawk Lane Future Rd‐Enda St

Pre‐Construction$300,000$0$300,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 4Project Manager Angeline To E‐mail [email protected]

Comments Requestor:  Kayla YountRequest:  Paving for access to residents living along S. Twin Hawk Lane from E. Future Road to E. Edna Street

Status New

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 21014

1.5

Page: 21Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 24: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Val Vista Road Warren Rd‐Hidden Valley Rd

Construction$520,000$0$520,000

ActivityCounty CostNon County Cost

IMPROVEMENT

District 4Project Manager John Kraft E‐mail [email protected]

Comments Requestor:  Linda BeresRequest:  This is a continuation from 2014‐2015 year.  To obtain road right‐of‐way and perhaps to get funding for a bridge over Vekol Wash.  This way is to get better access when there is a major rain and everything is running.  This also includes paving Val Vista, the first mile.

Status New

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 22036

1

Page: 22Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 25: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Ashmore Street Passmore Rd‐Baldwin Av

Dust Palliative$59,000$0$59,000

ActivityCounty CostNon County Cost

MAINTENANCE

District 3, 4Project Manager John Kraft E‐mail [email protected]

Comments Requestor:  Adriana GuatzozonRequest:  I am requesting to pave Ashmore Road from Passmore Road to Baldwin Avenue because there has been an increase in traffic including truck traffic.  The road is dirt now and is very dusty when dry and muddy when it rains.  There is at least 10 households and 1 church who use this road most of the week.

Status New

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 23022

0.5

Page: 23Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 26: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Boyd Road Roosevelt St‐Cactus Wren St

Dust Palliative$11,000$0$11,000

ActivityCounty CostNon County Cost

MAINTENANCE

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Celeste PembertonRequest:  Submitting project on behalf of Apache Junction Maintenance Foreman for Asphalt Rock Dust Palliative Program.  Currently maintained with existing right‐of‐way. Distance is approximately 510 feet.

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 24018

0.1

Page: 24Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 27: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Boyd Road Roosevelt St‐End of road (Scenic St)

Dust Palliative$11,000$0$11,000

ActivityCounty CostNon County Cost

MAINTENANCE

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Stephanie BarnardRequest:  This section of Boyd Road is not paved.  It is used numerous times during the week by large, commercial trucks that generate a lot of dust.

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 25015

0.1

Page: 25Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 28: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Cactus Garden Way Knofler Rd‐Cactus Garden Wy

Pavement Preservation$0$0$0

ActivityCounty CostNon County Cost

MAINTENANCE

District 4Project Manager Angeline To E‐mail [email protected]

Comments Request:  Margaret and Domenic FasoliRequestor:  The road is actually "chip sealed" however that was not available so I marked paved.  We would like to petition the county to take over maintenance.  The road in our opinion is in good condition other than a few pot holes.

Status New

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 26117

0.07

Page: 26Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 29: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Carefree Place State Route 347‐Pepper Pl

Dust Palliative$50,000$0$50,000

ActivityCounty CostNon County Cost

MAINTENANCE

District 4Project Manager John Kraft E‐mail [email protected]

Comments Requestor:  Rebecca HuertaRequest:  There is a lot of traffic on this road, and it becomes washboard so fast.  People generally speed to "float" over the washboard road.  This creates a lot of dust and a dangerous environment for families who go on walks along the road in the evening.  We personally avoid this road because we feel it is dangerous.  It also attracts many 4‐wheeled motorcyclists because they are able to easily skid on it.  We appreciate the work the county does to maintain the dirt road frequently, but it simply isn't enough.  Please help.  Thank you.

Status New

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 27124

0.5

Page: 27Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 30: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Dolores Place‐Shirley Road Olberg Rd‐Avram Rd

Dust Palliative$78,100$0$78,100

ActivityCounty CostNon County Cost

MAINTENANCE

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Celeste PembertonRequest:  Submitting project on behalf of San Tan Maintenance Foreman for Asphalt Rock Dust Palliative Program.  Currently maintained with existing right‐of‐way.  Distance is approximately 0.71 miles.

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 28121

0.71

Page: 28Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 31: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Donnaloy Road Wilma Rd‐Brenner Pass Rd

Dust Palliative$84,700$0$84,700

ActivityCounty CostNon County Cost

MAINTENANCE

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Celeste PembertonRequest:  Submitting project on behalf of San Tan Maintenance Foreman for Asphalt Rock Dust Palliative Program.  Currently maintained with existing right‐of‐way.  Distance is approximately 0.77 miles

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 29120

0.77

Page: 29Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 32: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Marlow Road Jacob Waltz St‐End of road

Dust Palliative$15,958$0$15,958

ActivityCounty CostNon County Cost

MAINTENANCE

District 5Project Manager Celeste Pemberton E‐mail [email protected] v

Comments Requestor:  David BrownRequest:  5 families with multiple drivers per family utilize this section of Marlow Road, and for dust control purposes, I was wondering if this section of roadway could be paved or chip sealed to keep the dust down and erosion at bay

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 30012

0.15

Page: 30Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 33: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Olberg Road Arizona Farms Rd‐Brenner Pass Road

Dust Palliative$102,083$0$102,083

ActivityCounty CostNon County Cost

MAINTENANCE

District 2Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Celeste PembertonRequest:  Submitting project on behalf of San Tan Maintenance Foreman for Asphalt Rock Dust Palliative Program.  Currently maintained with existing right‐of‐way.  Distance is approximate 2.58 miles

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 31119

0.93

Page: 31Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 34: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Plaza Drive Moon Vista St‐Goldpoppy St

Dust Palliative$6,667$0$6,667

ActivityCounty CostNon County Cost

MAINTENANCE

District 5Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Melanie MerkelRequest:  We appreciate the dirt road improvement that filled 2' deep trenches in this road.  There are several residents that use this road and to regrade this 1/2 mile (approximately) every time a rain storm hits or to reduce dust would cost more in the long run than a single paving would do.  Thank you so much for grading it which helps and I am sure the postal service appreciates this too.  Sincerely, Melanie Merkel

Status New

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 32016

0.06

Page: 32Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 35: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Rahma Street State Route 238‐Islamic Cemetery

Dust Palliative$31,200$0$31,200

ActivityCounty CostNon County Cost

MAINTENANCE

District 4Project Manager John Kraft E‐mail [email protected]

Comments Requestor:  Angum AlimohammedRequest:  Whenever we get rain, Rahma Road leading to the cemetery develops potholes or simply gets washed away.  We have continually been repairing it but it makes no difference.  There is a lot of traffic on that street as there are continual burials and people come to visit their loved ones but the road becomes a hazard with cars getting stuck in the mud and slipping.

Status New

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 33085

0.2

Page: 33Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 36: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Randolph Road Toltec Buttes Rd‐Overfield Rd

Dust Palliative$100,000$0$100,000

ActivityCounty CostNon County Cost

MAINTENANCE

District 3Project Manager John Kraft E‐mail [email protected]

Comments Requestor:  Lisa GatlinRequest:  It is my understanding that this stretch of road is shared between Coolidge and Casa Grande, and it also runs between two farms, which has created difficulty in getting it paved.  Having said that, the difficulty for the community is commuting in and out of our homes, not only on a regular basis without creating air pollution, due to the dust, but also the treacherous conditions any time rain falls.  I've submitted this request in the past, I've submitted photos to give you a visual of our needs and I am in great hopes of having our difficulty resolved.  Sincerely, Lisa Gatlin

Status New

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 34112

1

Page: 34Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 37: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Reed Road Bartlett Rd‐At wash before Cactus Forest Rd

Dust Palliative$91,667$0$91,667

ActivityCounty CostNon County Cost

MAINTENANCE

District 1Project Manager Celeste Pemberton E‐mail [email protected]

Comments Requestor:  Celeste PembertonRequest:  Submitting project on behalf of San Tan Maintenance Foreman for Asphalt Rock Dust Palliative Program.  Currently maintained with existing right‐of‐way.  Distance is approximately 4365'

Status New

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 35029

0.74

Page: 35Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 38: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

Length in Miles

Whirly Bird Road Amarillo Valley Rd‐Ralston Rd

Dust Palliative$200,000$0$200,000

ActivityCounty CostNon County Cost

MAINTENANCE

District 4Project Manager John Kraft E‐mail [email protected]

Comments Requestor:  Andy LariosRequest:  Dirt road produces too much dust and making family sick.  Allergies, breathing problems.  There's too much traffic during weekdays that makes outdoor life impossible.  Too unhealthy to be outside.  School buses, Fed Ex trucks, etc., drive like this road is a freeway and more dust.  I don't mind the dirt road but do really mind breathing dust.  This road was not meant to have many vehicles traveling at high speeds.  Thank you and may God bless you all.

Status New

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 36008

2

Page: 36Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520‐866‐6411 (telephone)520‐866‐6511 (fax)

Page 39: Transportation Improvement and Maintenance Program Budget ... · Ghost Rider Street Combs Rd‐Stagecoach Pass Av Construction $55,000 6Celeste Pemberton New 5 ... Stagecoach Pass

vw202

vw202

vw101

_̀60

vx87

_̀60

vx143

vx51

FLORE N CE-K

ELVI N

HW

Y

§̈¦17

§̈¦10

§̈¦10

rx347

rx87

rx77

rx77

£¤60

£¤60rx188

£¤70

rx79

Ironwood Forest National Monument

SierraEstrella

WildernessArea

PINAL COUNTY

PIMA COUNTY

PIN

AL

CO

UN

TY

GR

AH

AM

CO

UN

TY

GILA

CO

UN

TY

PINA

L CO

UN

TY

MARICOPA COUNTY

PINAL COUNTY

PINAL COUNTY

MARICOPA COUNTY

PIN

AL

CO

UN

TY

MA

RIC

OPA

CO

UN

TY

MESAPHOENIX

ELOY

GILBERT

CASA GRANDE

MARANA

CHANDLER

TEMPE

FLORENCE

MARICOPA

COOLIDGE

GLOBE

MAMMOTH

QUEENCREEK

APACHE JUNCTION

GOODYEAR

SCOTTSDALE

ORO VALLEY

GLENDALE

KEARNY

PARADISE VALLEY

SUPERIOR

HAYDEN

MIAMI

TOLLESON

GUADALUPE

WINKELMAN

PARK LINK DR

MARICOPA-CASA GRANDE HWY

§̈¦10

§̈¦8 rx77

rx79

rx177

rx87

rx347

rx84 rx287

rx238

rx387

rx587

rx88

rx287

£¤60

rx187

§̈¦10

HUNT HWY

;District 1

;District 4

;District 3

;District 5

;District 2

San Carlos Indian Res.

Tohono Indian Res.

Gila River Indian Res.

Salt River Indian Res.

Ak-Chin Indian Res.

TontoNationalForest

CoronadoNationalForest

OracleStatePark

PicachoPeakStatePark

HohokamPima

NationalPark

LostDutchman

StatePark

Parks and Recreation

SonoranDesert

NationalMonument

TabletopWilderness

Area

AravaipaCanyon

WildernessArea

Needles EyeWilderness Area

White CanyonWilderness Area

2

9

36

8

34

22

35

12

6

27

15

14

23

19

26

4

32

3

11

21

16 17

1

31

29

18

28

20

107

5

33

30

24 25

13

1 - Amber Sunrise Dr (Cattle Tank Rd to Galena Dr)

2 - Amber Sunrise Dr (Estancia Dr to Saguaro Vista Dr)

3 - Florence-Kelvin Hwy (Gardenshire Rd to Apache Kid Rd)

4 - Gantzel Rd @ Queen Creek Wash

5 - Rittenhouse Rd (Gary Rd to Combs Rd)

6 - Ghost Rider St (Stagecoach Pass Ave to Combs Rd)

7 - Hanging Tree St (Lonesome Dove Trl to Hash Knife Draw Rd)

8 - Hash Knife Draw Rd (Schnepf Rd to Sierra Vista Dr)

9 - Hunt Hwy (Hiller Rd to Arizona Farms Rd)

10 - Jackpot St (Skyline Dr to Rolling Ridge Rd)

11 - Judd Rd (Hunt Hwy to Drifter Pass Rd)

12 - Moeur Rd (Frye Rd to Williams Field Rd)

13 - Ocotillo Rd & Cambria Dr intersection

14 - Peddler Pl (Quartzite Dr to Paisano Dr)

15 - Roberts Rd (Felix Rd to Joel Rd)

16 - Rolling Ridge Rd (Schnepf Rd to Sierra Vista Dr)

17 - Sage Brush Ave (Schnepf Rd to Sierra Vista Dr)

18 - Stagecoach Pass Ave (Schnepf Rd to Sierra Vista Dr)

19 - Sunland Gin Rd & Battaglia Dr Intersection

20 - Tombstone St (Skyline Dr to Rolling Ridge Rd)

21 - Twin Hawk Ln (Future Rd to Enda St)

22 - Val Vista Rd (Hidden Valley Rd to Warren Rd)

23 - Ashmoore St (Baldwin Ave to Passmore Rd)

24 - Boyd Rd (Roosevelt St, north 500' to end of street)

25 - Boyd Rd (Roosevelt St, north 500' to end of street)

26 - Cactus Garden Wy (Knofler Ln, north 340' to end of street)

27 - Carefree Pl (SR 347 to Pepper Pl)

28 - Shirley Rd (Avram Pl to Olberg Rd)

29 - Donnaloy Rd (Wilma Rd to Brenner Pass Rd)

30 - Marlow Rd (Jacob Waltz St, north 760' to end of road)

31 - Olberg Rd (Brenner Pass Rd to Arizona Farms Rd)

32 - Plaza Dr (Moon Vista St to Goldpoppy St)

33 - Rahma St (SR238, north 770' to cemetery)

34 - Randolph Rd (Overfield Rd to Toltec Buttes Rd)

35 - Reed Rd (from 480' north of Bartlett Rd to 500' north of Sahara Dr)

36 - Whirly Bird Rd (Ralston Rd to Amarillo Valley Rd)

Incorporated Cities

Indian Communities

Protected Areas & Parks

M A P K E YIndex of projects

Transportation Improvement and Maintenance Program2015 Project Requests

PINAL COUNTY - ARIZONA

W10 Miles


Recommended