11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015 2 MDTA Overview Established in 1971 Purpose Construct, manage, operate, and improve toll facilities Funded by toll revenues Headquarters - Point Breeze Office Complex, Baltimore 8 Facilities: Hatem Bridge Intercounty Connector John F. Kennedy Highway, including Express Toll Lanes Nice Bridge Bay Bridge Baltimore Harbor Tunnel Key Bridge Fort McHenry Tunnel MDTA Transportation Facilities Facilities consist of signature bridges, tunnels and highways on major Interstate & U.S. routes
Transcript
Page 1: Transportation Multi-Modal Meetingfiles.ctctcdn.com/8e114e49001/7fff6e36-50b3-42f7-9dd1-1c...11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015

11/19/2015

1

Transportation Multi-Modal

Meetingby Brian Wolfe, P.E.

November 18, 2015

2

MDTA Overview

• Established in 1971

• Purpose

– Construct, manage, operate, and improve toll facilities

• Funded by toll revenues

• Headquarters - Point Breeze Office Complex, Baltimore

• 8 Facilities:

� Hatem Bridge

� Intercounty Connector

� John F. Kennedy Highway,

including Express Toll Lanes

� Nice Bridge

� Bay Bridge

� Baltimore Harbor Tunnel

� Key Bridge

� Fort McHenry Tunnel

MDTA Transportation Facilities

Facilities consist of signature bridges, tunnels and highways on major Interstate & U.S. routes

Page 2: Transportation Multi-Modal Meetingfiles.ctctcdn.com/8e114e49001/7fff6e36-50b3-42f7-9dd1-1c...11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015

11/19/2015

2

Note: Project planning funds are in the MDTA Operating Budget and

do not appear in the six-year program.

Six-Year Capital Program Funding by Phase($ in Millions)

Project Planning, $0

Design, $81

Right-of-Way, $23

Construction, $1,746 Other, $104

Project Planning Design Right-of-Way Construction

Total Capital Program $1.85 Billion

Six-Year Capital ProgramFunding by Year

($ in Millions)

SIX-YEAR

FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 TOTAL

Construction Program

Major Projects $ 169.9 $ 155.2 $ 157.9 $ 125.2 $ 112.2 $ 37.7 $ 758.3

System Preservation Projects

$ 94.0 $ 162.2 $ 195.5 $ 186.4 $ 201.5 $ 189.5 $ 1,029.1

Development & Evaluation Program $ 14.4 $ 15.0 $ 4.8 $ 8.8 $ 9.6 $ 9.8 $ 62.4

TOTAL $ 278.3 $ 332.4 $ 358.2 $ 320.5 $ 323.3 $ 237.0 $ 1,849.8

6

Where Will the Toll Dollars Go?Total CTP (FY16-FY21) Budget

$1.9BKey

Facility, Project Budgets ($M),

Percentage of Total

Baltimore Harbor Tunnel

$555M

29%

Multi-area

$392M

21%

John F Kennedy Highway

$267M

14%

Bay Bridge

$225M

12%

Fort McHenry Tunnel

$209M

11%

Francis Scott Key

$99M

5%

Nice Bridge

$72M

4%

Inter County Connector

$44M

2%

Point Breeze

$31M

2%

Hatem Bridge

$5M

0%

Page 3: Transportation Multi-Modal Meetingfiles.ctctcdn.com/8e114e49001/7fff6e36-50b3-42f7-9dd1-1c...11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015

11/19/2015

3

7

Where Will the Toll Dollars Go?Total CTP (FY16-FY21) Budget

$1.9B

Environmental

$30M

2%

Safety and Capacity

Improvements

$94M

5%

Bridge Replacement

$258M

14%

Structural Repairs

$663M

35%

Tunnel Repairs

$195M

10%

Highway Repairs

$211M

11%

Mega Projects &

Equipment Budget

$295M

15%

Building Repairs

$71M

4%

Building Renovations

or Replacements

$56M

3%

Unallocated Reserves

$26M

1%

Key

Discipline, Project Budgets ($M),

Percentage of Total

System Preservation Programs• Formalized Programs for:

• Bridge Deck Rehabilitation

• Bridge Deck Sealing

• Structural Steel Painting

• Pavement Overlay/Resurfacing

• Lighting & Signing

• Bridge Superstructure Repairs

• Bridge Substructure Repairs

• Evaluating project candidates for Alternative Delivery

Upcoming System Preservation Opportunities

• Bridge Structural Rehabilitation & Sub/Superstructure Repair projects (BHT, JFK, FSK, FMT, TJH, HWN) - $97M

• Rehab/Replace Bridge Decks on JFK - $26M

• HVAC/Generator projects - $12M

• Phased Roadway Resurface/HMA projects - $30M

• Navigational Lighting Systems, Lights and Light Pole repair/replace projects throughout facilities - $40M

• Replacement of Vent Fans at BHT - $64M

• TMDL projects - $6.5M

• ETC Replacement, 3rd Generation - $79M

• Rehabilitate Pipe Culverts - $8M

Page 4: Transportation Multi-Modal Meetingfiles.ctctcdn.com/8e114e49001/7fff6e36-50b3-42f7-9dd1-1c...11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015

11/19/2015

4

Facility and Building Opportunities

Upcoming Opportunities:

• On call Construction Contracts

• Operational Corrections of FMT campus

• Replace HVAC units (FSK & Bay Bridge)

• Rehabilitate offices/AOC (FMT)

• Replace roofing (BHT)

• Replace windows and doors(various facilities)

• Lead and asbestos abatement (various facilities)

• Upgrade building fire and security systems (various facilities)

• Campus master plans

Environmental Opportunities

� Chesapeake Bay TMDL Retrofits Winner of MDOT 1st Annual

Environmental Excellence Award

Upcoming Opportunities:

• On call Drainage and StormwaterContracts

• Bay TMDL Stormwater Retrofits

• Miscellaneous Culvert Rehabilitation

• BHT Repair Slopes and Drainage

Northern RegionJohn F. Kennedy Memorial Highway (I-95)

Thomas J. Hatem Memorial Bridge (US 40)

Upcoming Opportunities :• Rehab superstructure &

substructure of Hatem Bridge

• Rehab/Paint Various I-95 Bridges

• Phased I-95 Resurfacing

• Rehabilitate Pipe Culverts

• Replace Navigational

Lighting/Poles

Page 5: Transportation Multi-Modal Meetingfiles.ctctcdn.com/8e114e49001/7fff6e36-50b3-42f7-9dd1-1c...11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015

11/19/2015

5

Central RegionFort McHenry Tunnel (I-95)

Baltimore Harbor Tunnel (I-895)

Francis Scott Key Bridge (I-695)Upcoming Opportunities:

• Canton Viaduct Replacement (I-895)

• Patapsco River Flats Superstructure

Replacement (I-895)

• Replace/Rehabilitate vent fans in

Baltimore Harbor Tunnel

• Lighting Rehab/LED conversion in Fort

McHenry Tunnel

• Rehab Various I-895 Bridges

I-95 (FMT) Improvements - Moravia Road to Tunnel

Replace I-895 Canton Viaduct

Page 6: Transportation Multi-Modal Meetingfiles.ctctcdn.com/8e114e49001/7fff6e36-50b3-42f7-9dd1-1c...11/19/2015 1 Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015

11/19/2015

6

Southern RegionWilliam Preston Lane Jr. Memorial (Bay) Bridge (US 50/301)

Harry W. Nice Memorial Bridge (US 301)

Intercounty Connector (MD 200)

Upcoming Opportunities:

• Facility-wide Priority

Repairs & Modifications,

• 5 KV Replacement,

• Navigational Lighting

Replacement,

• Phase IV Painting,

QUESTIONS???