Transportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection Information Provided Below 1. Welcome and Introductions (10:00) 2. Action: Approval of Meeting Summary April 22, 2020* (10:05) 3. Action: Kitsap Transit Redistribution Request* (10:10) 4. Action: 2020 Project Selection Recommendations* (10:15) FTA 2023-2024 earned share and preservation set-aside. FTA 2023-2024 regional competition 5. Discussion: Transit Funding Discussion at TPB Transit Caucus (10:35) This is an opportunity to debrief on the June 11, 2020 TPB Transit Caucus discussion about transit funding and talk about next steps. 6. Discussion: 2020 Transit Integration Report Initiation (11:00) PSRC staff are initiating work on the 2020 Transit Integration Report. We are soliciting TOC member input to begin this work, to be completed in fall 2020. 7. Discussion: 2022 Regional Transportation Plan Transit Topics and Timeline (11:15) PSRC staff will share a timeline of the 2022 Regional Transportation Plan process with a focus on TOC and transit agency inputs and their timing. 8. Discussion: Puget Sound Passenger-only Ferry Update (11:30) PSRC staff will share a brief update on the status and next steps associated with the Puget Sound Passenger-only Ferry Study. 9. Discussion: Transit Agency Roundtable (11:45) As time permits, transit agency staff will provide updates on agency projects, operations and issues related to COVID-19, etc. 10. Information: 2020 Planned Meeting Topics* 11. Next Meeting: August 26, 2020 Calendar Link: https://www.psrc.org/sites/default/files/toc2020-calendar.pdf Transportation Operators Committee Agenda - Page 1 June 24, 2020
Transcript
Page 1: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Transportation Operators Committee Agenda

Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m.

Online Meeting Only: Use BlueJeans Connection Information Provided Below

1. Welcome and Introductions (10:00)

2. Action: Approval of Meeting Summary – April 22, 2020* (10:05)

3. Action: Kitsap Transit Redistribution Request* (10:10)

4. Action: 2020 Project Selection Recommendations* (10:15)

• FTA 2023-2024 earned share and preservation set-aside.

• FTA 2023-2024 regional competition

5. Discussion: Transit Funding Discussion at TPB Transit Caucus (10:35)

This is an opportunity to debrief on the June 11, 2020 TPB Transit Caucus

discussion about transit funding and talk about next steps.

6. Discussion: 2020 Transit Integration Report Initiation (11:00)

PSRC staff are initiating work on the 2020 Transit Integration Report. We are

soliciting TOC member input to begin this work, to be completed in fall 2020.

7. Discussion: 2022 Regional Transportation Plan Transit Topics and Timeline

(11:15)

PSRC staff will share a timeline of the 2022 Regional Transportation Plan process

with a focus on TOC and transit agency inputs and their timing.

8. Discussion: Puget Sound Passenger-only Ferry Update (11:30)

PSRC staff will share a brief update on the status and next steps associated with

the Puget Sound Passenger-only Ferry Study.

9. Discussion: Transit Agency Roundtable (11:45)

As time permits, transit agency staff will provide updates on agency projects,

operations and issues related to COVID-19, etc.

10. Information: 2020 Planned Meeting Topics*

11. Next Meeting: August 26, 2020

Calendar Link: https://www.psrc.org/sites/default/files/toc2020-calendar.pdf

Transportation Operators Committee Agenda - Page 1 June 24, 2020

Page 2: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

12. Adjourn (12:00)

*Supporting materials attached

BlueJeans Remote Connection Information:

To join the meeting with audio and visuals:

https://bluejeans.com/917737376

or:

Go to: https://www.bluejeans.com/

Click Join Meeting (top right)

Enter Meeting ID: 917737376

Enter your full name

To join via phone:

1) Dial: 1.888.240.2560 or 1.408.740.7256

2) Enter Conference ID: 917 737 376

Other Formats:

• Sign language, and communication material in alternative formats, can be arranged

given sufficient notice by calling 206-464-7090, TTY Relay 711.

العربية اللغة • | Arabic, 中文 | Chinese, Deutsch | German, Française | French

한국어 | Korean, Русский | Russian, Español | Spanish, Tagalog, Tiếng việt |

Vietnamese, Call (206) 402-1334

Transportation Operators Committee Agenda - Page 2 June 24, 2020

Page 3: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Transportation Operators Committee Meeting Summary

Date: April 22, 2020

Location: Online Meeting Only: BlueJeans Remote Meeting

Welcome and Introductions

Gil Cerise PSRC, welcomed everyone at 10:00 a.m. Representatives from the transit

agencies were confirmed as being present.

Approval of Meeting Summary

The summary for the February 26, 2020 meeting was approved.

Discussion item: PSRC’s 2020 Project Selection Update

Sarah Gutschow, PSRC, provided a brief update on the 2020 Project Selection process

and noted that the current deadlines in the process have not been changed.

More information is available on the PSRC website: https://www.psrc.org/our-

work/funding/project-selection/fhwa-and-fta-regional-funding

For questions or additional information, contact Sarah Gutschow at (206) 587-4822

Discussion item: COVID-19 Impacts on Transit Agencies

Gil explained that PSRC is attempting to collate this information into a regional

summary of regional impacts and asked the transit agencies to share impacts of the

COVID-19 emergency on their operations, capital programs, and finances to-date.

Representatives listed below from each transit agency provided information or a contact

within their agency that would have additional knowledge.

• Melinda Adams, Everett Transit

• Sabina Araya, Community Transit

• Don Chartock, WSDOT

• Peter Heffernan, King County Metro

• Celeste Gilman, WSDOT

• Alex Krieg, Sound Transit

Transportation Operators Committee Agenda Item 2 - Page 1 June 24, 2020

Page 4: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

• Steffani Lillie, Kitsap Transit

• Alexandra Mather, Pierce Transit

• Randy Rogers, Pierce County Ferries

• Benjamin Smith, City of Seattle

• Darrin Stavish, Pierce Transit

Gil produced a summary of the COVID-19 related impacts provided at this meeting and

shared that information with TOC members and alternates via email in early May.

Additional changes were noted in response to that email, as this is an evolving situation.

For more information, contact Gil Cerise at (206) 971-3053

Discussion item: Update on PSRC Planning-Related Topics

PSRC staff provided updates on other PSRC planning-related topics, including:

Regional Transportation Plan

Gil mentioned that PSRC was looking to assess transit agencies’ timeframes for

engaging in work needed for the update of the RTP, including development/update of

2030 and 2040 transit service networks and access to transit discussion. He noted

there continues to be more quantification of data, including, TDM, special needs

transportation, and sidewalk network information, among other information.

For more information, contact Gil Cerise at (206) 971-3053

Regional Transit Safety Targets

Gary Simonson, PSRC, provided an update on progress toward development of

regional transit safety targets in compliance with FTA requirements. He summarized

the initial remote call held on April 13 with the various agencies that included reviewing

the spreadsheet that the agencies filled out which showed where they are in the plan

development and target-setting process for rail, fixed route buses and non-fixed route

buses. He said that this information and other aspects of the target development was

discussed such as data sources, methodologies used, and target timelines to ascertain

if agencies preferred to roll up their targets together or use each target separately.

Gary said the next steps would be to do a comparison of each agency’s targets and

then see which approach to set targets would work best. This would be discussed at

the next meeting to be held sometime in May or June.

For more information, contact Gary Simonson at (206) 971-3276

Passenger-Only Ferry (POF) Study Progress

Gil shared updates on the POF Study, which included a review of the April 15 webinar

PSRC held to introduce people to the Puget Sound Passenger-Only Ferry Study and

Transportation Operators Committee Agenda Item 2 - Page 2 June 24, 2020

Page 5: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

seek stakeholders who want to continue informing the study. He noted a detailed FAQ

based on the questions asked during the webinar will be available soon.

The presentation is available on the PSRC website here .

More information on the Puget Sound POF Study is available on the PSRC website

here: https://www.psrc.org/passenger-ferry-study

For questions or additional information, contact Gil Cerise at (206) 971-3053

Information: Summary of February 21, 2020 Toolbox Peer Networking on Access

to Transit

A summary of the February 21 Toolbox was provided.

Information: 2020 Planned Meeting Topics

An updated 2020 Planned Meeting Topics document was provided.

Adjourn

The meeting adjourned at 12:00 p.m.

*Members and Alternates Present

Peter Heffernan, King County Metro and Chair; Alex Krieg, Sound Transit and Vice-

Chair; Melinda Adams, Everett Transit; Sabina Araya, Community Transit; Don

Chartock, WSDOT; Celeste Gilman, WSDOT; Steffani Lillie, Kitsap Transit; Randy

Rogers, Pierce County Ferries; Benjamin Smith, City of Seattle; Darin Stavish, Pierce

Transit

*PSRC Staff and Other Guests Present

Monica Adkins, PSRC; Curtis Ailes, City of Seattle; Gil Cerise, PSRC; Sarah Gutschow,

PSRC; Craig Helmann, PSRC; Brock Howell, Everett Station District Alliance; Kathryn

Johnson, PSRC; Alexandra Mather, Pierce Transit; Kelly McGourty, PSRC; Maggie

Moore, PSRC; Pavithra Parthasarathi, PSRC; Gary Simonson, PSRC; Kalon Thomas,

PSRC; Lacey Jane Wolfe, City of Bellevue

*All attendees were present via remote participation

Transportation Operators Committee Agenda Item 2 - Page 3 June 24, 2020

Page 6: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

x

FFY 2019 and 2020 BRE UZA 5307 Earned ShareSponsor Appropriation Year TIP ID # Project Title Source Current Proposed Change Final

Kitsap Transit 2019 KT-45 Bus and OTR Coach Purchase 5307 Earned Share $3,228,500 -$3,228,500 $0

Kitsap Transit 2019 KT-64 KT Transit Operations (2018-2020) 5307 Earned Share $0 $3,228,500 $3,228,500

Kitsap Transit 2020 KT-45 Bus and OTR Coach Purchase 5307 Earned Share $3,228,500 -$3,228,500 $0

Kitsap Transit 2020 KT-64 KT Transit Operations (2018-2020) 5307 Earned Share $606,190 $3,228,500 $3,834,690

Kitsap Transit Redistribution Request

Explanation: The redistribution is needed because KT has additional operating assistance needs due to the financial impacts of the Covid-19 pandemic. Therefore,

KT requests to redistribute $6,457,000 in Bremerton UZA FFY 2019 and 2020 FTA 5307 Earned Share funds from its "Bus and OTR Coach Purchase" to its "KT

Transit Operations (2018-2020)" project. After the redistribution, KT will reduce the "Bus and OTR Coach Purchase" project scope by approximately twelve

vehicles. The "KT Transit Operations (2018-2020)" project will use the increase in funding from the redistribution to support approximately 80,700 additional

hours of operations.

Request: Kitsap Transit (KT) requests a redistribution of $6,457,000 in Bremerton UZA FFY 2019 and 2020 FTA 5307 Earned Share funds between the projects

identified below.

Transportation Operators Committee Agenda Item 3 June 24, 2020

Page 7: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Item 4 MEMORANDUM June 24, 2020

To: Transportation Operators Committee (TOC)

From: Sarah Gutschow, Senior Planner

Subject: 2020 Project Selection Process for PSRC’s FFY 2023-2024 Federal Transit Administration Funds

Every two to three years PSRC undertakes a project selection process to distribute funds from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA). The FTA funds are distributed within three urbanized areas (UZAs) in the region: Bremerton, Marysville, and Seattle-Tacoma-Everett (STE). The project selection process for PSRC’s FTA funds includes an earned share distribution to the Bremerton and Marysville UZAs, since only one transit agency operates within each of those UZAs. Within the STE UZA, FTA funds are distributed via an earned share process and a regional competition. Per adopted policy, 45% of the regional portion of funds is recommended to preservation projects under the preservation set-aside. Based on the policies contained in the adopted 2020 Policy Framework for PSRC’s Federal Funds, a Call for Projects was released in February 2020 for the distribution of an estimated $342 million of PSRC’s FFY 2023-2024 FTA earned share and STE UZA regional competitive funds. Additional background information on the details of the project selection process may be found on PSRC’s website at: https://www.psrc.org/our-work/funding/project-selection/fhwa-and-fta-regional-funding.

On June 10, 2020, the Regional FTA Caucus finalized its recommendations to the TOC for the projects to receive earned share funds and STE UZA regional competitive funds, including a prioritized contingency list of projects should additional funds become available prior to the next process. These recommendations are contained in Attachments A, B, C and D.

Recommended Action

The Transportation Operators Committee should recommend the following:

• The Transportation Policy Board should recommend approval by the Executive Board ofthe projects recommended for PSRC’s FFY 2023-2024 FTA earned share fundingdistributions, preservation set-aside in the STE UZA, and list of projects to receivefunding from the regional FTA competition, including a prioritized contingency list ofprojects should additional funds become available, as identified in Attachments A, B, C,and D.

Transportation Operators Committee Agenda Item 4 - Page 1 June 24, 2020

Page 8: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Discussion PSRC’s Executive Board adopted the 2020 Policy Framework for PSRC’s Federal Funds in February 2020. The Policy Framework details the regional policy direction and guidelines for the selection of projects to receive PSRC’s federal funds. The 2020 Policy Framework maintains the policy direction of support for the development of centers and the corridors that serve them. There are three urbanized areas, or UZAs, in the PSRC region: Bremerton, Marysville and Seattle-Tacoma-Everett. PSRC coordinates with FTA and the public transit agencies operating within each UZA to conduct the process to distribute PSRC’s FTA funds to projects. Per adopted regional policy, the process used to recommend and select projects to receive the funds is split between an “earned share” process and a regional competition. Funds come to the region based on the service and operating characteristics of each transit agency, as well as from regional attributes such as population density. Since there is only one transit agency operating in the Bremerton and Marysville UZAs, respectively, funds are distributed to these two UZAs based on their earnings. Within the STE UZA, approximately 86% of the FTA funds are based on the service and operating characteristics of each transit agency and are therefore distributed via the earned share process. The remaining 14% of the funds in the STE UZA are based on regional attributes, and since 2004 this portion of the funds has been used for a regional competition. Per adopted policy, 45% of the regional portion of funds is recommended to preservation projects under the preservation set-aside, which is distributed to transit agencies via their earned share percentages. Twelve projects were submitted into the FTA regional competition, requesting almost $58 million for the approximately $28 million available. Projects were scored and ranked by PSRC staff based on the agreed upon Regional Project Evaluation Criteria. The criteria include the following: benefit to a regional and/or locally identified center; system continuity/long-term benefit/sustainability; air quality and climate change; and project readiness/financial plan. The Regional FTA Caucus met on June 10, 2020 to recommend projects for funding to the TOC. In addition to the project scores, the Caucus agreed to consider the following additional factors in preparing their recommendation: geographic equity, agency equity, modal equity, project completion / implementation, and the ability to fund as many projects as possible. The Caucus unanimously recommends the list of projects as identified in Attachment C, which represents funding for seven projects. The attachment notes where any project is accepting a reduced funding amount, with the resulting adjustment in scope or agreement by the sponsor to fully fund the phase with local funds. Schedule The TOC recommendation for PSRC’s 2020 project selection process for FFY 2023-2024 FTA funds will be presented to the Transportation Policy Board on July 9, 2020 for its recommendation to Executive Board. The Executive Board is scheduled to take final action on July 23rd. The draft 2021-2024 Regional Transportation Improvement Program (TIP) will be released for public comment in September, and the final TIP will be sent to the state in October, with federal approval expected in January 2021. For more information please contact Sarah Gutschow at (206) 587-4822 or [email protected], or Kelly McGourty at (206) 971-3061 or [email protected].

Transportation Operators Committee Agenda Item 4 - Page 2 June 24, 2020

Page 9: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Attachment A: Project Recommendations for PSRC’s FFY 2023-2024 FTA Earned Share Funding Distributions

Attachment B: Regional FTA Caucus Project Recommendations for PSRC’s FFY 2023-2024 Preservation Set-Aside

Attachment C: Regional FTA Caucus Project Recommendations for PSRC’s 2020 Regional FTA Competition

Attachment D: Regional FTA Caucus Recommended Contingency List for PSRC’s 2020 Regional FTA Competition

Transportation Operators Committee Agenda Item 4 - Page 3 June 24, 2020

Page 10: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Seattle-Tacoma-Everett Urbanized Area (UZA) Sponsor Project Title Amount Recommended Year FTA Source Description

$6,293,931 2023 5307

$6,293,931 2024 5307

$2,284,408 2023 5337 HIMB

$2,284,408 2024 5337 HIMB

$869,171 2023 5339

$869,171 2024 5339

Subtotal $18,895,020

$1,270,898 2023 5307

$1,270,898 2024 5307

Subtotal $2,541,796

$104,102 2023 5339

$104,102 2024 5339

Subtotal $208,204

$559,354 2023 5307

$559,354 2024 5307

$245,631 2023 5339

$245,631 2024 5339

Subtotal $1,609,970

$320,000 2023 5307

$320,000 2024 5307

Subtotal $640,000

$900,000 2023 5307

$900,000 2024 5307

Subtotal $1,800,000 Subtotal

King County

Metro

Atlantic Base Pavement

Replacement

$531,527 2023 5337 HIFG

This project will replace pavement at Metro's Atlantic Base. Atlantic Base provides support to Metro's

trolley bus system operations. The project will include the removal and replacement of the concrete

bus parking areas, the removal and replacement of the sanitary/storm water drainage systems, the

removal and replacement of the overhead DC trolley wire system, the removal and replacement of the

existing site lighting standards and fixtures, and the removal and replacement of the existing

perimeter chain link fence.

Subtotal $531,527

FY 2023- 2024 Vanpool Vans

This new bucket project will use PSRC’s 2023- 2024 allocated earned share 5307 funds for a portion

of annual funding for new and/or replacement vanpool vans in proportion to Intercity Transit vanpool

service provided to and from the PSRC service area. These funds will be used to acquire

approximately 30 vans in 2023 and 30 vans in 2024 for an approximate total of 60 vans.

Attachment A: Project Recommendations for PSRC's FFY 2023-2024 FTA Earned Share Funding Distributions

Community

Transit

Transit Revenue Vehicles 2023-

2024

This is a TIP bucket project which contains Community Transit's revenue vehicle FTA funding for the

2023-2024 cycle. An estimated 31 total transit revenue vehicles will be purchased for replacement of

buses that have exceeded their useful life or for expansion of service. The estimated total includes

about 20 replacement or expansion buses with 5307 Earned Share funds; 3 replacement or expansion

buses with 5339 funds; 2 replacement buses with 5307 Preservation funds; and 6 replacement buses

with 5337 HIMB funds that will operate on HOV lanes.

Everett Transit2023-2024 Preventive Maintenance

Vehicle Fleet

This project contains 5307 funding for preventive maintenance work on the agency’s fleet of

approximately 70 fixed route and paratransit vehicles. Typical work includes performance of

inspections and routine maintenance, such as changing belts, hoses, distributor parts, oil changes

and tune-ups. This project supports approximately 22,000 hours in labor (approximately 11,000 hours

per year) and is scheduled for FFY 2023 and 2024.

Everett Transit 2023-2024 Electronic SignageThis project will fund the purchase of electronic signage systems to provide customers with real-time

arrival and departure information at Everett Station in 2023, and College and Mall Stations in 2024.

FY 2023- 2024 Replacement Fixed

Route CoachesIntercity Transit

This is a new bucket project which will contribute to the replacement of approximately 4 fixed route

coaches at the end of their useful life. The funds reflected in this project will go towards the

proportion of coach replacement cost associated with fixed route express coach revenue miles

served in the Seattle-Tacoma-Everett UZA.

Intercity Transit

Intercity TransitFY 23-24 Capital Preventive

Maintenance

This is a new bucket project that will provide for Capital Preventive Maintenance (CPM) eligible

operating expenses for FFY 2023- 2024. Reimbursement will be based on the PSRC Earned Share

STE UZA 5307 formula funds based on the proportion of revenue miles of Intercity Transit public

transportation service to and from the STE UZA reported in NTD statistics for fixed route express

coach service and vanpool service. This funding will be used for approximately 7% of eligible CPM

expenses. The project consists of FTA funds scheduled to be expended over the span of FFYs

2023- 2024.

Transportation Operators Committee Agenda Item 4 - Attachment 4A - Page 1 June 24, 2020

Page 11: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project Title Amount Recommended Year FTA Source Description

King County

MetroVessel Preservation 2023-2024

$1,472,452 2023 5337 HIFG

This is a TIP bucket project that contains the Ferry District's tasks over time to provide for facility and

vessel maintenance costs, labor, annual inspection/dry dock, routine maintenance repair/parts,

contract replacement vessels, and contract repair service. The federal funding represents roughly 70

percent of the total budget for this activity during the time period. The project includes PSRC FTA

funds scheduled to be expended over the span of FFYs 2023-2024.

Subtotal $1,472,452

$900,000 2023 5337 HIFG

$900,000 2024 5337 HIFG

Subtotal $1,800,000

$17,062,360 2023 5337 HIFG

$18,152,767 2024 5337 HIFG

Subtotal $35,215,127

$3,842,610 2023 5337 HIFG

$3,261,942 2024 5337 HIFG

Subtotal $7,104,552

King County

Metro

Trolley Pole Replacement 2023-

2024

$3,359,000 2024 5337 HIFG

This project will purchase and install support poles and related accessories and items for Metro's

trolley system that need to be replaced. The total number of poles to be purchased (replaced) using

these funds is approximately 200. The project includes PSRC FTA funds scheduled to be expended

over the span of FFYs 2023-204.

Subtotal $3,359,000

King County

Metro

Atlantic Base Trolley Power System

Replacement$1,864,761 2023 5337 HIFG

This project will purchase and install power system support equipment needed to maintain the Atlantic

Base Trolley network power delivery system at multiple substations in a state of good repair for 2023

to 2024.

Subtotal $1,864,761

$36,626,935 2023 5307

$36,626,936 2024 5307

$8,038,793 2023 5337 HIMB

$8,038,793 2024 5337 HIMB

$3,819,168 2023 5339

$3,819,168 2024 5339

Subtotal $96,969,793

King County

Metro

Vehicle, Equipment and Facilities

Maintenance for Electric Trolley

Fleet 2023-2024

King County

Metro

Vessel Maintenance 2023-2024

This is a TIP bucket project that contains the tasks over time to provide for facility and vessel

maintenance costs, labor, annual inspection/dry dock, routine maintenance repair/parts, contract

replacement vessels, and contract repair service. Depending on the amount of federal funds

programmed, the federal funding roughly represents 80 percent of the total budget for this activity.

The project includes PSRC FTA funds scheduled to be expended over the span of FFYs 2023-2024.

King County

Metro

This is a TIP bucket project that contains King County Metro Transit's FTA-funded preventive

maintenance of transit-related electric trolley vehicles, equipment and facilities. The project contains

the annual program of maintenance work on Metro's fleet of approximately 174 electric trolley buses

and infrastructure at Metro's Atlantic operating base and other facilities that are necessary for the

maintenance and operations of Metro trolley service. The primary use of the funds is for staff costs for

preventive maintenance activities on electric trolley buses. Depending on the amount of federal funds

programmed, the federal amount could represent from 50 to 70 percent of the annual budget for this

activity. The project includes PSRC FTA funds already expended or scheduled to be expended over

the span of FFYs 2023-2024.

King County

Metro

Trolley System Transit Asset

Management 2023-2024

This project provides for Metro's trolley system asset management program in order to achieve and

maintain the transit network in a state of good repair (SGR). Depending on the number and complexity

of projects utilizing this funding, the federal amount roughly represents 40 percent of the overall

budget for this activity. The project includes PSRC FTA funds scheduled to be expended over the

span of FFY's 2023-2024.

Bus Acquisition 2023-2024

This project will purchase buses to replace buses that are beyond their retirement age or expand the

existing bus fleet. The current amount programmed will be used to purchase approximately 120

vehicles. The project includes PSRC FTA funds already expended or scheduled to be expended over

the span of FFYs 2023-2024. The 5337 HIMB funds will be used to acquire replacement buses that

will operate on HOV lanes.

Transportation Operators Committee Agenda Item 4 - Attachment 4A - Page 2 June 24, 2020

Page 12: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project Title Amount Recommended Year FTA Source Description

$358,324 2023 5307

$358,324 2024 5307

$48,309 2023 5339

$48,309 2024 5339

Subtotal $813,266

$20,503 2023 5337 HIFG

$20,503 2024 5337 HIFG

Subtotal $41,006

$698,298 2023 5307

$698,298 2024 5307

Subtotal $1,396,596

$5,784,247 2023 5307

$5,784,247 2024 5307

$79,548 2023 5337 HIMB

$79,548 2024 5337 HIMB

$705,322 2023 5339

$705,322 2024 5339

Subtotal $13,138,234

$430,129 2023 5307

$430,129 2024 5307

$593,051 2023 5337 HIFG

$593,051 2024 5337 HIFG

Subtotal $2,046,360

$351,819 2023 5307

$351,819 2024 5307

Subtotal $703,638

$274,590 2023 5307

$274,590 2024 5307

$37,906 2023 5339

$37,906 2024 5339

Subtotal $624,992

This is a TIP bucket project that contains capital improvements and major maintenance grants to

support the Seattle Center Monorail, which began service in 1962. The monorail system includes two

trains, two stations, and an elevated guideway between the stations. The 2023-2024 Monorail funds

will be used to fund two capital improvement and major maintenance projects: New Train Propulsion

System and Bogie Inspections and Updates. This work is part of the ongoing Transit Asset

Management Plan (TAMP) for the Seattle Center Monorail.

Seattle Streetcar System

Maintenance 2023-2024City of Seattle

TBD

Project(s) to be announced as part of FY23 and FY24 annual adjustments.

Clean Fuels Bus

Replacement/Expansion 2023-24

Skagit Transit

This is a TIP bucket project that contains FTA-funded preventive and major maintenance grants to

support the Seattle Streetcar System. The first line began operations in 2007 and the second line

began operations in 2016. The project contains funds for vehicle and facility preventive maintenance,

corrective maintenance, expected vehicle overhauls and other defects as may occur in the 2023-2024

timeframe. The 5307 grants will fund 23% of streetcar maintenance in 2023 and 2024.

Seattle Monorail System

Maintenance 2023-2024City of Seattle

An estimated 26 transit revenue vehicles will be purchased for replacement of buses that have

exceeded their useful life or expansion of service using FY 2023 and 2024 earned share funding,

including about 20 replacement or expansion buses with 5307 funds; 2 replacement or expansion

buses with 5339 funds; 2 replacement buses with 5307 Preservation funds; and 2 replacement

buses with 5337 HIMB funds that will operate on HOV lanes.

This project contains funds for Pierce Transit's complementary ADA Service for persons with

disabilities as provided for in the Americans with Disabilities Act scheduled for 2023 and 2024. The

amount requested will be applied to Pierce Transit's contracted provider agreement. For the two-year

period the project funding will provide 31,741 hours of service.

Pierce Transit

Bus and OTR Coach Purchase (23-

24)

This is a TIP bucket project for transit revenue vehicle purchases. The 2023-2024 PSRC FTA 5307

and 5339 funds will assist in acquiring approximately 16 vehicles. The 5339 funds will be used on bus

procurement, including on board vehicle technologies hardware.

Pierce Transit ADA Service 2023-24

Kitsap TransitPassenger Only Ferry Terminal

Improvements (23-24)

Kitsap Transit is responsible for the maintenance of facilities associated with the passenger-only ferry

service. This project includes preventive maintenance of a wide range of possible types of work to

cost-effectively preserve and extend ferry service assets. Funds will be used for approximately 5,900

labor hours of preventive maintenance work. The 2023-2024 PSRC 5337 HIFG funds will use Toll

Credits as local match. One hundred percent of the STE UZA funding will support and preserve ferry

service to the STE UZA.

Kitsap Transit

Transportation Operators Committee Agenda Item 4 - Attachment 4A - Page 3 June 24, 2020

Page 13: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project Title Amount Recommended Year FTA Source Description

$19,272,104 2023 5337 HIFG

$19,272,104 2024 5337 HIFG

Subtotal $38,544,208

$8,105,425 2023 5337 HIMB

$8,105,425 2024 5337 HIMB

$1,430,970 2023 5339

$1,430,970 2024 5339

Subtotal $19,072,790

$22,297,584 2023 5307

$22,297,584 2024 5307

Subtotal $44,595,168

Washington

State Ferries

Seattle Multimodal Terminal at

Colman Dock

$3,490,636 2023 5307

Replace the north timber trestle and the main terminal building, as well as utilities and auxiliary

structures located on the timber trestle. Replacement structures will be constructed to meet current

seismic codes. This is part of the larger Colman Dock project, which includes the Slip 3 OHL and

Transfer Span Replacement (WSF-105) and the POF facility (KCMD-5). FA #s: 2006(035) and WA-04-

0004. This is a multiyear project and the funding included is the portion within the span of the regional

TIP.

Subtotal $3,490,636

$944,210 2023 5307

$4,434,846 2024 5307

$7,636,112 2023 5337 HIFG

$7,636,112 2024 5337 HIFG

Subtotal $20,651,280

$319,130,376

Sound TransitSounder and Link State of Good

Repair (2023-2024)

This is a TIP bucket project providing state of good repair/preventive maintenance for Sounder

commuter rail and Link light rail rolling stock and related rail facilities to extend the life and ensure

continued performance of these assets. Sounder includes a current active fleet of 81 locomotives and

cab/coach cars and Link light rail active fleet currently includes 65 vehicles. The project includes FTA

5337 HIFG funds (approx 10% of the overall project budget) to be expended over the span of FFY's

2023-2024 and will provide for labor and fringe costs incurred for engineering maintenance of

vehicles, transit way, related structures and supporting maintenance facilities, as well as

administrative support of these activities.

Downtown Redmond Link Extension

Extend light rail approximately 3.4 miles from the Redmond Technology Center Station (opening

2023), with new stations in downtown Redmond and southeast Redmond near Marymoor Park. This is

a multiyear project and the funding programmed reflects the funds within the span of the TIP. The

project also includes parking spaces and a range of bicycle and pedestrian improvements. The 5307

Earned Share funds will be used to construct elements of the project described above. These funds

will be applied toward the design-build contract.

Washington

State Ferries

Vessel Preservation and

Improvement (2023- 2024)

This is a TIP bucket project that contains Washington State Ferries’ federal FTA, FBP, NHPP, STP

funding for preventive maintenance, preservation and improvement of ferry vessels to ensure

the vessels remain in safe, efficient and effective operating condition. The project contains all

biennial funding (both state and federal) for work on up to 23 vessels in the WSF fleet over the span

of the 23-25 biennium. The primary use of the funds is for renovation, replacement and/or upgrade of

vessel systems; including, steel structures, structural preservation systems, interior spaces, piping

systems, propulsion systems, major mechanical /electrical, communication / navigation / lifesaving,

and security equipment on vessels. Funding may also be used to address emergency repairs,

regulatory compliance, maintenance and preservation, and enhancements as required. The federal

amount represents approximately 38% percent of the biennial budget for this activity.

STE UZA Earned Share Total

Sound Transit

This bucket project will include the purchase of replacement buses and the performance of preventive

maintenance services – including possible midlife overhauls – for ST’s express bus program serving

Snohomish, King, and Pierce Counties. The funds will be used to maintain a fleet of approximately

315 buses in a state of good repair and upkeep of bus related facilities to preserve and extend

functionality and serviceability of these assets. The 2023-2024 FTA 5337 HIMB funds will pay for

preventive maintenance work. The 2023-2024 FTA 5339 and 5307 Preservation funds will procure

replacement buses to replace buses that have reached the end of their useful life. The 2023-2024

funds represent approximately 6% of the of the overall project budget.

Regional Express Bus Program

(2023-2024)Sound Transit

Transportation Operators Committee Agenda Item 4 - Attachment 4A - Page 4 June 24, 2020

Page 14: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project Title Amount Recommended Year FTA Source Description

$3,451,170 2023 5307

$3,451,170 2024 5307

$296,550 2023 5339

$296,550 2024 5339

Subtotal $7,495,440

$276,029 2023 5337 HIFG

$276,029 2024 5337 HIFG

Subtotal $552,058

$8,047,498

Sponsor Project Title Amount Recommended Year FTA Source Description

$2,037,078 2023 5307

$2,037,078 2024 5307

Subtotal $4,074,156

$247,923 2023 5339

$247,923 2024 5339

Subtotal $495,846

$4,570,002

$331,747,876Grand Total, All UZAs

Bremerton UZA

Kitsap TransitBus and OTR Coach Purchase (23-

24)

Community

Transit

Community

Transit

Marysville UZA Transit Operations

2023-2024

Transit Revenue Vehicles 2023-

2024

Kitsap Transit

Marysville ES UZA Total

Bremerton ES UZA Total

This is a TIP bucket project which contains Community Transit's 2023-2024 FTA funds for transit bus

service benefiting the Marysville UZA. The amount of federal funding available will provide

approximately 41,000 hours of fixed route bus service.

This is a TIP bucket project which contains Community Transit's FTA funded Revenue Vehicle funding

for the 2023-2024 cycle. An estimated 31 total Transit Revenue Vehicles will be purchased for

replacement of buses that have exceeded their useful life or for expansion of service. The estimated

total includes about 20 replacement or expansion buses with 5307 Earned Share funds; 3

replacement or expansion buses with 5339 funds; 2 replacement buses with 5307 Preservation funds;

6 replacement buses with 5337 HIMB funds that will operate on HOV lanes.

Marysville UZA

Kitsap Transit is responsible for the maintenance of facilities associated with the passenger-only ferry

service. This project includes preventive maintenance of a wide range of possible types of work to

cost-effectively preserve and extend ferry service assets. Funds will be used for approximately 5,900

labor hours of preventive maintenance work. The 2023-2024 PSRC 5337 HIFG funds will use Toll

Credits as local match. One hundred percent of the STE UZA funding will support and preserve ferry

service to the STE UZA.

Passenger Only Ferry Terminal

Improvements (23-24)

This is a TIP bucket project for transit revenue vehicle purchases. The 2023-2024 PSRC FTA 5307

and 5339 funds will assist in acquiring approximately 16 vehicles. The 5339 funds will be used on bus

procurement, including on board vehicle technologies hardware.

Transportation Operators Committee Agenda Item 4 - Attachment 4A - Page 5 June 24, 2020

Page 15: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project Title Amount Recommended Year FTA Source Description

$704,416 2023 5307

$704,416 2024 5307

Subtotal $1,408,832

$63,992 2023 5307

$63,992 2024 5307

Subtotal $127,984

$5,529,357 2023 5307

$5,529,358 2024 5307

Subtotal $11,058,715

$500,434 2023 5307

$500,434 2024 5307

Subtotal $1,000,868

$58,763 2023 5307

$58,763 2024 5307

Subtotal $117,526

$3,810,528 2023 5307

$3,810,528 2024 5307

Subtotal $7,621,056

Seattle Streetcar System

Maintenance 2023-2024

This is a TIP bucket project that contains FTA-funded preventive and major maintenance grants to

support the Seattle Streetcar System. The first line began operations in 2007 and the second line began

operations in 2016. The project contains funds for vehicle and facility preventive maintenance, corrective

maintenance, expected vehicle overhauls and other defects as may occur in the 2023-2024 timeframe.

The 5307 grants will fund 23% of streetcar maintenance in 2023 and 2024.

Seattle

Sound

Transit

Regional Express Bus

Program (2023-2024)

This bucket project will include the purchase of replacement buses and the performance of preventive

maintenance services – including possible midlife overhauls – for ST’s express bus program serving

Snohomish, King, and Pierce Counties. The funds will be used to maintain a fleet of approximately 315

buses in a state of good repair and upkeep of bus related facilities to preserve and extend functionality

and serviceability of these assets. The 2023-2024 FTA 5337 HIMB funds will pay for preventive

maintenance work. The 2023-2024 FTA 5339 and 5307 Preservation funds will procure replacement

buses to replace buses that have reached the end of their useful life. The 2023-2024 funds represent

approximately 6% of the of the overall project budget.

King County

MetroBus Acquisition 2023-2024

This project will purchase buses to replace buses that are beyond their retirement age or expand the

existing bus fleet. The current amount programmed will be used to purchase approximately 120

vehicles. The project includes PSRC FTA funds already expended or scheduled to be expended over

the span of FFYs 2023-2024. The 5337 HIMB funds will be used to acquire replacement buses that will

operate on HOV lanes.

Pierce

Transit

Clean Fuels Bus

Replacement/Expansion

2023-24

This project contains funds for Pierce Transit's bus replacement projects scheduled for 2023 and 2024.

For the two-year period, the project funding will provide for the purchase of approximately 14 clean fuels

buses.

Attachment B: Project Recommendations for PSRC's 2023-2024 FTA Preservation Set-Aside Funding

Community

Transit

Transit Revenue Vehicles

2023-2024

This is a TIP bucket project which contains Community Transit's revenue vehicle FTA funding for the

2023-2024 cycle. An estimated 31 total transit revenue vehicles will be purchased for replacement of

buses that have exceeded their useful life or for expansion of service. The estimated total includes

about 20 replacement or expansion buses with 5307 Earned Share funds; 3 replacement or expansion

buses with 5339 funds; 2 replacement buses with 5307 Preservation funds; and 6 replacement buses

with 5337 HIMB funds that will operate on HOV lanes.

Everett

Transit

2023-2024 Everett Station

Preventive Maintenance

The 2023-2024 funding will assist with upgrading an obsolete low-voltage fire alarm control panel to the

City standard.

Transportation Operators Committee Agenda Item 4 - Attachment 4B - Page 1 June 24, 2020

Page 16: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project Title Amount Recommended Year FTA Source Description

$900,023 2023 5307

$900,023 2024 5307

Subtotal $1,800,046

Preservation Total $23,135,027

Washington

State Ferries

Vessel Preservation and

Improvement (2023- 2024)

This is a TIP bucket project that contains Washington State Ferries’ federal FTA, FBP, NHPP, STP

funding for preventative maintenance, preservation and improvement of ferry vessels to ensure the

vessels remain in safe, efficient and effective operating condition. The project contains all biennial

funding (both state and federal) for work on up to 23 vessels in the WSF fleet over the span of the 23-25

biennium. The primary use of the funds is for renovation, replacement and/or upgrade of vessel

systems; including, steel structures, structural preservation systems, interior spaces, piping systems,

propulsion systems, major mechanical /electrical, communication / navigation / lifesaving, and security

equipment on vessels. Funding may also be used to address emergency repairs, regulatory compliance,

maintenance and preservation, and enhancements as required. The federal amount represents

approximately 38% percent of the biennial budget for this activity.

Transportation Operators Committee Agenda Item 4 - Attachment 4B - Page 2 June 24, 2020

Page 17: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project TitleTotal

ScorePhase

Amount

RequestedYear

Amount

RecommendedDescription

Sound Transit

Buses for the New SR

522/NE 145th Bus Rapid

Transit Service 85 OTH 7,000,000$ 2023 $ 6,272,690

This project will purchase six battery electric high capacity transit buses to support Sound Transit’s new

Bus Rapid Transit (BRT) Stride service that will connect the communities of Shoreline, Seattle, Lake

Forest Park, Kenmore, Bothell, and Woodinville along NE 145th/522. This new service offers 8 miles of

bus service connecting to Link light rail at Shoreline South/145th and I-405 BRT in Bothell, as well as

connections to other transit service provided by Community Transit and King County Metro. The

recommended amount of funding for this project is lower than the amount requested, so the remaining

funds were placed on the contingency list. Sound Transit will use the remaining funding on the

contingency list to purchase one additional bus as requested for this project phase.

2023 $ 1,157,535

2024 $ 5,842,465

Community

Transit

Swift Orange Line EDCC

Transit Center 69 CN 4,088,240$ 2023 $ 4,088,240

This project request is for construction of the Edmonds Community College Transit Center, which will be

the western terminus for Community Transit's Swift BRT Orange Line. The proposed terminus will include

one Swift boarding station, one Swift drop-off station, one Swift layover area, and approximately four local

boarding zones. The local boarding zones will have a pedestrian platform, shelters, driver restroom,

lighting, sidewalk, landscaping, and modifications to the existing Edmonds Community College parking lot

immediately adjacent to the new terminus.

Kitsap Transit

Passenger-Only Ferry

Terminal Docking Facility

on the Seattle Waterfront 69 PE 2,500,000$ 2024 $ 2,500,000

The project includes planning, environmental planning/permitting, and the preliminary engineering phases

necessary to construct a new passenger-only ferry (POF) docking facility in Seattle, which will provide

added capacity for both new and existing POF services. This funding opportunity will be used to conduct

more detailed terminal planning and preliminary engineering design, building upon the findings of the

Seattle Terminal Alternatives Analysis, as well as to support the necessary environmental permitting

efforts and any related construction permitting requirements.

City of Seattle

Northgate to Downtown

Transit improvements 68 CN 3,000,000$ 2024 $ 3,000,000

This project will construct transit spot improvements and multimodal corridor improvements along King

County Metro Route 40, including bus priority lanes at pinch points; traffic signal optimization at

intersections; bus stop rebalancing; conversion of bus stops at approximately five intersections to in-lane

bus stops; and bicycle and pedestrian infrastructure upgrades. This route provides transit connections to

destinations in North and Central Seattle, including Northgate, Greenwood, Crown Hill, Ballard, Fremont,

South Lake Union, and Downtown Seattle. The City of Seattle originally requested both the preliminary

engineering and construction phases, but only the construction phase was recommended for funding. The

preliminary engineering phase was placed on the contingency list.

2023 $ 737,000

2024 $ 2,913,000

Attachment C: Regional FTA Caucus Project Recommendations for PSRC's 2020 Regional FTA Competition

Sound Transit

South Renton Transit

Center 79 CN 7,000,000$

This project will construct a new South Renton Transit Center and 700-stall parking garage; transit signal

prioritization; bus-only lanes; and bicycle and pedestrian amenities to support access to Sound Transit's I-

405 Stride BRT service; King County Metro’s RapidRide service, and local bus service. The I-405 BRT

south line, which includes the South Renton Transit Center, connects five cities and four Regional Growth

Centers along I-405 and SR 518 from Bellevue to Burien.

3,650,000$ CN65

South King County

Corridor Speed and

Reliability Improvements

King County

Metro

This project will construct transit speed and reliability improvements on congested segments of Route 181

and the new Route 165. Route 181 travels between the Twin Lakes Park & Ride southeast of Federal

Way, to the Federal Way Transit Center and Green River College in Auburn. Route 165 is a consolidation

of routes 164 and 166, and is scheduled to begin service in September 2020, connecting the Burien

Transit Center, Normandy Park commercial/residential areas, Highline College, Kent Des Moines Park &

Ride, Kent Station, and Green River College. The project would construct or implement enhanced HOV

lanes, new bus lanes/bypass lanes, signal queue jumps, intersection turning restrictions, bus bulbs, signal

timing optimization, improved bus stop spacing, passenger facility improvements, transit signal priority, off-

board fare collection at selected locations, channelization improvements, improved access to bus stops,

and layover improvements.

Transportation Operators Committee Agenda Item 4 - Attachment 4C - Page 1 June 24, 2020

Page 18: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project TitleTotal

ScorePhase

Amount

RequestedYear

Amount

RecommendedDescription

Pierce Transit

Spanaway Transit Center -

Phase II 54 CN 4,000,000$ 2023 $ 2,000,000

This project will provide a bus turnaround and layover facility to serve the new Pacific Avenue S/State

Route 7 BRT corridor at the southern end of the Route 1 Corridor in Spanaway. The facility will include an

operators' comfort station and add up to 250 parking spaces to the Park-and-Ride, based on predicted

parking demand. In addition, the agency may construct electric vehicle or Battery-Electric Bus charging

infrastructure on-site. The recommended amount of funding for this project is lower than the amount

requested for this project phase, so Pierce Transit will reduce the amount of parking from the original

scope in the project application.

$ 28,510,930 Regional FTA Competitive Total

Transportation Operators Committee Agenda Item 4 - Attachment 4C - Page 2 June 24, 2020

Page 19: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Priority #1: Any additional FTA competitive funds received in the region will be used to advance projects on the recommended list of projects, identified in Attachment 1.

Priority #2: After Priority #1 on the contingency list is satisfied, the following projects, in priority order, will be considered for funding up to the amount identified.

Sponsor Project TitleTotal

ScorePhase

Amount

Requested

Contingency

AmountDescription

Sound Transit

Buses for the New SR

522/NE 145th Bus Rapid

Transit Service 85 OTH $ 7,000,000 $ 727,310

This project will purchase six battery electric high capacity transit buses to support Sound Transit’s new

Bus Rapid Transit (BRT) Stride service that will connect the communities of Shoreline, Seattle, Lake

Forest Park, Kenmore, Bothell, and Woodinville along NE 145th/522. This new service offers 8 miles of

bus service connecting to Link light rail at Shoreline South/145th and I-405 BRT in Bothell, as well as

connections to other transit service provided by Community Transit and King County Metro. The

recommended amount of funding for this project is lower than the amount requested, so the remaining

funds were placed on the contingency list. Sound Transit will use the remaining funding on the

contingency list to purchase one additional bus as requested for this project phase.

King County

Metro

RapidRide K Line: Speed

and Reliability

Improvements 71 CN $ 6,000,000 $ 6,000,000

This project scope will construct and implement transit speed and reliability improvements for the

RapidRide K Line, which is scheduled to begin service in 2025. RapidRide K Line will operate between

the Kirkland Totem Lake Regional Growth Center and the Eastgate Park and Ride in Bellevue.

Proposed improvements include construction of bus lanes, queue jumps, turning restrictions, bus bulbs,

signal timing optimization, bus stop spacing management, transit signal priority, turn lanes, traffic

channelization improvements, and layover improvements.

Sound Transit

NE 130th Street Infill

Station 69 CN $ 7,300,000 $ 7,300,000

This project will construct a new elevated, side platform light rail station at NE 130th Street and I-5 in

North Seattle. This funding request will complete construction of the station platforms and canopies,

plaza and other station finishes. The NE 130th Street Infill Station will be constructed along with the

Lynnwood Link Extension light rail corridor serving the Lynnwood and Northgate Regional Growth

Centers and connecting to a total of five centers. The 130th St Infill Station includes a street-level plaza,

bus and paratransit transfer facilities, sidewalks, and bicycle infrastructure.

City of Seattle

Northgate to Downtown

Transit improvements 68 PE $ 1,000,000 $ 1,000,000

This project will construct transit spot improvements and multimodal corridor improvements along King

County Metro Route 40, including bus priority lanes at pinch points; traffic signal optimization at

intersections; bus stop rebalancing; conversion of bus stops at approximately five intersections to in-lane

bus stops; and bicycle and pedestrian infrastructure upgrades. This route provides transit connections to

destinations in North and Central Seattle, including Northgate, Greenwood, Crown Hill, Ballard, Fremont,

South Lake Union, and Downtown Seattle. The City of Seattle originally requested both the preliminary

engineering and construction phases, but only the construction phase was recommended for funding.

The preliminary engineering phase was placed on the contingency list.

King County

Metro

Route 36 Speed and

Reliability Corridor

Improvements 63 CN $ 2,449,000 $ 2,449,000

This project will make transit speed and reliability improvements on congested segments and

bottlenecks along Metro Route 36, a trolleybus route operating between Othello Link Light Rail Station

and Downtown Seattle via Beacon Hill and a planned future RapidRide Corridor. The project would

construct treatments, including bus lanes, queue jumps, turning restrictions, transit signal priority,

layover/bus zone improvements, bus stop optimization, restrictions, transit signal priority, layover/bus

zone improvements, bus stop optimization, trolleywire modifications and other treatments to improve

transit speed and reliability. Bus stop access upgrades would include adding bus bulbs, improved

lighting, improved high visibility crosswalks street crossings, and possible sidewalk and bike connection

reconstruction adjacent to new bus stops or bus bulbs.

Pierce Transit

Spanaway Transit Center -

Phase II 54 CN $ 4,000,000 $ 2,000,000

This project will provide a bus turnaround and layover facility to serve the new Pacific Avenue S/State

Route 7 BRT corridor at the southern end of the Route 1 Corridor in Spanaway. The facility will include

an operators' comfort station and add up to 250 parking spaces to the Park-and-Ride, based on

predicted parking demand. In addition, the agency may construct electric vehicle or Battery-Electric Bus

charging infrastructure on-site. As the amount of recommended funding is lower than the amount

requested, Pierce Transit reduced the amount of parking in the project scope. The additional parking

from the original project scope was placed on the contingency list.

City of Seattle

Seattle Center Monorail

Station Improvements 54 CN $ 4,800,000 $ 4,800,000

This project will increase the Seattle Monorail system capacity by improving the handling capacity,

passenger flows, accessibility, safety, security, and all-weather accommodations of the Seattle Center

Monorail Station. Project components include adding automated passenger gates at the Monorail

platform edge; making the station’s main entrance ADA accessible; covering passenger staging; leveling

the station platform and train floor for better ADA compliance; making queuing areas more efficient; and

improving passenger signage, wayfinding, and regional transit information.

Attachment D: Regional FTA Caucus Recommended Contingency List for PSRC's 2020 Regional FTA Competition

Transportation Operators Committee Agenda Item 4 - Attachment 4D - Page 1 June 24, 2020

Page 20: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

Sponsor Project TitleTotal

ScorePhase

Amount

Requested

Contingency

AmountDescription

Sound Transit

South Tacoma &

Lakewood Station Access

Improvements 51 PE $ 5,000,000 $ 5,000,000

This project will complete preliminary engineering and NEPA environmental review for station access

improvements at the South Tacoma and Lakewood Sounder stations, including sidewalks, pedestrian

and bicycle improvements, lighting, and other station area enhancements to improve safety and

accessibility. The work will also include analyzing transit use around the stations to inform integration of

multi-modal improvements and evaluation of parking improvement options at the stations. Additionally,

the scope includes the development and implementation of an external engagement strategy, including

public engagement activities for targeted outreach to underserved communities in the project area.

Transportation Operators Committee Agenda Item 4 - Attachment 4D - Page 2 June 24, 2020

Page 21: Transportation Operators Committee AgendaTransportation Operators Committee Agenda Date: Wednesday, June 24, 2020 from 10:00 a.m.- 12:00 p.m. Online Meeting Only: Use BlueJeans Connection

11/25/2019

2020 TOC Planned Meeting Topics

Ongoing

• FTA fund adjustments

• FTA fund project tracking

Quarter 1 (January – March)

• Next Level of Transit Planning for Regional Transportation Plan

• Check-in FTA Performance-based Planning:

o Transit Safety Rule implementation – agency plan development; performance and targets

o Transit Asset Management

Quarter 2 (April – June)

• COVID-19 Impacts

• Next Level of Transit Planning for Regional Transportation Plan

• Action 2020 FTA Project Selection

• 2020 Transit Integration Report Initiation

Quarter 3 (July – September)

• Next Level of Transit Planning for Regional Transportation Plan

• PSRC Budget Year 2022-2023 Transit Work Program Development

• 2020 Transit Integration Report development

• Transit Safety Plan completion/ submission of targets to PSRC (deadline July)

Quarter 4 (October – December)

• Next Level of Transit Planning for Regional Transportation Plan

• Transit Safety Plan completion/ submission of targets to PSRC (deadline DecemberJuly)

• Development of regional transit safety performance targets in compliance with FTA

• Action on Special Needs Transportation Regional Priorities (WSDOT Consolidated Grant) (delayed

to January 2021)

• UPWP Transit information updates for PSRC 2022-2023 Budget & UPWP

Transportation Operators Committee Agenda Item 10 June 24, 2020


Recommended