  • 8/3/2019 Traverse City Road Conversion Forum

    1/28

    Lansings Complete Streets Experience

    Road Conversions: A Tool for Complete Streets

    Traverse Area District LibrarySeptember 20, 2011

    Andrew Kilpatrick, P.E.

    Transportation Engineer

    City of Lansing

  • 8/3/2019 Traverse City Road Conversion Forum

    2/28

    LansingCompleteStreetsMilestonesStartedNeighborhoodStudyandTrafficCalming

    Programinmid90s

    Completedfirstfourtothreelaneconversionin1998

    Proposedreconfigurationof7milesofmajorstreetstoincludebikelanesin2003,butgrantrejectedbyCityCouncil

    MayorsTaskForceonWalkingandBicyclingestablishedin2006.CompleteStreetsOrdinancepassedin2009DesignatedaBicycleFriendlyCommunityin2010

  • 8/3/2019 Traverse City Road Conversion Forum

    3/28

    LansingsCompleteStreetsOrdinance RequirestheadoptionofaNonMotorizedNetworkPlan. TheNonMotorizedNetworkPlanwouldinclude,ata

    minimum,accommodationsforaccessibility,sidewalks,curb

    rampsandcuts,trailsandpathways,signage,andbikelanes,andshallincorporatetheprinciplesofCompleteStreetsandmaximizewalkableandbikeablestreetswithinthecity.

    Totheextentfinanciallyfeasible,futureconstructionorreconstructionofCityrightsofwayorpartsthereofshallbeinconformitywiththeNonMotorizedNetworkPlan.

    Setsagoalof5%toadequatelyfundingwalkandbikefriendlyinfrastructure.(currentlyspend2%to3%)

    Requiresanupdateoftheplaneveryfiveyears.

  • 8/3/2019 Traverse City Road Conversion Forum

    4/28

    AccommodatingBicycleandPedestrianTravel

    USDOTPolicyStatement

    1.Bicycleandpedestrianwaysshallbeestablishedinnewconstruction

    andreconstructionprojectsinallurbanizedareasunlessoneormore

    ofthreeconditionsaremet:

    bicyclistsandpedestriansareprohibitedbylawfromusingtheroadway.

    thecostofestablishingbikewaysorwalkwaysexceedstwentypercentofthecostofthelargertransportationproject.

    sparsityofpopulationorotherfactorsindicateanabsenceofneed.2.Inruralareas,pavedshouldersshouldbeincludedinallnewconstructionandreconstructionprojectsonroadwaysusedbymore

    than1,000vehiclesperday.

    Source:http://www.fhwa.dot.gov/environment/bikeped/design.htm#d4

  • 8/3/2019 Traverse City Road Conversion Forum

    5/28

    WhatAreCompleteStreets? CompleteStreetsarestreetsforeveryone. Designedandoperatedtoenablesafeaccessforall

    users(pedestrians,bicyclists,motorists,andpublictransportationusersofallagesandabilities).

    Designedtomakeiteasytocrossthestreet,walktoshops,andbicycletowork.

    Accommodatetrucks,buses,passengervehicles,bicyclesandpedestrians. Notonesizefitsall.

  • 8/3/2019 Traverse City Road Conversion Forum

    6/28

    CompleteStreet

  • 8/3/2019 Traverse City Road Conversion Forum

    7/28

    CompleteStreets?

  • 8/3/2019 Traverse City Road Conversion Forum

    8/28

    CompleteStreet?Corridor?

  • 8/3/2019 Traverse City Road Conversion Forum

    9/28

    Parallelresidentialstreet

  • 8/3/2019 Traverse City Road Conversion Forum

    10/28

    ParallelRoutesCedarSt.

    5lanes

    trunkline

    35mph22,000ADT

    StablerSt.

    2lanesresidential25mph2,000ADT

    Wildwood

    Ave.2lanesresidential25mph

  • 8/3/2019 Traverse City Road Conversion Forum

    11/28

    DraftNonMotorizedPlanNoRouteProposed

    ProposedRoute

    Proposed

    Route

  • 8/3/2019 Traverse City Road Conversion Forum

    12/28

    MasterPlanStreetTypologies

  • 8/3/2019 Traverse City Road Conversion Forum

    13/28

    NonMotorizedPlanCriteria Needstoformanetwork Safemajorstreetcrossingspartofthisnetwork Majorstreetsshouldhavebikelanes Parallelroutesacceptable Nobikelanesonlowvolumeroads(

  • 8/3/2019 Traverse City Road Conversion Forum

    14/28

    NonMotorizedFacilityPlanning Publicinvolvementiskeytoasuccessfulproject

    Inceptionofproject(conceptlevel)

    Preliminarydesign Preconstruction

    Stakeholdersinclude: Residents&businesses Publicofficials(commissions,boards,councils) Publictransit,publicsafety advocacygroups

    Projectsshouldbeplanned2+yearsinadvance

  • 8/3/2019 Traverse City Road Conversion Forum

    15/28

    CostofNonMotorizedImprovementsFacility/ProjectType Cost

    4to3laneconversion(w/mill&resurface) $4k$8kpermile

    (couldincludebikelanes)

    4to3laneconversion(w/oroadwork) $20,000permile

    Offroadtwowaypath(10)(Trail) $340,000permile

    Onroadbikelane(5x2directions) $550,000permile(Costforadditionalpavement,striping,andsigns)

    Sidewalkinstallation $185,000permile/side

  • 8/3/2019 Traverse City Road Conversion Forum

    16/28

    HolmesRoad(before)4lanes8,000to12,000ADT35mphspeedlimit

  • 8/3/2019 Traverse City Road Conversion Forum

    17/28

    HolmesRoad(after)3lanes

  • 8/3/2019 Traverse City Road Conversion Forum

    18/28

    8,000ADT,1.1milelength

    45mphspeedlimitNoexistingnonmotorizedfacilityWillconnecttoshouldersectioninEast

    Lansing,bikelanesonAureliusRoad&LansingsRiverTrail

  • 8/3/2019 Traverse City Road Conversion Forum

    19/28

    4 to 3 conversion

  • 8/3/2019 Traverse City Road Conversion Forum

    20/28

    4 to 3 conversion

  • 8/3/2019 Traverse City Road Conversion Forum

    21/28

    New 10 Pathway

  • 8/3/2019 Traverse City Road Conversion Forum

    22/28

    4lanecrosssection,1.8milelength35mileperhourspeedlimit12,000to30,000ADTSidewalksatsouthend(.2miles)WillconnectwithbikelanesonHolmesRoad,

    futureConsumersEnergypathwaysouthof

    projectarea,andproposedMooresRiver

    Driveconversionproject

  • 8/3/2019 Traverse City Road Conversion Forum

    23/28

    MooresRiverDrive(WB)4laneboulevard

    30mphspeedlimit

    6,000ADT

  • 8/3/2019 Traverse City Road Conversion Forum

    24/28

    MooresRiverDrive(WB)

  • 8/3/2019 Traverse City Road Conversion Forum

    25/28

    MooresRiverDrive(EB)

  • 8/3/2019 Traverse City Road Conversion Forum

    26/28

    ProjectFundingOpportunitiesAct51 SurfaceTransportationProgram CMAQ(ifineligiblearea) Enhancement SafeRoutestoSchool MichiganNaturalResourcesTrustFund FTA HUD/MSHDA

  • 8/3/2019 Traverse City Road Conversion Forum

    27/28

    FundingOpportunities(cont.) CommunityDevelopmentBlockGrant(CDBG) Healthdepartment Foundations Localmillageorallocation Currentinfrastructureprojects Designstandards&policies

  • 8/3/2019 Traverse City Road Conversion Forum

    28/28

    QuestionsorCommentsContactInformation

    AndrewKilpatrick,P.E.TransportationEngineer732CityHall124W.MichiganAve.

    LansingMI48933

    [email protected]