Lansings Complete Streets Experience
Road Conversions: A Tool for Complete Streets
Traverse Area District LibrarySeptember 20, 2011
Andrew Kilpatrick, P.E.
Transportation Engineer
City of Lansing
8/3/2019 Traverse City Road Conversion Forum
2/28
LansingCompleteStreetsMilestonesStartedNeighborhoodStudyandTrafficCalming
Programinmid90s
Completedfirstfourtothreelaneconversionin1998
Proposedreconfigurationof7milesofmajorstreetstoincludebikelanesin2003,butgrantrejectedbyCityCouncil
MayorsTaskForceonWalkingandBicyclingestablishedin2006.CompleteStreetsOrdinancepassedin2009DesignatedaBicycleFriendlyCommunityin2010
8/3/2019 Traverse City Road Conversion Forum
3/28
LansingsCompleteStreetsOrdinance RequirestheadoptionofaNonMotorizedNetworkPlan. TheNonMotorizedNetworkPlanwouldinclude,ata
minimum,accommodationsforaccessibility,sidewalks,curb
rampsandcuts,trailsandpathways,signage,andbikelanes,andshallincorporatetheprinciplesofCompleteStreetsandmaximizewalkableandbikeablestreetswithinthecity.
Totheextentfinanciallyfeasible,futureconstructionorreconstructionofCityrightsofwayorpartsthereofshallbeinconformitywiththeNonMotorizedNetworkPlan.
Setsagoalof5%toadequatelyfundingwalkandbikefriendlyinfrastructure.(currentlyspend2%to3%)
Requiresanupdateoftheplaneveryfiveyears.
8/3/2019 Traverse City Road Conversion Forum
4/28
AccommodatingBicycleandPedestrianTravel
USDOTPolicyStatement
1.Bicycleandpedestrianwaysshallbeestablishedinnewconstruction
andreconstructionprojectsinallurbanizedareasunlessoneormore
ofthreeconditionsaremet:
bicyclistsandpedestriansareprohibitedbylawfromusingtheroadway.
thecostofestablishingbikewaysorwalkwaysexceedstwentypercentofthecostofthelargertransportationproject.
sparsityofpopulationorotherfactorsindicateanabsenceofneed.2.Inruralareas,pavedshouldersshouldbeincludedinallnewconstructionandreconstructionprojectsonroadwaysusedbymore
than1,000vehiclesperday.
Source:http://www.fhwa.dot.gov/environment/bikeped/design.htm#d4
8/3/2019 Traverse City Road Conversion Forum
5/28
WhatAreCompleteStreets? CompleteStreetsarestreetsforeveryone. Designedandoperatedtoenablesafeaccessforall
users(pedestrians,bicyclists,motorists,andpublictransportationusersofallagesandabilities).
Designedtomakeiteasytocrossthestreet,walktoshops,andbicycletowork.
Accommodatetrucks,buses,passengervehicles,bicyclesandpedestrians. Notonesizefitsall.
8/3/2019 Traverse City Road Conversion Forum
6/28
CompleteStreet
8/3/2019 Traverse City Road Conversion Forum
7/28
CompleteStreets?
8/3/2019 Traverse City Road Conversion Forum
8/28
CompleteStreet?Corridor?
8/3/2019 Traverse City Road Conversion Forum
9/28
Parallelresidentialstreet
8/3/2019 Traverse City Road Conversion Forum
10/28
ParallelRoutesCedarSt.
5lanes
trunkline
35mph22,000ADT
StablerSt.
2lanesresidential25mph2,000ADT
Wildwood
Ave.2lanesresidential25mph
8/3/2019 Traverse City Road Conversion Forum
11/28
DraftNonMotorizedPlanNoRouteProposed
ProposedRoute
Proposed
Route
8/3/2019 Traverse City Road Conversion Forum
12/28
MasterPlanStreetTypologies
8/3/2019 Traverse City Road Conversion Forum
13/28
NonMotorizedPlanCriteria Needstoformanetwork Safemajorstreetcrossingspartofthisnetwork Majorstreetsshouldhavebikelanes Parallelroutesacceptable Nobikelanesonlowvolumeroads(
8/3/2019 Traverse City Road Conversion Forum
14/28
NonMotorizedFacilityPlanning Publicinvolvementiskeytoasuccessfulproject
Inceptionofproject(conceptlevel)
Preliminarydesign Preconstruction
Stakeholdersinclude: Residents&businesses Publicofficials(commissions,boards,councils) Publictransit,publicsafety advocacygroups
Projectsshouldbeplanned2+yearsinadvance
8/3/2019 Traverse City Road Conversion Forum
15/28
CostofNonMotorizedImprovementsFacility/ProjectType Cost
4to3laneconversion(w/mill&resurface) $4k$8kpermile
(couldincludebikelanes)
4to3laneconversion(w/oroadwork) $20,000permile
Offroadtwowaypath(10)(Trail) $340,000permile
Onroadbikelane(5x2directions) $550,000permile(Costforadditionalpavement,striping,andsigns)
Sidewalkinstallation $185,000permile/side
8/3/2019 Traverse City Road Conversion Forum
16/28
HolmesRoad(before)4lanes8,000to12,000ADT35mphspeedlimit
8/3/2019 Traverse City Road Conversion Forum
17/28
HolmesRoad(after)3lanes
8/3/2019 Traverse City Road Conversion Forum
18/28
8,000ADT,1.1milelength
45mphspeedlimitNoexistingnonmotorizedfacilityWillconnecttoshouldersectioninEast
Lansing,bikelanesonAureliusRoad&LansingsRiverTrail
8/3/2019 Traverse City Road Conversion Forum
19/28
4 to 3 conversion
8/3/2019 Traverse City Road Conversion Forum
20/28
4 to 3 conversion
8/3/2019 Traverse City Road Conversion Forum
21/28
New 10 Pathway
8/3/2019 Traverse City Road Conversion Forum
22/28
4lanecrosssection,1.8milelength35mileperhourspeedlimit12,000to30,000ADTSidewalksatsouthend(.2miles)WillconnectwithbikelanesonHolmesRoad,
futureConsumersEnergypathwaysouthof
projectarea,andproposedMooresRiver
Driveconversionproject
8/3/2019 Traverse City Road Conversion Forum
23/28
MooresRiverDrive(WB)4laneboulevard
30mphspeedlimit
6,000ADT
8/3/2019 Traverse City Road Conversion Forum
24/28
MooresRiverDrive(WB)
8/3/2019 Traverse City Road Conversion Forum
25/28
MooresRiverDrive(EB)
8/3/2019 Traverse City Road Conversion Forum
26/28
ProjectFundingOpportunitiesAct51 SurfaceTransportationProgram CMAQ(ifineligiblearea) Enhancement SafeRoutestoSchool MichiganNaturalResourcesTrustFund FTA HUD/MSHDA
8/3/2019 Traverse City Road Conversion Forum
27/28
FundingOpportunities(cont.) CommunityDevelopmentBlockGrant(CDBG) Healthdepartment Foundations Localmillageorallocation Currentinfrastructureprojects Designstandards&policies
8/3/2019 Traverse City Road Conversion Forum
28/28
QuestionsorCommentsContactInformation