HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term Planning. Travis Ball, PE USACE Seattle Hydraulic Engineering Section 2 May 2014. FEMA’s Hydraulic Modeling Effort: Mission Assigned to USACE. - PowerPoint PPT Presentation
Popular Tags:
24
Travis Ball, PE USACE Seattle Hydraulic Engineering Section 2 May 2014 HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term Planning
Transcript
Page 1: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Travis Ball, PEUSACE SeattleHydraulic Engineering Section2 May 2014

HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term Planning

Page 2: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

FEMA’s Hydraulic Modeling Effort: Mission Assigned to USACE

1. Planning-level modeling to help inform decision makers about long-term flood risks and channel alignment/geometry alternatives

2. Continue and add to the long-term modeling effort that will be ongoing by various parties for several months

Page 3: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014
Page 4: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014
Page 5: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014
Page 6: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014
Page 7: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Flow and Lake Level

Page 8: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

North Combo

Middle

Page 9: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014
Page 10: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

90000 95000 100000 105000

240

260

280

300

DEM2013XSsGeom: 2013XSs

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 100yr

Ground

NFStillaguamish NFStillaguamish

Pre-Slide Conditions: 100-yr Event

C-Po

st R

oad

Slide Reach

Page 11: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invertGeom: Base+PilotGeo=40'wide270'invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 100yr - DEM2013XSs

WS 100yr - Pilot40'w270'invert

Ground

NFStillaguamish NFStillaguamish

Present Conditions: 100-yr Event

C-Po

st R

oad

Slide Reach

279.6

300.2

Current channel alignment and geometry

Page 12: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) North100% 4) North75% 5) North50% 6) North25%Geom: Base+PilotGeo=40'wide270' invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 100yr - DEM2013XSs

WS 100yr - Pilot40'w270'invert

WS 100yr - North100%

WS 100yr - North75%

WS 100yr - North50%

WS 100yr - North25%

Ground

NFStillaguamish NFStillaguamish

Future: North Alignment - 100yr Event

C-Po

st R

oad

Slide Reach

Page 13: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) Mid100% 4) Mid75% 5) Mid50% 6) Mid25%Geom: Base+PilotGeo=40'wide270'invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 100yr - DEM2013XSs

WS 100yr - Pilot40'w270'invert

WS 100yr - Mid100%

WS 100yr - Mid75%

WS 100yr - Mid50%

WS 100yr - Mid25%

Ground

NFStillaguamish NFStillaguamish

Future: Middle Alignment- 100yr Event

C-Po

st R

oad

Slide Reach

Page 14: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) Combo100% 4) Combo50% 5) Combo75% 6) Combo25%Geom: Base+PilotGeo=40'wide270' invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 100yr - DEM2013XSs

WS 100yr - Pilot40'w270'invert

WS 100yr - Combo100%

WS 100yr - Combo50%

WS 100yr - Combo75%

WS 100yr - Combo25%

Ground

NFStillaguamish NFStillaguamish

Future: Combo Alignment- 100yr Event

C-Po

st R

oad

Slide Reach

Page 15: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Future: North Alignment - 100yr Event

# Pre-Slide Post-Slide

1% Flood Event (100-year: 34,103 cfs) FEMA Hydraulic

Model with 2013 LiDAR and no Bathymetry

Baseline: Using Observed Data

on/around 4/23/2014

C-Post WSE 285.7 300.8

Upstream End of Slide Reach WSE (Pool /Pilot

Transition Zone) 279.6 300.7Midway Through Slide

Reach WSE 269.3 285.1Downstream End of

Slide Reach WSE 265.5 266.5

Long Term Measure Runs for Modifications to Existing (North Alignment) Channel

Base Width of 150 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions**

Base Width of 125 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions

Base Width of 100 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions

Base Width of 75 Feet, 2:1 Side Slopes, and

Elevation (variable) Equal to PreSlide

Conditions

287.9 289.0 290.7 293.4

282.9 286.5 290.0 293.1

273.5 275.6 278.0 280.7

265.3 265.5 265.8 266.0

Cut Volume to Match Existing Channel to Specified Geometry (Cu. Yd) 600000 463000 331000 210000

Page 16: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Future: Middle Alignment- 100yr Event

# Pre-Slide Post-Slide

1% Flood Event (100-year: 34,103 cfs) FEMA Hydraulic

Model with 2013 LiDAR and no Bathymetry

Baseline: Using Observed Data

on/around 4/23/2014

C-Post WSE 285.7 300.8

Upstream End of Slide Reach WSE (Pool /Pilot

Transition Zone) 279.6 300.7Midway Through Slide

Reach WSE 269.3 285.1Downstream End of

Slide Reach WSE 265.5 266.5

Long Term Measure Runs for Middle Channel Development

Base Width of 150 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions**

Base Width of 125 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions

Base Width of 100 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions

Base Width of 75 Feet, 2:1 Side Slopes, and

Elevation (variable) Equal to PreSlide

Conditions

288.1 288.6 289.9 292.2

281.0 284.4 289.0 291.8

271.3 272.4 273.7 275.4

265.6 265.5 265.8 266.0

Cut Volume to Match Existing Channel to Specified Geometry (Cu. Yd) 849000 710000 579000 456000

Page 17: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Future: Combo Alignment- 100yr Event

# Pre-Slide Post-Slide

1% Flood Event (100-year: 34,103 cfs) FEMA Hydraulic

Model with 2013 LiDAR and no Bathymetry

Baseline: Using Observed Data

on/around 4/23/2014

C-Post WSE 285.7 300.8

Upstream End of Slide Reach WSE (Pool /Pilot

Transition Zone) 279.6 300.7Midway Through Slide

Reach WSE 269.3 285.1Downstream End of

Slide Reach WSE 265.5 266.5

Long Term Measure Runs for Combo Channel Development

Base Width of 150 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions**

Base Width of 125 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions

Base Width of 100 Feet, 2:1 Side Slopes,

and Elevation (variable) Equal to

PreSlide Conditions

Base Width of 75 Feet, 2:1 Side Slopes, and

Elevation (variable) Equal to PreSlide

Conditions

287.9 289.1 290.7 293.4

282.9 286.5 290.0 293.1

271.2 272.8 274.0 275.4

265.1 265.4 265.7 265.9

Cut Volume to Match Existing Channel to Specified Geometry (Cu. Yd) 815000 663000 519000 386000

Page 18: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) North100% 4) Mid100% 5) Combo100%Geom: Base+PilotGeo=40'wide270' invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 2yr - DEM2013XSs

WS 2yr - Pilot40'w270'invert

WS 2yr - North100%

WS 2yr - Mid100%

WS 2yr - Combo100%

Ground

NFStillaguamish NFStillaguamish

Future: 2yr Event – 150’ Wide

C-Po

st R

oad

Slide Reach

Page 19: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) North25% 4) Mid25% 5) Combo25%Geom: Base+PilotGeo=40'wide270' invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 2yr - DEM2013XSs

WS 2yr - Pilot40'w270'invert

WS 2yr - North25%

WS 2yr - Mid25%

WS 2yr - Combo25%

Ground

NFStillaguamish NFStillaguamish

Future: 2yr Event – 75’ Wide

C-Po

st R

oad

Slide Reach

Page 20: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) North100% 4) Mid100% 5) Combo100%Geom: Base+PilotGeo=40'wide270'invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 10yr - DEM2013XSs

WS 10yr - Pilot40'w270'invert

WS 10yr - North100%

WS 10yr - Mid100%

WS 10yr - Combo100%

Ground

NFStillaguamish NFStillaguamish

Future: 10yr Event – 150’ Wide

C-Po

st R

oad

Slide Reach

Page 21: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

85000 90000 95000 100000

240

260

280

300

1) DEM2013XSs 2) Pilot40'w270'invert 3) North25% 4) Mid25% 5) Combo25%Geom: Base+PilotGeo=40'wide270'invert

Main Channel Distance (ft)

Ele

vatio

n (ft

)

Legend

WS 10yr - DEM2013XSs

WS 10yr - Pilot40'w270'invert

WS 10yr - North25%

WS 10yr - Mid25%

WS 10yr - Combo25%

Ground

NFStillaguamish NFStillaguamish

Future: 10yr Event – 75’ Wide

C-Po

st R

oad

Slide Reach

Page 22: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Excel Summary of Alignment Alternatives

Page 23: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Slide developed by Casey Kramer

Page 24: Travis Ball, PE USACE Seattle Hydraulic  Engineering Section 2 May 2014

Recommended