TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply
Transcript
Page 1: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD GAS Progress

AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS

• Box-S/C

• Manifolds

• UG Power Supply

Page 2: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD Gas SystemSUPPLY CIRCULATION DISTRIBUTION

POWER CONTROL

Page 3: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD GAS Box-S Supply Vessels (Xe, CO2)

Transfer VolumesMixing VesselRelief Valve

Safety Requirement

Page 4: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD GAS Box-C

Canister

Circulation PumpsVent LinePressure SensorsCO2 Spirometer55Fe Gasgain Monitor

Page 5: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

QM GasSystemEM UG-Crate

@ RWTH PreTest

Page 6: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

QM GasSyst Tests

Nov.06 F. Spada (Rome) G.Rybka (MIT)• UG Script Control implemented ok• Box-C Functional Check ok - 1 Flipper Valve stuck (remove in FM) - QM Canister Leak fixed (FM ok) - Spirometer / Gasgain-Monitor off

Dec.06 F. Zhou (MIT)• Box-S Functional Checks ok - V2a, V2b leaky (QM RV mod. – FM ok) - Transfer & Mixing @ 16 bar ok - Kulite sensor U noisy

Jan.06 J. Hattenbach (RWTH) • Check Gasgain in TRD Modules • Check Circulation-Flow• Prepare QM TRD-GAS TVT

Page 7: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

FM Box-SInspection at ARDE ok

Gastightness 1∙10-5 l mbar/s

Shipped to MIT

Cabeling in preparationFinished by mid-March 07

MIT JAN-04-2007

FM Box-CReplace Flipper-Valve unitwith Check-Valve Unit (RWTH)

Assembly at MIT 2 months

Page 8: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD Gas Manifolds• Distribute TRD gasflow into 41 segments

• Measure gastightness of individual segments

• Allow isolation of a segment when leaky

• Introduce no additional risk of gas leakage

• Safe operation in globally heated TRD

Page 9: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD Manifolds• 20 / 16+4 aluminum bodies machined• Flat Viton sealing modified• Production sequence finalized• QM gastight and functional• FM Manifold cabeling received Connectors shipped to Rome UGPS ready in Mar.07• QM ManifoldSQ tests in Jan.06 FM ready for octagon in Mar.07

QM

Page 10: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

UG Power SupplyDefine DC/DC VoltagesPower On Control for 12/29VIsolate SubsystemsLatch-Up ProtectionMonitor Operation

m.d.i. 6031-S28 29.0V orderedm.d.i. 6031-S12 12.5V ordered

Controller for m.d.i. DC/DC major effortWould not protect individual UG-boards

Page 11: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

UG-Electronics Latch-Up Protection for UG-Board Components:- 54SX 208/32A FPGA- LM2941S 12V-> 10V LinReg- TPS7350 5V-> 5V LinReg- TPS7333 3.3V->3.3V LinReg- TPS7325 2.5V->2.5V LinReg- SN65LVDS390 LVDS-Driver- AD7476 ADC for P-Sensors- Si4840DY MOSFET Heater/MV Control- SUB65P06-20 MOSFET Heater/MV Enable- SUB85N10-10 MOSFET Heater/MV switch- LM239A Comparator MV Sense- Si4544DY MOSFET FV- Si4966DY MOSFET FV- MAX225EWI RS232 Driver- HI-508 Analog MUX- AD620BR UGPS Diff.Amplifier

+ TRD-GAS P-Sens., TubeAmp, MCA, Spirometer

Open Item ListSafe 29V for Kulite SensorsSeparate 5V for TubeAmpSeparate 12V for FV/UGPS

- EM System working at RWTH- QM System at Rome with new prototype backplane

Schedule:- QM backplane prod. in Feb.- QM SQ in Mar/Apr. at SERMS

Page 12: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

Problem 1Kulite Sensor SupplyCurrent Design:

29V supply directly from backplane29V-A and -B connected at sensorLoss of redundancyRisk of losing Marotta Valve actuation power

Proposal:

Diodes and 1k Resistor at sensor in Box-S

Decision needed for FM Box-S wiring at MIT

Also twisted pairs needed to reduce noise

Page 13: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

Problem 2

TubeAmp Supply

5V shared with RS232 and ADCs

Risk losing only abs.press.sens.in TRG Gas volume

Proposalsa) Supply from UGBC-A onlyb) Add separate 5V LinRegc) OVC protect. On TubeAmp

Page 14: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

Problem 3UGPS Supply

12V shared with Flipper Valves

Risk losing FV actuation power

Proposal:

Add separate 12V LinReg

Page 15: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

Simple UGPD ControlWithout OVC / latch-up protection

Keep UG boards and backplanePassive control of 12V and 29V m.d.i. convertersSimple board in UGPD – No Controller Delayed power on after 5V on Switched off when 5V off

Page 16: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

UG Power Control Board

Replace UHVG in UG-Crate Gasgain monitor HV from U-Crate

+ Provide individual board SSF for 3.3/5V and Control of 12/29V+ No modifications of UG-Boards+ No Controller in UGPD– Redesign UG backplane discussed with Capell & Lebedev, W.Karpinski may design, 20k€ required

Page 17: TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.

TRD Integration Schedule

Rosengitter tubing & cabeling Nov 06 - Feb 07Manifold design Apr 06 - Jan 07 √ Manifold production Dec 06 - Mar 07 Box-S/C EM -> QM upgrade Apr - Oct 06 √QM Gas System Test @ RWTH Nov 06 – Feb 07 Define TRD Operation Procedures - Heater Operation - Supply Vessel Filling / ShipmentUG QM Electronics Prod. & Test Apr 06 - Apr 07 2nd QM UG Backplane for 2 A-only SystemsBox-S/C FM Prod. & Test Apr 06 - Mar 07UGPD Design, Prod. & Test Nov 06 - Aug 07UGPC/UGBP Design, Prod. & Test Jan 07 - Aug 07UG FM Electronics Prod. & Test tbdQM Gas System Install. on Octagon Apr – May 07TRD Cosmics QM-UG FM-U @ AC May - Jun 07