TRD GAS Progress
AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS
• Box-S/C
• Manifolds
• UG Power Supply
TRD Gas SystemSUPPLY CIRCULATION DISTRIBUTION
POWER CONTROL
TRD GAS Box-S Supply Vessels (Xe, CO2)
Transfer VolumesMixing VesselRelief Valve
Safety Requirement
TRD GAS Box-C
Canister
Circulation PumpsVent LinePressure SensorsCO2 Spirometer55Fe Gasgain Monitor
QM GasSystemEM UG-Crate
@ RWTH PreTest
QM GasSyst Tests
Nov.06 F. Spada (Rome) G.Rybka (MIT)• UG Script Control implemented ok• Box-C Functional Check ok - 1 Flipper Valve stuck (remove in FM) - QM Canister Leak fixed (FM ok) - Spirometer / Gasgain-Monitor off
Dec.06 F. Zhou (MIT)• Box-S Functional Checks ok - V2a, V2b leaky (QM RV mod. – FM ok) - Transfer & Mixing @ 16 bar ok - Kulite sensor U noisy
Jan.06 J. Hattenbach (RWTH) • Check Gasgain in TRD Modules • Check Circulation-Flow• Prepare QM TRD-GAS TVT
FM Box-SInspection at ARDE ok
Gastightness 1∙10-5 l mbar/s
Shipped to MIT
Cabeling in preparationFinished by mid-March 07
MIT JAN-04-2007
FM Box-CReplace Flipper-Valve unitwith Check-Valve Unit (RWTH)
Assembly at MIT 2 months
TRD Gas Manifolds• Distribute TRD gasflow into 41 segments
• Measure gastightness of individual segments
• Allow isolation of a segment when leaky
• Introduce no additional risk of gas leakage
• Safe operation in globally heated TRD
TRD Manifolds• 20 / 16+4 aluminum bodies machined• Flat Viton sealing modified• Production sequence finalized• QM gastight and functional• FM Manifold cabeling received Connectors shipped to Rome UGPS ready in Mar.07• QM ManifoldSQ tests in Jan.06 FM ready for octagon in Mar.07
QM
UG Power SupplyDefine DC/DC VoltagesPower On Control for 12/29VIsolate SubsystemsLatch-Up ProtectionMonitor Operation
m.d.i. 6031-S28 29.0V orderedm.d.i. 6031-S12 12.5V ordered
Controller for m.d.i. DC/DC major effortWould not protect individual UG-boards
UG-Electronics Latch-Up Protection for UG-Board Components:- 54SX 208/32A FPGA- LM2941S 12V-> 10V LinReg- TPS7350 5V-> 5V LinReg- TPS7333 3.3V->3.3V LinReg- TPS7325 2.5V->2.5V LinReg- SN65LVDS390 LVDS-Driver- AD7476 ADC for P-Sensors- Si4840DY MOSFET Heater/MV Control- SUB65P06-20 MOSFET Heater/MV Enable- SUB85N10-10 MOSFET Heater/MV switch- LM239A Comparator MV Sense- Si4544DY MOSFET FV- Si4966DY MOSFET FV- MAX225EWI RS232 Driver- HI-508 Analog MUX- AD620BR UGPS Diff.Amplifier
+ TRD-GAS P-Sens., TubeAmp, MCA, Spirometer
Open Item ListSafe 29V for Kulite SensorsSeparate 5V for TubeAmpSeparate 12V for FV/UGPS
- EM System working at RWTH- QM System at Rome with new prototype backplane
Schedule:- QM backplane prod. in Feb.- QM SQ in Mar/Apr. at SERMS
Problem 1Kulite Sensor SupplyCurrent Design:
29V supply directly from backplane29V-A and -B connected at sensorLoss of redundancyRisk of losing Marotta Valve actuation power
Proposal:
Diodes and 1k Resistor at sensor in Box-S
Decision needed for FM Box-S wiring at MIT
Also twisted pairs needed to reduce noise
Problem 2
TubeAmp Supply
5V shared with RS232 and ADCs
Risk losing only abs.press.sens.in TRG Gas volume
Proposalsa) Supply from UGBC-A onlyb) Add separate 5V LinRegc) OVC protect. On TubeAmp
Problem 3UGPS Supply
12V shared with Flipper Valves
Risk losing FV actuation power
Proposal:
Add separate 12V LinReg
Simple UGPD ControlWithout OVC / latch-up protection
Keep UG boards and backplanePassive control of 12V and 29V m.d.i. convertersSimple board in UGPD – No Controller Delayed power on after 5V on Switched off when 5V off
UG Power Control Board
Replace UHVG in UG-Crate Gasgain monitor HV from U-Crate
+ Provide individual board SSF for 3.3/5V and Control of 12/29V+ No modifications of UG-Boards+ No Controller in UGPD– Redesign UG backplane discussed with Capell & Lebedev, W.Karpinski may design, 20k€ required
TRD Integration Schedule
Rosengitter tubing & cabeling Nov 06 - Feb 07Manifold design Apr 06 - Jan 07 √ Manifold production Dec 06 - Mar 07 Box-S/C EM -> QM upgrade Apr - Oct 06 √QM Gas System Test @ RWTH Nov 06 – Feb 07 Define TRD Operation Procedures - Heater Operation - Supply Vessel Filling / ShipmentUG QM Electronics Prod. & Test Apr 06 - Apr 07 2nd QM UG Backplane for 2 A-only SystemsBox-S/C FM Prod. & Test Apr 06 - Mar 07UGPD Design, Prod. & Test Nov 06 - Aug 07UGPC/UGBP Design, Prod. & Test Jan 07 - Aug 07UG FM Electronics Prod. & Test tbdQM Gas System Install. on Octagon Apr – May 07TRD Cosmics QM-UG FM-U @ AC May - Jun 07