  • disp 0.037149bbl/ft S.MDB-1 RIH 9 5/8" CSG

    LENGTH THEORITICAL ACTUAL TRIP ft DISP/FT DISP. TOTAL DISP. TOTAL 10

    5 200 200 0.017 3.4 3.400 9.00 9.00 10

    10 200 200 0.017 3.4 6.800 -4.32 4.68 10

    15 200 200 0.017 3.4 10.200 5.00 9.68 10

    20 200 200 0.017 3.4 13.600 -7.00 2.68 10

    25 200 200 0.017 3.4 17.000 -3.37 -0.69 10

    30 200 200 0.017 3.4 20.400 5.02 4.33 10.39

    35 194 200 0.017 3.4 23.800 1.98 6.31 10.41

    40 194 200 0.017 3.4 27.200 8.00 14.31 10.41

    45 194 200 0.017 3.4 30.600 22.58 36.89 10.83

    50 194 200 0.017 3.4 34.000 -5.13 31.76 10.7

    55 194 200 0.017 3.4 37.400 -4.10 27.66 10.8

    60 194 194 0.037149 7.2 44.607 -352.80 -325.14

    65 194 194 0.037149 7.2 51.814 0.00 -325.14

    70 194 194 0.037149 7.2 59.021 0.00 -325.14

    75 194 194 0.037149 7.2 66.228 0.00 -325.14

    80 194 194 0.037149 7.2 73.435 0.00 -325.14

    85 194 194 0.037149 7.2 80.641 0.00 -325.14

    90 194 194 0.037149 7.2 87.848 0.00 -325.14

    95 194 194 0.037149 7.2 95.055 0.00 -325.14

    100 194 194 0.037149 7.2 102.262 0.00 -325.14

    105 194 194 0.037149 7.2 109.469 0.00 -325.14

    110 194 194 0.037149 7.2 116.676 0.00 -325.14

    0ON BOTTOM @ 10:30 06-10-12

    Total stands

  • S.MDB-1 RIH 9 5/8" CSG

    Active2 Active2+Trip LOSS CUM REMARKS377 387 BBL BBL 15-Jun-15368 378.3 5.600 5.60 RIH 1500 HRS364 374.0 -7.720 -2.12

    359 369.0 1.600 -0.52

    352 362.0 -10.400 -10.92

    355 365.4 -6.770 -17.69

    360 370.4 1.620 -16.07

    358.0 368.4 -1.420 -17.49

    366.0 376.4 4.600 -12.89

    343.0 353.8 19.180 6.29 F/U CSG & CIRC338.0 348.7 -8.530 -2.24

    342.0 352.8 -7.500 -9.74

    0.0 -360.007 -369.75

    0.0 -7.207 -376.95

    0.0 -7.207 -384.16

    0.0 -7.207 -391.37

    0.0 -7.207 -398.57

    0.0 -7.207 -405.78

    0.0 -7.207 -412.99

    0.0 -7.207 -420.20

    0.0 -7.207 -427.40

    0.0 -7.207 -434.61

    0.0 -7.207 -441.82

    0ON BOTTOM @ 10:30 06-10-12

  • disp 0.0105bbl/ft LIMU-1RIH 7" CSG

    S.NO. DISP/FTTHEORITICAL ACTUAL

    DISP. TOTAL DISP.

    2 2 74 74 0.0105 0.78 0.78 05 3 182 108 0.0105 1.13 1.91 2

    10 5 364 182 0.0105 1.91 3.82 015 5 546 182 0.0105 1.91 5.73 -320 5 728 182 0.0105 1.91 7.64 425 5 910 182 0.0105 1.91 9.56 030 5 1092 182 0.0105 1.91 11.47 035 5 1274 182 0.0105 1.91 13.38 840 5 1456 182 0.0105 1.91 15.29 645 5 1638 182 0.0105 1.91 17.20 050 5 1820 182 0.0105 1.91 19.11 -855 5 2002 182 0.0105 1.91 21.02 160 5 2184 182 0.0105 1.91 22.93 465 5 2366 182 0.0105 1.91 24.84 270 5 2548 182 0.0105 1.91 26.75 375 5 2730 182 0.0105 1.91 28.67 080 5 2912 182 0.0105 1.91 30.58 585 5 3094 182 0.0105 1.91 32.49 890 5 3276 182 0.0105 1.91 34.40 -695 5 3458 182 0.0105 1.91 36.31 6100 5 3640 182 0.0105 1.91 38.22 2105 5 3822 182 0.0105 1.91 40.13 3110 5 4004 182 0.0105 1.91 42.04 2115 5 4186 182 0.0105 1.91 43.95 2120 5 4368 182 0.0105 1.91 45.86 2125 5 4550 182 0.0105 1.91 47.78 2130 5 4732 182 0.0105 1.91 49.69 1135 5 4914 182 0.0105 1.91 51.60 1140 5 5096 182 0.0105 1.91 53.51 -3

    Total stands

    LENGTH ft

  • 145 5 5278 182 0.0105 1.91 55.42 -1150 5 5460 182 0.0105 1.91 57.33 0155 5 5642 182 0.0105 1.91 59.24 5160 5 5824 182 0.0105 1.91 61.15 3165 5 6006 182 0.0105 1.91 63.06 5170 5 6188 182 0.0105 1.91 64.97 6175 5 6370 182 0.0105 1.91 66.89 8180 5 6550 180 0.0105 1.89 68.78 -6185 5 6730 180 0.0105 1.89 70.67 7190 5 6910 180 0.0105 1.89 72.56 5195 5 7090 180 0.0105 1.89 74.45 0200 5 7270 180 0.0105 1.89 76.34 1205 5 7450 180 0.0105 1.89 78.23 8210 5 7630 180 0.0105 1.89 80.12 -2215 5 7810 180 0.0105 1.89 82.01 4220 5 7990 180 0.0105 1.89 83.90 -5225 5 8170 180 0.0105 1.89 85.79 2230 5 8350 180 0.0105 1.89 87.68 3235 5 8530 180 0.0105 1.89 89.57 -6240 5 8710 180 0.0105 1.89 91.46 7245 5 8890 180 0.0105 1.89 93.35 0250 5 9070 180 0.0105 1.89 95.24 3255 5 9250 180 0.0105 1.89 97.13 0261 5 9465 215 0.0105 2.26 99.38 4

    START RIH @ 1930 02-08-14ON BOTTOM @ 16:30 04-02-14

  • LIMU-1RIH 7" CSG

    ACTUAL TRIP ACT1 ACT1+TripTRANS

    LOSS CUM REMARKS

    TOTAL 16.0 332 348 BBL BBL 2-Aug-140 16 332.0 348 -1.177 -1.182 16 334.0 350 1.266 0.092 16 334.0 350 -1.911 -1.82-1 16 331.0 347 -4.911 -6.73 F/U CSG JNT3 16.7 334.0 351 1.789 -4.94 F/U CSG JNT3 16.7 334.0 351 -1.911 -6.86 F/U CSG JNT3 17.0 334.0 351 -1.611 -8.4711 17.0 342.0 359 6.089 -2.3817 17.1 348.0 365 4.189 1.8117 17.2 348.0 365 -1.811 0.009 17.3 340.0 357 -9.811 -9.8110 17.4 341.0 358 -0.811 -10.6215 17.5 345.0 363 2.189 -8.4317 17.7 347.0 365 0.289 -8.1420 17.9 350.0 368 1.289 -6.8520 18.0 350.0 368 -1.811 -8.6725 18.1 355.0 373 3.189 -5.4833 18.0 363.0 381 5.989 0.5127 18.3 357.0 375 -7.611 -7.10 F/U CSG JNT33 18.4 363.0 381 4.189 -2.91 F/U CSG JNT36 18.5 365.0 384 0.189 -2.72 F/U CSG JNT39 18.6 368.0 387 1.189 -1.53 F/U CSG JNT41 18.7 370.0 389 0.189 -1.34 F/U CSG JNT43 18.7 372.0 391 0.089 -1.25 F/U CSG JNT45 18.8 374.0 393 0.189 -1.06 F/U CSG JNT47 18.8 376.0 395 0.089 -0.97 F/U CSG JNT48 18.8 377.0 396 -0.911 -1.89 F/U CSG JNT49 18.7 378.0 397 -1.011 -2.9046 18.8 375.0 394 -4.811 -7.71 F/U CSG JNT

  • 45 18.7 374.0 393 -3.011 -10.72 F/U CSG JNT45 18.7 374.0 392.7 -1.911 -12.63 F/U CSG JNT50 18.7 379.0 397.7 3.089 -9.54 F/U CSG JNT53 18.7 382.0 400.7 1.089 -8.45 F/U CSG JNT58 18.7 387.0 405.7 3.089 -5.36 F/U CSG JNT64 18.7 393.0 411.7 4.089 -1.27 F/U CSG JNT72 18.7 401.0 419.7 6.089 4.82 F/U CSG JNT66 18.7 395.0 413.7 -7.890 -3.08 F/U CSG JNT73 18.8 402.0 420.8 5.210 2.14 f/u &Mud trsnf frm suc78 18.8 407.0 425.8 3.110 5.25 F/U CSG JNT78 18.7 417.0 435.7 -1.990 3.26 F/U CSG JNT79 18.8 418.0 436.8 -0.790 2.47 F/U CSG JNT87 18.8 426.0 444.8 6.110 8.58 F/U CSG JNT85 18.8 424.0 442.8 -3.890 4.69 F/U CSG JNT89 18.8 428.0 446.8 2.110 6.80 F/U CSG JNT84 18.8 423.0 442 -6.890 -0.09 F/U CSG JNT86 18.8 425.0 444 0.110 0.02 F/U CSG JNT89 18.8 428.0 447 1.110 1.13 F/U CSG JNT83 18.8 422.0 441 -7.890 -6.76 F/U CSG JNT90 18.8 429.0 448 5.110 -1.65 F/U CSG JNT90 18.8 429.0 448 -1.890 -3.54 F/U CSG JNT93 18.8 432.0 451 1.110 -2.43 F/U CSG JNT93 18.8 419.0 438 -1.890 -4.32 F/U CSG JNT97 18.8 410.0 429 1.743 -2.58 F/U CSG JNT

    START RIH @ 1930 02-08-14ON BOTTOM @ 16:30 04-02-14

  • REMARKS

    2-Aug-14

    F/U CSG JNTF/U CSG JNTF/U CSG JNT

    F/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNT

    F/U CSG JNT

  • F/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNT

    f/u &Mud trsnf frm sucF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNTF/U CSG JNT 418F/U CSG JNT

    START RIH @ 1930 02-08-14ON BOTTOM @ 16:30 04-02-14

  • disp 0.0105bbl/ft KORAI NORTH-1RIH 9 5/8" CSG

    S.NO. DISP/FTTHEORITICAL ACTUAL

    DISP. TOTAL DISP.

    2 2 74 74 0.0105 0.78 0.78 25 3 182 108 0.0105 1.13 1.91 -7

    10 5 364 182 0.0105 1.91 3.82 715 5 546 182 0.0105 1.91 5.73 420 5 728 182 0.0105 1.91 7.64 025 5 910 182 0.0105 1.91 9.56 -32430 5 1092 182 0.0105 1.91 11.47 035 5 1274 182 0.0105 1.91 13.38 040 5 1456 182 0.0105 1.91 15.29 045 5 1638 182 0.0105 1.91 17.20 050 5 1820 182 0.0105 1.91 19.11 055 5 2002 182 0.0105 1.91 21.02 060 5 2184 182 0.0105 1.91 22.93 065 5 2366 182 0.0105 1.91 24.84 070 5 2548 182 0.0105 1.91 26.75 075 5 2730 182 0.0105 1.91 28.67 080 5 2912 182 0.0105 1.91 30.58 085 5 3094 182 0.0105 1.91 32.49 090 5 3276 182 0.0105 1.91 34.40 095 5 3458 182 0.0105 1.91 36.31 0100 5 3640 182 0.0105 1.91 38.22 0105 5 3822 182 0.0105 1.91 40.13 0110 5 4004 182 0.0105 1.91 42.04 0115 5 4186 182 0.0105 1.91 43.95 0120 5 4368 182 0.0105 1.91 45.86 0125 5 4550 182 0.0105 1.91 47.78 0130 5 4732 182 0.0105 1.91 49.69 0135 5 4914 182 0.0105 1.91 51.60 0140 5 5096 182 0.0105 1.91 53.51 0

    Total stands

    LENGTH ft

  • 145 5 5278 182 0.0105 1.91 55.42 0150 5 5460 182 0.0105 1.91 57.33 0155 5 5642 182 0.0105 1.91 59.24 0160 5 5824 182 0.0105 1.91 61.15 0165 5 6006 182 0.0105 1.91 63.06 0170 5 6188 182 0.0105 1.91 64.97 0175 5 6370 182 0.0105 1.91 66.89 0180 5 6550 180 0.0105 1.89 68.78 0185 5 6730 180 0.0105 1.89 70.67 0190 5 6910 180 0.0105 1.89 72.56 0195 5 7090 180 0.0105 1.89 74.45 0200 5 7270 180 0.0105 1.89 76.34 0205 5 7450 180 0.0105 1.89 78.23 0210 5 7630 180 0.0105 1.89 80.12 0215 5 7810 180 0.0105 1.89 82.01 0220 5 7990 180 0.0105 1.89 83.90 0225 5 8170 180 0.0105 1.89 85.79 0230 5 8350 180 0.0105 1.89 87.68 0235 5 8530 180 0.0105 1.89 89.57 0240 5 8710 180 0.0105 1.89 91.46 0245 5 8890 180 0.0105 1.89 93.35 0250 5 9070 180 0.0105 1.89 95.24 0255 5 9250 180 0.0105 1.89 97.13 13261 5 9465 215 0.0105 2.26 99.38 13

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • KORAI NORTH-1RIH 9 5/8" CSG

    ACTUAL TRIP ACT1 ACT1+TripTRANS

    LOSS CUM REMARKS

    TOTAL 33.1 285 318 BBL BBL 25-Feb-142 40 280.0 320 0.723 0.72-6 12 301.0 313 -8.134 -7.412 21 299.0 320 5.089 -2.326 29 295.0 324 2.189 -0.13 F/U CSG JNT6 28.7 295.0 324 -1.911 -2.04

    -318 0 -325.611 -327.66-318 0 -1.911 -329.57-318 0 -1.911 -331.48-318 0 -1.911 -333.39-318 0 -1.911 -335.30-318 0 -1.911 -337.21-318 0 -1.911 -339.12-318 0 -1.911 -341.03-318 0 -1.911 -342.94-318 0 -1.911 -344.85-318 0 -1.911 -346.77-318 0 -1.911 -348.68-318 0 -1.911 -350.59-318 0 -1.911 -352.50-318 0 -1.911 -354.41-318 0 -1.911 -356.32-318 0 -1.911 -358.23-318 0 -1.911 -360.14-318 0 -1.911 -362.05-318 0 -1.911 -363.96-318 0 -1.911 -365.88-318 0 -1.911 -367.79-318 0 -1.911 -369.70-318 0 -1.911 -371.61

  • -318 0 -1.911 -373.52-318 0.0 -1.911 -375.43-318 0.0 -1.911 -377.34-318 0.0 -1.911 -379.25-318 0.0 -1.911 -381.16-318 0.0 -1.911 -383.07-318 0.0 -1.911 -384.99-318 0.0 -1.890 -386.88-318 0.0 -1.890 -388.77-318 0.0 -1.890 -390.66-318 0.0 -1.890 -392.55-318 0.0 -1.890 -394.44-318 0.0 -1.890 -396.33-318 0.0 -1.890 -398.22-318 0.0 -1.890 -400.11-318 0 -1.890 -402.00-318 0 -1.890 -403.89-318 0 -1.890 -405.78-318 0 -1.890 -407.67-318 0 -1.890 -409.56-318 0 -1.890 -411.45-318 0 -1.890 -413.34-305 0 11.110 -402.23-292 0 10.743 -391.48

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • REMARKS

    25-Feb-14

    F/U CSG JNT

  • 418

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • disp 0.0105bbl/ft NIHAL-1RIH 9 5/8" CSG

    S.NO. DISP/FTTHEORITICAL ACTUAL

    DISP. TOTAL DISP.

    5 5 200 200 0.0168 3.36 3.36 410 5 400 200 0.0168 3.36 6.71 415 5 600 200 0.0168 3.36 10.07 420 5 800 200 0.0168 3.36 13.42 -1125 5 1000 200 0.0168 3.36 16.78 430 5 1200 200 0.0168 3.36 20.14 635 5 1400 200 0.0168 3.36 23.49 440 5 1600 200 0.0168 3.36 26.85 445 5 1800 200 0.0168 3.36 30.20 -2450 5 2000 200 0.0168 3.36 33.56 455 5 2200 200 0.0168 3.36 36.92 560 5 2400 200 0.0168 3.36 40.27 465 5 2600 200 0.0168 3.36 43.63 570 5 2800 200 0.0168 3.36 46.98 475 5 3000 200 0.0168 3.36 50.34 480 5 3200 200 0.0168 3.36 53.70 4

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

    Total stands

    LENGTH ft

  • NIHAL-1RIH 9 5/8" CSG

    ACTUAL TRIP ACT1 ACT1+TripTRANS

    LOSS CUM REMARKS

    TOTAL 11.0 299 310 BBL BBL 7-May-144 11.0 300.0 314 0.644 0.648 11.0 304.0 318 0.644 1.2912 11.0 308.0 322 0.644 1.931 11.0 304.0 311 -14.356 -12.42 F/U CSG JNT5 11.0 306.0 315 0.644 -11.7811 11.0 310.0 321 2.644 -9.1415 11.0 314.0 325 0.644 -8.4919 11.0 318.0 329 0.644 -7.85-5 11.0 305.0 305 -27.356 -35.20 F/U CSG JNT-1 11.0 309.0 309 0.644 -34.564 11.0 314.0 314 1.644 -32.928 11.0 318.0 318 0.644 -32.2713 11.0 323.0 323 1.644 -30.6317 11.0 327.0 327 0.644 -29.9821 11.0 331.0 331 0.644 -29.3425 11.0 335.0 335 0.644 -28.70

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • REMARKS

    7-May-14

    F/U CSG JNT

    F/U CSG JNT

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • disp 0.0105bbl/ft PIARO DEEP BASAL -1RIH 7" CSG

    S.NO. DISP/FTTHEORITICAL ACTUAL

    DISP. TOTAL DISP.

    2 2 74 74 0.0105 0.78 0.78 25 3 187 113 0.0105 1.19 1.96 0

    10 5 369 182 0.0105 1.91 3.87 115 5 551 182 0.0105 1.91 5.79 220 5 733 182 0.0105 1.91 7.70 -1725 5 915 182 0.0105 1.91 9.61 530 5 1097 182 0.0105 1.91 11.52 135 5 1279 182 0.0105 1.91 13.43 1140 5 1461 182 0.0105 1.91 15.34 845 5 1643 182 0.0105 1.91 17.25 -1350 5 1825 182 0.0105 1.91 19.16 955 5 2007 182 0.0105 1.91 21.07 -260 5 2189 182 0.0105 1.91 22.98 565 5 2371 182 0.0105 1.91 24.90 1070 5 2553 182 0.0105 1.91 26.81 -675 5 2735 182 0.0105 1.91 28.72 780 5 2917 182 0.0105 1.91 30.63 3485 5 3099 182 0.0105 1.91 32.54 290 5 3281 182 0.0105 1.91 34.45 -495 5 3463 182 0.0105 1.91 36.36 2100 5 3645 182 0.0105 1.91 38.27 3105 5 3827 182 0.0105 1.91 40.18 -2110 5 4009 182 0.0105 1.91 42.09 5115 5 4191 182 0.0105 1.91 44.01 0120 5 4373 182 0.0105 1.91 45.92 0125 5 4555 182 0.0105 1.91 47.83 1130 5 4737 182 0.0105 1.91 49.74 3135 5 4919 182 0.0105 1.91 51.65 10140 5 5101 182 0.0105 1.91 53.56 4

    Total stands

    LENGTH ft

  • 145 5 5283 182 0.0105 1.91 55.47 9150 5 5465 182 0.0105 1.91 57.38 -369155 5 5647 182 0.0105 1.91 59.29 0160 5 5829 182 0.0105 1.91 61.20 0165 5 6011 182 0.0105 1.91 63.12 0170 5 6193 182 0.0105 1.91 65.03 0175 5 6375 182 0.0105 1.91 66.94 0180 5 6555 180 0.0105 1.89 68.83 0185 5 6735 180 0.0105 1.89 70.72 0190 5 6915 180 0.0105 1.89 72.61 0195 5 7095 180 0.0105 1.89 74.50 0200 5 7275 180 0.0105 1.89 76.39 0205 5 7455 180 0.0105 1.89 78.28 0210 5 7635 180 0.0105 1.89 80.17 0215 5 7815 180 0.0105 1.89 82.06 0220 5 7995 180 0.0105 1.89 83.95 0225 5 8175 180 0.0105 1.89 85.84 0230 5 8355 180 0.0105 1.89 87.73 0235 5 8535 180 0.0105 1.89 89.62 0240 5 8715 180 0.0105 1.89 91.51 0245 5 8895 180 0.0105 1.89 93.40 0250 5 9075 180 0.0105 1.89 95.29 0255 5 9255 180 0.0105 1.89 97.18 13261 5 9470 215 0.0105 2.26 99.44 13

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • PIARO DEEP BASAL -1RIH 7" CSG

    ACTUAL TRIP ACT1 ACT1+TripTRANS

    LOSS CUM REMARKS

    TOTAL 16.7 260 277 BBL BBL 26-May-152 26 253.0 279 1.223 1.222 26 253.0 279 -1.187 0.043 35 245.0 280 -0.611 -0.576 42 240.0 282 0.379 -0.20

    -11 1.5 264.0 266 -18.701 -18.90 F/U CSG JNT-6 1.7 269.0 271 3.299 -15.60-5 1.7 270.0 272 -0.921 -16.526 1.8 281.0 283 9.169 -7.3514 1.9 289.0 291 6.209 -1.141 2.1 276.0 278 -14.711 -15.85 F/U CSG JNT11 2.2 285.0 287 7.189 -8.669 2.3 283.0 285 -3.811 -12.47 nn14 2.4 288.0 290 3.189 -9.2824 2.4 298.0 300 8.089 -1.2018 2.8 292.0 295 -7.561 -8.7625 2.8 299.0 302 5.139 -3.6259 2.8 333.0 336 35 -2.911 -6.53 TRANSFER MUD61 2.8 335.0 338 0.089 -6.4457 2.8 331.0 334 -5.911 -12.3559 2.8 333.0 336 0.089 -12.2662 2.8 336.0 339 1.089 -11.17 F/U CSG JNT60 2.8 334.0 337 -3.911 -15.0865 2.8 339.0 342 3.089 -11.9965 2.8 339.0 342 -1.911 -13.91 F/U CSG JNT65 2.8 339.0 342 -1.911 -15.8266 2.8 340.0 343 -0.911 -16.7369 5.0 341.0 346 1.289 -15.4479 14.5 341.0 356 7.589 -7.8583 23.8 336.0 360 2.389 -5.46

  • 92 33.0 336.0 369 7.289 1.83-277 0.0 -370.911 -369.08-277 0.0 -1.911 -370.99-277 0.0 -1.911 -372.90-277 0.0 -1.911 -374.82-277 0.0 -1.911 -376.73-277 0.0 -1.911 -378.64-277 0.0 -1.890 -380.53-277 0.0 -1.890 -382.42-277 0.0 -1.890 -384.31-277 0.0 -1.890 -386.20-277 0.0 -1.890 -388.09-277 0.0 -1.890 -389.98-277 0.0 -1.890 -391.87-277 0.0 -1.890 -393.76-277 0 -1.890 -395.65-277 0 -1.890 -397.54-277 0 -1.890 -399.43-277 0 -1.890 -401.32-277 0 -1.890 -403.21-277 0 -1.890 -405.10-277 0 -1.890 -406.99-264 0 11.110 -395.88-251 0 10.743 -385.14

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • REMARKS

    26-May-15

    F/U CSG JNT

    F/U CSG JNT

    nn

    TRANSFER MUD

    F/U CSG JNT

    F/U CSG JNT

  • 418

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • disp 0.0105bbl/ft PIARO DEEP BASAL -1RIH 5" LINER

    DISP/FTTHEORITICAL ACTUAL TRIP

    DISP. TOTAL DISP. TOTAL 14.4

    5 181 0.0243 4.40 4.40 -3 -3 14.410 181 0.0243 4.40 8.80 1 -2 14.415 181 0.0243 4.40 13.19 1 -1 14.420 181 0.0243 4.40 17.59 2 1 14.425 181 0.0243 4.40 21.99 4 5 14.430 181 0.0243 4.40 26.39 4 9 14.435 181 0.0243 4.40 30.79 3 12 14.440 181 0.0243 4.40 35.19 6 18 14.445 181 0.0243 4.40 39.58 5 23 14.45 311 0.0120 3.73 43.32 -4 19 21.5

    10 311 0.0120 3.73 47.05 4 23 25.815 311 0.0120 3.73 50.78 0 23 30.320 311 0.0120 3.73 54.51 4 27 34.525 311 0.0120 3.73 58.24 -14 13 5.430 311 0.0120 3.73 61.98 18 31 10.335 311 0.0120 3.73 65.71 -1 30 14.540 311 0.0120 3.73 69.44 4 34 18.845 311 0.0120 3.73 73.17 -354 -31950 311 0.0120 3.73 76.90 0 -31955 311 0.0120 3.73 80.64 0 -31960 311 0.0120 3.73 84.37 0 -31965 311 0.0120 3.73 88.10 0 -31970 311 0.0120 3.73 91.83 0 -31975 311 0.0120 3.73 95.56 0 -31980 311 0.0120 3.73 99.30 0 -31985 311 0.0120 3.73 103.03 0 -31990 311 0.0120 3.73 106.76 0 -31995 311 0.0120 3.73 110.49 0 -319100 311 0.0120 3.73 114.22 0 -319

    Total stands

    LENGTH ft

  • 105 311 0.0120 3.73 117.96 0 -319110 311 0.0120 3.73 121.69 0 -319115 311 0.0120 3.73 125.42 0 -319120 311 0.0120 3.73 129.15 0 -319125 311 0.0120 3.73 132.88 0 -319130 311 0.0120 3.73 136.62 0 -319135 311 0.0120 3.73 140.35 0 -319140 311 0.0120 3.73 144.08 0 -319145 311 0.0120 3.73 147.81 0 -319150 311 0.0120 3.73 151.54 0 -319155 311 0.0120 3.73 155.28 0 -319160 311 0.0120 3.73 159.01 0 -319165 311 0.0120 3.73 162.74 0 -319170 311 0.0120 3.73 166.47 0 -319175 311 0.0120 3.73 170.20 0 -319180 311 0.0120 3.73 173.94 0 -319185 311 0.0120 3.73 177.67 0 -319190 311 0.0120 3.73 181.40 0 -319195 311 0.0120 3.73 185.13 0 -319200 311 0.0120 3.73 188.86 0 -319205 311 0.0120 3.73 192.60 0 -319210 311 0.0120 3.73 196.33 0 -319215 311 0.0120 3.73 200.06 0 -319220 311 0.0120 3.73 203.79 0 -319

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • PIARO DEEP BASAL -1RIH 5" LINER

    ACT1 ACT1+TripTRANS

    LOSS CUM REMARKS

    305 319 BBL BBL 3-Jun-15302.0 316 -7.398 -7.40303.0 317 -3.398 -10.80304.0 318 -3.398 -14.19306.0 320 -2.398 -16.59310.0 324 -0.398 -16.99 F/U CSG JNT314.0 328 -0.398 -17.39317.0 331 -1.398 -18.79323.0 337 1.602 -17.19328.0 342 0.602 -16.58317.0 338 -7.652 -24.24 F/U CSG JNT317.0 343 0.558 -23.68312.0 342 -4.222 -27.90 nn312.0 346 0.468 -27.43327.0 332 -17.832 -45.26340.0 350 14.188 -31.08335.0 350 -4.522 -35.60335.0 354 0.538 -35.06 TRANSFER MUD

    0 -357.512 -392.570 -3.732 -396.300 -3.732 -400.040 -3.732 -403.77 F/U CSG JNT0 -3.732 -407.500 -3.732 -411.230 -3.732 -414.96 F/U CSG JNT0 -3.732 -418.700 -3.732 -422.430 -3.732 -426.160 -3.732 -429.890 -3.732 -433.62

  • 0 -3.732 -437.360 -3.732 -441.090 -3.732 -444.820 -3.732 -448.550 -3.732 -452.280 -3.732 -456.020 -3.732 -459.750 -3.732 -463.480 -3.732 -467.210 -3.732 -470.940 -3.732 -474.680 -3.732 -478.410 -3.732 -482.140 -3.732 -485.870 -3.732 -489.600 -3.732 -493.340 -3.732 -497.070 -3.732 -500.800 -3.732 -504.530 -3.732 -508.260 -3.732 -512.000 -3.732 -515.730 -3.732 -519.460 -3.732 -523.19

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • REMARKS

    3-Jun-15

    F/U CSG JNT

    F/U CSG JNT

    nn

    TRANSFER MUD

    F/U CSG JNT

    F/U CSG JNT

  • 418

    START RIH @ 1840 25-02-15ON BOTTOM @ 16:30 04-02-14

  • disp 0.02259bbl/ft SOUTH MAZARI DEEP BASAL -1 ST-1RIH 7" CSG

    S.NO. DISP/FTTHEORITICAL ACTUAL

    DISP. TOTAL DISP.

    3 3 110 110 0.0104 1.14 1.14 05 5 75 73 0.0104 0.76 1.90 -1

    10 10 258 183 0.0104 1.90 3.81 015 15 441 183 0.0104 1.90 5.71 4420 20 624 183 0.0104 1.90 7.61 -7025 25 807 183 0.0104 1.90 9.52 3130 30 990 183 0.0104 1.90 11.42 835 35 1173 183 0.0104 1.90 13.32 040 40 1356 183 0.0104 1.90 15.23 145 45 1539 183 0.0104 1.90 17.13 -550 50 1722 183 0.0104 1.90 19.03 955 55 1905 183 0.0104 1.90 20.94 260 60 2088 183 0.0104 1.90 22.84 -1065 65 2271 183 0.0104 1.90 24.74 1370 70 2454 183 0.0104 1.90 26.64 -475 75 2637 183 0.0104 1.90 28.55 980 80 2820 183 0.0104 1.90 30.45 285 85 3003 183 0.0104 1.90 32.35 190 90 3186 183 0.0104 1.90 34.26 395 95 3369 183 0.0104 1.90 36.16 0100 100 3552 183 0.0104 1.90 38.06 2105 105 3735 183 0.0104 1.90 39.97 3110 110 3918 183 0.0104 1.90 41.87 4115 115 4101 183 0.0104 1.90 43.77 1120 120 4284 183 0.0104 1.90 45.68 -1125 125 4467 183 0.0104 1.90 47.58 4130 130 4650 183 0.0104 1.90 49.48 4135 135 4833 183 0.0104 1.90 51.39 -4140 140 5016 183 0.0104 1.90 53.29 4

    Total stands

    LENGTH ft

  • 145 145 5199 183 0.0104 1.90 55.19 -1150 150 5382 183 0.0104 1.90 57.10 -5155 155 5565 183 0.0104 1.90 59.00 4160 160 5748 183 0.0104 1.90 60.90 1165 165 5931 183 0.0104 1.90 62.81 -1170 170 6114 183 0.0104 1.90 64.71 5175 175 6297 183 0.0104 1.90 66.61 -1180 180 6480 183 0.0104 1.90 68.52 -2185 185 6663 183 0.0104 1.90 70.42 3190 190 6846 183 0.0226 4.13 74.55 -220195 195 7029 183 0.0226 4.13 78.69 0200 200 7212 183 0.0226 4.13 82.82 0205 205 7395 183 0.0226 4.13 86.95 0210 210 7578 183 0.0226 4.13 91.09 0215 215 7761 183 0.0226 4.13 95.22 0220 220 7944 183 0.0226 4.13 99.36 0225 225 8127 183 0.0226 4.13 103.49 0230 230 8310 183 0.0226 4.13 107.62 0235 235 8493 183 0.0226 4.13 111.76 0240 240 8676 183 0.0226 4.13 115.89 0245 245 8859 183 0.0226 4.13 120.03 0250 250 9042 183 0.0226 4.13 124.16 0255 255 9225 183 0.0226 4.13 128.29 13261 260 9408 183 0.0226 4.13 132.43 13

    START RIH @ 1230 09-07-2015ON BOTTOM @ 16:30 04-02-14

  • SOUTH MAZARI DEEP BASAL -1 ST-1RIH 7" CSG

    ACTUAL TRIP ACT1 ACT1+Triptrans

    LOSS CUM REMARKS

    TOTAL 21.7 147 169 BBL BBL 9-Jul-150 28 141.0 169 1 -0.924 -0.92

    cont filling csg -1 31 136.4 168 0 -2.189 -3.11-2 43 124.5 167 -44 -2.303 -5.4242 45 166.2 211 70 42.167 36.75 mud trns f/ trip tank-28 23.7 117.0 141 -31 -72.363 -35.613 5.0 167.2 172 -8 29.587 -6.03 filled csg every 5 jnts11 14.8 165.0 180 0 5.697 -0.3311 23.9 156.0 180 -1 -1.853 -2.1812 32.8 147.7 181 5 -1.253 -3.446 1.1 174.0 175 -9 -7.303 -10.74 mud trns f/ trip tank, f/u csg15 1.1 183.0 184 -2 7.097 -3.64 Trip Sheet prepared by system17 1.1 185.0 186 10 0.097 -3.557 1.1 175.0 176 -13 -11.903 -15.45 BREAK CIRC20 1.9 187.0 189 4 10.847 -4.6016 2.0 186.0 185 -9 -5.753 -10.3525 2.0 192.0 194 -2 7.047 -3.3127 2.0 194.0 196 -1 0.147 -3.1628 2.0 195.0 197 -3 -0.903 -4.0631 2.0 198.0 200 0 1.097 -2.9731 2.0 198.0 200 -2 -1.903 -4.8733 2.0 200.0 202 -3 0.097 -4.7736 2.0 203.0 205 -4 1.097 -3.6840 2.0 207.0 209 -1 2.097 -1.5841 2.0 208.0 210 1 -0.903 -2.4840 2.0 207.0 209 -4 -2.903 -5.3944 2.0 211.0 213 -4 2.097 -3.2948 2.0 215.0 217 4 2.097 -1.1944 2.0 211.0 213 -4 -5.903 -7.1048 2.0 215.0 217 1 2.097 -5.00

  • 47 2.0 214.0 216 5 -2.903 -7.9042 2.0 209.0 211.0 -4 -6.903 -14.8146 2.0 213.2 215.2 -1 2.297 -12.5147 2.0 214.0 216.0 1 -1.103 -13.6146 2.0 213.0 215.0 -5 -2.903 -16.5251 2.0 218.0 220.0 1 3.097 -13.4250 2.0 217.0 219.0 2 -2.903 -16.3248 2.0 215.0 217.0 -3 -3.903 -20.2351 2.0 218.0 220.0 220 1.097 -19.13

    -169 0.0 0 -224.134 -243.26-169 0.0 0 -4.134 -247.40-169 0.0 0 -4.134 -251.53-169 0.0 0 -4.134 -255.66-169 0.0 0 -4.134 -259.80-169 0.0 0 -4.134 -263.93-169 0 0 -4.134 -268.07-169 0 0 -4.134 -272.20-169 0 0 -4.134 -276.33-169 0 0 -4.134 -280.47-169 0 0 -4.134 -284.60-169 0 -4.134 -288.74-169 0 -4.134 -292.87-156 0 8.866 -284.00-143 0 8.866 -275.14

    START RIH @ 1230 09-07-2015ON BOTTOM @ 16:30 04-02-14

  • REMARKS

    9-Jul-15

    cont filling csg

    mud trns f/ trip tank

    filled csg every 5 jnts

    mud trns f/ trip tank, f/u csgTrip Sheet prepared by system

    BREAK CIRC

  • 418

    START RIH @ 1230 09-07-2015ON BOTTOM @ 16:30 04-02-14

    RIH 9.625" csgRIH CSG 7" 25-1-15RIH CSG 7" 25-2-15RIH CSG 9 58" 7-5-15RIH CSG 7" 26-5-15 (2)RIH CSG 5" 3-6-15RIH CSG 7" 9-7-15