Circle -Electrical Circle-ll
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
1
Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary)
Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp TSECL
TRIPURA STATE ELECTRICITY CORPORATION LIMITEDA Govt of Tripura Enterprise)
Division Electrical Division Jirania
BIDDING SCHEDULEName of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
Description of items
Unit Qty
Supply Erection
2 insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments
Km 083TSECL
SUPPLYhelliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3
Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in
trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of
soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the
other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over
2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick
solling work upto ground lavel for XLPE cable of size 50 sqmm
Km 083TSECL
SUPPLYhelliphelliphellip helliphellip
4Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp
PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1)Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5
Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE
insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to
IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040
Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with
local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in
trenches etc as per direction of Engineer-in-Charge
Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable
Nos 4
7Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable
Nos 1
8Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL)
Mt 36
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
9
T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment
Nos 10
10Erection of different size of PCC pole ST pole direct in earth inc excavation refilling
ramming etc as requiredThe pole should be burried 16th of their length
a90mt long Steel Pole
Nos 4TSECL
SUPPLYhelliphellip helliphellip
b80mt long PCC Pole
Nos 20TSECL
SUPPLYhelliphellip helliphellip
11
Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted
stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with
300 mm long threaded adjustable 16 mm dia MS rod and thimble
Set 18TSECL
SUPPLYhelliphellip helliphellip
Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm TSECL
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
12
MS Channel (6 Nos)
Nos 6TSECL
SUPPLYhelliphellip helliphellip
13
Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel
(4 Nos)
Nos 4TSECL
SUPPLYhelliphellip helliphellip
14
Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size
75x40x40x6mm MS Channel (8 Nos)
Nos 8TSECL
SUPPLYhelliphellip helliphellip
15
Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size
65x65x6mm MS Angle (2 Nos)
Nos 2TSECL
SUPPLYhelliphellip helliphellip
16
Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle
(8 Nos)
Nos 8TSECL
SUPPLYhelliphellip helliphellip
17 Fabrication of Cross arms as per specification
aMS Channel 100x50x50x6mm75x40x40x6mm
Kg 343TSECL
SUPPLYhelliphellip helliphellip
bMS angle 65x65x6mm 50x50x6mm
Kg 58TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
18
Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
necessary connection
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
a
100 KVA Transformer
Nos 2TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
19
Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break
switch including necessary connection as per TS
Set 3TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
20
Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for
11KV 50Hz AC system operation for air break switch including necessary connection
as per TS
Set 2TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
21
Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable
for nominal system Voltage of 11 KV inc necessary connection as per TS
Nos 6TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
22
Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per
Set 8nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design
23
Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp
Nuts amp Bolts)
Nos 4TSECL
SUPPLYhelliphelliphellip helliphelliphellip
24
Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying
hoisting binding etc complete as reqd
Km 21TSECL
SUPPLYhelliphelliphellip helliphelliphellip
25
Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc
complete as reqd
Km 09TSECL
SUPPLYhelliphelliphellip helliphelliphellip
26
Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp
Bolts on poles excluding the cost of straps Nuts and Bolts
Nos 52TSECL
SUPPLYhelliphelliphellip helliphelliphellip
27Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL
aBracket Clamp
Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
bStay Clamp
pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28
Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of
size 24x10x15 and cable connections with termination by Lugs Thimble complete Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
29
Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection
Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Signature of bidderDy General Manager
Jirania Electrical Division
Rounded of Rs (Rupees only)
Sub Total
( Supply + Erection) total Rs
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
9
T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment
Nos 10
10Erection of different size of PCC pole ST pole direct in earth inc excavation refilling
ramming etc as requiredThe pole should be burried 16th of their length
a90mt long Steel Pole
Nos 4TSECL
SUPPLYhelliphellip helliphellip
b80mt long PCC Pole
Nos 20TSECL
SUPPLYhelliphellip helliphellip
11
Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted
stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with
300 mm long threaded adjustable 16 mm dia MS rod and thimble
Set 18TSECL
SUPPLYhelliphellip helliphellip
Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm TSECL
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
12
MS Channel (6 Nos)
Nos 6TSECL
SUPPLYhelliphellip helliphellip
13
Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel
(4 Nos)
Nos 4TSECL
SUPPLYhelliphellip helliphellip
14
Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size
75x40x40x6mm MS Channel (8 Nos)
Nos 8TSECL
SUPPLYhelliphellip helliphellip
15
Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size
65x65x6mm MS Angle (2 Nos)
Nos 2TSECL
SUPPLYhelliphellip helliphellip
16
Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle
(8 Nos)
Nos 8TSECL
SUPPLYhelliphellip helliphellip
17 Fabrication of Cross arms as per specification
aMS Channel 100x50x50x6mm75x40x40x6mm
Kg 343TSECL
SUPPLYhelliphellip helliphellip
bMS angle 65x65x6mm 50x50x6mm
Kg 58TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
18
Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
necessary connection
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
a
100 KVA Transformer
Nos 2TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
19
Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break
switch including necessary connection as per TS
Set 3TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
20
Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for
11KV 50Hz AC system operation for air break switch including necessary connection
as per TS
Set 2TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
21
Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable
for nominal system Voltage of 11 KV inc necessary connection as per TS
Nos 6TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
22
Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per
Set 8nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design
23
Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp
Nuts amp Bolts)
Nos 4TSECL
SUPPLYhelliphelliphellip helliphelliphellip
24
Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying
hoisting binding etc complete as reqd
Km 21TSECL
SUPPLYhelliphelliphellip helliphelliphellip
25
Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc
complete as reqd
Km 09TSECL
SUPPLYhelliphelliphellip helliphelliphellip
26
Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp
Bolts on poles excluding the cost of straps Nuts and Bolts
Nos 52TSECL
SUPPLYhelliphelliphellip helliphelliphellip
27Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL
aBracket Clamp
Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
bStay Clamp
pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28
Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of
size 24x10x15 and cable connections with termination by Lugs Thimble complete Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
29
Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection
Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Signature of bidderDy General Manager
Jirania Electrical Division
Rounded of Rs (Rupees only)
Sub Total
( Supply + Erection) total Rs
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
a
100 KVA Transformer
Nos 2TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
19
Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break
switch including necessary connection as per TS
Set 3TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
20
Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for
11KV 50Hz AC system operation for air break switch including necessary connection
as per TS
Set 2TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
21
Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable
for nominal system Voltage of 11 KV inc necessary connection as per TS
Nos 6TSECL
SUPPLYhelliphelliphelliphelliphelliphellip helliphellip
22
Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per
Set 8nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design
23
Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp
Nuts amp Bolts)
Nos 4TSECL
SUPPLYhelliphelliphellip helliphelliphellip
24
Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying
hoisting binding etc complete as reqd
Km 21TSECL
SUPPLYhelliphelliphellip helliphelliphellip
25
Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc
complete as reqd
Km 09TSECL
SUPPLYhelliphelliphellip helliphelliphellip
26
Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp
Bolts on poles excluding the cost of straps Nuts and Bolts
Nos 52TSECL
SUPPLYhelliphelliphellip helliphelliphellip
27Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL
aBracket Clamp
Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
bStay Clamp
pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28
Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of
size 24x10x15 and cable connections with termination by Lugs Thimble complete Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
29
Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection
Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Signature of bidderDy General Manager
Jirania Electrical Division
Rounded of Rs (Rupees only)
Sub Total
( Supply + Erection) total Rs
SlNoRate in Rs
in digidRate in Rs in word
Amt in Rs
Rate in Rs in digid
Rate in Rs in word
Amt in Rs
Description of items
Unit Qty
Supply Erection
29
Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection
Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Signature of bidderDy General Manager
Jirania Electrical Division
Rounded of Rs (Rupees only)
Sub Total
( Supply + Erection) total Rs
TRIPURA STATE ELECTRICITY CORPORATION LIMITED | |||||||||||||||||||
A Govt of Tripura Enterprise) | |||||||||||||||||||
Circle -Electrical Circle-ll | Division Electrical Division Jirania | ||||||||||||||||||
BIDDING SCHEDULE | |||||||||||||||||||
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||||
SlNo | Description of items | Unit | Qty | Supply | Erection | ||||||||||||||
Rate in Rs in digid | Rate in Rs in word | Amt in Rs | Rate in Rs in digid | Rate in Rs in word | Amt in Rs | ||||||||||||||
1 | Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) | Km | 07 | helliphelliphellip | helliphelliphellip | helliphelliphellip | |||||||||||||
2 | Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments | Km | 083 | TSECL SUPPLY | helliphelliphellip | helliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphellip | ||||||||||
3 | Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm | Km | 083 | TSECL SUPPLY | helliphelliphellip | helliphellip | |||||||||||||
4 | Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) | Mt | 200 | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
5 | Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge | Mt | 200 | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
6 | Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable | Nos | 4 | ||||||||||||||||
7 | Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable | Nos | 1 | ||||||||||||||||
8 | Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) | Mt | 36 | ||||||||||||||||
9 | T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment | Nos | 10 | ||||||||||||||||
10 | Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | 90mt long Steel Pole | Nos | 4 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
b | 80mt long PCC Pole | Nos | 20 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
11 | Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble | Set | 18 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
12 | Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) | Nos | 6 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
13 | Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) | Nos | 4 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
14 | Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) | Nos | 8 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
15 | Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) | Nos | 2 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
16 | Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) | Nos | 8 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
17 | Fabrication of Cross arms as per specification | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | MS Channel 100x50x50x6mm75x40x40x6mm | Kg | 34344 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
b | MS angle 65x65x6mm 50x50x6mm | Kg | 58 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
18 | Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | 100 KVA Transformer | Nos | 2 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
19 | Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS | Set | 3 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
20 | Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS | Set | 2 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
21 | Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS | Nos | 6 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
22 | Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design | Set | 8 | ||||||||||||||||
23 | Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) | Nos | 4 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
24 | Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd | Km | 21 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
25 | Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd | Km | 09 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
26 | Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts | Nos | 52 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
27 | Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | Bracket Clamp | Nos | 38 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
b | Stay Clamp | pair | 36 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
28 | Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble | Set | 4 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
29 | Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection | Mt | 20 | helliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
Sub Total | |||||||||||||||||||
( Supply + Erection) total Rs | |||||||||||||||||||
Rounded of Rs | |||||||||||||||||||
(Rupees only) | |||||||||||||||||||
Signature of bidder | |||||||||||||||||||
Dy General Manager | |||||||||||||||||||
Jirania Electrical Division |
WORK ESTIMATE | |||||||||||||
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division | |||||||||||||
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA | |||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- | Chargeable to - DEPOSIT WORK WITH TIDC | ||||||||||||
B] COST OF MATERIALS FOR 11KV LINE EXTENSION | |||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||
1 | 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) | 35 | Nos | 1015422 | 3553977 | ||||||||
2 | 9mtr Long PCC Pole | 25 | Nos | 2650 | 66250 | ||||||||
3 | Stay Set Complete | 25 | Sets | 47025 | 1175625 | 29390625 | |||||||
4 | Stay Insulator(11KV) | 125 | Nos | 1092 | 1365 | 34125 | |||||||
5 | Stay Wire (725mm) | 24 | Kgs | 451 | 10824 | ||||||||
6 | MS Channel(75x40x40x6mm4) | 116 | Kgs | 3352 | 388832 | ||||||||
a) | Double Pole X-Arm(22Mtr) | 3 | Nos | ||||||||||
b) | Single Pole Top X-Arm(03Mtr) | 6 | Nos | ||||||||||
c) | Single Pole Bottom X-Arm(12Mtr) | 6 | Nos | ||||||||||
7 | MS Angle(65x65x6mm3) | 96 | Kgs | 321 | 30816 | ||||||||
a) | Double Pole Guard X-Arm (25Mtr) | 3 | Nos | ||||||||||
b) | SinglePole Guard X-Arm (15Mtr) | 6 | Nos | ||||||||||
8 | Weasel ACSR (61259mm) | 12 | Km | 2061233 | 24734796 | 6183699 | |||||||
9 | 8 SWG GI Wire | 80 | Kgs | 391 | 3128 | 782 | |||||||
10 | 11KV 45KN Disc Insulator | 18 | Nos | 49487 | 890766 | 2226915 | |||||||
11 | Single U Bolt type Disc Fittings | 18 | Nos | 19352 | 348336 | ||||||||
12 | 11KV Pin Insulator | 27 | Nos | 991 | 26757 | 668925 | |||||||
13 | GI Pin for 11KV Pin Insulator | 27 | Nos | 561 | 15147 | ||||||||
14 | MS Nuts and Bolts of Assorted Size | 20 | Kgs | 407 | 814 | ||||||||
15 | Stay Clamp by (50x6mm2) MS Flat | 6 | Pairs | 495 | 297 | ||||||||
16 | Bracket Clamp by (50x6mm2) MS Flat | 40 | Nos | 27 | 1080 | ||||||||
17 | Barbed Wire | 22 | Kgs | 429 | 9438 | 23595 | |||||||
24 | AddMetering Arrangement with Kiosk | 1 | Nos | 50000 | 50000 | ||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 2 | Nos | 1605 | 3210 | ||||||||
TOTAL | 543610286 | 1359025715 | |||||||||||
say | 163391 | ||||||||||||
(One Lac sixty three thousand three hundred and ninety one only) | |||||||||||||
ABSTRACT OF COST | 0 | ||||||||||||
A | Cost of Materials | 163391 | 0 | ||||||||||
B | Storage Charge 2 on A | 326782 | |||||||||||
C | Total (A + B) | 16665882 | 0 | ||||||||||
D | Erection Charge 15 on C | 24998823 | |||||||||||
E | Total (C + D) | 191657643 | 0 | ||||||||||
F | Transportation Charge 5 on C | 8332941 | |||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 2874864645 | |||||||||||
H | Total (E + F + G) | 2287392305 | |||||||||||
I | Contingency Charge 3 on H | 6862176914 | 0 | ||||||||||
GRAND TOTAL | 2356014074 | ||||||||||||
Say | Rs | 235601 | 0 | ||||||||||
(Rupees two Lacs thirty five thousand six hundred and one)Only | |||||||||||||
0 | |||||||||||||
0 | |||||||||||||
0 | |||||||||||||
0 |
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 200 KVA Substation for Providing of Service connection at Central effulent Effulent Treatment Plant ( CETP) Bodhjungnagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK with TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 200 KVA 110433KV Distribution Transformer | 1 | Nos | 22574688 | 22574688 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 5 | Nos | 4325 | 21625 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 58082 | 29041 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 20 | Kgs | 5707 | 11414 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 3972 | 389256 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 215 | Kgs | 3977 | 855055 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 3 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 3 | Nos | ||||||||||||||
e) | 11 Kv DP Top Bkt ( 22 Mtr) | 2 | Nos | ||||||||||||||
f) | 11KV DP bottom Bracket(25Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 84 | Kgs | 3927 | 329868 | ||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
d) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 15 | Km | 2347653 | 35214795 | ||||||||||||
10 | 8 SWG GI Wire | 48 | Kgs | 4934 | 236832 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 201 | 3618 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 28769 | 517842 | ||||||||||||
13 | 11KV Pin Insulator | 24 | Nos | 4668 | 112032 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 24 | Nos | 561 | 13464 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 50 | Kgs | 505 | 2525 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 72 | Nos | 27 | 1944 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1300 | 3900 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 70 | Mtr | 10495 | 73465 | ||||||||||||
23 | 300Amps Cutout | 6 | Nos | 5225 | 3135 | ||||||||||||
24 | 120sqmm Lugs | 24 | Nos | 1913 | 45912 | ||||||||||||
25 | Transformer Base | 1 | Job | 89500 | 89500 | ||||||||||||
26 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
27 | Danger plate | 12 | Nos | 50 | 600 | ||||||||||||
TOTAL | 492300635 | ||||||||||||||||
say | 492300635 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 492300635 | |||||||||||||||
C | Storage Charge 2 on A | 98460127 | |||||||||||||||
D | Total (A + B) | 5021466477 | |||||||||||||||
E | Erection Charge 15 on D | 7532199716 | |||||||||||||||
F | Total (C + D) | 5774686449 | |||||||||||||||
G | Transportation Charge 5 on D | 2510733239 | |||||||||||||||
H | Supervision Charge and Establishment Charge 5 on F | 2887343224 | |||||||||||||||
H | Total ( F + G+H ) | 6314494095 | |||||||||||||||
I | Contingency Charge 3 on H | 1894348228 | |||||||||||||||
j | Addhoc 10 on H | 6314494095 | |||||||||||||||
GRAND TOTAL | 7135378327 | ||||||||||||||||
Say | Rs | 713538 | |||||||||||||||
(Rupees seven Lac thirteen thousand five hundred thirty eight )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection to Airtel Tower Amtali under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AIRTEL | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 7247368 | 7247368 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) | 8 | Nos | 4325 | 34600 | ||||||||||||
2 | 8Mtr PCC Pole | 8 | Nos | 4325 | 34600 | ||||||||||||
3 | Stay Set Complete | 15 | Sets | 58082 | 87123 | ||||||||||||
4 | Stay Insulator(11KV) | 15 | Nos | 20 | 300 | ||||||||||||
5 | Stay Wire (725mm) | 75 | Kgs | 5707 | 428025 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 3972 | 389256 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 345 | Kgs | 3977 | 1372065 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 8 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 8 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 4 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 4 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 97 | Kgs | 3927 | 380919 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 4 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 8 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 6 | Km | 2347653 | 14085918 | ||||||||||||
10 | 8 SWG GI Wire | 90 | Kgs | 4934 | 44406 | ||||||||||||
11 | 11KV Disc Insulator | 36 | Nos | 201 | 7236 | ||||||||||||
12 | 11KV Disc Fittings | 36 | Nos | 28769 | 1035684 | ||||||||||||
13 | 11KV Pin Insulator | 48 | Nos | 4668 | 224064 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 48 | Nos | 561 | 26928 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 70 | Kgs | 505 | 3535 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 15 | Pairs | 495 | 7425 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 120 | Nos | 27 | 3240 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 4 | Nos | 1605 | 6420 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 200 | Mtr | 10495 | 20990 | ||||||||||||
23 | 200Amps Cutout | 12 | Nos | 14425 | 1731 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 19129 | 459096 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
27 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
28 | Barbed Wire | 20 | Kgs | 50 | 1000 | ||||||||||||
TOTAL | 46403016 | ||||||||||||||||
say | 464030 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 464030 | |||||||||||||||
B | Storage Charge 2 on A | 92806 | |||||||||||||||
C | Total (A + B) | 4733106 | |||||||||||||||
D | Erection Charge 15 on C | 7099659 | |||||||||||||||
E | Total (C + D) | 54430719 | |||||||||||||||
F | Transportation Charge 5 on C | 2366553 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on E | 272153595 | |||||||||||||||
H | Total (E + F + G) | 5951880795 | |||||||||||||||
i | Over head charge 10 above ( adhoc increase) | 5951880795 | |||||||||||||||
I | Contingency Charge 3 on H | 1785564239 | |||||||||||||||
GRAND TOTAL | 6725625298 | ||||||||||||||||
Say | 672563 | ||||||||||||||||
(Rupees Six Lac seventy two thousand five hundred sixty three)Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to NIELIT AGARTALA CENTRE for the smooth construction activities of the campus under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH NIELIT AGARTALA CENTRE | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 453582 | 453582 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) | 5 | Nos | 4325 | 21625 | ||||||||||||
2 | 8Mtr PCC Pole | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 58082 | 29041 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 5707 | 142675 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 3972 | 389256 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 345 | Kgs | 3977 | 1372065 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 4 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 4 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 2 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 97 | Kgs | 3927 | 380919 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 2 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 4 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 12 | Km | 2347653 | 28171836 | ||||||||||||
10 | 8 SWG GI Wire | 40 | Kgs | 4934 | 19736 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 201 | 2412 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 28769 | 345228 | ||||||||||||
13 | 11KV Pin Insulator | 18 | Nos | 4668 | 84024 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 18 | Nos | 561 | 10098 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 505 | 12625 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 60 | Nos | 27 | 1620 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 4 | Nos | 1605 | 6420 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 200 | Mtr | 10495 | 20990 | ||||||||||||
23 | 100Amps Cutout | 12 | Nos | 14425 | 1731 | ||||||||||||
24 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 19129 | 459096 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
TOTAL | 203944176 | ||||||||||||||||
say | 203944 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 203944 | |||||||||||||||
B | Storage Charge 2 on A | 407888 | |||||||||||||||
C | Total (A + B) | 20802288 | |||||||||||||||
D | Erection Charge 15 on C | 31203432 | |||||||||||||||
E | Total (C + D) | 239226312 | |||||||||||||||
F | Transportation Charge 5 on C | 10401144 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on E | 119613156 | |||||||||||||||
H | Total (E + F + G) | 2615887716 | |||||||||||||||
i | Over head charge 10 above ( adhoc increase) | 2615887716 | |||||||||||||||
I | Contingency Charge 3 on H | 7847663148 | |||||||||||||||
GRAND TOTAL | 2955953119 | ||||||||||||||||
Say | 295595 | ||||||||||||||||
(Rupees Two Lac Ninety five thousand five hundred ninety five )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to STATE BANK OF INDIA RK Nagar Industrial branch under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK with TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 72474 | 72474 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 4 | Nos | 4325 | 17300 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 58082 | 29041 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 20 | Kgs | 5707 | 11414 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 3972 | 389256 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 215 | Kgs | 3977 | 855055 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 3 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 3 | Nos | ||||||||||||||
e) | 11 Kv DP Top Bkt ( 22 Mtr) | 2 | Nos | ||||||||||||||
f) | 11KV DP bottom Bracket(25Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 84 | Kgs | 3927 | 329868 | ||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
d) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 15 | Km | 2347653 | 35214795 | ||||||||||||
10 | 8 SWG GI Wire | 48 | Kgs | 4934 | 236832 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 201 | 3618 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 28769 | 517842 | ||||||||||||
13 | 11KV Pin Insulator | 24 | Nos | 4668 | 112032 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 24 | Nos | 561 | 13464 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 50 | Kgs | 505 | 2525 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 72 | Nos | 27 | 1944 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1300 | 3900 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 70 | Mtr | 10495 | 73465 | ||||||||||||
23 | 300Amps Cutout | 6 | Nos | 5225 | 3135 | ||||||||||||
24 | 120sqmm Lugs | 24 | Nos | 1913 | 45912 | ||||||||||||
25 | Transformer Fancing | 1 | Job | 15000 | 15000 | ||||||||||||
27 | Danger plate | 12 | Nos | 50 | 600 | ||||||||||||
TOTAL | 210702755 | ||||||||||||||||
say | 210702755 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 210702755 | |||||||||||||||
C | Storage Charge 2 on A | 42140551 | |||||||||||||||
D | Total (A + B) | 2149168101 | |||||||||||||||
E | Erection Charge 15 on D | 3223752152 | |||||||||||||||
F | Total (C + D) | 2471543316 | |||||||||||||||
G | Transportation Charge 5 on D | 1074584051 | |||||||||||||||
H | Supervision Charge and Establishment Charge 5 on F | 1235771658 | |||||||||||||||
H | Total ( F + G+H ) | 2702578887 | |||||||||||||||
I | Contingency Charge 3 on H | 8107736661 | |||||||||||||||
j | Addhoc 10 on H | 2702578887 | |||||||||||||||
GRAND TOTAL | 3053914142 | ||||||||||||||||
Say | Rs | 305391 | |||||||||||||||
(Rupees three Lac five thousand three hundred ninety one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 17-03-2013 During the year 2013-2014 | |||||||||||||||||
Chargeable to - Revenue Expenditure | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 4 | Nos | 4325 | 17300 | ||||||||||||
2 | 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 6 | Nos | 3553 | 21318 | ||||||||||||
3 | Stay Set Complete | 4 | Sets | 58082 | 232328 | ||||||||||||
4 | Stay Insulator(11KV) | 4 | Nos | 20 | 80 | ||||||||||||
5 | Stay Wire (725mm) | 20 | Kgs | 5707 | 11414 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 238 | Kgs | 3977 | 946526 | ||||||||||||
a) | Single Pole Top X-Arm(03Mtr) | 6 | Nos | ||||||||||||||
b) | Single Pole Bottom X-Arm(13Mtr) | 6 | Nos | ||||||||||||||
c) | 11 Kv DP Top Bkt ( 22 Mtr) | 5 | Nos | ||||||||||||||
d) | 11KV DP bottom Bracket(25Mtr) | 5 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 157 | Kgs | 3927 | 616539 | ||||||||||||
a) | SinglePole Guard X-Arm (15Mtr) | 6 | No | ||||||||||||||
b) | Double Pole Guard X-Arm (28Mtr) | 5 | No | ||||||||||||||
c) | 2 wire LT Bkt( 051 Mtr) | 4 | No | ||||||||||||||
d) | 4 wire LT Bkt( 11 Mtr) | 2 | No | ||||||||||||||
8 | Weasel ACSR (61259mm) | 14 | Km | 2347653 | 32867142 | ||||||||||||
9 | 8 SWG GI Wire | 30 | Kgs | 4934 | 14802 | ||||||||||||
10 | 11KV Disc Insulator | 6 | Nos | 201 | 1206 | ||||||||||||
11 | 11KV Disc Fittings | 6 | Nos | 28769 | 172614 | ||||||||||||
12 | 11KV Pin Insulator | 8 | Nos | 4668 | 37344 | ||||||||||||
13 | GI Pin for 11KV Pin Insulator | 8 | Nos | 561 | 4488 | ||||||||||||
14 | MS Nuts and Bolts of Assorted Size | 12 | Kgs | 505 | 606 | ||||||||||||
15 | Stay Clamp by (50x6mm2) MS Flat | 4 | Pairs | 495 | 198 | ||||||||||||
16 | Bracket Clamp by (50x6mm2) MS Flat | 18 | Nos | 27 | 486 | ||||||||||||
17 | Shackle insulator | 14 | Nos | 10495 | 14693 | ||||||||||||
TOTAL | 98654352 | ||||||||||||||||
say | 98654352 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 98654 | |||||||||||||||
C | Storage Charge 2 on A | 197308 | |||||||||||||||
D | Total (A + B) | 10062708 | |||||||||||||||
E | Erection Charge 15 on D | 15094062 | |||||||||||||||
F | Total (C + D) | 115721142 | |||||||||||||||
G | Transportation Charge 5 on D | 5031354 | |||||||||||||||
H | Supervision Charge and Establishment Charge 0 on F | 0 | |||||||||||||||
H | Total ( F + G+H ) | 120752496 | |||||||||||||||
I | Contingency Charge 3 on H | 362257488 | |||||||||||||||
j | Addhoc 0 on H | 0 | |||||||||||||||
GRAND TOTAL | 1243750709 | ||||||||||||||||
Say | 124375 | ||||||||||||||||
(Rupees one lac twenty four thousand three hundred seventy five )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 16-04-2013 amp 17-04-2013 During the year 2013-2014 | |||||||||||||||||
Chargeable to - Revenue Expenditure | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 Mtr ST Pole | 3 | Nos | 1358265 | 4074795 | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 11 | Nos | 4325 | 47575 | ||||||||||||
2 | 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 10 | Nos | 3553 | 35530 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 58082 | 29041 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 5707 | 142675 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 238 | Kgs | 3977 | 946526 | ||||||||||||
a) | Single Pole Top X-Arm(03Mtr) | 6 | Nos | ||||||||||||||
b) | Single Pole Bottom X-Arm(13Mtr) | 6 | Nos | ||||||||||||||
c) | 11 Kv DP Top Bkt ( 22 Mtr) | 5 | Nos | ||||||||||||||
d) | 11KV DP bottom Bracket(25Mtr) | 5 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 207 | Kgs | 3927 | 812889 | ||||||||||||
a) | SinglePole Guard X-Arm (15Mtr) | 6 | No | ||||||||||||||
b) | Double Pole Guard X-Arm (28Mtr) | 5 | No | ||||||||||||||
c) | 2 wire LT Bkt( 051 Mtr) | 10 | No | ||||||||||||||
d) | 4 wire LT Bkt( 11 Mtr) | 7 | No | ||||||||||||||
8 | Weasel ACSR (61259mm) | 48 | Km | 2347653 | 112687344 | ||||||||||||
9 | 8 SWG GI Wire | 30 | Kgs | 4934 | 14802 | ||||||||||||
10 | 11KV Disc Insulator | 13 | Nos | 201 | 2613 | ||||||||||||
11 | 11KV Disc Fittings | 13 | Nos | 28769 | 373997 | ||||||||||||
12 | 11KV Pin Insulator | 16 | Nos | 4668 | 74688 | ||||||||||||
13 | GI Pin for 11KV Pin Insulator | 16 | Nos | 561 | 8976 | ||||||||||||
14 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 505 | 12625 | ||||||||||||
15 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
16 | Bracket Clamp by (50x6mm2) MS Flat | 16 | Nos | 27 | 432 | ||||||||||||
17 | Shackle insulator | 14 | Nos | 10495 | 14693 | ||||||||||||
TOTAL | 230706294 | ||||||||||||||||
say | 230706294 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 230706 | |||||||||||||||
C | Storage Charge 2 on A | 461412 | |||||||||||||||
D | Total (A + B) | 23532012 | |||||||||||||||
E | Erection Charge 15 on D | 35298018 | |||||||||||||||
F | Total (C + D) | 270618138 | |||||||||||||||
G | Transportation Charge 5 on D | 11766006 | |||||||||||||||
H | Supervision Charge and Establishment Charge 0 on F | 0 | |||||||||||||||
H | Total ( F + G+H ) | 282384144 | |||||||||||||||
I | Contingency Charge 3 on H | 847152432 | |||||||||||||||
j | Addhoc 0 on H | 0 | |||||||||||||||
GRAND TOTAL | 2908556683 | ||||||||||||||||
Say | 290856 | ||||||||||||||||
(Rupees two Lac ninety thousand eight hundred amp fiftysix )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on03-05-2013 05-05-2013 06-05-2013 12-05-2013 amp 16-05-2013 During the year 2013-2014 | |||||||||||||||||
Chargeable to - Revenue Expenditure | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 Mtr ST Pole | 3 | Nos | 1358265 | 4074795 | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 3 | Nos | 4325 | 12975 | ||||||||||||
2 | 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) | 8 | Nos | 3553 | 28424 | ||||||||||||
3 | Stay Set Complete | 2 | Sets | 58082 | 116164 | 2 | |||||||||||
4 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
5 | Stay Wire (725mm) | 10 | Kgs | 5707 | 5707 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 238 | Kgs | 3977 | 946526 | ||||||||||||
a) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
b) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
c) | 11 Kv DP Top Bkt ( 22 Mtr) | 1 | Nos | ||||||||||||||
d) | 11KV DP bottom Bracket(25Mtr) | 1 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 207 | Kgs | 3927 | 812889 | ||||||||||||
a) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
b) | Double Pole Guard X-Arm (28Mtr) | 1 | No | ||||||||||||||
c) | 2 wire LT Bkt( 051 Mtr) | 6 | No | ||||||||||||||
d) | 4 wire LT Bkt( 11 Mtr) | 12 | No | ||||||||||||||
8 | Weasel ACSR (61259mm) | 09 | Km | 2347653 | 21128877 | ||||||||||||
9 | 8 SWG GI Wire | 22 | Kgs | 4934 | 108548 | ||||||||||||
10 | 11KV Disc Insulator | 3 | Nos | 201 | 603 | ||||||||||||
11 | 11KV Disc Fittings | 3 | Nos | 28769 | 86307 | ||||||||||||
12 | 11KV Pin Insulator | 6 | Nos | 4668 | 28008 | ||||||||||||
13 | GI Pin for 11KV Pin Insulator | 6 | Nos | 561 | 3366 | ||||||||||||
14 | MS Nuts and Bolts of Assorted Size | 18 | Kgs | 505 | 909 | ||||||||||||
15 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
16 | Bracket Clamp by (50x6mm2) MS Flat | 8 | Nos | 27 | 216 | ||||||||||||
17 | Shackle insulator | 12 | Nos | 10495 | 12594 | ||||||||||||
TOTAL | 87545997 | ||||||||||||||||
say | 87545997 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 87546 | |||||||||||||||
C | Storage Charge 2 on A | 175092 | |||||||||||||||
D | Total (A + B) | 8929692 | |||||||||||||||
E | Erection Charge 15 on D | 13394538 | |||||||||||||||
F | Total (C + D) | 102691458 | |||||||||||||||
G | Transportation Charge 5 on D | 4464846 | |||||||||||||||
H | Supervision Charge and Establishment Charge 0 on F | 0 | |||||||||||||||
H | Total ( F + G+H ) | 107156304 | |||||||||||||||
I | Contingency Charge 3 on H | 321468912 | |||||||||||||||
j | Addhoc 10 on H | 0 | |||||||||||||||
GRAND TOTAL | 1103709931 | ||||||||||||||||
Say | 110371 | ||||||||||||||||
B) | Maintance of 3 nos Damage 25 KVA TXr Rs1200000Each | Rs 3600000 | |||||||||||||||
Total | Rs14637100 | ||||||||||||||||
(Rupees one Lac forty six thousand three hundred amp seventy one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Reviesed estimate of Upgredation of Transformer 1x 200 KVA to 1x500KVA for Providing of new Service connection to CITY STAR AGRO INDUSTRIES Private limited at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with CITY STAR AGRO INDUSTRIES Private limited | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA DT | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 52803318 | 52803318 | ||||||||||||
2 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
3 | 240 sqmm PVC insulated Al Conductor | 70 | Mtr | 10495 | 73465 | ||||||||||||
4 | 400Amps Cutout | 6 | Nos | 777 | 4662 | ||||||||||||
5 | Bimetalic Lugs( 300mm2) | 8 | Nos | 23809 | 190472 | ||||||||||||
TOTAL | 5467614 | ||||||||||||||||
say | |||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 546761 | |||||||||||||||
B | Storage Charge 2 on A | 1093522 | |||||||||||||||
C | Total (A + B) | 55769622 | |||||||||||||||
D | Erection Charge 15 on C | 83654433 | |||||||||||||||
E | Total (C + D) | 641350653 | |||||||||||||||
F | Transportation Charge 5 on C | 27884811 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 9620259795 | |||||||||||||||
H | Total (E + F + G) | 765438062 | |||||||||||||||
I | Contingency Charge 3 on H | 2886077939 | |||||||||||||||
I | Addhoc 10 on H | 765438062 | |||||||||||||||
GRAND TOTAL | 8419818681 | ||||||||||||||||
Say | 841982 | ||||||||||||||||
B) | Dismental of 200 KVA Txr amp Cutout | Rs 150000 | |||||||||||||||
Total (A+B ) | Rs 84348200 | ||||||||||||||||
C) | Less scrap value of existing 200 KVA Txr 40 on 22574700 | 13544800 | |||||||||||||||
GRAND TOTAL | 70803400 | ||||||||||||||||
(Rupees Seven Lac eight thousand thirty four )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at DAS PARA under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AIRTEL | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 55146 | 55146 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=8 nos SP= 9 Nos) | 25 | Nos | 4325 | 108125 | ||||||||||||
3 | Stay Set Complete | 18 | Sets | 58082 | 1045476 | ||||||||||||
4 | Stay Insulator(11KV) | 18 | Nos | 20 | 360 | ||||||||||||
5 | Stay Wire (725mm) | 90 | Kgs | 5707 | 51363 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 446 | Kgs | 5473 | 2440958 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 9 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 9 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 7 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 7 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 213 | Kgs | 5473 | 1165749 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 7 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 9 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 4 | Km | 2347653 | 9390612 | ||||||||||||
10 | 8 SWG GI Wire | 180 | Kgs | 4934 | 88812 | ||||||||||||
11 | 11KV Disc Insulator | 54 | Nos | 201 | 10854 | ||||||||||||
12 | 11KV Disc Fittings | 54 | Nos | 28769 | 1553526 | ||||||||||||
13 | 11KV Pin Insulator | 62 | Nos | 4668 | 289416 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 62 | Nos | 561 | 34782 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 98 | Kgs | 505 | 4949 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 18 | Pairs | 495 | 891 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 96 | Nos | 27 | 2592 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 14425 | 8655 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 19129 | 459096 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
27 | Kiosk Box | 1 | job | 49500 | 49500 | ||||||||||||
27 | Barbed Wire | 20 | Kgs | 429 | 858 | ||||||||||||
TOTAL | 45877295 | ||||||||||||||||
say | 45877295 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 45877295 | |||||||||||||||
B | Storage Charge 2 on A | 9175459 | |||||||||||||||
C | Total (A + B) | 467948409 | |||||||||||||||
D | Erection Charge 15 on C | 7019226135 | |||||||||||||||
E | Total (C + D) | 5381406704 | |||||||||||||||
F | Transportation Charge 5 on C | 2339742045 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 8072110055 | |||||||||||||||
H | Total (E + F + G) | 6422591914 | |||||||||||||||
I | Contingency Charge 3 on H | 1926777574 | |||||||||||||||
GRAND TOTAL | 6615269671 | ||||||||||||||||
Say | Rs | 6615269671 | |||||||||||||||
(Rupees six Lac sixty one thousand five hundred twenty seven )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at AMTALI under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AIRTEL | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 55146 | 55146 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) | 4 | Nos | 4325 | 17300 | ||||||||||||
2 | 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) | 14 | Nos | 3553 | 49742 | ||||||||||||
3 | Stay Set Complete | 12 | Sets | 58082 | 696984 | ||||||||||||
4 | Stay Insulator(11KV) | 12 | Nos | 20 | 240 | ||||||||||||
5 | Stay Wire (725mm) | 60 | Kgs | 5707 | 34242 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 137 | Kgs | 5473 | 749801 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 157 | Kgs | 5473 | 859261 | ||||||||||||
a) | 11 mtr long LT Bkt | 18 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 38 | Km | 2347653 | 89210814 | ||||||||||||
10 | 8 SWG GI Wire | 80 | Kgs | 4934 | 39472 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 201 | 2412 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 28769 | 345228 | ||||||||||||
13 | 11KV Pin Insulator | 12 | Nos | 4668 | 56016 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 12 | Nos | 561 | 6732 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 60 | Kgs | 505 | 3030 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 12 | Pairs | 495 | 594 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 68 | Nos | 27 | 1836 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 14425 | 8655 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 19129 | 459096 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
27 | Kiosk Box | 1 | job | 49500 | 49500 | ||||||||||||
28 | Shackle insulator | 56 | Nos | 1396 | 78176 | ||||||||||||
29 | Straps NampB(16x75) | 56 | pairs | 6871 | 384776 | ||||||||||||
27 | Barbed Wire | 20 | Kgs | 429 | 858 | ||||||||||||
TOTAL | 358760714 | ||||||||||||||||
say | 358760714 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 358760714 | |||||||||||||||
B | Storage Charge 2 on A | 717521428 | |||||||||||||||
C | Total (A + B) | 3659359283 | |||||||||||||||
D | Erection Charge 15 on C | 5489038924 | |||||||||||||||
E | Total (C + D) | 4208263175 | |||||||||||||||
F | Transportation Charge 5 on C | 1829679641 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 6312394763 | |||||||||||||||
H | Total (E + F + G) | 5022470616 | |||||||||||||||
I | Contingency Charge 3 on H | 1506741185 | |||||||||||||||
GRAND TOTAL | 5173144734 | ||||||||||||||||
Say | Rs | 5173144734 | |||||||||||||||
(Rupees Five Lac seventeen thousand three hundred fourteen )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at RAJCHANTAI under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AIRTEL | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 55146 | 55146 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=3 nos SP= 6Nos) | 12 | Nos | 4325 | 51900 | ||||||||||||
3 | Stay Set Complete | 8 | Sets | 58082 | 464656 | ||||||||||||
4 | Stay Insulator(11KV) | 8 | Nos | 20 | 160 | ||||||||||||
5 | Stay Wire (725mm) | 48 | Kgs | 5707 | 273936 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | Kgs | 5473 | 0 | |||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 2 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 2 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 6 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 6 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | Kgs | 5473 | 0 | |||||||||||||
a) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 6 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 27 | Km | 2347653 | 63386631 | ||||||||||||
10 | 8 SWG GI Wire | 60 | Kgs | 4934 | 29604 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 201 | 3618 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 28769 | 517842 | ||||||||||||
13 | 11KV Pin Insulator | 36 | Nos | 4668 | 168048 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 36 | Nos | 561 | 20196 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 48 | Kgs | 505 | 2424 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 8 | Pairs | 495 | 396 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 52 | Nos | 27 | 1404 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 14425 | 8655 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 19129 | 459096 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
27 | Kiosk Box | 1 | job | 49500 | 49500 | ||||||||||||
29 | Straps NampB(16x75) | 56 | pairs | 6871 | 384776 | ||||||||||||
27 | Barbed Wire | 20 | Kgs | 429 | 858 | ||||||||||||
TOTAL | 301010091 | ||||||||||||||||
say | 301010091 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 301010091 | |||||||||||||||
B | Storage Charge 2 on A | 602020182 | |||||||||||||||
C | Total (A + B) | 3070302928 | |||||||||||||||
D | Erection Charge 15 on C | 4605454392 | |||||||||||||||
E | Total (C + D) | 3530848367 | |||||||||||||||
F | Transportation Charge 5 on C | 1535151464 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 5296272551 | |||||||||||||||
H | Total (E + F + G) | 4213990769 | |||||||||||||||
I | Contingency Charge 3 on H | 1264197231 | |||||||||||||||
GRAND TOTAL | 4340410492 | ||||||||||||||||
Say | Rs | 4340410492 | |||||||||||||||
(Rupees four Lac thirtyfour thousand forty one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with AGMC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 2 | Nos | 3553 | 7106 | ||||||||||||
2 | Stay Set Complete | 1 | Sets | 70998 | 70998 | ||||||||||||
3 | Stay Insulator(11KV) | 1 | Nos | 12 | 12 | ||||||||||||
4 | Stay Wire (725mm) | 5 | Kgs | 8136 | 4068 | ||||||||||||
5 | Weasel ACSR (61259mm) | 7 | Km | 2016279 | 14113953 | ||||||||||||
7 | MS Nuts and Bolts of Assorted Size | 70 | Kgs | 505 | 3535 | ||||||||||||
8 | Stay Clamp by (50x6mm2) MS Flat | 1 | Pairs | 495 | 495 | ||||||||||||
11 | LT shackle insulator | 210 | Nos | 1396 | 29316 | ||||||||||||
13 | Straps with NB ( Prs) | 200 | Prs | 4586 | 9172 | ||||||||||||
TOTAL | 16506241 | ||||||||||||||||
say | 16506241 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 16506241 | |||||||||||||||
B | Storage Charge 2 on A | 33012482 | |||||||||||||||
C | Total (A + B) | 1683636582 | |||||||||||||||
D | Erection Charge 15 on C | 2525454873 | |||||||||||||||
E | Transportation Charge 3 on C | 82531205 | |||||||||||||||
F | Total (C + D+E) | 2018713274 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 1009356637 | |||||||||||||||
H | Total ( F + G ) | 2119648938 | |||||||||||||||
I | Overhead charge 10 on H | 2018713274 | |||||||||||||||
J | Contingency Charge 3 on H | 6358946814 | |||||||||||||||
L | GRAND TOTAL | 2385109734 | |||||||||||||||
Say | Rs | 238511 | |||||||||||||||
(Rupees three Lac seventy two thousand one hundred thirty seven )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with AMC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 1 | Nos | 3553 | 3553 | ||||||||||||
2 | Stay Set Complete | 1 | Sets | 58082 | 58082 | ||||||||||||
3 | Stay Insulator(11KV) | 1 | Nos | 20 | 20 | ||||||||||||
4 | Stay Wire (725mm) | 5 | Kgs | 5707 | 28535 | ||||||||||||
5 | Weasel ACSR (61259mm) | 001 | Km | 2347653 | 2347653 | ||||||||||||
7 | MS Nuts and Bolts of Assorted Size | 3 | Kgs | 505 | 1515 | ||||||||||||
8 | Stay Clamp by (50x6mm2) MS Flat | 1 | Pairs | 495 | 495 | ||||||||||||
11 | LT shackle insulator | 4 | Nos | 1125 | 45 | ||||||||||||
13 | Straps with NB ( 16x75) | 4 | Nos | 6871 | 27484 | ||||||||||||
TOTAL | 51947753 | ||||||||||||||||
say | 51947753 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 51947753 | |||||||||||||||
B | Storage Charge 2 on A | 103895506 | |||||||||||||||
C | Total (A + B) | 5298670806 | |||||||||||||||
D | Erection Charge 15 on C | 7948006209 | |||||||||||||||
E | Transportation Charge 3 on C | 259738765 | |||||||||||||||
F | Total (C + D+E) | 6353210192 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 3176605096 | |||||||||||||||
H | Total ( F + G ) | 6670870701 | |||||||||||||||
I | Overhead charge 10 on H | 6353210192 | |||||||||||||||
J | Contingency Charge 3 on H | 200126121 | |||||||||||||||
K | WCT6 on erection charge ie on D | 4768803725 | |||||||||||||||
L | GRAND TOTAL | 7554005879 | |||||||||||||||
Say | Rs | 7554005879 | |||||||||||||||
Service connection charge | Rs 1595 | ||||||||||||||||
GRAND TOTAL | Rs 755400 | ||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Stay Set Complete | 5 | Sets | 70998 | 35499 | ||||||||||||
2 | Stay Insulator(11KV) | 5 | Nos | 12 | 60 | ||||||||||||
3 | Stay Wire (725mm) | 25 | Kgs | 8136 | 2034 | ||||||||||||
4 | 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) | 232 | Kgs | 3927 | 911064 | ||||||||||||
5 | 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) | 119 | Kgs | 3927 | 467313 | ||||||||||||
6 | Weasel ACSR (61259mm) ( 6 wire 44 span) | 135 | Km | 2347653 | 316933155 | ||||||||||||
7 | 8 SWG GI Wire | 400 | Kgs | 4934 | 19736 | ||||||||||||
8 | LT Straps amp Bolts | 260 | Nos | 38 | 9880 | ||||||||||||
9 | Shackle Insulator | 280 | Nos | 11 | 3080 | ||||||||||||
10 | MS Nuts and Bolts of Assorted Size | 180 | Kgs | 505 | 9090 | ||||||||||||
11 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
TOTAL | 37718128 | ||||||||||||||||
say | 37718128 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 37718128 | |||||||||||||||
B | Storage Charge 2 on A | 75436256 | |||||||||||||||
C | Total (A + B) | 3847249056 | |||||||||||||||
D | Erection Charge 15 on C | 5770873584 | |||||||||||||||
E | Total (C + D) | 4424336414 | |||||||||||||||
F | Transportation Charge 5 on C | 1923624528 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 6636504622 | |||||||||||||||
H | Total (E + F + G) | 5280349329 | |||||||||||||||
I | Contingency Charge 3 on H | 1584104799 | |||||||||||||||
GRAND TOTAL | 5438759809 | ||||||||||||||||
Say | 543876 | ||||||||||||||||
(Rupees five lac Forty three thousand eight hundred seventy six )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Stay Set Complete | 5 | Sets | 58082 | 29041 | ||||||||||||
2 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
3 | Stay Wire (725mm) | 25 | Kgs | 5707 | 142675 | ||||||||||||
4 | 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) | 232 | Kgs | 3927 | 911064 | ||||||||||||
5 | 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) | 119 | Kgs | 3927 | 467313 | ||||||||||||
6 | Weasel ACSR (61259mm) ( 6 wire 44 span) | 135 | Km | 2347653 | 316933155 | ||||||||||||
7 | 8 SWG GI Wire | 400 | Kgs | 4934 | 19736 | ||||||||||||
8 | LT Straps amp Bolts | 260 | Nos | 38 | 9880 | ||||||||||||
9 | Shackle Insulator | 280 | Nos | 11 | 3080 | ||||||||||||
10 | MS Nuts and Bolts of Assorted Size | 180 | Kgs | 505 | 9090 | ||||||||||||
11 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
TOTAL | 37718128 | ||||||||||||||||
say | 37718128 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 37718128 | |||||||||||||||
B | Storage Charge 2 on A | 75436256 | |||||||||||||||
C | Total (A + B) | 3847249056 | |||||||||||||||
D | Erection Charge 15 on C | 5770873584 | |||||||||||||||
E | Total (C + D) | 4424336414 | |||||||||||||||
F | Transportation Charge 5 on C | 1923624528 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 6636504622 | |||||||||||||||
H | Total (E + F + G) | 5280349329 | |||||||||||||||
I | Contingency Charge 3 on H | 1584104799 | |||||||||||||||
GRAND TOTAL | 5438759809 | ||||||||||||||||
Say | 543876 | ||||||||||||||||
(Rupees five lac Forty three thousand eight hundred seventy six )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to the newly constructed building of college of veterinary sciences amp AH RK nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with Debashish Das | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 4 | Nos | 3553 | 14212 | ||||||||||||
2 | Stay Set Complete | 4 | Sets | 58082 | 232328 | ||||||||||||
3 | Stay Insulator(11KV) | 4 | Nos | 20 | 80 | ||||||||||||
4 | Stay Wire (725mm) | 16 | Kgs | 5707 | 91312 | ||||||||||||
5 | Weasel ACSR (61259mm) | 08 | Km | 2347653 | 18781224 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 505 | 12625 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 4 | Pairs | 495 | 198 | ||||||||||||
8 | LT shackle insulator | 20 | Nos | 1125 | 225 | ||||||||||||
9 | Straps with NB ( 16x75) | 20 | Nos | 6871 | 13742 | ||||||||||||
TOTAL | 39369324 | ||||||||||||||||
say | 39369324 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 39369324 | |||||||||||||||
B | Storage Charge 2 on A | 78738648 | |||||||||||||||
C | Total (A + B) | 4015671048 | |||||||||||||||
D | Erection Charge 15 on C | 6023506572 | |||||||||||||||
E | Transportation Charge 3 on C | 19684662 | |||||||||||||||
F | Total (C + D+E) | 4814868325 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 2407434163 | |||||||||||||||
H | Total ( F + G ) | 5055611741 | |||||||||||||||
I | Overhead charge 10 on H | 4814868325 | |||||||||||||||
J | Contingency Charge 3 on H | 1516683522 | |||||||||||||||
K | WCT6 on erection charge ie on D | 3614103943 | |||||||||||||||
L | GRAND TOTAL | 5724907966 | |||||||||||||||
Say | Rs | 5724907966 | |||||||||||||||
B) | Service connection charge | 1877 | |||||||||||||||
C) | Security | 900 | |||||||||||||||
Grand total (A+B+C) | 60026 | ||||||||||||||||
( Sixty thousand amp twenty six ) only | |||||||||||||||||
BILL | |||||||||||||||||
Name of work - | |||||||||||||||||
Supply Errection amp commissioning of Various capacity Sodium Vapour Lamp for lightining of 14 Goddess temple at Uttarchampura During Kharchi Puja 2013-2014 | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
A | 250 wattSodium vapour Lamp | ||||||||||||||||
1 | Ballast | 25 | Nos | 2450 | 61250 | ||||||||||||
2 | Lamp | 25 | Nos | 380 | 9500 | ||||||||||||
3 | capacitor | 25 | Nos | 288 | 7200 | ||||||||||||
4 | Indicator | 25 | Nos | 220 | 5500 | ||||||||||||
B | 70 Watt Sodium vapour lamp | 0 | |||||||||||||||
1 | Ballast | 11 | Nos | 1125 | 12375 | ||||||||||||
2 | Lamp | 11 | Nos | 280 | 3080 | ||||||||||||
3 | capacitor | 11 | Nos | 288 | 3168 | ||||||||||||
4 | Indicator | 11 | Nos | 220 | 2420 | ||||||||||||
C | 250 watt Metal | ||||||||||||||||
1 | Ballast | 5 | Nos | 2450 | 12250 | ||||||||||||
2 | Lamp | 5 | Nos | 930 | 4650 | ||||||||||||
3 | capacitor | 5 | Nos | 288 | 1440 | ||||||||||||
4 | Indicator | 5 | Nos | 220 | 1100 | ||||||||||||
D | Stand light 18 watt | 8 | Nos | 140 | 1120 | ||||||||||||
E | Decorating light | 10 | Nos | 120 | 1200 | ||||||||||||
TOTAL | 126253 | ||||||||||||||||
Vat 135 on Rs 12625300 | Rs1704400 | ||||||||||||||||
Contractor Profit 10 on Rs 12625300 | Rs1262500 | ||||||||||||||||
Grand Total | Rs 15592200 | ||||||||||||||||
( Rupees one lac fifty five thousand nine hundred twenty two) only | |||||||||||||||||
Quatation | |||||||||||||||||
Name of work - | |||||||||||||||||
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | ||||||||||||||||
I | Bracket | 85 | Nos | 3350 | 284750 | ||||||||||||
II | Ballast | 85 | Nos | 1600 | 136000 | ||||||||||||
III | Lamp | 85 | Nos | 400 | 34000 | ||||||||||||
2 | Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC | 0 | |||||||||||||||
I | 2x25 Sqmm | 425 | mtr | 24 | 10200 | ||||||||||||
II | 2x40 Sqmm | 425 | mtr | 34 | 14450 | ||||||||||||
3 | MS clamp | 170 | Nos | 80 | 13600 | ||||||||||||
4 | Nuts amp Bolts | 340 | Nos | 20 | 6800 | ||||||||||||
5 | GI pipe ( 65 mm dia) (25 M long) | 2125 | mtr | 420 | 89250 | ||||||||||||
^6 | Labour charge | 0 | mtr | 0 | 0 | ||||||||||||
I | Skilled labour | 255 | Nos | 300 | 7650 | ||||||||||||
II | Unskilled labour | 1275 | Nos | 240 | 3060 | ||||||||||||
TOTAL | 599760 | ||||||||||||||||
Contractor profit 10 on Rs 59976000 | 59976 | 59976 | |||||||||||||||
Grand Total | 659736 | ||||||||||||||||
( Rupees six lac fiftynine thousand seven hundred thirty six) only | |||||||||||||||||
Quatation | |||||||||||||||||
Name of work - | |||||||||||||||||
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | ||||||||||||||||
I | Bracket | 85 | Nos | 3450 | 293250 | ||||||||||||
II | Ballast | 85 | Nos | 1570 | 133450 | ||||||||||||
III | Lamp | 85 | Nos | 410 | 34850 | ||||||||||||
2 | Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC | 0 | |||||||||||||||
I | 2x25 Sqmm | 425 | mtr | 24 | 10200 | ||||||||||||
II | 2x40 Sqmm | 425 | mtr | 34 | 14450 | ||||||||||||
3 | MS clamp | 170 | Nos | 80 | 13600 | ||||||||||||
4 | Nuts amp Bolts | 340 | Nos | 20 | 6800 | ||||||||||||
5 | GI pipe ( 65 mm dia) (25 M long) | 2125 | mtr | 600 | 127500 | ||||||||||||
^6 | Labour charge | 0 | mtr | 0 | 0 | ||||||||||||
I | Skilled labour | 255 | Nos | 300 | 7650 | ||||||||||||
II | Unskilled labour | 1275 | Nos | 240 | 3060 | ||||||||||||
TOTAL | 644810 | ||||||||||||||||
Contractor profit 10 on Rs 6448100 | 64481 | ||||||||||||||||
Grand Total | 709291 | ||||||||||||||||
( Rupees seven lac nine thousand two hundred ninety one only | |||||||||||||||||
Quatation | |||||||||||||||||
Name of work - | |||||||||||||||||
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | ||||||||||||||||
I | Bracket | 85 | Nos | 4000 | 340000 | ||||||||||||
II | Ballast | 85 | Nos | 1500 | 127500 | ||||||||||||
III | Lamp | 85 | Nos | 410 | 34850 | ||||||||||||
2 | Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC | 0 | |||||||||||||||
I | 2x25 Sqmm | 425 | mtr | 24 | 10200 | ||||||||||||
II | 2x40 Sqmm | 425 | mtr | 34 | 14450 | ||||||||||||
3 | MS clamp | 170 | Nos | 80 | 13600 | ||||||||||||
4 | Nuts amp Bolts | 340 | Nos | 20 | 6800 | ||||||||||||
5 | GI pipe ( 65 mm dia) (25 M long) | 2125 | mtr | 540 | 114750 | ||||||||||||
^6 | Labour charge | 0 | mtr | 0 | 0 | ||||||||||||
I | Skilled labour | 255 | Nos | 400 | 10200 | ||||||||||||
II | Unskilled labour | 1275 | Nos | 300 | 3825 | ||||||||||||
TOTAL | 676175 | ||||||||||||||||
Contractor profit 10 on Rs 6761750 | 67617 | ||||||||||||||||
Grand Total | 743792 | ||||||||||||||||
( Rupees seven lac fortythree thousand seven hundred ninety two ) only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of 11 KV Dedicated Feeder line from Bodhjungnagar 132 KV Substation to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED for Providing of Service connection to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH CITY STAR AGRO INDUSTRIES PRIVATE LIMITED | |||||||||||||||||
A] COST OF MATERIALS - | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 Mtrlong ST Pole | 2 | Nos | 1358265 | 271653 | ||||||||||||
2 | 120 sq mm XLPE cable | 015 | Km | 572183 | 8582745 | ||||||||||||
3 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
4 | MS Channel(75x40x40x6mm4) | 245 | Kgs | 5473 | 1340885 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
e) | Top Bracket(28Mtr) | 3 | Nos | ||||||||||||||
5 | MS Angle(65x65x6mm3) | 33 | Kgs | 5473 | 180609 | ||||||||||||
c) | 11KV LA Bracket(28Mtr) | 2 | No | ||||||||||||||
6 | Weasel ACSR (61259mm) | 015 | Km | 2347653 | 35214795 | ||||||||||||
7 | 11KV Disc Insulator | 15 | Nos | 201 | 3015 | ||||||||||||
8 | 11KV Disc Fittings | 15 | Nos | 28769 | 431535 | ||||||||||||
9 | 11KV Pin Insulator | 12 | Nos | 4668 | 56016 | ||||||||||||
10 | GI Pin for 11KV Pin Insulator | 12 | Nos | 561 | 6732 | ||||||||||||
11 | 11KV GOS | 2 | Set | 806288 | 1612576 | ||||||||||||
12 | 11KV DOF | 2 | Set | 373613 | 747226 | ||||||||||||
13 | 11KV LA | 6 | Nos | 369 | 2214 | ||||||||||||
14 | MS Nuts and Bolts of Assorted Size | 15 | Kgs | 505 | 7575 | ||||||||||||
15 | Bracket Clamp by (50x6mm2) MS Flat | 24 | Nos | 27 | 648 | ||||||||||||
16 | Jointing Kit ( indoor type) | 2 | Nos | 9000 | 18000 | ||||||||||||
17 | Jointing Kit ( outdoor type) | 2 | Nos | 12000 | 24000 | ||||||||||||
18 | 11 KV Vacum circuit Breaker control amp relay panel simplex type 400 A continous current 250 MVA rupturring capacity complete with electrical closing mechanism with internal wiring 2 overcurrent amp 1 earth fault combine relay auxilury relays 3 ammeter 1- voltmeter CT operated static trivactor meter 1 CT operated static KWH meter of CTR 1001-1A with integral earthing facility and internal arc tested for out going feeders | 1 | Nos | 404000 | 404000 | ||||||||||||
TOTAL | 5913802595 | ||||||||||||||||
say | 5913802595 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 5913802595 | |||||||||||||||
B | Storage Charge 2 on A | 1182760519 | |||||||||||||||
C | Total (A + B) | 6032078647 | |||||||||||||||
D | Erection Charge 15 on C | 904811797 | |||||||||||||||
E | Total (C + D) | 6936890444 | |||||||||||||||
F | Transportation Charge 5 on C | 3016039323 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 1040533567 | |||||||||||||||
H | Total (E + F + G) | 8279027943 | |||||||||||||||
I | Contingency Charge 3 on H | 2483708383 | |||||||||||||||
GRAND TOTAL | 8527398781 | ||||||||||||||||
Say | Rs | 8527398781 | |||||||||||||||
(Rupees Eight Lac fifty two thousand seven hundred seventy forty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HTLT Line amp Construction of 25 KVA Substation for Providing of Service connectionin the PIG shed under under RKVY at RK Nagar catal farm under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH BDO JIRINIA | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 55146 | 55146 | ||||||||||||
2 | 11 Mtr PCC Pole ( DP=1 nos SP= 2 Nos) | 4 | Nos | 1358265 | 543306 | ||||||||||||
2 | 8Mtr PCC Pole | 10 | Nos | 3553 | 35530 | ||||||||||||
3 | Stay Set Complete | 8 | Sets | 70998 | 567984 | ||||||||||||
4 | Stay Insulator(11KV) | 8 | Nos | 20 | 160 | ||||||||||||
5 | Stay Wire (725mm) | 50 | Kgs | 8137 | 40685 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 137 | Kgs | 5473 | 749801 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 119 | Kgs | 5473 | 651287 | ||||||||||||
a) | 11 mtr long LT Bkt | 12 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 31 | Km | 2016279 | 62504649 | ||||||||||||
10 | 8 SWG GI Wire | 60 | Kgs | 6772 | 40632 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 34958 | 419496 | ||||||||||||
13 | 11KV Pin Insulator | 12 | Nos | 5292 | 63504 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 12 | Nos | 8248 | 98976 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 52 | Kgs | 6871 | 357292 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 8 | Pairs | 495 | 396 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 68 | Nos | 27 | 1836 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10911 | 600105 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 21906 | 131436 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 162 | 3888 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
27 | Shackle insulator | 52 | Nos | 1396 | 72592 | ||||||||||||
28 | Straps NampB(16x75) | 52 | pairs | 4586 | 238472 | ||||||||||||
29 | Barbed Wire | 20 | Kgs | 429 | 858 | ||||||||||||
TOTAL | 304414759 | ||||||||||||||||
say | 304414759 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 304414759 | |||||||||||||||
B | Storage Charge 2 on A | 608829518 | |||||||||||||||
C | Total (A + B) | 3105030542 | |||||||||||||||
D | Erection Charge 15 on C | 4657545813 | |||||||||||||||
E | Total (C + D) | 3570785123 | |||||||||||||||
F | Transportation Charge 5 on C | 1552515271 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 5356177685 | |||||||||||||||
H | Total (E + F + G) | 4261654419 | |||||||||||||||
I | Contingency Charge 3 on H | 1278496326 | |||||||||||||||
GRAND TOTAL | 4389504051 | ||||||||||||||||
Say | Rs | 4389504051 | |||||||||||||||
(Rupees four Lac thirty eight thousand nine hundred fifty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH Ratan debnath | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 469300 | 469300 | 0 | |||||||||||
2 | 9 Mtr PCC Pole | 6 | Nos | 4325 | 25950 | ||||||||||||
3 | Stay Set Complete | 8 | Sets | 70998 | 567984 | ||||||||||||
4 | Stay Insulator(11KV) | 8 | Nos | 20 | 160 | ||||||||||||
5 | Stay Wire (725mm) | 50 | Kgs | 8137 | 40685 | ||||||||||||
7 | MS Channel(75x40x40x6mm4) | 152 | Kgs | 5473 | 831896 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
g | DP Pole Guard X-Arm(22 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 66 | Kgs | 5473 | 361218 | ||||||||||||
a) | Single Pole Bottom X-Arm(15Mtr) | 2 | Nos | ||||||||||||||
b) | DP Pole Top X-Arm(25 Mtr) | 1 | Nos | ||||||||||||||
c) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
d) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 15 | Km | 2016279 | 30244185 | ||||||||||||
10 | 8 SWG GI Wire | 50 | Kgs | 6772 | 3386 | ||||||||||||
11 | 11KV Disc Insulator | 24 | Nos | 2406 | 57744 | ||||||||||||
12 | 11KV Disc Fittings | 24 | Nos | 34958 | 838992 | ||||||||||||
13 | 11KV Pin Insulator | 27 | Nos | 5292 | 142884 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 27 | Nos | 8248 | 222696 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 52 | Kgs | 6871 | 357292 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 8 | Pairs | 495 | 396 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 68 | Nos | 27 | 1836 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 240 sqmm PVC insulated Al Conductor | 120 | Mtr | 19295 | 23154 | ||||||||||||
23 | 300Amps Cutout | 6 | Nos | 5225 | 3135 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 240 sqmm Lugs | 24 | Nos | 215 | 5160 | ||||||||||||
26 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
TOTAL | 671383525 | ||||||||||||||||
say | 671383525 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 671383525 | |||||||||||||||
B | Storage Charge 2 on A | 134276705 | |||||||||||||||
C | Total (A + B) | 6848111955 | |||||||||||||||
D | Erection Charge 15 on C | 1027216793 | |||||||||||||||
E | Total (C + D) | 7875328748 | |||||||||||||||
F | Transportation Charge 5 on C | 3424055978 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 1181299312 | |||||||||||||||
H | Total (E + F + G) | 9399033658 | |||||||||||||||
I | Overhead charge 10 on H | 9399033658 | |||||||||||||||
J | Contingency Charge 3 on H | 2819710097 | |||||||||||||||
GRAND TOTAL | 1062090803 | ||||||||||||||||
Say | Rs | 1062091 | |||||||||||||||
(Rupees ten Lac sixty two thousand ninety one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH Ratan debnath | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 469300 | 469300 | ||||||||||||
2 | 9 Mtr PCC Pole | 5 | Nos | 4325 | 21625 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 70998 | 212994 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 8137 | 122055 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 0 | Kgs | 5473 | 0 | ||||||||||||
7 | MS Channel(75x40x40x6mm4) | 152 | Kgs | 5473 | 831896 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
g | DP Pole Guard X-Arm(22 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 66 | Kgs | 5473 | 361218 | ||||||||||||
a) | Single Pole Bottom X-Arm(15Mtr) | 2 | Nos | ||||||||||||||
b) | DP Pole Top X-Arm(25 Mtr) | 1 | Nos | ||||||||||||||
c) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
d) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 08 | Km | 2016279 | 16130232 | ||||||||||||
10 | 8 SWG GI Wire | 35 | Kgs | 6772 | 23702 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 34958 | 419496 | ||||||||||||
13 | 11KV Pin Insulator | 15 | Nos | 5292 | 7938 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 15 | Nos | 8248 | 12372 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 35 | Kgs | 6871 | 240485 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 27 | 1296 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 240 sqmm PVC insulated Al Conductor | 30 | Mtr | 19295 | 57885 | ||||||||||||
23 | 300Amps Cutout | 3 | Nos | 5225 | 15675 | ||||||||||||
24 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
25 | 240 sqmm Lugs | 12 | Nos | 215 | 2580 | ||||||||||||
26 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
TOTAL | 616537572 | ||||||||||||||||
say | 616537572 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 616537572 | |||||||||||||||
B | Storage Charge 2 on A | 1233075144 | |||||||||||||||
C | Total (A + B) | 6288683234 | |||||||||||||||
D | Erection Charge 15 on C | 9433024852 | |||||||||||||||
E | Total (C + D) | 723198572 | |||||||||||||||
F | Transportation Charge 5 on C | 3144341617 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 1084797858 | |||||||||||||||
H | Total (E + F + G) | 8631217739 | |||||||||||||||
I | Overhead charge 10 on H | 8631217739 | |||||||||||||||
j | Contingency Charge 3 on H | 2589365322 | |||||||||||||||
GRAND TOTAL | 8890154271 | ||||||||||||||||
Say | Rs | 8890154271 | |||||||||||||||
(Rupees four Lac thirty eight thousand nine hundred fifty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - Extension of LT line for providing Street light connerction at DUKLI INDUSTRIAL GROWTH CENTRE ( TIDC) | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9 Mtr PCC Pole | 4 | Nos | 4325 | 17300 | ||||||||||||
2 | 8Mtr PCC Pole | 20 | Nos | 3553 | 71060 | ||||||||||||
3 | Stay Set Complete | 14 | Sets | 850 | 11900 | ||||||||||||
4 | Stay Insulator(11KV) | 14 | Nos | 20 | 280 | ||||||||||||
5 | Stay Wire (725mm) | 70 | Kgs | 70 | 4900 | ||||||||||||
6 | 2 mtr long MS Angle(50x50x6mm3) ( 6Nos fo C Bkt) | 72 | Kgs | 70 | 5040 | ||||||||||||
7 | Bracket Clamp by (50x6mm2) MS Flat | 14 | Nos | 48 | 672 | ||||||||||||
8 | Weasel ACSR (61259mm) ( 6 wire 44 span) | 3 | Km | 2347653 | 7042959 | ||||||||||||
9 | 8 SWG GI Wire | 80 | Kgs | 75 | 6000 | ||||||||||||
10 | LT Straps amp Bolts | 50 | Nos | 38 | 1900 | ||||||||||||
11 | Shackle Insulator | 150 | Nos | 11 | 1650 | ||||||||||||
12 | MS Nuts and Bolts of Assorted Size | 320 | Kgs | 75 | 24000 | ||||||||||||
13 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 2500 | 7500 | ||||||||||||
14 | 35 sqmm PVC insulated Al Conductor | 55 | Mtr | 58 | 3190 | ||||||||||||
15 | Stay Clamp by (50x6mm2) MS Flat | 14 | Pairs | 495 | 693 | ||||||||||||
16 | Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | ||||||||||||||||
I | Bracket | 50 | Nos | 4000 | 200000 | ||||||||||||
II | Ballast | 50 | Nos | 1500 | 75000 | ||||||||||||
III | Lamp | 50 | Nos | 410 | 20500 | ||||||||||||
17 | Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC | 0 | |||||||||||||||
I | 2x25 Sqmm | 210 | mtr | 24 | 5040 | ||||||||||||
II | 2x40 Sqmm | 210 | mtr | 34 | 7140 | ||||||||||||
18 | MS clamp | 200 | Nos | 80 | 16000 | ||||||||||||
19 | GI pipe ( 65 mm dia) (25 M long) | 105 | mtr | 540 | 56700 | ||||||||||||
20 | Labour charge | 0 | mtr | 0 | 0 | ||||||||||||
I | Skilled labour | 13 | Nos | 400 | 5200 | ||||||||||||
II | Unskilled labour | 7 | Nos | 300 | 2100 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 2500 | 7500 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 55 | Mtr | 58 | 3190 | ||||||||||||
23 | Stay Clamp by (50x6mm2) MS Flat | 14 | Pairs | 495 | 693 | ||||||||||||
TOTAL | 62557759 | ||||||||||||||||
say | 62557759 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 62557759 | |||||||||||||||
B | Storage Charge 2 on A | 125115518 | |||||||||||||||
C | Total (A + B) | 6380891418 | |||||||||||||||
D | Erection Charge 15 on C | 9571337127 | |||||||||||||||
E | Total (C + D) | 7338025131 | |||||||||||||||
F | Transportation Charge 5 on C | 3190445709 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 110070377 | |||||||||||||||
H | Total (E + F + G) | 8757773471 | |||||||||||||||
I | Contingency Charge 3 on H | 2627332041 | |||||||||||||||
GRAND TOTAL | 9020506675 | ||||||||||||||||
Say | 902051 | ||||||||||||||||
( Rupees nine lac two thousand amp fifty one ) only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required | ||||||||||||||||
I | Bracket | 50 | Nos | 4000 | 200000 | ||||||||||||
II | Ballast | 50 | Nos | 1500 | 75000 | ||||||||||||
III | Lamp | 50 | Nos | 410 | 20500 | ||||||||||||
2 | Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC | 0 | |||||||||||||||
I | 2x25 Sqmm | 210 | mtr | 24 | 5040 | ||||||||||||
II | 2x40 Sqmm | 210 | mtr | 34 | 7140 | ||||||||||||
3 | MS clamp | 200 | Nos | 80 | 16000 | ||||||||||||
4 | Nuts amp Bolts | 200 | Nos | 20 | 4000 | ||||||||||||
5 | GI pipe ( 65 mm dia) (25 M long) | 105 | mtr | 540 | 56700 | ||||||||||||
^6 | Labour charge | 0 | mtr | 0 | 0 | ||||||||||||
I | Skilled labour | 13 | Nos | 400 | 5200 | ||||||||||||
II | Unskilled labour | 7 | Nos | 300 | 2100 | ||||||||||||
TOTAL | 391680 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 391680 | |||||||||||||||
B | Storage Charge 2 on A | 78336 | |||||||||||||||
C | Total (A + B) | 3995136 | |||||||||||||||
D | Erection Charge 15 on C | 5992704 | |||||||||||||||
E | Total (C + D) | 45944064 | |||||||||||||||
F | Transportation Charge 5 on C | 1997568 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 68916096 | |||||||||||||||
H | Total (E + F + G) | 548332416 | |||||||||||||||
I | Contingency Charge 3 on H | 1644997248 | |||||||||||||||
GRAND TOTAL | 5647823885 | ||||||||||||||||
Say | 551084 | ||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 55146 | 55146 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) | 3 | Nos | 4325 | 12975 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 58082 | 174246 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 5707 | 85605 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 124 | Kgs | 5473 | 678652 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 1 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 32 | Kgs | 5473 | 175136 | ||||||||||||
a) | 11 mtr long LT Bkt | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 1 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 08 | Km | 2347653 | 18781224 | ||||||||||||
10 | 8 SWG GI Wire | 25 | Kgs | 4934 | 12335 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 201 | 2412 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 28769 | 345228 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 4668 | 42012 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 561 | 5049 | ||||||||||||
15 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
16 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 30 | Kgs | 505 | 1515 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 27 | 1296 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 14425 | 8655 | ||||||||||||
24 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 19129 | 459096 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
28 | Shackle insulator | 8 | Nos | 1396 | 11168 | ||||||||||||
29 | Straps NampB(16x75) | 8 | pairs | 6871 | 54968 | ||||||||||||
27 | Barbed Wire | 15 | Kgs | 429 | 6435 | ||||||||||||
TOTAL | 159200654 | ||||||||||||||||
say | 159200654 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 159200654 | |||||||||||||||
B | Storage Charge 2 on A | 318401308 | |||||||||||||||
C | Total (A + B) | 1623846671 | |||||||||||||||
D | Erection Charge 15 on C | 2435770006 | |||||||||||||||
E | Total (C + D) | 1867423671 | |||||||||||||||
F | Transportation Charge 5 on C | 8119233354 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 2801135507 | |||||||||||||||
H | Total (E + F + G) | 2228729556 | |||||||||||||||
I | Contingency Charge 3 on H | 6686188667 | |||||||||||||||
GRAND TOTAL | 2295591442 | ||||||||||||||||
Say | Rs | 2295591442 | |||||||||||||||
(Rupees Two Lac Twenty nine thousand five hundred fiftynine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to FOOD TESTING LABORATORY at TIDC under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 5 | Nos | 3553 | 17765 | ||||||||||||
2 | Stay Set Complete | 4 | Sets | 58082 | 232328 | ||||||||||||
3 | Stay Insulator(11KV) | 4 | Nos | 20 | 80 | ||||||||||||
4 | Stay Wire (725mm) | 16 | Kgs | 5707 | 91312 | ||||||||||||
5 | Weasel ACSR (61259mm) | 1 | Km | 2347653 | 2347653 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 505 | 12625 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 4 | Pairs | 495 | 198 | ||||||||||||
8 | LT shackle insulator | 24 | Nos | 1125 | 270 | ||||||||||||
9 | Straps with NB ( 16x75) | 24 | Nos | 6871 | 164904 | ||||||||||||
TOTAL | 4793747 | ||||||||||||||||
say | 4793747 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 4793747 | |||||||||||||||
B | Storage Charge 2 on A | 9587494 | |||||||||||||||
C | Total (A + B) | 488962194 | |||||||||||||||
D | Erection Charge 15 on C | 733443291 | |||||||||||||||
E | Transportation Charge 3 on C | 23968735 | |||||||||||||||
F | Total (C + D+E) | 5862752581 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 2931376291 | |||||||||||||||
H | Total ( F + G ) | 615589021 | |||||||||||||||
I | Overhead charge 10 on H | 5862752581 | |||||||||||||||
J | Contingency Charge 3 on H | 1846767063 | |||||||||||||||
K | WCT6 on erection charge ie on D | 4400659746 | |||||||||||||||
L | GRAND TOTAL | 6970848772 | |||||||||||||||
Say | Rs | 6970848772 | |||||||||||||||
( Sixty nine thousand seven hundred eight ) only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to LALIT FLOUR MILL at TIDC under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with LALIT FLOUR MILL | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 2 | Nos | 3553 | 7106 | ||||||||||||
2 | Stay Set Complete | 1 | Sets | 58082 | 58082 | ||||||||||||
3 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
4 | Stay Wire (725mm) | 35 | Kgs | 5707 | 199745 | ||||||||||||
5 | Weasel ACSR (61259mm) | 02 | Km | 2347653 | 4695306 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 505 | 12625 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
8 | LT shackle insulator | 6 | Nos | 1125 | 675 | ||||||||||||
6 | 2 mtr long MS Angle(50x50x6mm3) ( 6Nos ) | 0 | Kgs | 70 | 0 | ||||||||||||
9 | Straps with NB ( 16x75) | 6 | Nos | 6871 | 41226 | ||||||||||||
TOTAL | 16260836 | ||||||||||||||||
say | 16260836 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 16260836 | |||||||||||||||
B | Storage Charge 2 on A | 32521672 | |||||||||||||||
C | Total (A + B) | 1658605272 | |||||||||||||||
D | Erection Charge 15 on C | 2487907908 | |||||||||||||||
E | Transportation Charge 3 on C | 8130418 | |||||||||||||||
F | Total (C + D+E) | 1988700243 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 9943501214 | |||||||||||||||
H | Total ( F + G ) | 2088135255 | |||||||||||||||
I | Overhead charge 10 on H | ||||||||||||||||
J | Contingency Charge 3 on H | 6264405765 | |||||||||||||||
K | WCT6 on erection charge ie on D | 1492744745 | |||||||||||||||
L | GRAND TOTAL | 216570676 | |||||||||||||||
Say | Rs | 216570676 | |||||||||||||||
( Sixty thousand four hundred ) only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line for Providing of Service connection to Ramkrishna Rubber industry at RUBBER PARK under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9 Mtr PCC Pole | 28 | Nos | 4325 | 121100 | ||||||||||||
2 | Stay Set Complete | 16 | Sets | 70998 | 1135968 | ||||||||||||
3 | Stay Insulator(11KV) | 16 | Nos | 20 | 320 | ||||||||||||
4 | Stay Wire (725mm) | 80 | Kgs | 8137 | 65096 | ||||||||||||
5 | MS Channel(75x40x40x6mm4) | 448 | Kgs | 5473 | 2451904 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 12 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 12 | Nos | ||||||||||||||
g | DP Pole top X-Arm(17 Mtr) | 8 | Nos | ||||||||||||||
g | DP Pole Bottom X-Arm(22 Mtr) | 8 | Nos | ||||||||||||||
6 | MS Angle(65x65x6mm3) | 225 | Kgs | 5473 | 1231425 | ||||||||||||
a) | Single Pole Bottom X-Arm(15Mtr) | 12 | Nos | ||||||||||||||
c) | Double Pole Guard X-Arm for Substation(3Mtr) | 6 | No | ||||||||||||||
d) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
7 | Weasel ACSR (61259mm) | 46 | Km | 2016279 | 92748834 | ||||||||||||
8 | 8 SWG GI Wire | 240 | Kgs | 6772 | 162528 | ||||||||||||
9 | 11KV Disc Insulator | 62 | Nos | 2406 | 149172 | ||||||||||||
10 | 11KV Disc Fittings | 62 | Nos | 34958 | 2167396 | ||||||||||||
11 | 11KV Pin Insulator | 72 | Nos | 5292 | 381024 | ||||||||||||
12 | GI Pin for 11KV Pin Insulator | 72 | Nos | 8248 | 593856 | ||||||||||||
13 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
14 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
15 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
16 | MS Nuts and Bolts of Assorted Size | 140 | Kgs | 6871 | 96194 | ||||||||||||
17 | Stay Clamp by (50x6mm2) MS Flat | 16 | Pairs | 495 | 792 | ||||||||||||
18 | Bracket Clamp by (50x6mm2) MS Flat | 110 | Nos | 27 | 2970 | ||||||||||||
19 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
20 | 11 Kv Danger Plate | 20 | Nos | 55 | 1100 | ||||||||||||
TOTAL | 357488314 | ||||||||||||||||
say | 357488314 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 357488314 | |||||||||||||||
B | Storage Charge 2 on A | 714976628 | |||||||||||||||
C | Total (A + B) | 3646380803 | |||||||||||||||
D | Erection Charge 15 on C | 5469571204 | |||||||||||||||
E | Total (C + D) | 4193337923 | |||||||||||||||
F | Transportation Charge 5 on C | 1823190401 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 6290006885 | |||||||||||||||
H | Total (E + F + G) | 5004657652 | |||||||||||||||
I | Overhead charge 10 on H | 5004657652 | |||||||||||||||
J | Contingency Charge 3 on H | 1501397296 | |||||||||||||||
GRAND TOTAL | 5655263147 | ||||||||||||||||
Say | Rs | 565526 | |||||||||||||||
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos ) | 2 | Nos | 4325 | 8650 | ||||||||||||
2 | ACSR (61259 | 04 | Km | 2016279 | 8065116 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 58082 | 174246 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 5707 | 85605 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 224 | Kgs | 3977 | 890848 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 17 | Kgs | 3927 | 66759 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
8 | 11KV Disc Insulator | 3 | Nos | 201 | 603 | ||||||||||||
9 | 11KV Disc Fittings | 3 | Nos | 28769 | 86307 | ||||||||||||
10 | 11KV Pin Insulator | 3 | Nos | 4668 | 14004 | ||||||||||||
11 | GI Pin for 11KV Pin Insulator | 3 | Nos | 561 | 1683 | ||||||||||||
12 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
13 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
14 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
15 | MS Nuts and Bolts of Assorted Size | 10 | Kgs | 505 | 505 | ||||||||||||
16 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
17 | Bracket Clamp by (50x6mm2) MS Flat | 32 | Nos | 27 | 864 | ||||||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
19 | 240 sqmm PVC insulated Al Conductor | 60 | Mtr | 19295 | 11577 | ||||||||||||
20 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
21 | 11 Kv Danger Plate | 4 | Nos | 55 | 220 | ||||||||||||
22 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
22 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 4 | Nos | 12531 | 50124 | ||||||||||||
24 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 80 | Mtr | 2200 | 176000 | ||||||||||||
24 | 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 50 | Mtr | 1500 | 75000 | ||||||||||||
24 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
TOTAL | 423354736 | ||||||||||||||||
say | 423355 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 423355 | |||||||||||||||
B | Storage Charge 2 on A | 84671 | |||||||||||||||
C | Total (A + B) | 4318221 | |||||||||||||||
D | Erection Charge 15 on C | 64773315 | |||||||||||||||
E | Total (C + D) | 496595415 | |||||||||||||||
F | Transportation Charge 5 on C | 21591105 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 7448931225 | |||||||||||||||
H | Total (E + F + G) | 5926758323 | |||||||||||||||
I | Overhead charge 10 on H | 5926758323 | |||||||||||||||
j | Contingency Charge 3 on H | 1778027497 | |||||||||||||||
GRAND TOTAL | 6697236904 | ||||||||||||||||
Say | Rs | 669724 | |||||||||||||||
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 500 KVA Base monted Substation for Providing of new Service connection to Ramkrishna Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos ) | 5 | Nos | 4325 | 21625 | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos ) | 5 | Nos | 4325 | 21625 | ||||||||||||
2 | ACSR (61259 | 1 | Km | 2016279 | 2016279 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 58082 | 29041 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 5707 | 142675 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 224 | Kgs | 3977 | 890848 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 17 | Kgs | 3927 | 66759 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
8 | 11KV Disc Insulator | 6 | Nos | 201 | 1206 | ||||||||||||
9 | 11KV Disc Fittings | 6 | Nos | 28769 | 172614 | ||||||||||||
10 | 11KV Pin Insulator | 9 | Nos | 4668 | 42012 | ||||||||||||
11 | GI Pin for 11KV Pin Insulator | 9 | Nos | 561 | 5049 | ||||||||||||
12 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
13 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
14 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
15 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 505 | 12625 | ||||||||||||
16 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
17 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 27 | 1296 | ||||||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
19 | 240 sqmm PVC insulated Al Conductor | 60 | Mtr | 19295 | 11577 | ||||||||||||
20 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
21 | 11 Kv Danger Plate | 4 | Nos | 55 | 220 | ||||||||||||
22 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
24 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
TOTAL | 152447 | ||||||||||||||||
say | 152447 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 152447 | |||||||||||||||
B | Storage Charge 2 on A | 304894 | |||||||||||||||
C | Total (A + B) | 15549594 | |||||||||||||||
D | Erection Charge 15 on C | 23324391 | |||||||||||||||
E | Total (C + D) | 178820331 | |||||||||||||||
F | Transportation Charge 5 on C | 7774797 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 2682304965 | |||||||||||||||
H | Total (E + F + G) | 2134181777 | |||||||||||||||
I | Overhead charge 10 on H | 2134181777 | |||||||||||||||
j | Contingency Charge 3 on H | 640254533 | |||||||||||||||
GRAND TOTAL | 2411625407 | ||||||||||||||||
Say | 241163 | ||||||||||||||||
(Rupees two Lac forty one thousand one hundred sixty three )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 500 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 469300 | 469300 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 2 | Sets | 58082 | 116164 | ||||||||||||
4 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
5 | Stay Wire (725mm) | 10 | Kgs | 5707 | 5707 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 124 | Kgs | 5473 | 678652 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 1 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 1 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 32 | Kgs | 5473 | 175136 | ||||||||||||
a) | 11 mtr long LT Bkt | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 1 | No | ||||||||||||||
8 | Weasel ACSR (61259mm) | 05 | Km | 2347653 | 11738265 | ||||||||||||
9 | 8 SWG GI Wire | 20 | Kgs | 4934 | 9868 | ||||||||||||
10 | 11KV Disc Insulator | 9 | Nos | 201 | 1809 | ||||||||||||
11 | 11KV Disc Fittings | 9 | Nos | 28769 | 258921 | ||||||||||||
12 | 11KV Pin Insulator | 9 | Nos | 4668 | 42012 | ||||||||||||
13 | GI Pin for 11KV Pin Insulator | 9 | Nos | 561 | 5049 | ||||||||||||
14 | 11KV GOS | 1 | Set | 806288 | 806288 | ||||||||||||
15 | 11KV DOF | 1 | Set | 373613 | 373613 | ||||||||||||
16 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
17 | MS Nuts and Bolts of Assorted Size | 30 | Kgs | 505 | 1515 | ||||||||||||
18 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
19 | Bracket Clamp by (50x6mm2) MS Flat | 38 | Nos | 48 | 1824 | ||||||||||||
20 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
21 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
22 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
23 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
24 | 240 sqmm Lugs | 24 | Nos | 215 | 5160 | ||||||||||||
25 | Transformer Base | 1 | Job | 89500 | 89500 | ||||||||||||
26 | Kiosk Box | 1 | Nos | 49500 | 49500 | ||||||||||||
27 | Barbed Wire | 15 | Kgs | 429 | 6435 | ||||||||||||
TOTAL | 684227175 | ||||||||||||||||
say | 684227175 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 684227175 | |||||||||||||||
B | Storage Charge 2 on A | 136845435 | |||||||||||||||
C | Total (A + B) | 6979117185 | |||||||||||||||
D | Erection Charge 15 on C | 1046867578 | |||||||||||||||
E | Total (C + D) | 8025984763 | |||||||||||||||
F | Transportation Charge 5 on C | 3489558593 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 1203897714 | |||||||||||||||
H | Total (E + F + G) | 9578838336 | |||||||||||||||
I | Contingency Charge 3 on H | 2873651501 | |||||||||||||||
GRAND TOTAL | 9866203487 | ||||||||||||||||
Say | Rs | 9866203487 | |||||||||||||||
(Rupees Nine Lac Eighty six thousand Six hundred Twenty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Line for providing of SC to Soma Paul at TIDC under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with Soma paul | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 mtr long steel Pole | 2 | Nos | 1358265 | 271653 | ||||||||||||
2 | 8Mtr PCC Pole | 1 | Nos | 3553 | 3553 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 58082 | 174246 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 5707 | 85605 | ||||||||||||
6 | Weasel ACSR (61259mm) | 32 | Km | 2347653 | 75124896 | ||||||||||||
7 | 8 SWG Gi wire | 50 | Kgs | 65 | 3250 | ||||||||||||
7 | MS Nuts and Bolts of Assorted Size | 30 | Kgs | 505 | 1515 | ||||||||||||
8 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
9 | LT shackle insulator | 56 | Nos | 1125 | 630 | ||||||||||||
10 | 2 mtr long MS Angle(50x50x6mm3) (16Nos ) | 144 | Kgs | 70 | 10080 | ||||||||||||
11 | Straps with NB ( 16x75) | 56 | Nos | 6871 | 384776 | ||||||||||||
TOTAL | 100758166 | ||||||||||||||||
say | 100758166 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 100758166 | |||||||||||||||
B | Storage Charge 2 on A | 201516332 | |||||||||||||||
C | Total (A + B) | 1027733293 | |||||||||||||||
D | Erection Charge 15 on C | 154159994 | |||||||||||||||
E | Transportation Charge 3 on C | 50379083 | |||||||||||||||
F | Total (C + D+E) | 123227237 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 6161361851 | |||||||||||||||
H | Total ( F + G ) | 1293885989 | |||||||||||||||
I | Overhead charge 10 on H | 123227237 | |||||||||||||||
J | Contingency Charge 3 on H | 3881657966 | |||||||||||||||
K | WCT6 on erection charge ie on D | 9249599639 | |||||||||||||||
L | GRAND TOTAL | 1465179405 | |||||||||||||||
Say | Rs | 1465179405 | |||||||||||||||
( Rupees one lac forty six thousand five hundred eighteen ) only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 2x63 KVA Substation for Providing of Street light connection at Growth centre At Bodhjungnagar Growth centre under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 2 | Nos | 1032833 | 1032833 | ||||||||||||
2 | 9Mtr PCC Pole | 11 | Nos | 4325 | 47575 | ||||||||||||
2 | 8Mtr PCC Pole | 6 | Nos | 3553 | 21318 | ||||||||||||
3 | Stay Set Complete | 12 | Sets | 70998 | 851976 | ||||||||||||
4 | Stay Insulator(11KV) | 12 | Nos | 20 | 240 | ||||||||||||
5 | Stay Wire (725mm) | 60 | Kgs | 8136 | 48816 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 184 | Kgs | 5473 | 1007032 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 338 | Kgs | 5473 | 1849874 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 5 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 5 | Nos | ||||||||||||||
g | DP Pole top X-Arm(17 Mtr) | 2 | Nos | ||||||||||||||
h | DP Pole Bottom X-Arm(22 Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 223 | Kgs | 5473 | 1220479 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 2 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 2 | No | ||||||||||||||
c) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
c) | DP Pole Guard X-Arm (25Mtr) | 2 | No | ||||||||||||||
d) | 11 mtr long 4 wire bkt | 12 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 45 | Km | 2016279 | 90732555 | ||||||||||||
10 | 8 SWG GI Wire | 128 | Kgs | 6773 | 866944 | ||||||||||||
11 | 11KV Disc Insulator | 42 | Nos | 2406 | 101052 | ||||||||||||
12 | 11KV Disc Fittings | 42 | Nos | 34958 | 1468236 | ||||||||||||
13 | 11KV Pin Insulator | 36 | Nos | 5293 | 190548 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 36 | Nos | 8243 | 296748 | ||||||||||||
15 | 11KV GOS | 2 | Set | 7899 | 15798 | ||||||||||||
16 | 11KV DOF | 2 | Set | 5221 | 10442 | ||||||||||||
17 | 11KV LA | 6 | Nos | 369 | 2214 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 98 | Kgs | 6871 | 673358 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 12 | Pairs | 495 | 594 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 86 | Nos | 56 | 4816 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 110 | Mtr | 10495 | 115445 | ||||||||||||
23 | 200Amps Cutout | 12 | Nos | 27885 | 33462 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 48 | Nos | 1913 | 91824 | ||||||||||||
26 | LT shackle insulator | 56 | Nos | 1125 | 630 | ||||||||||||
27 | Straps with NB | 56 | Nos | 3683 | 206248 | ||||||||||||
29 | Kiosk Box | 2 | Job | 49500 | 99000 | ||||||||||||
30 | Barber wire | 20 | Kgs | 60 | 1200 | ||||||||||||
TOTAL | 53350719 | ||||||||||||||||
say | 53350719 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 53350719 | |||||||||||||||
B | Storage Charge 2 on A | 106701438 | |||||||||||||||
C | Total (A + B) | 5441773338 | |||||||||||||||
D | Erection Charge 15 on C | 8162660007 | |||||||||||||||
E | Transportation Charge 3 on C | 266753595 | |||||||||||||||
F | Total (C + D+E) | 6524792934 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 9787189401 | |||||||||||||||
H | Total ( F + G ) | 7503511874 | |||||||||||||||
I | Overhead charge 10 on H | 6524792934 | |||||||||||||||
J | Contingency Charge 3 on H | 2251053562 | |||||||||||||||
K | WCT6 on erection charge ie on D | 4897596004 | |||||||||||||||
L | GRAND TOTAL | 8430072483 | |||||||||||||||
Say | Rs | 843007 | |||||||||||||||
(Rupees Eight Lac Forty three thousand amp seven )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x63 KVA Substation for Providing Service connection DWS Pump at Newly constructed Vetenairy college at RK Nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work DWS DIVISION-II Agartala | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 1032833 | 1032833 | ||||||||||||
2 | 9Mtr PCC Pole | 4 | Nos | 4325 | 17300 | ||||||||||||
2 | 8Mtr PCC Pole | 12 | Nos | 3553 | 42636 | ||||||||||||
3 | Stay Set Complete | 12 | Sets | 70998 | 851976 | ||||||||||||
4 | Stay Insulator(11KV) | 12 | Nos | 20 | 240 | ||||||||||||
5 | Stay Wire (725mm) | 60 | Kgs | 8136 | 48816 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 338 | Kgs | 5473 | 1849874 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 1 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 1 | Nos | ||||||||||||||
g | DP Pole top X-Arm(17 Mtr) | 1 | Nos | ||||||||||||||
h | DP Pole Bottom X-Arm(22 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 223 | Kgs | 5473 | 1220479 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | SinglePole Guard X-Arm (15Mtr) | 1 | No | ||||||||||||||
c) | DP Pole Guard X-Arm (25Mtr) | 1 | No | ||||||||||||||
d) | 11 mtr long 4 wire bkt | 12 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 45 | Km | 2016279 | 90732555 | ||||||||||||
10 | 8 SWG GI Wire | 128 | Kgs | 6773 | 866944 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 2406 | 43308 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 34958 | 629244 | ||||||||||||
13 | 11KV Pin Insulator | 15 | Nos | 5293 | 79395 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 15 | Nos | 8243 | 123645 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 98 | Kgs | 6871 | 673358 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 12 | Pairs | 495 | 594 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 56 | Nos | 56 | 3136 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 200Amps Cutout | 3 | Nos | 27885 | 83655 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 1913 | 45912 | ||||||||||||
26 | LT shackle insulator | 88 | Nos | 1125 | 990 | ||||||||||||
27 | Straps with NB | 88 | Nos | 3683 | 324104 | ||||||||||||
30 | Barber wire | 10 | Kgs | 60 | 600 | ||||||||||||
TOTAL | 37085161 | ||||||||||||||||
say | 37085161 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 37085161 | |||||||||||||||
B | Storage Charge 2 on A | 74170322 | |||||||||||||||
C | Total (A + B) | 3782686422 | |||||||||||||||
D | Erection Charge 15 on C | 5674029633 | |||||||||||||||
E | Transportation Charge 3 on C | 185425805 | |||||||||||||||
F | Total (C + D+E) | 453551519 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 6803272785 | |||||||||||||||
H | Total ( F + G ) | 5215842469 | |||||||||||||||
I | Overhead charge 10 on H | 453551519 | |||||||||||||||
J | Contingency Charge 3 on H | 1564752741 | |||||||||||||||
K | WCT6 on erection charge ie on D | 340441778 | |||||||||||||||
L | GRAND TOTAL | 585991344 | |||||||||||||||
Say | Rs | 585991 | |||||||||||||||
(Rupees five Lac Eighty five thousand Nine hundred ninety one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of 08 km HT 15 km LT Line amp Construction of 2x 25 KVA Substation for providing of Service connection to Unhabited electrified area at Das para amp sarat pally under R K Nagar Grampanchyat under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with BDO Jirinia RD Block | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 2 | Nos | 55146 | 110292 | ||||||||||||
2 | 9Mtr PCC Pole | 16 | Nos | 4325 | 69200 | ||||||||||||
2 | 8Mtr PCC Pole | 24 | Nos | 3553 | 85272 | ||||||||||||
3 | Stay Set Complete | 12 | Sets | 70998 | 851976 | ||||||||||||
4 | Stay Insulator(11KV) | 12 | Nos | 20 | 240 | ||||||||||||
5 | Stay Wire (725mm) | 60 | Kgs | 8136 | 48816 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 184 | Kgs | 5473 | 1007032 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 429 | Kgs | 5473 | 2347917 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 8 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 8 | Nos | ||||||||||||||
g | DP Pole top X-Arm(17 Mtr) | 4 | Nos | ||||||||||||||
h | DP Pole Bottom X-Arm(22 Mtr) | 4 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 237 | Kgs | 5473 | 1297101 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 2 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 2 | No | ||||||||||||||
c) | SinglePole Guard X-Arm (15Mtr) | 8 | No | ||||||||||||||
c) | DP Pole Guard X-Arm (25Mtr) | 4 | No | ||||||||||||||
d) | 11 mtr long 4 wire bkt | 12 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 84 | Km | 2016279 | 169367436 | ||||||||||||
10 | 8 SWG GI Wire | 128 | Kgs | 6773 | 866944 | ||||||||||||
11 | 11KV Disc Insulator | 52 | Nos | 2406 | 125112 | ||||||||||||
12 | 11KV Disc Fittings | 52 | Nos | 34958 | 1817816 | ||||||||||||
13 | 11KV Pin Insulator | 48 | Nos | 5293 | 254064 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 48 | Nos | 8243 | 395664 | ||||||||||||
15 | 11KV GOS | 2 | Set | 7899 | 15798 | ||||||||||||
16 | 11KV DOF | 2 | Set | 5221 | 10442 | ||||||||||||
17 | 11KV LA | 6 | Nos | 369 | 2214 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 176 | Kgs | 6871 | 1209296 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 12 | Pairs | 495 | 594 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 56 | Nos | 56 | 3136 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 200Amps Cutout | 6 | Nos | 27885 | 16731 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 1913 | 45912 | ||||||||||||
26 | LT shackle insulator | 96 | Nos | 1125 | 1080 | ||||||||||||
27 | Straps with NB | 96 | Nos | 3683 | 353568 | ||||||||||||
30 | Barber wire | 10 | Kgs | 60 | 600 | ||||||||||||
TOTAL | 61196857 | ||||||||||||||||
say | 61196857 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 61196857 | |||||||||||||||
B | Storage Charge 2 on A | 122393714 | |||||||||||||||
C | Total (A + B) | 6242079414 | |||||||||||||||
D | Erection Charge 15 on C | 9363119121 | |||||||||||||||
E | Transportation Charge 3 on C | 305984285 | |||||||||||||||
F | Total (C + D+E) | 7484375611 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 1122656342 | |||||||||||||||
H | Total ( F + G ) | 8607031953 | |||||||||||||||
I | Overhead charge 10 on H | 7484375611 | |||||||||||||||
J | Contingency Charge 3 on H | 2582109586 | |||||||||||||||
K | WCT6 on erection charge ie on D | 5617871473 | |||||||||||||||
L | GRAND TOTAL | 9669859187 | |||||||||||||||
Say | Rs | 966986 | |||||||||||||||
(Rupees Nine Lac sixty six nine hundred eighty six )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of 08 km HT amp 15 KM LT Line amp Construction of 1x 25 KVA Substation for Providing Service connection Un-electrified Habitation at sen para Muslim para Muslim Basti under West Noabadi GP under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work BDO Jirinia R D Block | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 55146 | 55146 | ||||||||||||
2 | 9Mtr PCC Pole | 12 | Nos | 4325 | 51900 | ||||||||||||
2 | 8Mtr PCC Pole | 25 | Nos | 3553 | 88825 | ||||||||||||
3 | Stay Set Complete | 30 | Sets | 70998 | 212994 | ||||||||||||
4 | Stay Insulator(11KV) | 30 | Nos | 20 | 600 | ||||||||||||
5 | Stay Wire (725mm) | 150 | Kgs | 8136 | 12204 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5473 | 503516 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 338 | Kgs | 5473 | 1849874 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 4 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 4 | Nos | ||||||||||||||
g | DP Pole top X-Arm(17 Mtr) | 3 | Nos | ||||||||||||||
h | DP Pole Bottom X-Arm(22 Mtr) | 3 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 223 | Kgs | 5473 | 1220479 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 2 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | SinglePole Guard X-Arm (15Mtr) | 1 | No | ||||||||||||||
c) | DP Pole Guard X-Arm (25Mtr) | 2 | No | ||||||||||||||
d) | 11 mtr long 4 wire bkt | 12 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 72 | Km | 2016279 | 145172088 | ||||||||||||
10 | 8 SWG GI Wire | 150 | Kgs | 6773 | 101595 | ||||||||||||
11 | 11KV Disc Insulator | 48 | Nos | 2406 | 115488 | ||||||||||||
12 | 11KV Disc Fittings | 48 | Nos | 34958 | 1677984 | ||||||||||||
13 | 11KV Pin Insulator | 52 | Nos | 5293 | 275236 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 52 | Nos | 8243 | 428636 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 160 | Kgs | 6871 | 109936 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 30 | Pairs | 495 | 1485 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 88 | Nos | 56 | 4928 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 10495 | 577225 | ||||||||||||
23 | 200Amps Cutout | 3 | Nos | 27885 | 83655 | ||||||||||||
24 | 11 Kv Danger Plate | 12 | Nos | 55 | 660 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 1913 | 45912 | ||||||||||||
26 | LT shackle insulator | 120 | Nos | 1125 | 1350 | ||||||||||||
27 | Straps with NB | 120 | Nos | 3683 | 44196 | ||||||||||||
30 | Barber wire | 30 | Kgs | 60 | 1800 | ||||||||||||
TOTAL | 51229024 | ||||||||||||||||
say | 51229024 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 51229024 | |||||||||||||||
B | Storage Charge 2 on A | 102458048 | |||||||||||||||
C | Total (A + B) | 5225360448 | |||||||||||||||
D | Erection Charge 15 on C | 7838040672 | |||||||||||||||
E | Transportation Charge 3 on C | 25614512 | |||||||||||||||
F | Total (C + D+E) | 6265309635 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 9397964453 | |||||||||||||||
H | Total ( F + G ) | 720510608 | |||||||||||||||
I | Overhead charge 10 on H | 6265309635 | |||||||||||||||
J | Contingency Charge 3 on H | 2161531824 | |||||||||||||||
L | GRAND TOTAL | 8047790226 | |||||||||||||||
Say | 804779 | ||||||||||||||||
(Rupees Eight Lac four thousand seven hundred seventy nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x200 KVA amp 1x100 KVA Substation for Providing of Service connection 108 nos family at Newly constructed Horizon colony at sen para under West Noabadi GP under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK with BDO OlD AGARTALA | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 200 KVA 110433KV Distribution Transformer | 1 | Nos | 219100 | 219100 | ||||||||||||
2 | 100 KVA 110433KV Distribution Transformer | 1 | Nos | 129478 | 129478 | ||||||||||||
3 | 9Mtr PCC Pole ( DP=04 nos SP= 6 Nos) | 14 | Nos | 4325 | 60550 | ||||||||||||
4 | 8Mtr PCC Pole | 85 | Nos | 3553 | 302005 | ||||||||||||
5 | Stay Set Complete | 90 | Sets | 70998 | 638982 | ||||||||||||
6 | Stay Insulator(11KV) | 90 | Nos | 20 | 1800 | ||||||||||||
7 | Stay Wire (725mm) | 450 | Kgs | 81369 | 3661605 | ||||||||||||
8 | MS Channel(100x50x50x6mm4) | 234 | Kgs | 5473 | 1280682 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
9 | MS Channel(75x40x40x6mm4) | 317 | Kgs | 5473 | 1734941 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 6 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 6 | Nos | ||||||||||||||
e) | 11 Kv DP Top Bkt ( 22 Mtr) | 2 | Nos | ||||||||||||||
f) | 11KV DP bottom Bracket(25Mtr) | 2 | Nos | ||||||||||||||
10 | MS Angle(65x65x6mm3) | 858 | Kgs | 5473 | 4695834 | ||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 2 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 4 | No | ||||||||||||||
d) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
d) | 15 mtr long 4 wire LT Bkt | 85 | No | ||||||||||||||
11 | Weasel ACSR (61259mm) | 18 | Km | 2016279 | 36293022 | ||||||||||||
12 | 8 SWG GI Wire | 520 | Kgs | 6772 | 352144 | ||||||||||||
13 | 11KV Disc Insulator | 48 | Nos | 2406 | 115488 | ||||||||||||
14 | 11KV Disc Fittings | 48 | Nos | 34958 | 1677984 | ||||||||||||
15 | 11KV Pin Insulator | 64 | Nos | 8248 | 527872 | ||||||||||||
16 | GI Pin for 11KV Pin Insulator | 64 | Nos | 561 | 35904 | ||||||||||||
17 | 11KV GOS | 3 | Set | 7899 | 23697 | ||||||||||||
18 | 11KV DOF | 3 | Set | 5221 | 15663 | ||||||||||||
19 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
20 | MS Nuts and Bolts of Assorted Size | 520 | Kgs | 6871 | 357292 | ||||||||||||
21 | Stay Clamp by (50x6mm2) MS Flat | 90 | Pairs | 495 | 4455 | ||||||||||||
22 | Bracket Clamp by (50x6mm2) MS Flat | 210 | Nos | 48 | 10080 | ||||||||||||
23 | 30Mtr long 40mm dia GI Pipe Earthing | 9 | Nos | 1300 | 11700 | ||||||||||||
24 | 120sqmm PVC insulated Al Conductor | 250 | Mtr | 10911 | 272775 | ||||||||||||
25 | 240 sqmm PVC insulated Al Conductor | 200 | Mtr | 19295 | 38590 | ||||||||||||
26 | 300Amps Cutout | 12 | Nos | 5225 | 6270 | ||||||||||||
27 | 200Amps Cutout | 9 | Nos | 41699 | 375291 | ||||||||||||
28 | 120sqmm Lugs | 48 | Nos | 162 | 7776 | ||||||||||||
29 | 240sqmm Lugs | 48 | Nos | 238 | 11424 | ||||||||||||
30 | Transformer Base | 1 | Job | 89500 | 89500 | ||||||||||||
31 | LT shackle insulator | 360 | Nos | 1125 | 4050 | ||||||||||||
32 | Straps with NB | 360 | Nos | 3683 | 132588 | ||||||||||||
33 | Danger plate | 92 | Nos | 50 | 4600 | ||||||||||||
TOTAL | 163704861 | ||||||||||||||||
say | 163704861 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 163704861 | |||||||||||||||
C | Storage Charge 2 on A | 327409722 | |||||||||||||||
D | Total (A + B) | 1669789582 | |||||||||||||||
E | Erection Charge 15 on D | 2504684373 | |||||||||||||||
F | Total (C + D) | 192025802 | |||||||||||||||
G | Transportation Charge 5 on D | 8348947911 | |||||||||||||||
H | Supervision Charge and Establishment Charge 5 on F | 9601290098 | |||||||||||||||
H | Total ( F + G+H ) | 20997604 | |||||||||||||||
I | Contingency Charge 3 on H | 6299281199 | |||||||||||||||
j | Addhoc 10 on H | 20997604 | |||||||||||||||
GRAND TOTAL | 2372729252 | ||||||||||||||||
Say | Rs | 2372729 | |||||||||||||||
(Rupees Twenty three Lac seventy two thousand seven hundred twenty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with AGMC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 2 | Nos | 3553 | 7106 | ||||||||||||
2 | Stay Set Complete | 1 | Sets | 70998 | 70998 | ||||||||||||
3 | Stay Insulator(11KV) | 1 | Nos | 12 | 12 | ||||||||||||
4 | Stay Wire (725mm) | 5 | Kgs | 8136 | 4068 | ||||||||||||
5 | Weasel ACSR (61259mm) | 7 | Km | 2016279 | 14113953 | ||||||||||||
7 | MS Nuts and Bolts of Assorted Size | 70 | Kgs | 505 | 3535 | ||||||||||||
8 | Stay Clamp by (50x6mm2) MS Flat | 1 | Pairs | 495 | 495 | ||||||||||||
11 | LT shackle insulator | 210 | Nos | 1396 | 29316 | ||||||||||||
13 | Straps with NB ( Prs) | 200 | Prs | 4586 | 9172 | ||||||||||||
TOTAL | 16506241 | ||||||||||||||||
say | 165062 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 165062 | |||||||||||||||
C | Storage Charge 2 on A | 330124 | |||||||||||||||
D | Total (A + B) | 16836324 | |||||||||||||||
E | Erection Charge 15 on D | 25254486 | |||||||||||||||
F | Total (C + D) | 193617726 | |||||||||||||||
G | Transportation Charge 5 on D | 8418162 | |||||||||||||||
H | Supervision Charge and Establishment Charge 5 on F | 96808863 | |||||||||||||||
H | Total ( F + G+H ) | 2117167743 | |||||||||||||||
I | Contingency Charge 3 on H | 6351503229 | |||||||||||||||
j | Addhoc 10 on H | 2117167743 | |||||||||||||||
GRAND TOTAL | 239240 | ||||||||||||||||
Say | Rs | 239240 | |||||||||||||||
(Rupees Two LacThirtynine thousand two hundred forty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 1000 KVA Base monted Substation for Providing of new Service connection to MALAYA Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH MALAYA RUB-TECH INDUSTRIES | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos ) | 5 | Nos | 4325 | 21625 | ||||||||||||
1 | 9Mtr PCC Pole ( DP=01 nos ) | 5 | Nos | 4325 | 21625 | ||||||||||||
2 | ACSR (61259 | 1 | Km | 2016279 | 2016279 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 70998 | 35499 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 12 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 8136 | 2034 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 224 | Kgs | 5473 | 1225952 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 17 | Kgs | 5473 | 93041 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
8 | 11KV Disc Insulator | 6 | Nos | 2406 | 14436 | ||||||||||||
9 | 11KV Disc Fittings | 6 | Nos | 34958 | 209748 | ||||||||||||
10 | 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
11 | GI Pin for 11KV Pin Insulator | 9 | Nos | 561 | 5049 | ||||||||||||
12 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
13 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
14 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
15 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 6871 | 171775 | ||||||||||||
16 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
17 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 48 | 2304 | ||||||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
19 | 240 sqmm PVC insulated Al Conductor | 90 | Mtr | 238 | 21420 | ||||||||||||
20 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
21 | 11 Kv Danger Plate | 4 | Nos | 55 | 220 | ||||||||||||
22 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
24 | Kiosk Box | 1 | Job | 49500 | 49500 | ||||||||||||
TOTAL | 17083229 | ||||||||||||||||
say | 170832 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 170832 | |||||||||||||||
B | Storage Charge 2 on A | 341664 | |||||||||||||||
C | Total (A + B) | 17424864 | |||||||||||||||
D | Erection Charge 15 on C | 26137296 | |||||||||||||||
E | Total (C + D) | 200385936 | |||||||||||||||
F | Transportation Charge 5 on C | 8712432 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 300578904 | |||||||||||||||
H | Total (E + F + G) | 2391562584 | |||||||||||||||
I | Overhead charge 10 on H | 2391562584 | |||||||||||||||
j | Contingency Charge 3 on H | 7174687752 | |||||||||||||||
GRAND TOTAL | 270246572 | ||||||||||||||||
Say | 270247 | ||||||||||||||||
(Rupees two Lac seventy thousand two hundred forty seven )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with AMC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 1 | Nos | 3553 | 3553 | ||||||||||||
2 | Stay Set Complete | 1 | Sets | 58082 | 58082 | ||||||||||||
3 | Stay Insulator(11KV) | 1 | Nos | 20 | 20 | ||||||||||||
4 | Stay Wire (725mm) | 5 | Kgs | 5707 | 28535 | ||||||||||||
5 | Weasel ACSR (61259mm) | 001 | Km | 2347653 | 2347653 | ||||||||||||
7 | MS Nuts and Bolts of Assorted Size | 3 | Kgs | 505 | 1515 | ||||||||||||
8 | Stay Clamp by (50x6mm2) MS Flat | 1 | Pairs | 495 | 495 | ||||||||||||
11 | LT shackle insulator | 4 | Nos | 1125 | 45 | ||||||||||||
13 | Straps with NB ( 16x75) | 4 | Nos | 6871 | 27484 | ||||||||||||
TOTAL | 51947753 | ||||||||||||||||
say | 51947753 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 51947753 | |||||||||||||||
B | Storage Charge 2 on A | 103895506 | |||||||||||||||
C | Total (A + B) | 5298670806 | |||||||||||||||
D | Erection Charge 15 on C | 7948006209 | |||||||||||||||
E | Transportation Charge 3 on C | 259738765 | |||||||||||||||
F | Total (C + D+E) | 6353210192 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 3176605096 | |||||||||||||||
H | Total ( F + G ) | 6670870701 | |||||||||||||||
I | Overhead charge 10 on H | 6353210192 | |||||||||||||||
J | Contingency Charge 3 on H | 200126121 | |||||||||||||||
K | WCT6 on erection charge ie on D | 4768803725 | |||||||||||||||
L | GRAND TOTAL | 7554005879 | |||||||||||||||
Say | Rs | 7554005879 | |||||||||||||||
Service connection charge | Rs 1595 | ||||||||||||||||
GRAND TOTAL | Rs 755400 | ||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Santi para under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Revenue expenditure | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 9726913 | 9726913 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) | 8 | Nos | 4325 | 34600 | ||||||||||||
2 | 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) | 6 | Nos | 3553 | 21318 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 74654 | 37327 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 6839 | 170975 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5485 | 50462 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 137 | Kgs | 5485 | 751445 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 35 | Kgs | 5485 | 191975 | ||||||||||||
a) | 11 mtr long LT Bkt | 18 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 18 | Km | 190276 | 3424968 | ||||||||||||
10 | 8 SWG GI Wire | 20 | Kgs | 6732 | 13464 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 12 | Nos | 5292 | 63504 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 12 | Nos | 8248 | 98976 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 40 | Kgs | 6871 | 27484 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 12 | Pairs | 495 | 594 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 68 | Nos | 48 | 3264 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 55 | Mtr | 11007 | 605385 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 1926 | 11556 | ||||||||||||
24 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
25 | 120sqmm Lugs | 12 | Nos | 165 | 1980 | ||||||||||||
26 | Shackle insulator | 56 | Nos | 1396 | 78176 | ||||||||||||
27 | Straps NampB(16x75) | 56 | pairs | 4345 | 24332 | ||||||||||||
28 | Barbed Wire | 20 | Kgs | 429 | 858 | ||||||||||||
TOTAL | 25661079 | ||||||||||||||||
say | 25661079 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 25661079 | |||||||||||||||
B | Storage Charge 2 on A | 51322158 | |||||||||||||||
C | Total (A + B) | 2617430058 | |||||||||||||||
D | Erection Charge 15 on C | 3926145087 | |||||||||||||||
E | Total (C + D) | 3010044567 | |||||||||||||||
F | Transportation Charge 5 on C | 1308715029 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on E | 3010044567 | |||||||||||||||
H | Total (E + F + G) | 3441920526 | |||||||||||||||
I | Contingency Charge 3 on H | 1032576158 | |||||||||||||||
GRAND TOTAL | 3545178142 | ||||||||||||||||
Say | Rs | 3545178142 | |||||||||||||||
(Rupees three Lac Fifty four thousand five hundred Eighteen )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Das para under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Revenue expenditure | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 9726913 | 9726913 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) | 4 | Nos | 4325 | 17300 | ||||||||||||
2 | 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) | 6 | Nos | 3553 | 21318 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 74654 | 37327 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 6839 | 170975 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 5485 | 50462 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 137 | Kgs | 5485 | 751445 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 2 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 35 | Kgs | 5485 | 191975 | ||||||||||||
a) | 11 mtr long LT Bkt | 18 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 12 | Km | 190276 | 2283312 | ||||||||||||
10 | 8 SWG GI Wire | 15 | Kgs | 6732 | 10098 | ||||||||||||
11 | 11KV Disc Insulator | 9 | Nos | 2406 | 21654 | ||||||||||||
12 | 11KV Disc Fittings | 9 | Nos | 33766 | 303894 | ||||||||||||
13 | 11KV Pin Insulator | 12 | Nos | 5292 | 63504 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 12 | Nos | 8248 | 98976 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 6871 | 171775 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 12 | Pairs | 495 | 594 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 48 | 2304 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 120sqmm PVC insulated Al Conductor | 30 | Mtr | 11007 | 33021 | ||||||||||||
23 | 100Amps Cutout | 6 | Nos | 1926 | 11556 | ||||||||||||
24 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
25 | 120sqmm Lugs | 12 | Nos | 165 | 1980 | ||||||||||||
26 | Shackle insulator | 56 | Nos | 1396 | 78176 | ||||||||||||
27 | Straps NampB(16x75) | 56 | pairs | 4345 | 24332 | ||||||||||||
28 | Barbed Wire | 20 | Kgs | 429 | 858 | ||||||||||||
TOTAL | 22108045 | ||||||||||||||||
say | 22108045 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 22108045 | |||||||||||||||
B | Storage Charge 2 on A | 4421609 | |||||||||||||||
C | Total (A + B) | 225502059 | |||||||||||||||
D | Erection Charge 15 on C | 3382530885 | |||||||||||||||
E | Total (C + D) | 2593273679 | |||||||||||||||
F | Transportation Charge 5 on C | 1127510295 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on E | 2593273679 | |||||||||||||||
H | Total (E + F + G) | 2965352076 | |||||||||||||||
I | Contingency Charge 3 on H | 8896056228 | |||||||||||||||
GRAND TOTAL | 3054312638 | ||||||||||||||||
Say | Rs | 3054312638 | |||||||||||||||
(Rupees three Lac Five thousand thousand four hundred thirty one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to Santosh das Bhanu kanta biswas amp purnima biswas under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with santosh das | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 3 | Nos | 3250 | 9750 | ||||||||||||
2 | stay set complete | 1 | Nos | 581 | 581 | ||||||||||||
3 | Stay insulator | 1 | Nos | 20 | 20 | ||||||||||||
4 | Stay wire | 1 | Nos | 57 | 57 | ||||||||||||
5 | Weasel ACSR (61259mm) | 003 | Km | 2016279 | 6048837 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 6 | Kgs | 505 | 303 | ||||||||||||
7 | LT shackle insulator | 6 | Nos | 1125 | 675 | ||||||||||||
TOTAL | 113833837 | ||||||||||||||||
say | 113833837 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 113833837 | |||||||||||||||
B | Storage Charge 2 on A | 227667674 | |||||||||||||||
C | Total (A + B) | 1161105137 | |||||||||||||||
D | Erection Charge 15 on C | 1741657706 | |||||||||||||||
E | Transportation Charge 3 on C | 569169185 | |||||||||||||||
F | Total (C + D+E) | 1392187827 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 6960939133 | |||||||||||||||
H | Total ( F + G ) | 1461797218 | |||||||||||||||
J | Contingency Charge 3 on H | 4385391654 | |||||||||||||||
L | GRAND TOTAL | 1505651134 | |||||||||||||||
Say | Rs | 15057 | |||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 463359 | 463359 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=02 nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 2 | Sets | 74654 | 149308 | ||||||||||||
4 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
5 | Stay Wire (725mm) | 10 | Kgs | 68387 | 68387 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 54849 | 5046108 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 1 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 06 | Km | 190276 | 1141656 | ||||||||||||
10 | 8 SWG GI Wire | 12 | Kgs | 67321 | 807852 | ||||||||||||
11 | 11KV Disc Insulator | 15 | Nos | 2406 | 3609 | ||||||||||||
12 | 11KV Disc Fittings | 15 | Nos | 33766 | 50649 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 32 | Kgs | 6871 | 219872 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 48 | 2304 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 60 | Mtr | 15394 | 92364 | ||||||||||||
23 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 50 | 100 | ||||||||||||
TOTAL | 55419033 | ||||||||||||||||
say | 55419033 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 55419033 | |||||||||||||||
C | Storage Charge 2 on A | 110838066 | |||||||||||||||
D | Total (A + B) | 5652741366 | |||||||||||||||
E | Erection Charge 15 on D | 8479112049 | |||||||||||||||
F | Total (C + D) | 6500652571 | |||||||||||||||
G | Transportation Charge 5 on D | 2826370683 | |||||||||||||||
H | Supervision Charge and Establishment Charge 15 on F | 9750978856 | |||||||||||||||
H | Total ( F + G+H ) | 7758387525 | |||||||||||||||
I | Contingency Charge 3 on H | 2327516257 | |||||||||||||||
GRAND TOTAL | 7991139151 | ||||||||||||||||
Say | 799114 | ||||||||||||||||
(Rupees seven lac ninety nine thousand one hundred fourteen )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9 Mtr PCC Pole | 28 | Nos | 4325 | 121100 | ||||||||||||
1 | 11 mtr long steel pole | 2 | Nos | 1224779 | 2449558 | ||||||||||||
2 | Stay Set Complete | 16 | Sets | 70998 | 1135968 | ||||||||||||
3 | Stay Insulator(11KV) | 16 | Nos | 20 | 320 | ||||||||||||
4 | Stay Wire (725mm) | 80 | Kgs | 8137 | 65096 | ||||||||||||
5 | MS Channel(75x40x40x6mm4) | Kgs | 5473 | 0 | |||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 12 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 12 | Nos | ||||||||||||||
g | DP Pole top X-Arm(17 Mtr) | 8 | Nos | ||||||||||||||
g | DP Pole Bottom X-Arm(22 Mtr) | 8 | Nos | ||||||||||||||
6 | MS Angle(65x65x6mm3) | Kgs | 5473 | 0 | |||||||||||||
a) | Single Pole Bottom X-Arm(15Mtr) | 12 | Nos | ||||||||||||||
c) | Double Pole Guard X-Arm for Substation(3Mtr) | 6 | No | ||||||||||||||
d) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
7 | Weasel ACSR (61259mm) | 46 | Km | 2016279 | 92748834 | ||||||||||||
8 | 8 SWG GI Wire | 240 | Kgs | 6772 | 162528 | ||||||||||||
9 | 11KV Disc Insulator | 62 | Nos | 2406 | 149172 | ||||||||||||
10 | 11KV Disc Fittings | 62 | Nos | 34958 | 2167396 | ||||||||||||
11 | 11KV Pin Insulator | 72 | Nos | 5292 | 381024 | ||||||||||||
12 | GI Pin for 11KV Pin Insulator | 72 | Nos | 8248 | 593856 | ||||||||||||
13 | 11KV GOS | 3 | Set | 7899 | 23697 | ||||||||||||
15 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
16 | MS Nuts and Bolts of Assorted Size | 140 | Kgs | 6871 | 96194 | ||||||||||||
17 | Stay Clamp by (50x6mm2) MS Flat | 16 | Pairs | 495 | 792 | ||||||||||||
18 | Bracket Clamp by (50x6mm2) MS Flat | 142 | Nos | 48 | 6816 | ||||||||||||
19 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
3 | 11 KB VCB | 1 | Sets | 450000 | 450000 | ||||||||||||
22 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 12531 | 25062 | ||||||||||||
24 | 11 KV 3 core 120 sqmm XLPE UG cable | 015 | Km | 572183 | 8582745 | ||||||||||||
20 | 11 Kv Danger Plate | 20 | Nos | 55 | 1100 | ||||||||||||
TOTAL | 934991304 | ||||||||||||||||
say | 934991304 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 934991304 | |||||||||||||||
B | Storage Charge 2 on A | 1869982608 | |||||||||||||||
C | Total (A + B) | 9536911301 | |||||||||||||||
D | Erection Charge 15 on C | 1430536695 | |||||||||||||||
E | Total (C + D) | 10967448 | |||||||||||||||
F | Transportation Charge 5 on C | 476845565 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 1645117199 | |||||||||||||||
H | Total (E + F + G) | 1308941076 | |||||||||||||||
I | Overhead charge 10 on H | 1308941076 | |||||||||||||||
J | Contingency Charge 3 on H | 3926823228 | |||||||||||||||
GRAND TOTAL | 1479103416 | ||||||||||||||||
Say | Rs | 565526 | |||||||||||||||
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 mtr long steel pole | 2 | Nos | 1224779 | 2449558 | ||||||||||||
2 | ACSR (61335 | 015 | Km | 3510265 | 52653975 | ||||||||||||
3 | 11 KB VCB | 1 | Sets | 450000 | 450000 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 65 | No | ||||||||||||||
8 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
9 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
10 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
11 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
12 | 11KV GOS | 3 | Set | 1006111 | 3018333 | ||||||||||||
13 | 11KV DOF | 3 | Set | 5221 | 15663 | ||||||||||||
14 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
15 | MS Nuts and Bolts of Assorted Size | 40 | Kgs | 6871 | 27484 | ||||||||||||
17 | Bracket Clamp by (50x6mm2) MS Flat | 64 | Nos | 48 | 3072 | ||||||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
21 | 11 Kv Danger post | 30 | Nos | 250 | 7500 | ||||||||||||
22 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
22 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 7 | Nos | 12531 | 87717 | ||||||||||||
22 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 12531 | 25062 | ||||||||||||
24 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 12 | Km | 572183 | 6866196 | ||||||||||||
24 | 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 90 | Mtr | 1500 | 135000 | ||||||||||||
24 | Errection oh UG cable | 1200 | Mtr | 450 | 540000 | ||||||||||||
24 | HT Kiosk Box | 3 | Job | 49500 | 148500 | ||||||||||||
TOTAL | 2197755172 | ||||||||||||||||
say | 2197755172 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 2197755172 | |||||||||||||||
B | Storage Charge 2 on A | 4395510343 | |||||||||||||||
C | Total (A + B) | 2241710275 | |||||||||||||||
D | Erection Charge 15 on C | 3362565412 | |||||||||||||||
E | Total (C + D) | 2577966816 | |||||||||||||||
F | Transportation Charge 5 on C | 1120855137 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 3866950224 | |||||||||||||||
H | Total (E + F + G) | 3076747352 | |||||||||||||||
I | Overhead charge 10 on H | 3076747352 | |||||||||||||||
j | Contingency Charge 3 on H | 9230242057 | |||||||||||||||
GRAND TOTAL | 3476724508 | ||||||||||||||||
Say | Rs | 3902237 | |||||||||||||||
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Up-gradition of electricity load from 10KW to 100 KW at CETP Bodhjungnagar Replacement of the PVC cable size single core 16 sq mm to single core 120 sqmm under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit work with TIDC | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
25 | 120sqmm PVC cable | 120 | Mtr | 110076 | 1320912 | ||||||||||||
TOTAL | 1320912 | ||||||||||||||||
say | 1320912 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 1320912 | |||||||||||||||
B | Storage Charge 2 on A | 2641824 | |||||||||||||||
C | Total (A + B) | 134733024 | |||||||||||||||
D | Erection Charge as actual | 808398144 | |||||||||||||||
E | Total (C + D) | 2155728384 | |||||||||||||||
F | Transportation Charge 5 on C | 67366512 | |||||||||||||||
G | Supervision Charge and Establishment Charge 20 on E | 4311456768 | |||||||||||||||
H | Total (E + F + G) | 2654240573 | |||||||||||||||
I | Contingency Charge 3 on H | 7962721718 | |||||||||||||||
GRAND TOTAL | 273386779 | ||||||||||||||||
Say | 27339 | ||||||||||||||||
(Rupees twenty seven thousand three hundred thirty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 463359 | 463359 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=02 nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 2 | Sets | 74654 | 149308 | ||||||||||||
4 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
5 | Stay Wire (725mm) | 10 | Kgs | 68387 | 68387 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 54849 | 5046108 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 1 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 06 | Km | 190276 | 1141656 | ||||||||||||
10 | 8 SWG GI Wire | 12 | Kgs | 67321 | 807852 | ||||||||||||
11 | 11KV Disc Insulator | 15 | Nos | 2406 | 3609 | ||||||||||||
12 | 11KV Disc Fittings | 15 | Nos | 33766 | 50649 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 32 | Kgs | 6871 | 219872 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 48 | 2304 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 60 | Mtr | 15394 | 92364 | ||||||||||||
23 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 50 | 100 | ||||||||||||
TOTAL | 55419033 | ||||||||||||||||
say | 554190 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 554190 | |||||||||||||||
B | Storage Charge 2 on A | 110838 | |||||||||||||||
C | Total (A + B) | 5652738 | |||||||||||||||
D | Erection Charge 15 on C | 8479107 | |||||||||||||||
E | Transportation Charge 3 on C | 166257 | |||||||||||||||
F | TOTAL ( C+ D+E ) | 66669057 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 333345285 | |||||||||||||||
H | Total ( F + G) | 7000250985 | |||||||||||||||
I | Contingency Charge 2 on H | 1400050197 | |||||||||||||||
J | WCT 4 on Errection charge | 33916428 | |||||||||||||||
TOTAL ESTIMATED COST OF DEPOSIT WORK | 7174172433 | ||||||||||||||||
Say | 717417 | ||||||||||||||||
(Rupees seven Lac seventeen thousand thousand four hundred seventeen )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to MBS FEED amp PHARMA at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH MBS Feed amp Pharma | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 463359 | 463359 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=02 nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 2 | Sets | 74654 | 149308 | ||||||||||||
4 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
5 | Stay Wire (725mm) | 10 | Kgs | 68387 | 68387 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 54849 | 5046108 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 1 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 01 | Km | 190276 | 190276 | ||||||||||||
10 | 8 SWG GI Wire | 12 | Kgs | 67321 | 807852 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 32 | Kgs | 6871 | 219872 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 42 | Nos | 48 | 2016 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 42 | Mtr | 15394 | 646548 | ||||||||||||
23 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 50 | 100 | ||||||||||||
TOTAL | 53988283 | ||||||||||||||||
say | 539883 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 539883 | |||||||||||||||
B | Storage Charge 2 on A | 1079766 | |||||||||||||||
C | Total (A + B) | 55068066 | |||||||||||||||
D | Erection Charge 15 on C | 82602099 | |||||||||||||||
E | Transportation Charge 3 on C | 1619649 | |||||||||||||||
F | TOTAL ( C+ D+E ) | 649479249 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 3247396245 | |||||||||||||||
H | Total ( F + G) | 6819532115 | |||||||||||||||
I | Contingency Charge 2 on H | 1363906423 | |||||||||||||||
J | WCT 4 on Errection charge | 330408396 | |||||||||||||||
TOTAL ESTIMATED COST OF DEPOSIT WORK | 6988963596 | ||||||||||||||||
Say | 698896 | ||||||||||||||||
(Rupees six Lac ninety eight thousand eight hundred ninety six )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Revisied Estimate for Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNIL Aircel Tower Ltd at Ramnath Kobra para under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AIRCEL | |||||||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS- | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 54044 | 54044 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) | 9 | Nos | 4325 | 38925 | ||||||||||||
2 | 8Mtr PCC Pole | 2 | Nos | 3553 | 7106 | ||||||||||||
3 | Stay Set Complete | 5 | Sets | 74654 | 37327 | ||||||||||||
4 | Stay Insulator(11KV) | 5 | Nos | 20 | 100 | ||||||||||||
5 | Stay Wire (725mm) | 25 | Kgs | 6838 | 17095 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 54849 | 5375202 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 345 | Kgs | 5485 | 1892325 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 4 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 4 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 2 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 97 | Kgs | 5485 | 532045 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 2 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 4 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 12 | Km | 190276 | 2283312 | ||||||||||||
10 | 8 SWG GI Wire | 40 | Kgs | 6732 | 26928 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 18 | Nos | 5292 | 95256 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 18 | Nos | 8248 | 148464 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 25 | Kgs | 509 | 12725 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 60 | Nos | 48 | 2880 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 200 | Mtr | 39386 | 78772 | ||||||||||||
23 | 100Amps Cutout | 12 | Nos | 1926 | 23112 | ||||||||||||
24 | 11 Kv Danger Plate | 6 | Nos | 55 | 330 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 165 | 3960 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
TOTAL | 222558742 | ||||||||||||||||
say | 222559 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 222559 | |||||||||||||||
B | Storage Charge 2 on A | 445118 | |||||||||||||||
C | Total (A + B) | 22701018 | |||||||||||||||
D | Erection Charge 15 on C | 34051527 | |||||||||||||||
E | Transportation Charge 3 on C | 667677 | |||||||||||||||
F | TOTAL ( C+ D+E ) | 267738477 | |||||||||||||||
G | Supervision Charge and Establishment Charge 5 on F | 1338692385 | |||||||||||||||
H | Total ( F + G) | 2811254009 | |||||||||||||||
I | Contingency Charge 2 on H | 5622508017 | |||||||||||||||
J | WCT 4 on Errection charge | 136206108 | |||||||||||||||
TOTAL ESTIMATED COST OF DEPOSIT WORK | 2881099699 | ||||||||||||||||
Say | 288110 | ||||||||||||||||
(Rupees two Lac Eighty eight thousand thousand one hundred ten )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with BDO old Agartala | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 5 | Nos | 3553 | 17765 | ||||||||||||
2 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
3 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
4 | Stay Wire (725mm) | 9 | Kgs | 6838 | 61542 | ||||||||||||
5 | Weasel ACSR (61259mm) | 042 | Km | 190276 | 7991592 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 1158 | Kgs | 6732 | 7795656 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 4 | Pairs | 495 | 198 | ||||||||||||
8 | LT shackle insulator | 10 | Nos | 1125 | 1125 | ||||||||||||
9 | Straps with NB ( 16x75) | 10 | Nos | 6871 | 6871 | ||||||||||||
TOTAL | 304487976 | ||||||||||||||||
say | 304487976 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 304487976 | |||||||||||||||
B | Storage Charge 2 on A | 608975952 | |||||||||||||||
C | Total (A + B) | 3105777355 | |||||||||||||||
D | Erection Charge 15 on C | 4658666033 | |||||||||||||||
E | Transportation Charge 3 on C | 9317332066 | |||||||||||||||
F | Total (C + D+E) | 3664817279 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 5497225919 | |||||||||||||||
H | Total ( F + G ) | 4214539871 | |||||||||||||||
i | Contingency Charge 2 on H | 8429079742 | |||||||||||||||
GRAND TOTAL | 4298830668 | ||||||||||||||||
Say | 42988 | ||||||||||||||||
( Forty two thousand nine hundred eighty eight ) only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x200 KVA Base mounted Substation for Providing of Service connection to MS RM SAHA amp SONS at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH RM SAHA amp SONS | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 200 KVA 110433KV Distribution Transformer | 1 | Nos | 214697 | 214697 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=01 nos SP-01 nos ) | 3 | Nos | 4325 | 12975 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 68387 | 1025805 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 92 | Kgs | 54849 | 5046108 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 1 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 04 | Km | 190276 | 761104 | ||||||||||||
10 | 8 SWG GI Wire | 20 | Kgs | 67321 | 134642 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 45 | Kgs | 6871 | 309195 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 48 | 2304 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 60 | Mtr | 15394 | 92364 | ||||||||||||
23 | 300Amps Cutout | 6 | Nos | 7029 | 42174 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 50 | 100 | ||||||||||||
TOTAL | 305315803 | ||||||||||||||||
say | 539883 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 539883 | |||||||||||||||
B | Storage Charge 2 on A | 1079766 | |||||||||||||||
C | Total (A + B) | 55068066 | |||||||||||||||
D | Erection Charge 15 on C | 82602099 | |||||||||||||||
E | TOTAL ( C+ D ) | 633282759 | |||||||||||||||
F | Transportation Charge 3 on C | 247806297 | |||||||||||||||
G | TOTAL ( E+F ) | 635760822 | |||||||||||||||
H | Supervision Charge and Establishment Charge 15 on G | 953641233 | |||||||||||||||
I | Total ( G+H ) | 7311249453 | |||||||||||||||
J | Contingency Charge 2 on H | 1907282466 | |||||||||||||||
TOTAL ESTIMATED COST OF DEPOSIT WORK | 7330322277 | ||||||||||||||||
Say | 733032 | ||||||||||||||||
(Rupees seven Lac thirty three thousand thirty two )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with BDO old Agartala | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 9 | Nos | 3553 | 31977 | ||||||||||||
2 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
3 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
4 | Stay Wire (725mm) | 12 | Kgs | 6838 | 82056 | ||||||||||||
5 | Weasel ACSR (61259mm) | 065 | Km | 190276 | 1236794 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 1158 | Kgs | 6732 | 7795656 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
8 | LT shackle insulator | 36 | Nos | 1125 | 405 | ||||||||||||
9 | Straps with NB ( 16x75) | 36 | Nos | 6871 | 247356 | ||||||||||||
TOTAL | 512717456 | ||||||||||||||||
say | 51272 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 51272 | |||||||||||||||
B | Storage Charge 2 on A | 102544 | |||||||||||||||
C | Total (A + B) | 5229744 | |||||||||||||||
D | Erection Charge 15 on C | 7844616 | |||||||||||||||
E | TOTAL ( C+ D ) | 60142056 | |||||||||||||||
F | Transportation Charge 3 on C | 23533848 | |||||||||||||||
G | TOTAL ( E+F ) | 6037739448 | |||||||||||||||
H | Supervision Charge and Establishment Charge 15 on G | 9056609172 | |||||||||||||||
I | Total ( G+H ) | 6943400365 | |||||||||||||||
J | Contingency Charge 2 on H | 1811321834 | |||||||||||||||
TOTAL ESTIMATED COST OF DEPOSIT WORK | 6961513584 | ||||||||||||||||
Say | 69615 | ||||||||||||||||
(Rupees sixty nine thousand six hundred fifteen )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to Pran gopal saha at TIDC under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH PRAN GOPAL SAHA | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 9726913 | 9726913 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 no) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 6838 | 10257 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 54849 | 5375202 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 139 | Kgs | 5485 | 762415 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Double Pole Top X-Arm( 22 Mtr) | 1 | Nos | ||||||||||||||
f) | Double Pole Bottom X-Arm(25 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 5485 | 26328 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 1 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 09 | Km | 190276 | 1712484 | ||||||||||||
10 | 8 SWG GI Wire | 25 | Kgs | 6732 | 1683 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 12 | Nos | 5292 | 63504 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 12 | Nos | 8248 | 98976 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 40 | Kgs | 6871 | 27484 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 48 | Nos | 48 | 2304 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 70 sqmm PVC insulated Al Conductor | 48 | Mtr | 662 | 31776 | ||||||||||||
23 | 16 sqmm PVC insulated Al Conductor | 150 | Mtr | 22602 | 33903 | ||||||||||||
24 | 200Amps Cutout | 3 | Nos | 40436 | 121308 | ||||||||||||
25 | 11 Kv Danger Plate | 3 | Nos | 55 | 165 | ||||||||||||
26 | 120sqmm Lugs | 24 | Nos | 165 | 3960 | ||||||||||||
27 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
TOTAL | 202996242 | ||||||||||||||||
say | 202996 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 202996 | |||||||||||||||
B | Storage Charge 2 on A | 405992 | |||||||||||||||
C | Total (A + B) | 20705592 | |||||||||||||||
D | Erection Charge 15 on C | 31058388 | |||||||||||||||
E | TOTAL ( C+ D ) | 238114308 | |||||||||||||||
F | Transportation Charge 3 on C | 93175164 | |||||||||||||||
G | TOTAL ( E+F ) | 2390460596 | |||||||||||||||
H | Supervision Charge and Establishment Charge 15 on G | 3585690895 | |||||||||||||||
I | Total ( G+H ) | 2749029686 | |||||||||||||||
J | Contingency Charge 2 on H | 7171381789 | |||||||||||||||
TOTAL ESTIMATED COST OF DEPOSIT WORK | 2756201068 | ||||||||||||||||
Say | 275620 | ||||||||||||||||
(Rupees two Lac seventy five thousand six hundred twenty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNG POINT at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH TIDC | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 54044 | 54044 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) | 5 | Nos | 4325 | 21625 | ||||||||||||
3 | Stay Set Complete | 4 | Sets | 74654 | 298616 | ||||||||||||
4 | Stay Insulator(11KV) | 4 | Nos | 20 | 80 | ||||||||||||
5 | Stay Wire (725mm) | 20 | Kgs | 6838 | 13676 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 54849 | 5375202 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 158 | Kgs | 5485 | 86663 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 1 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 1 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 1 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 57 | Kgs | 5485 | 312645 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 1 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 4 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 12 | Km | 190276 | 2283312 | ||||||||||||
10 | 8 SWG GI Wire | 35 | Kgs | 6732 | 23562 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 2406 | 43308 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 33766 | 607788 | ||||||||||||
13 | 11KV Pin Insulator | 18 | Nos | 5292 | 95256 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 18 | Nos | 8248 | 148464 | ||||||||||||
15 | 11KV GOS (3 ph) | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF (3 ph) | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 40 | Kgs | 6871 | 27484 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 60 | Nos | 48 | 2880 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 48 | Mtr | 39386 | 1890528 | ||||||||||||
22 | 16 sqmm PVC insulated Al Conductor | 200 | Mtr | 22602 | 45204 | ||||||||||||
23 | 100Amps Cutout | 3 | Nos | 1926 | 5778 | ||||||||||||
24 | 11 Kv Danger Plate | 4 | Nos | 55 | 220 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 165 | 3960 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
TOTAL | 18589254 | ||||||||||||||||
say | 185893 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 185893 | |||||||||||||||
B | Storage Charge 2 on A | 371786 | |||||||||||||||
C | Total (A + B) | 18961086 | |||||||||||||||
D | Erection Charge 15 on C | 28441629 | |||||||||||||||
E | Transportation Charge 3 on C | 56883258 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 2237408148 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 3356112222 | |||||||||||||||
H | Total ( F+G) | 257301937 | |||||||||||||||
I | Contingency Charge 2 on H | 514603874 | |||||||||||||||
2624479758 | |||||||||||||||||
Say | 262448 | ||||||||||||||||
(Rupees two Lac sixty two thousand four hundred forty eight )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT Line amp Construction of 25KVA Substation for Providing of new Service connection to | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 9 Mtr PCC Pole | 32 | Nos | 4325 | 138400 | ||||||||||||
2 | 11 mtr long steel pole | 2 | Nos | 1224779 | 2449558 | ||||||||||||
3 | Stay Set Complete | 18 | Sets | 70998 | 1277964 | ||||||||||||
4 | Stay Insulator(11KV) | 18 | Nos | 20 | 360 | ||||||||||||
5 | Stay Wire (725mm) | 72 | Kgs | 8137 | 585864 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 452 | Kgs | 5473 | 2473796 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 12 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 12 | Nos | ||||||||||||||
g | DP Pole top X-Arm(13 Mtr) | 8 | Nos | ||||||||||||||
g | DP Pole Bottom X-Arm(22 Mtr) | 8 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 225 | Kgs | 5473 | 1231425 | ||||||||||||
a) | Single Pole Bottom X-Arm(15Mtr) | 12 | Nos | ||||||||||||||
c) | Double Pole Guard X-Arm for Substation(3Mtr) | 6 | No | ||||||||||||||
d) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
8 | Weasel ACSR (61259mm) | 38 | Km | 2016279 | 76618602 | ||||||||||||
9 | 8 SWG GI Wire | 240 | Kgs | 6772 | 162528 | ||||||||||||
10 | 11KV Disc Insulator | 62 | Nos | 2406 | 149172 | ||||||||||||
11 | 11KV Disc Fittings | 62 | Nos | 34958 | 2167396 | ||||||||||||
12 | 11KV Pin Insulator | 72 | Nos | 5292 | 381024 | ||||||||||||
13 | GI Pin for 11KV Pin Insulator | 72 | Nos | 8248 | 593856 | ||||||||||||
14 | 11KV GOS | 2 | Set | 7899 | 15798 | ||||||||||||
15 | 11KV LA | 6 | Nos | 369 | 2214 | ||||||||||||
16 | 11KV DOF (3 ph) | 2 | Set | 5221 | 10442 | ||||||||||||
17 | MS Nuts and Bolts of Assorted Size | 140 | Kgs | 6871 | 96194 | ||||||||||||
18 | Stay Clamp by (50x6mm2) MS Flat | 16 | Pairs | 495 | 792 | ||||||||||||
19 | Bracket Clamp by (50x6mm2) MS Flat | 110 | Nos | 48 | 5280 | ||||||||||||
20 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
21 | 11 Kv Danger Plate | 20 | Nos | 55 | 1100 | ||||||||||||
TOTAL | 395903582 | ||||||||||||||||
say | 395903582 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 395903582 | |||||||||||||||
B | Storage Charge 2 on A | 791807164 | |||||||||||||||
C | Total (A + B) | 4038216536 | |||||||||||||||
D | Erection Charge 15 on C | 6057324805 | |||||||||||||||
E | Total (C + D) | 4643949017 | |||||||||||||||
F | Transportation Charge 5 on C | 2019108268 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 6965923525 | |||||||||||||||
H | Total (E + F + G) | 5542452196 | |||||||||||||||
I | Overhead charge 10 on H | 5542452196 | |||||||||||||||
J | Contingency Charge 3 on H | 1662735659 | |||||||||||||||
GRAND TOTAL | 6262970982 | ||||||||||||||||
Say | Rs | 626297 | |||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to AIRTEL TOWER at Murabari under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH Bharati infratel limited | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 63 KVA 110433KV Distribution Transformer | 1 | Nos | 9726913 | 9726913 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) | 5 | Nos | 4325 | 21625 | ||||||||||||
3 | Stay Set Complete | 6 | Sets | 74654 | 447924 | ||||||||||||
4 | Stay Insulator(11KV) | 6 | Nos | 20 | 120 | ||||||||||||
5 | Stay Wire (725mm) | 30 | Kgs | 6838 | 20514 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 54849 | 5375202 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 158 | Kgs | 5485 | 86663 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 1 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 1 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 1 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 57 | Kgs | 5485 | 312645 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 1 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 4 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 21 | Km | 190276 | 3995796 | ||||||||||||
10 | 8 SWG GI Wire | 35 | Kgs | 6732 | 23562 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 2406 | 43308 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 33766 | 607788 | ||||||||||||
13 | 11KV Pin Insulator | 18 | Nos | 5292 | 95256 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 18 | Nos | 8248 | 148464 | ||||||||||||
15 | 11KV GOS (3 ph) | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF (3 ph) | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 40 | Kgs | 6871 | 27484 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 60 | Nos | 48 | 2880 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 48 | Mtr | 39386 | 1890528 | ||||||||||||
22 | 16 sqmm PVC insulated Al Conductor | 200 | Mtr | 22602 | 45204 | ||||||||||||
23 | 100Amps Cutout | 3 | Nos | 1926 | 5778 | ||||||||||||
24 | 11 Kv Danger Plate | 4 | Nos | 55 | 220 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 165 | 3960 | ||||||||||||
26 | Substation fancing | 1 | Job | 14500 | 14500 | ||||||||||||
TOTAL | 24845939 | ||||||||||||||||
say | 248459 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 248459 | |||||||||||||||
B | Storage Charge 2 on A | 496918 | |||||||||||||||
C | Total (A + B) | 25342818 | |||||||||||||||
D | Erection Charge 15 on C | 38014227 | |||||||||||||||
E | Transportation Charge 3 on C | 76028454 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 2990452524 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 4485678786 | |||||||||||||||
H | Total ( F+G) | 3439020403 | |||||||||||||||
I | Contingency Charge 2 on H | 6878040805 | |||||||||||||||
3507800811 | |||||||||||||||||
Say | 350780 | ||||||||||||||||
(Rupees three Lac fifty thousand seven hundred eighty )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to 7 nos consumer at Ramchandra nagar village comittee under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with RC Nagar village committee | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 9 | Nos | 3553 | 31977 | ||||||||||||
2 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
3 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
4 | Stay Wire (725mm) | 12 | Kgs | 6838 | 82056 | ||||||||||||
5 | Weasel ACSR (61259mm) | 056 | Km | 190276 | 10655456 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 1158 | Kgs | 6732 | 7795656 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
8 | LT shackle insulator | 36 | Nos | 1125 | 405 | ||||||||||||
9 | Straps with NB ( 16x75) | 36 | Nos | 6871 | 247356 | ||||||||||||
TOTAL | 495592616 | ||||||||||||||||
say | 49559 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 49559 | |||||||||||||||
B | Storage Charge 2 on A | 99118 | |||||||||||||||
C | Total (A + B) | 5055018 | |||||||||||||||
D | Erection Charge 15 on C | 7582527 | |||||||||||||||
E | Transportation Charge 3 on C | 15165054 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 596492124 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 894738186 | |||||||||||||||
H | Total ( F+G) | 6859659426 | |||||||||||||||
I | Contingency Charge 2 on H | 1371931885 | |||||||||||||||
6996852615 | |||||||||||||||||
Say | 69969 | ||||||||||||||||
(Rupees sixty nine thousand nine hundred sixty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 mtr long steel pole | 2 | Nos | 1224779 | 2449558 | ||||||||||||
2 | ACSR (61335 | 025 | Km | 3510265 | 87756625 | ||||||||||||
3 | 11 KB VCB | 1 | Sets | 450000 | 450000 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 65 | No | ||||||||||||||
8 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
9 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
10 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
11 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
12 | 11KV GOS | 3 | Set | 1006111 | 3018333 | ||||||||||||
13 | 11KV DOF | 3 | Set | 5221 | 15663 | ||||||||||||
14 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
15 | MS Nuts and Bolts of Assorted Size | 60 | Kgs | 6871 | 41226 | ||||||||||||
17 | Bracket Clamp by (50x6mm2) MS Flat | 64 | Nos | 48 | 3072 | ||||||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
21 | 11 Kv Danger post | 30 | Nos | 500 | 15000 | ||||||||||||
22 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
22 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 7 | Nos | 12531 | 87717 | ||||||||||||
22 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 12531 | 25062 | ||||||||||||
24 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 135 | Km | 572183 | 77244705 | ||||||||||||
24 | 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 120 | Mtr | 1500 | 180000 | ||||||||||||
24 | Errection oh UG cable | 1350 | Mtr | 450 | 607500 | ||||||||||||
24 | HT Kiosk Box | 3 | Job | 49500 | 148500 | ||||||||||||
TOTAL | 2408467087 | ||||||||||||||||
say | 2408467087 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 2408467087 | |||||||||||||||
B | Storage Charge 2 on A | 4816934173 | |||||||||||||||
C | Total (A + B) | 2456636428 | |||||||||||||||
D | Erection Charge 15 on C | 3684954642 | |||||||||||||||
E | Transportation Charge 3 on C | 7369909285 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 2898830985 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 4348246478 | |||||||||||||||
H | Total ( F+G) | 3333655633 | |||||||||||||||
I | Contingency Charge 2 on H | 6667311266 | |||||||||||||||
3400328746 | |||||||||||||||||
Say | 3400329 | ||||||||||||||||
(Rupees thirty four Lac three hundred twenty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 mtr long steel pole | 2 | Nos | 1224779 | 2449558 | ||||||||||||
2 | ACSR (61335 | 025 | Km | 3510265 | 87756625 | ||||||||||||
3 | 11 KB VCB | 1 | Sets | 550000 | 550000 | ||||||||||||
6 | MS Channel(75x40x40x6mm4) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Angle(65x65x6mm3) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 65 | No | ||||||||||||||
8 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
9 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
10 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
11 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
12 | 11KV GOS | 3 | Set | 1006111 | 3018333 | ||||||||||||
13 | 11KV DOF | 3 | Set | 5221 | 15663 | ||||||||||||
14 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
15 | MS Nuts and Bolts of Assorted Size | 60 | Kgs | 6871 | 41226 | ||||||||||||
17 | Bracket Clamp by (50x6mm2) MS Flat | 64 | Nos | 48 | 3072 | ||||||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1605 | 9630 | ||||||||||||
21 | 11 Kv Danger post | 55 | Nos | 500 | 27500 | ||||||||||||
22 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
22 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 12 | Nos | 12531 | 150372 | ||||||||||||
22 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 3 | Nos | 12531 | 37593 | ||||||||||||
24 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 23 | Km | 572183 | 13160209 | ||||||||||||
24 | 4incdia GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 225 | Mtr | 1500 | 337500 | ||||||||||||
24 | Errection oh UG cable | 2300 | Mtr | 450 | 1035000 | ||||||||||||
24 | HT Kiosk Box | 4 | Job | 49500 | 198000 | ||||||||||||
TOTAL | 3774226937 | ||||||||||||||||
say | 3774226937 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 3774226937 | |||||||||||||||
B | Storage Charge 2 on A | 7548453873 | |||||||||||||||
C | Total (A + B) | 3849711475 | |||||||||||||||
D | Erection Charge 15 on C | 5774567213 | |||||||||||||||
E | Transportation Charge 3 on C | 1154913443 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 4542659541 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 6813989311 | |||||||||||||||
H | Total ( F+G) | 5224058472 | |||||||||||||||
I | Contingency Charge 2 on H | 1044811694 | |||||||||||||||
5328539641 | |||||||||||||||||
Say | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Ramkrishna Rubber industry under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 463359 | 463359 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=02 nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 2 | Sets | 74654 | 149308 | ||||||||||||
4 | Stay Insulator(11KV) | 2 | Nos | 20 | 40 | ||||||||||||
5 | Stay Wire (725mm) | 10 | Kgs | 68387 | 68387 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 53 | Kgs | 54849 | 2906997 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV DOF Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 01 | Km | 190276 | 190276 | ||||||||||||
10 | 8 SWG GI Wire | 12 | Kgs | 67321 | 807852 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 32 | Kgs | 6871 | 219872 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 42 | Nos | 60 | 2520 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 42 | Mtr | 15394 | 646548 | ||||||||||||
23 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 55 | 110 | ||||||||||||
TOTAL | 538257719 | ||||||||||||||||
say | 538258 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 538258 | |||||||||||||||
B | Storage Charge 2 on A | 1076516 | |||||||||||||||
C | Total (A + B) | 54902316 | |||||||||||||||
D | Erection Charge 15 on C | 82353474 | |||||||||||||||
E | Transportation Charge 3 on C | 164706948 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 6478473288 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 9717709932 | |||||||||||||||
H | Total ( F+G) | 7450244281 | |||||||||||||||
I | Contingency Charge 2 on H | 1490048856 | |||||||||||||||
7599249167 | |||||||||||||||||
Say | 759925 | ||||||||||||||||
(Rupees seven Lac fifty nine thousand nine hundred twenty five )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Globe Enterprise under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 463359 | 463359 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=02 nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 68387 | 1025805 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 52 | Kgs | 54849 | 2852148 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 015 | Km | 190276 | 285414 | ||||||||||||
10 | 8 SWG GI Wire | 12 | Kgs | 67321 | 807852 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 32 | Kgs | 6871 | 219872 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 42 | Nos | 60 | 2520 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 42 | Mtr | 15394 | 646548 | ||||||||||||
23 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 55 | 110 | ||||||||||||
TOTAL | 540262725 | ||||||||||||||||
say | 540263 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 540263 | |||||||||||||||
B | Storage Charge 2 on A | 1080526 | |||||||||||||||
C | Total (A + B) | 55106826 | |||||||||||||||
D | Erection Charge 15 on C | 82660239 | |||||||||||||||
E | Transportation Charge 3 on C | 165320478 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 6502605468 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 9753908202 | |||||||||||||||
H | Total ( F+G) | 7477996288 | |||||||||||||||
I | Contingency Charge 2 on H | 1495599258 | |||||||||||||||
7627556214 | |||||||||||||||||
Say | 762756 | ||||||||||||||||
(Rupees seven Lac sixty two thousand seven hundred )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of Overhead Dedicated Feeder line line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd for providing service connection toAgartala plastic private limited under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 mtr long steel pole ( Dp-03 nos Sp-10 nos) | 16 | Nos | 1224779 | 19596464 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=08 nos Sp-26 nos ) | 42 | Nos | 4325 | 181650 | ||||||||||||
4 | Stay Set Complete | 42 | Sets | 74654 | 3135468 | ||||||||||||
5 | Stay Insulator(11KV) | 42 | Nos | 20 | 840 | ||||||||||||
6 | Stay Wire (725mm) | 210 | Kgs | 68387 | 1436127 | ||||||||||||
7 | ACSR (61335 | 87 | Km | 3510265 | 305393055 | ||||||||||||
8 | 11 KB VCB | 1 | Sets | 450000 | 450000 | ||||||||||||
9 | MS Channel(75x40x40x6mm4) | 1190 | Kgs | 54849 | 6527031 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 10 | Nos | ||||||||||||||
b | 11KV GOS Handle Support Bracket(28Mtr) | 5 | Nos | ||||||||||||||
c | Single Pole Top X-Arm(03Mtr) | 36 | Nos | ||||||||||||||
d | Single Pole Bottom X-Arm(13Mtr) | 36 | Nos | ||||||||||||||
e | Double Pole Top X-Arm( 22 Mtr) | 11 | Nos | ||||||||||||||
f | Double Pole Bottom X-Arm(25 Mtr) | 11 | Nos | ||||||||||||||
g | 11KV GOS Handle Support Bracket(28Mtr) | 5 | Nos | ||||||||||||||
10 | MS Angle(65x65x6mm3) | 994 | Kgs | 54849 | 54519906 | ||||||||||||
a) | SinglePole Guard X-Arm (15Mtr) | 36 | No | ||||||||||||||
b | DP Pole Guard X-Arm (25Mtr) | 11 | No | ||||||||||||||
c | DP Pole cross braket (17Mtrlong ) | 44 | No | ||||||||||||||
d | 11KV LA Bracket(28Mtr) | 5 | No | ||||||||||||||
11 | 11KV Disc Insulator | 156 | Nos | 2406 | 375336 | ||||||||||||
12 | 11KV Disc Fittings | 156 | Nos | 33766 | 5267496 | ||||||||||||
13 | 11KV Pin Insulator | 210 | Nos | 5292 | 111132 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 210 | Nos | 8248 | 173208 | ||||||||||||
15 | 11KV GOS (3p two post) | 5 | Set | 1006111 | 5030555 | ||||||||||||
16 | 11KV DOF(3ph) | 5 | Set | 5221 | 26105 | ||||||||||||
17 | 11KV LA | 15 | Nos | 369 | 5535 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 340 | Kgs | 6871 | 233614 | ||||||||||||
19 | Bracket Clamp by (50x6mm2) MS Flat | 560 | Nos | 60 | 33600 | ||||||||||||
20 | Stay Clamp by (50x6mm2) MS Flat | 42 | Nos | 495 | 2079 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe ( for earthing) | 9 | Nos | 1500 | 13500 | ||||||||||||
22 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 6000 | 12000 | ||||||||||||
23 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 6000 | 12000 | ||||||||||||
24 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) | 015 | Km | 870000 | 130500 | ||||||||||||
25 | 11KV Danger plate | 47 | Nos | 55 | 2585 | ||||||||||||
TOTAL | 1729567371 | ||||||||||||||||
say | 1729567 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 1729567 | |||||||||||||||
B | Storage Charge 2 on A | 3459134 | |||||||||||||||
C | Total (A + B) | 176415834 | |||||||||||||||
D | Erection Charge 15 on C | 264623751 | |||||||||||||||
E | Transportation Charge 3 on C | 529247502 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 2081706841 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on F | 2081706841 | |||||||||||||||
H | Total ( F+G) | 2289877525 | |||||||||||||||
I | Contingency Charge 2 on H | 4579755051 | |||||||||||||||
J | TOTAL ( H+I) | 2335675076 | |||||||||||||||
K | Service charge 5on J | 1167837538 | |||||||||||||||
L | TOTAL ( J+K) | 245245883 | |||||||||||||||
Say | 2452459 | ||||||||||||||||
(Rupees twenty four Lac Fifty two thousand four hundred fifty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH PRAN BREVARAGE INDIA ( PVT) LIMITED | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 11 mtr long steel pole | 2 | Nos | 1224779 | 2449558 | ||||||||||||
2 | ACSR (61335 | 025 | Km | 3510265 | 87756625 | ||||||||||||
3 | 11 KB VCB | 1 | Sets | 450000 | 450000 | ||||||||||||
4 | MS Channel(75x40x40x6mm4) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
5 | MS Angle(65x65x6mm3) | 88 | Kgs | 54849 | 4826712 | ||||||||||||
a) | 11KV LA Bracket(28Mtr) | 65 | No | ||||||||||||||
6 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
7 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
8 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
9 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
10 | 11KV GOS | 3 | Set | 1006111 | 3018333 | ||||||||||||
11 | 11KV DOF | 3 | Set | 5221 | 15663 | ||||||||||||
12 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
13 | MS Nuts and Bolts of Assorted Size | 60 | Kgs | 6871 | 41226 | ||||||||||||
14 | Bracket Clamp by (50x6mm2) MS Flat | 64 | Nos | 48 | 3072 | ||||||||||||
15 | 30Mtr long 40mm dia GI Pipe ( for Earthing) | 6 | Nos | 1605 | 9630 | ||||||||||||
16 | 11 Kv Danger post | 30 | Nos | 500 | 15000 | ||||||||||||
17 | 240sqmm Lugs | 24 | Nos | 21528 | 516672 | ||||||||||||
18 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 7 | Nos | 12531 | 87717 | ||||||||||||
19 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 12531 | 25062 | ||||||||||||
20 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 08 | Km | 572183 | 4577464 | ||||||||||||
21 | 10 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) | 24 | Mtr | 1500 | 36000 | ||||||||||||
22 | cutting of treanch for UG cable ( Depth-11mtr wide- 05 mtr ) | 800 | Mtr | 450 | 360000 | ||||||||||||
23 | HT Kiosk Box | 2 | Job | 49500 | 99000 | ||||||||||||
TOTAL | 1652766437 | ||||||||||||||||
say | 1652766 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 1652766 | |||||||||||||||
B | Storage Charge 2 on A | 3305532 | |||||||||||||||
C | Total (A + B) | 168582132 | |||||||||||||||
D | Erection Charge 15 on C | 252873198 | |||||||||||||||
E | Transportation Charge 3 on C | 505746396 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 1989269158 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on F | 1989269158 | |||||||||||||||
H | Total ( F+G) | 2188196073 | |||||||||||||||
I | Contingency Charge 2 on H | 4376392147 | |||||||||||||||
J | TOTAL ( H+I) | 2231959995 | |||||||||||||||
K | Service charge 5on J | 1115979997 | |||||||||||||||
L | TOTAL ( J+K) | 2343557995 | |||||||||||||||
Say | Rs234355900 | ||||||||||||||||
Say | 2343559 | ||||||||||||||||
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK WITH | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 2 | Nos | 463359 | 926718 | ||||||||||||
2 | 9Mtr PCC Pole | 12 | Nos | 4325 | 51900 | ||||||||||||
3 | Stay Set Complete | 8 | Sets | 74654 | 597232 | ||||||||||||
4 | Stay Insulator(11KV) | 8 | Nos | 20 | 160 | ||||||||||||
5 | Stay Wire (725mm) | 40 | Kgs | 68387 | 273548 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 52 | Kgs | 54849 | 2852148 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 4 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 4 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 4 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 2 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 4 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 4 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 2 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 2 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 2 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 2 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 15 | Km | 190276 | 285414 | ||||||||||||
10 | 8 SWG GI Wire | 55 | Kgs | 67321 | 3702655 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 2406 | 43308 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 33766 | 607788 | ||||||||||||
13 | 11KV Pin Insulator | 15 | Nos | 5292 | 7938 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 15 | Nos | 8248 | 12372 | ||||||||||||
15 | 11KV GOS | 2 | Set | 7899 | 15798 | ||||||||||||
16 | 11KV DOF | 2 | Set | 5221 | 10442 | ||||||||||||
17 | 11KV LA | 6 | Nos | 369 | 2214 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 52 | Kgs | 6871 | 357292 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 8 | Pairs | 495 | 396 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 52 | Nos | 60 | 3120 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1600 | 9600 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 84 | Mtr | 15394 | 1293096 | ||||||||||||
23 | 500Amps Cutout | 12 | Nos | 9674 | 116088 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 8 | Nos | 55 | 440 | ||||||||||||
TOTAL | 1119176203 | ||||||||||||||||
say | 1119176 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 1119176 | |||||||||||||||
B | Storage Charge 2 on A | 2238352 | |||||||||||||||
C | Total (A + B) | 114155952 | |||||||||||||||
D | Erection Charge 15 on C | 171233928 | |||||||||||||||
E | Transportation Charge 3 on C | 342467856 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 1347040234 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 202056035 | |||||||||||||||
H | Total ( F+G) | 1549096269 | |||||||||||||||
I | Contingency Charge 2 on H | 3098192537 | |||||||||||||||
1580078194 | |||||||||||||||||
Say | 1580078 | ||||||||||||||||
(Rupees fifteen Lac eighty thousand amp seventy eight )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of Didicated Feeder line from Rubber Park 33 KV substation to Abhisar Buildwell Pvt Ltd ( Rubber Division) amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 2 | Nos | 463359 | 926718 | ||||||||||||
2 | 9Mtr PCC Pole | 28 | Nos | 4325 | 121100 | ||||||||||||
3 | 11 KB VCB | 1 | Sets | 450000 | 450000 | ||||||||||||
3 | Stay Set Complete | 14 | Sets | 74654 | 1045156 | ||||||||||||
4 | Stay Insulator(11KV) | 14 | Nos | 20 | 280 | ||||||||||||
5 | Stay Wire (725mm) | 70 | Kgs | 68387 | 478709 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 52 | Kgs | 54849 | 2852148 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 739 | Kgs | 54849 | 40533411 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 6 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 6 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 6 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 6 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 12 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 12 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 6 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 6 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 234 | Kgs | 54849 | 12834666 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 6 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 2 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 6 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 42 | Km | 190276 | 7991592 | ||||||||||||
10 | 8 SWG GI Wire | 220 | Kgs | 67321 | 1481062 | ||||||||||||
11 | 11KV Disc Insulator | 54 | Nos | 2406 | 129924 | ||||||||||||
12 | 11KV Disc Fittings | 54 | Nos | 33766 | 1823364 | ||||||||||||
13 | 11KV Pin Insulator | 30 | Nos | 5292 | 15876 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 30 | Nos | 8248 | 24744 | ||||||||||||
15 | 11KV GOS | 3 | Set | 7899 | 23697 | ||||||||||||
16 | 11KV DOF | 3 | Set | 5221 | 15663 | ||||||||||||
17 | 11KV LA | 9 | Nos | 369 | 3321 | ||||||||||||
18 | 120sqmm Lugs | 24 | Nos | 165 | 3960 | ||||||||||||
19 | 240 sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
20 | 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 12531 | 25062 | ||||||||||||
21 | 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor | 2 | Nos | 12531 | 25062 | ||||||||||||
22 | 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) | 015 | Km | 572183 | 8582745 | ||||||||||||
23 | MS Nuts and Bolts of Assorted Size | 189 | Kgs | 6871 | 1298619 | ||||||||||||
24 | Stay Clamp by (50x6mm2) MS Flat | 14 | Pairs | 495 | 693 | ||||||||||||
25 | Bracket Clamp by (50x6mm2) MS Flat | 140 | Nos | 60 | 8400 | ||||||||||||
26 | 30Mtr long 40mm dia GI Pipe Earthing | 6 | Nos | 1600 | 9600 | ||||||||||||
27 | 185 sqmm PVC insulated Al Conductor | 84 | Mtr | 15394 | 1293096 | ||||||||||||
28 | 500Amps Cutout | 12 | Nos | 9674 | 116088 | ||||||||||||
29 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
30 | Danger plate | 8 | Nos | 55 | 440 | ||||||||||||
TOTAL | 1949334855 | ||||||||||||||||
say | 1949335 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 1949335 | |||||||||||||||
B | Storage Charge 2 on A | 389867 | |||||||||||||||
C | Total (A + B) | 19883217 | |||||||||||||||
D | Erection Charge 15 on C | 298248255 | |||||||||||||||
E | Transportation Charge 3 on C | 59649651 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 2346219606 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 3519329409 | |||||||||||||||
H | Total ( F+G) | 2698152547 | |||||||||||||||
I | Contingency Charge 2 on H | 5396305094 | |||||||||||||||
2752115598 | |||||||||||||||||
Say | 2752116 | ||||||||||||||||
(Rupees Twenty seven Lac fifty two thousand one hundred sixteen )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to PRAN BREVARAGE (INDIA) PRIVATE LIMITED under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 500 KVA 110433KV Distribution Transformer | 1 | Nos | 463359 | 463359 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=02 nos) | 2 | Nos | 4325 | 8650 | ||||||||||||
3 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
4 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
5 | Stay Wire (725mm) | 15 | Kgs | 68387 | 1025805 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 52 | Kgs | 54849 | 2852148 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 112 | Kgs | 54849 | 6143088 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 48 | Kgs | 54849 | 2632752 | ||||||||||||
a) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
b) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
c) | Double Pole Guard X-Arm (28Mtr) | 2 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 015 | Km | 190276 | 285414 | ||||||||||||
10 | 8 SWG GI Wire | 12 | Kgs | 67321 | 807852 | ||||||||||||
11 | 11KV Disc Insulator | 12 | Nos | 2406 | 28872 | ||||||||||||
12 | 11KV Disc Fittings | 12 | Nos | 33766 | 405192 | ||||||||||||
13 | 11KV Pin Insulator | 9 | Nos | 5292 | 47628 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 9 | Nos | 8248 | 74232 | ||||||||||||
15 | 11KV GOS | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 32 | Kgs | 6871 | 219872 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 2 | Pairs | 495 | 99 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 42 | Nos | 60 | 2520 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe Earthing | 3 | Nos | 1600 | 4800 | ||||||||||||
22 | 185 sqmm PVC insulated Al Conductor | 42 | Mtr | 15394 | 646548 | ||||||||||||
23 | 500Amps Cutout | 6 | Nos | 9674 | 58044 | ||||||||||||
24 | 185sqmm Lugs | 24 | Nos | 219 | 5256 | ||||||||||||
25 | Danger plate | 2 | Nos | 55 | 110 | ||||||||||||
TOTAL | 540262725 | ||||||||||||||||
say | 540263 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 540263 | |||||||||||||||
B | Storage Charge 2 on A | 1080526 | |||||||||||||||
C | Total (A + B) | 55106826 | |||||||||||||||
D | Erection Charge 15 on C | 82660239 | |||||||||||||||
E | Transportation Charge 3 on C | 165320478 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 6502605468 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on F | 6502605468 | |||||||||||||||
H | Total ( F+G) | 7152866015 | |||||||||||||||
I | Contingency Charge 2 on H | 1430573203 | |||||||||||||||
J | TOTAL ( H+I) | 7295923335 | |||||||||||||||
K | Service charge 5on J | 3647961668 | |||||||||||||||
L | TOTAL ( J+K) | 7660719502 | |||||||||||||||
Say | 766072 | ||||||||||||||||
Say | 766072 | ||||||||||||||||
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to 10 nos consumer at south shib nagar village comittee under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with South shib nagar village committee | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | Stay Set Complete | 3 | Sets | 74654 | 223962 | ||||||||||||
2 | Stay Insulator(11KV) | 3 | Nos | 20 | 60 | ||||||||||||
3 | Stay Wire (725mm) | 12 | Kgs | 6838 | 82056 | ||||||||||||
4 | Weasel ACSR (61259mm) | 08 | Km | 190276 | 1522208 | ||||||||||||
5 | MS Nuts and Bolts of Assorted Size | 1158 | Kgs | 6732 | 7795656 | ||||||||||||
6 | Stay Clamp by (50x6mm2) MS Flat | 3 | Pairs | 495 | 1485 | ||||||||||||
7 | LT shackle insulator | 20 | Nos | 1125 | 225 | ||||||||||||
8 | Straps with NB ( 16x75) | 20 | Nos | 6871 | 13742 | ||||||||||||
TOTAL | 208695256 | ||||||||||||||||
say | 20870 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 20870 | |||||||||||||||
B | Storage Charge 2 on A | 4174 | |||||||||||||||
C | Total (A + B) | 212874 | |||||||||||||||
D | Erection Charge 15 on C | 319311 | |||||||||||||||
E | Transportation Charge 3 on C | 638622 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 25119132 | |||||||||||||||
G | Supervision Charge and Establishment Charge 15 on F | 37678698 | |||||||||||||||
H | Total ( F+G) | 288870018 | |||||||||||||||
I | Contingency Charge 2 on H | 577740036 | |||||||||||||||
2946474184 | |||||||||||||||||
Say | 29465 | ||||||||||||||||
(Rupees twenty nine thousand four hundred sixty five )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of LT Linne for providing of SC to sri Pankaj Roy Kalitilla under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - Deposit Work with sri Pankaj roy | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 8Mtr PCC Pole | 15 | Nos | 3553 | 53295 | ||||||||||||
2 | Stay Set Complete | 9 | Sets | 74654 | 671886 | ||||||||||||
3 | Stay Insulator(11KV) | 9 | Nos | 20 | 180 | ||||||||||||
4 | Stay Wire (725mm) | 45 | Kgs | 6838 | 30771 | ||||||||||||
5 | Weasel ACSR (61259mm) | 17 | Km | 190276 | 3234692 | ||||||||||||
6 | MS Nuts and Bolts of Assorted Size | 75 | Kgs | 6732 | 5049 | ||||||||||||
7 | Stay Clamp by (50x6mm2) MS Flat | 15 | Pairs | 495 | 7425 | ||||||||||||
8 | LT shackle insulator | 36 | Nos | 1125 | 405 | ||||||||||||
9 | Straps with NB ( 16x75) | 36 | Nos | 6871 | 247356 | ||||||||||||
TOTAL | 10428794 | ||||||||||||||||
say | 104288 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 104288 | |||||||||||||||
B | Storage Charge 2 on A | 208576 | |||||||||||||||
C | Total (A + B) | 10637376 | |||||||||||||||
D | Erection Charge 15 on C | 15956064 | |||||||||||||||
E | Transportation Charge 3 on C | 31912128 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 1255210368 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on F | 1255210368 | |||||||||||||||
H | Total ( F+G) | 1380731405 | |||||||||||||||
I | Contingency Charge 2 on H | 276146281 | |||||||||||||||
J | TOTAL ( H+I) | 1408346033 | |||||||||||||||
K | Service charge 5on J | 7041730164 | |||||||||||||||
L | TOTAL ( J+K) | 1478763335 | |||||||||||||||
Say | 147876 | ||||||||||||||||
Say | 147876 | ||||||||||||||||
(Rupees one Lac forty seven thousand eight hundred seventy six )Only | |||||||||||||||||
WORK ESTIMATE | |||||||||||||||||
Name of work - | |||||||||||||||||
Extension of HT LT Line amp Construction of 1x25 KVA pole mounted Substation for Providing of Service connection to ATC INDIA TOWER at RKNagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||
Chargeable to - DEPOSIT WORK | |||||||||||||||||
A] COST OF MATERIALS | |||||||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||||||
1 | 25 KVA 110433KV Distribution Transformer | 1 | Nos | 54044 | 54044 | ||||||||||||
2 | 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) | 3 | Nos | 4325 | 12975 | ||||||||||||
3 | Stay Set Complete | 4 | Sets | 74654 | 298616 | ||||||||||||
4 | Stay Insulator(11KV) | 4 | Nos | 20 | 80 | ||||||||||||
5 | Stay Wire (725mm) | 20 | Kgs | 6838 | 13676 | ||||||||||||
6 | MS Channel(100x50x50x6mm4) | 98 | Kgs | 54849 | 5375202 | ||||||||||||
a) | Substation Line Bracket(28Mtr) | 1 | Nos | ||||||||||||||
b) | Transformer Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
c) | Transformer Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
7 | MS Channel(75x40x40x6mm4) | 158 | Kgs | 5485 | 86663 | ||||||||||||
a) | 11KV GOS Base Bracket(28Mtr) | 2 | Nos | ||||||||||||||
b) | 11KV GOS Base Support Bracket(08Mtr) | 2 | Nos | ||||||||||||||
c) | 11KV DOF Bracket(28Mtr) | 2 | Nos | ||||||||||||||
d) | 11KV GOS Handle Support Bracket(28Mtr) | 1 | Nos | ||||||||||||||
e) | Single Pole Top X-Arm(03Mtr) | 1 | Nos | ||||||||||||||
f) | Single Pole Bottom X-Arm(13Mtr) | 1 | Nos | ||||||||||||||
g) | Double Pole Top X-Arm( 22 Mtr) | 1 | Nos | ||||||||||||||
h) | Double Pole Bottom X-Arm(25 Mtr) | 1 | Nos | ||||||||||||||
8 | MS Angle(65x65x6mm3) | 57 | Kgs | 5485 | 312645 | ||||||||||||
a) | Double pole Gurd Bkt( 25 Mtr) | 1 | No | ||||||||||||||
b) | Double Pole Guard X-Arm for Substation(3Mtr) | 1 | No | ||||||||||||||
c) | 11KV LA Bracket(28Mtr) | 1 | No | ||||||||||||||
d) | SinglePole Guard X-Arm (15Mtr) | 4 | No | ||||||||||||||
9 | Weasel ACSR (61259mm) | 08 | Km | 190276 | 1522208 | ||||||||||||
10 | 8 SWG GI Wire | 35 | Kgs | 6732 | 23562 | ||||||||||||
11 | 11KV Disc Insulator | 18 | Nos | 2406 | 43308 | ||||||||||||
12 | 11KV Disc Fittings | 18 | Nos | 33766 | 607788 | ||||||||||||
13 | 11KV Pin Insulator | 18 | Nos | 5292 | 95256 | ||||||||||||
14 | GI Pin for 11KV Pin Insulator | 18 | Nos | 8248 | 148464 | ||||||||||||
15 | 11KV GOS (3 ph) | 1 | Set | 7899 | 7899 | ||||||||||||
16 | 11KV DOF (3 ph) | 1 | Set | 5221 | 5221 | ||||||||||||
17 | 11KV LA | 3 | Nos | 369 | 1107 | ||||||||||||
18 | MS Nuts and Bolts of Assorted Size | 40 | Kgs | 6871 | 27484 | ||||||||||||
19 | Stay Clamp by (50x6mm2) MS Flat | 5 | Pairs | 495 | 2475 | ||||||||||||
20 | Bracket Clamp by (50x6mm2) MS Flat | 60 | Nos | 48 | 2880 | ||||||||||||
21 | 30Mtr long 40mm dia GI Pipe for Earthing | 3 | Nos | 1605 | 4815 | ||||||||||||
22 | 35 sqmm PVC insulated Al Conductor | 48 | Mtr | 39386 | 1890528 | ||||||||||||
22 | 16 sqmm PVC insulated Al Conductor | 200 | Mtr | 22602 | 45204 | ||||||||||||
23 | 100Amps Cutout | 3 | Nos | 1926 | 5778 | ||||||||||||
24 | 11 Kv Danger Plate | 4 | Nos | 55 | 220 | ||||||||||||
25 | 120sqmm Lugs | 24 | Nos | 165 | 3960 | ||||||||||||
TOTAL | 15513150 | ||||||||||||||||
say | 155132 | ||||||||||||||||
ABSTRACT OF COST | |||||||||||||||||
A | Cost of Materials | 155132 | |||||||||||||||
B | Storage Charge 2 on A | 310264 | |||||||||||||||
C | Total (A + B) | 15823464 | |||||||||||||||
D | Erection Charge 15 on C | 23735196 | |||||||||||||||
E | Transportation Charge 3 on C | 47470392 | |||||||||||||||
F | TOTAL ( C+D+E) ) | 1867168752 | |||||||||||||||
G | Supervision Charge and Establishment Charge 10 on F | 1867168752 | |||||||||||||||
H | Total ( F+G) | 2053885627 | |||||||||||||||
I | Contingency Charge 2 on H | 4107771254 | |||||||||||||||
J | TOTAL ( H+I) | 209496334 | |||||||||||||||
K | Service charge 5on J | 104748167 | |||||||||||||||
L | TOTAL ( J+K) | 2199711507 | |||||||||||||||
Say | 219971 | ||||||||||||||||
(Rupees two Lac nineteen thousand nine hundred seventy one )Only |
TRIPURA STATE ELECTRICITY CORPORATION LIMITED | |||||||||||||||||||
A Govt of Tripura Enterprise) | |||||||||||||||||||
Circle -Electrical Circle-ll | Division Electrical Division Jirania | ||||||||||||||||||
BIDDING SCHEDULE | |||||||||||||||||||
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||||
SlNo | Description of items | Unit | Qty | Supply | Erection | ||||||||||||||
Rate in Rs in digid | Rate in Rs in word | Amt in Rs | Rate in Rs in digid | Rate in Rs in word | Amt in Rs | ||||||||||||||
1 | Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) | Km | 07 | helliphelliphellip | helliphelliphellip | helliphelliphellip | |||||||||||||
2 | Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments | Km | 083 | TSECL SUPPLY | helliphelliphellip | helliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphellip | ||||||||||
3 | Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm | Km | 083 | TSECL SUPPLY | helliphelliphellip | helliphellip | |||||||||||||
4 | Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) | Mt | 200 | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
5 | Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge | Mt | 200 | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
6 | Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable | Nos | 4 | ||||||||||||||||
7 | Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable | Nos | 1 | ||||||||||||||||
8 | Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) | Mt | 36 | ||||||||||||||||
9 | T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment | Nos | 10 | ||||||||||||||||
10 | Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | 90mt long Steel Pole | Nos | 4 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
b | 80mt long PCC Pole | Nos | 20 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
11 | Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble | Set | 18 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
12 | Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) | Nos | 6 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
13 | Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) | Nos | 4 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
14 | Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) | Nos | 8 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
15 | Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) | Nos | 2 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
16 | Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) | Nos | 8 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
17 | Fabrication of Cross arms as per specification | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | MS Channel 100x50x50x6mm75x40x40x6mm | Kg | 34344 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
b | MS angle 65x65x6mm 50x50x6mm | Kg | 58 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
18 | Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | 100 KVA Transformer | Nos | 2 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
19 | Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS | Set | 3 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
20 | Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS | Set | 2 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
21 | Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS | Nos | 6 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
22 | Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design | Set | 8 | ||||||||||||||||
23 | Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) | Nos | 4 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
24 | Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd | Km | 21 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
25 | Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd | Km | 09 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
26 | Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts | Nos | 52 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
27 | Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | Bracket Clamp | Nos | 38 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
b | Stay Clamp | pair | 36 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
28 | Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble | Set | 4 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
29 | Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection | Mt | 20 | helliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
Sub Total | |||||||||||||||||||
( Supply + Erection) total Rs | |||||||||||||||||||
Rounded of Rs | |||||||||||||||||||
(Rupees only) | |||||||||||||||||||
Signature of bidder | |||||||||||||||||||
Dy General Manager | |||||||||||||||||||
Jirania Electrical Division |
WORK ESTIMATE | |||||||||||||
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division | |||||||||||||
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA | |||||||||||||
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- | Chargeable to - DEPOSIT WORK WITH TIDC | ||||||||||||
B] COST OF MATERIALS FOR 11KV LINE EXTENSION | |||||||||||||
SlNO | Description of work | Qty | Unit | RateUnit | Amount | ||||||||
1 | 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) | 35 | Nos | 1015422 | 3553977 | ||||||||
2 | 9mtr Long PCC Pole | 25 | Nos | 2650 | 66250 | ||||||||
3 | Stay Set Complete | 25 | Sets | 47025 | 1175625 | 29390625 | |||||||
4 | Stay Insulator(11KV) | 125 | Nos | 1092 | 1365 | 34125 | |||||||
5 | Stay Wire (725mm) | 24 | Kgs | 451 | 10824 | ||||||||
6 | MS Channel(75x40x40x6mm4) | 116 | Kgs | 3352 | 388832 | ||||||||
a) | Double Pole X-Arm(22Mtr) | 3 | Nos | ||||||||||
b) | Single Pole Top X-Arm(03Mtr) | 6 | Nos | ||||||||||
c) | Single Pole Bottom X-Arm(12Mtr) | 6 | Nos | ||||||||||
7 | MS Angle(65x65x6mm3) | 96 | Kgs | 321 | 30816 | ||||||||
a) | Double Pole Guard X-Arm (25Mtr) | 3 | Nos | ||||||||||
b) | SinglePole Guard X-Arm (15Mtr) | 6 | Nos | ||||||||||
8 | Weasel ACSR (61259mm) | 12 | Km | 2061233 | 24734796 | 6183699 | |||||||
9 | 8 SWG GI Wire | 80 | Kgs | 391 | 3128 | 782 | |||||||
10 | 11KV 45KN Disc Insulator | 18 | Nos | 49487 | 890766 | 2226915 | |||||||
11 | Single U Bolt type Disc Fittings | 18 | Nos | 19352 | 348336 | ||||||||
12 | 11KV Pin Insulator | 27 | Nos | 991 | 26757 | 668925 | |||||||
13 | GI Pin for 11KV Pin Insulator | 27 | Nos | 561 | 15147 | ||||||||
14 | MS Nuts and Bolts of Assorted Size | 20 | Kgs | 407 | 814 | ||||||||
15 | Stay Clamp by (50x6mm2) MS Flat | 6 | Pairs | 495 | 297 | ||||||||
16 | Bracket Clamp by (50x6mm2) MS Flat | 40 | Nos | 27 | 1080 | ||||||||
17 | Barbed Wire | 22 | Kgs | 429 | 9438 | 23595 | |||||||
24 | AddMetering Arrangement with Kiosk | 1 | Nos | 50000 | 50000 | ||||||||
18 | 30Mtr long 40mm dia GI Pipe Earthing | 2 | Nos | 1605 | 3210 | ||||||||
TOTAL | 543610286 | 1359025715 | |||||||||||
say | 163391 | ||||||||||||
(One Lac sixty three thousand three hundred and ninety one only) | |||||||||||||
ABSTRACT OF COST | 0 | ||||||||||||
A | Cost of Materials | 163391 | 0 | ||||||||||
B | Storage Charge 2 on A | 326782 | |||||||||||
C | Total (A + B) | 16665882 | 0 | ||||||||||
D | Erection Charge 15 on C | 24998823 | |||||||||||
E | Total (C + D) | 191657643 | 0 | ||||||||||
F | Transportation Charge 5 on C | 8332941 | |||||||||||
G | Supervision Charge and Establishment Charge 15 on E | 2874864645 | |||||||||||
H | Total (E + F + G) | 2287392305 | |||||||||||
I | Contingency Charge 3 on H | 6862176914 | 0 | ||||||||||
GRAND TOTAL | 2356014074 | ||||||||||||
Say | Rs | 235601 | 0 | ||||||||||
(Rupees two Lacs thirty five thousand six hundred and one)Only | |||||||||||||
0 | |||||||||||||
0 | |||||||||||||
0 | |||||||||||||
0 |
TRIPURA STATE ELECTRICITY CORPORATION LIMITED | |||||||||||||||||||
A Govt of Tripura Enterprise) | |||||||||||||||||||
Circle -Electrical Circle-ll | Division Electrical Division Jirania | ||||||||||||||||||
BIDDING SCHEDULE | |||||||||||||||||||
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division | |||||||||||||||||||
SlNo | Description of items | Unit | Qty | Supply | Erection | ||||||||||||||
Rate in Rs in digid | Rate in Rs in word | Amt in Rs | Rate in Rs in digid | Rate in Rs in word | Amt in Rs | ||||||||||||||
1 | Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) | Km | 07 | helliphelliphellip | helliphelliphellip | helliphelliphellip | |||||||||||||
2 | Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments | Km | 083 | TSECL SUPPLY | helliphelliphellip | helliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphellip | ||||||||||
3 | Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm | Km | 083 | TSECL SUPPLY | helliphelliphellip | helliphellip | |||||||||||||
4 | Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) | Mt | 200 | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
5 | Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge | Mt | 200 | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
6 | Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable | Nos | 4 | ||||||||||||||||
7 | Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable | Nos | 1 | ||||||||||||||||
8 | Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) | Mt | 36 | ||||||||||||||||
9 | T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment | Nos | 10 | ||||||||||||||||
10 | Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | 90mt long Steel Pole | Nos | 4 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
b | 80mt long PCC Pole | Nos | 20 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
11 | Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble | Set | 18 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
12 | Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) | Nos | 6 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
13 | Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) | Nos | 4 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
14 | Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) | Nos | 8 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
15 | Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) | Nos | 2 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
16 | Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) | Nos | 8 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
17 | Fabrication of Cross arms as per specification | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | MS Channel 100x50x50x6mm75x40x40x6mm | Kg | 34344 | TSECL SUPPLY | helliphellip | helliphellip | |||||||||||||
b | MS angle 65x65x6mm 50x50x6mm | Kg | 58 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
18 | Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | 100 KVA Transformer | Nos | 2 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
19 | Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS | Set | 3 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
20 | Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS | Set | 2 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
21 | Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS | Nos | 6 | TSECL SUPPLY | helliphelliphelliphelliphelliphellip | helliphellip | |||||||||||||
22 | Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design | Set | 8 | ||||||||||||||||
23 | Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) | Nos | 4 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
24 | Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd | Km | 21 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
25 | Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd | Km | 09 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
26 | Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts | Nos | 52 | TSECL SUPPLY | helliphelliphellip | helliphelliphellip | |||||||||||||
27 | Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL | helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip | |||||||||||||||||
a | Bracket Clamp | Nos | 38 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
b | Stay Clamp | pair | 36 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
28 | Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble | Set | 4 | helliphelliphelliphellip | helliphelliphelliphellip | helliphelliphelliphellip | |||||||||||||
29 | Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection | Mt | 20 | helliphelliphelliphellip | helliphelliphelliphelliphellip | helliphelliphelliphelliphellip | |||||||||||||
Sub Total | |||||||||||||||||||
( Supply + Erection) total Rs | |||||||||||||||||||
Rounded of Rs | |||||||||||||||||||
(Rupees only) | |||||||||||||||||||
Signature of bidder | |||||||||||||||||||
Dy General Manager | |||||||||||||||||||
Jirania Electrical Division |