TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia...

Date post: 02-Nov-2019
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
4
Circle :-Electrical Circle-ll Sl.N Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs 1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines, bridges, pipe lines telicom lines, gas lines and other obstracles likly to be faced etc. (Both over ground & under ground during excution as necessary). Km 0.7 ……… ……… ……….. Supply of 11 KV, 3 phase 3 core, 50 sqmm 6.35/11KV XLPE insulated conductor & TSECL TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of Tripura Enterprise) Division: Electrical Division Jirania BIDDING SCHEDULE Name of work:-Extension of 11KV U.G line in/c construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and A.H, R.K Nagar under Bodhjungnagar Electrical Sub-Division. Description of items Unit Qty Supply Erection 2 insulation screened Aluminium, power cable conductor as per IS 7098/II/1985 and latest amendments. Km 0.83 TSECL SUPPLY ……… ……. ……………. ……………. …………. 3 Laying & comissioning of 3 phase, 3 core, 11KV, XLPE insulated power cable in trenchs depth of 1100mm & width of 500mm in/c i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed & the other over the cable laid iii) Laying of consolidated plain brick solling i/c supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm. Km 0.83 TSECL SUPPLY ……… ……. 4 Supply of 1100 Volts three & half (3.5) core Aluminium conductor, XLPE insulated & PVC sheathed, Armoured (A2XFY) cable 120 Sqmm conforming to IS:7098 (Pt-1) Mt. 200 …………… …………… ……………. 5 Laying, Erection & comissioning of 1100Volts 3& 1/2 Aluminium conductor, XLPE insulated & PVC Sheathed, Armoured (A2XFY) cables 120 Sqmm conforming to IS:7098 (Pt-1) in/c exacavation of earth upto a depth of 1 Mtr and width of trench 0.40 Mtr. Protection of cable using first class flat brick 3 inch single layer, filling of trench with local sand upto a thicness of 0.3 mtr in two layers, refilling available excaveted earth in trenches etc. as per direction of Engineer-in-Charge. Mt. 200 …………… …………… ……………. 6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 6.35/11 KV (E),3 Ph,3 core, 50 sqmm cable. Nos 4 7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 6.35/11 KV (E),3 Ph,3 core, 50 sqmm cable. Nos 1 8 Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing, at crossing of water supply point, Teliphone line etc.for U.G Cable as reqd.(Make TATA, JINDAL, BANSAL) Mt. 36
Transcript
Page 1: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

Circle -Electrical Circle-ll

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

1

Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary)

Km 07 helliphelliphellip helliphelliphellip helliphelliphellip

Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp TSECL

TRIPURA STATE ELECTRICITY CORPORATION LIMITEDA Govt of Tripura Enterprise)

Division Electrical Division Jirania

BIDDING SCHEDULEName of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division

Description of items

Unit Qty

Supply Erection

2 insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments

Km 083TSECL

SUPPLYhelliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip

3

Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in

trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of

soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the

other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over

2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick

solling work upto ground lavel for XLPE cable of size 50 sqmm

Km 083TSECL

SUPPLYhelliphelliphellip helliphellip

4Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp

PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1)Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip

5

Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE

insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to

IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040

Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with

local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in

trenches etc as per direction of Engineer-in-Charge

Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip

6Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable

Nos 4

7Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable

Nos 1

8Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL)

Mt 36

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

9

T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment

Nos 10

10Erection of different size of PCC pole ST pole direct in earth inc excavation refilling

ramming etc as requiredThe pole should be burried 16th of their length

a90mt long Steel Pole

Nos 4TSECL

SUPPLYhelliphellip helliphellip

b80mt long PCC Pole

Nos 20TSECL

SUPPLYhelliphellip helliphellip

11

Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted

stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with

300 mm long threaded adjustable 16 mm dia MS rod and thimble

Set 18TSECL

SUPPLYhelliphellip helliphellip

Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm TSECL

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

12

MS Channel (6 Nos)

Nos 6TSECL

SUPPLYhelliphellip helliphellip

13

Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel

(4 Nos)

Nos 4TSECL

SUPPLYhelliphellip helliphellip

14

Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size

75x40x40x6mm MS Channel (8 Nos)

Nos 8TSECL

SUPPLYhelliphellip helliphellip

15

Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size

65x65x6mm MS Angle (2 Nos)

Nos 2TSECL

SUPPLYhelliphellip helliphellip

16

Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle

(8 Nos)

Nos 8TSECL

SUPPLYhelliphellip helliphellip

17 Fabrication of Cross arms as per specification

aMS Channel 100x50x50x6mm75x40x40x6mm

Kg 343TSECL

SUPPLYhelliphellip helliphellip

bMS angle 65x65x6mm 50x50x6mm

Kg 58TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

18

Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

necessary connection

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

a

100 KVA Transformer

Nos 2TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

19

Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break

switch including necessary connection as per TS

Set 3TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

20

Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for

11KV 50Hz AC system operation for air break switch including necessary connection

as per TS

Set 2TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

21

Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable

for nominal system Voltage of 11 KV inc necessary connection as per TS

Nos 6TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

22

Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per

Set 8nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design

23

Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp

Nuts amp Bolts)

Nos 4TSECL

SUPPLYhelliphelliphellip helliphelliphellip

24

Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying

hoisting binding etc complete as reqd

Km 21TSECL

SUPPLYhelliphelliphellip helliphelliphellip

25

Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc

complete as reqd

Km 09TSECL

SUPPLYhelliphelliphellip helliphelliphellip

26

Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp

Bolts on poles excluding the cost of straps Nuts and Bolts

Nos 52TSECL

SUPPLYhelliphelliphellip helliphelliphellip

27Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL

aBracket Clamp

Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

bStay Clamp

pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

28

Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of

size 24x10x15 and cable connections with termination by Lugs Thimble complete Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

29

Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection

Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip

Signature of bidderDy General Manager

Jirania Electrical Division

Rounded of Rs (Rupees only)

Sub Total

( Supply + Erection) total Rs

RUB amp LI(

Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

Work Estimate for Line

(AS Deb Barma)Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division
WORK ESTIMATE
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- Chargeable to - DEPOSIT WORK WITH TIDC
B] COST OF MATERIALS FOR 11KV LINE EXTENSION
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) 35 Nos 1015422 3553977
2 9mtr Long PCC Pole 25 Nos 2650 66250
3 Stay Set Complete 25 Sets 47025 1175625 29390625
4 Stay Insulator(11KV) 125 Nos 1092 1365 34125
5 Stay Wire (725mm) 24 Kgs 451 10824
6 MS Channel(75x40x40x6mm4) 116 Kgs 3352 388832
a) Double Pole X-Arm(22Mtr) 3 Nos
b) Single Pole Top X-Arm(03Mtr) 6 Nos
c) Single Pole Bottom X-Arm(12Mtr) 6 Nos
7 MS Angle(65x65x6mm3) 96 Kgs 321 30816
a) Double Pole Guard X-Arm (25Mtr) 3 Nos
b) SinglePole Guard X-Arm (15Mtr) 6 Nos
8 Weasel ACSR (61259mm) 12 Km 2061233 24734796 6183699
9 8 SWG GI Wire 80 Kgs 391 3128 782
10 11KV 45KN Disc Insulator 18 Nos 49487 890766 2226915
11 Single U Bolt type Disc Fittings 18 Nos 19352 348336
12 11KV Pin Insulator 27 Nos 991 26757 668925
13 GI Pin for 11KV Pin Insulator 27 Nos 561 15147
14 MS Nuts and Bolts of Assorted Size 20 Kgs 407 814
15 Stay Clamp by (50x6mm2) MS Flat 6 Pairs 495 297
16 Bracket Clamp by (50x6mm2) MS Flat 40 Nos 27 1080
17 Barbed Wire 22 Kgs 429 9438 23595
24 AddMetering Arrangement with Kiosk 1 Nos 50000 50000
18 30Mtr long 40mm dia GI Pipe Earthing 2 Nos 1605 3210
TOTAL 543610286 1359025715
say 163391
(One Lac sixty three thousand three hundred and ninety one only)
ABSTRACT OF COST 0
A Cost of Materials 163391 0
B Storage Charge 2 on A 326782
C Total (A + B) 16665882 0
D Erection Charge 15 on C 24998823
E Total (C + D) 191657643 0
F Transportation Charge 5 on C 8332941
G Supervision Charge and Establishment Charge 15 on E 2874864645
H Total (E + F + G) 2287392305
I Contingency Charge 3 on H 6862176914 0
GRAND TOTAL 2356014074
Say Rs 235601 0
(Rupees two Lacs thirty five thousand six hundred and one)Only
0
0
0
0
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 200 KVA Substation for Providing of Service connection at Central effulent Effulent Treatment Plant ( CETP) Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 22574688 22574688
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 5 Nos 4325 21625
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Job 49500 49500
27 Danger plate 12 Nos 50 600
TOTAL 492300635
say 492300635
ABSTRACT OF COST
A Cost of Materials 492300635
C Storage Charge 2 on A 98460127
D Total (A + B) 5021466477
E Erection Charge 15 on D 7532199716
F Total (C + D) 5774686449
G Transportation Charge 5 on D 2510733239
H Supervision Charge and Establishment Charge 5 on F 2887343224
H Total ( F + G+H ) 6314494095
I Contingency Charge 3 on H 1894348228
j Addhoc 10 on H 6314494095
GRAND TOTAL 7135378327
Say Rs 713538
(Rupees seven Lac thirteen thousand five hundred thirty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection to Airtel Tower Amtali under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 7247368 7247368
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole 8 Nos 4325 34600
3 Stay Set Complete 15 Sets 58082 87123
4 Stay Insulator(11KV) 15 Nos 20 300
5 Stay Wire (725mm) 75 Kgs 5707 428025
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g) Double Pole Top X-Arm( 22 Mtr) 4 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 4 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 8 No
9 Weasel ACSR (61259mm) 6 Km 2347653 14085918
10 8 SWG GI Wire 90 Kgs 4934 44406
11 11KV Disc Insulator 36 Nos 201 7236
12 11KV Disc Fittings 36 Nos 28769 1035684
13 11KV Pin Insulator 48 Nos 4668 224064
14 GI Pin for 11KV Pin Insulator 48 Nos 561 26928
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
19 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
20 Bracket Clamp by (50x6mm2) MS Flat 120 Nos 27 3240
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 200Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 Job 49500 49500
28 Barbed Wire 20 Kgs 50 1000
TOTAL 46403016
say 464030
ABSTRACT OF COST
A Cost of Materials 464030
B Storage Charge 2 on A 92806
C Total (A + B) 4733106
D Erection Charge 15 on C 7099659
E Total (C + D) 54430719
F Transportation Charge 5 on C 2366553
G Supervision Charge and Establishment Charge 5 on E 272153595
H Total (E + F + G) 5951880795
i Over head charge 10 above ( adhoc increase) 5951880795
I Contingency Charge 3 on H 1785564239
GRAND TOTAL 6725625298
Say 672563
(Rupees Six Lac seventy two thousand five hundred sixty three)Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to NIELIT AGARTALA CENTRE for the smooth construction activities of the campus under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH NIELIT AGARTALA CENTRE
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 453582 453582
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 5 Nos 4325 21625
2 8Mtr PCC Pole 2 Nos 4325 8650
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 2347653 28171836
10 8 SWG GI Wire 40 Kgs 4934 19736
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 18 Nos 4668 84024
14 GI Pin for 11KV Pin Insulator 18 Nos 561 10098
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 27 1620
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 100Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
TOTAL 203944176
say 203944
ABSTRACT OF COST
A Cost of Materials 203944
B Storage Charge 2 on A 407888
C Total (A + B) 20802288
D Erection Charge 15 on C 31203432
E Total (C + D) 239226312
F Transportation Charge 5 on C 10401144
G Supervision Charge and Establishment Charge 5 on E 119613156
H Total (E + F + G) 2615887716
i Over head charge 10 above ( adhoc increase) 2615887716
I Contingency Charge 3 on H 7847663148
GRAND TOTAL 2955953119
Say 295595
(Rupees Two Lac Ninety five thousand five hundred ninety five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to STATE BANK OF INDIA RK Nagar Industrial branch under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 72474 72474
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Fancing 1 Job 15000 15000
27 Danger plate 12 Nos 50 600
TOTAL 210702755
say 210702755
ABSTRACT OF COST
A Cost of Materials 210702755
C Storage Charge 2 on A 42140551
D Total (A + B) 2149168101
E Erection Charge 15 on D 3223752152
F Total (C + D) 2471543316
G Transportation Charge 5 on D 1074584051
H Supervision Charge and Establishment Charge 5 on F 1235771658
H Total ( F + G+H ) 2702578887
I Contingency Charge 3 on H 8107736661
j Addhoc 10 on H 2702578887
GRAND TOTAL 3053914142
Say Rs 305391
(Rupees three Lac five thousand three hundred ninety one )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 17-03-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 6 Nos 3553 21318
3 Stay Set Complete 4 Sets 58082 232328
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 157 Kgs 3927 616539
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 4 No
d) 4 wire LT Bkt( 11 Mtr) 2 No
8 Weasel ACSR (61259mm) 14 Km 2347653 32867142
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 6 Nos 201 1206
11 11KV Disc Fittings 6 Nos 28769 172614
12 11KV Pin Insulator 8 Nos 4668 37344
13 GI Pin for 11KV Pin Insulator 8 Nos 561 4488
14 MS Nuts and Bolts of Assorted Size 12 Kgs 505 606
15 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
16 Bracket Clamp by (50x6mm2) MS Flat 18 Nos 27 486
17 Shackle insulator 14 Nos 10495 14693
TOTAL 98654352
say 98654352
ABSTRACT OF COST
A Cost of Materials 98654
C Storage Charge 2 on A 197308
D Total (A + B) 10062708
E Erection Charge 15 on D 15094062
F Total (C + D) 115721142
G Transportation Charge 5 on D 5031354
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 120752496
I Contingency Charge 3 on H 362257488
j Addhoc 0 on H 0
GRAND TOTAL 1243750709
Say 124375
(Rupees one lac twenty four thousand three hundred seventy five )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 16-04-2013 amp 17-04-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 11 Nos 4325 47575
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 10 Nos 3553 35530
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 10 No
d) 4 wire LT Bkt( 11 Mtr) 7 No
8 Weasel ACSR (61259mm) 48 Km 2347653 112687344
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 13 Nos 201 2613
11 11KV Disc Fittings 13 Nos 28769 373997
12 11KV Pin Insulator 16 Nos 4668 74688
13 GI Pin for 11KV Pin Insulator 16 Nos 561 8976
14 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
15 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
16 Bracket Clamp by (50x6mm2) MS Flat 16 Nos 27 432
17 Shackle insulator 14 Nos 10495 14693
TOTAL 230706294
say 230706294
ABSTRACT OF COST
A Cost of Materials 230706
C Storage Charge 2 on A 461412
D Total (A + B) 23532012
E Erection Charge 15 on D 35298018
F Total (C + D) 270618138
G Transportation Charge 5 on D 11766006
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 282384144
I Contingency Charge 3 on H 847152432
j Addhoc 0 on H 0
GRAND TOTAL 2908556683
Say 290856
(Rupees two Lac ninety thousand eight hundred amp fiftysix )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on03-05-2013 05-05-2013 06-05-2013 12-05-2013 amp 16-05-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 3 Nos 4325 12975
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 8 Nos 3553 28424
3 Stay Set Complete 2 Sets 58082 116164 2
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 2 Nos
b) Single Pole Bottom X-Arm(13Mtr) 2 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 1 Nos
d) 11KV DP bottom Bracket(25Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 2 No
b) Double Pole Guard X-Arm (28Mtr) 1 No
c) 2 wire LT Bkt( 051 Mtr) 6 No
d) 4 wire LT Bkt( 11 Mtr) 12 No
8 Weasel ACSR (61259mm) 09 Km 2347653 21128877
9 8 SWG GI Wire 22 Kgs 4934 108548
10 11KV Disc Insulator 3 Nos 201 603
11 11KV Disc Fittings 3 Nos 28769 86307
12 11KV Pin Insulator 6 Nos 4668 28008
13 GI Pin for 11KV Pin Insulator 6 Nos 561 3366
14 MS Nuts and Bolts of Assorted Size 18 Kgs 505 909
15 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
16 Bracket Clamp by (50x6mm2) MS Flat 8 Nos 27 216
17 Shackle insulator 12 Nos 10495 12594
TOTAL 87545997
say 87545997
ABSTRACT OF COST
A Cost of Materials 87546
C Storage Charge 2 on A 175092
D Total (A + B) 8929692
E Erection Charge 15 on D 13394538
F Total (C + D) 102691458
G Transportation Charge 5 on D 4464846
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 107156304
I Contingency Charge 3 on H 321468912
j Addhoc 10 on H 0
GRAND TOTAL 1103709931
Say 110371
B) Maintance of 3 nos Damage 25 KVA TXr Rs1200000Each Rs 3600000
Total Rs14637100
(Rupees one Lac forty six thousand three hundred amp seventy one )Only
WORK ESTIMATE
Name of work -
Reviesed estimate of Upgredation of Transformer 1x 200 KVA to 1x500KVA for Providing of new Service connection to CITY STAR AGRO INDUSTRIES Private limited at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with CITY STAR AGRO INDUSTRIES Private limited
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA DT
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 52803318 52803318
2 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
3 240 sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
4 400Amps Cutout 6 Nos 777 4662
5 Bimetalic Lugs( 300mm2) 8 Nos 23809 190472
TOTAL 5467614
say
ABSTRACT OF COST
A Cost of Materials 546761
B Storage Charge 2 on A 1093522
C Total (A + B) 55769622
D Erection Charge 15 on C 83654433
E Total (C + D) 641350653
F Transportation Charge 5 on C 27884811
G Supervision Charge and Establishment Charge 15 on E 9620259795
H Total (E + F + G) 765438062
I Contingency Charge 3 on H 2886077939
I Addhoc 10 on H 765438062
GRAND TOTAL 8419818681
Say 841982
B) Dismental of 200 KVA Txr amp Cutout Rs 150000
Total (A+B ) Rs 84348200
C) Less scrap value of existing 200 KVA Txr 40 on 22574700 13544800
GRAND TOTAL 70803400
(Rupees Seven Lac eight thousand thirty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at DAS PARA under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=8 nos SP= 9 Nos) 25 Nos 4325 108125
3 Stay Set Complete 18 Sets 58082 1045476
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 90 Kgs 5707 51363
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 446 Kgs 5473 2440958
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 9 Nos
f) Single Pole Bottom X-Arm(13Mtr) 9 Nos
g) Double Pole Top X-Arm( 22 Mtr) 7 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 7 Nos
8 MS Angle(65x65x6mm3) 213 Kgs 5473 1165749
a) Double pole Gurd Bkt( 25 Mtr) 7 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 9 No
9 Weasel ACSR (61259mm) 4 Km 2347653 9390612
10 8 SWG GI Wire 180 Kgs 4934 88812
11 11KV Disc Insulator 54 Nos 201 10854
12 11KV Disc Fittings 54 Nos 28769 1553526
13 11KV Pin Insulator 62 Nos 4668 289416
14 GI Pin for 11KV Pin Insulator 62 Nos 561 34782
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 505 4949
19 Stay Clamp by (50x6mm2) MS Flat 18 Pairs 495 891
20 Bracket Clamp by (50x6mm2) MS Flat 96 Nos 27 2592
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
27 Barbed Wire 20 Kgs 429 858
TOTAL 45877295
say 45877295
ABSTRACT OF COST
A Cost of Materials 45877295
B Storage Charge 2 on A 9175459
C Total (A + B) 467948409
D Erection Charge 15 on C 7019226135
E Total (C + D) 5381406704
F Transportation Charge 5 on C 2339742045
G Supervision Charge and Establishment Charge 15 on E 8072110055
H Total (E + F + G) 6422591914
I Contingency Charge 3 on H 1926777574
GRAND TOTAL 6615269671
Say Rs 6615269671
(Rupees six Lac sixty one thousand five hundred twenty seven )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at AMTALI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 14 Nos 3553 49742
3 Stay Set Complete 12 Sets 58082 696984
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 5707 34242
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 157 Kgs 5473 859261
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 38 Km 2347653 89210814
10 8 SWG GI Wire 80 Kgs 4934 39472
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 12 Nos 4668 56016
14 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 60 Kgs 505 3030
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
28 Shackle insulator 56 Nos 1396 78176
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 358760714
say 358760714
ABSTRACT OF COST
A Cost of Materials 358760714
B Storage Charge 2 on A 717521428
C Total (A + B) 3659359283
D Erection Charge 15 on C 5489038924
E Total (C + D) 4208263175
F Transportation Charge 5 on C 1829679641
G Supervision Charge and Establishment Charge 15 on E 6312394763
H Total (E + F + G) 5022470616
I Contingency Charge 3 on H 1506741185
GRAND TOTAL 5173144734
Say Rs 5173144734
(Rupees Five Lac seventeen thousand three hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at RAJCHANTAI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=3 nos SP= 6Nos) 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 58082 464656
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 48 Kgs 5707 273936
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
8 MS Angle(65x65x6mm3) Kgs 5473 0
a) Double Pole Guard X-Arm (28Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 6 No
9 Weasel ACSR (61259mm) 27 Km 2347653 63386631
10 8 SWG GI Wire 60 Kgs 4934 29604
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 36 Nos 4668 168048
14 GI Pin for 11KV Pin Insulator 36 Nos 561 20196
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 48 Kgs 505 2424
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 27 1404
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 301010091
say 301010091
ABSTRACT OF COST
A Cost of Materials 301010091
B Storage Charge 2 on A 602020182
C Total (A + B) 3070302928
D Erection Charge 15 on C 4605454392
E Total (C + D) 3530848367
F Transportation Charge 5 on C 1535151464
G Supervision Charge and Establishment Charge 15 on E 5296272551
H Total (E + F + G) 4213990769
I Contingency Charge 3 on H 1264197231
GRAND TOTAL 4340410492
Say Rs 4340410492
(Rupees four Lac thirtyfour thousand forty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 16506241
ABSTRACT OF COST
A Cost of Materials 16506241
B Storage Charge 2 on A 33012482
C Total (A + B) 1683636582
D Erection Charge 15 on C 2525454873
E Transportation Charge 3 on C 82531205
F Total (C + D+E) 2018713274
G Supervision Charge and Establishment Charge 5 on F 1009356637
H Total ( F + G ) 2119648938
I Overhead charge 10 on H 2018713274
J Contingency Charge 3 on H 6358946814
L GRAND TOTAL 2385109734
Say Rs 238511
(Rupees three Lac seventy two thousand one hundred thirty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 70998 35499
2 Stay Insulator(11KV) 5 Nos 12 60
3 Stay Wire (725mm) 25 Kgs 8136 2034
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 58082 29041
2 Stay Insulator(11KV) 5 Nos 20 100
3 Stay Wire (725mm) 25 Kgs 5707 142675
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to the newly constructed building of college of veterinary sciences amp AH RK nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Debashish Das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 4 Nos 3553 14212
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 08 Km 2347653 18781224
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 20 Nos 1125 225
9 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 39369324
say 39369324
ABSTRACT OF COST
A Cost of Materials 39369324
B Storage Charge 2 on A 78738648
C Total (A + B) 4015671048
D Erection Charge 15 on C 6023506572
E Transportation Charge 3 on C 19684662
F Total (C + D+E) 4814868325
G Supervision Charge and Establishment Charge 5 on F 2407434163
H Total ( F + G ) 5055611741
I Overhead charge 10 on H 4814868325
J Contingency Charge 3 on H 1516683522
K WCT6 on erection charge ie on D 3614103943
L GRAND TOTAL 5724907966
Say Rs 5724907966
B) Service connection charge 1877
C) Security 900
Grand total (A+B+C) 60026
( Sixty thousand amp twenty six ) only
BILL
Name of work -
Supply Errection amp commissioning of Various capacity Sodium Vapour Lamp for lightining of 14 Goddess temple at Uttarchampura During Kharchi Puja 2013-2014
SlNO Description of work Qty Unit RateUnit Amount
A 250 wattSodium vapour Lamp
1 Ballast 25 Nos 2450 61250
2 Lamp 25 Nos 380 9500
3 capacitor 25 Nos 288 7200
4 Indicator 25 Nos 220 5500
B 70 Watt Sodium vapour lamp 0
1 Ballast 11 Nos 1125 12375
2 Lamp 11 Nos 280 3080
3 capacitor 11 Nos 288 3168
4 Indicator 11 Nos 220 2420
C 250 watt Metal
1 Ballast 5 Nos 2450 12250
2 Lamp 5 Nos 930 4650
3 capacitor 5 Nos 288 1440
4 Indicator 5 Nos 220 1100
D Stand light 18 watt 8 Nos 140 1120
E Decorating light 10 Nos 120 1200
TOTAL 126253
Vat 135 on Rs 12625300 Rs1704400
Contractor Profit 10 on Rs 12625300 Rs1262500
Grand Total Rs 15592200
( Rupees one lac fifty five thousand nine hundred twenty two) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3350 284750
II Ballast 85 Nos 1600 136000
III Lamp 85 Nos 400 34000
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 420 89250
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 599760
Contractor profit 10 on Rs 59976000 59976 59976
Grand Total 659736
( Rupees six lac fiftynine thousand seven hundred thirty six) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3450 293250
II Ballast 85 Nos 1570 133450
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 600 127500
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 644810
Contractor profit 10 on Rs 6448100 64481
Grand Total 709291
( Rupees seven lac nine thousand two hundred ninety one only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 4000 340000
II Ballast 85 Nos 1500 127500
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 540 114750
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 400 10200
II Unskilled labour 1275 Nos 300 3825
TOTAL 676175
Contractor profit 10 on Rs 6761750 67617
Grand Total 743792
( Rupees seven lac fortythree thousand seven hundred ninety two ) only
WORK ESTIMATE
Name of work -
Extension of 11 KV Dedicated Feeder line from Bodhjungnagar 132 KV Substation to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED for Providing of Service connection to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH CITY STAR AGRO INDUSTRIES PRIVATE LIMITED
A] COST OF MATERIALS -
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtrlong ST Pole 2 Nos 1358265 271653
2 120 sq mm XLPE cable 015 Km 572183 8582745
3 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
4 MS Channel(75x40x40x6mm4) 245 Kgs 5473 1340885
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Top Bracket(28Mtr) 3 Nos
5 MS Angle(65x65x6mm3) 33 Kgs 5473 180609
c) 11KV LA Bracket(28Mtr) 2 No
6 Weasel ACSR (61259mm) 015 Km 2347653 35214795
7 11KV Disc Insulator 15 Nos 201 3015
8 11KV Disc Fittings 15 Nos 28769 431535
9 11KV Pin Insulator 12 Nos 4668 56016
10 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
11 11KV GOS 2 Set 806288 1612576
12 11KV DOF 2 Set 373613 747226
13 11KV LA 6 Nos 369 2214
14 MS Nuts and Bolts of Assorted Size 15 Kgs 505 7575
15 Bracket Clamp by (50x6mm2) MS Flat 24 Nos 27 648
16 Jointing Kit ( indoor type) 2 Nos 9000 18000
17 Jointing Kit ( outdoor type) 2 Nos 12000 24000
18 11 KV Vacum circuit Breaker control amp relay panel simplex type 400 A continous current 250 MVA rupturring capacity complete with electrical closing mechanism with internal wiring 2 overcurrent amp 1 earth fault combine relay auxilury relays 3 ammeter 1- voltmeter CT operated static trivactor meter 1 CT operated static KWH meter of CTR 1001-1A with integral earthing facility and internal arc tested for out going feeders 1 Nos 404000 404000
TOTAL 5913802595
say 5913802595
ABSTRACT OF COST
A Cost of Materials 5913802595
B Storage Charge 2 on A 1182760519
C Total (A + B) 6032078647
D Erection Charge 15 on C 904811797
E Total (C + D) 6936890444
F Transportation Charge 5 on C 3016039323
G Supervision Charge and Establishment Charge 15 on E 1040533567
H Total (E + F + G) 8279027943
I Contingency Charge 3 on H 2483708383
GRAND TOTAL 8527398781
Say Rs 8527398781
(Rupees Eight Lac fifty two thousand seven hundred seventy forty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 25 KVA Substation for Providing of Service connectionin the PIG shed under under RKVY at RK Nagar catal farm under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH BDO JIRINIA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 11 Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 4 Nos 1358265 543306
2 8Mtr PCC Pole 10 Nos 3553 35530
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 119 Kgs 5473 651287
a) 11 mtr long LT Bkt 12 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 31 Km 2016279 62504649
10 8 SWG GI Wire 60 Kgs 6772 40632
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10911 600105
23 100Amps Cutout 6 Nos 21906 131436
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 162 3888
26 Substation fancing 1 Job 14500 14500
27 Shackle insulator 52 Nos 1396 72592
28 Straps NampB(16x75) 52 pairs 4586 238472
29 Barbed Wire 20 Kgs 429 858
TOTAL 304414759
say 304414759
ABSTRACT OF COST
A Cost of Materials 304414759
B Storage Charge 2 on A 608829518
C Total (A + B) 3105030542
D Erection Charge 15 on C 4657545813
E Total (C + D) 3570785123
F Transportation Charge 5 on C 1552515271
G Supervision Charge and Establishment Charge 15 on E 5356177685
H Total (E + F + G) 4261654419
I Contingency Charge 3 on H 1278496326
GRAND TOTAL 4389504051
Say Rs 4389504051
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300 0
2 9 Mtr PCC Pole 6 Nos 4325 25950
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 15 Km 2016279 30244185
10 8 SWG GI Wire 50 Kgs 6772 3386
11 11KV Disc Insulator 24 Nos 2406 57744
12 11KV Disc Fittings 24 Nos 34958 838992
13 11KV Pin Insulator 27 Nos 5292 142884
14 GI Pin for 11KV Pin Insulator 27 Nos 8248 222696
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 120 Mtr 19295 23154
23 300Amps Cutout 6 Nos 5225 3135
24 11 Kv Danger Plate 12 Nos 55 660
25 240 sqmm Lugs 24 Nos 215 5160
26 Kiosk Box 1 Job 49500 49500
TOTAL 671383525
say 671383525
ABSTRACT OF COST
A Cost of Materials 671383525
B Storage Charge 2 on A 134276705
C Total (A + B) 6848111955
D Erection Charge 15 on C 1027216793
E Total (C + D) 7875328748
F Transportation Charge 5 on C 3424055978
G Supervision Charge and Establishment Charge 15 on E 1181299312
H Total (E + F + G) 9399033658
I Overhead charge 10 on H 9399033658
J Contingency Charge 3 on H 2819710097
GRAND TOTAL 1062090803
Say Rs 1062091
(Rupees ten Lac sixty two thousand ninety one )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9 Mtr PCC Pole 5 Nos 4325 21625
3 Stay Set Complete 3 Sets 70998 212994
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 8137 122055
6 MS Channel(100x50x50x6mm4) 0 Kgs 5473 0
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2016279 16130232
10 8 SWG GI Wire 35 Kgs 6772 23702
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 35 Kgs 6871 240485
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 30 Mtr 19295 57885
23 300Amps Cutout 3 Nos 5225 15675
24 11 Kv Danger Plate 6 Nos 55 330
25 240 sqmm Lugs 12 Nos 215 2580
26 Kiosk Box 1 Job 49500 49500
TOTAL 616537572
say 616537572
ABSTRACT OF COST
A Cost of Materials 616537572
B Storage Charge 2 on A 1233075144
C Total (A + B) 6288683234
D Erection Charge 15 on C 9433024852
E Total (C + D) 723198572
F Transportation Charge 5 on C 3144341617
G Supervision Charge and Establishment Charge 15 on E 1084797858
H Total (E + F + G) 8631217739
I Overhead charge 10 on H 8631217739
j Contingency Charge 3 on H 2589365322
GRAND TOTAL 8890154271
Say Rs 8890154271
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work - Extension of LT line for providing Street light connerction at DUKLI INDUSTRIAL GROWTH CENTRE ( TIDC)
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 20 Nos 3553 71060
3 Stay Set Complete 14 Sets 850 11900
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 70 4900
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos fo C Bkt) 72 Kgs 70 5040
7 Bracket Clamp by (50x6mm2) MS Flat 14 Nos 48 672
8 Weasel ACSR (61259mm) ( 6 wire 44 span) 3 Km 2347653 7042959
9 8 SWG GI Wire 80 Kgs 75 6000
10 LT Straps amp Bolts 50 Nos 38 1900
11 Shackle Insulator 150 Nos 11 1650
12 MS Nuts and Bolts of Assorted Size 320 Kgs 75 24000
13 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
14 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
15 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
16 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
17 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
18 MS clamp 200 Nos 80 16000
19 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
20 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
22 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
23 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
TOTAL 62557759
say 62557759
ABSTRACT OF COST
A Cost of Materials 62557759
B Storage Charge 2 on A 125115518
C Total (A + B) 6380891418
D Erection Charge 15 on C 9571337127
E Total (C + D) 7338025131
F Transportation Charge 5 on C 3190445709
G Supervision Charge and Establishment Charge 15 on E 110070377
H Total (E + F + G) 8757773471
I Contingency Charge 3 on H 2627332041
GRAND TOTAL 9020506675
Say 902051
( Rupees nine lac two thousand amp fifty one ) only
WORK ESTIMATE
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
3 MS clamp 200 Nos 80 16000
4 Nuts amp Bolts 200 Nos 20 4000
5 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
^6 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
TOTAL 391680
ABSTRACT OF COST
A Cost of Materials 391680
B Storage Charge 2 on A 78336
C Total (A + B) 3995136
D Erection Charge 15 on C 5992704
E Total (C + D) 45944064
F Transportation Charge 5 on C 1997568
G Supervision Charge and Establishment Charge 15 on E 68916096
H Total (E + F + G) 548332416
I Contingency Charge 3 on H 1644997248
GRAND TOTAL 5647823885
Say 551084
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2347653 18781224
10 8 SWG GI Wire 25 Kgs 4934 12335
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 9 Nos 4668 42012
14 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
28 Shackle insulator 8 Nos 1396 11168
29 Straps NampB(16x75) 8 pairs 6871 54968
27 Barbed Wire 15 Kgs 429 6435
TOTAL 159200654
say 159200654
ABSTRACT OF COST
A Cost of Materials 159200654
B Storage Charge 2 on A 318401308
C Total (A + B) 1623846671
D Erection Charge 15 on C 2435770006
E Total (C + D) 1867423671
F Transportation Charge 5 on C 8119233354
G Supervision Charge and Establishment Charge 15 on E 2801135507
H Total (E + F + G) 2228729556
I Contingency Charge 3 on H 6686188667
GRAND TOTAL 2295591442
Say Rs 2295591442
(Rupees Two Lac Twenty nine thousand five hundred fiftynine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to FOOD TESTING LABORATORY at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 1 Km 2347653 2347653
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 24 Nos 1125 270
9 Straps with NB ( 16x75) 24 Nos 6871 164904
TOTAL 4793747
say 4793747
ABSTRACT OF COST
A Cost of Materials 4793747
B Storage Charge 2 on A 9587494
C Total (A + B) 488962194
D Erection Charge 15 on C 733443291
E Transportation Charge 3 on C 23968735
F Total (C + D+E) 5862752581
G Supervision Charge and Establishment Charge 5 on F 2931376291
H Total ( F + G ) 615589021
I Overhead charge 10 on H 5862752581
J Contingency Charge 3 on H 1846767063
K WCT6 on erection charge ie on D 4400659746
L GRAND TOTAL 6970848772
Say Rs 6970848772
( Sixty nine thousand seven hundred eight ) only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to LALIT FLOUR MILL at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with LALIT FLOUR MILL
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 2 Nos 20 40
4 Stay Wire (725mm) 35 Kgs 5707 199745
5 Weasel ACSR (61259mm) 02 Km 2347653 4695306
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
8 LT shackle insulator 6 Nos 1125 675
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos ) 0 Kgs 70 0
9 Straps with NB ( 16x75) 6 Nos 6871 41226
TOTAL 16260836
say 16260836
ABSTRACT OF COST
A Cost of Materials 16260836
B Storage Charge 2 on A 32521672
C Total (A + B) 1658605272
D Erection Charge 15 on C 2487907908
E Transportation Charge 3 on C 8130418
F Total (C + D+E) 1988700243
G Supervision Charge and Establishment Charge 5 on F 9943501214
H Total ( F + G ) 2088135255
I Overhead charge 10 on H
J Contingency Charge 3 on H 6264405765
K WCT6 on erection charge ie on D 1492744745
L GRAND TOTAL 216570676
Say Rs 216570676
( Sixty thousand four hundred ) only
WORK ESTIMATE
Name of work -
Extension of HT Line for Providing of Service connection to Ramkrishna Rubber industry at RUBBER PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) 448 Kgs 5473 2451904
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 1 Set 7899 7899
14 11KV DOF 1 Set 5221 5221
15 11KV LA 3 Nos 369 1107
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 27 2970
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 357488314
say 357488314
ABSTRACT OF COST
A Cost of Materials 357488314
B Storage Charge 2 on A 714976628
C Total (A + B) 3646380803
D Erection Charge 15 on C 5469571204
E Total (C + D) 4193337923
F Transportation Charge 5 on C 1823190401
G Supervision Charge and Establishment Charge 15 on E 6290006885
H Total (E + F + G) 5004657652
I Overhead charge 10 on H 5004657652
J Contingency Charge 3 on H 1501397296
GRAND TOTAL 5655263147
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 2 Nos 4325 8650
2 ACSR (61259 04 Km 2016279 8065116
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 3 Nos 201 603
9 11KV Disc Fittings 3 Nos 28769 86307
10 11KV Pin Insulator 3 Nos 4668 14004
11 GI Pin for 11KV Pin Insulator 3 Nos 561 1683
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 10 Kgs 505 505
16 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
17 Bracket Clamp by (50x6mm2) MS Flat 32 Nos 27 864
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 4 Nos 12531 50124
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 80 Mtr 2200 176000
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 50 Mtr 1500 75000
24 Kiosk Box 1 Job 49500 49500
TOTAL 423354736
say 423355
ABSTRACT OF COST
A Cost of Materials 423355
B Storage Charge 2 on A 84671
C Total (A + B) 4318221
D Erection Charge 15 on C 64773315
E Total (C + D) 496595415
F Transportation Charge 5 on C 21591105
G Supervision Charge and Establishment Charge 15 on E 7448931225
H Total (E + F + G) 5926758323
I Overhead charge 10 on H 5926758323
j Contingency Charge 3 on H 1778027497
GRAND TOTAL 6697236904
Say Rs 669724
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Base monted Substation for Providing of new Service connection to Ramkrishna Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 201 1206
9 11KV Disc Fittings 6 Nos 28769 172614
10 11KV Pin Insulator 9 Nos 4668 42012
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 152447
say 152447
ABSTRACT OF COST
A Cost of Materials 152447
B Storage Charge 2 on A 304894
C Total (A + B) 15549594
D Erection Charge 15 on C 23324391
E Total (C + D) 178820331
F Transportation Charge 5 on C 7774797
G Supervision Charge and Establishment Charge 15 on E 2682304965
H Total (E + F + G) 2134181777
I Overhead charge 10 on H 2134181777
j Contingency Charge 3 on H 640254533
GRAND TOTAL 2411625407
Say 241163
(Rupees two Lac forty one thousand one hundred sixty three )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 58082 116164
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
8 Weasel ACSR (61259mm) 05 Km 2347653 11738265
9 8 SWG GI Wire 20 Kgs 4934 9868
10 11KV Disc Insulator 9 Nos 201 1809
11 11KV Disc Fittings 9 Nos 28769 258921
12 11KV Pin Insulator 9 Nos 4668 42012
13 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
14 11KV GOS 1 Set 806288 806288
15 11KV DOF 1 Set 373613 373613
16 11KV LA 3 Nos 369 1107
17 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
18 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
19 Bracket Clamp by (50x6mm2) MS Flat 38 Nos 48 1824
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
22 500Amps Cutout 6 Nos 9674 58044
23 11 Kv Danger Plate 6 Nos 55 330
24 240 sqmm Lugs 24 Nos 215 5160
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Nos 49500 49500
27 Barbed Wire 15 Kgs 429 6435
TOTAL 684227175
say 684227175
ABSTRACT OF COST
A Cost of Materials 684227175
B Storage Charge 2 on A 136845435
C Total (A + B) 6979117185
D Erection Charge 15 on C 1046867578
E Total (C + D) 8025984763
F Transportation Charge 5 on C 3489558593
G Supervision Charge and Establishment Charge 15 on E 1203897714
H Total (E + F + G) 9578838336
I Contingency Charge 3 on H 2873651501
GRAND TOTAL 9866203487
Say Rs 9866203487
(Rupees Nine Lac Eighty six thousand Six hundred Twenty )Only
WORK ESTIMATE
Name of work -
Extension of LT Line for providing of SC to Soma Paul at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Soma paul
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel Pole 2 Nos 1358265 271653
2 8Mtr PCC Pole 1 Nos 3553 3553
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 Weasel ACSR (61259mm) 32 Km 2347653 75124896
7 8 SWG Gi wire 50 Kgs 65 3250
7 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
9 LT shackle insulator 56 Nos 1125 630
10 2 mtr long MS Angle(50x50x6mm3) (16Nos ) 144 Kgs 70 10080
11 Straps with NB ( 16x75) 56 Nos 6871 384776
TOTAL 100758166
say 100758166
ABSTRACT OF COST
A Cost of Materials 100758166
B Storage Charge 2 on A 201516332
C Total (A + B) 1027733293
D Erection Charge 15 on C 154159994
E Transportation Charge 3 on C 50379083
F Total (C + D+E) 123227237
G Supervision Charge and Establishment Charge 5 on F 6161361851
H Total ( F + G ) 1293885989
I Overhead charge 10 on H 123227237
J Contingency Charge 3 on H 3881657966
K WCT6 on erection charge ie on D 9249599639
L GRAND TOTAL 1465179405
Say Rs 1465179405
( Rupees one lac forty six thousand five hundred eighteen ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x63 KVA Substation for Providing of Street light connection at Growth centre At Bodhjungnagar Growth centre under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 2 Nos 1032833 1032833
2 9Mtr PCC Pole 11 Nos 4325 47575
2 8Mtr PCC Pole 6 Nos 3553 21318
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 5 Nos
f) Single Pole Bottom X-Arm(13Mtr) 5 Nos
g DP Pole top X-Arm(17 Mtr) 2 Nos
h DP Pole Bottom X-Arm(22 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 2 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 42 Nos 2406 101052
12 11KV Disc Fittings 42 Nos 34958 1468236
13 11KV Pin Insulator 36 Nos 5293 190548
14 GI Pin for 11KV Pin Insulator 36 Nos 8243 296748
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 86 Nos 56 4816
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 110 Mtr 10495 115445
23 200Amps Cutout 12 Nos 27885 33462
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 48 Nos 1913 91824
26 LT shackle insulator 56 Nos 1125 630
27 Straps with NB 56 Nos 3683 206248
29 Kiosk Box 2 Job 49500 99000
30 Barber wire 20 Kgs 60 1200
TOTAL 53350719
say 53350719
ABSTRACT OF COST
A Cost of Materials 53350719
B Storage Charge 2 on A 106701438
C Total (A + B) 5441773338
D Erection Charge 15 on C 8162660007
E Transportation Charge 3 on C 266753595
F Total (C + D+E) 6524792934
G Supervision Charge and Establishment Charge 15 on F 9787189401
H Total ( F + G ) 7503511874
I Overhead charge 10 on H 6524792934
J Contingency Charge 3 on H 2251053562
K WCT6 on erection charge ie on D 4897596004
L GRAND TOTAL 8430072483
Say Rs 843007
(Rupees Eight Lac Forty three thousand amp seven )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x63 KVA Substation for Providing Service connection DWS Pump at Newly constructed Vetenairy college at RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work DWS DIVISION-II Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 1032833 1032833
2 9Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 12 Nos 3553 42636
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g DP Pole top X-Arm(17 Mtr) 1 Nos
h DP Pole Bottom X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 1 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 34958 629244
13 11KV Pin Insulator 15 Nos 5293 79395
14 GI Pin for 11KV Pin Insulator 15 Nos 8243 123645
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 88 Nos 1125 990
27 Straps with NB 88 Nos 3683 324104
30 Barber wire 10 Kgs 60 600
TOTAL 37085161
say 37085161
ABSTRACT OF COST
A Cost of Materials 37085161
B Storage Charge 2 on A 74170322
C Total (A + B) 3782686422
D Erection Charge 15 on C 5674029633
E Transportation Charge 3 on C 185425805
F Total (C + D+E) 453551519
G Supervision Charge and Establishment Charge 15 on F 6803272785
H Total ( F + G ) 5215842469
I Overhead charge 10 on H 453551519
J Contingency Charge 3 on H 1564752741
K WCT6 on erection charge ie on D 340441778
L GRAND TOTAL 585991344
Say Rs 585991
(Rupees five Lac Eighty five thousand Nine hundred ninety one )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT 15 km LT Line amp Construction of 2x 25 KVA Substation for providing of Service connection to Unhabited electrified area at Das para amp sarat pally under R K Nagar Grampanchyat under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO Jirinia RD Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 2 Nos 55146 110292
2 9Mtr PCC Pole 16 Nos 4325 69200
2 8Mtr PCC Pole 24 Nos 3553 85272
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 429 Kgs 5473 2347917
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g DP Pole top X-Arm(17 Mtr) 4 Nos
h DP Pole Bottom X-Arm(22 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 237 Kgs 5473 1297101
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 8 No
c) DP Pole Guard X-Arm (25Mtr) 4 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 84 Km 2016279 169367436
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 52 Nos 2406 125112
12 11KV Disc Fittings 52 Nos 34958 1817816
13 11KV Pin Insulator 48 Nos 5293 254064
14 GI Pin for 11KV Pin Insulator 48 Nos 8243 395664
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 176 Kgs 6871 1209296
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 6 Nos 27885 16731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 96 Nos 1125 1080
27 Straps with NB 96 Nos 3683 353568
30 Barber wire 10 Kgs 60 600
TOTAL 61196857
say 61196857
ABSTRACT OF COST
A Cost of Materials 61196857
B Storage Charge 2 on A 122393714
C Total (A + B) 6242079414
D Erection Charge 15 on C 9363119121
E Transportation Charge 3 on C 305984285
F Total (C + D+E) 7484375611
G Supervision Charge and Establishment Charge 15 on F 1122656342
H Total ( F + G ) 8607031953
I Overhead charge 10 on H 7484375611
J Contingency Charge 3 on H 2582109586
K WCT6 on erection charge ie on D 5617871473
L GRAND TOTAL 9669859187
Say Rs 966986
(Rupees Nine Lac sixty six nine hundred eighty six )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT amp 15 KM LT Line amp Construction of 1x 25 KVA Substation for Providing Service connection Un-electrified Habitation at sen para Muslim para Muslim Basti under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work BDO Jirinia R D Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole 12 Nos 4325 51900
2 8Mtr PCC Pole 25 Nos 3553 88825
3 Stay Set Complete 30 Sets 70998 212994
4 Stay Insulator(11KV) 30 Nos 20 600
5 Stay Wire (725mm) 150 Kgs 8136 12204
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g DP Pole top X-Arm(17 Mtr) 3 Nos
h DP Pole Bottom X-Arm(22 Mtr) 3 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 72 Km 2016279 145172088
10 8 SWG GI Wire 150 Kgs 6773 101595
11 11KV Disc Insulator 48 Nos 2406 115488
12 11KV Disc Fittings 48 Nos 34958 1677984
13 11KV Pin Insulator 52 Nos 5293 275236
14 GI Pin for 11KV Pin Insulator 52 Nos 8243 428636
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 160 Kgs 6871 109936
19 Stay Clamp by (50x6mm2) MS Flat 30 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 88 Nos 56 4928
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 120 Nos 1125 1350
27 Straps with NB 120 Nos 3683 44196
30 Barber wire 30 Kgs 60 1800
TOTAL 51229024
say 51229024
ABSTRACT OF COST
A Cost of Materials 51229024
B Storage Charge 2 on A 102458048
C Total (A + B) 5225360448
D Erection Charge 15 on C 7838040672
E Transportation Charge 3 on C 25614512
F Total (C + D+E) 6265309635
G Supervision Charge and Establishment Charge 15 on F 9397964453
H Total ( F + G ) 720510608
I Overhead charge 10 on H 6265309635
J Contingency Charge 3 on H 2161531824
L GRAND TOTAL 8047790226
Say 804779
(Rupees Eight Lac four thousand seven hundred seventy nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA amp 1x100 KVA Substation for Providing of Service connection 108 nos family at Newly constructed Horizon colony at sen para under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with BDO OlD AGARTALA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 219100 219100
2 100 KVA 110433KV Distribution Transformer 1 Nos 129478 129478
3 9Mtr PCC Pole ( DP=04 nos SP= 6 Nos) 14 Nos 4325 60550
4 8Mtr PCC Pole 85 Nos 3553 302005
5 Stay Set Complete 90 Sets 70998 638982
6 Stay Insulator(11KV) 90 Nos 20 1800
7 Stay Wire (725mm) 450 Kgs 81369 3661605
8 MS Channel(100x50x50x6mm4) 234 Kgs 5473 1280682
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
9 MS Channel(75x40x40x6mm4) 317 Kgs 5473 1734941
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
10 MS Angle(65x65x6mm3) 858 Kgs 5473 4695834
b) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
d) 15 mtr long 4 wire LT Bkt 85 No
11 Weasel ACSR (61259mm) 18 Km 2016279 36293022
12 8 SWG GI Wire 520 Kgs 6772 352144
13 11KV Disc Insulator 48 Nos 2406 115488
14 11KV Disc Fittings 48 Nos 34958 1677984
15 11KV Pin Insulator 64 Nos 8248 527872
16 GI Pin for 11KV Pin Insulator 64 Nos 561 35904
17 11KV GOS 3 Set 7899 23697
18 11KV DOF 3 Set 5221 15663
19 11KV LA 9 Nos 369 3321
20 MS Nuts and Bolts of Assorted Size 520 Kgs 6871 357292
21 Stay Clamp by (50x6mm2) MS Flat 90 Pairs 495 4455
22 Bracket Clamp by (50x6mm2) MS Flat 210 Nos 48 10080
23 30Mtr long 40mm dia GI Pipe Earthing 9 Nos 1300 11700
24 120sqmm PVC insulated Al Conductor 250 Mtr 10911 272775
25 240 sqmm PVC insulated Al Conductor 200 Mtr 19295 38590
26 300Amps Cutout 12 Nos 5225 6270
27 200Amps Cutout 9 Nos 41699 375291
28 120sqmm Lugs 48 Nos 162 7776
29 240sqmm Lugs 48 Nos 238 11424
30 Transformer Base 1 Job 89500 89500
31 LT shackle insulator 360 Nos 1125 4050
32 Straps with NB 360 Nos 3683 132588
33 Danger plate 92 Nos 50 4600
TOTAL 163704861
say 163704861
ABSTRACT OF COST
A Cost of Materials 163704861
C Storage Charge 2 on A 327409722
D Total (A + B) 1669789582
E Erection Charge 15 on D 2504684373
F Total (C + D) 192025802
G Transportation Charge 5 on D 8348947911
H Supervision Charge and Establishment Charge 5 on F 9601290098
H Total ( F + G+H ) 20997604
I Contingency Charge 3 on H 6299281199
j Addhoc 10 on H 20997604
GRAND TOTAL 2372729252
Say Rs 2372729
(Rupees Twenty three Lac seventy two thousand seven hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 165062
ABSTRACT OF COST
A Cost of Materials 165062
C Storage Charge 2 on A 330124
D Total (A + B) 16836324
E Erection Charge 15 on D 25254486
F Total (C + D) 193617726
G Transportation Charge 5 on D 8418162
H Supervision Charge and Establishment Charge 5 on F 96808863
H Total ( F + G+H ) 2117167743
I Contingency Charge 3 on H 6351503229
j Addhoc 10 on H 2117167743
GRAND TOTAL 239240
Say Rs 239240
(Rupees Two LacThirtynine thousand two hundred forty )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 1000 KVA Base monted Substation for Providing of new Service connection to MALAYA Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MALAYA RUB-TECH INDUSTRIES
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 70998 35499
4 Stay Insulator(11KV) 5 Nos 12 60
5 Stay Wire (725mm) 25 Kgs 8136 2034
6 MS Channel(75x40x40x6mm4) 224 Kgs 5473 1225952
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 5473 93041
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 2406 14436
9 11KV Disc Fittings 6 Nos 34958 209748
10 11KV Pin Insulator 9 Nos 8248 74232
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 7899 7899
13 11KV DOF 1 Set 5221 5221
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 90 Mtr 238 21420
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 17083229
say 170832
ABSTRACT OF COST
A Cost of Materials 170832
B Storage Charge 2 on A 341664
C Total (A + B) 17424864
D Erection Charge 15 on C 26137296
E Total (C + D) 200385936
F Transportation Charge 5 on C 8712432
G Supervision Charge and Establishment Charge 15 on E 300578904
H Total (E + F + G) 2391562584
I Overhead charge 10 on H 2391562584
j Contingency Charge 3 on H 7174687752
GRAND TOTAL 270246572
Say 270247
(Rupees two Lac seventy thousand two hundred forty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Santi para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 18 Km 190276 3424968
10 8 SWG GI Wire 20 Kgs 6732 13464
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 48 3264
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 11007 605385
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 25661079
say 25661079
ABSTRACT OF COST
A Cost of Materials 25661079
B Storage Charge 2 on A 51322158
C Total (A + B) 2617430058
D Erection Charge 15 on C 3926145087
E Total (C + D) 3010044567
F Transportation Charge 5 on C 1308715029
G Supervision Charge and Establishment Charge 10 on E 3010044567
H Total (E + F + G) 3441920526
I Contingency Charge 3 on H 1032576158
GRAND TOTAL 3545178142
Say Rs 3545178142
(Rupees three Lac Fifty four thousand five hundred Eighteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Das para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 15 Kgs 6732 10098
11 11KV Disc Insulator 9 Nos 2406 21654
12 11KV Disc Fittings 9 Nos 33766 303894
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 30 Mtr 11007 33021
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 22108045
say 22108045
ABSTRACT OF COST
A Cost of Materials 22108045
B Storage Charge 2 on A 4421609
C Total (A + B) 225502059
D Erection Charge 15 on C 3382530885
E Total (C + D) 2593273679
F Transportation Charge 5 on C 1127510295
G Supervision Charge and Establishment Charge 10 on E 2593273679
H Total (E + F + G) 2965352076
I Contingency Charge 3 on H 8896056228
GRAND TOTAL 3054312638
Say Rs 3054312638
(Rupees three Lac Five thousand thousand four hundred thirty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to Santosh das Bhanu kanta biswas amp purnima biswas under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with santosh das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 3 Nos 3250 9750
2 stay set complete 1 Nos 581 581
3 Stay insulator 1 Nos 20 20
4 Stay wire 1 Nos 57 57
5 Weasel ACSR (61259mm) 003 Km 2016279 6048837
6 MS Nuts and Bolts of Assorted Size 6 Kgs 505 303
7 LT shackle insulator 6 Nos 1125 675
TOTAL 113833837
say 113833837
ABSTRACT OF COST
A Cost of Materials 113833837
B Storage Charge 2 on A 227667674
C Total (A + B) 1161105137
D Erection Charge 15 on C 1741657706
E Transportation Charge 3 on C 569169185
F Total (C + D+E) 1392187827
G Supervision Charge and Establishment Charge 5 on F 6960939133
H Total ( F + G ) 1461797218
J Contingency Charge 3 on H 4385391654
L GRAND TOTAL 1505651134
Say Rs 15057
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 55419033
ABSTRACT OF COST
A Cost of Materials 55419033
C Storage Charge 2 on A 110838066
D Total (A + B) 5652741366
E Erection Charge 15 on D 8479112049
F Total (C + D) 6500652571
G Transportation Charge 5 on D 2826370683
H Supervision Charge and Establishment Charge 15 on F 9750978856
H Total ( F + G+H ) 7758387525
I Contingency Charge 3 on H 2327516257
GRAND TOTAL 7991139151
Say 799114
(Rupees seven lac ninety nine thousand one hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) Kgs 5473 0
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 3 Set 7899 23697
15 11KV LA 9 Nos 369 3321
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 142 Nos 48 6816
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
3 11 KB VCB 1 Sets 450000 450000
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable 015 Km 572183 8582745
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 934991304
say 934991304
ABSTRACT OF COST
A Cost of Materials 934991304
B Storage Charge 2 on A 1869982608
C Total (A + B) 9536911301
D Erection Charge 15 on C 1430536695
E Total (C + D) 10967448
F Transportation Charge 5 on C 476845565
G Supervision Charge and Establishment Charge 15 on E 1645117199
H Total (E + F + G) 1308941076
I Overhead charge 10 on H 1308941076
J Contingency Charge 3 on H 3926823228
GRAND TOTAL 1479103416
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 015 Km 3510265 52653975
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 250 7500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 12 Km 572183 6866196
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 90 Mtr 1500 135000
24 Errection oh UG cable 1200 Mtr 450 540000
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2197755172
say 2197755172
ABSTRACT OF COST
A Cost of Materials 2197755172
B Storage Charge 2 on A 4395510343
C Total (A + B) 2241710275
D Erection Charge 15 on C 3362565412
E Total (C + D) 2577966816
F Transportation Charge 5 on C 1120855137
G Supervision Charge and Establishment Charge 15 on E 3866950224
H Total (E + F + G) 3076747352
I Overhead charge 10 on H 3076747352
j Contingency Charge 3 on H 9230242057
GRAND TOTAL 3476724508
Say Rs 3902237
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Up-gradition of electricity load from 10KW to 100 KW at CETP Bodhjungnagar Replacement of the PVC cable size single core 16 sq mm to single core 120 sqmm under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit work with TIDC
SlNO Description of work Qty Unit RateUnit Amount
25 120sqmm PVC cable 120 Mtr 110076 1320912
TOTAL 1320912
say 1320912
ABSTRACT OF COST
A Cost of Materials 1320912
B Storage Charge 2 on A 2641824
C Total (A + B) 134733024
D Erection Charge as actual 808398144
E Total (C + D) 2155728384
F Transportation Charge 5 on C 67366512
G Supervision Charge and Establishment Charge 20 on E 4311456768
H Total (E + F + G) 2654240573
I Contingency Charge 3 on H 7962721718
GRAND TOTAL 273386779
Say 27339
(Rupees twenty seven thousand three hundred thirty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 554190
ABSTRACT OF COST
A Cost of Materials 554190
B Storage Charge 2 on A 110838
C Total (A + B) 5652738
D Erection Charge 15 on C 8479107
E Transportation Charge 3 on C 166257
F TOTAL ( C+ D+E ) 66669057
G Supervision Charge and Establishment Charge 5 on F 333345285
H Total ( F + G) 7000250985
I Contingency Charge 2 on H 1400050197
J WCT 4 on Errection charge 33916428
TOTAL ESTIMATED COST OF DEPOSIT WORK 7174172433
Say 717417
(Rupees seven Lac seventeen thousand thousand four hundred seventeen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to MBS FEED amp PHARMA at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS Feed amp Pharma
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 48 2016
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 53988283
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E Transportation Charge 3 on C 1619649
F TOTAL ( C+ D+E ) 649479249
G Supervision Charge and Establishment Charge 5 on F 3247396245
H Total ( F + G) 6819532115
I Contingency Charge 2 on H 1363906423
J WCT 4 on Errection charge 330408396
TOTAL ESTIMATED COST OF DEPOSIT WORK 6988963596
Say 698896
(Rupees six Lac ninety eight thousand eight hundred ninety six )Only
WORK ESTIMATE
Name of work -
Revisied Estimate for Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNIL Aircel Tower Ltd at Ramnath Kobra para under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRCEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 9 Nos 4325 38925
2 8Mtr PCC Pole 2 Nos 3553 7106
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6838 17095
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 5485 1892325
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 5485 532045
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 40 Kgs 6732 26928
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 509 12725
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 200 Mtr 39386 78772
23 100Amps Cutout 12 Nos 1926 23112
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 222558742
say 222559
ABSTRACT OF COST
A Cost of Materials 222559
B Storage Charge 2 on A 445118
C Total (A + B) 22701018
D Erection Charge 15 on C 34051527
E Transportation Charge 3 on C 667677
F TOTAL ( C+ D+E ) 267738477
G Supervision Charge and Establishment Charge 5 on F 1338692385
H Total ( F + G) 2811254009
I Contingency Charge 2 on H 5622508017
J WCT 4 on Errection charge 136206108
TOTAL ESTIMATED COST OF DEPOSIT WORK 2881099699
Say 288110
(Rupees two Lac Eighty eight thousand thousand one hundred ten )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 9 Kgs 6838 61542
5 Weasel ACSR (61259mm) 042 Km 190276 7991592
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 10 Nos 1125 1125
9 Straps with NB ( 16x75) 10 Nos 6871 6871
TOTAL 304487976
say 304487976
ABSTRACT OF COST
A Cost of Materials 304487976
B Storage Charge 2 on A 608975952
C Total (A + B) 3105777355
D Erection Charge 15 on C 4658666033
E Transportation Charge 3 on C 9317332066
F Total (C + D+E) 3664817279
G Supervision Charge and Establishment Charge 15 on F 5497225919
H Total ( F + G ) 4214539871
i Contingency Charge 2 on H 8429079742
GRAND TOTAL 4298830668
Say 42988
( Forty two thousand nine hundred eighty eight ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA Base mounted Substation for Providing of Service connection to MS RM SAHA amp SONS at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH RM SAHA amp SONS
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 214697 214697
2 9Mtr PCC Pole ( DP=01 nos SP-01 nos ) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 04 Km 190276 761104
10 8 SWG GI Wire 20 Kgs 67321 134642
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 45 Kgs 6871 309195
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 300Amps Cutout 6 Nos 7029 42174
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 305315803
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E TOTAL ( C+ D ) 633282759
F Transportation Charge 3 on C 247806297
G TOTAL ( E+F ) 635760822
H Supervision Charge and Establishment Charge 15 on G 953641233
I Total ( G+H ) 7311249453
J Contingency Charge 2 on H 1907282466
TOTAL ESTIMATED COST OF DEPOSIT WORK 7330322277
Say 733032
(Rupees seven Lac thirty three thousand thirty two )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 065 Km 190276 1236794
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 512717456
say 51272
ABSTRACT OF COST
A Cost of Materials 51272
B Storage Charge 2 on A 102544
C Total (A + B) 5229744
D Erection Charge 15 on C 7844616
E TOTAL ( C+ D ) 60142056
F Transportation Charge 3 on C 23533848
G TOTAL ( E+F ) 6037739448
H Supervision Charge and Establishment Charge 15 on G 9056609172
I Total ( G+H ) 6943400365
J Contingency Charge 2 on H 1811321834
TOTAL ESTIMATED COST OF DEPOSIT WORK 6961513584
Say 69615
(Rupees sixty nine thousand six hundred fifteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to Pran gopal saha at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN GOPAL SAHA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 no) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 6838 10257
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 139 Kgs 5485 762415
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Double Pole Top X-Arm( 22 Mtr) 1 Nos
f) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 5485 26328
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 09 Km 190276 1712484
10 8 SWG GI Wire 25 Kgs 6732 1683
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 70 sqmm PVC insulated Al Conductor 48 Mtr 662 31776
23 16 sqmm PVC insulated Al Conductor 150 Mtr 22602 33903
24 200Amps Cutout 3 Nos 40436 121308
25 11 Kv Danger Plate 3 Nos 55 165
26 120sqmm Lugs 24 Nos 165 3960
27 Substation fancing 1 Job 14500 14500
TOTAL 202996242
say 202996
ABSTRACT OF COST
A Cost of Materials 202996
B Storage Charge 2 on A 405992
C Total (A + B) 20705592
D Erection Charge 15 on C 31058388
E TOTAL ( C+ D ) 238114308
F Transportation Charge 3 on C 93175164
G TOTAL ( E+F ) 2390460596
H Supervision Charge and Establishment Charge 15 on G 3585690895
I Total ( G+H ) 2749029686
J Contingency Charge 2 on H 7171381789
TOTAL ESTIMATED COST OF DEPOSIT WORK 2756201068
Say 275620
(Rupees two Lac seventy five thousand six hundred twenty )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNG POINT at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 18589254
say 185893
ABSTRACT OF COST
A Cost of Materials 185893
B Storage Charge 2 on A 371786
C Total (A + B) 18961086
D Erection Charge 15 on C 28441629
E Transportation Charge 3 on C 56883258
F TOTAL ( C+D+E) ) 2237408148
G Supervision Charge and Establishment Charge 15 on F 3356112222
H Total ( F+G) 257301937
I Contingency Charge 2 on H 514603874
2624479758
Say 262448
(Rupees two Lac sixty two thousand four hundred forty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25KVA Substation for Providing of new Service connection to
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 32 Nos 4325 138400
2 11 mtr long steel pole 2 Nos 1224779 2449558
3 Stay Set Complete 18 Sets 70998 1277964
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 72 Kgs 8137 585864
6 MS Channel(75x40x40x6mm4) 452 Kgs 5473 2473796
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(13 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
7 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
8 Weasel ACSR (61259mm) 38 Km 2016279 76618602
9 8 SWG GI Wire 240 Kgs 6772 162528
10 11KV Disc Insulator 62 Nos 2406 149172
11 11KV Disc Fittings 62 Nos 34958 2167396
12 11KV Pin Insulator 72 Nos 5292 381024
13 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
14 11KV GOS 2 Set 7899 15798
15 11KV LA 6 Nos 369 2214
16 11KV DOF (3 ph) 2 Set 5221 10442
17 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
18 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
19 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 48 5280
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 395903582
say 395903582
ABSTRACT OF COST
A Cost of Materials 395903582
B Storage Charge 2 on A 791807164
C Total (A + B) 4038216536
D Erection Charge 15 on C 6057324805
E Total (C + D) 4643949017
F Transportation Charge 5 on C 2019108268
G Supervision Charge and Establishment Charge 15 on E 6965923525
H Total (E + F + G) 5542452196
I Overhead charge 10 on H 5542452196
J Contingency Charge 3 on H 1662735659
GRAND TOTAL 6262970982
Say Rs 626297
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to AIRTEL TOWER at Murabari under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Bharati infratel limited
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 6 Sets 74654 447924
4 Stay Insulator(11KV) 6 Nos 20 120
5 Stay Wire (725mm) 30 Kgs 6838 20514
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 21 Km 190276 3995796
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 24845939
say 248459
ABSTRACT OF COST
A Cost of Materials 248459
B Storage Charge 2 on A 496918
C Total (A + B) 25342818
D Erection Charge 15 on C 38014227
E Transportation Charge 3 on C 76028454
F TOTAL ( C+D+E) ) 2990452524
G Supervision Charge and Establishment Charge 15 on F 4485678786
H Total ( F+G) 3439020403
I Contingency Charge 2 on H 6878040805
3507800811
Say 350780
(Rupees three Lac fifty thousand seven hundred eighty )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at Ramchandra nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with RC Nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 056 Km 190276 10655456
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 495592616
say 49559
ABSTRACT OF COST
A Cost of Materials 49559
B Storage Charge 2 on A 99118
C Total (A + B) 5055018
D Erection Charge 15 on C 7582527
E Transportation Charge 3 on C 15165054
F TOTAL ( C+D+E) ) 596492124
G Supervision Charge and Establishment Charge 15 on F 894738186
H Total ( F+G) 6859659426
I Contingency Charge 2 on H 1371931885
6996852615
Say 69969
(Rupees sixty nine thousand nine hundred sixty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 500 15000
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 135 Km 572183 77244705
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 120 Mtr 1500 180000
24 Errection oh UG cable 1350 Mtr 450 607500
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2408467087
say 2408467087
ABSTRACT OF COST
A Cost of Materials 2408467087
B Storage Charge 2 on A 4816934173
C Total (A + B) 2456636428
D Erection Charge 15 on C 3684954642
E Transportation Charge 3 on C 7369909285
F TOTAL ( C+D+E) ) 2898830985
G Supervision Charge and Establishment Charge 15 on F 4348246478
H Total ( F+G) 3333655633
I Contingency Charge 2 on H 6667311266
3400328746
Say 3400329
(Rupees thirty four Lac three hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 550000 550000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 55 Nos 500 27500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 12 Nos 12531 150372
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 3 Nos 12531 37593
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 23 Km 572183 13160209
24 4incdia GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 225 Mtr 1500 337500
24 Errection oh UG cable 2300 Mtr 450 1035000
24 HT Kiosk Box 4 Job 49500 198000
TOTAL 3774226937
say 3774226937
ABSTRACT OF COST
A Cost of Materials 3774226937
B Storage Charge 2 on A 7548453873
C Total (A + B) 3849711475
D Erection Charge 15 on C 5774567213
E Transportation Charge 3 on C 1154913443
F TOTAL ( C+D+E) ) 4542659541
G Supervision Charge and Establishment Charge 15 on F 6813989311
H Total ( F+G) 5224058472
I Contingency Charge 2 on H 1044811694
5328539641
Say
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Ramkrishna Rubber industry under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 53 Kgs 54849 2906997
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV DOF Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 538257719
say 538258
ABSTRACT OF COST
A Cost of Materials 538258
B Storage Charge 2 on A 1076516
C Total (A + B) 54902316
D Erection Charge 15 on C 82353474
E Transportation Charge 3 on C 164706948
F TOTAL ( C+D+E) ) 6478473288
G Supervision Charge and Establishment Charge 15 on F 9717709932
H Total ( F+G) 7450244281
I Contingency Charge 2 on H 1490048856
7599249167
Say 759925
(Rupees seven Lac fifty nine thousand nine hundred twenty five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Globe Enterprise under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 15 on F 9753908202
H Total ( F+G) 7477996288
I Contingency Charge 2 on H 1495599258
7627556214
Say 762756
(Rupees seven Lac sixty two thousand seven hundred )Only
WORK ESTIMATE
Name of work -
Extension of Overhead Dedicated Feeder line line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd for providing service connection toAgartala plastic private limited under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole ( Dp-03 nos Sp-10 nos) 16 Nos 1224779 19596464
2 9Mtr PCC Pole ( DP=08 nos Sp-26 nos ) 42 Nos 4325 181650
4 Stay Set Complete 42 Sets 74654 3135468
5 Stay Insulator(11KV) 42 Nos 20 840
6 Stay Wire (725mm) 210 Kgs 68387 1436127
7 ACSR (61335 87 Km 3510265 305393055
8 11 KB VCB 1 Sets 450000 450000
9 MS Channel(75x40x40x6mm4) 1190 Kgs 54849 6527031
a) 11KV GOS Base Bracket(28Mtr) 10 Nos
b 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
c Single Pole Top X-Arm(03Mtr) 36 Nos
d Single Pole Bottom X-Arm(13Mtr) 36 Nos
e Double Pole Top X-Arm( 22 Mtr) 11 Nos
f Double Pole Bottom X-Arm(25 Mtr) 11 Nos
g 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
10 MS Angle(65x65x6mm3) 994 Kgs 54849 54519906
a) SinglePole Guard X-Arm (15Mtr) 36 No
b DP Pole Guard X-Arm (25Mtr) 11 No
c DP Pole cross braket (17Mtrlong ) 44 No
d 11KV LA Bracket(28Mtr) 5 No
11 11KV Disc Insulator 156 Nos 2406 375336
12 11KV Disc Fittings 156 Nos 33766 5267496
13 11KV Pin Insulator 210 Nos 5292 111132
14 GI Pin for 11KV Pin Insulator 210 Nos 8248 173208
15 11KV GOS (3p two post) 5 Set 1006111 5030555
16 11KV DOF(3ph) 5 Set 5221 26105
17 11KV LA 15 Nos 369 5535
18 MS Nuts and Bolts of Assorted Size 340 Kgs 6871 233614
19 Bracket Clamp by (50x6mm2) MS Flat 560 Nos 60 33600
20 Stay Clamp by (50x6mm2) MS Flat 42 Nos 495 2079
21 30Mtr long 40mm dia GI Pipe ( for earthing) 9 Nos 1500 13500
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
23 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 870000 130500
25 11KV Danger plate 47 Nos 55 2585
TOTAL 1729567371
say 1729567
ABSTRACT OF COST
A Cost of Materials 1729567
B Storage Charge 2 on A 3459134
C Total (A + B) 176415834
D Erection Charge 15 on C 264623751
E Transportation Charge 3 on C 529247502
F TOTAL ( C+D+E) ) 2081706841
G Supervision Charge and Establishment Charge 10 on F 2081706841
H Total ( F+G) 2289877525
I Contingency Charge 2 on H 4579755051
J TOTAL ( H+I) 2335675076
K Service charge 5on J 1167837538
L TOTAL ( J+K) 245245883
Say 2452459
(Rupees twenty four Lac Fifty two thousand four hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN BREVARAGE INDIA ( PVT) LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
4 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
5 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
6 11KV Disc Insulator 12 Nos 2406 28872
7 11KV Disc Fittings 12 Nos 33766 405192
8 11KV Pin Insulator 9 Nos 5292 47628
9 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
10 11KV GOS 3 Set 1006111 3018333
11 11KV DOF 3 Set 5221 15663
12 11KV LA 9 Nos 369 3321
13 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
14 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
15 30Mtr long 40mm dia GI Pipe ( for Earthing) 6 Nos 1605 9630
16 11 Kv Danger post 30 Nos 500 15000
17 240sqmm Lugs 24 Nos 21528 516672
18 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
19 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
20 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 08 Km 572183 4577464
21 10 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 24 Mtr 1500 36000
22 cutting of treanch for UG cable ( Depth-11mtr wide- 05 mtr ) 800 Mtr 450 360000
23 HT Kiosk Box 2 Job 49500 99000
TOTAL 1652766437
say 1652766
ABSTRACT OF COST
A Cost of Materials 1652766
B Storage Charge 2 on A 3305532
C Total (A + B) 168582132
D Erection Charge 15 on C 252873198
E Transportation Charge 3 on C 505746396
F TOTAL ( C+D+E) ) 1989269158
G Supervision Charge and Establishment Charge 10 on F 1989269158
H Total ( F+G) 2188196073
I Contingency Charge 2 on H 4376392147
J TOTAL ( H+I) 2231959995
K Service charge 5on J 1115979997
L TOTAL ( J+K) 2343557995
Say Rs234355900
Say 2343559
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 74654 597232
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 40 Kgs 68387 273548
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 190276 285414
10 8 SWG GI Wire 55 Kgs 67321 3702655
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 60 3120
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
22 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
23 500Amps Cutout 12 Nos 9674 116088
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 8 Nos 55 440
TOTAL 1119176203
say 1119176
ABSTRACT OF COST
A Cost of Materials 1119176
B Storage Charge 2 on A 2238352
C Total (A + B) 114155952
D Erection Charge 15 on C 171233928
E Transportation Charge 3 on C 342467856
F TOTAL ( C+D+E) ) 1347040234
G Supervision Charge and Establishment Charge 15 on F 202056035
H Total ( F+G) 1549096269
I Contingency Charge 2 on H 3098192537
1580078194
Say 1580078
(Rupees fifteen Lac eighty thousand amp seventy eight )Only
WORK ESTIMATE
Name of work -
Extension of Didicated Feeder line from Rubber Park 33 KV substation to Abhisar Buildwell Pvt Ltd ( Rubber Division) amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 28 Nos 4325 121100
3 11 KB VCB 1 Sets 450000 450000
3 Stay Set Complete 14 Sets 74654 1045156
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 68387 478709
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 739 Kgs 54849 40533411
a) 11KV GOS Base Bracket(28Mtr) 6 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 6 Nos
c) 11KV DOF Bracket(28Mtr) 6 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 6 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g) Double Pole Top X-Arm( 22 Mtr) 6 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 6 Nos
8 MS Angle(65x65x6mm3) 234 Kgs 54849 12834666
a) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 6 No
9 Weasel ACSR (61259mm) 42 Km 190276 7991592
10 8 SWG GI Wire 220 Kgs 67321 1481062
11 11KV Disc Insulator 54 Nos 2406 129924
12 11KV Disc Fittings 54 Nos 33766 1823364
13 11KV Pin Insulator 30 Nos 5292 15876
14 GI Pin for 11KV Pin Insulator 30 Nos 8248 24744
15 11KV GOS 3 Set 7899 23697
16 11KV DOF 3 Set 5221 15663
17 11KV LA 9 Nos 369 3321
18 120sqmm Lugs 24 Nos 165 3960
19 240 sqmm Lugs 24 Nos 219 5256
20 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
21 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
22 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 572183 8582745
23 MS Nuts and Bolts of Assorted Size 189 Kgs 6871 1298619
24 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
25 Bracket Clamp by (50x6mm2) MS Flat 140 Nos 60 8400
26 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
27 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
28 500Amps Cutout 12 Nos 9674 116088
29 185sqmm Lugs 24 Nos 219 5256
30 Danger plate 8 Nos 55 440
TOTAL 1949334855
say 1949335
ABSTRACT OF COST
A Cost of Materials 1949335
B Storage Charge 2 on A 389867
C Total (A + B) 19883217
D Erection Charge 15 on C 298248255
E Transportation Charge 3 on C 59649651
F TOTAL ( C+D+E) ) 2346219606
G Supervision Charge and Establishment Charge 15 on F 3519329409
H Total ( F+G) 2698152547
I Contingency Charge 2 on H 5396305094
2752115598
Say 2752116
(Rupees Twenty seven Lac fifty two thousand one hundred sixteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to PRAN BREVARAGE (INDIA) PRIVATE LIMITED under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 10 on F 6502605468
H Total ( F+G) 7152866015
I Contingency Charge 2 on H 1430573203
J TOTAL ( H+I) 7295923335
K Service charge 5on J 3647961668
L TOTAL ( J+K) 7660719502
Say 766072
Say 766072
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 10 nos consumer at south shib nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with South shib nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 3 Sets 74654 223962
2 Stay Insulator(11KV) 3 Nos 20 60
3 Stay Wire (725mm) 12 Kgs 6838 82056
4 Weasel ACSR (61259mm) 08 Km 190276 1522208
5 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
6 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
7 LT shackle insulator 20 Nos 1125 225
8 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 208695256
say 20870
ABSTRACT OF COST
A Cost of Materials 20870
B Storage Charge 2 on A 4174
C Total (A + B) 212874
D Erection Charge 15 on C 319311
E Transportation Charge 3 on C 638622
F TOTAL ( C+D+E) ) 25119132
G Supervision Charge and Establishment Charge 15 on F 37678698
H Total ( F+G) 288870018
I Contingency Charge 2 on H 577740036
2946474184
Say 29465
(Rupees twenty nine thousand four hundred sixty five )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to sri Pankaj Roy Kalitilla under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with sri Pankaj roy
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 15 Nos 3553 53295
2 Stay Set Complete 9 Sets 74654 671886
3 Stay Insulator(11KV) 9 Nos 20 180
4 Stay Wire (725mm) 45 Kgs 6838 30771
5 Weasel ACSR (61259mm) 17 Km 190276 3234692
6 MS Nuts and Bolts of Assorted Size 75 Kgs 6732 5049
7 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 10428794
say 104288
ABSTRACT OF COST
A Cost of Materials 104288
B Storage Charge 2 on A 208576
C Total (A + B) 10637376
D Erection Charge 15 on C 15956064
E Transportation Charge 3 on C 31912128
F TOTAL ( C+D+E) ) 1255210368
G Supervision Charge and Establishment Charge 10 on F 1255210368
H Total ( F+G) 1380731405
I Contingency Charge 2 on H 276146281
J TOTAL ( H+I) 1408346033
K Service charge 5on J 7041730164
L TOTAL ( J+K) 1478763335
Say 147876
Say 147876
(Rupees one Lac forty seven thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x25 KVA pole mounted Substation for Providing of Service connection to ATC INDIA TOWER at RKNagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 3 Nos 4325 12975
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 08 Km 190276 1522208
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe for Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
TOTAL 15513150
say 155132
ABSTRACT OF COST
A Cost of Materials 155132
B Storage Charge 2 on A 310264
C Total (A + B) 15823464
D Erection Charge 15 on C 23735196
E Transportation Charge 3 on C 47470392
F TOTAL ( C+D+E) ) 1867168752
G Supervision Charge and Establishment Charge 10 on F 1867168752
H Total ( F+G) 2053885627
I Contingency Charge 2 on H 4107771254
J TOTAL ( H+I) 209496334
K Service charge 5on J 104748167
L TOTAL ( J+K) 2199711507
Say 219971
(Rupees two Lac nineteen thousand nine hundred seventy one )Only
Page 2: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

9

T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment

Nos 10

10Erection of different size of PCC pole ST pole direct in earth inc excavation refilling

ramming etc as requiredThe pole should be burried 16th of their length

a90mt long Steel Pole

Nos 4TSECL

SUPPLYhelliphellip helliphellip

b80mt long PCC Pole

Nos 20TSECL

SUPPLYhelliphellip helliphellip

11

Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted

stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with

300 mm long threaded adjustable 16 mm dia MS rod and thimble

Set 18TSECL

SUPPLYhelliphellip helliphellip

Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm TSECL

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

12

MS Channel (6 Nos)

Nos 6TSECL

SUPPLYhelliphellip helliphellip

13

Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel

(4 Nos)

Nos 4TSECL

SUPPLYhelliphellip helliphellip

14

Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size

75x40x40x6mm MS Channel (8 Nos)

Nos 8TSECL

SUPPLYhelliphellip helliphellip

15

Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size

65x65x6mm MS Angle (2 Nos)

Nos 2TSECL

SUPPLYhelliphellip helliphellip

16

Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle

(8 Nos)

Nos 8TSECL

SUPPLYhelliphellip helliphellip

17 Fabrication of Cross arms as per specification

aMS Channel 100x50x50x6mm75x40x40x6mm

Kg 343TSECL

SUPPLYhelliphellip helliphellip

bMS angle 65x65x6mm 50x50x6mm

Kg 58TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

18

Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

necessary connection

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

a

100 KVA Transformer

Nos 2TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

19

Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break

switch including necessary connection as per TS

Set 3TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

20

Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for

11KV 50Hz AC system operation for air break switch including necessary connection

as per TS

Set 2TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

21

Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable

for nominal system Voltage of 11 KV inc necessary connection as per TS

Nos 6TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

22

Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per

Set 8nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design

23

Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp

Nuts amp Bolts)

Nos 4TSECL

SUPPLYhelliphelliphellip helliphelliphellip

24

Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying

hoisting binding etc complete as reqd

Km 21TSECL

SUPPLYhelliphelliphellip helliphelliphellip

25

Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc

complete as reqd

Km 09TSECL

SUPPLYhelliphelliphellip helliphelliphellip

26

Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp

Bolts on poles excluding the cost of straps Nuts and Bolts

Nos 52TSECL

SUPPLYhelliphelliphellip helliphelliphellip

27Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL

aBracket Clamp

Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

bStay Clamp

pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

28

Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of

size 24x10x15 and cable connections with termination by Lugs Thimble complete Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

29

Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection

Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip

Signature of bidderDy General Manager

Jirania Electrical Division

Rounded of Rs (Rupees only)

Sub Total

( Supply + Erection) total Rs

RUB amp LI(

Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

Work Estimate for Line

(AS Deb Barma)Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division
WORK ESTIMATE
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- Chargeable to - DEPOSIT WORK WITH TIDC
B] COST OF MATERIALS FOR 11KV LINE EXTENSION
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) 35 Nos 1015422 3553977
2 9mtr Long PCC Pole 25 Nos 2650 66250
3 Stay Set Complete 25 Sets 47025 1175625 29390625
4 Stay Insulator(11KV) 125 Nos 1092 1365 34125
5 Stay Wire (725mm) 24 Kgs 451 10824
6 MS Channel(75x40x40x6mm4) 116 Kgs 3352 388832
a) Double Pole X-Arm(22Mtr) 3 Nos
b) Single Pole Top X-Arm(03Mtr) 6 Nos
c) Single Pole Bottom X-Arm(12Mtr) 6 Nos
7 MS Angle(65x65x6mm3) 96 Kgs 321 30816
a) Double Pole Guard X-Arm (25Mtr) 3 Nos
b) SinglePole Guard X-Arm (15Mtr) 6 Nos
8 Weasel ACSR (61259mm) 12 Km 2061233 24734796 6183699
9 8 SWG GI Wire 80 Kgs 391 3128 782
10 11KV 45KN Disc Insulator 18 Nos 49487 890766 2226915
11 Single U Bolt type Disc Fittings 18 Nos 19352 348336
12 11KV Pin Insulator 27 Nos 991 26757 668925
13 GI Pin for 11KV Pin Insulator 27 Nos 561 15147
14 MS Nuts and Bolts of Assorted Size 20 Kgs 407 814
15 Stay Clamp by (50x6mm2) MS Flat 6 Pairs 495 297
16 Bracket Clamp by (50x6mm2) MS Flat 40 Nos 27 1080
17 Barbed Wire 22 Kgs 429 9438 23595
24 AddMetering Arrangement with Kiosk 1 Nos 50000 50000
18 30Mtr long 40mm dia GI Pipe Earthing 2 Nos 1605 3210
TOTAL 543610286 1359025715
say 163391
(One Lac sixty three thousand three hundred and ninety one only)
ABSTRACT OF COST 0
A Cost of Materials 163391 0
B Storage Charge 2 on A 326782
C Total (A + B) 16665882 0
D Erection Charge 15 on C 24998823
E Total (C + D) 191657643 0
F Transportation Charge 5 on C 8332941
G Supervision Charge and Establishment Charge 15 on E 2874864645
H Total (E + F + G) 2287392305
I Contingency Charge 3 on H 6862176914 0
GRAND TOTAL 2356014074
Say Rs 235601 0
(Rupees two Lacs thirty five thousand six hundred and one)Only
0
0
0
0
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 200 KVA Substation for Providing of Service connection at Central effulent Effulent Treatment Plant ( CETP) Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 22574688 22574688
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 5 Nos 4325 21625
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Job 49500 49500
27 Danger plate 12 Nos 50 600
TOTAL 492300635
say 492300635
ABSTRACT OF COST
A Cost of Materials 492300635
C Storage Charge 2 on A 98460127
D Total (A + B) 5021466477
E Erection Charge 15 on D 7532199716
F Total (C + D) 5774686449
G Transportation Charge 5 on D 2510733239
H Supervision Charge and Establishment Charge 5 on F 2887343224
H Total ( F + G+H ) 6314494095
I Contingency Charge 3 on H 1894348228
j Addhoc 10 on H 6314494095
GRAND TOTAL 7135378327
Say Rs 713538
(Rupees seven Lac thirteen thousand five hundred thirty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection to Airtel Tower Amtali under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 7247368 7247368
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole 8 Nos 4325 34600
3 Stay Set Complete 15 Sets 58082 87123
4 Stay Insulator(11KV) 15 Nos 20 300
5 Stay Wire (725mm) 75 Kgs 5707 428025
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g) Double Pole Top X-Arm( 22 Mtr) 4 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 4 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 8 No
9 Weasel ACSR (61259mm) 6 Km 2347653 14085918
10 8 SWG GI Wire 90 Kgs 4934 44406
11 11KV Disc Insulator 36 Nos 201 7236
12 11KV Disc Fittings 36 Nos 28769 1035684
13 11KV Pin Insulator 48 Nos 4668 224064
14 GI Pin for 11KV Pin Insulator 48 Nos 561 26928
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
19 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
20 Bracket Clamp by (50x6mm2) MS Flat 120 Nos 27 3240
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 200Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 Job 49500 49500
28 Barbed Wire 20 Kgs 50 1000
TOTAL 46403016
say 464030
ABSTRACT OF COST
A Cost of Materials 464030
B Storage Charge 2 on A 92806
C Total (A + B) 4733106
D Erection Charge 15 on C 7099659
E Total (C + D) 54430719
F Transportation Charge 5 on C 2366553
G Supervision Charge and Establishment Charge 5 on E 272153595
H Total (E + F + G) 5951880795
i Over head charge 10 above ( adhoc increase) 5951880795
I Contingency Charge 3 on H 1785564239
GRAND TOTAL 6725625298
Say 672563
(Rupees Six Lac seventy two thousand five hundred sixty three)Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to NIELIT AGARTALA CENTRE for the smooth construction activities of the campus under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH NIELIT AGARTALA CENTRE
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 453582 453582
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 5 Nos 4325 21625
2 8Mtr PCC Pole 2 Nos 4325 8650
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 2347653 28171836
10 8 SWG GI Wire 40 Kgs 4934 19736
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 18 Nos 4668 84024
14 GI Pin for 11KV Pin Insulator 18 Nos 561 10098
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 27 1620
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 100Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
TOTAL 203944176
say 203944
ABSTRACT OF COST
A Cost of Materials 203944
B Storage Charge 2 on A 407888
C Total (A + B) 20802288
D Erection Charge 15 on C 31203432
E Total (C + D) 239226312
F Transportation Charge 5 on C 10401144
G Supervision Charge and Establishment Charge 5 on E 119613156
H Total (E + F + G) 2615887716
i Over head charge 10 above ( adhoc increase) 2615887716
I Contingency Charge 3 on H 7847663148
GRAND TOTAL 2955953119
Say 295595
(Rupees Two Lac Ninety five thousand five hundred ninety five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to STATE BANK OF INDIA RK Nagar Industrial branch under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 72474 72474
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Fancing 1 Job 15000 15000
27 Danger plate 12 Nos 50 600
TOTAL 210702755
say 210702755
ABSTRACT OF COST
A Cost of Materials 210702755
C Storage Charge 2 on A 42140551
D Total (A + B) 2149168101
E Erection Charge 15 on D 3223752152
F Total (C + D) 2471543316
G Transportation Charge 5 on D 1074584051
H Supervision Charge and Establishment Charge 5 on F 1235771658
H Total ( F + G+H ) 2702578887
I Contingency Charge 3 on H 8107736661
j Addhoc 10 on H 2702578887
GRAND TOTAL 3053914142
Say Rs 305391
(Rupees three Lac five thousand three hundred ninety one )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 17-03-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 6 Nos 3553 21318
3 Stay Set Complete 4 Sets 58082 232328
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 157 Kgs 3927 616539
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 4 No
d) 4 wire LT Bkt( 11 Mtr) 2 No
8 Weasel ACSR (61259mm) 14 Km 2347653 32867142
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 6 Nos 201 1206
11 11KV Disc Fittings 6 Nos 28769 172614
12 11KV Pin Insulator 8 Nos 4668 37344
13 GI Pin for 11KV Pin Insulator 8 Nos 561 4488
14 MS Nuts and Bolts of Assorted Size 12 Kgs 505 606
15 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
16 Bracket Clamp by (50x6mm2) MS Flat 18 Nos 27 486
17 Shackle insulator 14 Nos 10495 14693
TOTAL 98654352
say 98654352
ABSTRACT OF COST
A Cost of Materials 98654
C Storage Charge 2 on A 197308
D Total (A + B) 10062708
E Erection Charge 15 on D 15094062
F Total (C + D) 115721142
G Transportation Charge 5 on D 5031354
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 120752496
I Contingency Charge 3 on H 362257488
j Addhoc 0 on H 0
GRAND TOTAL 1243750709
Say 124375
(Rupees one lac twenty four thousand three hundred seventy five )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 16-04-2013 amp 17-04-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 11 Nos 4325 47575
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 10 Nos 3553 35530
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 10 No
d) 4 wire LT Bkt( 11 Mtr) 7 No
8 Weasel ACSR (61259mm) 48 Km 2347653 112687344
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 13 Nos 201 2613
11 11KV Disc Fittings 13 Nos 28769 373997
12 11KV Pin Insulator 16 Nos 4668 74688
13 GI Pin for 11KV Pin Insulator 16 Nos 561 8976
14 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
15 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
16 Bracket Clamp by (50x6mm2) MS Flat 16 Nos 27 432
17 Shackle insulator 14 Nos 10495 14693
TOTAL 230706294
say 230706294
ABSTRACT OF COST
A Cost of Materials 230706
C Storage Charge 2 on A 461412
D Total (A + B) 23532012
E Erection Charge 15 on D 35298018
F Total (C + D) 270618138
G Transportation Charge 5 on D 11766006
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 282384144
I Contingency Charge 3 on H 847152432
j Addhoc 0 on H 0
GRAND TOTAL 2908556683
Say 290856
(Rupees two Lac ninety thousand eight hundred amp fiftysix )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on03-05-2013 05-05-2013 06-05-2013 12-05-2013 amp 16-05-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 3 Nos 4325 12975
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 8 Nos 3553 28424
3 Stay Set Complete 2 Sets 58082 116164 2
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 2 Nos
b) Single Pole Bottom X-Arm(13Mtr) 2 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 1 Nos
d) 11KV DP bottom Bracket(25Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 2 No
b) Double Pole Guard X-Arm (28Mtr) 1 No
c) 2 wire LT Bkt( 051 Mtr) 6 No
d) 4 wire LT Bkt( 11 Mtr) 12 No
8 Weasel ACSR (61259mm) 09 Km 2347653 21128877
9 8 SWG GI Wire 22 Kgs 4934 108548
10 11KV Disc Insulator 3 Nos 201 603
11 11KV Disc Fittings 3 Nos 28769 86307
12 11KV Pin Insulator 6 Nos 4668 28008
13 GI Pin for 11KV Pin Insulator 6 Nos 561 3366
14 MS Nuts and Bolts of Assorted Size 18 Kgs 505 909
15 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
16 Bracket Clamp by (50x6mm2) MS Flat 8 Nos 27 216
17 Shackle insulator 12 Nos 10495 12594
TOTAL 87545997
say 87545997
ABSTRACT OF COST
A Cost of Materials 87546
C Storage Charge 2 on A 175092
D Total (A + B) 8929692
E Erection Charge 15 on D 13394538
F Total (C + D) 102691458
G Transportation Charge 5 on D 4464846
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 107156304
I Contingency Charge 3 on H 321468912
j Addhoc 10 on H 0
GRAND TOTAL 1103709931
Say 110371
B) Maintance of 3 nos Damage 25 KVA TXr Rs1200000Each Rs 3600000
Total Rs14637100
(Rupees one Lac forty six thousand three hundred amp seventy one )Only
WORK ESTIMATE
Name of work -
Reviesed estimate of Upgredation of Transformer 1x 200 KVA to 1x500KVA for Providing of new Service connection to CITY STAR AGRO INDUSTRIES Private limited at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with CITY STAR AGRO INDUSTRIES Private limited
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA DT
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 52803318 52803318
2 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
3 240 sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
4 400Amps Cutout 6 Nos 777 4662
5 Bimetalic Lugs( 300mm2) 8 Nos 23809 190472
TOTAL 5467614
say
ABSTRACT OF COST
A Cost of Materials 546761
B Storage Charge 2 on A 1093522
C Total (A + B) 55769622
D Erection Charge 15 on C 83654433
E Total (C + D) 641350653
F Transportation Charge 5 on C 27884811
G Supervision Charge and Establishment Charge 15 on E 9620259795
H Total (E + F + G) 765438062
I Contingency Charge 3 on H 2886077939
I Addhoc 10 on H 765438062
GRAND TOTAL 8419818681
Say 841982
B) Dismental of 200 KVA Txr amp Cutout Rs 150000
Total (A+B ) Rs 84348200
C) Less scrap value of existing 200 KVA Txr 40 on 22574700 13544800
GRAND TOTAL 70803400
(Rupees Seven Lac eight thousand thirty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at DAS PARA under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=8 nos SP= 9 Nos) 25 Nos 4325 108125
3 Stay Set Complete 18 Sets 58082 1045476
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 90 Kgs 5707 51363
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 446 Kgs 5473 2440958
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 9 Nos
f) Single Pole Bottom X-Arm(13Mtr) 9 Nos
g) Double Pole Top X-Arm( 22 Mtr) 7 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 7 Nos
8 MS Angle(65x65x6mm3) 213 Kgs 5473 1165749
a) Double pole Gurd Bkt( 25 Mtr) 7 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 9 No
9 Weasel ACSR (61259mm) 4 Km 2347653 9390612
10 8 SWG GI Wire 180 Kgs 4934 88812
11 11KV Disc Insulator 54 Nos 201 10854
12 11KV Disc Fittings 54 Nos 28769 1553526
13 11KV Pin Insulator 62 Nos 4668 289416
14 GI Pin for 11KV Pin Insulator 62 Nos 561 34782
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 505 4949
19 Stay Clamp by (50x6mm2) MS Flat 18 Pairs 495 891
20 Bracket Clamp by (50x6mm2) MS Flat 96 Nos 27 2592
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
27 Barbed Wire 20 Kgs 429 858
TOTAL 45877295
say 45877295
ABSTRACT OF COST
A Cost of Materials 45877295
B Storage Charge 2 on A 9175459
C Total (A + B) 467948409
D Erection Charge 15 on C 7019226135
E Total (C + D) 5381406704
F Transportation Charge 5 on C 2339742045
G Supervision Charge and Establishment Charge 15 on E 8072110055
H Total (E + F + G) 6422591914
I Contingency Charge 3 on H 1926777574
GRAND TOTAL 6615269671
Say Rs 6615269671
(Rupees six Lac sixty one thousand five hundred twenty seven )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at AMTALI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 14 Nos 3553 49742
3 Stay Set Complete 12 Sets 58082 696984
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 5707 34242
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 157 Kgs 5473 859261
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 38 Km 2347653 89210814
10 8 SWG GI Wire 80 Kgs 4934 39472
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 12 Nos 4668 56016
14 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 60 Kgs 505 3030
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
28 Shackle insulator 56 Nos 1396 78176
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 358760714
say 358760714
ABSTRACT OF COST
A Cost of Materials 358760714
B Storage Charge 2 on A 717521428
C Total (A + B) 3659359283
D Erection Charge 15 on C 5489038924
E Total (C + D) 4208263175
F Transportation Charge 5 on C 1829679641
G Supervision Charge and Establishment Charge 15 on E 6312394763
H Total (E + F + G) 5022470616
I Contingency Charge 3 on H 1506741185
GRAND TOTAL 5173144734
Say Rs 5173144734
(Rupees Five Lac seventeen thousand three hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at RAJCHANTAI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=3 nos SP= 6Nos) 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 58082 464656
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 48 Kgs 5707 273936
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
8 MS Angle(65x65x6mm3) Kgs 5473 0
a) Double Pole Guard X-Arm (28Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 6 No
9 Weasel ACSR (61259mm) 27 Km 2347653 63386631
10 8 SWG GI Wire 60 Kgs 4934 29604
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 36 Nos 4668 168048
14 GI Pin for 11KV Pin Insulator 36 Nos 561 20196
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 48 Kgs 505 2424
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 27 1404
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 301010091
say 301010091
ABSTRACT OF COST
A Cost of Materials 301010091
B Storage Charge 2 on A 602020182
C Total (A + B) 3070302928
D Erection Charge 15 on C 4605454392
E Total (C + D) 3530848367
F Transportation Charge 5 on C 1535151464
G Supervision Charge and Establishment Charge 15 on E 5296272551
H Total (E + F + G) 4213990769
I Contingency Charge 3 on H 1264197231
GRAND TOTAL 4340410492
Say Rs 4340410492
(Rupees four Lac thirtyfour thousand forty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 16506241
ABSTRACT OF COST
A Cost of Materials 16506241
B Storage Charge 2 on A 33012482
C Total (A + B) 1683636582
D Erection Charge 15 on C 2525454873
E Transportation Charge 3 on C 82531205
F Total (C + D+E) 2018713274
G Supervision Charge and Establishment Charge 5 on F 1009356637
H Total ( F + G ) 2119648938
I Overhead charge 10 on H 2018713274
J Contingency Charge 3 on H 6358946814
L GRAND TOTAL 2385109734
Say Rs 238511
(Rupees three Lac seventy two thousand one hundred thirty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 70998 35499
2 Stay Insulator(11KV) 5 Nos 12 60
3 Stay Wire (725mm) 25 Kgs 8136 2034
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 58082 29041
2 Stay Insulator(11KV) 5 Nos 20 100
3 Stay Wire (725mm) 25 Kgs 5707 142675
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to the newly constructed building of college of veterinary sciences amp AH RK nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Debashish Das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 4 Nos 3553 14212
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 08 Km 2347653 18781224
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 20 Nos 1125 225
9 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 39369324
say 39369324
ABSTRACT OF COST
A Cost of Materials 39369324
B Storage Charge 2 on A 78738648
C Total (A + B) 4015671048
D Erection Charge 15 on C 6023506572
E Transportation Charge 3 on C 19684662
F Total (C + D+E) 4814868325
G Supervision Charge and Establishment Charge 5 on F 2407434163
H Total ( F + G ) 5055611741
I Overhead charge 10 on H 4814868325
J Contingency Charge 3 on H 1516683522
K WCT6 on erection charge ie on D 3614103943
L GRAND TOTAL 5724907966
Say Rs 5724907966
B) Service connection charge 1877
C) Security 900
Grand total (A+B+C) 60026
( Sixty thousand amp twenty six ) only
BILL
Name of work -
Supply Errection amp commissioning of Various capacity Sodium Vapour Lamp for lightining of 14 Goddess temple at Uttarchampura During Kharchi Puja 2013-2014
SlNO Description of work Qty Unit RateUnit Amount
A 250 wattSodium vapour Lamp
1 Ballast 25 Nos 2450 61250
2 Lamp 25 Nos 380 9500
3 capacitor 25 Nos 288 7200
4 Indicator 25 Nos 220 5500
B 70 Watt Sodium vapour lamp 0
1 Ballast 11 Nos 1125 12375
2 Lamp 11 Nos 280 3080
3 capacitor 11 Nos 288 3168
4 Indicator 11 Nos 220 2420
C 250 watt Metal
1 Ballast 5 Nos 2450 12250
2 Lamp 5 Nos 930 4650
3 capacitor 5 Nos 288 1440
4 Indicator 5 Nos 220 1100
D Stand light 18 watt 8 Nos 140 1120
E Decorating light 10 Nos 120 1200
TOTAL 126253
Vat 135 on Rs 12625300 Rs1704400
Contractor Profit 10 on Rs 12625300 Rs1262500
Grand Total Rs 15592200
( Rupees one lac fifty five thousand nine hundred twenty two) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3350 284750
II Ballast 85 Nos 1600 136000
III Lamp 85 Nos 400 34000
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 420 89250
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 599760
Contractor profit 10 on Rs 59976000 59976 59976
Grand Total 659736
( Rupees six lac fiftynine thousand seven hundred thirty six) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3450 293250
II Ballast 85 Nos 1570 133450
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 600 127500
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 644810
Contractor profit 10 on Rs 6448100 64481
Grand Total 709291
( Rupees seven lac nine thousand two hundred ninety one only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 4000 340000
II Ballast 85 Nos 1500 127500
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 540 114750
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 400 10200
II Unskilled labour 1275 Nos 300 3825
TOTAL 676175
Contractor profit 10 on Rs 6761750 67617
Grand Total 743792
( Rupees seven lac fortythree thousand seven hundred ninety two ) only
WORK ESTIMATE
Name of work -
Extension of 11 KV Dedicated Feeder line from Bodhjungnagar 132 KV Substation to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED for Providing of Service connection to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH CITY STAR AGRO INDUSTRIES PRIVATE LIMITED
A] COST OF MATERIALS -
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtrlong ST Pole 2 Nos 1358265 271653
2 120 sq mm XLPE cable 015 Km 572183 8582745
3 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
4 MS Channel(75x40x40x6mm4) 245 Kgs 5473 1340885
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Top Bracket(28Mtr) 3 Nos
5 MS Angle(65x65x6mm3) 33 Kgs 5473 180609
c) 11KV LA Bracket(28Mtr) 2 No
6 Weasel ACSR (61259mm) 015 Km 2347653 35214795
7 11KV Disc Insulator 15 Nos 201 3015
8 11KV Disc Fittings 15 Nos 28769 431535
9 11KV Pin Insulator 12 Nos 4668 56016
10 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
11 11KV GOS 2 Set 806288 1612576
12 11KV DOF 2 Set 373613 747226
13 11KV LA 6 Nos 369 2214
14 MS Nuts and Bolts of Assorted Size 15 Kgs 505 7575
15 Bracket Clamp by (50x6mm2) MS Flat 24 Nos 27 648
16 Jointing Kit ( indoor type) 2 Nos 9000 18000
17 Jointing Kit ( outdoor type) 2 Nos 12000 24000
18 11 KV Vacum circuit Breaker control amp relay panel simplex type 400 A continous current 250 MVA rupturring capacity complete with electrical closing mechanism with internal wiring 2 overcurrent amp 1 earth fault combine relay auxilury relays 3 ammeter 1- voltmeter CT operated static trivactor meter 1 CT operated static KWH meter of CTR 1001-1A with integral earthing facility and internal arc tested for out going feeders 1 Nos 404000 404000
TOTAL 5913802595
say 5913802595
ABSTRACT OF COST
A Cost of Materials 5913802595
B Storage Charge 2 on A 1182760519
C Total (A + B) 6032078647
D Erection Charge 15 on C 904811797
E Total (C + D) 6936890444
F Transportation Charge 5 on C 3016039323
G Supervision Charge and Establishment Charge 15 on E 1040533567
H Total (E + F + G) 8279027943
I Contingency Charge 3 on H 2483708383
GRAND TOTAL 8527398781
Say Rs 8527398781
(Rupees Eight Lac fifty two thousand seven hundred seventy forty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 25 KVA Substation for Providing of Service connectionin the PIG shed under under RKVY at RK Nagar catal farm under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH BDO JIRINIA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 11 Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 4 Nos 1358265 543306
2 8Mtr PCC Pole 10 Nos 3553 35530
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 119 Kgs 5473 651287
a) 11 mtr long LT Bkt 12 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 31 Km 2016279 62504649
10 8 SWG GI Wire 60 Kgs 6772 40632
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10911 600105
23 100Amps Cutout 6 Nos 21906 131436
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 162 3888
26 Substation fancing 1 Job 14500 14500
27 Shackle insulator 52 Nos 1396 72592
28 Straps NampB(16x75) 52 pairs 4586 238472
29 Barbed Wire 20 Kgs 429 858
TOTAL 304414759
say 304414759
ABSTRACT OF COST
A Cost of Materials 304414759
B Storage Charge 2 on A 608829518
C Total (A + B) 3105030542
D Erection Charge 15 on C 4657545813
E Total (C + D) 3570785123
F Transportation Charge 5 on C 1552515271
G Supervision Charge and Establishment Charge 15 on E 5356177685
H Total (E + F + G) 4261654419
I Contingency Charge 3 on H 1278496326
GRAND TOTAL 4389504051
Say Rs 4389504051
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300 0
2 9 Mtr PCC Pole 6 Nos 4325 25950
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 15 Km 2016279 30244185
10 8 SWG GI Wire 50 Kgs 6772 3386
11 11KV Disc Insulator 24 Nos 2406 57744
12 11KV Disc Fittings 24 Nos 34958 838992
13 11KV Pin Insulator 27 Nos 5292 142884
14 GI Pin for 11KV Pin Insulator 27 Nos 8248 222696
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 120 Mtr 19295 23154
23 300Amps Cutout 6 Nos 5225 3135
24 11 Kv Danger Plate 12 Nos 55 660
25 240 sqmm Lugs 24 Nos 215 5160
26 Kiosk Box 1 Job 49500 49500
TOTAL 671383525
say 671383525
ABSTRACT OF COST
A Cost of Materials 671383525
B Storage Charge 2 on A 134276705
C Total (A + B) 6848111955
D Erection Charge 15 on C 1027216793
E Total (C + D) 7875328748
F Transportation Charge 5 on C 3424055978
G Supervision Charge and Establishment Charge 15 on E 1181299312
H Total (E + F + G) 9399033658
I Overhead charge 10 on H 9399033658
J Contingency Charge 3 on H 2819710097
GRAND TOTAL 1062090803
Say Rs 1062091
(Rupees ten Lac sixty two thousand ninety one )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9 Mtr PCC Pole 5 Nos 4325 21625
3 Stay Set Complete 3 Sets 70998 212994
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 8137 122055
6 MS Channel(100x50x50x6mm4) 0 Kgs 5473 0
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2016279 16130232
10 8 SWG GI Wire 35 Kgs 6772 23702
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 35 Kgs 6871 240485
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 30 Mtr 19295 57885
23 300Amps Cutout 3 Nos 5225 15675
24 11 Kv Danger Plate 6 Nos 55 330
25 240 sqmm Lugs 12 Nos 215 2580
26 Kiosk Box 1 Job 49500 49500
TOTAL 616537572
say 616537572
ABSTRACT OF COST
A Cost of Materials 616537572
B Storage Charge 2 on A 1233075144
C Total (A + B) 6288683234
D Erection Charge 15 on C 9433024852
E Total (C + D) 723198572
F Transportation Charge 5 on C 3144341617
G Supervision Charge and Establishment Charge 15 on E 1084797858
H Total (E + F + G) 8631217739
I Overhead charge 10 on H 8631217739
j Contingency Charge 3 on H 2589365322
GRAND TOTAL 8890154271
Say Rs 8890154271
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work - Extension of LT line for providing Street light connerction at DUKLI INDUSTRIAL GROWTH CENTRE ( TIDC)
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 20 Nos 3553 71060
3 Stay Set Complete 14 Sets 850 11900
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 70 4900
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos fo C Bkt) 72 Kgs 70 5040
7 Bracket Clamp by (50x6mm2) MS Flat 14 Nos 48 672
8 Weasel ACSR (61259mm) ( 6 wire 44 span) 3 Km 2347653 7042959
9 8 SWG GI Wire 80 Kgs 75 6000
10 LT Straps amp Bolts 50 Nos 38 1900
11 Shackle Insulator 150 Nos 11 1650
12 MS Nuts and Bolts of Assorted Size 320 Kgs 75 24000
13 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
14 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
15 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
16 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
17 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
18 MS clamp 200 Nos 80 16000
19 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
20 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
22 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
23 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
TOTAL 62557759
say 62557759
ABSTRACT OF COST
A Cost of Materials 62557759
B Storage Charge 2 on A 125115518
C Total (A + B) 6380891418
D Erection Charge 15 on C 9571337127
E Total (C + D) 7338025131
F Transportation Charge 5 on C 3190445709
G Supervision Charge and Establishment Charge 15 on E 110070377
H Total (E + F + G) 8757773471
I Contingency Charge 3 on H 2627332041
GRAND TOTAL 9020506675
Say 902051
( Rupees nine lac two thousand amp fifty one ) only
WORK ESTIMATE
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
3 MS clamp 200 Nos 80 16000
4 Nuts amp Bolts 200 Nos 20 4000
5 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
^6 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
TOTAL 391680
ABSTRACT OF COST
A Cost of Materials 391680
B Storage Charge 2 on A 78336
C Total (A + B) 3995136
D Erection Charge 15 on C 5992704
E Total (C + D) 45944064
F Transportation Charge 5 on C 1997568
G Supervision Charge and Establishment Charge 15 on E 68916096
H Total (E + F + G) 548332416
I Contingency Charge 3 on H 1644997248
GRAND TOTAL 5647823885
Say 551084
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2347653 18781224
10 8 SWG GI Wire 25 Kgs 4934 12335
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 9 Nos 4668 42012
14 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
28 Shackle insulator 8 Nos 1396 11168
29 Straps NampB(16x75) 8 pairs 6871 54968
27 Barbed Wire 15 Kgs 429 6435
TOTAL 159200654
say 159200654
ABSTRACT OF COST
A Cost of Materials 159200654
B Storage Charge 2 on A 318401308
C Total (A + B) 1623846671
D Erection Charge 15 on C 2435770006
E Total (C + D) 1867423671
F Transportation Charge 5 on C 8119233354
G Supervision Charge and Establishment Charge 15 on E 2801135507
H Total (E + F + G) 2228729556
I Contingency Charge 3 on H 6686188667
GRAND TOTAL 2295591442
Say Rs 2295591442
(Rupees Two Lac Twenty nine thousand five hundred fiftynine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to FOOD TESTING LABORATORY at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 1 Km 2347653 2347653
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 24 Nos 1125 270
9 Straps with NB ( 16x75) 24 Nos 6871 164904
TOTAL 4793747
say 4793747
ABSTRACT OF COST
A Cost of Materials 4793747
B Storage Charge 2 on A 9587494
C Total (A + B) 488962194
D Erection Charge 15 on C 733443291
E Transportation Charge 3 on C 23968735
F Total (C + D+E) 5862752581
G Supervision Charge and Establishment Charge 5 on F 2931376291
H Total ( F + G ) 615589021
I Overhead charge 10 on H 5862752581
J Contingency Charge 3 on H 1846767063
K WCT6 on erection charge ie on D 4400659746
L GRAND TOTAL 6970848772
Say Rs 6970848772
( Sixty nine thousand seven hundred eight ) only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to LALIT FLOUR MILL at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with LALIT FLOUR MILL
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 2 Nos 20 40
4 Stay Wire (725mm) 35 Kgs 5707 199745
5 Weasel ACSR (61259mm) 02 Km 2347653 4695306
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
8 LT shackle insulator 6 Nos 1125 675
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos ) 0 Kgs 70 0
9 Straps with NB ( 16x75) 6 Nos 6871 41226
TOTAL 16260836
say 16260836
ABSTRACT OF COST
A Cost of Materials 16260836
B Storage Charge 2 on A 32521672
C Total (A + B) 1658605272
D Erection Charge 15 on C 2487907908
E Transportation Charge 3 on C 8130418
F Total (C + D+E) 1988700243
G Supervision Charge and Establishment Charge 5 on F 9943501214
H Total ( F + G ) 2088135255
I Overhead charge 10 on H
J Contingency Charge 3 on H 6264405765
K WCT6 on erection charge ie on D 1492744745
L GRAND TOTAL 216570676
Say Rs 216570676
( Sixty thousand four hundred ) only
WORK ESTIMATE
Name of work -
Extension of HT Line for Providing of Service connection to Ramkrishna Rubber industry at RUBBER PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) 448 Kgs 5473 2451904
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 1 Set 7899 7899
14 11KV DOF 1 Set 5221 5221
15 11KV LA 3 Nos 369 1107
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 27 2970
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 357488314
say 357488314
ABSTRACT OF COST
A Cost of Materials 357488314
B Storage Charge 2 on A 714976628
C Total (A + B) 3646380803
D Erection Charge 15 on C 5469571204
E Total (C + D) 4193337923
F Transportation Charge 5 on C 1823190401
G Supervision Charge and Establishment Charge 15 on E 6290006885
H Total (E + F + G) 5004657652
I Overhead charge 10 on H 5004657652
J Contingency Charge 3 on H 1501397296
GRAND TOTAL 5655263147
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 2 Nos 4325 8650
2 ACSR (61259 04 Km 2016279 8065116
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 3 Nos 201 603
9 11KV Disc Fittings 3 Nos 28769 86307
10 11KV Pin Insulator 3 Nos 4668 14004
11 GI Pin for 11KV Pin Insulator 3 Nos 561 1683
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 10 Kgs 505 505
16 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
17 Bracket Clamp by (50x6mm2) MS Flat 32 Nos 27 864
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 4 Nos 12531 50124
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 80 Mtr 2200 176000
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 50 Mtr 1500 75000
24 Kiosk Box 1 Job 49500 49500
TOTAL 423354736
say 423355
ABSTRACT OF COST
A Cost of Materials 423355
B Storage Charge 2 on A 84671
C Total (A + B) 4318221
D Erection Charge 15 on C 64773315
E Total (C + D) 496595415
F Transportation Charge 5 on C 21591105
G Supervision Charge and Establishment Charge 15 on E 7448931225
H Total (E + F + G) 5926758323
I Overhead charge 10 on H 5926758323
j Contingency Charge 3 on H 1778027497
GRAND TOTAL 6697236904
Say Rs 669724
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Base monted Substation for Providing of new Service connection to Ramkrishna Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 201 1206
9 11KV Disc Fittings 6 Nos 28769 172614
10 11KV Pin Insulator 9 Nos 4668 42012
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 152447
say 152447
ABSTRACT OF COST
A Cost of Materials 152447
B Storage Charge 2 on A 304894
C Total (A + B) 15549594
D Erection Charge 15 on C 23324391
E Total (C + D) 178820331
F Transportation Charge 5 on C 7774797
G Supervision Charge and Establishment Charge 15 on E 2682304965
H Total (E + F + G) 2134181777
I Overhead charge 10 on H 2134181777
j Contingency Charge 3 on H 640254533
GRAND TOTAL 2411625407
Say 241163
(Rupees two Lac forty one thousand one hundred sixty three )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 58082 116164
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
8 Weasel ACSR (61259mm) 05 Km 2347653 11738265
9 8 SWG GI Wire 20 Kgs 4934 9868
10 11KV Disc Insulator 9 Nos 201 1809
11 11KV Disc Fittings 9 Nos 28769 258921
12 11KV Pin Insulator 9 Nos 4668 42012
13 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
14 11KV GOS 1 Set 806288 806288
15 11KV DOF 1 Set 373613 373613
16 11KV LA 3 Nos 369 1107
17 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
18 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
19 Bracket Clamp by (50x6mm2) MS Flat 38 Nos 48 1824
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
22 500Amps Cutout 6 Nos 9674 58044
23 11 Kv Danger Plate 6 Nos 55 330
24 240 sqmm Lugs 24 Nos 215 5160
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Nos 49500 49500
27 Barbed Wire 15 Kgs 429 6435
TOTAL 684227175
say 684227175
ABSTRACT OF COST
A Cost of Materials 684227175
B Storage Charge 2 on A 136845435
C Total (A + B) 6979117185
D Erection Charge 15 on C 1046867578
E Total (C + D) 8025984763
F Transportation Charge 5 on C 3489558593
G Supervision Charge and Establishment Charge 15 on E 1203897714
H Total (E + F + G) 9578838336
I Contingency Charge 3 on H 2873651501
GRAND TOTAL 9866203487
Say Rs 9866203487
(Rupees Nine Lac Eighty six thousand Six hundred Twenty )Only
WORK ESTIMATE
Name of work -
Extension of LT Line for providing of SC to Soma Paul at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Soma paul
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel Pole 2 Nos 1358265 271653
2 8Mtr PCC Pole 1 Nos 3553 3553
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 Weasel ACSR (61259mm) 32 Km 2347653 75124896
7 8 SWG Gi wire 50 Kgs 65 3250
7 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
9 LT shackle insulator 56 Nos 1125 630
10 2 mtr long MS Angle(50x50x6mm3) (16Nos ) 144 Kgs 70 10080
11 Straps with NB ( 16x75) 56 Nos 6871 384776
TOTAL 100758166
say 100758166
ABSTRACT OF COST
A Cost of Materials 100758166
B Storage Charge 2 on A 201516332
C Total (A + B) 1027733293
D Erection Charge 15 on C 154159994
E Transportation Charge 3 on C 50379083
F Total (C + D+E) 123227237
G Supervision Charge and Establishment Charge 5 on F 6161361851
H Total ( F + G ) 1293885989
I Overhead charge 10 on H 123227237
J Contingency Charge 3 on H 3881657966
K WCT6 on erection charge ie on D 9249599639
L GRAND TOTAL 1465179405
Say Rs 1465179405
( Rupees one lac forty six thousand five hundred eighteen ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x63 KVA Substation for Providing of Street light connection at Growth centre At Bodhjungnagar Growth centre under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 2 Nos 1032833 1032833
2 9Mtr PCC Pole 11 Nos 4325 47575
2 8Mtr PCC Pole 6 Nos 3553 21318
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 5 Nos
f) Single Pole Bottom X-Arm(13Mtr) 5 Nos
g DP Pole top X-Arm(17 Mtr) 2 Nos
h DP Pole Bottom X-Arm(22 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 2 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 42 Nos 2406 101052
12 11KV Disc Fittings 42 Nos 34958 1468236
13 11KV Pin Insulator 36 Nos 5293 190548
14 GI Pin for 11KV Pin Insulator 36 Nos 8243 296748
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 86 Nos 56 4816
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 110 Mtr 10495 115445
23 200Amps Cutout 12 Nos 27885 33462
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 48 Nos 1913 91824
26 LT shackle insulator 56 Nos 1125 630
27 Straps with NB 56 Nos 3683 206248
29 Kiosk Box 2 Job 49500 99000
30 Barber wire 20 Kgs 60 1200
TOTAL 53350719
say 53350719
ABSTRACT OF COST
A Cost of Materials 53350719
B Storage Charge 2 on A 106701438
C Total (A + B) 5441773338
D Erection Charge 15 on C 8162660007
E Transportation Charge 3 on C 266753595
F Total (C + D+E) 6524792934
G Supervision Charge and Establishment Charge 15 on F 9787189401
H Total ( F + G ) 7503511874
I Overhead charge 10 on H 6524792934
J Contingency Charge 3 on H 2251053562
K WCT6 on erection charge ie on D 4897596004
L GRAND TOTAL 8430072483
Say Rs 843007
(Rupees Eight Lac Forty three thousand amp seven )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x63 KVA Substation for Providing Service connection DWS Pump at Newly constructed Vetenairy college at RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work DWS DIVISION-II Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 1032833 1032833
2 9Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 12 Nos 3553 42636
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g DP Pole top X-Arm(17 Mtr) 1 Nos
h DP Pole Bottom X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 1 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 34958 629244
13 11KV Pin Insulator 15 Nos 5293 79395
14 GI Pin for 11KV Pin Insulator 15 Nos 8243 123645
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 88 Nos 1125 990
27 Straps with NB 88 Nos 3683 324104
30 Barber wire 10 Kgs 60 600
TOTAL 37085161
say 37085161
ABSTRACT OF COST
A Cost of Materials 37085161
B Storage Charge 2 on A 74170322
C Total (A + B) 3782686422
D Erection Charge 15 on C 5674029633
E Transportation Charge 3 on C 185425805
F Total (C + D+E) 453551519
G Supervision Charge and Establishment Charge 15 on F 6803272785
H Total ( F + G ) 5215842469
I Overhead charge 10 on H 453551519
J Contingency Charge 3 on H 1564752741
K WCT6 on erection charge ie on D 340441778
L GRAND TOTAL 585991344
Say Rs 585991
(Rupees five Lac Eighty five thousand Nine hundred ninety one )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT 15 km LT Line amp Construction of 2x 25 KVA Substation for providing of Service connection to Unhabited electrified area at Das para amp sarat pally under R K Nagar Grampanchyat under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO Jirinia RD Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 2 Nos 55146 110292
2 9Mtr PCC Pole 16 Nos 4325 69200
2 8Mtr PCC Pole 24 Nos 3553 85272
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 429 Kgs 5473 2347917
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g DP Pole top X-Arm(17 Mtr) 4 Nos
h DP Pole Bottom X-Arm(22 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 237 Kgs 5473 1297101
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 8 No
c) DP Pole Guard X-Arm (25Mtr) 4 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 84 Km 2016279 169367436
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 52 Nos 2406 125112
12 11KV Disc Fittings 52 Nos 34958 1817816
13 11KV Pin Insulator 48 Nos 5293 254064
14 GI Pin for 11KV Pin Insulator 48 Nos 8243 395664
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 176 Kgs 6871 1209296
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 6 Nos 27885 16731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 96 Nos 1125 1080
27 Straps with NB 96 Nos 3683 353568
30 Barber wire 10 Kgs 60 600
TOTAL 61196857
say 61196857
ABSTRACT OF COST
A Cost of Materials 61196857
B Storage Charge 2 on A 122393714
C Total (A + B) 6242079414
D Erection Charge 15 on C 9363119121
E Transportation Charge 3 on C 305984285
F Total (C + D+E) 7484375611
G Supervision Charge and Establishment Charge 15 on F 1122656342
H Total ( F + G ) 8607031953
I Overhead charge 10 on H 7484375611
J Contingency Charge 3 on H 2582109586
K WCT6 on erection charge ie on D 5617871473
L GRAND TOTAL 9669859187
Say Rs 966986
(Rupees Nine Lac sixty six nine hundred eighty six )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT amp 15 KM LT Line amp Construction of 1x 25 KVA Substation for Providing Service connection Un-electrified Habitation at sen para Muslim para Muslim Basti under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work BDO Jirinia R D Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole 12 Nos 4325 51900
2 8Mtr PCC Pole 25 Nos 3553 88825
3 Stay Set Complete 30 Sets 70998 212994
4 Stay Insulator(11KV) 30 Nos 20 600
5 Stay Wire (725mm) 150 Kgs 8136 12204
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g DP Pole top X-Arm(17 Mtr) 3 Nos
h DP Pole Bottom X-Arm(22 Mtr) 3 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 72 Km 2016279 145172088
10 8 SWG GI Wire 150 Kgs 6773 101595
11 11KV Disc Insulator 48 Nos 2406 115488
12 11KV Disc Fittings 48 Nos 34958 1677984
13 11KV Pin Insulator 52 Nos 5293 275236
14 GI Pin for 11KV Pin Insulator 52 Nos 8243 428636
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 160 Kgs 6871 109936
19 Stay Clamp by (50x6mm2) MS Flat 30 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 88 Nos 56 4928
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 120 Nos 1125 1350
27 Straps with NB 120 Nos 3683 44196
30 Barber wire 30 Kgs 60 1800
TOTAL 51229024
say 51229024
ABSTRACT OF COST
A Cost of Materials 51229024
B Storage Charge 2 on A 102458048
C Total (A + B) 5225360448
D Erection Charge 15 on C 7838040672
E Transportation Charge 3 on C 25614512
F Total (C + D+E) 6265309635
G Supervision Charge and Establishment Charge 15 on F 9397964453
H Total ( F + G ) 720510608
I Overhead charge 10 on H 6265309635
J Contingency Charge 3 on H 2161531824
L GRAND TOTAL 8047790226
Say 804779
(Rupees Eight Lac four thousand seven hundred seventy nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA amp 1x100 KVA Substation for Providing of Service connection 108 nos family at Newly constructed Horizon colony at sen para under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with BDO OlD AGARTALA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 219100 219100
2 100 KVA 110433KV Distribution Transformer 1 Nos 129478 129478
3 9Mtr PCC Pole ( DP=04 nos SP= 6 Nos) 14 Nos 4325 60550
4 8Mtr PCC Pole 85 Nos 3553 302005
5 Stay Set Complete 90 Sets 70998 638982
6 Stay Insulator(11KV) 90 Nos 20 1800
7 Stay Wire (725mm) 450 Kgs 81369 3661605
8 MS Channel(100x50x50x6mm4) 234 Kgs 5473 1280682
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
9 MS Channel(75x40x40x6mm4) 317 Kgs 5473 1734941
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
10 MS Angle(65x65x6mm3) 858 Kgs 5473 4695834
b) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
d) 15 mtr long 4 wire LT Bkt 85 No
11 Weasel ACSR (61259mm) 18 Km 2016279 36293022
12 8 SWG GI Wire 520 Kgs 6772 352144
13 11KV Disc Insulator 48 Nos 2406 115488
14 11KV Disc Fittings 48 Nos 34958 1677984
15 11KV Pin Insulator 64 Nos 8248 527872
16 GI Pin for 11KV Pin Insulator 64 Nos 561 35904
17 11KV GOS 3 Set 7899 23697
18 11KV DOF 3 Set 5221 15663
19 11KV LA 9 Nos 369 3321
20 MS Nuts and Bolts of Assorted Size 520 Kgs 6871 357292
21 Stay Clamp by (50x6mm2) MS Flat 90 Pairs 495 4455
22 Bracket Clamp by (50x6mm2) MS Flat 210 Nos 48 10080
23 30Mtr long 40mm dia GI Pipe Earthing 9 Nos 1300 11700
24 120sqmm PVC insulated Al Conductor 250 Mtr 10911 272775
25 240 sqmm PVC insulated Al Conductor 200 Mtr 19295 38590
26 300Amps Cutout 12 Nos 5225 6270
27 200Amps Cutout 9 Nos 41699 375291
28 120sqmm Lugs 48 Nos 162 7776
29 240sqmm Lugs 48 Nos 238 11424
30 Transformer Base 1 Job 89500 89500
31 LT shackle insulator 360 Nos 1125 4050
32 Straps with NB 360 Nos 3683 132588
33 Danger plate 92 Nos 50 4600
TOTAL 163704861
say 163704861
ABSTRACT OF COST
A Cost of Materials 163704861
C Storage Charge 2 on A 327409722
D Total (A + B) 1669789582
E Erection Charge 15 on D 2504684373
F Total (C + D) 192025802
G Transportation Charge 5 on D 8348947911
H Supervision Charge and Establishment Charge 5 on F 9601290098
H Total ( F + G+H ) 20997604
I Contingency Charge 3 on H 6299281199
j Addhoc 10 on H 20997604
GRAND TOTAL 2372729252
Say Rs 2372729
(Rupees Twenty three Lac seventy two thousand seven hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 165062
ABSTRACT OF COST
A Cost of Materials 165062
C Storage Charge 2 on A 330124
D Total (A + B) 16836324
E Erection Charge 15 on D 25254486
F Total (C + D) 193617726
G Transportation Charge 5 on D 8418162
H Supervision Charge and Establishment Charge 5 on F 96808863
H Total ( F + G+H ) 2117167743
I Contingency Charge 3 on H 6351503229
j Addhoc 10 on H 2117167743
GRAND TOTAL 239240
Say Rs 239240
(Rupees Two LacThirtynine thousand two hundred forty )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 1000 KVA Base monted Substation for Providing of new Service connection to MALAYA Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MALAYA RUB-TECH INDUSTRIES
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 70998 35499
4 Stay Insulator(11KV) 5 Nos 12 60
5 Stay Wire (725mm) 25 Kgs 8136 2034
6 MS Channel(75x40x40x6mm4) 224 Kgs 5473 1225952
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 5473 93041
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 2406 14436
9 11KV Disc Fittings 6 Nos 34958 209748
10 11KV Pin Insulator 9 Nos 8248 74232
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 7899 7899
13 11KV DOF 1 Set 5221 5221
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 90 Mtr 238 21420
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 17083229
say 170832
ABSTRACT OF COST
A Cost of Materials 170832
B Storage Charge 2 on A 341664
C Total (A + B) 17424864
D Erection Charge 15 on C 26137296
E Total (C + D) 200385936
F Transportation Charge 5 on C 8712432
G Supervision Charge and Establishment Charge 15 on E 300578904
H Total (E + F + G) 2391562584
I Overhead charge 10 on H 2391562584
j Contingency Charge 3 on H 7174687752
GRAND TOTAL 270246572
Say 270247
(Rupees two Lac seventy thousand two hundred forty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Santi para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 18 Km 190276 3424968
10 8 SWG GI Wire 20 Kgs 6732 13464
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 48 3264
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 11007 605385
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 25661079
say 25661079
ABSTRACT OF COST
A Cost of Materials 25661079
B Storage Charge 2 on A 51322158
C Total (A + B) 2617430058
D Erection Charge 15 on C 3926145087
E Total (C + D) 3010044567
F Transportation Charge 5 on C 1308715029
G Supervision Charge and Establishment Charge 10 on E 3010044567
H Total (E + F + G) 3441920526
I Contingency Charge 3 on H 1032576158
GRAND TOTAL 3545178142
Say Rs 3545178142
(Rupees three Lac Fifty four thousand five hundred Eighteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Das para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 15 Kgs 6732 10098
11 11KV Disc Insulator 9 Nos 2406 21654
12 11KV Disc Fittings 9 Nos 33766 303894
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 30 Mtr 11007 33021
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 22108045
say 22108045
ABSTRACT OF COST
A Cost of Materials 22108045
B Storage Charge 2 on A 4421609
C Total (A + B) 225502059
D Erection Charge 15 on C 3382530885
E Total (C + D) 2593273679
F Transportation Charge 5 on C 1127510295
G Supervision Charge and Establishment Charge 10 on E 2593273679
H Total (E + F + G) 2965352076
I Contingency Charge 3 on H 8896056228
GRAND TOTAL 3054312638
Say Rs 3054312638
(Rupees three Lac Five thousand thousand four hundred thirty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to Santosh das Bhanu kanta biswas amp purnima biswas under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with santosh das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 3 Nos 3250 9750
2 stay set complete 1 Nos 581 581
3 Stay insulator 1 Nos 20 20
4 Stay wire 1 Nos 57 57
5 Weasel ACSR (61259mm) 003 Km 2016279 6048837
6 MS Nuts and Bolts of Assorted Size 6 Kgs 505 303
7 LT shackle insulator 6 Nos 1125 675
TOTAL 113833837
say 113833837
ABSTRACT OF COST
A Cost of Materials 113833837
B Storage Charge 2 on A 227667674
C Total (A + B) 1161105137
D Erection Charge 15 on C 1741657706
E Transportation Charge 3 on C 569169185
F Total (C + D+E) 1392187827
G Supervision Charge and Establishment Charge 5 on F 6960939133
H Total ( F + G ) 1461797218
J Contingency Charge 3 on H 4385391654
L GRAND TOTAL 1505651134
Say Rs 15057
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 55419033
ABSTRACT OF COST
A Cost of Materials 55419033
C Storage Charge 2 on A 110838066
D Total (A + B) 5652741366
E Erection Charge 15 on D 8479112049
F Total (C + D) 6500652571
G Transportation Charge 5 on D 2826370683
H Supervision Charge and Establishment Charge 15 on F 9750978856
H Total ( F + G+H ) 7758387525
I Contingency Charge 3 on H 2327516257
GRAND TOTAL 7991139151
Say 799114
(Rupees seven lac ninety nine thousand one hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) Kgs 5473 0
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 3 Set 7899 23697
15 11KV LA 9 Nos 369 3321
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 142 Nos 48 6816
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
3 11 KB VCB 1 Sets 450000 450000
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable 015 Km 572183 8582745
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 934991304
say 934991304
ABSTRACT OF COST
A Cost of Materials 934991304
B Storage Charge 2 on A 1869982608
C Total (A + B) 9536911301
D Erection Charge 15 on C 1430536695
E Total (C + D) 10967448
F Transportation Charge 5 on C 476845565
G Supervision Charge and Establishment Charge 15 on E 1645117199
H Total (E + F + G) 1308941076
I Overhead charge 10 on H 1308941076
J Contingency Charge 3 on H 3926823228
GRAND TOTAL 1479103416
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 015 Km 3510265 52653975
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 250 7500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 12 Km 572183 6866196
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 90 Mtr 1500 135000
24 Errection oh UG cable 1200 Mtr 450 540000
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2197755172
say 2197755172
ABSTRACT OF COST
A Cost of Materials 2197755172
B Storage Charge 2 on A 4395510343
C Total (A + B) 2241710275
D Erection Charge 15 on C 3362565412
E Total (C + D) 2577966816
F Transportation Charge 5 on C 1120855137
G Supervision Charge and Establishment Charge 15 on E 3866950224
H Total (E + F + G) 3076747352
I Overhead charge 10 on H 3076747352
j Contingency Charge 3 on H 9230242057
GRAND TOTAL 3476724508
Say Rs 3902237
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Up-gradition of electricity load from 10KW to 100 KW at CETP Bodhjungnagar Replacement of the PVC cable size single core 16 sq mm to single core 120 sqmm under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit work with TIDC
SlNO Description of work Qty Unit RateUnit Amount
25 120sqmm PVC cable 120 Mtr 110076 1320912
TOTAL 1320912
say 1320912
ABSTRACT OF COST
A Cost of Materials 1320912
B Storage Charge 2 on A 2641824
C Total (A + B) 134733024
D Erection Charge as actual 808398144
E Total (C + D) 2155728384
F Transportation Charge 5 on C 67366512
G Supervision Charge and Establishment Charge 20 on E 4311456768
H Total (E + F + G) 2654240573
I Contingency Charge 3 on H 7962721718
GRAND TOTAL 273386779
Say 27339
(Rupees twenty seven thousand three hundred thirty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 554190
ABSTRACT OF COST
A Cost of Materials 554190
B Storage Charge 2 on A 110838
C Total (A + B) 5652738
D Erection Charge 15 on C 8479107
E Transportation Charge 3 on C 166257
F TOTAL ( C+ D+E ) 66669057
G Supervision Charge and Establishment Charge 5 on F 333345285
H Total ( F + G) 7000250985
I Contingency Charge 2 on H 1400050197
J WCT 4 on Errection charge 33916428
TOTAL ESTIMATED COST OF DEPOSIT WORK 7174172433
Say 717417
(Rupees seven Lac seventeen thousand thousand four hundred seventeen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to MBS FEED amp PHARMA at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS Feed amp Pharma
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 48 2016
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 53988283
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E Transportation Charge 3 on C 1619649
F TOTAL ( C+ D+E ) 649479249
G Supervision Charge and Establishment Charge 5 on F 3247396245
H Total ( F + G) 6819532115
I Contingency Charge 2 on H 1363906423
J WCT 4 on Errection charge 330408396
TOTAL ESTIMATED COST OF DEPOSIT WORK 6988963596
Say 698896
(Rupees six Lac ninety eight thousand eight hundred ninety six )Only
WORK ESTIMATE
Name of work -
Revisied Estimate for Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNIL Aircel Tower Ltd at Ramnath Kobra para under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRCEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 9 Nos 4325 38925
2 8Mtr PCC Pole 2 Nos 3553 7106
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6838 17095
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 5485 1892325
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 5485 532045
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 40 Kgs 6732 26928
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 509 12725
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 200 Mtr 39386 78772
23 100Amps Cutout 12 Nos 1926 23112
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 222558742
say 222559
ABSTRACT OF COST
A Cost of Materials 222559
B Storage Charge 2 on A 445118
C Total (A + B) 22701018
D Erection Charge 15 on C 34051527
E Transportation Charge 3 on C 667677
F TOTAL ( C+ D+E ) 267738477
G Supervision Charge and Establishment Charge 5 on F 1338692385
H Total ( F + G) 2811254009
I Contingency Charge 2 on H 5622508017
J WCT 4 on Errection charge 136206108
TOTAL ESTIMATED COST OF DEPOSIT WORK 2881099699
Say 288110
(Rupees two Lac Eighty eight thousand thousand one hundred ten )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 9 Kgs 6838 61542
5 Weasel ACSR (61259mm) 042 Km 190276 7991592
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 10 Nos 1125 1125
9 Straps with NB ( 16x75) 10 Nos 6871 6871
TOTAL 304487976
say 304487976
ABSTRACT OF COST
A Cost of Materials 304487976
B Storage Charge 2 on A 608975952
C Total (A + B) 3105777355
D Erection Charge 15 on C 4658666033
E Transportation Charge 3 on C 9317332066
F Total (C + D+E) 3664817279
G Supervision Charge and Establishment Charge 15 on F 5497225919
H Total ( F + G ) 4214539871
i Contingency Charge 2 on H 8429079742
GRAND TOTAL 4298830668
Say 42988
( Forty two thousand nine hundred eighty eight ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA Base mounted Substation for Providing of Service connection to MS RM SAHA amp SONS at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH RM SAHA amp SONS
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 214697 214697
2 9Mtr PCC Pole ( DP=01 nos SP-01 nos ) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 04 Km 190276 761104
10 8 SWG GI Wire 20 Kgs 67321 134642
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 45 Kgs 6871 309195
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 300Amps Cutout 6 Nos 7029 42174
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 305315803
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E TOTAL ( C+ D ) 633282759
F Transportation Charge 3 on C 247806297
G TOTAL ( E+F ) 635760822
H Supervision Charge and Establishment Charge 15 on G 953641233
I Total ( G+H ) 7311249453
J Contingency Charge 2 on H 1907282466
TOTAL ESTIMATED COST OF DEPOSIT WORK 7330322277
Say 733032
(Rupees seven Lac thirty three thousand thirty two )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 065 Km 190276 1236794
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 512717456
say 51272
ABSTRACT OF COST
A Cost of Materials 51272
B Storage Charge 2 on A 102544
C Total (A + B) 5229744
D Erection Charge 15 on C 7844616
E TOTAL ( C+ D ) 60142056
F Transportation Charge 3 on C 23533848
G TOTAL ( E+F ) 6037739448
H Supervision Charge and Establishment Charge 15 on G 9056609172
I Total ( G+H ) 6943400365
J Contingency Charge 2 on H 1811321834
TOTAL ESTIMATED COST OF DEPOSIT WORK 6961513584
Say 69615
(Rupees sixty nine thousand six hundred fifteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to Pran gopal saha at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN GOPAL SAHA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 no) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 6838 10257
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 139 Kgs 5485 762415
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Double Pole Top X-Arm( 22 Mtr) 1 Nos
f) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 5485 26328
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 09 Km 190276 1712484
10 8 SWG GI Wire 25 Kgs 6732 1683
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 70 sqmm PVC insulated Al Conductor 48 Mtr 662 31776
23 16 sqmm PVC insulated Al Conductor 150 Mtr 22602 33903
24 200Amps Cutout 3 Nos 40436 121308
25 11 Kv Danger Plate 3 Nos 55 165
26 120sqmm Lugs 24 Nos 165 3960
27 Substation fancing 1 Job 14500 14500
TOTAL 202996242
say 202996
ABSTRACT OF COST
A Cost of Materials 202996
B Storage Charge 2 on A 405992
C Total (A + B) 20705592
D Erection Charge 15 on C 31058388
E TOTAL ( C+ D ) 238114308
F Transportation Charge 3 on C 93175164
G TOTAL ( E+F ) 2390460596
H Supervision Charge and Establishment Charge 15 on G 3585690895
I Total ( G+H ) 2749029686
J Contingency Charge 2 on H 7171381789
TOTAL ESTIMATED COST OF DEPOSIT WORK 2756201068
Say 275620
(Rupees two Lac seventy five thousand six hundred twenty )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNG POINT at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 18589254
say 185893
ABSTRACT OF COST
A Cost of Materials 185893
B Storage Charge 2 on A 371786
C Total (A + B) 18961086
D Erection Charge 15 on C 28441629
E Transportation Charge 3 on C 56883258
F TOTAL ( C+D+E) ) 2237408148
G Supervision Charge and Establishment Charge 15 on F 3356112222
H Total ( F+G) 257301937
I Contingency Charge 2 on H 514603874
2624479758
Say 262448
(Rupees two Lac sixty two thousand four hundred forty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25KVA Substation for Providing of new Service connection to
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 32 Nos 4325 138400
2 11 mtr long steel pole 2 Nos 1224779 2449558
3 Stay Set Complete 18 Sets 70998 1277964
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 72 Kgs 8137 585864
6 MS Channel(75x40x40x6mm4) 452 Kgs 5473 2473796
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(13 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
7 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
8 Weasel ACSR (61259mm) 38 Km 2016279 76618602
9 8 SWG GI Wire 240 Kgs 6772 162528
10 11KV Disc Insulator 62 Nos 2406 149172
11 11KV Disc Fittings 62 Nos 34958 2167396
12 11KV Pin Insulator 72 Nos 5292 381024
13 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
14 11KV GOS 2 Set 7899 15798
15 11KV LA 6 Nos 369 2214
16 11KV DOF (3 ph) 2 Set 5221 10442
17 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
18 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
19 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 48 5280
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 395903582
say 395903582
ABSTRACT OF COST
A Cost of Materials 395903582
B Storage Charge 2 on A 791807164
C Total (A + B) 4038216536
D Erection Charge 15 on C 6057324805
E Total (C + D) 4643949017
F Transportation Charge 5 on C 2019108268
G Supervision Charge and Establishment Charge 15 on E 6965923525
H Total (E + F + G) 5542452196
I Overhead charge 10 on H 5542452196
J Contingency Charge 3 on H 1662735659
GRAND TOTAL 6262970982
Say Rs 626297
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to AIRTEL TOWER at Murabari under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Bharati infratel limited
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 6 Sets 74654 447924
4 Stay Insulator(11KV) 6 Nos 20 120
5 Stay Wire (725mm) 30 Kgs 6838 20514
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 21 Km 190276 3995796
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 24845939
say 248459
ABSTRACT OF COST
A Cost of Materials 248459
B Storage Charge 2 on A 496918
C Total (A + B) 25342818
D Erection Charge 15 on C 38014227
E Transportation Charge 3 on C 76028454
F TOTAL ( C+D+E) ) 2990452524
G Supervision Charge and Establishment Charge 15 on F 4485678786
H Total ( F+G) 3439020403
I Contingency Charge 2 on H 6878040805
3507800811
Say 350780
(Rupees three Lac fifty thousand seven hundred eighty )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at Ramchandra nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with RC Nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 056 Km 190276 10655456
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 495592616
say 49559
ABSTRACT OF COST
A Cost of Materials 49559
B Storage Charge 2 on A 99118
C Total (A + B) 5055018
D Erection Charge 15 on C 7582527
E Transportation Charge 3 on C 15165054
F TOTAL ( C+D+E) ) 596492124
G Supervision Charge and Establishment Charge 15 on F 894738186
H Total ( F+G) 6859659426
I Contingency Charge 2 on H 1371931885
6996852615
Say 69969
(Rupees sixty nine thousand nine hundred sixty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 500 15000
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 135 Km 572183 77244705
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 120 Mtr 1500 180000
24 Errection oh UG cable 1350 Mtr 450 607500
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2408467087
say 2408467087
ABSTRACT OF COST
A Cost of Materials 2408467087
B Storage Charge 2 on A 4816934173
C Total (A + B) 2456636428
D Erection Charge 15 on C 3684954642
E Transportation Charge 3 on C 7369909285
F TOTAL ( C+D+E) ) 2898830985
G Supervision Charge and Establishment Charge 15 on F 4348246478
H Total ( F+G) 3333655633
I Contingency Charge 2 on H 6667311266
3400328746
Say 3400329
(Rupees thirty four Lac three hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 550000 550000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 55 Nos 500 27500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 12 Nos 12531 150372
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 3 Nos 12531 37593
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 23 Km 572183 13160209
24 4incdia GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 225 Mtr 1500 337500
24 Errection oh UG cable 2300 Mtr 450 1035000
24 HT Kiosk Box 4 Job 49500 198000
TOTAL 3774226937
say 3774226937
ABSTRACT OF COST
A Cost of Materials 3774226937
B Storage Charge 2 on A 7548453873
C Total (A + B) 3849711475
D Erection Charge 15 on C 5774567213
E Transportation Charge 3 on C 1154913443
F TOTAL ( C+D+E) ) 4542659541
G Supervision Charge and Establishment Charge 15 on F 6813989311
H Total ( F+G) 5224058472
I Contingency Charge 2 on H 1044811694
5328539641
Say
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Ramkrishna Rubber industry under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 53 Kgs 54849 2906997
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV DOF Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 538257719
say 538258
ABSTRACT OF COST
A Cost of Materials 538258
B Storage Charge 2 on A 1076516
C Total (A + B) 54902316
D Erection Charge 15 on C 82353474
E Transportation Charge 3 on C 164706948
F TOTAL ( C+D+E) ) 6478473288
G Supervision Charge and Establishment Charge 15 on F 9717709932
H Total ( F+G) 7450244281
I Contingency Charge 2 on H 1490048856
7599249167
Say 759925
(Rupees seven Lac fifty nine thousand nine hundred twenty five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Globe Enterprise under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 15 on F 9753908202
H Total ( F+G) 7477996288
I Contingency Charge 2 on H 1495599258
7627556214
Say 762756
(Rupees seven Lac sixty two thousand seven hundred )Only
WORK ESTIMATE
Name of work -
Extension of Overhead Dedicated Feeder line line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd for providing service connection toAgartala plastic private limited under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole ( Dp-03 nos Sp-10 nos) 16 Nos 1224779 19596464
2 9Mtr PCC Pole ( DP=08 nos Sp-26 nos ) 42 Nos 4325 181650
4 Stay Set Complete 42 Sets 74654 3135468
5 Stay Insulator(11KV) 42 Nos 20 840
6 Stay Wire (725mm) 210 Kgs 68387 1436127
7 ACSR (61335 87 Km 3510265 305393055
8 11 KB VCB 1 Sets 450000 450000
9 MS Channel(75x40x40x6mm4) 1190 Kgs 54849 6527031
a) 11KV GOS Base Bracket(28Mtr) 10 Nos
b 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
c Single Pole Top X-Arm(03Mtr) 36 Nos
d Single Pole Bottom X-Arm(13Mtr) 36 Nos
e Double Pole Top X-Arm( 22 Mtr) 11 Nos
f Double Pole Bottom X-Arm(25 Mtr) 11 Nos
g 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
10 MS Angle(65x65x6mm3) 994 Kgs 54849 54519906
a) SinglePole Guard X-Arm (15Mtr) 36 No
b DP Pole Guard X-Arm (25Mtr) 11 No
c DP Pole cross braket (17Mtrlong ) 44 No
d 11KV LA Bracket(28Mtr) 5 No
11 11KV Disc Insulator 156 Nos 2406 375336
12 11KV Disc Fittings 156 Nos 33766 5267496
13 11KV Pin Insulator 210 Nos 5292 111132
14 GI Pin for 11KV Pin Insulator 210 Nos 8248 173208
15 11KV GOS (3p two post) 5 Set 1006111 5030555
16 11KV DOF(3ph) 5 Set 5221 26105
17 11KV LA 15 Nos 369 5535
18 MS Nuts and Bolts of Assorted Size 340 Kgs 6871 233614
19 Bracket Clamp by (50x6mm2) MS Flat 560 Nos 60 33600
20 Stay Clamp by (50x6mm2) MS Flat 42 Nos 495 2079
21 30Mtr long 40mm dia GI Pipe ( for earthing) 9 Nos 1500 13500
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
23 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 870000 130500
25 11KV Danger plate 47 Nos 55 2585
TOTAL 1729567371
say 1729567
ABSTRACT OF COST
A Cost of Materials 1729567
B Storage Charge 2 on A 3459134
C Total (A + B) 176415834
D Erection Charge 15 on C 264623751
E Transportation Charge 3 on C 529247502
F TOTAL ( C+D+E) ) 2081706841
G Supervision Charge and Establishment Charge 10 on F 2081706841
H Total ( F+G) 2289877525
I Contingency Charge 2 on H 4579755051
J TOTAL ( H+I) 2335675076
K Service charge 5on J 1167837538
L TOTAL ( J+K) 245245883
Say 2452459
(Rupees twenty four Lac Fifty two thousand four hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN BREVARAGE INDIA ( PVT) LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
4 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
5 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
6 11KV Disc Insulator 12 Nos 2406 28872
7 11KV Disc Fittings 12 Nos 33766 405192
8 11KV Pin Insulator 9 Nos 5292 47628
9 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
10 11KV GOS 3 Set 1006111 3018333
11 11KV DOF 3 Set 5221 15663
12 11KV LA 9 Nos 369 3321
13 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
14 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
15 30Mtr long 40mm dia GI Pipe ( for Earthing) 6 Nos 1605 9630
16 11 Kv Danger post 30 Nos 500 15000
17 240sqmm Lugs 24 Nos 21528 516672
18 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
19 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
20 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 08 Km 572183 4577464
21 10 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 24 Mtr 1500 36000
22 cutting of treanch for UG cable ( Depth-11mtr wide- 05 mtr ) 800 Mtr 450 360000
23 HT Kiosk Box 2 Job 49500 99000
TOTAL 1652766437
say 1652766
ABSTRACT OF COST
A Cost of Materials 1652766
B Storage Charge 2 on A 3305532
C Total (A + B) 168582132
D Erection Charge 15 on C 252873198
E Transportation Charge 3 on C 505746396
F TOTAL ( C+D+E) ) 1989269158
G Supervision Charge and Establishment Charge 10 on F 1989269158
H Total ( F+G) 2188196073
I Contingency Charge 2 on H 4376392147
J TOTAL ( H+I) 2231959995
K Service charge 5on J 1115979997
L TOTAL ( J+K) 2343557995
Say Rs234355900
Say 2343559
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 74654 597232
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 40 Kgs 68387 273548
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 190276 285414
10 8 SWG GI Wire 55 Kgs 67321 3702655
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 60 3120
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
22 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
23 500Amps Cutout 12 Nos 9674 116088
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 8 Nos 55 440
TOTAL 1119176203
say 1119176
ABSTRACT OF COST
A Cost of Materials 1119176
B Storage Charge 2 on A 2238352
C Total (A + B) 114155952
D Erection Charge 15 on C 171233928
E Transportation Charge 3 on C 342467856
F TOTAL ( C+D+E) ) 1347040234
G Supervision Charge and Establishment Charge 15 on F 202056035
H Total ( F+G) 1549096269
I Contingency Charge 2 on H 3098192537
1580078194
Say 1580078
(Rupees fifteen Lac eighty thousand amp seventy eight )Only
WORK ESTIMATE
Name of work -
Extension of Didicated Feeder line from Rubber Park 33 KV substation to Abhisar Buildwell Pvt Ltd ( Rubber Division) amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 28 Nos 4325 121100
3 11 KB VCB 1 Sets 450000 450000
3 Stay Set Complete 14 Sets 74654 1045156
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 68387 478709
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 739 Kgs 54849 40533411
a) 11KV GOS Base Bracket(28Mtr) 6 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 6 Nos
c) 11KV DOF Bracket(28Mtr) 6 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 6 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g) Double Pole Top X-Arm( 22 Mtr) 6 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 6 Nos
8 MS Angle(65x65x6mm3) 234 Kgs 54849 12834666
a) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 6 No
9 Weasel ACSR (61259mm) 42 Km 190276 7991592
10 8 SWG GI Wire 220 Kgs 67321 1481062
11 11KV Disc Insulator 54 Nos 2406 129924
12 11KV Disc Fittings 54 Nos 33766 1823364
13 11KV Pin Insulator 30 Nos 5292 15876
14 GI Pin for 11KV Pin Insulator 30 Nos 8248 24744
15 11KV GOS 3 Set 7899 23697
16 11KV DOF 3 Set 5221 15663
17 11KV LA 9 Nos 369 3321
18 120sqmm Lugs 24 Nos 165 3960
19 240 sqmm Lugs 24 Nos 219 5256
20 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
21 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
22 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 572183 8582745
23 MS Nuts and Bolts of Assorted Size 189 Kgs 6871 1298619
24 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
25 Bracket Clamp by (50x6mm2) MS Flat 140 Nos 60 8400
26 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
27 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
28 500Amps Cutout 12 Nos 9674 116088
29 185sqmm Lugs 24 Nos 219 5256
30 Danger plate 8 Nos 55 440
TOTAL 1949334855
say 1949335
ABSTRACT OF COST
A Cost of Materials 1949335
B Storage Charge 2 on A 389867
C Total (A + B) 19883217
D Erection Charge 15 on C 298248255
E Transportation Charge 3 on C 59649651
F TOTAL ( C+D+E) ) 2346219606
G Supervision Charge and Establishment Charge 15 on F 3519329409
H Total ( F+G) 2698152547
I Contingency Charge 2 on H 5396305094
2752115598
Say 2752116
(Rupees Twenty seven Lac fifty two thousand one hundred sixteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to PRAN BREVARAGE (INDIA) PRIVATE LIMITED under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 10 on F 6502605468
H Total ( F+G) 7152866015
I Contingency Charge 2 on H 1430573203
J TOTAL ( H+I) 7295923335
K Service charge 5on J 3647961668
L TOTAL ( J+K) 7660719502
Say 766072
Say 766072
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 10 nos consumer at south shib nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with South shib nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 3 Sets 74654 223962
2 Stay Insulator(11KV) 3 Nos 20 60
3 Stay Wire (725mm) 12 Kgs 6838 82056
4 Weasel ACSR (61259mm) 08 Km 190276 1522208
5 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
6 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
7 LT shackle insulator 20 Nos 1125 225
8 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 208695256
say 20870
ABSTRACT OF COST
A Cost of Materials 20870
B Storage Charge 2 on A 4174
C Total (A + B) 212874
D Erection Charge 15 on C 319311
E Transportation Charge 3 on C 638622
F TOTAL ( C+D+E) ) 25119132
G Supervision Charge and Establishment Charge 15 on F 37678698
H Total ( F+G) 288870018
I Contingency Charge 2 on H 577740036
2946474184
Say 29465
(Rupees twenty nine thousand four hundred sixty five )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to sri Pankaj Roy Kalitilla under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with sri Pankaj roy
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 15 Nos 3553 53295
2 Stay Set Complete 9 Sets 74654 671886
3 Stay Insulator(11KV) 9 Nos 20 180
4 Stay Wire (725mm) 45 Kgs 6838 30771
5 Weasel ACSR (61259mm) 17 Km 190276 3234692
6 MS Nuts and Bolts of Assorted Size 75 Kgs 6732 5049
7 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 10428794
say 104288
ABSTRACT OF COST
A Cost of Materials 104288
B Storage Charge 2 on A 208576
C Total (A + B) 10637376
D Erection Charge 15 on C 15956064
E Transportation Charge 3 on C 31912128
F TOTAL ( C+D+E) ) 1255210368
G Supervision Charge and Establishment Charge 10 on F 1255210368
H Total ( F+G) 1380731405
I Contingency Charge 2 on H 276146281
J TOTAL ( H+I) 1408346033
K Service charge 5on J 7041730164
L TOTAL ( J+K) 1478763335
Say 147876
Say 147876
(Rupees one Lac forty seven thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x25 KVA pole mounted Substation for Providing of Service connection to ATC INDIA TOWER at RKNagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 3 Nos 4325 12975
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 08 Km 190276 1522208
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe for Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
TOTAL 15513150
say 155132
ABSTRACT OF COST
A Cost of Materials 155132
B Storage Charge 2 on A 310264
C Total (A + B) 15823464
D Erection Charge 15 on C 23735196
E Transportation Charge 3 on C 47470392
F TOTAL ( C+D+E) ) 1867168752
G Supervision Charge and Establishment Charge 10 on F 1867168752
H Total ( F+G) 2053885627
I Contingency Charge 2 on H 4107771254
J TOTAL ( H+I) 209496334
K Service charge 5on J 104748167
L TOTAL ( J+K) 2199711507
Say 219971
(Rupees two Lac nineteen thousand nine hundred seventy one )Only
Page 3: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

a

100 KVA Transformer

Nos 2TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

19

Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break

switch including necessary connection as per TS

Set 3TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

20

Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for

11KV 50Hz AC system operation for air break switch including necessary connection

as per TS

Set 2TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

21

Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable

for nominal system Voltage of 11 KV inc necessary connection as per TS

Nos 6TSECL

SUPPLYhelliphelliphelliphelliphelliphellip helliphellip

22

Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per

Set 8nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design

23

Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp

Nuts amp Bolts)

Nos 4TSECL

SUPPLYhelliphelliphellip helliphelliphellip

24

Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying

hoisting binding etc complete as reqd

Km 21TSECL

SUPPLYhelliphelliphellip helliphelliphellip

25

Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc

complete as reqd

Km 09TSECL

SUPPLYhelliphelliphellip helliphelliphellip

26

Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp

Bolts on poles excluding the cost of straps Nuts and Bolts

Nos 52TSECL

SUPPLYhelliphelliphellip helliphelliphellip

27Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL

aBracket Clamp

Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

bStay Clamp

pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

28

Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of

size 24x10x15 and cable connections with termination by Lugs Thimble complete Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip

helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip

inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

29

Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection

Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip

Signature of bidderDy General Manager

Jirania Electrical Division

Rounded of Rs (Rupees only)

Sub Total

( Supply + Erection) total Rs

RUB amp LI(

Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

Work Estimate for Line

(AS Deb Barma)Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division
WORK ESTIMATE
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- Chargeable to - DEPOSIT WORK WITH TIDC
B] COST OF MATERIALS FOR 11KV LINE EXTENSION
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) 35 Nos 1015422 3553977
2 9mtr Long PCC Pole 25 Nos 2650 66250
3 Stay Set Complete 25 Sets 47025 1175625 29390625
4 Stay Insulator(11KV) 125 Nos 1092 1365 34125
5 Stay Wire (725mm) 24 Kgs 451 10824
6 MS Channel(75x40x40x6mm4) 116 Kgs 3352 388832
a) Double Pole X-Arm(22Mtr) 3 Nos
b) Single Pole Top X-Arm(03Mtr) 6 Nos
c) Single Pole Bottom X-Arm(12Mtr) 6 Nos
7 MS Angle(65x65x6mm3) 96 Kgs 321 30816
a) Double Pole Guard X-Arm (25Mtr) 3 Nos
b) SinglePole Guard X-Arm (15Mtr) 6 Nos
8 Weasel ACSR (61259mm) 12 Km 2061233 24734796 6183699
9 8 SWG GI Wire 80 Kgs 391 3128 782
10 11KV 45KN Disc Insulator 18 Nos 49487 890766 2226915
11 Single U Bolt type Disc Fittings 18 Nos 19352 348336
12 11KV Pin Insulator 27 Nos 991 26757 668925
13 GI Pin for 11KV Pin Insulator 27 Nos 561 15147
14 MS Nuts and Bolts of Assorted Size 20 Kgs 407 814
15 Stay Clamp by (50x6mm2) MS Flat 6 Pairs 495 297
16 Bracket Clamp by (50x6mm2) MS Flat 40 Nos 27 1080
17 Barbed Wire 22 Kgs 429 9438 23595
24 AddMetering Arrangement with Kiosk 1 Nos 50000 50000
18 30Mtr long 40mm dia GI Pipe Earthing 2 Nos 1605 3210
TOTAL 543610286 1359025715
say 163391
(One Lac sixty three thousand three hundred and ninety one only)
ABSTRACT OF COST 0
A Cost of Materials 163391 0
B Storage Charge 2 on A 326782
C Total (A + B) 16665882 0
D Erection Charge 15 on C 24998823
E Total (C + D) 191657643 0
F Transportation Charge 5 on C 8332941
G Supervision Charge and Establishment Charge 15 on E 2874864645
H Total (E + F + G) 2287392305
I Contingency Charge 3 on H 6862176914 0
GRAND TOTAL 2356014074
Say Rs 235601 0
(Rupees two Lacs thirty five thousand six hundred and one)Only
0
0
0
0
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 200 KVA Substation for Providing of Service connection at Central effulent Effulent Treatment Plant ( CETP) Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 22574688 22574688
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 5 Nos 4325 21625
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Job 49500 49500
27 Danger plate 12 Nos 50 600
TOTAL 492300635
say 492300635
ABSTRACT OF COST
A Cost of Materials 492300635
C Storage Charge 2 on A 98460127
D Total (A + B) 5021466477
E Erection Charge 15 on D 7532199716
F Total (C + D) 5774686449
G Transportation Charge 5 on D 2510733239
H Supervision Charge and Establishment Charge 5 on F 2887343224
H Total ( F + G+H ) 6314494095
I Contingency Charge 3 on H 1894348228
j Addhoc 10 on H 6314494095
GRAND TOTAL 7135378327
Say Rs 713538
(Rupees seven Lac thirteen thousand five hundred thirty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection to Airtel Tower Amtali under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 7247368 7247368
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole 8 Nos 4325 34600
3 Stay Set Complete 15 Sets 58082 87123
4 Stay Insulator(11KV) 15 Nos 20 300
5 Stay Wire (725mm) 75 Kgs 5707 428025
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g) Double Pole Top X-Arm( 22 Mtr) 4 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 4 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 8 No
9 Weasel ACSR (61259mm) 6 Km 2347653 14085918
10 8 SWG GI Wire 90 Kgs 4934 44406
11 11KV Disc Insulator 36 Nos 201 7236
12 11KV Disc Fittings 36 Nos 28769 1035684
13 11KV Pin Insulator 48 Nos 4668 224064
14 GI Pin for 11KV Pin Insulator 48 Nos 561 26928
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
19 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
20 Bracket Clamp by (50x6mm2) MS Flat 120 Nos 27 3240
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 200Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 Job 49500 49500
28 Barbed Wire 20 Kgs 50 1000
TOTAL 46403016
say 464030
ABSTRACT OF COST
A Cost of Materials 464030
B Storage Charge 2 on A 92806
C Total (A + B) 4733106
D Erection Charge 15 on C 7099659
E Total (C + D) 54430719
F Transportation Charge 5 on C 2366553
G Supervision Charge and Establishment Charge 5 on E 272153595
H Total (E + F + G) 5951880795
i Over head charge 10 above ( adhoc increase) 5951880795
I Contingency Charge 3 on H 1785564239
GRAND TOTAL 6725625298
Say 672563
(Rupees Six Lac seventy two thousand five hundred sixty three)Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to NIELIT AGARTALA CENTRE for the smooth construction activities of the campus under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH NIELIT AGARTALA CENTRE
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 453582 453582
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 5 Nos 4325 21625
2 8Mtr PCC Pole 2 Nos 4325 8650
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 2347653 28171836
10 8 SWG GI Wire 40 Kgs 4934 19736
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 18 Nos 4668 84024
14 GI Pin for 11KV Pin Insulator 18 Nos 561 10098
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 27 1620
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 100Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
TOTAL 203944176
say 203944
ABSTRACT OF COST
A Cost of Materials 203944
B Storage Charge 2 on A 407888
C Total (A + B) 20802288
D Erection Charge 15 on C 31203432
E Total (C + D) 239226312
F Transportation Charge 5 on C 10401144
G Supervision Charge and Establishment Charge 5 on E 119613156
H Total (E + F + G) 2615887716
i Over head charge 10 above ( adhoc increase) 2615887716
I Contingency Charge 3 on H 7847663148
GRAND TOTAL 2955953119
Say 295595
(Rupees Two Lac Ninety five thousand five hundred ninety five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to STATE BANK OF INDIA RK Nagar Industrial branch under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 72474 72474
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Fancing 1 Job 15000 15000
27 Danger plate 12 Nos 50 600
TOTAL 210702755
say 210702755
ABSTRACT OF COST
A Cost of Materials 210702755
C Storage Charge 2 on A 42140551
D Total (A + B) 2149168101
E Erection Charge 15 on D 3223752152
F Total (C + D) 2471543316
G Transportation Charge 5 on D 1074584051
H Supervision Charge and Establishment Charge 5 on F 1235771658
H Total ( F + G+H ) 2702578887
I Contingency Charge 3 on H 8107736661
j Addhoc 10 on H 2702578887
GRAND TOTAL 3053914142
Say Rs 305391
(Rupees three Lac five thousand three hundred ninety one )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 17-03-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 6 Nos 3553 21318
3 Stay Set Complete 4 Sets 58082 232328
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 157 Kgs 3927 616539
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 4 No
d) 4 wire LT Bkt( 11 Mtr) 2 No
8 Weasel ACSR (61259mm) 14 Km 2347653 32867142
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 6 Nos 201 1206
11 11KV Disc Fittings 6 Nos 28769 172614
12 11KV Pin Insulator 8 Nos 4668 37344
13 GI Pin for 11KV Pin Insulator 8 Nos 561 4488
14 MS Nuts and Bolts of Assorted Size 12 Kgs 505 606
15 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
16 Bracket Clamp by (50x6mm2) MS Flat 18 Nos 27 486
17 Shackle insulator 14 Nos 10495 14693
TOTAL 98654352
say 98654352
ABSTRACT OF COST
A Cost of Materials 98654
C Storage Charge 2 on A 197308
D Total (A + B) 10062708
E Erection Charge 15 on D 15094062
F Total (C + D) 115721142
G Transportation Charge 5 on D 5031354
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 120752496
I Contingency Charge 3 on H 362257488
j Addhoc 0 on H 0
GRAND TOTAL 1243750709
Say 124375
(Rupees one lac twenty four thousand three hundred seventy five )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 16-04-2013 amp 17-04-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 11 Nos 4325 47575
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 10 Nos 3553 35530
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 10 No
d) 4 wire LT Bkt( 11 Mtr) 7 No
8 Weasel ACSR (61259mm) 48 Km 2347653 112687344
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 13 Nos 201 2613
11 11KV Disc Fittings 13 Nos 28769 373997
12 11KV Pin Insulator 16 Nos 4668 74688
13 GI Pin for 11KV Pin Insulator 16 Nos 561 8976
14 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
15 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
16 Bracket Clamp by (50x6mm2) MS Flat 16 Nos 27 432
17 Shackle insulator 14 Nos 10495 14693
TOTAL 230706294
say 230706294
ABSTRACT OF COST
A Cost of Materials 230706
C Storage Charge 2 on A 461412
D Total (A + B) 23532012
E Erection Charge 15 on D 35298018
F Total (C + D) 270618138
G Transportation Charge 5 on D 11766006
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 282384144
I Contingency Charge 3 on H 847152432
j Addhoc 0 on H 0
GRAND TOTAL 2908556683
Say 290856
(Rupees two Lac ninety thousand eight hundred amp fiftysix )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on03-05-2013 05-05-2013 06-05-2013 12-05-2013 amp 16-05-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 3 Nos 4325 12975
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 8 Nos 3553 28424
3 Stay Set Complete 2 Sets 58082 116164 2
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 2 Nos
b) Single Pole Bottom X-Arm(13Mtr) 2 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 1 Nos
d) 11KV DP bottom Bracket(25Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 2 No
b) Double Pole Guard X-Arm (28Mtr) 1 No
c) 2 wire LT Bkt( 051 Mtr) 6 No
d) 4 wire LT Bkt( 11 Mtr) 12 No
8 Weasel ACSR (61259mm) 09 Km 2347653 21128877
9 8 SWG GI Wire 22 Kgs 4934 108548
10 11KV Disc Insulator 3 Nos 201 603
11 11KV Disc Fittings 3 Nos 28769 86307
12 11KV Pin Insulator 6 Nos 4668 28008
13 GI Pin for 11KV Pin Insulator 6 Nos 561 3366
14 MS Nuts and Bolts of Assorted Size 18 Kgs 505 909
15 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
16 Bracket Clamp by (50x6mm2) MS Flat 8 Nos 27 216
17 Shackle insulator 12 Nos 10495 12594
TOTAL 87545997
say 87545997
ABSTRACT OF COST
A Cost of Materials 87546
C Storage Charge 2 on A 175092
D Total (A + B) 8929692
E Erection Charge 15 on D 13394538
F Total (C + D) 102691458
G Transportation Charge 5 on D 4464846
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 107156304
I Contingency Charge 3 on H 321468912
j Addhoc 10 on H 0
GRAND TOTAL 1103709931
Say 110371
B) Maintance of 3 nos Damage 25 KVA TXr Rs1200000Each Rs 3600000
Total Rs14637100
(Rupees one Lac forty six thousand three hundred amp seventy one )Only
WORK ESTIMATE
Name of work -
Reviesed estimate of Upgredation of Transformer 1x 200 KVA to 1x500KVA for Providing of new Service connection to CITY STAR AGRO INDUSTRIES Private limited at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with CITY STAR AGRO INDUSTRIES Private limited
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA DT
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 52803318 52803318
2 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
3 240 sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
4 400Amps Cutout 6 Nos 777 4662
5 Bimetalic Lugs( 300mm2) 8 Nos 23809 190472
TOTAL 5467614
say
ABSTRACT OF COST
A Cost of Materials 546761
B Storage Charge 2 on A 1093522
C Total (A + B) 55769622
D Erection Charge 15 on C 83654433
E Total (C + D) 641350653
F Transportation Charge 5 on C 27884811
G Supervision Charge and Establishment Charge 15 on E 9620259795
H Total (E + F + G) 765438062
I Contingency Charge 3 on H 2886077939
I Addhoc 10 on H 765438062
GRAND TOTAL 8419818681
Say 841982
B) Dismental of 200 KVA Txr amp Cutout Rs 150000
Total (A+B ) Rs 84348200
C) Less scrap value of existing 200 KVA Txr 40 on 22574700 13544800
GRAND TOTAL 70803400
(Rupees Seven Lac eight thousand thirty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at DAS PARA under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=8 nos SP= 9 Nos) 25 Nos 4325 108125
3 Stay Set Complete 18 Sets 58082 1045476
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 90 Kgs 5707 51363
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 446 Kgs 5473 2440958
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 9 Nos
f) Single Pole Bottom X-Arm(13Mtr) 9 Nos
g) Double Pole Top X-Arm( 22 Mtr) 7 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 7 Nos
8 MS Angle(65x65x6mm3) 213 Kgs 5473 1165749
a) Double pole Gurd Bkt( 25 Mtr) 7 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 9 No
9 Weasel ACSR (61259mm) 4 Km 2347653 9390612
10 8 SWG GI Wire 180 Kgs 4934 88812
11 11KV Disc Insulator 54 Nos 201 10854
12 11KV Disc Fittings 54 Nos 28769 1553526
13 11KV Pin Insulator 62 Nos 4668 289416
14 GI Pin for 11KV Pin Insulator 62 Nos 561 34782
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 505 4949
19 Stay Clamp by (50x6mm2) MS Flat 18 Pairs 495 891
20 Bracket Clamp by (50x6mm2) MS Flat 96 Nos 27 2592
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
27 Barbed Wire 20 Kgs 429 858
TOTAL 45877295
say 45877295
ABSTRACT OF COST
A Cost of Materials 45877295
B Storage Charge 2 on A 9175459
C Total (A + B) 467948409
D Erection Charge 15 on C 7019226135
E Total (C + D) 5381406704
F Transportation Charge 5 on C 2339742045
G Supervision Charge and Establishment Charge 15 on E 8072110055
H Total (E + F + G) 6422591914
I Contingency Charge 3 on H 1926777574
GRAND TOTAL 6615269671
Say Rs 6615269671
(Rupees six Lac sixty one thousand five hundred twenty seven )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at AMTALI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 14 Nos 3553 49742
3 Stay Set Complete 12 Sets 58082 696984
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 5707 34242
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 157 Kgs 5473 859261
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 38 Km 2347653 89210814
10 8 SWG GI Wire 80 Kgs 4934 39472
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 12 Nos 4668 56016
14 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 60 Kgs 505 3030
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
28 Shackle insulator 56 Nos 1396 78176
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 358760714
say 358760714
ABSTRACT OF COST
A Cost of Materials 358760714
B Storage Charge 2 on A 717521428
C Total (A + B) 3659359283
D Erection Charge 15 on C 5489038924
E Total (C + D) 4208263175
F Transportation Charge 5 on C 1829679641
G Supervision Charge and Establishment Charge 15 on E 6312394763
H Total (E + F + G) 5022470616
I Contingency Charge 3 on H 1506741185
GRAND TOTAL 5173144734
Say Rs 5173144734
(Rupees Five Lac seventeen thousand three hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at RAJCHANTAI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=3 nos SP= 6Nos) 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 58082 464656
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 48 Kgs 5707 273936
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
8 MS Angle(65x65x6mm3) Kgs 5473 0
a) Double Pole Guard X-Arm (28Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 6 No
9 Weasel ACSR (61259mm) 27 Km 2347653 63386631
10 8 SWG GI Wire 60 Kgs 4934 29604
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 36 Nos 4668 168048
14 GI Pin for 11KV Pin Insulator 36 Nos 561 20196
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 48 Kgs 505 2424
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 27 1404
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 301010091
say 301010091
ABSTRACT OF COST
A Cost of Materials 301010091
B Storage Charge 2 on A 602020182
C Total (A + B) 3070302928
D Erection Charge 15 on C 4605454392
E Total (C + D) 3530848367
F Transportation Charge 5 on C 1535151464
G Supervision Charge and Establishment Charge 15 on E 5296272551
H Total (E + F + G) 4213990769
I Contingency Charge 3 on H 1264197231
GRAND TOTAL 4340410492
Say Rs 4340410492
(Rupees four Lac thirtyfour thousand forty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 16506241
ABSTRACT OF COST
A Cost of Materials 16506241
B Storage Charge 2 on A 33012482
C Total (A + B) 1683636582
D Erection Charge 15 on C 2525454873
E Transportation Charge 3 on C 82531205
F Total (C + D+E) 2018713274
G Supervision Charge and Establishment Charge 5 on F 1009356637
H Total ( F + G ) 2119648938
I Overhead charge 10 on H 2018713274
J Contingency Charge 3 on H 6358946814
L GRAND TOTAL 2385109734
Say Rs 238511
(Rupees three Lac seventy two thousand one hundred thirty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 70998 35499
2 Stay Insulator(11KV) 5 Nos 12 60
3 Stay Wire (725mm) 25 Kgs 8136 2034
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 58082 29041
2 Stay Insulator(11KV) 5 Nos 20 100
3 Stay Wire (725mm) 25 Kgs 5707 142675
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to the newly constructed building of college of veterinary sciences amp AH RK nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Debashish Das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 4 Nos 3553 14212
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 08 Km 2347653 18781224
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 20 Nos 1125 225
9 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 39369324
say 39369324
ABSTRACT OF COST
A Cost of Materials 39369324
B Storage Charge 2 on A 78738648
C Total (A + B) 4015671048
D Erection Charge 15 on C 6023506572
E Transportation Charge 3 on C 19684662
F Total (C + D+E) 4814868325
G Supervision Charge and Establishment Charge 5 on F 2407434163
H Total ( F + G ) 5055611741
I Overhead charge 10 on H 4814868325
J Contingency Charge 3 on H 1516683522
K WCT6 on erection charge ie on D 3614103943
L GRAND TOTAL 5724907966
Say Rs 5724907966
B) Service connection charge 1877
C) Security 900
Grand total (A+B+C) 60026
( Sixty thousand amp twenty six ) only
BILL
Name of work -
Supply Errection amp commissioning of Various capacity Sodium Vapour Lamp for lightining of 14 Goddess temple at Uttarchampura During Kharchi Puja 2013-2014
SlNO Description of work Qty Unit RateUnit Amount
A 250 wattSodium vapour Lamp
1 Ballast 25 Nos 2450 61250
2 Lamp 25 Nos 380 9500
3 capacitor 25 Nos 288 7200
4 Indicator 25 Nos 220 5500
B 70 Watt Sodium vapour lamp 0
1 Ballast 11 Nos 1125 12375
2 Lamp 11 Nos 280 3080
3 capacitor 11 Nos 288 3168
4 Indicator 11 Nos 220 2420
C 250 watt Metal
1 Ballast 5 Nos 2450 12250
2 Lamp 5 Nos 930 4650
3 capacitor 5 Nos 288 1440
4 Indicator 5 Nos 220 1100
D Stand light 18 watt 8 Nos 140 1120
E Decorating light 10 Nos 120 1200
TOTAL 126253
Vat 135 on Rs 12625300 Rs1704400
Contractor Profit 10 on Rs 12625300 Rs1262500
Grand Total Rs 15592200
( Rupees one lac fifty five thousand nine hundred twenty two) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3350 284750
II Ballast 85 Nos 1600 136000
III Lamp 85 Nos 400 34000
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 420 89250
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 599760
Contractor profit 10 on Rs 59976000 59976 59976
Grand Total 659736
( Rupees six lac fiftynine thousand seven hundred thirty six) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3450 293250
II Ballast 85 Nos 1570 133450
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 600 127500
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 644810
Contractor profit 10 on Rs 6448100 64481
Grand Total 709291
( Rupees seven lac nine thousand two hundred ninety one only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 4000 340000
II Ballast 85 Nos 1500 127500
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 540 114750
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 400 10200
II Unskilled labour 1275 Nos 300 3825
TOTAL 676175
Contractor profit 10 on Rs 6761750 67617
Grand Total 743792
( Rupees seven lac fortythree thousand seven hundred ninety two ) only
WORK ESTIMATE
Name of work -
Extension of 11 KV Dedicated Feeder line from Bodhjungnagar 132 KV Substation to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED for Providing of Service connection to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH CITY STAR AGRO INDUSTRIES PRIVATE LIMITED
A] COST OF MATERIALS -
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtrlong ST Pole 2 Nos 1358265 271653
2 120 sq mm XLPE cable 015 Km 572183 8582745
3 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
4 MS Channel(75x40x40x6mm4) 245 Kgs 5473 1340885
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Top Bracket(28Mtr) 3 Nos
5 MS Angle(65x65x6mm3) 33 Kgs 5473 180609
c) 11KV LA Bracket(28Mtr) 2 No
6 Weasel ACSR (61259mm) 015 Km 2347653 35214795
7 11KV Disc Insulator 15 Nos 201 3015
8 11KV Disc Fittings 15 Nos 28769 431535
9 11KV Pin Insulator 12 Nos 4668 56016
10 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
11 11KV GOS 2 Set 806288 1612576
12 11KV DOF 2 Set 373613 747226
13 11KV LA 6 Nos 369 2214
14 MS Nuts and Bolts of Assorted Size 15 Kgs 505 7575
15 Bracket Clamp by (50x6mm2) MS Flat 24 Nos 27 648
16 Jointing Kit ( indoor type) 2 Nos 9000 18000
17 Jointing Kit ( outdoor type) 2 Nos 12000 24000
18 11 KV Vacum circuit Breaker control amp relay panel simplex type 400 A continous current 250 MVA rupturring capacity complete with electrical closing mechanism with internal wiring 2 overcurrent amp 1 earth fault combine relay auxilury relays 3 ammeter 1- voltmeter CT operated static trivactor meter 1 CT operated static KWH meter of CTR 1001-1A with integral earthing facility and internal arc tested for out going feeders 1 Nos 404000 404000
TOTAL 5913802595
say 5913802595
ABSTRACT OF COST
A Cost of Materials 5913802595
B Storage Charge 2 on A 1182760519
C Total (A + B) 6032078647
D Erection Charge 15 on C 904811797
E Total (C + D) 6936890444
F Transportation Charge 5 on C 3016039323
G Supervision Charge and Establishment Charge 15 on E 1040533567
H Total (E + F + G) 8279027943
I Contingency Charge 3 on H 2483708383
GRAND TOTAL 8527398781
Say Rs 8527398781
(Rupees Eight Lac fifty two thousand seven hundred seventy forty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 25 KVA Substation for Providing of Service connectionin the PIG shed under under RKVY at RK Nagar catal farm under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH BDO JIRINIA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 11 Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 4 Nos 1358265 543306
2 8Mtr PCC Pole 10 Nos 3553 35530
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 119 Kgs 5473 651287
a) 11 mtr long LT Bkt 12 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 31 Km 2016279 62504649
10 8 SWG GI Wire 60 Kgs 6772 40632
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10911 600105
23 100Amps Cutout 6 Nos 21906 131436
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 162 3888
26 Substation fancing 1 Job 14500 14500
27 Shackle insulator 52 Nos 1396 72592
28 Straps NampB(16x75) 52 pairs 4586 238472
29 Barbed Wire 20 Kgs 429 858
TOTAL 304414759
say 304414759
ABSTRACT OF COST
A Cost of Materials 304414759
B Storage Charge 2 on A 608829518
C Total (A + B) 3105030542
D Erection Charge 15 on C 4657545813
E Total (C + D) 3570785123
F Transportation Charge 5 on C 1552515271
G Supervision Charge and Establishment Charge 15 on E 5356177685
H Total (E + F + G) 4261654419
I Contingency Charge 3 on H 1278496326
GRAND TOTAL 4389504051
Say Rs 4389504051
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300 0
2 9 Mtr PCC Pole 6 Nos 4325 25950
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 15 Km 2016279 30244185
10 8 SWG GI Wire 50 Kgs 6772 3386
11 11KV Disc Insulator 24 Nos 2406 57744
12 11KV Disc Fittings 24 Nos 34958 838992
13 11KV Pin Insulator 27 Nos 5292 142884
14 GI Pin for 11KV Pin Insulator 27 Nos 8248 222696
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 120 Mtr 19295 23154
23 300Amps Cutout 6 Nos 5225 3135
24 11 Kv Danger Plate 12 Nos 55 660
25 240 sqmm Lugs 24 Nos 215 5160
26 Kiosk Box 1 Job 49500 49500
TOTAL 671383525
say 671383525
ABSTRACT OF COST
A Cost of Materials 671383525
B Storage Charge 2 on A 134276705
C Total (A + B) 6848111955
D Erection Charge 15 on C 1027216793
E Total (C + D) 7875328748
F Transportation Charge 5 on C 3424055978
G Supervision Charge and Establishment Charge 15 on E 1181299312
H Total (E + F + G) 9399033658
I Overhead charge 10 on H 9399033658
J Contingency Charge 3 on H 2819710097
GRAND TOTAL 1062090803
Say Rs 1062091
(Rupees ten Lac sixty two thousand ninety one )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9 Mtr PCC Pole 5 Nos 4325 21625
3 Stay Set Complete 3 Sets 70998 212994
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 8137 122055
6 MS Channel(100x50x50x6mm4) 0 Kgs 5473 0
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2016279 16130232
10 8 SWG GI Wire 35 Kgs 6772 23702
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 35 Kgs 6871 240485
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 30 Mtr 19295 57885
23 300Amps Cutout 3 Nos 5225 15675
24 11 Kv Danger Plate 6 Nos 55 330
25 240 sqmm Lugs 12 Nos 215 2580
26 Kiosk Box 1 Job 49500 49500
TOTAL 616537572
say 616537572
ABSTRACT OF COST
A Cost of Materials 616537572
B Storage Charge 2 on A 1233075144
C Total (A + B) 6288683234
D Erection Charge 15 on C 9433024852
E Total (C + D) 723198572
F Transportation Charge 5 on C 3144341617
G Supervision Charge and Establishment Charge 15 on E 1084797858
H Total (E + F + G) 8631217739
I Overhead charge 10 on H 8631217739
j Contingency Charge 3 on H 2589365322
GRAND TOTAL 8890154271
Say Rs 8890154271
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work - Extension of LT line for providing Street light connerction at DUKLI INDUSTRIAL GROWTH CENTRE ( TIDC)
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 20 Nos 3553 71060
3 Stay Set Complete 14 Sets 850 11900
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 70 4900
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos fo C Bkt) 72 Kgs 70 5040
7 Bracket Clamp by (50x6mm2) MS Flat 14 Nos 48 672
8 Weasel ACSR (61259mm) ( 6 wire 44 span) 3 Km 2347653 7042959
9 8 SWG GI Wire 80 Kgs 75 6000
10 LT Straps amp Bolts 50 Nos 38 1900
11 Shackle Insulator 150 Nos 11 1650
12 MS Nuts and Bolts of Assorted Size 320 Kgs 75 24000
13 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
14 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
15 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
16 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
17 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
18 MS clamp 200 Nos 80 16000
19 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
20 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
22 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
23 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
TOTAL 62557759
say 62557759
ABSTRACT OF COST
A Cost of Materials 62557759
B Storage Charge 2 on A 125115518
C Total (A + B) 6380891418
D Erection Charge 15 on C 9571337127
E Total (C + D) 7338025131
F Transportation Charge 5 on C 3190445709
G Supervision Charge and Establishment Charge 15 on E 110070377
H Total (E + F + G) 8757773471
I Contingency Charge 3 on H 2627332041
GRAND TOTAL 9020506675
Say 902051
( Rupees nine lac two thousand amp fifty one ) only
WORK ESTIMATE
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
3 MS clamp 200 Nos 80 16000
4 Nuts amp Bolts 200 Nos 20 4000
5 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
^6 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
TOTAL 391680
ABSTRACT OF COST
A Cost of Materials 391680
B Storage Charge 2 on A 78336
C Total (A + B) 3995136
D Erection Charge 15 on C 5992704
E Total (C + D) 45944064
F Transportation Charge 5 on C 1997568
G Supervision Charge and Establishment Charge 15 on E 68916096
H Total (E + F + G) 548332416
I Contingency Charge 3 on H 1644997248
GRAND TOTAL 5647823885
Say 551084
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2347653 18781224
10 8 SWG GI Wire 25 Kgs 4934 12335
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 9 Nos 4668 42012
14 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
28 Shackle insulator 8 Nos 1396 11168
29 Straps NampB(16x75) 8 pairs 6871 54968
27 Barbed Wire 15 Kgs 429 6435
TOTAL 159200654
say 159200654
ABSTRACT OF COST
A Cost of Materials 159200654
B Storage Charge 2 on A 318401308
C Total (A + B) 1623846671
D Erection Charge 15 on C 2435770006
E Total (C + D) 1867423671
F Transportation Charge 5 on C 8119233354
G Supervision Charge and Establishment Charge 15 on E 2801135507
H Total (E + F + G) 2228729556
I Contingency Charge 3 on H 6686188667
GRAND TOTAL 2295591442
Say Rs 2295591442
(Rupees Two Lac Twenty nine thousand five hundred fiftynine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to FOOD TESTING LABORATORY at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 1 Km 2347653 2347653
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 24 Nos 1125 270
9 Straps with NB ( 16x75) 24 Nos 6871 164904
TOTAL 4793747
say 4793747
ABSTRACT OF COST
A Cost of Materials 4793747
B Storage Charge 2 on A 9587494
C Total (A + B) 488962194
D Erection Charge 15 on C 733443291
E Transportation Charge 3 on C 23968735
F Total (C + D+E) 5862752581
G Supervision Charge and Establishment Charge 5 on F 2931376291
H Total ( F + G ) 615589021
I Overhead charge 10 on H 5862752581
J Contingency Charge 3 on H 1846767063
K WCT6 on erection charge ie on D 4400659746
L GRAND TOTAL 6970848772
Say Rs 6970848772
( Sixty nine thousand seven hundred eight ) only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to LALIT FLOUR MILL at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with LALIT FLOUR MILL
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 2 Nos 20 40
4 Stay Wire (725mm) 35 Kgs 5707 199745
5 Weasel ACSR (61259mm) 02 Km 2347653 4695306
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
8 LT shackle insulator 6 Nos 1125 675
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos ) 0 Kgs 70 0
9 Straps with NB ( 16x75) 6 Nos 6871 41226
TOTAL 16260836
say 16260836
ABSTRACT OF COST
A Cost of Materials 16260836
B Storage Charge 2 on A 32521672
C Total (A + B) 1658605272
D Erection Charge 15 on C 2487907908
E Transportation Charge 3 on C 8130418
F Total (C + D+E) 1988700243
G Supervision Charge and Establishment Charge 5 on F 9943501214
H Total ( F + G ) 2088135255
I Overhead charge 10 on H
J Contingency Charge 3 on H 6264405765
K WCT6 on erection charge ie on D 1492744745
L GRAND TOTAL 216570676
Say Rs 216570676
( Sixty thousand four hundred ) only
WORK ESTIMATE
Name of work -
Extension of HT Line for Providing of Service connection to Ramkrishna Rubber industry at RUBBER PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) 448 Kgs 5473 2451904
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 1 Set 7899 7899
14 11KV DOF 1 Set 5221 5221
15 11KV LA 3 Nos 369 1107
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 27 2970
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 357488314
say 357488314
ABSTRACT OF COST
A Cost of Materials 357488314
B Storage Charge 2 on A 714976628
C Total (A + B) 3646380803
D Erection Charge 15 on C 5469571204
E Total (C + D) 4193337923
F Transportation Charge 5 on C 1823190401
G Supervision Charge and Establishment Charge 15 on E 6290006885
H Total (E + F + G) 5004657652
I Overhead charge 10 on H 5004657652
J Contingency Charge 3 on H 1501397296
GRAND TOTAL 5655263147
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 2 Nos 4325 8650
2 ACSR (61259 04 Km 2016279 8065116
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 3 Nos 201 603
9 11KV Disc Fittings 3 Nos 28769 86307
10 11KV Pin Insulator 3 Nos 4668 14004
11 GI Pin for 11KV Pin Insulator 3 Nos 561 1683
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 10 Kgs 505 505
16 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
17 Bracket Clamp by (50x6mm2) MS Flat 32 Nos 27 864
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 4 Nos 12531 50124
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 80 Mtr 2200 176000
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 50 Mtr 1500 75000
24 Kiosk Box 1 Job 49500 49500
TOTAL 423354736
say 423355
ABSTRACT OF COST
A Cost of Materials 423355
B Storage Charge 2 on A 84671
C Total (A + B) 4318221
D Erection Charge 15 on C 64773315
E Total (C + D) 496595415
F Transportation Charge 5 on C 21591105
G Supervision Charge and Establishment Charge 15 on E 7448931225
H Total (E + F + G) 5926758323
I Overhead charge 10 on H 5926758323
j Contingency Charge 3 on H 1778027497
GRAND TOTAL 6697236904
Say Rs 669724
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Base monted Substation for Providing of new Service connection to Ramkrishna Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 201 1206
9 11KV Disc Fittings 6 Nos 28769 172614
10 11KV Pin Insulator 9 Nos 4668 42012
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 152447
say 152447
ABSTRACT OF COST
A Cost of Materials 152447
B Storage Charge 2 on A 304894
C Total (A + B) 15549594
D Erection Charge 15 on C 23324391
E Total (C + D) 178820331
F Transportation Charge 5 on C 7774797
G Supervision Charge and Establishment Charge 15 on E 2682304965
H Total (E + F + G) 2134181777
I Overhead charge 10 on H 2134181777
j Contingency Charge 3 on H 640254533
GRAND TOTAL 2411625407
Say 241163
(Rupees two Lac forty one thousand one hundred sixty three )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 58082 116164
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
8 Weasel ACSR (61259mm) 05 Km 2347653 11738265
9 8 SWG GI Wire 20 Kgs 4934 9868
10 11KV Disc Insulator 9 Nos 201 1809
11 11KV Disc Fittings 9 Nos 28769 258921
12 11KV Pin Insulator 9 Nos 4668 42012
13 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
14 11KV GOS 1 Set 806288 806288
15 11KV DOF 1 Set 373613 373613
16 11KV LA 3 Nos 369 1107
17 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
18 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
19 Bracket Clamp by (50x6mm2) MS Flat 38 Nos 48 1824
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
22 500Amps Cutout 6 Nos 9674 58044
23 11 Kv Danger Plate 6 Nos 55 330
24 240 sqmm Lugs 24 Nos 215 5160
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Nos 49500 49500
27 Barbed Wire 15 Kgs 429 6435
TOTAL 684227175
say 684227175
ABSTRACT OF COST
A Cost of Materials 684227175
B Storage Charge 2 on A 136845435
C Total (A + B) 6979117185
D Erection Charge 15 on C 1046867578
E Total (C + D) 8025984763
F Transportation Charge 5 on C 3489558593
G Supervision Charge and Establishment Charge 15 on E 1203897714
H Total (E + F + G) 9578838336
I Contingency Charge 3 on H 2873651501
GRAND TOTAL 9866203487
Say Rs 9866203487
(Rupees Nine Lac Eighty six thousand Six hundred Twenty )Only
WORK ESTIMATE
Name of work -
Extension of LT Line for providing of SC to Soma Paul at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Soma paul
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel Pole 2 Nos 1358265 271653
2 8Mtr PCC Pole 1 Nos 3553 3553
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 Weasel ACSR (61259mm) 32 Km 2347653 75124896
7 8 SWG Gi wire 50 Kgs 65 3250
7 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
9 LT shackle insulator 56 Nos 1125 630
10 2 mtr long MS Angle(50x50x6mm3) (16Nos ) 144 Kgs 70 10080
11 Straps with NB ( 16x75) 56 Nos 6871 384776
TOTAL 100758166
say 100758166
ABSTRACT OF COST
A Cost of Materials 100758166
B Storage Charge 2 on A 201516332
C Total (A + B) 1027733293
D Erection Charge 15 on C 154159994
E Transportation Charge 3 on C 50379083
F Total (C + D+E) 123227237
G Supervision Charge and Establishment Charge 5 on F 6161361851
H Total ( F + G ) 1293885989
I Overhead charge 10 on H 123227237
J Contingency Charge 3 on H 3881657966
K WCT6 on erection charge ie on D 9249599639
L GRAND TOTAL 1465179405
Say Rs 1465179405
( Rupees one lac forty six thousand five hundred eighteen ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x63 KVA Substation for Providing of Street light connection at Growth centre At Bodhjungnagar Growth centre under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 2 Nos 1032833 1032833
2 9Mtr PCC Pole 11 Nos 4325 47575
2 8Mtr PCC Pole 6 Nos 3553 21318
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 5 Nos
f) Single Pole Bottom X-Arm(13Mtr) 5 Nos
g DP Pole top X-Arm(17 Mtr) 2 Nos
h DP Pole Bottom X-Arm(22 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 2 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 42 Nos 2406 101052
12 11KV Disc Fittings 42 Nos 34958 1468236
13 11KV Pin Insulator 36 Nos 5293 190548
14 GI Pin for 11KV Pin Insulator 36 Nos 8243 296748
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 86 Nos 56 4816
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 110 Mtr 10495 115445
23 200Amps Cutout 12 Nos 27885 33462
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 48 Nos 1913 91824
26 LT shackle insulator 56 Nos 1125 630
27 Straps with NB 56 Nos 3683 206248
29 Kiosk Box 2 Job 49500 99000
30 Barber wire 20 Kgs 60 1200
TOTAL 53350719
say 53350719
ABSTRACT OF COST
A Cost of Materials 53350719
B Storage Charge 2 on A 106701438
C Total (A + B) 5441773338
D Erection Charge 15 on C 8162660007
E Transportation Charge 3 on C 266753595
F Total (C + D+E) 6524792934
G Supervision Charge and Establishment Charge 15 on F 9787189401
H Total ( F + G ) 7503511874
I Overhead charge 10 on H 6524792934
J Contingency Charge 3 on H 2251053562
K WCT6 on erection charge ie on D 4897596004
L GRAND TOTAL 8430072483
Say Rs 843007
(Rupees Eight Lac Forty three thousand amp seven )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x63 KVA Substation for Providing Service connection DWS Pump at Newly constructed Vetenairy college at RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work DWS DIVISION-II Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 1032833 1032833
2 9Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 12 Nos 3553 42636
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g DP Pole top X-Arm(17 Mtr) 1 Nos
h DP Pole Bottom X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 1 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 34958 629244
13 11KV Pin Insulator 15 Nos 5293 79395
14 GI Pin for 11KV Pin Insulator 15 Nos 8243 123645
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 88 Nos 1125 990
27 Straps with NB 88 Nos 3683 324104
30 Barber wire 10 Kgs 60 600
TOTAL 37085161
say 37085161
ABSTRACT OF COST
A Cost of Materials 37085161
B Storage Charge 2 on A 74170322
C Total (A + B) 3782686422
D Erection Charge 15 on C 5674029633
E Transportation Charge 3 on C 185425805
F Total (C + D+E) 453551519
G Supervision Charge and Establishment Charge 15 on F 6803272785
H Total ( F + G ) 5215842469
I Overhead charge 10 on H 453551519
J Contingency Charge 3 on H 1564752741
K WCT6 on erection charge ie on D 340441778
L GRAND TOTAL 585991344
Say Rs 585991
(Rupees five Lac Eighty five thousand Nine hundred ninety one )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT 15 km LT Line amp Construction of 2x 25 KVA Substation for providing of Service connection to Unhabited electrified area at Das para amp sarat pally under R K Nagar Grampanchyat under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO Jirinia RD Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 2 Nos 55146 110292
2 9Mtr PCC Pole 16 Nos 4325 69200
2 8Mtr PCC Pole 24 Nos 3553 85272
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 429 Kgs 5473 2347917
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g DP Pole top X-Arm(17 Mtr) 4 Nos
h DP Pole Bottom X-Arm(22 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 237 Kgs 5473 1297101
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 8 No
c) DP Pole Guard X-Arm (25Mtr) 4 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 84 Km 2016279 169367436
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 52 Nos 2406 125112
12 11KV Disc Fittings 52 Nos 34958 1817816
13 11KV Pin Insulator 48 Nos 5293 254064
14 GI Pin for 11KV Pin Insulator 48 Nos 8243 395664
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 176 Kgs 6871 1209296
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 6 Nos 27885 16731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 96 Nos 1125 1080
27 Straps with NB 96 Nos 3683 353568
30 Barber wire 10 Kgs 60 600
TOTAL 61196857
say 61196857
ABSTRACT OF COST
A Cost of Materials 61196857
B Storage Charge 2 on A 122393714
C Total (A + B) 6242079414
D Erection Charge 15 on C 9363119121
E Transportation Charge 3 on C 305984285
F Total (C + D+E) 7484375611
G Supervision Charge and Establishment Charge 15 on F 1122656342
H Total ( F + G ) 8607031953
I Overhead charge 10 on H 7484375611
J Contingency Charge 3 on H 2582109586
K WCT6 on erection charge ie on D 5617871473
L GRAND TOTAL 9669859187
Say Rs 966986
(Rupees Nine Lac sixty six nine hundred eighty six )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT amp 15 KM LT Line amp Construction of 1x 25 KVA Substation for Providing Service connection Un-electrified Habitation at sen para Muslim para Muslim Basti under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work BDO Jirinia R D Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole 12 Nos 4325 51900
2 8Mtr PCC Pole 25 Nos 3553 88825
3 Stay Set Complete 30 Sets 70998 212994
4 Stay Insulator(11KV) 30 Nos 20 600
5 Stay Wire (725mm) 150 Kgs 8136 12204
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g DP Pole top X-Arm(17 Mtr) 3 Nos
h DP Pole Bottom X-Arm(22 Mtr) 3 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 72 Km 2016279 145172088
10 8 SWG GI Wire 150 Kgs 6773 101595
11 11KV Disc Insulator 48 Nos 2406 115488
12 11KV Disc Fittings 48 Nos 34958 1677984
13 11KV Pin Insulator 52 Nos 5293 275236
14 GI Pin for 11KV Pin Insulator 52 Nos 8243 428636
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 160 Kgs 6871 109936
19 Stay Clamp by (50x6mm2) MS Flat 30 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 88 Nos 56 4928
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 120 Nos 1125 1350
27 Straps with NB 120 Nos 3683 44196
30 Barber wire 30 Kgs 60 1800
TOTAL 51229024
say 51229024
ABSTRACT OF COST
A Cost of Materials 51229024
B Storage Charge 2 on A 102458048
C Total (A + B) 5225360448
D Erection Charge 15 on C 7838040672
E Transportation Charge 3 on C 25614512
F Total (C + D+E) 6265309635
G Supervision Charge and Establishment Charge 15 on F 9397964453
H Total ( F + G ) 720510608
I Overhead charge 10 on H 6265309635
J Contingency Charge 3 on H 2161531824
L GRAND TOTAL 8047790226
Say 804779
(Rupees Eight Lac four thousand seven hundred seventy nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA amp 1x100 KVA Substation for Providing of Service connection 108 nos family at Newly constructed Horizon colony at sen para under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with BDO OlD AGARTALA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 219100 219100
2 100 KVA 110433KV Distribution Transformer 1 Nos 129478 129478
3 9Mtr PCC Pole ( DP=04 nos SP= 6 Nos) 14 Nos 4325 60550
4 8Mtr PCC Pole 85 Nos 3553 302005
5 Stay Set Complete 90 Sets 70998 638982
6 Stay Insulator(11KV) 90 Nos 20 1800
7 Stay Wire (725mm) 450 Kgs 81369 3661605
8 MS Channel(100x50x50x6mm4) 234 Kgs 5473 1280682
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
9 MS Channel(75x40x40x6mm4) 317 Kgs 5473 1734941
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
10 MS Angle(65x65x6mm3) 858 Kgs 5473 4695834
b) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
d) 15 mtr long 4 wire LT Bkt 85 No
11 Weasel ACSR (61259mm) 18 Km 2016279 36293022
12 8 SWG GI Wire 520 Kgs 6772 352144
13 11KV Disc Insulator 48 Nos 2406 115488
14 11KV Disc Fittings 48 Nos 34958 1677984
15 11KV Pin Insulator 64 Nos 8248 527872
16 GI Pin for 11KV Pin Insulator 64 Nos 561 35904
17 11KV GOS 3 Set 7899 23697
18 11KV DOF 3 Set 5221 15663
19 11KV LA 9 Nos 369 3321
20 MS Nuts and Bolts of Assorted Size 520 Kgs 6871 357292
21 Stay Clamp by (50x6mm2) MS Flat 90 Pairs 495 4455
22 Bracket Clamp by (50x6mm2) MS Flat 210 Nos 48 10080
23 30Mtr long 40mm dia GI Pipe Earthing 9 Nos 1300 11700
24 120sqmm PVC insulated Al Conductor 250 Mtr 10911 272775
25 240 sqmm PVC insulated Al Conductor 200 Mtr 19295 38590
26 300Amps Cutout 12 Nos 5225 6270
27 200Amps Cutout 9 Nos 41699 375291
28 120sqmm Lugs 48 Nos 162 7776
29 240sqmm Lugs 48 Nos 238 11424
30 Transformer Base 1 Job 89500 89500
31 LT shackle insulator 360 Nos 1125 4050
32 Straps with NB 360 Nos 3683 132588
33 Danger plate 92 Nos 50 4600
TOTAL 163704861
say 163704861
ABSTRACT OF COST
A Cost of Materials 163704861
C Storage Charge 2 on A 327409722
D Total (A + B) 1669789582
E Erection Charge 15 on D 2504684373
F Total (C + D) 192025802
G Transportation Charge 5 on D 8348947911
H Supervision Charge and Establishment Charge 5 on F 9601290098
H Total ( F + G+H ) 20997604
I Contingency Charge 3 on H 6299281199
j Addhoc 10 on H 20997604
GRAND TOTAL 2372729252
Say Rs 2372729
(Rupees Twenty three Lac seventy two thousand seven hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 165062
ABSTRACT OF COST
A Cost of Materials 165062
C Storage Charge 2 on A 330124
D Total (A + B) 16836324
E Erection Charge 15 on D 25254486
F Total (C + D) 193617726
G Transportation Charge 5 on D 8418162
H Supervision Charge and Establishment Charge 5 on F 96808863
H Total ( F + G+H ) 2117167743
I Contingency Charge 3 on H 6351503229
j Addhoc 10 on H 2117167743
GRAND TOTAL 239240
Say Rs 239240
(Rupees Two LacThirtynine thousand two hundred forty )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 1000 KVA Base monted Substation for Providing of new Service connection to MALAYA Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MALAYA RUB-TECH INDUSTRIES
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 70998 35499
4 Stay Insulator(11KV) 5 Nos 12 60
5 Stay Wire (725mm) 25 Kgs 8136 2034
6 MS Channel(75x40x40x6mm4) 224 Kgs 5473 1225952
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 5473 93041
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 2406 14436
9 11KV Disc Fittings 6 Nos 34958 209748
10 11KV Pin Insulator 9 Nos 8248 74232
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 7899 7899
13 11KV DOF 1 Set 5221 5221
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 90 Mtr 238 21420
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 17083229
say 170832
ABSTRACT OF COST
A Cost of Materials 170832
B Storage Charge 2 on A 341664
C Total (A + B) 17424864
D Erection Charge 15 on C 26137296
E Total (C + D) 200385936
F Transportation Charge 5 on C 8712432
G Supervision Charge and Establishment Charge 15 on E 300578904
H Total (E + F + G) 2391562584
I Overhead charge 10 on H 2391562584
j Contingency Charge 3 on H 7174687752
GRAND TOTAL 270246572
Say 270247
(Rupees two Lac seventy thousand two hundred forty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Santi para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 18 Km 190276 3424968
10 8 SWG GI Wire 20 Kgs 6732 13464
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 48 3264
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 11007 605385
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 25661079
say 25661079
ABSTRACT OF COST
A Cost of Materials 25661079
B Storage Charge 2 on A 51322158
C Total (A + B) 2617430058
D Erection Charge 15 on C 3926145087
E Total (C + D) 3010044567
F Transportation Charge 5 on C 1308715029
G Supervision Charge and Establishment Charge 10 on E 3010044567
H Total (E + F + G) 3441920526
I Contingency Charge 3 on H 1032576158
GRAND TOTAL 3545178142
Say Rs 3545178142
(Rupees three Lac Fifty four thousand five hundred Eighteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Das para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 15 Kgs 6732 10098
11 11KV Disc Insulator 9 Nos 2406 21654
12 11KV Disc Fittings 9 Nos 33766 303894
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 30 Mtr 11007 33021
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 22108045
say 22108045
ABSTRACT OF COST
A Cost of Materials 22108045
B Storage Charge 2 on A 4421609
C Total (A + B) 225502059
D Erection Charge 15 on C 3382530885
E Total (C + D) 2593273679
F Transportation Charge 5 on C 1127510295
G Supervision Charge and Establishment Charge 10 on E 2593273679
H Total (E + F + G) 2965352076
I Contingency Charge 3 on H 8896056228
GRAND TOTAL 3054312638
Say Rs 3054312638
(Rupees three Lac Five thousand thousand four hundred thirty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to Santosh das Bhanu kanta biswas amp purnima biswas under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with santosh das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 3 Nos 3250 9750
2 stay set complete 1 Nos 581 581
3 Stay insulator 1 Nos 20 20
4 Stay wire 1 Nos 57 57
5 Weasel ACSR (61259mm) 003 Km 2016279 6048837
6 MS Nuts and Bolts of Assorted Size 6 Kgs 505 303
7 LT shackle insulator 6 Nos 1125 675
TOTAL 113833837
say 113833837
ABSTRACT OF COST
A Cost of Materials 113833837
B Storage Charge 2 on A 227667674
C Total (A + B) 1161105137
D Erection Charge 15 on C 1741657706
E Transportation Charge 3 on C 569169185
F Total (C + D+E) 1392187827
G Supervision Charge and Establishment Charge 5 on F 6960939133
H Total ( F + G ) 1461797218
J Contingency Charge 3 on H 4385391654
L GRAND TOTAL 1505651134
Say Rs 15057
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 55419033
ABSTRACT OF COST
A Cost of Materials 55419033
C Storage Charge 2 on A 110838066
D Total (A + B) 5652741366
E Erection Charge 15 on D 8479112049
F Total (C + D) 6500652571
G Transportation Charge 5 on D 2826370683
H Supervision Charge and Establishment Charge 15 on F 9750978856
H Total ( F + G+H ) 7758387525
I Contingency Charge 3 on H 2327516257
GRAND TOTAL 7991139151
Say 799114
(Rupees seven lac ninety nine thousand one hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) Kgs 5473 0
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 3 Set 7899 23697
15 11KV LA 9 Nos 369 3321
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 142 Nos 48 6816
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
3 11 KB VCB 1 Sets 450000 450000
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable 015 Km 572183 8582745
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 934991304
say 934991304
ABSTRACT OF COST
A Cost of Materials 934991304
B Storage Charge 2 on A 1869982608
C Total (A + B) 9536911301
D Erection Charge 15 on C 1430536695
E Total (C + D) 10967448
F Transportation Charge 5 on C 476845565
G Supervision Charge and Establishment Charge 15 on E 1645117199
H Total (E + F + G) 1308941076
I Overhead charge 10 on H 1308941076
J Contingency Charge 3 on H 3926823228
GRAND TOTAL 1479103416
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 015 Km 3510265 52653975
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 250 7500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 12 Km 572183 6866196
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 90 Mtr 1500 135000
24 Errection oh UG cable 1200 Mtr 450 540000
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2197755172
say 2197755172
ABSTRACT OF COST
A Cost of Materials 2197755172
B Storage Charge 2 on A 4395510343
C Total (A + B) 2241710275
D Erection Charge 15 on C 3362565412
E Total (C + D) 2577966816
F Transportation Charge 5 on C 1120855137
G Supervision Charge and Establishment Charge 15 on E 3866950224
H Total (E + F + G) 3076747352
I Overhead charge 10 on H 3076747352
j Contingency Charge 3 on H 9230242057
GRAND TOTAL 3476724508
Say Rs 3902237
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Up-gradition of electricity load from 10KW to 100 KW at CETP Bodhjungnagar Replacement of the PVC cable size single core 16 sq mm to single core 120 sqmm under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit work with TIDC
SlNO Description of work Qty Unit RateUnit Amount
25 120sqmm PVC cable 120 Mtr 110076 1320912
TOTAL 1320912
say 1320912
ABSTRACT OF COST
A Cost of Materials 1320912
B Storage Charge 2 on A 2641824
C Total (A + B) 134733024
D Erection Charge as actual 808398144
E Total (C + D) 2155728384
F Transportation Charge 5 on C 67366512
G Supervision Charge and Establishment Charge 20 on E 4311456768
H Total (E + F + G) 2654240573
I Contingency Charge 3 on H 7962721718
GRAND TOTAL 273386779
Say 27339
(Rupees twenty seven thousand three hundred thirty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 554190
ABSTRACT OF COST
A Cost of Materials 554190
B Storage Charge 2 on A 110838
C Total (A + B) 5652738
D Erection Charge 15 on C 8479107
E Transportation Charge 3 on C 166257
F TOTAL ( C+ D+E ) 66669057
G Supervision Charge and Establishment Charge 5 on F 333345285
H Total ( F + G) 7000250985
I Contingency Charge 2 on H 1400050197
J WCT 4 on Errection charge 33916428
TOTAL ESTIMATED COST OF DEPOSIT WORK 7174172433
Say 717417
(Rupees seven Lac seventeen thousand thousand four hundred seventeen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to MBS FEED amp PHARMA at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS Feed amp Pharma
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 48 2016
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 53988283
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E Transportation Charge 3 on C 1619649
F TOTAL ( C+ D+E ) 649479249
G Supervision Charge and Establishment Charge 5 on F 3247396245
H Total ( F + G) 6819532115
I Contingency Charge 2 on H 1363906423
J WCT 4 on Errection charge 330408396
TOTAL ESTIMATED COST OF DEPOSIT WORK 6988963596
Say 698896
(Rupees six Lac ninety eight thousand eight hundred ninety six )Only
WORK ESTIMATE
Name of work -
Revisied Estimate for Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNIL Aircel Tower Ltd at Ramnath Kobra para under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRCEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 9 Nos 4325 38925
2 8Mtr PCC Pole 2 Nos 3553 7106
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6838 17095
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 5485 1892325
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 5485 532045
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 40 Kgs 6732 26928
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 509 12725
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 200 Mtr 39386 78772
23 100Amps Cutout 12 Nos 1926 23112
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 222558742
say 222559
ABSTRACT OF COST
A Cost of Materials 222559
B Storage Charge 2 on A 445118
C Total (A + B) 22701018
D Erection Charge 15 on C 34051527
E Transportation Charge 3 on C 667677
F TOTAL ( C+ D+E ) 267738477
G Supervision Charge and Establishment Charge 5 on F 1338692385
H Total ( F + G) 2811254009
I Contingency Charge 2 on H 5622508017
J WCT 4 on Errection charge 136206108
TOTAL ESTIMATED COST OF DEPOSIT WORK 2881099699
Say 288110
(Rupees two Lac Eighty eight thousand thousand one hundred ten )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 9 Kgs 6838 61542
5 Weasel ACSR (61259mm) 042 Km 190276 7991592
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 10 Nos 1125 1125
9 Straps with NB ( 16x75) 10 Nos 6871 6871
TOTAL 304487976
say 304487976
ABSTRACT OF COST
A Cost of Materials 304487976
B Storage Charge 2 on A 608975952
C Total (A + B) 3105777355
D Erection Charge 15 on C 4658666033
E Transportation Charge 3 on C 9317332066
F Total (C + D+E) 3664817279
G Supervision Charge and Establishment Charge 15 on F 5497225919
H Total ( F + G ) 4214539871
i Contingency Charge 2 on H 8429079742
GRAND TOTAL 4298830668
Say 42988
( Forty two thousand nine hundred eighty eight ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA Base mounted Substation for Providing of Service connection to MS RM SAHA amp SONS at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH RM SAHA amp SONS
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 214697 214697
2 9Mtr PCC Pole ( DP=01 nos SP-01 nos ) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 04 Km 190276 761104
10 8 SWG GI Wire 20 Kgs 67321 134642
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 45 Kgs 6871 309195
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 300Amps Cutout 6 Nos 7029 42174
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 305315803
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E TOTAL ( C+ D ) 633282759
F Transportation Charge 3 on C 247806297
G TOTAL ( E+F ) 635760822
H Supervision Charge and Establishment Charge 15 on G 953641233
I Total ( G+H ) 7311249453
J Contingency Charge 2 on H 1907282466
TOTAL ESTIMATED COST OF DEPOSIT WORK 7330322277
Say 733032
(Rupees seven Lac thirty three thousand thirty two )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 065 Km 190276 1236794
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 512717456
say 51272
ABSTRACT OF COST
A Cost of Materials 51272
B Storage Charge 2 on A 102544
C Total (A + B) 5229744
D Erection Charge 15 on C 7844616
E TOTAL ( C+ D ) 60142056
F Transportation Charge 3 on C 23533848
G TOTAL ( E+F ) 6037739448
H Supervision Charge and Establishment Charge 15 on G 9056609172
I Total ( G+H ) 6943400365
J Contingency Charge 2 on H 1811321834
TOTAL ESTIMATED COST OF DEPOSIT WORK 6961513584
Say 69615
(Rupees sixty nine thousand six hundred fifteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to Pran gopal saha at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN GOPAL SAHA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 no) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 6838 10257
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 139 Kgs 5485 762415
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Double Pole Top X-Arm( 22 Mtr) 1 Nos
f) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 5485 26328
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 09 Km 190276 1712484
10 8 SWG GI Wire 25 Kgs 6732 1683
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 70 sqmm PVC insulated Al Conductor 48 Mtr 662 31776
23 16 sqmm PVC insulated Al Conductor 150 Mtr 22602 33903
24 200Amps Cutout 3 Nos 40436 121308
25 11 Kv Danger Plate 3 Nos 55 165
26 120sqmm Lugs 24 Nos 165 3960
27 Substation fancing 1 Job 14500 14500
TOTAL 202996242
say 202996
ABSTRACT OF COST
A Cost of Materials 202996
B Storage Charge 2 on A 405992
C Total (A + B) 20705592
D Erection Charge 15 on C 31058388
E TOTAL ( C+ D ) 238114308
F Transportation Charge 3 on C 93175164
G TOTAL ( E+F ) 2390460596
H Supervision Charge and Establishment Charge 15 on G 3585690895
I Total ( G+H ) 2749029686
J Contingency Charge 2 on H 7171381789
TOTAL ESTIMATED COST OF DEPOSIT WORK 2756201068
Say 275620
(Rupees two Lac seventy five thousand six hundred twenty )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNG POINT at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 18589254
say 185893
ABSTRACT OF COST
A Cost of Materials 185893
B Storage Charge 2 on A 371786
C Total (A + B) 18961086
D Erection Charge 15 on C 28441629
E Transportation Charge 3 on C 56883258
F TOTAL ( C+D+E) ) 2237408148
G Supervision Charge and Establishment Charge 15 on F 3356112222
H Total ( F+G) 257301937
I Contingency Charge 2 on H 514603874
2624479758
Say 262448
(Rupees two Lac sixty two thousand four hundred forty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25KVA Substation for Providing of new Service connection to
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 32 Nos 4325 138400
2 11 mtr long steel pole 2 Nos 1224779 2449558
3 Stay Set Complete 18 Sets 70998 1277964
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 72 Kgs 8137 585864
6 MS Channel(75x40x40x6mm4) 452 Kgs 5473 2473796
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(13 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
7 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
8 Weasel ACSR (61259mm) 38 Km 2016279 76618602
9 8 SWG GI Wire 240 Kgs 6772 162528
10 11KV Disc Insulator 62 Nos 2406 149172
11 11KV Disc Fittings 62 Nos 34958 2167396
12 11KV Pin Insulator 72 Nos 5292 381024
13 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
14 11KV GOS 2 Set 7899 15798
15 11KV LA 6 Nos 369 2214
16 11KV DOF (3 ph) 2 Set 5221 10442
17 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
18 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
19 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 48 5280
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 395903582
say 395903582
ABSTRACT OF COST
A Cost of Materials 395903582
B Storage Charge 2 on A 791807164
C Total (A + B) 4038216536
D Erection Charge 15 on C 6057324805
E Total (C + D) 4643949017
F Transportation Charge 5 on C 2019108268
G Supervision Charge and Establishment Charge 15 on E 6965923525
H Total (E + F + G) 5542452196
I Overhead charge 10 on H 5542452196
J Contingency Charge 3 on H 1662735659
GRAND TOTAL 6262970982
Say Rs 626297
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to AIRTEL TOWER at Murabari under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Bharati infratel limited
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 6 Sets 74654 447924
4 Stay Insulator(11KV) 6 Nos 20 120
5 Stay Wire (725mm) 30 Kgs 6838 20514
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 21 Km 190276 3995796
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 24845939
say 248459
ABSTRACT OF COST
A Cost of Materials 248459
B Storage Charge 2 on A 496918
C Total (A + B) 25342818
D Erection Charge 15 on C 38014227
E Transportation Charge 3 on C 76028454
F TOTAL ( C+D+E) ) 2990452524
G Supervision Charge and Establishment Charge 15 on F 4485678786
H Total ( F+G) 3439020403
I Contingency Charge 2 on H 6878040805
3507800811
Say 350780
(Rupees three Lac fifty thousand seven hundred eighty )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at Ramchandra nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with RC Nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 056 Km 190276 10655456
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 495592616
say 49559
ABSTRACT OF COST
A Cost of Materials 49559
B Storage Charge 2 on A 99118
C Total (A + B) 5055018
D Erection Charge 15 on C 7582527
E Transportation Charge 3 on C 15165054
F TOTAL ( C+D+E) ) 596492124
G Supervision Charge and Establishment Charge 15 on F 894738186
H Total ( F+G) 6859659426
I Contingency Charge 2 on H 1371931885
6996852615
Say 69969
(Rupees sixty nine thousand nine hundred sixty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 500 15000
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 135 Km 572183 77244705
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 120 Mtr 1500 180000
24 Errection oh UG cable 1350 Mtr 450 607500
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2408467087
say 2408467087
ABSTRACT OF COST
A Cost of Materials 2408467087
B Storage Charge 2 on A 4816934173
C Total (A + B) 2456636428
D Erection Charge 15 on C 3684954642
E Transportation Charge 3 on C 7369909285
F TOTAL ( C+D+E) ) 2898830985
G Supervision Charge and Establishment Charge 15 on F 4348246478
H Total ( F+G) 3333655633
I Contingency Charge 2 on H 6667311266
3400328746
Say 3400329
(Rupees thirty four Lac three hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 550000 550000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 55 Nos 500 27500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 12 Nos 12531 150372
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 3 Nos 12531 37593
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 23 Km 572183 13160209
24 4incdia GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 225 Mtr 1500 337500
24 Errection oh UG cable 2300 Mtr 450 1035000
24 HT Kiosk Box 4 Job 49500 198000
TOTAL 3774226937
say 3774226937
ABSTRACT OF COST
A Cost of Materials 3774226937
B Storage Charge 2 on A 7548453873
C Total (A + B) 3849711475
D Erection Charge 15 on C 5774567213
E Transportation Charge 3 on C 1154913443
F TOTAL ( C+D+E) ) 4542659541
G Supervision Charge and Establishment Charge 15 on F 6813989311
H Total ( F+G) 5224058472
I Contingency Charge 2 on H 1044811694
5328539641
Say
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Ramkrishna Rubber industry under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 53 Kgs 54849 2906997
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV DOF Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 538257719
say 538258
ABSTRACT OF COST
A Cost of Materials 538258
B Storage Charge 2 on A 1076516
C Total (A + B) 54902316
D Erection Charge 15 on C 82353474
E Transportation Charge 3 on C 164706948
F TOTAL ( C+D+E) ) 6478473288
G Supervision Charge and Establishment Charge 15 on F 9717709932
H Total ( F+G) 7450244281
I Contingency Charge 2 on H 1490048856
7599249167
Say 759925
(Rupees seven Lac fifty nine thousand nine hundred twenty five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Globe Enterprise under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 15 on F 9753908202
H Total ( F+G) 7477996288
I Contingency Charge 2 on H 1495599258
7627556214
Say 762756
(Rupees seven Lac sixty two thousand seven hundred )Only
WORK ESTIMATE
Name of work -
Extension of Overhead Dedicated Feeder line line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd for providing service connection toAgartala plastic private limited under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole ( Dp-03 nos Sp-10 nos) 16 Nos 1224779 19596464
2 9Mtr PCC Pole ( DP=08 nos Sp-26 nos ) 42 Nos 4325 181650
4 Stay Set Complete 42 Sets 74654 3135468
5 Stay Insulator(11KV) 42 Nos 20 840
6 Stay Wire (725mm) 210 Kgs 68387 1436127
7 ACSR (61335 87 Km 3510265 305393055
8 11 KB VCB 1 Sets 450000 450000
9 MS Channel(75x40x40x6mm4) 1190 Kgs 54849 6527031
a) 11KV GOS Base Bracket(28Mtr) 10 Nos
b 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
c Single Pole Top X-Arm(03Mtr) 36 Nos
d Single Pole Bottom X-Arm(13Mtr) 36 Nos
e Double Pole Top X-Arm( 22 Mtr) 11 Nos
f Double Pole Bottom X-Arm(25 Mtr) 11 Nos
g 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
10 MS Angle(65x65x6mm3) 994 Kgs 54849 54519906
a) SinglePole Guard X-Arm (15Mtr) 36 No
b DP Pole Guard X-Arm (25Mtr) 11 No
c DP Pole cross braket (17Mtrlong ) 44 No
d 11KV LA Bracket(28Mtr) 5 No
11 11KV Disc Insulator 156 Nos 2406 375336
12 11KV Disc Fittings 156 Nos 33766 5267496
13 11KV Pin Insulator 210 Nos 5292 111132
14 GI Pin for 11KV Pin Insulator 210 Nos 8248 173208
15 11KV GOS (3p two post) 5 Set 1006111 5030555
16 11KV DOF(3ph) 5 Set 5221 26105
17 11KV LA 15 Nos 369 5535
18 MS Nuts and Bolts of Assorted Size 340 Kgs 6871 233614
19 Bracket Clamp by (50x6mm2) MS Flat 560 Nos 60 33600
20 Stay Clamp by (50x6mm2) MS Flat 42 Nos 495 2079
21 30Mtr long 40mm dia GI Pipe ( for earthing) 9 Nos 1500 13500
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
23 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 870000 130500
25 11KV Danger plate 47 Nos 55 2585
TOTAL 1729567371
say 1729567
ABSTRACT OF COST
A Cost of Materials 1729567
B Storage Charge 2 on A 3459134
C Total (A + B) 176415834
D Erection Charge 15 on C 264623751
E Transportation Charge 3 on C 529247502
F TOTAL ( C+D+E) ) 2081706841
G Supervision Charge and Establishment Charge 10 on F 2081706841
H Total ( F+G) 2289877525
I Contingency Charge 2 on H 4579755051
J TOTAL ( H+I) 2335675076
K Service charge 5on J 1167837538
L TOTAL ( J+K) 245245883
Say 2452459
(Rupees twenty four Lac Fifty two thousand four hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN BREVARAGE INDIA ( PVT) LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
4 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
5 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
6 11KV Disc Insulator 12 Nos 2406 28872
7 11KV Disc Fittings 12 Nos 33766 405192
8 11KV Pin Insulator 9 Nos 5292 47628
9 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
10 11KV GOS 3 Set 1006111 3018333
11 11KV DOF 3 Set 5221 15663
12 11KV LA 9 Nos 369 3321
13 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
14 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
15 30Mtr long 40mm dia GI Pipe ( for Earthing) 6 Nos 1605 9630
16 11 Kv Danger post 30 Nos 500 15000
17 240sqmm Lugs 24 Nos 21528 516672
18 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
19 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
20 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 08 Km 572183 4577464
21 10 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 24 Mtr 1500 36000
22 cutting of treanch for UG cable ( Depth-11mtr wide- 05 mtr ) 800 Mtr 450 360000
23 HT Kiosk Box 2 Job 49500 99000
TOTAL 1652766437
say 1652766
ABSTRACT OF COST
A Cost of Materials 1652766
B Storage Charge 2 on A 3305532
C Total (A + B) 168582132
D Erection Charge 15 on C 252873198
E Transportation Charge 3 on C 505746396
F TOTAL ( C+D+E) ) 1989269158
G Supervision Charge and Establishment Charge 10 on F 1989269158
H Total ( F+G) 2188196073
I Contingency Charge 2 on H 4376392147
J TOTAL ( H+I) 2231959995
K Service charge 5on J 1115979997
L TOTAL ( J+K) 2343557995
Say Rs234355900
Say 2343559
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 74654 597232
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 40 Kgs 68387 273548
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 190276 285414
10 8 SWG GI Wire 55 Kgs 67321 3702655
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 60 3120
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
22 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
23 500Amps Cutout 12 Nos 9674 116088
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 8 Nos 55 440
TOTAL 1119176203
say 1119176
ABSTRACT OF COST
A Cost of Materials 1119176
B Storage Charge 2 on A 2238352
C Total (A + B) 114155952
D Erection Charge 15 on C 171233928
E Transportation Charge 3 on C 342467856
F TOTAL ( C+D+E) ) 1347040234
G Supervision Charge and Establishment Charge 15 on F 202056035
H Total ( F+G) 1549096269
I Contingency Charge 2 on H 3098192537
1580078194
Say 1580078
(Rupees fifteen Lac eighty thousand amp seventy eight )Only
WORK ESTIMATE
Name of work -
Extension of Didicated Feeder line from Rubber Park 33 KV substation to Abhisar Buildwell Pvt Ltd ( Rubber Division) amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 28 Nos 4325 121100
3 11 KB VCB 1 Sets 450000 450000
3 Stay Set Complete 14 Sets 74654 1045156
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 68387 478709
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 739 Kgs 54849 40533411
a) 11KV GOS Base Bracket(28Mtr) 6 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 6 Nos
c) 11KV DOF Bracket(28Mtr) 6 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 6 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g) Double Pole Top X-Arm( 22 Mtr) 6 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 6 Nos
8 MS Angle(65x65x6mm3) 234 Kgs 54849 12834666
a) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 6 No
9 Weasel ACSR (61259mm) 42 Km 190276 7991592
10 8 SWG GI Wire 220 Kgs 67321 1481062
11 11KV Disc Insulator 54 Nos 2406 129924
12 11KV Disc Fittings 54 Nos 33766 1823364
13 11KV Pin Insulator 30 Nos 5292 15876
14 GI Pin for 11KV Pin Insulator 30 Nos 8248 24744
15 11KV GOS 3 Set 7899 23697
16 11KV DOF 3 Set 5221 15663
17 11KV LA 9 Nos 369 3321
18 120sqmm Lugs 24 Nos 165 3960
19 240 sqmm Lugs 24 Nos 219 5256
20 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
21 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
22 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 572183 8582745
23 MS Nuts and Bolts of Assorted Size 189 Kgs 6871 1298619
24 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
25 Bracket Clamp by (50x6mm2) MS Flat 140 Nos 60 8400
26 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
27 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
28 500Amps Cutout 12 Nos 9674 116088
29 185sqmm Lugs 24 Nos 219 5256
30 Danger plate 8 Nos 55 440
TOTAL 1949334855
say 1949335
ABSTRACT OF COST
A Cost of Materials 1949335
B Storage Charge 2 on A 389867
C Total (A + B) 19883217
D Erection Charge 15 on C 298248255
E Transportation Charge 3 on C 59649651
F TOTAL ( C+D+E) ) 2346219606
G Supervision Charge and Establishment Charge 15 on F 3519329409
H Total ( F+G) 2698152547
I Contingency Charge 2 on H 5396305094
2752115598
Say 2752116
(Rupees Twenty seven Lac fifty two thousand one hundred sixteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to PRAN BREVARAGE (INDIA) PRIVATE LIMITED under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 10 on F 6502605468
H Total ( F+G) 7152866015
I Contingency Charge 2 on H 1430573203
J TOTAL ( H+I) 7295923335
K Service charge 5on J 3647961668
L TOTAL ( J+K) 7660719502
Say 766072
Say 766072
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 10 nos consumer at south shib nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with South shib nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 3 Sets 74654 223962
2 Stay Insulator(11KV) 3 Nos 20 60
3 Stay Wire (725mm) 12 Kgs 6838 82056
4 Weasel ACSR (61259mm) 08 Km 190276 1522208
5 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
6 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
7 LT shackle insulator 20 Nos 1125 225
8 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 208695256
say 20870
ABSTRACT OF COST
A Cost of Materials 20870
B Storage Charge 2 on A 4174
C Total (A + B) 212874
D Erection Charge 15 on C 319311
E Transportation Charge 3 on C 638622
F TOTAL ( C+D+E) ) 25119132
G Supervision Charge and Establishment Charge 15 on F 37678698
H Total ( F+G) 288870018
I Contingency Charge 2 on H 577740036
2946474184
Say 29465
(Rupees twenty nine thousand four hundred sixty five )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to sri Pankaj Roy Kalitilla under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with sri Pankaj roy
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 15 Nos 3553 53295
2 Stay Set Complete 9 Sets 74654 671886
3 Stay Insulator(11KV) 9 Nos 20 180
4 Stay Wire (725mm) 45 Kgs 6838 30771
5 Weasel ACSR (61259mm) 17 Km 190276 3234692
6 MS Nuts and Bolts of Assorted Size 75 Kgs 6732 5049
7 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 10428794
say 104288
ABSTRACT OF COST
A Cost of Materials 104288
B Storage Charge 2 on A 208576
C Total (A + B) 10637376
D Erection Charge 15 on C 15956064
E Transportation Charge 3 on C 31912128
F TOTAL ( C+D+E) ) 1255210368
G Supervision Charge and Establishment Charge 10 on F 1255210368
H Total ( F+G) 1380731405
I Contingency Charge 2 on H 276146281
J TOTAL ( H+I) 1408346033
K Service charge 5on J 7041730164
L TOTAL ( J+K) 1478763335
Say 147876
Say 147876
(Rupees one Lac forty seven thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x25 KVA pole mounted Substation for Providing of Service connection to ATC INDIA TOWER at RKNagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 3 Nos 4325 12975
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 08 Km 190276 1522208
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe for Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
TOTAL 15513150
say 155132
ABSTRACT OF COST
A Cost of Materials 155132
B Storage Charge 2 on A 310264
C Total (A + B) 15823464
D Erection Charge 15 on C 23735196
E Transportation Charge 3 on C 47470392
F TOTAL ( C+D+E) ) 1867168752
G Supervision Charge and Establishment Charge 10 on F 1867168752
H Total ( F+G) 2053885627
I Contingency Charge 2 on H 4107771254
J TOTAL ( H+I) 209496334
K Service charge 5on J 104748167
L TOTAL ( J+K) 2199711507
Say 219971
(Rupees two Lac nineteen thousand nine hundred seventy one )Only
Page 4: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

SlNoRate in Rs

in digidRate in Rs in word

Amt in Rs

Rate in Rs in digid

Rate in Rs in word

Amt in Rs

Description of items

Unit Qty

Supply Erection

29

Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection

Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip

Signature of bidderDy General Manager

Jirania Electrical Division

Rounded of Rs (Rupees only)

Sub Total

( Supply + Erection) total Rs

RUB amp LI(

Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

Work Estimate for Line

(AS Deb Barma)Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division
WORK ESTIMATE
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- Chargeable to - DEPOSIT WORK WITH TIDC
B] COST OF MATERIALS FOR 11KV LINE EXTENSION
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) 35 Nos 1015422 3553977
2 9mtr Long PCC Pole 25 Nos 2650 66250
3 Stay Set Complete 25 Sets 47025 1175625 29390625
4 Stay Insulator(11KV) 125 Nos 1092 1365 34125
5 Stay Wire (725mm) 24 Kgs 451 10824
6 MS Channel(75x40x40x6mm4) 116 Kgs 3352 388832
a) Double Pole X-Arm(22Mtr) 3 Nos
b) Single Pole Top X-Arm(03Mtr) 6 Nos
c) Single Pole Bottom X-Arm(12Mtr) 6 Nos
7 MS Angle(65x65x6mm3) 96 Kgs 321 30816
a) Double Pole Guard X-Arm (25Mtr) 3 Nos
b) SinglePole Guard X-Arm (15Mtr) 6 Nos
8 Weasel ACSR (61259mm) 12 Km 2061233 24734796 6183699
9 8 SWG GI Wire 80 Kgs 391 3128 782
10 11KV 45KN Disc Insulator 18 Nos 49487 890766 2226915
11 Single U Bolt type Disc Fittings 18 Nos 19352 348336
12 11KV Pin Insulator 27 Nos 991 26757 668925
13 GI Pin for 11KV Pin Insulator 27 Nos 561 15147
14 MS Nuts and Bolts of Assorted Size 20 Kgs 407 814
15 Stay Clamp by (50x6mm2) MS Flat 6 Pairs 495 297
16 Bracket Clamp by (50x6mm2) MS Flat 40 Nos 27 1080
17 Barbed Wire 22 Kgs 429 9438 23595
24 AddMetering Arrangement with Kiosk 1 Nos 50000 50000
18 30Mtr long 40mm dia GI Pipe Earthing 2 Nos 1605 3210
TOTAL 543610286 1359025715
say 163391
(One Lac sixty three thousand three hundred and ninety one only)
ABSTRACT OF COST 0
A Cost of Materials 163391 0
B Storage Charge 2 on A 326782
C Total (A + B) 16665882 0
D Erection Charge 15 on C 24998823
E Total (C + D) 191657643 0
F Transportation Charge 5 on C 8332941
G Supervision Charge and Establishment Charge 15 on E 2874864645
H Total (E + F + G) 2287392305
I Contingency Charge 3 on H 6862176914 0
GRAND TOTAL 2356014074
Say Rs 235601 0
(Rupees two Lacs thirty five thousand six hundred and one)Only
0
0
0
0
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 200 KVA Substation for Providing of Service connection at Central effulent Effulent Treatment Plant ( CETP) Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 22574688 22574688
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 5 Nos 4325 21625
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Job 49500 49500
27 Danger plate 12 Nos 50 600
TOTAL 492300635
say 492300635
ABSTRACT OF COST
A Cost of Materials 492300635
C Storage Charge 2 on A 98460127
D Total (A + B) 5021466477
E Erection Charge 15 on D 7532199716
F Total (C + D) 5774686449
G Transportation Charge 5 on D 2510733239
H Supervision Charge and Establishment Charge 5 on F 2887343224
H Total ( F + G+H ) 6314494095
I Contingency Charge 3 on H 1894348228
j Addhoc 10 on H 6314494095
GRAND TOTAL 7135378327
Say Rs 713538
(Rupees seven Lac thirteen thousand five hundred thirty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection to Airtel Tower Amtali under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 7247368 7247368
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole 8 Nos 4325 34600
3 Stay Set Complete 15 Sets 58082 87123
4 Stay Insulator(11KV) 15 Nos 20 300
5 Stay Wire (725mm) 75 Kgs 5707 428025
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g) Double Pole Top X-Arm( 22 Mtr) 4 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 4 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 8 No
9 Weasel ACSR (61259mm) 6 Km 2347653 14085918
10 8 SWG GI Wire 90 Kgs 4934 44406
11 11KV Disc Insulator 36 Nos 201 7236
12 11KV Disc Fittings 36 Nos 28769 1035684
13 11KV Pin Insulator 48 Nos 4668 224064
14 GI Pin for 11KV Pin Insulator 48 Nos 561 26928
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
19 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
20 Bracket Clamp by (50x6mm2) MS Flat 120 Nos 27 3240
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 200Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 Job 49500 49500
28 Barbed Wire 20 Kgs 50 1000
TOTAL 46403016
say 464030
ABSTRACT OF COST
A Cost of Materials 464030
B Storage Charge 2 on A 92806
C Total (A + B) 4733106
D Erection Charge 15 on C 7099659
E Total (C + D) 54430719
F Transportation Charge 5 on C 2366553
G Supervision Charge and Establishment Charge 5 on E 272153595
H Total (E + F + G) 5951880795
i Over head charge 10 above ( adhoc increase) 5951880795
I Contingency Charge 3 on H 1785564239
GRAND TOTAL 6725625298
Say 672563
(Rupees Six Lac seventy two thousand five hundred sixty three)Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to NIELIT AGARTALA CENTRE for the smooth construction activities of the campus under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH NIELIT AGARTALA CENTRE
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 453582 453582
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 5 Nos 4325 21625
2 8Mtr PCC Pole 2 Nos 4325 8650
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 2347653 28171836
10 8 SWG GI Wire 40 Kgs 4934 19736
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 18 Nos 4668 84024
14 GI Pin for 11KV Pin Insulator 18 Nos 561 10098
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 27 1620
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 100Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
TOTAL 203944176
say 203944
ABSTRACT OF COST
A Cost of Materials 203944
B Storage Charge 2 on A 407888
C Total (A + B) 20802288
D Erection Charge 15 on C 31203432
E Total (C + D) 239226312
F Transportation Charge 5 on C 10401144
G Supervision Charge and Establishment Charge 5 on E 119613156
H Total (E + F + G) 2615887716
i Over head charge 10 above ( adhoc increase) 2615887716
I Contingency Charge 3 on H 7847663148
GRAND TOTAL 2955953119
Say 295595
(Rupees Two Lac Ninety five thousand five hundred ninety five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to STATE BANK OF INDIA RK Nagar Industrial branch under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 72474 72474
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Fancing 1 Job 15000 15000
27 Danger plate 12 Nos 50 600
TOTAL 210702755
say 210702755
ABSTRACT OF COST
A Cost of Materials 210702755
C Storage Charge 2 on A 42140551
D Total (A + B) 2149168101
E Erection Charge 15 on D 3223752152
F Total (C + D) 2471543316
G Transportation Charge 5 on D 1074584051
H Supervision Charge and Establishment Charge 5 on F 1235771658
H Total ( F + G+H ) 2702578887
I Contingency Charge 3 on H 8107736661
j Addhoc 10 on H 2702578887
GRAND TOTAL 3053914142
Say Rs 305391
(Rupees three Lac five thousand three hundred ninety one )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 17-03-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 6 Nos 3553 21318
3 Stay Set Complete 4 Sets 58082 232328
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 157 Kgs 3927 616539
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 4 No
d) 4 wire LT Bkt( 11 Mtr) 2 No
8 Weasel ACSR (61259mm) 14 Km 2347653 32867142
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 6 Nos 201 1206
11 11KV Disc Fittings 6 Nos 28769 172614
12 11KV Pin Insulator 8 Nos 4668 37344
13 GI Pin for 11KV Pin Insulator 8 Nos 561 4488
14 MS Nuts and Bolts of Assorted Size 12 Kgs 505 606
15 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
16 Bracket Clamp by (50x6mm2) MS Flat 18 Nos 27 486
17 Shackle insulator 14 Nos 10495 14693
TOTAL 98654352
say 98654352
ABSTRACT OF COST
A Cost of Materials 98654
C Storage Charge 2 on A 197308
D Total (A + B) 10062708
E Erection Charge 15 on D 15094062
F Total (C + D) 115721142
G Transportation Charge 5 on D 5031354
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 120752496
I Contingency Charge 3 on H 362257488
j Addhoc 0 on H 0
GRAND TOTAL 1243750709
Say 124375
(Rupees one lac twenty four thousand three hundred seventy five )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 16-04-2013 amp 17-04-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 11 Nos 4325 47575
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 10 Nos 3553 35530
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 10 No
d) 4 wire LT Bkt( 11 Mtr) 7 No
8 Weasel ACSR (61259mm) 48 Km 2347653 112687344
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 13 Nos 201 2613
11 11KV Disc Fittings 13 Nos 28769 373997
12 11KV Pin Insulator 16 Nos 4668 74688
13 GI Pin for 11KV Pin Insulator 16 Nos 561 8976
14 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
15 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
16 Bracket Clamp by (50x6mm2) MS Flat 16 Nos 27 432
17 Shackle insulator 14 Nos 10495 14693
TOTAL 230706294
say 230706294
ABSTRACT OF COST
A Cost of Materials 230706
C Storage Charge 2 on A 461412
D Total (A + B) 23532012
E Erection Charge 15 on D 35298018
F Total (C + D) 270618138
G Transportation Charge 5 on D 11766006
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 282384144
I Contingency Charge 3 on H 847152432
j Addhoc 0 on H 0
GRAND TOTAL 2908556683
Say 290856
(Rupees two Lac ninety thousand eight hundred amp fiftysix )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on03-05-2013 05-05-2013 06-05-2013 12-05-2013 amp 16-05-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 3 Nos 4325 12975
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 8 Nos 3553 28424
3 Stay Set Complete 2 Sets 58082 116164 2
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 2 Nos
b) Single Pole Bottom X-Arm(13Mtr) 2 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 1 Nos
d) 11KV DP bottom Bracket(25Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 2 No
b) Double Pole Guard X-Arm (28Mtr) 1 No
c) 2 wire LT Bkt( 051 Mtr) 6 No
d) 4 wire LT Bkt( 11 Mtr) 12 No
8 Weasel ACSR (61259mm) 09 Km 2347653 21128877
9 8 SWG GI Wire 22 Kgs 4934 108548
10 11KV Disc Insulator 3 Nos 201 603
11 11KV Disc Fittings 3 Nos 28769 86307
12 11KV Pin Insulator 6 Nos 4668 28008
13 GI Pin for 11KV Pin Insulator 6 Nos 561 3366
14 MS Nuts and Bolts of Assorted Size 18 Kgs 505 909
15 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
16 Bracket Clamp by (50x6mm2) MS Flat 8 Nos 27 216
17 Shackle insulator 12 Nos 10495 12594
TOTAL 87545997
say 87545997
ABSTRACT OF COST
A Cost of Materials 87546
C Storage Charge 2 on A 175092
D Total (A + B) 8929692
E Erection Charge 15 on D 13394538
F Total (C + D) 102691458
G Transportation Charge 5 on D 4464846
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 107156304
I Contingency Charge 3 on H 321468912
j Addhoc 10 on H 0
GRAND TOTAL 1103709931
Say 110371
B) Maintance of 3 nos Damage 25 KVA TXr Rs1200000Each Rs 3600000
Total Rs14637100
(Rupees one Lac forty six thousand three hundred amp seventy one )Only
WORK ESTIMATE
Name of work -
Reviesed estimate of Upgredation of Transformer 1x 200 KVA to 1x500KVA for Providing of new Service connection to CITY STAR AGRO INDUSTRIES Private limited at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with CITY STAR AGRO INDUSTRIES Private limited
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA DT
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 52803318 52803318
2 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
3 240 sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
4 400Amps Cutout 6 Nos 777 4662
5 Bimetalic Lugs( 300mm2) 8 Nos 23809 190472
TOTAL 5467614
say
ABSTRACT OF COST
A Cost of Materials 546761
B Storage Charge 2 on A 1093522
C Total (A + B) 55769622
D Erection Charge 15 on C 83654433
E Total (C + D) 641350653
F Transportation Charge 5 on C 27884811
G Supervision Charge and Establishment Charge 15 on E 9620259795
H Total (E + F + G) 765438062
I Contingency Charge 3 on H 2886077939
I Addhoc 10 on H 765438062
GRAND TOTAL 8419818681
Say 841982
B) Dismental of 200 KVA Txr amp Cutout Rs 150000
Total (A+B ) Rs 84348200
C) Less scrap value of existing 200 KVA Txr 40 on 22574700 13544800
GRAND TOTAL 70803400
(Rupees Seven Lac eight thousand thirty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at DAS PARA under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=8 nos SP= 9 Nos) 25 Nos 4325 108125
3 Stay Set Complete 18 Sets 58082 1045476
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 90 Kgs 5707 51363
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 446 Kgs 5473 2440958
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 9 Nos
f) Single Pole Bottom X-Arm(13Mtr) 9 Nos
g) Double Pole Top X-Arm( 22 Mtr) 7 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 7 Nos
8 MS Angle(65x65x6mm3) 213 Kgs 5473 1165749
a) Double pole Gurd Bkt( 25 Mtr) 7 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 9 No
9 Weasel ACSR (61259mm) 4 Km 2347653 9390612
10 8 SWG GI Wire 180 Kgs 4934 88812
11 11KV Disc Insulator 54 Nos 201 10854
12 11KV Disc Fittings 54 Nos 28769 1553526
13 11KV Pin Insulator 62 Nos 4668 289416
14 GI Pin for 11KV Pin Insulator 62 Nos 561 34782
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 505 4949
19 Stay Clamp by (50x6mm2) MS Flat 18 Pairs 495 891
20 Bracket Clamp by (50x6mm2) MS Flat 96 Nos 27 2592
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
27 Barbed Wire 20 Kgs 429 858
TOTAL 45877295
say 45877295
ABSTRACT OF COST
A Cost of Materials 45877295
B Storage Charge 2 on A 9175459
C Total (A + B) 467948409
D Erection Charge 15 on C 7019226135
E Total (C + D) 5381406704
F Transportation Charge 5 on C 2339742045
G Supervision Charge and Establishment Charge 15 on E 8072110055
H Total (E + F + G) 6422591914
I Contingency Charge 3 on H 1926777574
GRAND TOTAL 6615269671
Say Rs 6615269671
(Rupees six Lac sixty one thousand five hundred twenty seven )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at AMTALI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 14 Nos 3553 49742
3 Stay Set Complete 12 Sets 58082 696984
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 5707 34242
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 157 Kgs 5473 859261
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 38 Km 2347653 89210814
10 8 SWG GI Wire 80 Kgs 4934 39472
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 12 Nos 4668 56016
14 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 60 Kgs 505 3030
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
28 Shackle insulator 56 Nos 1396 78176
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 358760714
say 358760714
ABSTRACT OF COST
A Cost of Materials 358760714
B Storage Charge 2 on A 717521428
C Total (A + B) 3659359283
D Erection Charge 15 on C 5489038924
E Total (C + D) 4208263175
F Transportation Charge 5 on C 1829679641
G Supervision Charge and Establishment Charge 15 on E 6312394763
H Total (E + F + G) 5022470616
I Contingency Charge 3 on H 1506741185
GRAND TOTAL 5173144734
Say Rs 5173144734
(Rupees Five Lac seventeen thousand three hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at RAJCHANTAI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=3 nos SP= 6Nos) 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 58082 464656
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 48 Kgs 5707 273936
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
8 MS Angle(65x65x6mm3) Kgs 5473 0
a) Double Pole Guard X-Arm (28Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 6 No
9 Weasel ACSR (61259mm) 27 Km 2347653 63386631
10 8 SWG GI Wire 60 Kgs 4934 29604
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 36 Nos 4668 168048
14 GI Pin for 11KV Pin Insulator 36 Nos 561 20196
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 48 Kgs 505 2424
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 27 1404
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 301010091
say 301010091
ABSTRACT OF COST
A Cost of Materials 301010091
B Storage Charge 2 on A 602020182
C Total (A + B) 3070302928
D Erection Charge 15 on C 4605454392
E Total (C + D) 3530848367
F Transportation Charge 5 on C 1535151464
G Supervision Charge and Establishment Charge 15 on E 5296272551
H Total (E + F + G) 4213990769
I Contingency Charge 3 on H 1264197231
GRAND TOTAL 4340410492
Say Rs 4340410492
(Rupees four Lac thirtyfour thousand forty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 16506241
ABSTRACT OF COST
A Cost of Materials 16506241
B Storage Charge 2 on A 33012482
C Total (A + B) 1683636582
D Erection Charge 15 on C 2525454873
E Transportation Charge 3 on C 82531205
F Total (C + D+E) 2018713274
G Supervision Charge and Establishment Charge 5 on F 1009356637
H Total ( F + G ) 2119648938
I Overhead charge 10 on H 2018713274
J Contingency Charge 3 on H 6358946814
L GRAND TOTAL 2385109734
Say Rs 238511
(Rupees three Lac seventy two thousand one hundred thirty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 70998 35499
2 Stay Insulator(11KV) 5 Nos 12 60
3 Stay Wire (725mm) 25 Kgs 8136 2034
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 58082 29041
2 Stay Insulator(11KV) 5 Nos 20 100
3 Stay Wire (725mm) 25 Kgs 5707 142675
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to the newly constructed building of college of veterinary sciences amp AH RK nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Debashish Das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 4 Nos 3553 14212
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 08 Km 2347653 18781224
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 20 Nos 1125 225
9 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 39369324
say 39369324
ABSTRACT OF COST
A Cost of Materials 39369324
B Storage Charge 2 on A 78738648
C Total (A + B) 4015671048
D Erection Charge 15 on C 6023506572
E Transportation Charge 3 on C 19684662
F Total (C + D+E) 4814868325
G Supervision Charge and Establishment Charge 5 on F 2407434163
H Total ( F + G ) 5055611741
I Overhead charge 10 on H 4814868325
J Contingency Charge 3 on H 1516683522
K WCT6 on erection charge ie on D 3614103943
L GRAND TOTAL 5724907966
Say Rs 5724907966
B) Service connection charge 1877
C) Security 900
Grand total (A+B+C) 60026
( Sixty thousand amp twenty six ) only
BILL
Name of work -
Supply Errection amp commissioning of Various capacity Sodium Vapour Lamp for lightining of 14 Goddess temple at Uttarchampura During Kharchi Puja 2013-2014
SlNO Description of work Qty Unit RateUnit Amount
A 250 wattSodium vapour Lamp
1 Ballast 25 Nos 2450 61250
2 Lamp 25 Nos 380 9500
3 capacitor 25 Nos 288 7200
4 Indicator 25 Nos 220 5500
B 70 Watt Sodium vapour lamp 0
1 Ballast 11 Nos 1125 12375
2 Lamp 11 Nos 280 3080
3 capacitor 11 Nos 288 3168
4 Indicator 11 Nos 220 2420
C 250 watt Metal
1 Ballast 5 Nos 2450 12250
2 Lamp 5 Nos 930 4650
3 capacitor 5 Nos 288 1440
4 Indicator 5 Nos 220 1100
D Stand light 18 watt 8 Nos 140 1120
E Decorating light 10 Nos 120 1200
TOTAL 126253
Vat 135 on Rs 12625300 Rs1704400
Contractor Profit 10 on Rs 12625300 Rs1262500
Grand Total Rs 15592200
( Rupees one lac fifty five thousand nine hundred twenty two) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3350 284750
II Ballast 85 Nos 1600 136000
III Lamp 85 Nos 400 34000
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 420 89250
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 599760
Contractor profit 10 on Rs 59976000 59976 59976
Grand Total 659736
( Rupees six lac fiftynine thousand seven hundred thirty six) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3450 293250
II Ballast 85 Nos 1570 133450
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 600 127500
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 644810
Contractor profit 10 on Rs 6448100 64481
Grand Total 709291
( Rupees seven lac nine thousand two hundred ninety one only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 4000 340000
II Ballast 85 Nos 1500 127500
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 540 114750
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 400 10200
II Unskilled labour 1275 Nos 300 3825
TOTAL 676175
Contractor profit 10 on Rs 6761750 67617
Grand Total 743792
( Rupees seven lac fortythree thousand seven hundred ninety two ) only
WORK ESTIMATE
Name of work -
Extension of 11 KV Dedicated Feeder line from Bodhjungnagar 132 KV Substation to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED for Providing of Service connection to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH CITY STAR AGRO INDUSTRIES PRIVATE LIMITED
A] COST OF MATERIALS -
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtrlong ST Pole 2 Nos 1358265 271653
2 120 sq mm XLPE cable 015 Km 572183 8582745
3 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
4 MS Channel(75x40x40x6mm4) 245 Kgs 5473 1340885
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Top Bracket(28Mtr) 3 Nos
5 MS Angle(65x65x6mm3) 33 Kgs 5473 180609
c) 11KV LA Bracket(28Mtr) 2 No
6 Weasel ACSR (61259mm) 015 Km 2347653 35214795
7 11KV Disc Insulator 15 Nos 201 3015
8 11KV Disc Fittings 15 Nos 28769 431535
9 11KV Pin Insulator 12 Nos 4668 56016
10 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
11 11KV GOS 2 Set 806288 1612576
12 11KV DOF 2 Set 373613 747226
13 11KV LA 6 Nos 369 2214
14 MS Nuts and Bolts of Assorted Size 15 Kgs 505 7575
15 Bracket Clamp by (50x6mm2) MS Flat 24 Nos 27 648
16 Jointing Kit ( indoor type) 2 Nos 9000 18000
17 Jointing Kit ( outdoor type) 2 Nos 12000 24000
18 11 KV Vacum circuit Breaker control amp relay panel simplex type 400 A continous current 250 MVA rupturring capacity complete with electrical closing mechanism with internal wiring 2 overcurrent amp 1 earth fault combine relay auxilury relays 3 ammeter 1- voltmeter CT operated static trivactor meter 1 CT operated static KWH meter of CTR 1001-1A with integral earthing facility and internal arc tested for out going feeders 1 Nos 404000 404000
TOTAL 5913802595
say 5913802595
ABSTRACT OF COST
A Cost of Materials 5913802595
B Storage Charge 2 on A 1182760519
C Total (A + B) 6032078647
D Erection Charge 15 on C 904811797
E Total (C + D) 6936890444
F Transportation Charge 5 on C 3016039323
G Supervision Charge and Establishment Charge 15 on E 1040533567
H Total (E + F + G) 8279027943
I Contingency Charge 3 on H 2483708383
GRAND TOTAL 8527398781
Say Rs 8527398781
(Rupees Eight Lac fifty two thousand seven hundred seventy forty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 25 KVA Substation for Providing of Service connectionin the PIG shed under under RKVY at RK Nagar catal farm under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH BDO JIRINIA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 11 Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 4 Nos 1358265 543306
2 8Mtr PCC Pole 10 Nos 3553 35530
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 119 Kgs 5473 651287
a) 11 mtr long LT Bkt 12 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 31 Km 2016279 62504649
10 8 SWG GI Wire 60 Kgs 6772 40632
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10911 600105
23 100Amps Cutout 6 Nos 21906 131436
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 162 3888
26 Substation fancing 1 Job 14500 14500
27 Shackle insulator 52 Nos 1396 72592
28 Straps NampB(16x75) 52 pairs 4586 238472
29 Barbed Wire 20 Kgs 429 858
TOTAL 304414759
say 304414759
ABSTRACT OF COST
A Cost of Materials 304414759
B Storage Charge 2 on A 608829518
C Total (A + B) 3105030542
D Erection Charge 15 on C 4657545813
E Total (C + D) 3570785123
F Transportation Charge 5 on C 1552515271
G Supervision Charge and Establishment Charge 15 on E 5356177685
H Total (E + F + G) 4261654419
I Contingency Charge 3 on H 1278496326
GRAND TOTAL 4389504051
Say Rs 4389504051
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300 0
2 9 Mtr PCC Pole 6 Nos 4325 25950
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 15 Km 2016279 30244185
10 8 SWG GI Wire 50 Kgs 6772 3386
11 11KV Disc Insulator 24 Nos 2406 57744
12 11KV Disc Fittings 24 Nos 34958 838992
13 11KV Pin Insulator 27 Nos 5292 142884
14 GI Pin for 11KV Pin Insulator 27 Nos 8248 222696
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 120 Mtr 19295 23154
23 300Amps Cutout 6 Nos 5225 3135
24 11 Kv Danger Plate 12 Nos 55 660
25 240 sqmm Lugs 24 Nos 215 5160
26 Kiosk Box 1 Job 49500 49500
TOTAL 671383525
say 671383525
ABSTRACT OF COST
A Cost of Materials 671383525
B Storage Charge 2 on A 134276705
C Total (A + B) 6848111955
D Erection Charge 15 on C 1027216793
E Total (C + D) 7875328748
F Transportation Charge 5 on C 3424055978
G Supervision Charge and Establishment Charge 15 on E 1181299312
H Total (E + F + G) 9399033658
I Overhead charge 10 on H 9399033658
J Contingency Charge 3 on H 2819710097
GRAND TOTAL 1062090803
Say Rs 1062091
(Rupees ten Lac sixty two thousand ninety one )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9 Mtr PCC Pole 5 Nos 4325 21625
3 Stay Set Complete 3 Sets 70998 212994
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 8137 122055
6 MS Channel(100x50x50x6mm4) 0 Kgs 5473 0
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2016279 16130232
10 8 SWG GI Wire 35 Kgs 6772 23702
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 35 Kgs 6871 240485
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 30 Mtr 19295 57885
23 300Amps Cutout 3 Nos 5225 15675
24 11 Kv Danger Plate 6 Nos 55 330
25 240 sqmm Lugs 12 Nos 215 2580
26 Kiosk Box 1 Job 49500 49500
TOTAL 616537572
say 616537572
ABSTRACT OF COST
A Cost of Materials 616537572
B Storage Charge 2 on A 1233075144
C Total (A + B) 6288683234
D Erection Charge 15 on C 9433024852
E Total (C + D) 723198572
F Transportation Charge 5 on C 3144341617
G Supervision Charge and Establishment Charge 15 on E 1084797858
H Total (E + F + G) 8631217739
I Overhead charge 10 on H 8631217739
j Contingency Charge 3 on H 2589365322
GRAND TOTAL 8890154271
Say Rs 8890154271
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work - Extension of LT line for providing Street light connerction at DUKLI INDUSTRIAL GROWTH CENTRE ( TIDC)
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 20 Nos 3553 71060
3 Stay Set Complete 14 Sets 850 11900
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 70 4900
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos fo C Bkt) 72 Kgs 70 5040
7 Bracket Clamp by (50x6mm2) MS Flat 14 Nos 48 672
8 Weasel ACSR (61259mm) ( 6 wire 44 span) 3 Km 2347653 7042959
9 8 SWG GI Wire 80 Kgs 75 6000
10 LT Straps amp Bolts 50 Nos 38 1900
11 Shackle Insulator 150 Nos 11 1650
12 MS Nuts and Bolts of Assorted Size 320 Kgs 75 24000
13 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
14 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
15 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
16 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
17 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
18 MS clamp 200 Nos 80 16000
19 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
20 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
22 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
23 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
TOTAL 62557759
say 62557759
ABSTRACT OF COST
A Cost of Materials 62557759
B Storage Charge 2 on A 125115518
C Total (A + B) 6380891418
D Erection Charge 15 on C 9571337127
E Total (C + D) 7338025131
F Transportation Charge 5 on C 3190445709
G Supervision Charge and Establishment Charge 15 on E 110070377
H Total (E + F + G) 8757773471
I Contingency Charge 3 on H 2627332041
GRAND TOTAL 9020506675
Say 902051
( Rupees nine lac two thousand amp fifty one ) only
WORK ESTIMATE
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
3 MS clamp 200 Nos 80 16000
4 Nuts amp Bolts 200 Nos 20 4000
5 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
^6 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
TOTAL 391680
ABSTRACT OF COST
A Cost of Materials 391680
B Storage Charge 2 on A 78336
C Total (A + B) 3995136
D Erection Charge 15 on C 5992704
E Total (C + D) 45944064
F Transportation Charge 5 on C 1997568
G Supervision Charge and Establishment Charge 15 on E 68916096
H Total (E + F + G) 548332416
I Contingency Charge 3 on H 1644997248
GRAND TOTAL 5647823885
Say 551084
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2347653 18781224
10 8 SWG GI Wire 25 Kgs 4934 12335
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 9 Nos 4668 42012
14 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
28 Shackle insulator 8 Nos 1396 11168
29 Straps NampB(16x75) 8 pairs 6871 54968
27 Barbed Wire 15 Kgs 429 6435
TOTAL 159200654
say 159200654
ABSTRACT OF COST
A Cost of Materials 159200654
B Storage Charge 2 on A 318401308
C Total (A + B) 1623846671
D Erection Charge 15 on C 2435770006
E Total (C + D) 1867423671
F Transportation Charge 5 on C 8119233354
G Supervision Charge and Establishment Charge 15 on E 2801135507
H Total (E + F + G) 2228729556
I Contingency Charge 3 on H 6686188667
GRAND TOTAL 2295591442
Say Rs 2295591442
(Rupees Two Lac Twenty nine thousand five hundred fiftynine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to FOOD TESTING LABORATORY at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 1 Km 2347653 2347653
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 24 Nos 1125 270
9 Straps with NB ( 16x75) 24 Nos 6871 164904
TOTAL 4793747
say 4793747
ABSTRACT OF COST
A Cost of Materials 4793747
B Storage Charge 2 on A 9587494
C Total (A + B) 488962194
D Erection Charge 15 on C 733443291
E Transportation Charge 3 on C 23968735
F Total (C + D+E) 5862752581
G Supervision Charge and Establishment Charge 5 on F 2931376291
H Total ( F + G ) 615589021
I Overhead charge 10 on H 5862752581
J Contingency Charge 3 on H 1846767063
K WCT6 on erection charge ie on D 4400659746
L GRAND TOTAL 6970848772
Say Rs 6970848772
( Sixty nine thousand seven hundred eight ) only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to LALIT FLOUR MILL at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with LALIT FLOUR MILL
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 2 Nos 20 40
4 Stay Wire (725mm) 35 Kgs 5707 199745
5 Weasel ACSR (61259mm) 02 Km 2347653 4695306
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
8 LT shackle insulator 6 Nos 1125 675
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos ) 0 Kgs 70 0
9 Straps with NB ( 16x75) 6 Nos 6871 41226
TOTAL 16260836
say 16260836
ABSTRACT OF COST
A Cost of Materials 16260836
B Storage Charge 2 on A 32521672
C Total (A + B) 1658605272
D Erection Charge 15 on C 2487907908
E Transportation Charge 3 on C 8130418
F Total (C + D+E) 1988700243
G Supervision Charge and Establishment Charge 5 on F 9943501214
H Total ( F + G ) 2088135255
I Overhead charge 10 on H
J Contingency Charge 3 on H 6264405765
K WCT6 on erection charge ie on D 1492744745
L GRAND TOTAL 216570676
Say Rs 216570676
( Sixty thousand four hundred ) only
WORK ESTIMATE
Name of work -
Extension of HT Line for Providing of Service connection to Ramkrishna Rubber industry at RUBBER PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) 448 Kgs 5473 2451904
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 1 Set 7899 7899
14 11KV DOF 1 Set 5221 5221
15 11KV LA 3 Nos 369 1107
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 27 2970
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 357488314
say 357488314
ABSTRACT OF COST
A Cost of Materials 357488314
B Storage Charge 2 on A 714976628
C Total (A + B) 3646380803
D Erection Charge 15 on C 5469571204
E Total (C + D) 4193337923
F Transportation Charge 5 on C 1823190401
G Supervision Charge and Establishment Charge 15 on E 6290006885
H Total (E + F + G) 5004657652
I Overhead charge 10 on H 5004657652
J Contingency Charge 3 on H 1501397296
GRAND TOTAL 5655263147
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 2 Nos 4325 8650
2 ACSR (61259 04 Km 2016279 8065116
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 3 Nos 201 603
9 11KV Disc Fittings 3 Nos 28769 86307
10 11KV Pin Insulator 3 Nos 4668 14004
11 GI Pin for 11KV Pin Insulator 3 Nos 561 1683
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 10 Kgs 505 505
16 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
17 Bracket Clamp by (50x6mm2) MS Flat 32 Nos 27 864
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 4 Nos 12531 50124
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 80 Mtr 2200 176000
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 50 Mtr 1500 75000
24 Kiosk Box 1 Job 49500 49500
TOTAL 423354736
say 423355
ABSTRACT OF COST
A Cost of Materials 423355
B Storage Charge 2 on A 84671
C Total (A + B) 4318221
D Erection Charge 15 on C 64773315
E Total (C + D) 496595415
F Transportation Charge 5 on C 21591105
G Supervision Charge and Establishment Charge 15 on E 7448931225
H Total (E + F + G) 5926758323
I Overhead charge 10 on H 5926758323
j Contingency Charge 3 on H 1778027497
GRAND TOTAL 6697236904
Say Rs 669724
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Base monted Substation for Providing of new Service connection to Ramkrishna Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 201 1206
9 11KV Disc Fittings 6 Nos 28769 172614
10 11KV Pin Insulator 9 Nos 4668 42012
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 152447
say 152447
ABSTRACT OF COST
A Cost of Materials 152447
B Storage Charge 2 on A 304894
C Total (A + B) 15549594
D Erection Charge 15 on C 23324391
E Total (C + D) 178820331
F Transportation Charge 5 on C 7774797
G Supervision Charge and Establishment Charge 15 on E 2682304965
H Total (E + F + G) 2134181777
I Overhead charge 10 on H 2134181777
j Contingency Charge 3 on H 640254533
GRAND TOTAL 2411625407
Say 241163
(Rupees two Lac forty one thousand one hundred sixty three )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 58082 116164
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
8 Weasel ACSR (61259mm) 05 Km 2347653 11738265
9 8 SWG GI Wire 20 Kgs 4934 9868
10 11KV Disc Insulator 9 Nos 201 1809
11 11KV Disc Fittings 9 Nos 28769 258921
12 11KV Pin Insulator 9 Nos 4668 42012
13 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
14 11KV GOS 1 Set 806288 806288
15 11KV DOF 1 Set 373613 373613
16 11KV LA 3 Nos 369 1107
17 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
18 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
19 Bracket Clamp by (50x6mm2) MS Flat 38 Nos 48 1824
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
22 500Amps Cutout 6 Nos 9674 58044
23 11 Kv Danger Plate 6 Nos 55 330
24 240 sqmm Lugs 24 Nos 215 5160
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Nos 49500 49500
27 Barbed Wire 15 Kgs 429 6435
TOTAL 684227175
say 684227175
ABSTRACT OF COST
A Cost of Materials 684227175
B Storage Charge 2 on A 136845435
C Total (A + B) 6979117185
D Erection Charge 15 on C 1046867578
E Total (C + D) 8025984763
F Transportation Charge 5 on C 3489558593
G Supervision Charge and Establishment Charge 15 on E 1203897714
H Total (E + F + G) 9578838336
I Contingency Charge 3 on H 2873651501
GRAND TOTAL 9866203487
Say Rs 9866203487
(Rupees Nine Lac Eighty six thousand Six hundred Twenty )Only
WORK ESTIMATE
Name of work -
Extension of LT Line for providing of SC to Soma Paul at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Soma paul
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel Pole 2 Nos 1358265 271653
2 8Mtr PCC Pole 1 Nos 3553 3553
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 Weasel ACSR (61259mm) 32 Km 2347653 75124896
7 8 SWG Gi wire 50 Kgs 65 3250
7 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
9 LT shackle insulator 56 Nos 1125 630
10 2 mtr long MS Angle(50x50x6mm3) (16Nos ) 144 Kgs 70 10080
11 Straps with NB ( 16x75) 56 Nos 6871 384776
TOTAL 100758166
say 100758166
ABSTRACT OF COST
A Cost of Materials 100758166
B Storage Charge 2 on A 201516332
C Total (A + B) 1027733293
D Erection Charge 15 on C 154159994
E Transportation Charge 3 on C 50379083
F Total (C + D+E) 123227237
G Supervision Charge and Establishment Charge 5 on F 6161361851
H Total ( F + G ) 1293885989
I Overhead charge 10 on H 123227237
J Contingency Charge 3 on H 3881657966
K WCT6 on erection charge ie on D 9249599639
L GRAND TOTAL 1465179405
Say Rs 1465179405
( Rupees one lac forty six thousand five hundred eighteen ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x63 KVA Substation for Providing of Street light connection at Growth centre At Bodhjungnagar Growth centre under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 2 Nos 1032833 1032833
2 9Mtr PCC Pole 11 Nos 4325 47575
2 8Mtr PCC Pole 6 Nos 3553 21318
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 5 Nos
f) Single Pole Bottom X-Arm(13Mtr) 5 Nos
g DP Pole top X-Arm(17 Mtr) 2 Nos
h DP Pole Bottom X-Arm(22 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 2 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 42 Nos 2406 101052
12 11KV Disc Fittings 42 Nos 34958 1468236
13 11KV Pin Insulator 36 Nos 5293 190548
14 GI Pin for 11KV Pin Insulator 36 Nos 8243 296748
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 86 Nos 56 4816
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 110 Mtr 10495 115445
23 200Amps Cutout 12 Nos 27885 33462
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 48 Nos 1913 91824
26 LT shackle insulator 56 Nos 1125 630
27 Straps with NB 56 Nos 3683 206248
29 Kiosk Box 2 Job 49500 99000
30 Barber wire 20 Kgs 60 1200
TOTAL 53350719
say 53350719
ABSTRACT OF COST
A Cost of Materials 53350719
B Storage Charge 2 on A 106701438
C Total (A + B) 5441773338
D Erection Charge 15 on C 8162660007
E Transportation Charge 3 on C 266753595
F Total (C + D+E) 6524792934
G Supervision Charge and Establishment Charge 15 on F 9787189401
H Total ( F + G ) 7503511874
I Overhead charge 10 on H 6524792934
J Contingency Charge 3 on H 2251053562
K WCT6 on erection charge ie on D 4897596004
L GRAND TOTAL 8430072483
Say Rs 843007
(Rupees Eight Lac Forty three thousand amp seven )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x63 KVA Substation for Providing Service connection DWS Pump at Newly constructed Vetenairy college at RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work DWS DIVISION-II Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 1032833 1032833
2 9Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 12 Nos 3553 42636
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g DP Pole top X-Arm(17 Mtr) 1 Nos
h DP Pole Bottom X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 1 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 34958 629244
13 11KV Pin Insulator 15 Nos 5293 79395
14 GI Pin for 11KV Pin Insulator 15 Nos 8243 123645
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 88 Nos 1125 990
27 Straps with NB 88 Nos 3683 324104
30 Barber wire 10 Kgs 60 600
TOTAL 37085161
say 37085161
ABSTRACT OF COST
A Cost of Materials 37085161
B Storage Charge 2 on A 74170322
C Total (A + B) 3782686422
D Erection Charge 15 on C 5674029633
E Transportation Charge 3 on C 185425805
F Total (C + D+E) 453551519
G Supervision Charge and Establishment Charge 15 on F 6803272785
H Total ( F + G ) 5215842469
I Overhead charge 10 on H 453551519
J Contingency Charge 3 on H 1564752741
K WCT6 on erection charge ie on D 340441778
L GRAND TOTAL 585991344
Say Rs 585991
(Rupees five Lac Eighty five thousand Nine hundred ninety one )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT 15 km LT Line amp Construction of 2x 25 KVA Substation for providing of Service connection to Unhabited electrified area at Das para amp sarat pally under R K Nagar Grampanchyat under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO Jirinia RD Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 2 Nos 55146 110292
2 9Mtr PCC Pole 16 Nos 4325 69200
2 8Mtr PCC Pole 24 Nos 3553 85272
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 429 Kgs 5473 2347917
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g DP Pole top X-Arm(17 Mtr) 4 Nos
h DP Pole Bottom X-Arm(22 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 237 Kgs 5473 1297101
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 8 No
c) DP Pole Guard X-Arm (25Mtr) 4 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 84 Km 2016279 169367436
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 52 Nos 2406 125112
12 11KV Disc Fittings 52 Nos 34958 1817816
13 11KV Pin Insulator 48 Nos 5293 254064
14 GI Pin for 11KV Pin Insulator 48 Nos 8243 395664
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 176 Kgs 6871 1209296
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 6 Nos 27885 16731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 96 Nos 1125 1080
27 Straps with NB 96 Nos 3683 353568
30 Barber wire 10 Kgs 60 600
TOTAL 61196857
say 61196857
ABSTRACT OF COST
A Cost of Materials 61196857
B Storage Charge 2 on A 122393714
C Total (A + B) 6242079414
D Erection Charge 15 on C 9363119121
E Transportation Charge 3 on C 305984285
F Total (C + D+E) 7484375611
G Supervision Charge and Establishment Charge 15 on F 1122656342
H Total ( F + G ) 8607031953
I Overhead charge 10 on H 7484375611
J Contingency Charge 3 on H 2582109586
K WCT6 on erection charge ie on D 5617871473
L GRAND TOTAL 9669859187
Say Rs 966986
(Rupees Nine Lac sixty six nine hundred eighty six )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT amp 15 KM LT Line amp Construction of 1x 25 KVA Substation for Providing Service connection Un-electrified Habitation at sen para Muslim para Muslim Basti under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work BDO Jirinia R D Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole 12 Nos 4325 51900
2 8Mtr PCC Pole 25 Nos 3553 88825
3 Stay Set Complete 30 Sets 70998 212994
4 Stay Insulator(11KV) 30 Nos 20 600
5 Stay Wire (725mm) 150 Kgs 8136 12204
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g DP Pole top X-Arm(17 Mtr) 3 Nos
h DP Pole Bottom X-Arm(22 Mtr) 3 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 72 Km 2016279 145172088
10 8 SWG GI Wire 150 Kgs 6773 101595
11 11KV Disc Insulator 48 Nos 2406 115488
12 11KV Disc Fittings 48 Nos 34958 1677984
13 11KV Pin Insulator 52 Nos 5293 275236
14 GI Pin for 11KV Pin Insulator 52 Nos 8243 428636
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 160 Kgs 6871 109936
19 Stay Clamp by (50x6mm2) MS Flat 30 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 88 Nos 56 4928
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 120 Nos 1125 1350
27 Straps with NB 120 Nos 3683 44196
30 Barber wire 30 Kgs 60 1800
TOTAL 51229024
say 51229024
ABSTRACT OF COST
A Cost of Materials 51229024
B Storage Charge 2 on A 102458048
C Total (A + B) 5225360448
D Erection Charge 15 on C 7838040672
E Transportation Charge 3 on C 25614512
F Total (C + D+E) 6265309635
G Supervision Charge and Establishment Charge 15 on F 9397964453
H Total ( F + G ) 720510608
I Overhead charge 10 on H 6265309635
J Contingency Charge 3 on H 2161531824
L GRAND TOTAL 8047790226
Say 804779
(Rupees Eight Lac four thousand seven hundred seventy nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA amp 1x100 KVA Substation for Providing of Service connection 108 nos family at Newly constructed Horizon colony at sen para under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with BDO OlD AGARTALA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 219100 219100
2 100 KVA 110433KV Distribution Transformer 1 Nos 129478 129478
3 9Mtr PCC Pole ( DP=04 nos SP= 6 Nos) 14 Nos 4325 60550
4 8Mtr PCC Pole 85 Nos 3553 302005
5 Stay Set Complete 90 Sets 70998 638982
6 Stay Insulator(11KV) 90 Nos 20 1800
7 Stay Wire (725mm) 450 Kgs 81369 3661605
8 MS Channel(100x50x50x6mm4) 234 Kgs 5473 1280682
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
9 MS Channel(75x40x40x6mm4) 317 Kgs 5473 1734941
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
10 MS Angle(65x65x6mm3) 858 Kgs 5473 4695834
b) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
d) 15 mtr long 4 wire LT Bkt 85 No
11 Weasel ACSR (61259mm) 18 Km 2016279 36293022
12 8 SWG GI Wire 520 Kgs 6772 352144
13 11KV Disc Insulator 48 Nos 2406 115488
14 11KV Disc Fittings 48 Nos 34958 1677984
15 11KV Pin Insulator 64 Nos 8248 527872
16 GI Pin for 11KV Pin Insulator 64 Nos 561 35904
17 11KV GOS 3 Set 7899 23697
18 11KV DOF 3 Set 5221 15663
19 11KV LA 9 Nos 369 3321
20 MS Nuts and Bolts of Assorted Size 520 Kgs 6871 357292
21 Stay Clamp by (50x6mm2) MS Flat 90 Pairs 495 4455
22 Bracket Clamp by (50x6mm2) MS Flat 210 Nos 48 10080
23 30Mtr long 40mm dia GI Pipe Earthing 9 Nos 1300 11700
24 120sqmm PVC insulated Al Conductor 250 Mtr 10911 272775
25 240 sqmm PVC insulated Al Conductor 200 Mtr 19295 38590
26 300Amps Cutout 12 Nos 5225 6270
27 200Amps Cutout 9 Nos 41699 375291
28 120sqmm Lugs 48 Nos 162 7776
29 240sqmm Lugs 48 Nos 238 11424
30 Transformer Base 1 Job 89500 89500
31 LT shackle insulator 360 Nos 1125 4050
32 Straps with NB 360 Nos 3683 132588
33 Danger plate 92 Nos 50 4600
TOTAL 163704861
say 163704861
ABSTRACT OF COST
A Cost of Materials 163704861
C Storage Charge 2 on A 327409722
D Total (A + B) 1669789582
E Erection Charge 15 on D 2504684373
F Total (C + D) 192025802
G Transportation Charge 5 on D 8348947911
H Supervision Charge and Establishment Charge 5 on F 9601290098
H Total ( F + G+H ) 20997604
I Contingency Charge 3 on H 6299281199
j Addhoc 10 on H 20997604
GRAND TOTAL 2372729252
Say Rs 2372729
(Rupees Twenty three Lac seventy two thousand seven hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 165062
ABSTRACT OF COST
A Cost of Materials 165062
C Storage Charge 2 on A 330124
D Total (A + B) 16836324
E Erection Charge 15 on D 25254486
F Total (C + D) 193617726
G Transportation Charge 5 on D 8418162
H Supervision Charge and Establishment Charge 5 on F 96808863
H Total ( F + G+H ) 2117167743
I Contingency Charge 3 on H 6351503229
j Addhoc 10 on H 2117167743
GRAND TOTAL 239240
Say Rs 239240
(Rupees Two LacThirtynine thousand two hundred forty )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 1000 KVA Base monted Substation for Providing of new Service connection to MALAYA Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MALAYA RUB-TECH INDUSTRIES
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 70998 35499
4 Stay Insulator(11KV) 5 Nos 12 60
5 Stay Wire (725mm) 25 Kgs 8136 2034
6 MS Channel(75x40x40x6mm4) 224 Kgs 5473 1225952
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 5473 93041
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 2406 14436
9 11KV Disc Fittings 6 Nos 34958 209748
10 11KV Pin Insulator 9 Nos 8248 74232
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 7899 7899
13 11KV DOF 1 Set 5221 5221
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 90 Mtr 238 21420
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 17083229
say 170832
ABSTRACT OF COST
A Cost of Materials 170832
B Storage Charge 2 on A 341664
C Total (A + B) 17424864
D Erection Charge 15 on C 26137296
E Total (C + D) 200385936
F Transportation Charge 5 on C 8712432
G Supervision Charge and Establishment Charge 15 on E 300578904
H Total (E + F + G) 2391562584
I Overhead charge 10 on H 2391562584
j Contingency Charge 3 on H 7174687752
GRAND TOTAL 270246572
Say 270247
(Rupees two Lac seventy thousand two hundred forty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Santi para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 18 Km 190276 3424968
10 8 SWG GI Wire 20 Kgs 6732 13464
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 48 3264
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 11007 605385
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 25661079
say 25661079
ABSTRACT OF COST
A Cost of Materials 25661079
B Storage Charge 2 on A 51322158
C Total (A + B) 2617430058
D Erection Charge 15 on C 3926145087
E Total (C + D) 3010044567
F Transportation Charge 5 on C 1308715029
G Supervision Charge and Establishment Charge 10 on E 3010044567
H Total (E + F + G) 3441920526
I Contingency Charge 3 on H 1032576158
GRAND TOTAL 3545178142
Say Rs 3545178142
(Rupees three Lac Fifty four thousand five hundred Eighteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Das para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 15 Kgs 6732 10098
11 11KV Disc Insulator 9 Nos 2406 21654
12 11KV Disc Fittings 9 Nos 33766 303894
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 30 Mtr 11007 33021
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 22108045
say 22108045
ABSTRACT OF COST
A Cost of Materials 22108045
B Storage Charge 2 on A 4421609
C Total (A + B) 225502059
D Erection Charge 15 on C 3382530885
E Total (C + D) 2593273679
F Transportation Charge 5 on C 1127510295
G Supervision Charge and Establishment Charge 10 on E 2593273679
H Total (E + F + G) 2965352076
I Contingency Charge 3 on H 8896056228
GRAND TOTAL 3054312638
Say Rs 3054312638
(Rupees three Lac Five thousand thousand four hundred thirty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to Santosh das Bhanu kanta biswas amp purnima biswas under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with santosh das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 3 Nos 3250 9750
2 stay set complete 1 Nos 581 581
3 Stay insulator 1 Nos 20 20
4 Stay wire 1 Nos 57 57
5 Weasel ACSR (61259mm) 003 Km 2016279 6048837
6 MS Nuts and Bolts of Assorted Size 6 Kgs 505 303
7 LT shackle insulator 6 Nos 1125 675
TOTAL 113833837
say 113833837
ABSTRACT OF COST
A Cost of Materials 113833837
B Storage Charge 2 on A 227667674
C Total (A + B) 1161105137
D Erection Charge 15 on C 1741657706
E Transportation Charge 3 on C 569169185
F Total (C + D+E) 1392187827
G Supervision Charge and Establishment Charge 5 on F 6960939133
H Total ( F + G ) 1461797218
J Contingency Charge 3 on H 4385391654
L GRAND TOTAL 1505651134
Say Rs 15057
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 55419033
ABSTRACT OF COST
A Cost of Materials 55419033
C Storage Charge 2 on A 110838066
D Total (A + B) 5652741366
E Erection Charge 15 on D 8479112049
F Total (C + D) 6500652571
G Transportation Charge 5 on D 2826370683
H Supervision Charge and Establishment Charge 15 on F 9750978856
H Total ( F + G+H ) 7758387525
I Contingency Charge 3 on H 2327516257
GRAND TOTAL 7991139151
Say 799114
(Rupees seven lac ninety nine thousand one hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) Kgs 5473 0
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 3 Set 7899 23697
15 11KV LA 9 Nos 369 3321
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 142 Nos 48 6816
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
3 11 KB VCB 1 Sets 450000 450000
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable 015 Km 572183 8582745
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 934991304
say 934991304
ABSTRACT OF COST
A Cost of Materials 934991304
B Storage Charge 2 on A 1869982608
C Total (A + B) 9536911301
D Erection Charge 15 on C 1430536695
E Total (C + D) 10967448
F Transportation Charge 5 on C 476845565
G Supervision Charge and Establishment Charge 15 on E 1645117199
H Total (E + F + G) 1308941076
I Overhead charge 10 on H 1308941076
J Contingency Charge 3 on H 3926823228
GRAND TOTAL 1479103416
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 015 Km 3510265 52653975
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 250 7500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 12 Km 572183 6866196
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 90 Mtr 1500 135000
24 Errection oh UG cable 1200 Mtr 450 540000
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2197755172
say 2197755172
ABSTRACT OF COST
A Cost of Materials 2197755172
B Storage Charge 2 on A 4395510343
C Total (A + B) 2241710275
D Erection Charge 15 on C 3362565412
E Total (C + D) 2577966816
F Transportation Charge 5 on C 1120855137
G Supervision Charge and Establishment Charge 15 on E 3866950224
H Total (E + F + G) 3076747352
I Overhead charge 10 on H 3076747352
j Contingency Charge 3 on H 9230242057
GRAND TOTAL 3476724508
Say Rs 3902237
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Up-gradition of electricity load from 10KW to 100 KW at CETP Bodhjungnagar Replacement of the PVC cable size single core 16 sq mm to single core 120 sqmm under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit work with TIDC
SlNO Description of work Qty Unit RateUnit Amount
25 120sqmm PVC cable 120 Mtr 110076 1320912
TOTAL 1320912
say 1320912
ABSTRACT OF COST
A Cost of Materials 1320912
B Storage Charge 2 on A 2641824
C Total (A + B) 134733024
D Erection Charge as actual 808398144
E Total (C + D) 2155728384
F Transportation Charge 5 on C 67366512
G Supervision Charge and Establishment Charge 20 on E 4311456768
H Total (E + F + G) 2654240573
I Contingency Charge 3 on H 7962721718
GRAND TOTAL 273386779
Say 27339
(Rupees twenty seven thousand three hundred thirty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 554190
ABSTRACT OF COST
A Cost of Materials 554190
B Storage Charge 2 on A 110838
C Total (A + B) 5652738
D Erection Charge 15 on C 8479107
E Transportation Charge 3 on C 166257
F TOTAL ( C+ D+E ) 66669057
G Supervision Charge and Establishment Charge 5 on F 333345285
H Total ( F + G) 7000250985
I Contingency Charge 2 on H 1400050197
J WCT 4 on Errection charge 33916428
TOTAL ESTIMATED COST OF DEPOSIT WORK 7174172433
Say 717417
(Rupees seven Lac seventeen thousand thousand four hundred seventeen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to MBS FEED amp PHARMA at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS Feed amp Pharma
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 48 2016
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 53988283
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E Transportation Charge 3 on C 1619649
F TOTAL ( C+ D+E ) 649479249
G Supervision Charge and Establishment Charge 5 on F 3247396245
H Total ( F + G) 6819532115
I Contingency Charge 2 on H 1363906423
J WCT 4 on Errection charge 330408396
TOTAL ESTIMATED COST OF DEPOSIT WORK 6988963596
Say 698896
(Rupees six Lac ninety eight thousand eight hundred ninety six )Only
WORK ESTIMATE
Name of work -
Revisied Estimate for Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNIL Aircel Tower Ltd at Ramnath Kobra para under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRCEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 9 Nos 4325 38925
2 8Mtr PCC Pole 2 Nos 3553 7106
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6838 17095
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 5485 1892325
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 5485 532045
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 40 Kgs 6732 26928
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 509 12725
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 200 Mtr 39386 78772
23 100Amps Cutout 12 Nos 1926 23112
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 222558742
say 222559
ABSTRACT OF COST
A Cost of Materials 222559
B Storage Charge 2 on A 445118
C Total (A + B) 22701018
D Erection Charge 15 on C 34051527
E Transportation Charge 3 on C 667677
F TOTAL ( C+ D+E ) 267738477
G Supervision Charge and Establishment Charge 5 on F 1338692385
H Total ( F + G) 2811254009
I Contingency Charge 2 on H 5622508017
J WCT 4 on Errection charge 136206108
TOTAL ESTIMATED COST OF DEPOSIT WORK 2881099699
Say 288110
(Rupees two Lac Eighty eight thousand thousand one hundred ten )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 9 Kgs 6838 61542
5 Weasel ACSR (61259mm) 042 Km 190276 7991592
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 10 Nos 1125 1125
9 Straps with NB ( 16x75) 10 Nos 6871 6871
TOTAL 304487976
say 304487976
ABSTRACT OF COST
A Cost of Materials 304487976
B Storage Charge 2 on A 608975952
C Total (A + B) 3105777355
D Erection Charge 15 on C 4658666033
E Transportation Charge 3 on C 9317332066
F Total (C + D+E) 3664817279
G Supervision Charge and Establishment Charge 15 on F 5497225919
H Total ( F + G ) 4214539871
i Contingency Charge 2 on H 8429079742
GRAND TOTAL 4298830668
Say 42988
( Forty two thousand nine hundred eighty eight ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA Base mounted Substation for Providing of Service connection to MS RM SAHA amp SONS at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH RM SAHA amp SONS
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 214697 214697
2 9Mtr PCC Pole ( DP=01 nos SP-01 nos ) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 04 Km 190276 761104
10 8 SWG GI Wire 20 Kgs 67321 134642
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 45 Kgs 6871 309195
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 300Amps Cutout 6 Nos 7029 42174
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 305315803
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E TOTAL ( C+ D ) 633282759
F Transportation Charge 3 on C 247806297
G TOTAL ( E+F ) 635760822
H Supervision Charge and Establishment Charge 15 on G 953641233
I Total ( G+H ) 7311249453
J Contingency Charge 2 on H 1907282466
TOTAL ESTIMATED COST OF DEPOSIT WORK 7330322277
Say 733032
(Rupees seven Lac thirty three thousand thirty two )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 065 Km 190276 1236794
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 512717456
say 51272
ABSTRACT OF COST
A Cost of Materials 51272
B Storage Charge 2 on A 102544
C Total (A + B) 5229744
D Erection Charge 15 on C 7844616
E TOTAL ( C+ D ) 60142056
F Transportation Charge 3 on C 23533848
G TOTAL ( E+F ) 6037739448
H Supervision Charge and Establishment Charge 15 on G 9056609172
I Total ( G+H ) 6943400365
J Contingency Charge 2 on H 1811321834
TOTAL ESTIMATED COST OF DEPOSIT WORK 6961513584
Say 69615
(Rupees sixty nine thousand six hundred fifteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to Pran gopal saha at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN GOPAL SAHA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 no) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 6838 10257
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 139 Kgs 5485 762415
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Double Pole Top X-Arm( 22 Mtr) 1 Nos
f) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 5485 26328
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 09 Km 190276 1712484
10 8 SWG GI Wire 25 Kgs 6732 1683
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 70 sqmm PVC insulated Al Conductor 48 Mtr 662 31776
23 16 sqmm PVC insulated Al Conductor 150 Mtr 22602 33903
24 200Amps Cutout 3 Nos 40436 121308
25 11 Kv Danger Plate 3 Nos 55 165
26 120sqmm Lugs 24 Nos 165 3960
27 Substation fancing 1 Job 14500 14500
TOTAL 202996242
say 202996
ABSTRACT OF COST
A Cost of Materials 202996
B Storage Charge 2 on A 405992
C Total (A + B) 20705592
D Erection Charge 15 on C 31058388
E TOTAL ( C+ D ) 238114308
F Transportation Charge 3 on C 93175164
G TOTAL ( E+F ) 2390460596
H Supervision Charge and Establishment Charge 15 on G 3585690895
I Total ( G+H ) 2749029686
J Contingency Charge 2 on H 7171381789
TOTAL ESTIMATED COST OF DEPOSIT WORK 2756201068
Say 275620
(Rupees two Lac seventy five thousand six hundred twenty )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNG POINT at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 18589254
say 185893
ABSTRACT OF COST
A Cost of Materials 185893
B Storage Charge 2 on A 371786
C Total (A + B) 18961086
D Erection Charge 15 on C 28441629
E Transportation Charge 3 on C 56883258
F TOTAL ( C+D+E) ) 2237408148
G Supervision Charge and Establishment Charge 15 on F 3356112222
H Total ( F+G) 257301937
I Contingency Charge 2 on H 514603874
2624479758
Say 262448
(Rupees two Lac sixty two thousand four hundred forty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25KVA Substation for Providing of new Service connection to
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 32 Nos 4325 138400
2 11 mtr long steel pole 2 Nos 1224779 2449558
3 Stay Set Complete 18 Sets 70998 1277964
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 72 Kgs 8137 585864
6 MS Channel(75x40x40x6mm4) 452 Kgs 5473 2473796
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(13 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
7 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
8 Weasel ACSR (61259mm) 38 Km 2016279 76618602
9 8 SWG GI Wire 240 Kgs 6772 162528
10 11KV Disc Insulator 62 Nos 2406 149172
11 11KV Disc Fittings 62 Nos 34958 2167396
12 11KV Pin Insulator 72 Nos 5292 381024
13 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
14 11KV GOS 2 Set 7899 15798
15 11KV LA 6 Nos 369 2214
16 11KV DOF (3 ph) 2 Set 5221 10442
17 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
18 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
19 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 48 5280
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 395903582
say 395903582
ABSTRACT OF COST
A Cost of Materials 395903582
B Storage Charge 2 on A 791807164
C Total (A + B) 4038216536
D Erection Charge 15 on C 6057324805
E Total (C + D) 4643949017
F Transportation Charge 5 on C 2019108268
G Supervision Charge and Establishment Charge 15 on E 6965923525
H Total (E + F + G) 5542452196
I Overhead charge 10 on H 5542452196
J Contingency Charge 3 on H 1662735659
GRAND TOTAL 6262970982
Say Rs 626297
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to AIRTEL TOWER at Murabari under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Bharati infratel limited
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 6 Sets 74654 447924
4 Stay Insulator(11KV) 6 Nos 20 120
5 Stay Wire (725mm) 30 Kgs 6838 20514
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 21 Km 190276 3995796
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 24845939
say 248459
ABSTRACT OF COST
A Cost of Materials 248459
B Storage Charge 2 on A 496918
C Total (A + B) 25342818
D Erection Charge 15 on C 38014227
E Transportation Charge 3 on C 76028454
F TOTAL ( C+D+E) ) 2990452524
G Supervision Charge and Establishment Charge 15 on F 4485678786
H Total ( F+G) 3439020403
I Contingency Charge 2 on H 6878040805
3507800811
Say 350780
(Rupees three Lac fifty thousand seven hundred eighty )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at Ramchandra nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with RC Nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 056 Km 190276 10655456
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 495592616
say 49559
ABSTRACT OF COST
A Cost of Materials 49559
B Storage Charge 2 on A 99118
C Total (A + B) 5055018
D Erection Charge 15 on C 7582527
E Transportation Charge 3 on C 15165054
F TOTAL ( C+D+E) ) 596492124
G Supervision Charge and Establishment Charge 15 on F 894738186
H Total ( F+G) 6859659426
I Contingency Charge 2 on H 1371931885
6996852615
Say 69969
(Rupees sixty nine thousand nine hundred sixty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 500 15000
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 135 Km 572183 77244705
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 120 Mtr 1500 180000
24 Errection oh UG cable 1350 Mtr 450 607500
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2408467087
say 2408467087
ABSTRACT OF COST
A Cost of Materials 2408467087
B Storage Charge 2 on A 4816934173
C Total (A + B) 2456636428
D Erection Charge 15 on C 3684954642
E Transportation Charge 3 on C 7369909285
F TOTAL ( C+D+E) ) 2898830985
G Supervision Charge and Establishment Charge 15 on F 4348246478
H Total ( F+G) 3333655633
I Contingency Charge 2 on H 6667311266
3400328746
Say 3400329
(Rupees thirty four Lac three hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 550000 550000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 55 Nos 500 27500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 12 Nos 12531 150372
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 3 Nos 12531 37593
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 23 Km 572183 13160209
24 4incdia GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 225 Mtr 1500 337500
24 Errection oh UG cable 2300 Mtr 450 1035000
24 HT Kiosk Box 4 Job 49500 198000
TOTAL 3774226937
say 3774226937
ABSTRACT OF COST
A Cost of Materials 3774226937
B Storage Charge 2 on A 7548453873
C Total (A + B) 3849711475
D Erection Charge 15 on C 5774567213
E Transportation Charge 3 on C 1154913443
F TOTAL ( C+D+E) ) 4542659541
G Supervision Charge and Establishment Charge 15 on F 6813989311
H Total ( F+G) 5224058472
I Contingency Charge 2 on H 1044811694
5328539641
Say
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Ramkrishna Rubber industry under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 53 Kgs 54849 2906997
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV DOF Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 538257719
say 538258
ABSTRACT OF COST
A Cost of Materials 538258
B Storage Charge 2 on A 1076516
C Total (A + B) 54902316
D Erection Charge 15 on C 82353474
E Transportation Charge 3 on C 164706948
F TOTAL ( C+D+E) ) 6478473288
G Supervision Charge and Establishment Charge 15 on F 9717709932
H Total ( F+G) 7450244281
I Contingency Charge 2 on H 1490048856
7599249167
Say 759925
(Rupees seven Lac fifty nine thousand nine hundred twenty five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Globe Enterprise under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 15 on F 9753908202
H Total ( F+G) 7477996288
I Contingency Charge 2 on H 1495599258
7627556214
Say 762756
(Rupees seven Lac sixty two thousand seven hundred )Only
WORK ESTIMATE
Name of work -
Extension of Overhead Dedicated Feeder line line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd for providing service connection toAgartala plastic private limited under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole ( Dp-03 nos Sp-10 nos) 16 Nos 1224779 19596464
2 9Mtr PCC Pole ( DP=08 nos Sp-26 nos ) 42 Nos 4325 181650
4 Stay Set Complete 42 Sets 74654 3135468
5 Stay Insulator(11KV) 42 Nos 20 840
6 Stay Wire (725mm) 210 Kgs 68387 1436127
7 ACSR (61335 87 Km 3510265 305393055
8 11 KB VCB 1 Sets 450000 450000
9 MS Channel(75x40x40x6mm4) 1190 Kgs 54849 6527031
a) 11KV GOS Base Bracket(28Mtr) 10 Nos
b 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
c Single Pole Top X-Arm(03Mtr) 36 Nos
d Single Pole Bottom X-Arm(13Mtr) 36 Nos
e Double Pole Top X-Arm( 22 Mtr) 11 Nos
f Double Pole Bottom X-Arm(25 Mtr) 11 Nos
g 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
10 MS Angle(65x65x6mm3) 994 Kgs 54849 54519906
a) SinglePole Guard X-Arm (15Mtr) 36 No
b DP Pole Guard X-Arm (25Mtr) 11 No
c DP Pole cross braket (17Mtrlong ) 44 No
d 11KV LA Bracket(28Mtr) 5 No
11 11KV Disc Insulator 156 Nos 2406 375336
12 11KV Disc Fittings 156 Nos 33766 5267496
13 11KV Pin Insulator 210 Nos 5292 111132
14 GI Pin for 11KV Pin Insulator 210 Nos 8248 173208
15 11KV GOS (3p two post) 5 Set 1006111 5030555
16 11KV DOF(3ph) 5 Set 5221 26105
17 11KV LA 15 Nos 369 5535
18 MS Nuts and Bolts of Assorted Size 340 Kgs 6871 233614
19 Bracket Clamp by (50x6mm2) MS Flat 560 Nos 60 33600
20 Stay Clamp by (50x6mm2) MS Flat 42 Nos 495 2079
21 30Mtr long 40mm dia GI Pipe ( for earthing) 9 Nos 1500 13500
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
23 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 870000 130500
25 11KV Danger plate 47 Nos 55 2585
TOTAL 1729567371
say 1729567
ABSTRACT OF COST
A Cost of Materials 1729567
B Storage Charge 2 on A 3459134
C Total (A + B) 176415834
D Erection Charge 15 on C 264623751
E Transportation Charge 3 on C 529247502
F TOTAL ( C+D+E) ) 2081706841
G Supervision Charge and Establishment Charge 10 on F 2081706841
H Total ( F+G) 2289877525
I Contingency Charge 2 on H 4579755051
J TOTAL ( H+I) 2335675076
K Service charge 5on J 1167837538
L TOTAL ( J+K) 245245883
Say 2452459
(Rupees twenty four Lac Fifty two thousand four hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN BREVARAGE INDIA ( PVT) LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
4 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
5 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
6 11KV Disc Insulator 12 Nos 2406 28872
7 11KV Disc Fittings 12 Nos 33766 405192
8 11KV Pin Insulator 9 Nos 5292 47628
9 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
10 11KV GOS 3 Set 1006111 3018333
11 11KV DOF 3 Set 5221 15663
12 11KV LA 9 Nos 369 3321
13 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
14 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
15 30Mtr long 40mm dia GI Pipe ( for Earthing) 6 Nos 1605 9630
16 11 Kv Danger post 30 Nos 500 15000
17 240sqmm Lugs 24 Nos 21528 516672
18 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
19 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
20 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 08 Km 572183 4577464
21 10 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 24 Mtr 1500 36000
22 cutting of treanch for UG cable ( Depth-11mtr wide- 05 mtr ) 800 Mtr 450 360000
23 HT Kiosk Box 2 Job 49500 99000
TOTAL 1652766437
say 1652766
ABSTRACT OF COST
A Cost of Materials 1652766
B Storage Charge 2 on A 3305532
C Total (A + B) 168582132
D Erection Charge 15 on C 252873198
E Transportation Charge 3 on C 505746396
F TOTAL ( C+D+E) ) 1989269158
G Supervision Charge and Establishment Charge 10 on F 1989269158
H Total ( F+G) 2188196073
I Contingency Charge 2 on H 4376392147
J TOTAL ( H+I) 2231959995
K Service charge 5on J 1115979997
L TOTAL ( J+K) 2343557995
Say Rs234355900
Say 2343559
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 74654 597232
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 40 Kgs 68387 273548
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 190276 285414
10 8 SWG GI Wire 55 Kgs 67321 3702655
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 60 3120
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
22 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
23 500Amps Cutout 12 Nos 9674 116088
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 8 Nos 55 440
TOTAL 1119176203
say 1119176
ABSTRACT OF COST
A Cost of Materials 1119176
B Storage Charge 2 on A 2238352
C Total (A + B) 114155952
D Erection Charge 15 on C 171233928
E Transportation Charge 3 on C 342467856
F TOTAL ( C+D+E) ) 1347040234
G Supervision Charge and Establishment Charge 15 on F 202056035
H Total ( F+G) 1549096269
I Contingency Charge 2 on H 3098192537
1580078194
Say 1580078
(Rupees fifteen Lac eighty thousand amp seventy eight )Only
WORK ESTIMATE
Name of work -
Extension of Didicated Feeder line from Rubber Park 33 KV substation to Abhisar Buildwell Pvt Ltd ( Rubber Division) amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 28 Nos 4325 121100
3 11 KB VCB 1 Sets 450000 450000
3 Stay Set Complete 14 Sets 74654 1045156
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 68387 478709
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 739 Kgs 54849 40533411
a) 11KV GOS Base Bracket(28Mtr) 6 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 6 Nos
c) 11KV DOF Bracket(28Mtr) 6 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 6 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g) Double Pole Top X-Arm( 22 Mtr) 6 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 6 Nos
8 MS Angle(65x65x6mm3) 234 Kgs 54849 12834666
a) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 6 No
9 Weasel ACSR (61259mm) 42 Km 190276 7991592
10 8 SWG GI Wire 220 Kgs 67321 1481062
11 11KV Disc Insulator 54 Nos 2406 129924
12 11KV Disc Fittings 54 Nos 33766 1823364
13 11KV Pin Insulator 30 Nos 5292 15876
14 GI Pin for 11KV Pin Insulator 30 Nos 8248 24744
15 11KV GOS 3 Set 7899 23697
16 11KV DOF 3 Set 5221 15663
17 11KV LA 9 Nos 369 3321
18 120sqmm Lugs 24 Nos 165 3960
19 240 sqmm Lugs 24 Nos 219 5256
20 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
21 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
22 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 572183 8582745
23 MS Nuts and Bolts of Assorted Size 189 Kgs 6871 1298619
24 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
25 Bracket Clamp by (50x6mm2) MS Flat 140 Nos 60 8400
26 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
27 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
28 500Amps Cutout 12 Nos 9674 116088
29 185sqmm Lugs 24 Nos 219 5256
30 Danger plate 8 Nos 55 440
TOTAL 1949334855
say 1949335
ABSTRACT OF COST
A Cost of Materials 1949335
B Storage Charge 2 on A 389867
C Total (A + B) 19883217
D Erection Charge 15 on C 298248255
E Transportation Charge 3 on C 59649651
F TOTAL ( C+D+E) ) 2346219606
G Supervision Charge and Establishment Charge 15 on F 3519329409
H Total ( F+G) 2698152547
I Contingency Charge 2 on H 5396305094
2752115598
Say 2752116
(Rupees Twenty seven Lac fifty two thousand one hundred sixteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to PRAN BREVARAGE (INDIA) PRIVATE LIMITED under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 10 on F 6502605468
H Total ( F+G) 7152866015
I Contingency Charge 2 on H 1430573203
J TOTAL ( H+I) 7295923335
K Service charge 5on J 3647961668
L TOTAL ( J+K) 7660719502
Say 766072
Say 766072
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 10 nos consumer at south shib nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with South shib nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 3 Sets 74654 223962
2 Stay Insulator(11KV) 3 Nos 20 60
3 Stay Wire (725mm) 12 Kgs 6838 82056
4 Weasel ACSR (61259mm) 08 Km 190276 1522208
5 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
6 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
7 LT shackle insulator 20 Nos 1125 225
8 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 208695256
say 20870
ABSTRACT OF COST
A Cost of Materials 20870
B Storage Charge 2 on A 4174
C Total (A + B) 212874
D Erection Charge 15 on C 319311
E Transportation Charge 3 on C 638622
F TOTAL ( C+D+E) ) 25119132
G Supervision Charge and Establishment Charge 15 on F 37678698
H Total ( F+G) 288870018
I Contingency Charge 2 on H 577740036
2946474184
Say 29465
(Rupees twenty nine thousand four hundred sixty five )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to sri Pankaj Roy Kalitilla under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with sri Pankaj roy
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 15 Nos 3553 53295
2 Stay Set Complete 9 Sets 74654 671886
3 Stay Insulator(11KV) 9 Nos 20 180
4 Stay Wire (725mm) 45 Kgs 6838 30771
5 Weasel ACSR (61259mm) 17 Km 190276 3234692
6 MS Nuts and Bolts of Assorted Size 75 Kgs 6732 5049
7 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 10428794
say 104288
ABSTRACT OF COST
A Cost of Materials 104288
B Storage Charge 2 on A 208576
C Total (A + B) 10637376
D Erection Charge 15 on C 15956064
E Transportation Charge 3 on C 31912128
F TOTAL ( C+D+E) ) 1255210368
G Supervision Charge and Establishment Charge 10 on F 1255210368
H Total ( F+G) 1380731405
I Contingency Charge 2 on H 276146281
J TOTAL ( H+I) 1408346033
K Service charge 5on J 7041730164
L TOTAL ( J+K) 1478763335
Say 147876
Say 147876
(Rupees one Lac forty seven thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x25 KVA pole mounted Substation for Providing of Service connection to ATC INDIA TOWER at RKNagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 3 Nos 4325 12975
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 08 Km 190276 1522208
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe for Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
TOTAL 15513150
say 155132
ABSTRACT OF COST
A Cost of Materials 155132
B Storage Charge 2 on A 310264
C Total (A + B) 15823464
D Erection Charge 15 on C 23735196
E Transportation Charge 3 on C 47470392
F TOTAL ( C+D+E) ) 1867168752
G Supervision Charge and Establishment Charge 10 on F 1867168752
H Total ( F+G) 2053885627
I Contingency Charge 2 on H 4107771254
J TOTAL ( H+I) 209496334
K Service charge 5on J 104748167
L TOTAL ( J+K) 2199711507
Say 219971
(Rupees two Lac nineteen thousand nine hundred seventy one )Only
Page 5: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

RUB amp LI(

Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Elecical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL
Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

Work Estimate for Line

(AS Deb Barma)Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division
WORK ESTIMATE
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- Chargeable to - DEPOSIT WORK WITH TIDC
B] COST OF MATERIALS FOR 11KV LINE EXTENSION
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) 35 Nos 1015422 3553977
2 9mtr Long PCC Pole 25 Nos 2650 66250
3 Stay Set Complete 25 Sets 47025 1175625 29390625
4 Stay Insulator(11KV) 125 Nos 1092 1365 34125
5 Stay Wire (725mm) 24 Kgs 451 10824
6 MS Channel(75x40x40x6mm4) 116 Kgs 3352 388832
a) Double Pole X-Arm(22Mtr) 3 Nos
b) Single Pole Top X-Arm(03Mtr) 6 Nos
c) Single Pole Bottom X-Arm(12Mtr) 6 Nos
7 MS Angle(65x65x6mm3) 96 Kgs 321 30816
a) Double Pole Guard X-Arm (25Mtr) 3 Nos
b) SinglePole Guard X-Arm (15Mtr) 6 Nos
8 Weasel ACSR (61259mm) 12 Km 2061233 24734796 6183699
9 8 SWG GI Wire 80 Kgs 391 3128 782
10 11KV 45KN Disc Insulator 18 Nos 49487 890766 2226915
11 Single U Bolt type Disc Fittings 18 Nos 19352 348336
12 11KV Pin Insulator 27 Nos 991 26757 668925
13 GI Pin for 11KV Pin Insulator 27 Nos 561 15147
14 MS Nuts and Bolts of Assorted Size 20 Kgs 407 814
15 Stay Clamp by (50x6mm2) MS Flat 6 Pairs 495 297
16 Bracket Clamp by (50x6mm2) MS Flat 40 Nos 27 1080
17 Barbed Wire 22 Kgs 429 9438 23595
24 AddMetering Arrangement with Kiosk 1 Nos 50000 50000
18 30Mtr long 40mm dia GI Pipe Earthing 2 Nos 1605 3210
TOTAL 543610286 1359025715
say 163391
(One Lac sixty three thousand three hundred and ninety one only)
ABSTRACT OF COST 0
A Cost of Materials 163391 0
B Storage Charge 2 on A 326782
C Total (A + B) 16665882 0
D Erection Charge 15 on C 24998823
E Total (C + D) 191657643 0
F Transportation Charge 5 on C 8332941
G Supervision Charge and Establishment Charge 15 on E 2874864645
H Total (E + F + G) 2287392305
I Contingency Charge 3 on H 6862176914 0
GRAND TOTAL 2356014074
Say Rs 235601 0
(Rupees two Lacs thirty five thousand six hundred and one)Only
0
0
0
0
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 200 KVA Substation for Providing of Service connection at Central effulent Effulent Treatment Plant ( CETP) Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 22574688 22574688
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 5 Nos 4325 21625
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Job 49500 49500
27 Danger plate 12 Nos 50 600
TOTAL 492300635
say 492300635
ABSTRACT OF COST
A Cost of Materials 492300635
C Storage Charge 2 on A 98460127
D Total (A + B) 5021466477
E Erection Charge 15 on D 7532199716
F Total (C + D) 5774686449
G Transportation Charge 5 on D 2510733239
H Supervision Charge and Establishment Charge 5 on F 2887343224
H Total ( F + G+H ) 6314494095
I Contingency Charge 3 on H 1894348228
j Addhoc 10 on H 6314494095
GRAND TOTAL 7135378327
Say Rs 713538
(Rupees seven Lac thirteen thousand five hundred thirty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection to Airtel Tower Amtali under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 7247368 7247368
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole 8 Nos 4325 34600
3 Stay Set Complete 15 Sets 58082 87123
4 Stay Insulator(11KV) 15 Nos 20 300
5 Stay Wire (725mm) 75 Kgs 5707 428025
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g) Double Pole Top X-Arm( 22 Mtr) 4 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 4 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 8 No
9 Weasel ACSR (61259mm) 6 Km 2347653 14085918
10 8 SWG GI Wire 90 Kgs 4934 44406
11 11KV Disc Insulator 36 Nos 201 7236
12 11KV Disc Fittings 36 Nos 28769 1035684
13 11KV Pin Insulator 48 Nos 4668 224064
14 GI Pin for 11KV Pin Insulator 48 Nos 561 26928
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
19 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
20 Bracket Clamp by (50x6mm2) MS Flat 120 Nos 27 3240
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 200Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 Job 49500 49500
28 Barbed Wire 20 Kgs 50 1000
TOTAL 46403016
say 464030
ABSTRACT OF COST
A Cost of Materials 464030
B Storage Charge 2 on A 92806
C Total (A + B) 4733106
D Erection Charge 15 on C 7099659
E Total (C + D) 54430719
F Transportation Charge 5 on C 2366553
G Supervision Charge and Establishment Charge 5 on E 272153595
H Total (E + F + G) 5951880795
i Over head charge 10 above ( adhoc increase) 5951880795
I Contingency Charge 3 on H 1785564239
GRAND TOTAL 6725625298
Say 672563
(Rupees Six Lac seventy two thousand five hundred sixty three)Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to NIELIT AGARTALA CENTRE for the smooth construction activities of the campus under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH NIELIT AGARTALA CENTRE
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 453582 453582
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 5 Nos 4325 21625
2 8Mtr PCC Pole 2 Nos 4325 8650
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 3977 1372065
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 3927 380919
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 2347653 28171836
10 8 SWG GI Wire 40 Kgs 4934 19736
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 18 Nos 4668 84024
14 GI Pin for 11KV Pin Insulator 18 Nos 561 10098
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 27 1620
21 30Mtr long 40mm dia GI Pipe Earthing 4 Nos 1605 6420
22 35 sqmm PVC insulated Al Conductor 200 Mtr 10495 20990
23 100Amps Cutout 12 Nos 14425 1731
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
TOTAL 203944176
say 203944
ABSTRACT OF COST
A Cost of Materials 203944
B Storage Charge 2 on A 407888
C Total (A + B) 20802288
D Erection Charge 15 on C 31203432
E Total (C + D) 239226312
F Transportation Charge 5 on C 10401144
G Supervision Charge and Establishment Charge 5 on E 119613156
H Total (E + F + G) 2615887716
i Over head charge 10 above ( adhoc increase) 2615887716
I Contingency Charge 3 on H 7847663148
GRAND TOTAL 2955953119
Say 295595
(Rupees Two Lac Ninety five thousand five hundred ninety five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to STATE BANK OF INDIA RK Nagar Industrial branch under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 72474 72474
2 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(100x50x50x6mm4) 98 Kgs 3972 389256
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 215 Kgs 3977 855055
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 3 Nos
f) Single Pole Bottom X-Arm(13Mtr) 3 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 84 Kgs 3927 329868
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 2347653 35214795
10 8 SWG GI Wire 48 Kgs 4934 236832
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 24 Nos 4668 112032
14 GI Pin for 11KV Pin Insulator 24 Nos 561 13464
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 50 Kgs 505 2525
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 72 Nos 27 1944
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1300 3900
22 120sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
23 300Amps Cutout 6 Nos 5225 3135
24 120sqmm Lugs 24 Nos 1913 45912
25 Transformer Fancing 1 Job 15000 15000
27 Danger plate 12 Nos 50 600
TOTAL 210702755
say 210702755
ABSTRACT OF COST
A Cost of Materials 210702755
C Storage Charge 2 on A 42140551
D Total (A + B) 2149168101
E Erection Charge 15 on D 3223752152
F Total (C + D) 2471543316
G Transportation Charge 5 on D 1074584051
H Supervision Charge and Establishment Charge 5 on F 1235771658
H Total ( F + G+H ) 2702578887
I Contingency Charge 3 on H 8107736661
j Addhoc 10 on H 2702578887
GRAND TOTAL 3053914142
Say Rs 305391
(Rupees three Lac five thousand three hundred ninety one )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 17-03-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 6 Nos 3553 21318
3 Stay Set Complete 4 Sets 58082 232328
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 5707 11414
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 157 Kgs 3927 616539
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 4 No
d) 4 wire LT Bkt( 11 Mtr) 2 No
8 Weasel ACSR (61259mm) 14 Km 2347653 32867142
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 6 Nos 201 1206
11 11KV Disc Fittings 6 Nos 28769 172614
12 11KV Pin Insulator 8 Nos 4668 37344
13 GI Pin for 11KV Pin Insulator 8 Nos 561 4488
14 MS Nuts and Bolts of Assorted Size 12 Kgs 505 606
15 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
16 Bracket Clamp by (50x6mm2) MS Flat 18 Nos 27 486
17 Shackle insulator 14 Nos 10495 14693
TOTAL 98654352
say 98654352
ABSTRACT OF COST
A Cost of Materials 98654
C Storage Charge 2 on A 197308
D Total (A + B) 10062708
E Erection Charge 15 on D 15094062
F Total (C + D) 115721142
G Transportation Charge 5 on D 5031354
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 120752496
I Contingency Charge 3 on H 362257488
j Addhoc 0 on H 0
GRAND TOTAL 1243750709
Say 124375
(Rupees one lac twenty four thousand three hundred seventy five )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on 16-04-2013 amp 17-04-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 11 Nos 4325 47575
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 10 Nos 3553 35530
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 6 Nos
b) Single Pole Bottom X-Arm(13Mtr) 6 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 5 Nos
d) 11KV DP bottom Bracket(25Mtr) 5 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 6 No
b) Double Pole Guard X-Arm (28Mtr) 5 No
c) 2 wire LT Bkt( 051 Mtr) 10 No
d) 4 wire LT Bkt( 11 Mtr) 7 No
8 Weasel ACSR (61259mm) 48 Km 2347653 112687344
9 8 SWG GI Wire 30 Kgs 4934 14802
10 11KV Disc Insulator 13 Nos 201 2613
11 11KV Disc Fittings 13 Nos 28769 373997
12 11KV Pin Insulator 16 Nos 4668 74688
13 GI Pin for 11KV Pin Insulator 16 Nos 561 8976
14 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
15 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
16 Bracket Clamp by (50x6mm2) MS Flat 16 Nos 27 432
17 Shackle insulator 14 Nos 10495 14693
TOTAL 230706294
say 230706294
ABSTRACT OF COST
A Cost of Materials 230706
C Storage Charge 2 on A 461412
D Total (A + B) 23532012
E Erection Charge 15 on D 35298018
F Total (C + D) 270618138
G Transportation Charge 5 on D 11766006
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 282384144
I Contingency Charge 3 on H 847152432
j Addhoc 0 on H 0
GRAND TOTAL 2908556683
Say 290856
(Rupees two Lac ninety thousand eight hundred amp fiftysix )Only
WORK ESTIMATE
Name of work -
Masintance of Damage HT LT Line for restoration of power supply under Bodhjungnagar Electrical Sub-Division Due to gale Damage occurred on03-05-2013 05-05-2013 06-05-2013 12-05-2013 amp 16-05-2013 During the year 2013-2014
Chargeable to - Revenue Expenditure
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtr ST Pole 3 Nos 1358265 4074795
1 9Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 3 Nos 4325 12975
2 8Mtr PCC Pole ( DP=01 nos SP= 1 Nos) 8 Nos 3553 28424
3 Stay Set Complete 2 Sets 58082 116164 2
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 238 Kgs 3977 946526
a) Single Pole Top X-Arm(03Mtr) 2 Nos
b) Single Pole Bottom X-Arm(13Mtr) 2 Nos
c) 11 Kv DP Top Bkt ( 22 Mtr) 1 Nos
d) 11KV DP bottom Bracket(25Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 207 Kgs 3927 812889
a) SinglePole Guard X-Arm (15Mtr) 2 No
b) Double Pole Guard X-Arm (28Mtr) 1 No
c) 2 wire LT Bkt( 051 Mtr) 6 No
d) 4 wire LT Bkt( 11 Mtr) 12 No
8 Weasel ACSR (61259mm) 09 Km 2347653 21128877
9 8 SWG GI Wire 22 Kgs 4934 108548
10 11KV Disc Insulator 3 Nos 201 603
11 11KV Disc Fittings 3 Nos 28769 86307
12 11KV Pin Insulator 6 Nos 4668 28008
13 GI Pin for 11KV Pin Insulator 6 Nos 561 3366
14 MS Nuts and Bolts of Assorted Size 18 Kgs 505 909
15 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
16 Bracket Clamp by (50x6mm2) MS Flat 8 Nos 27 216
17 Shackle insulator 12 Nos 10495 12594
TOTAL 87545997
say 87545997
ABSTRACT OF COST
A Cost of Materials 87546
C Storage Charge 2 on A 175092
D Total (A + B) 8929692
E Erection Charge 15 on D 13394538
F Total (C + D) 102691458
G Transportation Charge 5 on D 4464846
H Supervision Charge and Establishment Charge 0 on F 0
H Total ( F + G+H ) 107156304
I Contingency Charge 3 on H 321468912
j Addhoc 10 on H 0
GRAND TOTAL 1103709931
Say 110371
B) Maintance of 3 nos Damage 25 KVA TXr Rs1200000Each Rs 3600000
Total Rs14637100
(Rupees one Lac forty six thousand three hundred amp seventy one )Only
WORK ESTIMATE
Name of work -
Reviesed estimate of Upgredation of Transformer 1x 200 KVA to 1x500KVA for Providing of new Service connection to CITY STAR AGRO INDUSTRIES Private limited at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with CITY STAR AGRO INDUSTRIES Private limited
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA DT
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 52803318 52803318
2 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
3 240 sqmm PVC insulated Al Conductor 70 Mtr 10495 73465
4 400Amps Cutout 6 Nos 777 4662
5 Bimetalic Lugs( 300mm2) 8 Nos 23809 190472
TOTAL 5467614
say
ABSTRACT OF COST
A Cost of Materials 546761
B Storage Charge 2 on A 1093522
C Total (A + B) 55769622
D Erection Charge 15 on C 83654433
E Total (C + D) 641350653
F Transportation Charge 5 on C 27884811
G Supervision Charge and Establishment Charge 15 on E 9620259795
H Total (E + F + G) 765438062
I Contingency Charge 3 on H 2886077939
I Addhoc 10 on H 765438062
GRAND TOTAL 8419818681
Say 841982
B) Dismental of 200 KVA Txr amp Cutout Rs 150000
Total (A+B ) Rs 84348200
C) Less scrap value of existing 200 KVA Txr 40 on 22574700 13544800
GRAND TOTAL 70803400
(Rupees Seven Lac eight thousand thirty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at DAS PARA under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=8 nos SP= 9 Nos) 25 Nos 4325 108125
3 Stay Set Complete 18 Sets 58082 1045476
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 90 Kgs 5707 51363
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 446 Kgs 5473 2440958
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 9 Nos
f) Single Pole Bottom X-Arm(13Mtr) 9 Nos
g) Double Pole Top X-Arm( 22 Mtr) 7 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 7 Nos
8 MS Angle(65x65x6mm3) 213 Kgs 5473 1165749
a) Double pole Gurd Bkt( 25 Mtr) 7 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 9 No
9 Weasel ACSR (61259mm) 4 Km 2347653 9390612
10 8 SWG GI Wire 180 Kgs 4934 88812
11 11KV Disc Insulator 54 Nos 201 10854
12 11KV Disc Fittings 54 Nos 28769 1553526
13 11KV Pin Insulator 62 Nos 4668 289416
14 GI Pin for 11KV Pin Insulator 62 Nos 561 34782
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 505 4949
19 Stay Clamp by (50x6mm2) MS Flat 18 Pairs 495 891
20 Bracket Clamp by (50x6mm2) MS Flat 96 Nos 27 2592
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
27 Barbed Wire 20 Kgs 429 858
TOTAL 45877295
say 45877295
ABSTRACT OF COST
A Cost of Materials 45877295
B Storage Charge 2 on A 9175459
C Total (A + B) 467948409
D Erection Charge 15 on C 7019226135
E Total (C + D) 5381406704
F Transportation Charge 5 on C 2339742045
G Supervision Charge and Establishment Charge 15 on E 8072110055
H Total (E + F + G) 6422591914
I Contingency Charge 3 on H 1926777574
GRAND TOTAL 6615269671
Say Rs 6615269671
(Rupees six Lac sixty one thousand five hundred twenty seven )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at AMTALI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 14 Nos 3553 49742
3 Stay Set Complete 12 Sets 58082 696984
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 5707 34242
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 157 Kgs 5473 859261
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 38 Km 2347653 89210814
10 8 SWG GI Wire 80 Kgs 4934 39472
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 12 Nos 4668 56016
14 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 60 Kgs 505 3030
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
28 Shackle insulator 56 Nos 1396 78176
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 358760714
say 358760714
ABSTRACT OF COST
A Cost of Materials 358760714
B Storage Charge 2 on A 717521428
C Total (A + B) 3659359283
D Erection Charge 15 on C 5489038924
E Total (C + D) 4208263175
F Transportation Charge 5 on C 1829679641
G Supervision Charge and Establishment Charge 15 on E 6312394763
H Total (E + F + G) 5022470616
I Contingency Charge 3 on H 1506741185
GRAND TOTAL 5173144734
Say Rs 5173144734
(Rupees Five Lac seventeen thousand three hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to AIRTEL TOWER at RAJCHANTAI under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRTEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=3 nos SP= 6Nos) 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 58082 464656
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 48 Kgs 5707 273936
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
8 MS Angle(65x65x6mm3) Kgs 5473 0
a) Double Pole Guard X-Arm (28Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 6 No
9 Weasel ACSR (61259mm) 27 Km 2347653 63386631
10 8 SWG GI Wire 60 Kgs 4934 29604
11 11KV Disc Insulator 18 Nos 201 3618
12 11KV Disc Fittings 18 Nos 28769 517842
13 11KV Pin Insulator 36 Nos 4668 168048
14 GI Pin for 11KV Pin Insulator 36 Nos 561 20196
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 48 Kgs 505 2424
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 27 1404
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
27 Kiosk Box 1 job 49500 49500
29 Straps NampB(16x75) 56 pairs 6871 384776
27 Barbed Wire 20 Kgs 429 858
TOTAL 301010091
say 301010091
ABSTRACT OF COST
A Cost of Materials 301010091
B Storage Charge 2 on A 602020182
C Total (A + B) 3070302928
D Erection Charge 15 on C 4605454392
E Total (C + D) 3530848367
F Transportation Charge 5 on C 1535151464
G Supervision Charge and Establishment Charge 15 on E 5296272551
H Total (E + F + G) 4213990769
I Contingency Charge 3 on H 1264197231
GRAND TOTAL 4340410492
Say Rs 4340410492
(Rupees four Lac thirtyfour thousand forty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 16506241
ABSTRACT OF COST
A Cost of Materials 16506241
B Storage Charge 2 on A 33012482
C Total (A + B) 1683636582
D Erection Charge 15 on C 2525454873
E Transportation Charge 3 on C 82531205
F Total (C + D+E) 2018713274
G Supervision Charge and Establishment Charge 5 on F 1009356637
H Total ( F + G ) 2119648938
I Overhead charge 10 on H 2018713274
J Contingency Charge 3 on H 6358946814
L GRAND TOTAL 2385109734
Say Rs 238511
(Rupees three Lac seventy two thousand one hundred thirty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 70998 35499
2 Stay Insulator(11KV) 5 Nos 12 60
3 Stay Wire (725mm) 25 Kgs 8136 2034
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT composit Line for Providing of street light facilites in the rest part of BAMBOO PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 5 Sets 58082 29041
2 Stay Insulator(11KV) 5 Nos 20 100
3 Stay Wire (725mm) 25 Kgs 5707 142675
4 11 mtr long MS Angle(50x50x6mm3) ( 44Nos) 232 Kgs 3927 911064
5 06 mtr long MS Angle(50x50x6mm3) ( 44Nos) 119 Kgs 3927 467313
6 Weasel ACSR (61259mm) ( 6 wire 44 span) 135 Km 2347653 316933155
7 8 SWG GI Wire 400 Kgs 4934 19736
8 LT Straps amp Bolts 260 Nos 38 9880
9 Shackle Insulator 280 Nos 11 3080
10 MS Nuts and Bolts of Assorted Size 180 Kgs 505 9090
11 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
TOTAL 37718128
say 37718128
ABSTRACT OF COST
A Cost of Materials 37718128
B Storage Charge 2 on A 75436256
C Total (A + B) 3847249056
D Erection Charge 15 on C 5770873584
E Total (C + D) 4424336414
F Transportation Charge 5 on C 1923624528
G Supervision Charge and Establishment Charge 15 on E 6636504622
H Total (E + F + G) 5280349329
I Contingency Charge 3 on H 1584104799
GRAND TOTAL 5438759809
Say 543876
(Rupees five lac Forty three thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to the newly constructed building of college of veterinary sciences amp AH RK nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Debashish Das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 4 Nos 3553 14212
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 08 Km 2347653 18781224
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 20 Nos 1125 225
9 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 39369324
say 39369324
ABSTRACT OF COST
A Cost of Materials 39369324
B Storage Charge 2 on A 78738648
C Total (A + B) 4015671048
D Erection Charge 15 on C 6023506572
E Transportation Charge 3 on C 19684662
F Total (C + D+E) 4814868325
G Supervision Charge and Establishment Charge 5 on F 2407434163
H Total ( F + G ) 5055611741
I Overhead charge 10 on H 4814868325
J Contingency Charge 3 on H 1516683522
K WCT6 on erection charge ie on D 3614103943
L GRAND TOTAL 5724907966
Say Rs 5724907966
B) Service connection charge 1877
C) Security 900
Grand total (A+B+C) 60026
( Sixty thousand amp twenty six ) only
BILL
Name of work -
Supply Errection amp commissioning of Various capacity Sodium Vapour Lamp for lightining of 14 Goddess temple at Uttarchampura During Kharchi Puja 2013-2014
SlNO Description of work Qty Unit RateUnit Amount
A 250 wattSodium vapour Lamp
1 Ballast 25 Nos 2450 61250
2 Lamp 25 Nos 380 9500
3 capacitor 25 Nos 288 7200
4 Indicator 25 Nos 220 5500
B 70 Watt Sodium vapour lamp 0
1 Ballast 11 Nos 1125 12375
2 Lamp 11 Nos 280 3080
3 capacitor 11 Nos 288 3168
4 Indicator 11 Nos 220 2420
C 250 watt Metal
1 Ballast 5 Nos 2450 12250
2 Lamp 5 Nos 930 4650
3 capacitor 5 Nos 288 1440
4 Indicator 5 Nos 220 1100
D Stand light 18 watt 8 Nos 140 1120
E Decorating light 10 Nos 120 1200
TOTAL 126253
Vat 135 on Rs 12625300 Rs1704400
Contractor Profit 10 on Rs 12625300 Rs1262500
Grand Total Rs 15592200
( Rupees one lac fifty five thousand nine hundred twenty two) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3350 284750
II Ballast 85 Nos 1600 136000
III Lamp 85 Nos 400 34000
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 420 89250
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 599760
Contractor profit 10 on Rs 59976000 59976 59976
Grand Total 659736
( Rupees six lac fiftynine thousand seven hundred thirty six) only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 3450 293250
II Ballast 85 Nos 1570 133450
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 600 127500
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 300 7650
II Unskilled labour 1275 Nos 240 3060
TOTAL 644810
Contractor profit 10 on Rs 6448100 64481
Grand Total 709291
( Rupees seven lac nine thousand two hundred ninety one only
Quatation
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 85 Nos 4000 340000
II Ballast 85 Nos 1500 127500
III Lamp 85 Nos 410 34850
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 425 mtr 24 10200
II 2x40 Sqmm 425 mtr 34 14450
3 MS clamp 170 Nos 80 13600
4 Nuts amp Bolts 340 Nos 20 6800
5 GI pipe ( 65 mm dia) (25 M long) 2125 mtr 540 114750
^6 Labour charge 0 mtr 0 0
I Skilled labour 255 Nos 400 10200
II Unskilled labour 1275 Nos 300 3825
TOTAL 676175
Contractor profit 10 on Rs 6761750 67617
Grand Total 743792
( Rupees seven lac fortythree thousand seven hundred ninety two ) only
WORK ESTIMATE
Name of work -
Extension of 11 KV Dedicated Feeder line from Bodhjungnagar 132 KV Substation to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED for Providing of Service connection to CITY STAR AGRO INDUSTRIES PRIVATE LIMITED at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH CITY STAR AGRO INDUSTRIES PRIVATE LIMITED
A] COST OF MATERIALS -
SlNO Description of work Qty Unit RateUnit Amount
1 11 Mtrlong ST Pole 2 Nos 1358265 271653
2 120 sq mm XLPE cable 015 Km 572183 8582745
3 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
4 MS Channel(75x40x40x6mm4) 245 Kgs 5473 1340885
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Top Bracket(28Mtr) 3 Nos
5 MS Angle(65x65x6mm3) 33 Kgs 5473 180609
c) 11KV LA Bracket(28Mtr) 2 No
6 Weasel ACSR (61259mm) 015 Km 2347653 35214795
7 11KV Disc Insulator 15 Nos 201 3015
8 11KV Disc Fittings 15 Nos 28769 431535
9 11KV Pin Insulator 12 Nos 4668 56016
10 GI Pin for 11KV Pin Insulator 12 Nos 561 6732
11 11KV GOS 2 Set 806288 1612576
12 11KV DOF 2 Set 373613 747226
13 11KV LA 6 Nos 369 2214
14 MS Nuts and Bolts of Assorted Size 15 Kgs 505 7575
15 Bracket Clamp by (50x6mm2) MS Flat 24 Nos 27 648
16 Jointing Kit ( indoor type) 2 Nos 9000 18000
17 Jointing Kit ( outdoor type) 2 Nos 12000 24000
18 11 KV Vacum circuit Breaker control amp relay panel simplex type 400 A continous current 250 MVA rupturring capacity complete with electrical closing mechanism with internal wiring 2 overcurrent amp 1 earth fault combine relay auxilury relays 3 ammeter 1- voltmeter CT operated static trivactor meter 1 CT operated static KWH meter of CTR 1001-1A with integral earthing facility and internal arc tested for out going feeders 1 Nos 404000 404000
TOTAL 5913802595
say 5913802595
ABSTRACT OF COST
A Cost of Materials 5913802595
B Storage Charge 2 on A 1182760519
C Total (A + B) 6032078647
D Erection Charge 15 on C 904811797
E Total (C + D) 6936890444
F Transportation Charge 5 on C 3016039323
G Supervision Charge and Establishment Charge 15 on E 1040533567
H Total (E + F + G) 8279027943
I Contingency Charge 3 on H 2483708383
GRAND TOTAL 8527398781
Say Rs 8527398781
(Rupees Eight Lac fifty two thousand seven hundred seventy forty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 25 KVA Substation for Providing of Service connectionin the PIG shed under under RKVY at RK Nagar catal farm under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH BDO JIRINIA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 11 Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 4 Nos 1358265 543306
2 8Mtr PCC Pole 10 Nos 3553 35530
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5473 749801
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 119 Kgs 5473 651287
a) 11 mtr long LT Bkt 12 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 31 Km 2016279 62504649
10 8 SWG GI Wire 60 Kgs 6772 40632
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10911 600105
23 100Amps Cutout 6 Nos 21906 131436
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 162 3888
26 Substation fancing 1 Job 14500 14500
27 Shackle insulator 52 Nos 1396 72592
28 Straps NampB(16x75) 52 pairs 4586 238472
29 Barbed Wire 20 Kgs 429 858
TOTAL 304414759
say 304414759
ABSTRACT OF COST
A Cost of Materials 304414759
B Storage Charge 2 on A 608829518
C Total (A + B) 3105030542
D Erection Charge 15 on C 4657545813
E Total (C + D) 3570785123
F Transportation Charge 5 on C 1552515271
G Supervision Charge and Establishment Charge 15 on E 5356177685
H Total (E + F + G) 4261654419
I Contingency Charge 3 on H 1278496326
GRAND TOTAL 4389504051
Say Rs 4389504051
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300 0
2 9 Mtr PCC Pole 6 Nos 4325 25950
3 Stay Set Complete 8 Sets 70998 567984
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 50 Kgs 8137 40685
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 15 Km 2016279 30244185
10 8 SWG GI Wire 50 Kgs 6772 3386
11 11KV Disc Insulator 24 Nos 2406 57744
12 11KV Disc Fittings 24 Nos 34958 838992
13 11KV Pin Insulator 27 Nos 5292 142884
14 GI Pin for 11KV Pin Insulator 27 Nos 8248 222696
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 27 1836
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 120 Mtr 19295 23154
23 300Amps Cutout 6 Nos 5225 3135
24 11 Kv Danger Plate 12 Nos 55 660
25 240 sqmm Lugs 24 Nos 215 5160
26 Kiosk Box 1 Job 49500 49500
TOTAL 671383525
say 671383525
ABSTRACT OF COST
A Cost of Materials 671383525
B Storage Charge 2 on A 134276705
C Total (A + B) 6848111955
D Erection Charge 15 on C 1027216793
E Total (C + D) 7875328748
F Transportation Charge 5 on C 3424055978
G Supervision Charge and Establishment Charge 15 on E 1181299312
H Total (E + F + G) 9399033658
I Overhead charge 10 on H 9399033658
J Contingency Charge 3 on H 2819710097
GRAND TOTAL 1062090803
Say Rs 1062091
(Rupees ten Lac sixty two thousand ninety one )Only
WORK ESTIMATE
Name of work -
Extension of HTLT Line amp Construction of 500 KVA Substation for Providing of Service connection to Ms Sova enterprise RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Ratan debnath
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9 Mtr PCC Pole 5 Nos 4325 21625
3 Stay Set Complete 3 Sets 70998 212994
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 8137 122055
6 MS Channel(100x50x50x6mm4) 0 Kgs 5473 0
7 MS Channel(75x40x40x6mm4) 152 Kgs 5473 831896
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
g DP Pole Guard X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 66 Kgs 5473 361218
a) Single Pole Bottom X-Arm(15Mtr) 2 Nos
b) DP Pole Top X-Arm(25 Mtr) 1 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
d) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2016279 16130232
10 8 SWG GI Wire 35 Kgs 6772 23702
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 34958 419496
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 35 Kgs 6871 240485
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 240 sqmm PVC insulated Al Conductor 30 Mtr 19295 57885
23 300Amps Cutout 3 Nos 5225 15675
24 11 Kv Danger Plate 6 Nos 55 330
25 240 sqmm Lugs 12 Nos 215 2580
26 Kiosk Box 1 Job 49500 49500
TOTAL 616537572
say 616537572
ABSTRACT OF COST
A Cost of Materials 616537572
B Storage Charge 2 on A 1233075144
C Total (A + B) 6288683234
D Erection Charge 15 on C 9433024852
E Total (C + D) 723198572
F Transportation Charge 5 on C 3144341617
G Supervision Charge and Establishment Charge 15 on E 1084797858
H Total (E + F + G) 8631217739
I Overhead charge 10 on H 8631217739
j Contingency Charge 3 on H 2589365322
GRAND TOTAL 8890154271
Say Rs 8890154271
(Rupees four Lac thirty eight thousand nine hundred fifty )Only
WORK ESTIMATE
Name of work - Extension of LT line for providing Street light connerction at DUKLI INDUSTRIAL GROWTH CENTRE ( TIDC)
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 20 Nos 3553 71060
3 Stay Set Complete 14 Sets 850 11900
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 70 4900
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos fo C Bkt) 72 Kgs 70 5040
7 Bracket Clamp by (50x6mm2) MS Flat 14 Nos 48 672
8 Weasel ACSR (61259mm) ( 6 wire 44 span) 3 Km 2347653 7042959
9 8 SWG GI Wire 80 Kgs 75 6000
10 LT Straps amp Bolts 50 Nos 38 1900
11 Shackle Insulator 150 Nos 11 1650
12 MS Nuts and Bolts of Assorted Size 320 Kgs 75 24000
13 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
14 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
15 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
16 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
17 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
18 MS clamp 200 Nos 80 16000
19 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
20 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 2500 7500
22 35 sqmm PVC insulated Al Conductor 55 Mtr 58 3190
23 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
TOTAL 62557759
say 62557759
ABSTRACT OF COST
A Cost of Materials 62557759
B Storage Charge 2 on A 125115518
C Total (A + B) 6380891418
D Erection Charge 15 on C 9571337127
E Total (C + D) 7338025131
F Transportation Charge 5 on C 3190445709
G Supervision Charge and Establishment Charge 15 on E 110070377
H Total (E + F + G) 8757773471
I Contingency Charge 3 on H 2627332041
GRAND TOTAL 9020506675
Say 902051
( Rupees nine lac two thousand amp fifty one ) only
WORK ESTIMATE
Name of work -
Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
SlNO Description of work Qty Unit RateUnit Amount
1 Supplying and fixing of streetlight of 150Watt HPSV lamp with necessary Ballast Capacitor ignatorholderlamp etc ic connection as required
I Bracket 50 Nos 4000 200000
II Ballast 50 Nos 1500 75000
III Lamp 50 Nos 410 20500
2 Wiring for circuitsubmain wiring with the followingsizes PVC insulated copper conductor cable in PVC 0
I 2x25 Sqmm 210 mtr 24 5040
II 2x40 Sqmm 210 mtr 34 7140
3 MS clamp 200 Nos 80 16000
4 Nuts amp Bolts 200 Nos 20 4000
5 GI pipe ( 65 mm dia) (25 M long) 105 mtr 540 56700
^6 Labour charge 0 mtr 0 0
I Skilled labour 13 Nos 400 5200
II Unskilled labour 7 Nos 300 2100
TOTAL 391680
ABSTRACT OF COST
A Cost of Materials 391680
B Storage Charge 2 on A 78336
C Total (A + B) 3995136
D Erection Charge 15 on C 5992704
E Total (C + D) 45944064
F Transportation Charge 5 on C 1997568
G Supervision Charge and Establishment Charge 15 on E 68916096
H Total (E + F + G) 548332416
I Contingency Charge 3 on H 1644997248
GRAND TOTAL 5647823885
Say 551084
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
9 Weasel ACSR (61259mm) 08 Km 2347653 18781224
10 8 SWG GI Wire 25 Kgs 4934 12335
11 11KV Disc Insulator 12 Nos 201 2412
12 11KV Disc Fittings 12 Nos 28769 345228
13 11KV Pin Insulator 9 Nos 4668 42012
14 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
15 11KV GOS 1 Set 806288 806288
16 11KV DOF 1 Set 373613 373613
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 100Amps Cutout 6 Nos 14425 8655
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 19129 459096
26 Substation fancing 1 Job 14500 14500
28 Shackle insulator 8 Nos 1396 11168
29 Straps NampB(16x75) 8 pairs 6871 54968
27 Barbed Wire 15 Kgs 429 6435
TOTAL 159200654
say 159200654
ABSTRACT OF COST
A Cost of Materials 159200654
B Storage Charge 2 on A 318401308
C Total (A + B) 1623846671
D Erection Charge 15 on C 2435770006
E Total (C + D) 1867423671
F Transportation Charge 5 on C 8119233354
G Supervision Charge and Establishment Charge 15 on E 2801135507
H Total (E + F + G) 2228729556
I Contingency Charge 3 on H 6686188667
GRAND TOTAL 2295591442
Say Rs 2295591442
(Rupees Two Lac Twenty nine thousand five hundred fiftynine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to FOOD TESTING LABORATORY at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 4 Sets 58082 232328
3 Stay Insulator(11KV) 4 Nos 20 80
4 Stay Wire (725mm) 16 Kgs 5707 91312
5 Weasel ACSR (61259mm) 1 Km 2347653 2347653
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 24 Nos 1125 270
9 Straps with NB ( 16x75) 24 Nos 6871 164904
TOTAL 4793747
say 4793747
ABSTRACT OF COST
A Cost of Materials 4793747
B Storage Charge 2 on A 9587494
C Total (A + B) 488962194
D Erection Charge 15 on C 733443291
E Transportation Charge 3 on C 23968735
F Total (C + D+E) 5862752581
G Supervision Charge and Establishment Charge 5 on F 2931376291
H Total ( F + G ) 615589021
I Overhead charge 10 on H 5862752581
J Contingency Charge 3 on H 1846767063
K WCT6 on erection charge ie on D 4400659746
L GRAND TOTAL 6970848772
Say Rs 6970848772
( Sixty nine thousand seven hundred eight ) only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to LALIT FLOUR MILL at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with LALIT FLOUR MILL
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 2 Nos 20 40
4 Stay Wire (725mm) 35 Kgs 5707 199745
5 Weasel ACSR (61259mm) 02 Km 2347653 4695306
6 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
7 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
8 LT shackle insulator 6 Nos 1125 675
6 2 mtr long MS Angle(50x50x6mm3) ( 6Nos ) 0 Kgs 70 0
9 Straps with NB ( 16x75) 6 Nos 6871 41226
TOTAL 16260836
say 16260836
ABSTRACT OF COST
A Cost of Materials 16260836
B Storage Charge 2 on A 32521672
C Total (A + B) 1658605272
D Erection Charge 15 on C 2487907908
E Transportation Charge 3 on C 8130418
F Total (C + D+E) 1988700243
G Supervision Charge and Establishment Charge 5 on F 9943501214
H Total ( F + G ) 2088135255
I Overhead charge 10 on H
J Contingency Charge 3 on H 6264405765
K WCT6 on erection charge ie on D 1492744745
L GRAND TOTAL 216570676
Say Rs 216570676
( Sixty thousand four hundred ) only
WORK ESTIMATE
Name of work -
Extension of HT Line for Providing of Service connection to Ramkrishna Rubber industry at RUBBER PARK under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) 448 Kgs 5473 2451904
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 1 Set 7899 7899
14 11KV DOF 1 Set 5221 5221
15 11KV LA 3 Nos 369 1107
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 27 2970
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 357488314
say 357488314
ABSTRACT OF COST
A Cost of Materials 357488314
B Storage Charge 2 on A 714976628
C Total (A + B) 3646380803
D Erection Charge 15 on C 5469571204
E Total (C + D) 4193337923
F Transportation Charge 5 on C 1823190401
G Supervision Charge and Establishment Charge 15 on E 6290006885
H Total (E + F + G) 5004657652
I Overhead charge 10 on H 5004657652
J Contingency Charge 3 on H 1501397296
GRAND TOTAL 5655263147
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 2 Nos 4325 8650
2 ACSR (61259 04 Km 2016279 8065116
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 3 Nos 201 603
9 11KV Disc Fittings 3 Nos 28769 86307
10 11KV Pin Insulator 3 Nos 4668 14004
11 GI Pin for 11KV Pin Insulator 3 Nos 561 1683
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 10 Kgs 505 505
16 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
17 Bracket Clamp by (50x6mm2) MS Flat 32 Nos 27 864
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 4 Nos 12531 50124
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 80 Mtr 2200 176000
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 50 Mtr 1500 75000
24 Kiosk Box 1 Job 49500 49500
TOTAL 423354736
say 423355
ABSTRACT OF COST
A Cost of Materials 423355
B Storage Charge 2 on A 84671
C Total (A + B) 4318221
D Erection Charge 15 on C 64773315
E Total (C + D) 496595415
F Transportation Charge 5 on C 21591105
G Supervision Charge and Establishment Charge 15 on E 7448931225
H Total (E + F + G) 5926758323
I Overhead charge 10 on H 5926758323
j Contingency Charge 3 on H 1778027497
GRAND TOTAL 6697236904
Say Rs 669724
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Base monted Substation for Providing of new Service connection to Ramkrishna Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 58082 29041
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 5707 142675
6 MS Channel(75x40x40x6mm4) 224 Kgs 3977 890848
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 3927 66759
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 201 1206
9 11KV Disc Fittings 6 Nos 28769 172614
10 11KV Pin Insulator 9 Nos 4668 42012
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 806288 806288
13 11KV DOF 1 Set 373613 373613
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 505 12625
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 27 1296
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 60 Mtr 19295 11577
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 152447
say 152447
ABSTRACT OF COST
A Cost of Materials 152447
B Storage Charge 2 on A 304894
C Total (A + B) 15549594
D Erection Charge 15 on C 23324391
E Total (C + D) 178820331
F Transportation Charge 5 on C 7774797
G Supervision Charge and Establishment Charge 15 on E 2682304965
H Total (E + F + G) 2134181777
I Overhead charge 10 on H 2134181777
j Contingency Charge 3 on H 640254533
GRAND TOTAL 2411625407
Say 241163
(Rupees two Lac forty one thousand one hundred sixty three )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 500 KVA Substation for Providing of Service connection to MBS FEED amp PHARMA PVT LTDat TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS FEED amp PHARMA PVT LTDat TIDC
A] COST OF MATERIALS FOR INSTALLATION OF ONE 500 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 469300 469300
2 9Mtr PCC Pole ( DP=1 nos SP= 1Nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 58082 116164
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 5707 5707
6 MS Channel(75x40x40x6mm4) 124 Kgs 5473 678652
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
7 MS Angle(65x65x6mm3) 32 Kgs 5473 175136
a) 11 mtr long LT Bkt 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 1 No
8 Weasel ACSR (61259mm) 05 Km 2347653 11738265
9 8 SWG GI Wire 20 Kgs 4934 9868
10 11KV Disc Insulator 9 Nos 201 1809
11 11KV Disc Fittings 9 Nos 28769 258921
12 11KV Pin Insulator 9 Nos 4668 42012
13 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
14 11KV GOS 1 Set 806288 806288
15 11KV DOF 1 Set 373613 373613
16 11KV LA 3 Nos 369 1107
17 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
18 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
19 Bracket Clamp by (50x6mm2) MS Flat 38 Nos 48 1824
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
22 500Amps Cutout 6 Nos 9674 58044
23 11 Kv Danger Plate 6 Nos 55 330
24 240 sqmm Lugs 24 Nos 215 5160
25 Transformer Base 1 Job 89500 89500
26 Kiosk Box 1 Nos 49500 49500
27 Barbed Wire 15 Kgs 429 6435
TOTAL 684227175
say 684227175
ABSTRACT OF COST
A Cost of Materials 684227175
B Storage Charge 2 on A 136845435
C Total (A + B) 6979117185
D Erection Charge 15 on C 1046867578
E Total (C + D) 8025984763
F Transportation Charge 5 on C 3489558593
G Supervision Charge and Establishment Charge 15 on E 1203897714
H Total (E + F + G) 9578838336
I Contingency Charge 3 on H 2873651501
GRAND TOTAL 9866203487
Say Rs 9866203487
(Rupees Nine Lac Eighty six thousand Six hundred Twenty )Only
WORK ESTIMATE
Name of work -
Extension of LT Line for providing of SC to Soma Paul at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with Soma paul
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel Pole 2 Nos 1358265 271653
2 8Mtr PCC Pole 1 Nos 3553 3553
3 Stay Set Complete 3 Sets 58082 174246
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 5707 85605
6 Weasel ACSR (61259mm) 32 Km 2347653 75124896
7 8 SWG Gi wire 50 Kgs 65 3250
7 MS Nuts and Bolts of Assorted Size 30 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
9 LT shackle insulator 56 Nos 1125 630
10 2 mtr long MS Angle(50x50x6mm3) (16Nos ) 144 Kgs 70 10080
11 Straps with NB ( 16x75) 56 Nos 6871 384776
TOTAL 100758166
say 100758166
ABSTRACT OF COST
A Cost of Materials 100758166
B Storage Charge 2 on A 201516332
C Total (A + B) 1027733293
D Erection Charge 15 on C 154159994
E Transportation Charge 3 on C 50379083
F Total (C + D+E) 123227237
G Supervision Charge and Establishment Charge 5 on F 6161361851
H Total ( F + G ) 1293885989
I Overhead charge 10 on H 123227237
J Contingency Charge 3 on H 3881657966
K WCT6 on erection charge ie on D 9249599639
L GRAND TOTAL 1465179405
Say Rs 1465179405
( Rupees one lac forty six thousand five hundred eighteen ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x63 KVA Substation for Providing of Street light connection at Growth centre At Bodhjungnagar Growth centre under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 2 Nos 1032833 1032833
2 9Mtr PCC Pole 11 Nos 4325 47575
2 8Mtr PCC Pole 6 Nos 3553 21318
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 5 Nos
f) Single Pole Bottom X-Arm(13Mtr) 5 Nos
g DP Pole top X-Arm(17 Mtr) 2 Nos
h DP Pole Bottom X-Arm(22 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 2 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 42 Nos 2406 101052
12 11KV Disc Fittings 42 Nos 34958 1468236
13 11KV Pin Insulator 36 Nos 5293 190548
14 GI Pin for 11KV Pin Insulator 36 Nos 8243 296748
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 86 Nos 56 4816
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 110 Mtr 10495 115445
23 200Amps Cutout 12 Nos 27885 33462
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 48 Nos 1913 91824
26 LT shackle insulator 56 Nos 1125 630
27 Straps with NB 56 Nos 3683 206248
29 Kiosk Box 2 Job 49500 99000
30 Barber wire 20 Kgs 60 1200
TOTAL 53350719
say 53350719
ABSTRACT OF COST
A Cost of Materials 53350719
B Storage Charge 2 on A 106701438
C Total (A + B) 5441773338
D Erection Charge 15 on C 8162660007
E Transportation Charge 3 on C 266753595
F Total (C + D+E) 6524792934
G Supervision Charge and Establishment Charge 15 on F 9787189401
H Total ( F + G ) 7503511874
I Overhead charge 10 on H 6524792934
J Contingency Charge 3 on H 2251053562
K WCT6 on erection charge ie on D 4897596004
L GRAND TOTAL 8430072483
Say Rs 843007
(Rupees Eight Lac Forty three thousand amp seven )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x63 KVA Substation for Providing Service connection DWS Pump at Newly constructed Vetenairy college at RK Nagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work DWS DIVISION-II Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 1032833 1032833
2 9Mtr PCC Pole 4 Nos 4325 17300
2 8Mtr PCC Pole 12 Nos 3553 42636
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g DP Pole top X-Arm(17 Mtr) 1 Nos
h DP Pole Bottom X-Arm(22 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 1 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 45 Km 2016279 90732555
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 34958 629244
13 11KV Pin Insulator 15 Nos 5293 79395
14 GI Pin for 11KV Pin Insulator 15 Nos 8243 123645
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 98 Kgs 6871 673358
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 88 Nos 1125 990
27 Straps with NB 88 Nos 3683 324104
30 Barber wire 10 Kgs 60 600
TOTAL 37085161
say 37085161
ABSTRACT OF COST
A Cost of Materials 37085161
B Storage Charge 2 on A 74170322
C Total (A + B) 3782686422
D Erection Charge 15 on C 5674029633
E Transportation Charge 3 on C 185425805
F Total (C + D+E) 453551519
G Supervision Charge and Establishment Charge 15 on F 6803272785
H Total ( F + G ) 5215842469
I Overhead charge 10 on H 453551519
J Contingency Charge 3 on H 1564752741
K WCT6 on erection charge ie on D 340441778
L GRAND TOTAL 585991344
Say Rs 585991
(Rupees five Lac Eighty five thousand Nine hundred ninety one )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT 15 km LT Line amp Construction of 2x 25 KVA Substation for providing of Service connection to Unhabited electrified area at Das para amp sarat pally under R K Nagar Grampanchyat under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO Jirinia RD Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 2 Nos 55146 110292
2 9Mtr PCC Pole 16 Nos 4325 69200
2 8Mtr PCC Pole 24 Nos 3553 85272
3 Stay Set Complete 12 Sets 70998 851976
4 Stay Insulator(11KV) 12 Nos 20 240
5 Stay Wire (725mm) 60 Kgs 8136 48816
6 MS Channel(100x50x50x6mm4) 184 Kgs 5473 1007032
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 429 Kgs 5473 2347917
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 8 Nos
f) Single Pole Bottom X-Arm(13Mtr) 8 Nos
g DP Pole top X-Arm(17 Mtr) 4 Nos
h DP Pole Bottom X-Arm(22 Mtr) 4 Nos
8 MS Angle(65x65x6mm3) 237 Kgs 5473 1297101
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) SinglePole Guard X-Arm (15Mtr) 8 No
c) DP Pole Guard X-Arm (25Mtr) 4 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 84 Km 2016279 169367436
10 8 SWG GI Wire 128 Kgs 6773 866944
11 11KV Disc Insulator 52 Nos 2406 125112
12 11KV Disc Fittings 52 Nos 34958 1817816
13 11KV Pin Insulator 48 Nos 5293 254064
14 GI Pin for 11KV Pin Insulator 48 Nos 8243 395664
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 176 Kgs 6871 1209296
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 56 Nos 56 3136
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 6 Nos 27885 16731
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 96 Nos 1125 1080
27 Straps with NB 96 Nos 3683 353568
30 Barber wire 10 Kgs 60 600
TOTAL 61196857
say 61196857
ABSTRACT OF COST
A Cost of Materials 61196857
B Storage Charge 2 on A 122393714
C Total (A + B) 6242079414
D Erection Charge 15 on C 9363119121
E Transportation Charge 3 on C 305984285
F Total (C + D+E) 7484375611
G Supervision Charge and Establishment Charge 15 on F 1122656342
H Total ( F + G ) 8607031953
I Overhead charge 10 on H 7484375611
J Contingency Charge 3 on H 2582109586
K WCT6 on erection charge ie on D 5617871473
L GRAND TOTAL 9669859187
Say Rs 966986
(Rupees Nine Lac sixty six nine hundred eighty six )Only
WORK ESTIMATE
Name of work -
Extension of 08 km HT amp 15 KM LT Line amp Construction of 1x 25 KVA Substation for Providing Service connection Un-electrified Habitation at sen para Muslim para Muslim Basti under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work BDO Jirinia R D Block
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 55146 55146
2 9Mtr PCC Pole 12 Nos 4325 51900
2 8Mtr PCC Pole 25 Nos 3553 88825
3 Stay Set Complete 30 Sets 70998 212994
4 Stay Insulator(11KV) 30 Nos 20 600
5 Stay Wire (725mm) 150 Kgs 8136 12204
6 MS Channel(100x50x50x6mm4) 92 Kgs 5473 503516
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 4 Nos
c) Transformer Base Support Bracket(08Mtr) 4 Nos
7 MS Channel(75x40x40x6mm4) 338 Kgs 5473 1849874
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g DP Pole top X-Arm(17 Mtr) 3 Nos
h DP Pole Bottom X-Arm(22 Mtr) 3 Nos
8 MS Angle(65x65x6mm3) 223 Kgs 5473 1220479
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 1 No
c) SinglePole Guard X-Arm (15Mtr) 1 No
c) DP Pole Guard X-Arm (25Mtr) 2 No
d) 11 mtr long 4 wire bkt 12 No
9 Weasel ACSR (61259mm) 72 Km 2016279 145172088
10 8 SWG GI Wire 150 Kgs 6773 101595
11 11KV Disc Insulator 48 Nos 2406 115488
12 11KV Disc Fittings 48 Nos 34958 1677984
13 11KV Pin Insulator 52 Nos 5293 275236
14 GI Pin for 11KV Pin Insulator 52 Nos 8243 428636
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 160 Kgs 6871 109936
19 Stay Clamp by (50x6mm2) MS Flat 30 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 88 Nos 56 4928
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 10495 577225
23 200Amps Cutout 3 Nos 27885 83655
24 11 Kv Danger Plate 12 Nos 55 660
25 120sqmm Lugs 24 Nos 1913 45912
26 LT shackle insulator 120 Nos 1125 1350
27 Straps with NB 120 Nos 3683 44196
30 Barber wire 30 Kgs 60 1800
TOTAL 51229024
say 51229024
ABSTRACT OF COST
A Cost of Materials 51229024
B Storage Charge 2 on A 102458048
C Total (A + B) 5225360448
D Erection Charge 15 on C 7838040672
E Transportation Charge 3 on C 25614512
F Total (C + D+E) 6265309635
G Supervision Charge and Establishment Charge 15 on F 9397964453
H Total ( F + G ) 720510608
I Overhead charge 10 on H 6265309635
J Contingency Charge 3 on H 2161531824
L GRAND TOTAL 8047790226
Say 804779
(Rupees Eight Lac four thousand seven hundred seventy nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA amp 1x100 KVA Substation for Providing of Service connection 108 nos family at Newly constructed Horizon colony at sen para under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK with BDO OlD AGARTALA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 219100 219100
2 100 KVA 110433KV Distribution Transformer 1 Nos 129478 129478
3 9Mtr PCC Pole ( DP=04 nos SP= 6 Nos) 14 Nos 4325 60550
4 8Mtr PCC Pole 85 Nos 3553 302005
5 Stay Set Complete 90 Sets 70998 638982
6 Stay Insulator(11KV) 90 Nos 20 1800
7 Stay Wire (725mm) 450 Kgs 81369 3661605
8 MS Channel(100x50x50x6mm4) 234 Kgs 5473 1280682
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
9 MS Channel(75x40x40x6mm4) 317 Kgs 5473 1734941
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 6 Nos
f) Single Pole Bottom X-Arm(13Mtr) 6 Nos
e) 11 Kv DP Top Bkt ( 22 Mtr) 2 Nos
f) 11KV DP bottom Bracket(25Mtr) 2 Nos
10 MS Angle(65x65x6mm3) 858 Kgs 5473 4695834
b) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
d) Double Pole Guard X-Arm (28Mtr) 2 No
d) 15 mtr long 4 wire LT Bkt 85 No
11 Weasel ACSR (61259mm) 18 Km 2016279 36293022
12 8 SWG GI Wire 520 Kgs 6772 352144
13 11KV Disc Insulator 48 Nos 2406 115488
14 11KV Disc Fittings 48 Nos 34958 1677984
15 11KV Pin Insulator 64 Nos 8248 527872
16 GI Pin for 11KV Pin Insulator 64 Nos 561 35904
17 11KV GOS 3 Set 7899 23697
18 11KV DOF 3 Set 5221 15663
19 11KV LA 9 Nos 369 3321
20 MS Nuts and Bolts of Assorted Size 520 Kgs 6871 357292
21 Stay Clamp by (50x6mm2) MS Flat 90 Pairs 495 4455
22 Bracket Clamp by (50x6mm2) MS Flat 210 Nos 48 10080
23 30Mtr long 40mm dia GI Pipe Earthing 9 Nos 1300 11700
24 120sqmm PVC insulated Al Conductor 250 Mtr 10911 272775
25 240 sqmm PVC insulated Al Conductor 200 Mtr 19295 38590
26 300Amps Cutout 12 Nos 5225 6270
27 200Amps Cutout 9 Nos 41699 375291
28 120sqmm Lugs 48 Nos 162 7776
29 240sqmm Lugs 48 Nos 238 11424
30 Transformer Base 1 Job 89500 89500
31 LT shackle insulator 360 Nos 1125 4050
32 Straps with NB 360 Nos 3683 132588
33 Danger plate 92 Nos 50 4600
TOTAL 163704861
say 163704861
ABSTRACT OF COST
A Cost of Materials 163704861
C Storage Charge 2 on A 327409722
D Total (A + B) 1669789582
E Erection Charge 15 on D 2504684373
F Total (C + D) 192025802
G Transportation Charge 5 on D 8348947911
H Supervision Charge and Establishment Charge 5 on F 9601290098
H Total ( F + G+H ) 20997604
I Contingency Charge 3 on H 6299281199
j Addhoc 10 on H 20997604
GRAND TOTAL 2372729252
Say Rs 2372729
(Rupees Twenty three Lac seventy two thousand seven hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing street light connection at Nayaniamura amp Nandanagar under AGMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AGMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 2 Nos 3553 7106
2 Stay Set Complete 1 Sets 70998 70998
3 Stay Insulator(11KV) 1 Nos 12 12
4 Stay Wire (725mm) 5 Kgs 8136 4068
5 Weasel ACSR (61259mm) 7 Km 2016279 14113953
7 MS Nuts and Bolts of Assorted Size 70 Kgs 505 3535
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 210 Nos 1396 29316
13 Straps with NB ( Prs) 200 Prs 4586 9172
TOTAL 16506241
say 165062
ABSTRACT OF COST
A Cost of Materials 165062
C Storage Charge 2 on A 330124
D Total (A + B) 16836324
E Erection Charge 15 on D 25254486
F Total (C + D) 193617726
G Transportation Charge 5 on D 8418162
H Supervision Charge and Establishment Charge 5 on F 96808863
H Total ( F + G+H ) 2117167743
I Contingency Charge 3 on H 6351503229
j Addhoc 10 on H 2117167743
GRAND TOTAL 239240
Say Rs 239240
(Rupees Two LacThirtynine thousand two hundred forty )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 1000 KVA Base monted Substation for Providing of new Service connection to MALAYA Rubber Industry at TIGC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MALAYA RUB-TECH INDUSTRIES
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
1 9Mtr PCC Pole ( DP=01 nos ) 5 Nos 4325 21625
2 ACSR (61259 1 Km 2016279 2016279
3 Stay Set Complete 5 Sets 70998 35499
4 Stay Insulator(11KV) 5 Nos 12 60
5 Stay Wire (725mm) 25 Kgs 8136 2034
6 MS Channel(75x40x40x6mm4) 224 Kgs 5473 1225952
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 17 Kgs 5473 93041
a) 11KV LA Bracket(28Mtr) 1 No
8 11KV Disc Insulator 6 Nos 2406 14436
9 11KV Disc Fittings 6 Nos 34958 209748
10 11KV Pin Insulator 9 Nos 8248 74232
11 GI Pin for 11KV Pin Insulator 9 Nos 561 5049
12 11KV GOS 1 Set 7899 7899
13 11KV DOF 1 Set 5221 5221
14 11KV LA 3 Nos 369 1107
15 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
16 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
17 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
18 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
19 240 sqmm PVC insulated Al Conductor 90 Mtr 238 21420
20 500Amps Cutout 6 Nos 9674 58044
21 11 Kv Danger Plate 4 Nos 55 220
22 240sqmm Lugs 24 Nos 21528 516672
24 Kiosk Box 1 Job 49500 49500
TOTAL 17083229
say 170832
ABSTRACT OF COST
A Cost of Materials 170832
B Storage Charge 2 on A 341664
C Total (A + B) 17424864
D Erection Charge 15 on C 26137296
E Total (C + D) 200385936
F Transportation Charge 5 on C 8712432
G Supervision Charge and Establishment Charge 15 on E 300578904
H Total (E + F + G) 2391562584
I Overhead charge 10 on H 2391562584
j Contingency Charge 3 on H 7174687752
GRAND TOTAL 270246572
Say 270247
(Rupees two Lac seventy thousand two hundred forty seven )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC mini deep tubewell at PAULPARANANDANAGAR under AMC ward no-5 under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with AMC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 1 Nos 3553 3553
2 Stay Set Complete 1 Sets 58082 58082
3 Stay Insulator(11KV) 1 Nos 20 20
4 Stay Wire (725mm) 5 Kgs 5707 28535
5 Weasel ACSR (61259mm) 001 Km 2347653 2347653
7 MS Nuts and Bolts of Assorted Size 3 Kgs 505 1515
8 Stay Clamp by (50x6mm2) MS Flat 1 Pairs 495 495
11 LT shackle insulator 4 Nos 1125 45
13 Straps with NB ( 16x75) 4 Nos 6871 27484
TOTAL 51947753
say 51947753
ABSTRACT OF COST
A Cost of Materials 51947753
B Storage Charge 2 on A 103895506
C Total (A + B) 5298670806
D Erection Charge 15 on C 7948006209
E Transportation Charge 3 on C 259738765
F Total (C + D+E) 6353210192
G Supervision Charge and Establishment Charge 5 on F 3176605096
H Total ( F + G ) 6670870701
I Overhead charge 10 on H 6353210192
J Contingency Charge 3 on H 200126121
K WCT6 on erection charge ie on D 4768803725
L GRAND TOTAL 7554005879
Say Rs 7554005879
Service connection charge Rs 1595
GRAND TOTAL Rs 755400
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Santi para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 8 Nos 4325 34600
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 18 Km 190276 3424968
10 8 SWG GI Wire 20 Kgs 6732 13464
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 68 Nos 48 3264
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 55 Mtr 11007 605385
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 25661079
say 25661079
ABSTRACT OF COST
A Cost of Materials 25661079
B Storage Charge 2 on A 51322158
C Total (A + B) 2617430058
D Erection Charge 15 on C 3926145087
E Total (C + D) 3010044567
F Transportation Charge 5 on C 1308715029
G Supervision Charge and Establishment Charge 10 on E 3010044567
H Total (E + F + G) 3441920526
I Contingency Charge 3 on H 1032576158
GRAND TOTAL 3545178142
Say Rs 3545178142
(Rupees three Lac Fifty four thousand five hundred Eighteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of New 63 KVA Substation for upgredation of voltage at Das para under Bodhjungnagar Electrical Sub-Division
Chargeable to - Revenue expenditure
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2Nos) 4 Nos 4325 17300
2 8Mtr PCC Pole ( DP=1 nos SP= 2Nos) 6 Nos 3553 21318
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6839 170975
6 MS Channel(100x50x50x6mm4) 92 Kgs 5485 50462
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 137 Kgs 5485 751445
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 2 Nos
f) Single Pole Bottom X-Arm(13Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 35 Kgs 5485 191975
a) 11 mtr long LT Bkt 18 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 2 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 15 Kgs 6732 10098
11 11KV Disc Insulator 9 Nos 2406 21654
12 11KV Disc Fittings 9 Nos 33766 303894
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 6871 171775
19 Stay Clamp by (50x6mm2) MS Flat 12 Pairs 495 594
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 120sqmm PVC insulated Al Conductor 30 Mtr 11007 33021
23 100Amps Cutout 6 Nos 1926 11556
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 12 Nos 165 1980
26 Shackle insulator 56 Nos 1396 78176
27 Straps NampB(16x75) 56 pairs 4345 24332
28 Barbed Wire 20 Kgs 429 858
TOTAL 22108045
say 22108045
ABSTRACT OF COST
A Cost of Materials 22108045
B Storage Charge 2 on A 4421609
C Total (A + B) 225502059
D Erection Charge 15 on C 3382530885
E Total (C + D) 2593273679
F Transportation Charge 5 on C 1127510295
G Supervision Charge and Establishment Charge 10 on E 2593273679
H Total (E + F + G) 2965352076
I Contingency Charge 3 on H 8896056228
GRAND TOTAL 3054312638
Say Rs 3054312638
(Rupees three Lac Five thousand thousand four hundred thirty one )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to Santosh das Bhanu kanta biswas amp purnima biswas under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with santosh das
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 3 Nos 3250 9750
2 stay set complete 1 Nos 581 581
3 Stay insulator 1 Nos 20 20
4 Stay wire 1 Nos 57 57
5 Weasel ACSR (61259mm) 003 Km 2016279 6048837
6 MS Nuts and Bolts of Assorted Size 6 Kgs 505 303
7 LT shackle insulator 6 Nos 1125 675
TOTAL 113833837
say 113833837
ABSTRACT OF COST
A Cost of Materials 113833837
B Storage Charge 2 on A 227667674
C Total (A + B) 1161105137
D Erection Charge 15 on C 1741657706
E Transportation Charge 3 on C 569169185
F Total (C + D+E) 1392187827
G Supervision Charge and Establishment Charge 5 on F 6960939133
H Total ( F + G ) 1461797218
J Contingency Charge 3 on H 4385391654
L GRAND TOTAL 1505651134
Say Rs 15057
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 55419033
ABSTRACT OF COST
A Cost of Materials 55419033
C Storage Charge 2 on A 110838066
D Total (A + B) 5652741366
E Erection Charge 15 on D 8479112049
F Total (C + D) 6500652571
G Transportation Charge 5 on D 2826370683
H Supervision Charge and Establishment Charge 15 on F 9750978856
H Total ( F + G+H ) 7758387525
I Contingency Charge 3 on H 2327516257
GRAND TOTAL 7991139151
Say 799114
(Rupees seven lac ninety nine thousand one hundred fourteen )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 28 Nos 4325 121100
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 Stay Set Complete 16 Sets 70998 1135968
3 Stay Insulator(11KV) 16 Nos 20 320
4 Stay Wire (725mm) 80 Kgs 8137 65096
5 MS Channel(75x40x40x6mm4) Kgs 5473 0
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(17 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
6 MS Angle(65x65x6mm3) Kgs 5473 0
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
7 Weasel ACSR (61259mm) 46 Km 2016279 92748834
8 8 SWG GI Wire 240 Kgs 6772 162528
9 11KV Disc Insulator 62 Nos 2406 149172
10 11KV Disc Fittings 62 Nos 34958 2167396
11 11KV Pin Insulator 72 Nos 5292 381024
12 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
13 11KV GOS 3 Set 7899 23697
15 11KV LA 9 Nos 369 3321
16 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
17 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
18 Bracket Clamp by (50x6mm2) MS Flat 142 Nos 48 6816
19 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
3 11 KB VCB 1 Sets 450000 450000
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable 015 Km 572183 8582745
20 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 934991304
say 934991304
ABSTRACT OF COST
A Cost of Materials 934991304
B Storage Charge 2 on A 1869982608
C Total (A + B) 9536911301
D Erection Charge 15 on C 1430536695
E Total (C + D) 10967448
F Transportation Charge 5 on C 476845565
G Supervision Charge and Establishment Charge 15 on E 1645117199
H Total (E + F + G) 1308941076
I Overhead charge 10 on H 1308941076
J Contingency Charge 3 on H 3926823228
GRAND TOTAL 1479103416
Say Rs 565526
(Rupees five Lac sixty five thousand five hundred twenty sixninety one )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 750KVA Base monted Substation for Providing of new Service connection to ARISTO TEXON PRIVATE LIMITED at TIGC Bodhjungnagar by UG HT line under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 015 Km 3510265 52653975
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 250 7500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 12 Km 572183 6866196
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 90 Mtr 1500 135000
24 Errection oh UG cable 1200 Mtr 450 540000
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2197755172
say 2197755172
ABSTRACT OF COST
A Cost of Materials 2197755172
B Storage Charge 2 on A 4395510343
C Total (A + B) 2241710275
D Erection Charge 15 on C 3362565412
E Total (C + D) 2577966816
F Transportation Charge 5 on C 1120855137
G Supervision Charge and Establishment Charge 15 on E 3866950224
H Total (E + F + G) 3076747352
I Overhead charge 10 on H 3076747352
j Contingency Charge 3 on H 9230242057
GRAND TOTAL 3476724508
Say Rs 3902237
(Rupees Six Lac sixty nine thousand seven hundred amp twenty four )Only
WORK ESTIMATE
Name of work -
Up-gradition of electricity load from 10KW to 100 KW at CETP Bodhjungnagar Replacement of the PVC cable size single core 16 sq mm to single core 120 sqmm under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit work with TIDC
SlNO Description of work Qty Unit RateUnit Amount
25 120sqmm PVC cable 120 Mtr 110076 1320912
TOTAL 1320912
say 1320912
ABSTRACT OF COST
A Cost of Materials 1320912
B Storage Charge 2 on A 2641824
C Total (A + B) 134733024
D Erection Charge as actual 808398144
E Total (C + D) 2155728384
F Transportation Charge 5 on C 67366512
G Supervision Charge and Establishment Charge 20 on E 4311456768
H Total (E + F + G) 2654240573
I Contingency Charge 3 on H 7962721718
GRAND TOTAL 273386779
Say 27339
(Rupees twenty seven thousand three hundred thirty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to AGARTALA PLASTIC PRIVATE LIMITED at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 06 Km 190276 1141656
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 15 Nos 2406 3609
12 11KV Disc Fittings 15 Nos 33766 50649
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 55419033
say 554190
ABSTRACT OF COST
A Cost of Materials 554190
B Storage Charge 2 on A 110838
C Total (A + B) 5652738
D Erection Charge 15 on C 8479107
E Transportation Charge 3 on C 166257
F TOTAL ( C+ D+E ) 66669057
G Supervision Charge and Establishment Charge 5 on F 333345285
H Total ( F + G) 7000250985
I Contingency Charge 2 on H 1400050197
J WCT 4 on Errection charge 33916428
TOTAL ESTIMATED COST OF DEPOSIT WORK 7174172433
Say 717417
(Rupees seven Lac seventeen thousand thousand four hundred seventeen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to MBS FEED amp PHARMA at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH MBS Feed amp Pharma
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 48 2016
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 53988283
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E Transportation Charge 3 on C 1619649
F TOTAL ( C+ D+E ) 649479249
G Supervision Charge and Establishment Charge 5 on F 3247396245
H Total ( F + G) 6819532115
I Contingency Charge 2 on H 1363906423
J WCT 4 on Errection charge 330408396
TOTAL ESTIMATED COST OF DEPOSIT WORK 6988963596
Say 698896
(Rupees six Lac ninety eight thousand eight hundred ninety six )Only
WORK ESTIMATE
Name of work -
Revisied Estimate for Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNIL Aircel Tower Ltd at Ramnath Kobra para under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AIRCEL
A] COST OF MATERIALS FOR INSTALLATION OF ONE 25 KVA 110433KV DT WITH METERING CONNECTIONS-
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=2 nos SP= 4 Nos) 9 Nos 4325 38925
2 8Mtr PCC Pole 2 Nos 3553 7106
3 Stay Set Complete 5 Sets 74654 37327
4 Stay Insulator(11KV) 5 Nos 20 100
5 Stay Wire (725mm) 25 Kgs 6838 17095
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 345 Kgs 5485 1892325
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 97 Kgs 5485 532045
a) Double pole Gurd Bkt( 25 Mtr) 2 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 40 Kgs 6732 26928
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 25 Kgs 509 12725
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 200 Mtr 39386 78772
23 100Amps Cutout 12 Nos 1926 23112
24 11 Kv Danger Plate 6 Nos 55 330
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 222558742
say 222559
ABSTRACT OF COST
A Cost of Materials 222559
B Storage Charge 2 on A 445118
C Total (A + B) 22701018
D Erection Charge 15 on C 34051527
E Transportation Charge 3 on C 667677
F TOTAL ( C+ D+E ) 267738477
G Supervision Charge and Establishment Charge 5 on F 1338692385
H Total ( F + G) 2811254009
I Contingency Charge 2 on H 5622508017
J WCT 4 on Errection charge 136206108
TOTAL ESTIMATED COST OF DEPOSIT WORK 2881099699
Say 288110
(Rupees two Lac Eighty eight thousand thousand one hundred ten )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 5 Nos 3553 17765
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 9 Kgs 6838 61542
5 Weasel ACSR (61259mm) 042 Km 190276 7991592
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 4 Pairs 495 198
8 LT shackle insulator 10 Nos 1125 1125
9 Straps with NB ( 16x75) 10 Nos 6871 6871
TOTAL 304487976
say 304487976
ABSTRACT OF COST
A Cost of Materials 304487976
B Storage Charge 2 on A 608975952
C Total (A + B) 3105777355
D Erection Charge 15 on C 4658666033
E Transportation Charge 3 on C 9317332066
F Total (C + D+E) 3664817279
G Supervision Charge and Establishment Charge 15 on F 5497225919
H Total ( F + G ) 4214539871
i Contingency Charge 2 on H 8429079742
GRAND TOTAL 4298830668
Say 42988
( Forty two thousand nine hundred eighty eight ) only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x200 KVA Base mounted Substation for Providing of Service connection to MS RM SAHA amp SONS at TIDC BODHJUNGNAGAR under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH RM SAHA amp SONS
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 200 KVA 110433KV Distribution Transformer 1 Nos 214697 214697
2 9Mtr PCC Pole ( DP=01 nos SP-01 nos ) 3 Nos 4325 12975
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 92 Kgs 54849 5046108
a) Substation Line Bracket(28Mtr) 2 Nos
b) Transformer Base Bracket(28Mtr) 1 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 04 Km 190276 761104
10 8 SWG GI Wire 20 Kgs 67321 134642
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 45 Kgs 6871 309195
19 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 60 Mtr 15394 92364
23 300Amps Cutout 6 Nos 7029 42174
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 50 100
TOTAL 305315803
say 539883
ABSTRACT OF COST
A Cost of Materials 539883
B Storage Charge 2 on A 1079766
C Total (A + B) 55068066
D Erection Charge 15 on C 82602099
E TOTAL ( C+ D ) 633282759
F Transportation Charge 3 on C 247806297
G TOTAL ( E+F ) 635760822
H Supervision Charge and Establishment Charge 15 on G 953641233
I Total ( G+H ) 7311249453
J Contingency Charge 2 on H 1907282466
TOTAL ESTIMATED COST OF DEPOSIT WORK 7330322277
Say 733032
(Rupees seven Lac thirty three thousand thirty two )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at DAS PARA under RK Nagar GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with BDO old Agartala
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 065 Km 190276 1236794
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 512717456
say 51272
ABSTRACT OF COST
A Cost of Materials 51272
B Storage Charge 2 on A 102544
C Total (A + B) 5229744
D Erection Charge 15 on C 7844616
E TOTAL ( C+ D ) 60142056
F Transportation Charge 3 on C 23533848
G TOTAL ( E+F ) 6037739448
H Supervision Charge and Establishment Charge 15 on G 9056609172
I Total ( G+H ) 6943400365
J Contingency Charge 2 on H 1811321834
TOTAL ESTIMATED COST OF DEPOSIT WORK 6961513584
Say 69615
(Rupees sixty nine thousand six hundred fifteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to Pran gopal saha at TIDC under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN GOPAL SAHA
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 no) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 6838 10257
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 139 Kgs 5485 762415
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Double Pole Top X-Arm( 22 Mtr) 1 Nos
f) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 5485 26328
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
9 Weasel ACSR (61259mm) 09 Km 190276 1712484
10 8 SWG GI Wire 25 Kgs 6732 1683
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 12 Nos 5292 63504
14 GI Pin for 11KV Pin Insulator 12 Nos 8248 98976
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 48 Nos 48 2304
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 70 sqmm PVC insulated Al Conductor 48 Mtr 662 31776
23 16 sqmm PVC insulated Al Conductor 150 Mtr 22602 33903
24 200Amps Cutout 3 Nos 40436 121308
25 11 Kv Danger Plate 3 Nos 55 165
26 120sqmm Lugs 24 Nos 165 3960
27 Substation fancing 1 Job 14500 14500
TOTAL 202996242
say 202996
ABSTRACT OF COST
A Cost of Materials 202996
B Storage Charge 2 on A 405992
C Total (A + B) 20705592
D Erection Charge 15 on C 31058388
E TOTAL ( C+ D ) 238114308
F Transportation Charge 3 on C 93175164
G TOTAL ( E+F ) 2390460596
H Supervision Charge and Establishment Charge 15 on G 3585690895
I Total ( G+H ) 2749029686
J Contingency Charge 2 on H 7171381789
TOTAL ESTIMATED COST OF DEPOSIT WORK 2756201068
Say 275620
(Rupees two Lac seventy five thousand six hundred twenty )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 25 KVA Substation for Providing of Service connection to CNG POINT at TIDC Bodhjungnagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH TIDC
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 12 Km 190276 2283312
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 18589254
say 185893
ABSTRACT OF COST
A Cost of Materials 185893
B Storage Charge 2 on A 371786
C Total (A + B) 18961086
D Erection Charge 15 on C 28441629
E Transportation Charge 3 on C 56883258
F TOTAL ( C+D+E) ) 2237408148
G Supervision Charge and Establishment Charge 15 on F 3356112222
H Total ( F+G) 257301937
I Contingency Charge 2 on H 514603874
2624479758
Say 262448
(Rupees two Lac sixty two thousand four hundred forty eight )Only
WORK ESTIMATE
Name of work -
Extension of HT Line amp Construction of 25KVA Substation for Providing of new Service connection to
Chargeable to - DEPOSIT WORK
SlNO Description of work Qty Unit RateUnit Amount
1 9 Mtr PCC Pole 32 Nos 4325 138400
2 11 mtr long steel pole 2 Nos 1224779 2449558
3 Stay Set Complete 18 Sets 70998 1277964
4 Stay Insulator(11KV) 18 Nos 20 360
5 Stay Wire (725mm) 72 Kgs 8137 585864
6 MS Channel(75x40x40x6mm4) 452 Kgs 5473 2473796
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g DP Pole top X-Arm(13 Mtr) 8 Nos
g DP Pole Bottom X-Arm(22 Mtr) 8 Nos
7 MS Angle(65x65x6mm3) 225 Kgs 5473 1231425
a) Single Pole Bottom X-Arm(15Mtr) 12 Nos
c) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
d) 11KV LA Bracket(28Mtr) 1 No
8 Weasel ACSR (61259mm) 38 Km 2016279 76618602
9 8 SWG GI Wire 240 Kgs 6772 162528
10 11KV Disc Insulator 62 Nos 2406 149172
11 11KV Disc Fittings 62 Nos 34958 2167396
12 11KV Pin Insulator 72 Nos 5292 381024
13 GI Pin for 11KV Pin Insulator 72 Nos 8248 593856
14 11KV GOS 2 Set 7899 15798
15 11KV LA 6 Nos 369 2214
16 11KV DOF (3 ph) 2 Set 5221 10442
17 MS Nuts and Bolts of Assorted Size 140 Kgs 6871 96194
18 Stay Clamp by (50x6mm2) MS Flat 16 Pairs 495 792
19 Bracket Clamp by (50x6mm2) MS Flat 110 Nos 48 5280
20 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
21 11 Kv Danger Plate 20 Nos 55 1100
TOTAL 395903582
say 395903582
ABSTRACT OF COST
A Cost of Materials 395903582
B Storage Charge 2 on A 791807164
C Total (A + B) 4038216536
D Erection Charge 15 on C 6057324805
E Total (C + D) 4643949017
F Transportation Charge 5 on C 2019108268
G Supervision Charge and Establishment Charge 15 on E 6965923525
H Total (E + F + G) 5542452196
I Overhead charge 10 on H 5542452196
J Contingency Charge 3 on H 1662735659
GRAND TOTAL 6262970982
Say Rs 626297
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 63 KVA Substation for Providing of Service connection to AIRTEL TOWER at Murabari under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH Bharati infratel limited
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 63 KVA 110433KV Distribution Transformer 1 Nos 9726913 9726913
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 5 Nos 4325 21625
3 Stay Set Complete 6 Sets 74654 447924
4 Stay Insulator(11KV) 6 Nos 20 120
5 Stay Wire (725mm) 30 Kgs 6838 20514
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 21 Km 190276 3995796
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
26 Substation fancing 1 Job 14500 14500
TOTAL 24845939
say 248459
ABSTRACT OF COST
A Cost of Materials 248459
B Storage Charge 2 on A 496918
C Total (A + B) 25342818
D Erection Charge 15 on C 38014227
E Transportation Charge 3 on C 76028454
F TOTAL ( C+D+E) ) 2990452524
G Supervision Charge and Establishment Charge 15 on F 4485678786
H Total ( F+G) 3439020403
I Contingency Charge 2 on H 6878040805
3507800811
Say 350780
(Rupees three Lac fifty thousand seven hundred eighty )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 7 nos consumer at Ramchandra nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with RC Nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 9 Nos 3553 31977
2 Stay Set Complete 3 Sets 74654 223962
3 Stay Insulator(11KV) 3 Nos 20 60
4 Stay Wire (725mm) 12 Kgs 6838 82056
5 Weasel ACSR (61259mm) 056 Km 190276 10655456
6 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
7 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 495592616
say 49559
ABSTRACT OF COST
A Cost of Materials 49559
B Storage Charge 2 on A 99118
C Total (A + B) 5055018
D Erection Charge 15 on C 7582527
E Transportation Charge 3 on C 15165054
F TOTAL ( C+D+E) ) 596492124
G Supervision Charge and Establishment Charge 15 on F 894738186
H Total ( F+G) 6859659426
I Contingency Charge 2 on H 1371931885
6996852615
Say 69969
(Rupees sixty nine thousand nine hundred sixty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 30 Nos 500 15000
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 135 Km 572183 77244705
24 100 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 120 Mtr 1500 180000
24 Errection oh UG cable 1350 Mtr 450 607500
24 HT Kiosk Box 3 Job 49500 148500
TOTAL 2408467087
say 2408467087
ABSTRACT OF COST
A Cost of Materials 2408467087
B Storage Charge 2 on A 4816934173
C Total (A + B) 2456636428
D Erection Charge 15 on C 3684954642
E Transportation Charge 3 on C 7369909285
F TOTAL ( C+D+E) ) 2898830985
G Supervision Charge and Establishment Charge 15 on F 4348246478
H Total ( F+G) 3333655633
I Contingency Charge 2 on H 6667311266
3400328746
Say 3400329
(Rupees thirty four Lac three hundred twenty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 550000 550000
6 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
7 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
8 11KV Disc Insulator 12 Nos 2406 28872
9 11KV Disc Fittings 12 Nos 33766 405192
10 11KV Pin Insulator 9 Nos 5292 47628
11 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
12 11KV GOS 3 Set 1006111 3018333
13 11KV DOF 3 Set 5221 15663
14 11KV LA 9 Nos 369 3321
15 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
17 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
18 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1605 9630
21 11 Kv Danger post 55 Nos 500 27500
22 240sqmm Lugs 24 Nos 21528 516672
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 12 Nos 12531 150372
22 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 3 Nos 12531 37593
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 23 Km 572183 13160209
24 4incdia GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 225 Mtr 1500 337500
24 Errection oh UG cable 2300 Mtr 450 1035000
24 HT Kiosk Box 4 Job 49500 198000
TOTAL 3774226937
say 3774226937
ABSTRACT OF COST
A Cost of Materials 3774226937
B Storage Charge 2 on A 7548453873
C Total (A + B) 3849711475
D Erection Charge 15 on C 5774567213
E Transportation Charge 3 on C 1154913443
F TOTAL ( C+D+E) ) 4542659541
G Supervision Charge and Establishment Charge 15 on F 6813989311
H Total ( F+G) 5224058472
I Contingency Charge 2 on H 1044811694
5328539641
Say
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Ramkrishna Rubber industry under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 2 Sets 74654 149308
4 Stay Insulator(11KV) 2 Nos 20 40
5 Stay Wire (725mm) 10 Kgs 68387 68387
6 MS Channel(100x50x50x6mm4) 53 Kgs 54849 2906997
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV DOF Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 01 Km 190276 190276
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 538257719
say 538258
ABSTRACT OF COST
A Cost of Materials 538258
B Storage Charge 2 on A 1076516
C Total (A + B) 54902316
D Erection Charge 15 on C 82353474
E Transportation Charge 3 on C 164706948
F TOTAL ( C+D+E) ) 6478473288
G Supervision Charge and Establishment Charge 15 on F 9717709932
H Total ( F+G) 7450244281
I Contingency Charge 2 on H 1490048856
7599249167
Say 759925
(Rupees seven Lac fifty nine thousand nine hundred twenty five )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to Globe Enterprise under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 15 on F 9753908202
H Total ( F+G) 7477996288
I Contingency Charge 2 on H 1495599258
7627556214
Say 762756
(Rupees seven Lac sixty two thousand seven hundred )Only
WORK ESTIMATE
Name of work -
Extension of Overhead Dedicated Feeder line line from 1323311 KV substation Bodhjungnagar to Agartala plastic pvt ltd for providing service connection toAgartala plastic private limited under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH AGARTALA PLASTIC PRIVATE LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole ( Dp-03 nos Sp-10 nos) 16 Nos 1224779 19596464
2 9Mtr PCC Pole ( DP=08 nos Sp-26 nos ) 42 Nos 4325 181650
4 Stay Set Complete 42 Sets 74654 3135468
5 Stay Insulator(11KV) 42 Nos 20 840
6 Stay Wire (725mm) 210 Kgs 68387 1436127
7 ACSR (61335 87 Km 3510265 305393055
8 11 KB VCB 1 Sets 450000 450000
9 MS Channel(75x40x40x6mm4) 1190 Kgs 54849 6527031
a) 11KV GOS Base Bracket(28Mtr) 10 Nos
b 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
c Single Pole Top X-Arm(03Mtr) 36 Nos
d Single Pole Bottom X-Arm(13Mtr) 36 Nos
e Double Pole Top X-Arm( 22 Mtr) 11 Nos
f Double Pole Bottom X-Arm(25 Mtr) 11 Nos
g 11KV GOS Handle Support Bracket(28Mtr) 5 Nos
10 MS Angle(65x65x6mm3) 994 Kgs 54849 54519906
a) SinglePole Guard X-Arm (15Mtr) 36 No
b DP Pole Guard X-Arm (25Mtr) 11 No
c DP Pole cross braket (17Mtrlong ) 44 No
d 11KV LA Bracket(28Mtr) 5 No
11 11KV Disc Insulator 156 Nos 2406 375336
12 11KV Disc Fittings 156 Nos 33766 5267496
13 11KV Pin Insulator 210 Nos 5292 111132
14 GI Pin for 11KV Pin Insulator 210 Nos 8248 173208
15 11KV GOS (3p two post) 5 Set 1006111 5030555
16 11KV DOF(3ph) 5 Set 5221 26105
17 11KV LA 15 Nos 369 5535
18 MS Nuts and Bolts of Assorted Size 340 Kgs 6871 233614
19 Bracket Clamp by (50x6mm2) MS Flat 560 Nos 60 33600
20 Stay Clamp by (50x6mm2) MS Flat 42 Nos 495 2079
21 30Mtr long 40mm dia GI Pipe ( for earthing) 9 Nos 1500 13500
22 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
23 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 6000 12000
24 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 870000 130500
25 11KV Danger plate 47 Nos 55 2585
TOTAL 1729567371
say 1729567
ABSTRACT OF COST
A Cost of Materials 1729567
B Storage Charge 2 on A 3459134
C Total (A + B) 176415834
D Erection Charge 15 on C 264623751
E Transportation Charge 3 on C 529247502
F TOTAL ( C+D+E) ) 2081706841
G Supervision Charge and Establishment Charge 10 on F 2081706841
H Total ( F+G) 2289877525
I Contingency Charge 2 on H 4579755051
J TOTAL ( H+I) 2335675076
K Service charge 5on J 1167837538
L TOTAL ( J+K) 245245883
Say 2452459
(Rupees twenty four Lac Fifty two thousand four hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of Dedicated Feeder (UG ) line from 1323311 KV substation Bodhjungnagar to Pran Brevarage india pvt ltd under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH PRAN BREVARAGE INDIA ( PVT) LIMITED
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 11 mtr long steel pole 2 Nos 1224779 2449558
2 ACSR (61335 025 Km 3510265 87756625
3 11 KB VCB 1 Sets 450000 450000
4 MS Channel(75x40x40x6mm4) 88 Kgs 54849 4826712
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
5 MS Angle(65x65x6mm3) 88 Kgs 54849 4826712
a) 11KV LA Bracket(28Mtr) 65 No
6 11KV Disc Insulator 12 Nos 2406 28872
7 11KV Disc Fittings 12 Nos 33766 405192
8 11KV Pin Insulator 9 Nos 5292 47628
9 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
10 11KV GOS 3 Set 1006111 3018333
11 11KV DOF 3 Set 5221 15663
12 11KV LA 9 Nos 369 3321
13 MS Nuts and Bolts of Assorted Size 60 Kgs 6871 41226
14 Bracket Clamp by (50x6mm2) MS Flat 64 Nos 48 3072
15 30Mtr long 40mm dia GI Pipe ( for Earthing) 6 Nos 1605 9630
16 11 Kv Danger post 30 Nos 500 15000
17 240sqmm Lugs 24 Nos 21528 516672
18 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 7 Nos 12531 87717
19 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
20 11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 08 Km 572183 4577464
21 10 mm dia 45 mm thick GI pipe for increase mechanical strength11 KV 3 core 120 sqmm XLPE UG cable ( Havales maker) 24 Mtr 1500 36000
22 cutting of treanch for UG cable ( Depth-11mtr wide- 05 mtr ) 800 Mtr 450 360000
23 HT Kiosk Box 2 Job 49500 99000
TOTAL 1652766437
say 1652766
ABSTRACT OF COST
A Cost of Materials 1652766
B Storage Charge 2 on A 3305532
C Total (A + B) 168582132
D Erection Charge 15 on C 252873198
E Transportation Charge 3 on C 505746396
F TOTAL ( C+D+E) ) 1989269158
G Supervision Charge and Establishment Charge 10 on F 1989269158
H Total ( F+G) 2188196073
I Contingency Charge 2 on H 4376392147
J TOTAL ( H+I) 2231959995
K Service charge 5on J 1115979997
L TOTAL ( J+K) 2343557995
Say Rs234355900
Say 2343559
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 12 Nos 4325 51900
3 Stay Set Complete 8 Sets 74654 597232
4 Stay Insulator(11KV) 8 Nos 20 160
5 Stay Wire (725mm) 40 Kgs 68387 273548
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 4 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 4 Nos
c) 11KV DOF Bracket(28Mtr) 4 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 2 Nos
e) Single Pole Top X-Arm(03Mtr) 4 Nos
f) Single Pole Bottom X-Arm(13Mtr) 4 Nos
g) Double Pole Top X-Arm( 22 Mtr) 2 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 2 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 2 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 15 Km 190276 285414
10 8 SWG GI Wire 55 Kgs 67321 3702655
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 15 Nos 5292 7938
14 GI Pin for 11KV Pin Insulator 15 Nos 8248 12372
15 11KV GOS 2 Set 7899 15798
16 11KV DOF 2 Set 5221 10442
17 11KV LA 6 Nos 369 2214
18 MS Nuts and Bolts of Assorted Size 52 Kgs 6871 357292
19 Stay Clamp by (50x6mm2) MS Flat 8 Pairs 495 396
20 Bracket Clamp by (50x6mm2) MS Flat 52 Nos 60 3120
21 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
22 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
23 500Amps Cutout 12 Nos 9674 116088
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 8 Nos 55 440
TOTAL 1119176203
say 1119176
ABSTRACT OF COST
A Cost of Materials 1119176
B Storage Charge 2 on A 2238352
C Total (A + B) 114155952
D Erection Charge 15 on C 171233928
E Transportation Charge 3 on C 342467856
F TOTAL ( C+D+E) ) 1347040234
G Supervision Charge and Establishment Charge 15 on F 202056035
H Total ( F+G) 1549096269
I Contingency Charge 2 on H 3098192537
1580078194
Say 1580078
(Rupees fifteen Lac eighty thousand amp seventy eight )Only
WORK ESTIMATE
Name of work -
Extension of Didicated Feeder line from Rubber Park 33 KV substation to Abhisar Buildwell Pvt Ltd ( Rubber Division) amp Construction of 2x500 KVA Base mounted Substation for Providing of Service connection to Abhisar Buildwell Pvt Ltd ( Rubber Division) under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 2 Nos 463359 926718
2 9Mtr PCC Pole 28 Nos 4325 121100
3 11 KB VCB 1 Sets 450000 450000
3 Stay Set Complete 14 Sets 74654 1045156
4 Stay Insulator(11KV) 14 Nos 20 280
5 Stay Wire (725mm) 70 Kgs 68387 478709
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 739 Kgs 54849 40533411
a) 11KV GOS Base Bracket(28Mtr) 6 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 6 Nos
c) 11KV DOF Bracket(28Mtr) 6 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 6 Nos
e) Single Pole Top X-Arm(03Mtr) 12 Nos
f) Single Pole Bottom X-Arm(13Mtr) 12 Nos
g) Double Pole Top X-Arm( 22 Mtr) 6 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 6 Nos
8 MS Angle(65x65x6mm3) 234 Kgs 54849 12834666
a) Double Pole Guard X-Arm for Substation(3Mtr) 6 No
b) 11KV LA Bracket(28Mtr) 2 No
c) Double Pole Guard X-Arm (28Mtr) 6 No
9 Weasel ACSR (61259mm) 42 Km 190276 7991592
10 8 SWG GI Wire 220 Kgs 67321 1481062
11 11KV Disc Insulator 54 Nos 2406 129924
12 11KV Disc Fittings 54 Nos 33766 1823364
13 11KV Pin Insulator 30 Nos 5292 15876
14 GI Pin for 11KV Pin Insulator 30 Nos 8248 24744
15 11KV GOS 3 Set 7899 23697
16 11KV DOF 3 Set 5221 15663
17 11KV LA 9 Nos 369 3321
18 120sqmm Lugs 24 Nos 165 3960
19 240 sqmm Lugs 24 Nos 219 5256
20 11 KV outdoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
21 11 KV indoor type jointing kit 120 sqmm suitable for 3 core 11 KV XLPE insulator AL conductor 2 Nos 12531 25062
22 11 KV 3 core 120 sqmm XLPE UG cable ( Havales make) 015 Km 572183 8582745
23 MS Nuts and Bolts of Assorted Size 189 Kgs 6871 1298619
24 Stay Clamp by (50x6mm2) MS Flat 14 Pairs 495 693
25 Bracket Clamp by (50x6mm2) MS Flat 140 Nos 60 8400
26 30Mtr long 40mm dia GI Pipe Earthing 6 Nos 1600 9600
27 185 sqmm PVC insulated Al Conductor 84 Mtr 15394 1293096
28 500Amps Cutout 12 Nos 9674 116088
29 185sqmm Lugs 24 Nos 219 5256
30 Danger plate 8 Nos 55 440
TOTAL 1949334855
say 1949335
ABSTRACT OF COST
A Cost of Materials 1949335
B Storage Charge 2 on A 389867
C Total (A + B) 19883217
D Erection Charge 15 on C 298248255
E Transportation Charge 3 on C 59649651
F TOTAL ( C+D+E) ) 2346219606
G Supervision Charge and Establishment Charge 15 on F 3519329409
H Total ( F+G) 2698152547
I Contingency Charge 2 on H 5396305094
2752115598
Say 2752116
(Rupees Twenty seven Lac fifty two thousand one hundred sixteen )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x500 KVA Base mounted Substation for Providing of Service connection to PRAN BREVARAGE (INDIA) PRIVATE LIMITED under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 500 KVA 110433KV Distribution Transformer 1 Nos 463359 463359
2 9Mtr PCC Pole ( DP=02 nos) 2 Nos 4325 8650
3 Stay Set Complete 3 Sets 74654 223962
4 Stay Insulator(11KV) 3 Nos 20 60
5 Stay Wire (725mm) 15 Kgs 68387 1025805
6 MS Channel(100x50x50x6mm4) 52 Kgs 54849 2852148
a) Substation Line Bracket(28Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 112 Kgs 54849 6143088
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 48 Kgs 54849 2632752
a) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
b) 11KV LA Bracket(28Mtr) 1 No
c) Double Pole Guard X-Arm (28Mtr) 2 No
9 Weasel ACSR (61259mm) 015 Km 190276 285414
10 8 SWG GI Wire 12 Kgs 67321 807852
11 11KV Disc Insulator 12 Nos 2406 28872
12 11KV Disc Fittings 12 Nos 33766 405192
13 11KV Pin Insulator 9 Nos 5292 47628
14 GI Pin for 11KV Pin Insulator 9 Nos 8248 74232
15 11KV GOS 1 Set 7899 7899
16 11KV DOF 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 32 Kgs 6871 219872
19 Stay Clamp by (50x6mm2) MS Flat 2 Pairs 495 99
20 Bracket Clamp by (50x6mm2) MS Flat 42 Nos 60 2520
21 30Mtr long 40mm dia GI Pipe Earthing 3 Nos 1600 4800
22 185 sqmm PVC insulated Al Conductor 42 Mtr 15394 646548
23 500Amps Cutout 6 Nos 9674 58044
24 185sqmm Lugs 24 Nos 219 5256
25 Danger plate 2 Nos 55 110
TOTAL 540262725
say 540263
ABSTRACT OF COST
A Cost of Materials 540263
B Storage Charge 2 on A 1080526
C Total (A + B) 55106826
D Erection Charge 15 on C 82660239
E Transportation Charge 3 on C 165320478
F TOTAL ( C+D+E) ) 6502605468
G Supervision Charge and Establishment Charge 10 on F 6502605468
H Total ( F+G) 7152866015
I Contingency Charge 2 on H 1430573203
J TOTAL ( H+I) 7295923335
K Service charge 5on J 3647961668
L TOTAL ( J+K) 7660719502
Say 766072
Say 766072
(Rupees twenty three Lac forty three thousand five hundred fifty nine )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to 10 nos consumer at south shib nagar village comittee under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with South shib nagar village committee
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 Stay Set Complete 3 Sets 74654 223962
2 Stay Insulator(11KV) 3 Nos 20 60
3 Stay Wire (725mm) 12 Kgs 6838 82056
4 Weasel ACSR (61259mm) 08 Km 190276 1522208
5 MS Nuts and Bolts of Assorted Size 1158 Kgs 6732 7795656
6 Stay Clamp by (50x6mm2) MS Flat 3 Pairs 495 1485
7 LT shackle insulator 20 Nos 1125 225
8 Straps with NB ( 16x75) 20 Nos 6871 13742
TOTAL 208695256
say 20870
ABSTRACT OF COST
A Cost of Materials 20870
B Storage Charge 2 on A 4174
C Total (A + B) 212874
D Erection Charge 15 on C 319311
E Transportation Charge 3 on C 638622
F TOTAL ( C+D+E) ) 25119132
G Supervision Charge and Establishment Charge 15 on F 37678698
H Total ( F+G) 288870018
I Contingency Charge 2 on H 577740036
2946474184
Say 29465
(Rupees twenty nine thousand four hundred sixty five )Only
WORK ESTIMATE
Name of work -
Extension of LT Linne for providing of SC to sri Pankaj Roy Kalitilla under Bodhjungnagar Electrical Sub-Division
Chargeable to - Deposit Work with sri Pankaj roy
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 8Mtr PCC Pole 15 Nos 3553 53295
2 Stay Set Complete 9 Sets 74654 671886
3 Stay Insulator(11KV) 9 Nos 20 180
4 Stay Wire (725mm) 45 Kgs 6838 30771
5 Weasel ACSR (61259mm) 17 Km 190276 3234692
6 MS Nuts and Bolts of Assorted Size 75 Kgs 6732 5049
7 Stay Clamp by (50x6mm2) MS Flat 15 Pairs 495 7425
8 LT shackle insulator 36 Nos 1125 405
9 Straps with NB ( 16x75) 36 Nos 6871 247356
TOTAL 10428794
say 104288
ABSTRACT OF COST
A Cost of Materials 104288
B Storage Charge 2 on A 208576
C Total (A + B) 10637376
D Erection Charge 15 on C 15956064
E Transportation Charge 3 on C 31912128
F TOTAL ( C+D+E) ) 1255210368
G Supervision Charge and Establishment Charge 10 on F 1255210368
H Total ( F+G) 1380731405
I Contingency Charge 2 on H 276146281
J TOTAL ( H+I) 1408346033
K Service charge 5on J 7041730164
L TOTAL ( J+K) 1478763335
Say 147876
Say 147876
(Rupees one Lac forty seven thousand eight hundred seventy six )Only
WORK ESTIMATE
Name of work -
Extension of HT LT Line amp Construction of 1x25 KVA pole mounted Substation for Providing of Service connection to ATC INDIA TOWER at RKNagar under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK
A] COST OF MATERIALS
SlNO Description of work Qty Unit RateUnit Amount
1 25 KVA 110433KV Distribution Transformer 1 Nos 54044 54044
2 9Mtr PCC Pole ( DP=1 nos SP= 2 Nos) 3 Nos 4325 12975
3 Stay Set Complete 4 Sets 74654 298616
4 Stay Insulator(11KV) 4 Nos 20 80
5 Stay Wire (725mm) 20 Kgs 6838 13676
6 MS Channel(100x50x50x6mm4) 98 Kgs 54849 5375202
a) Substation Line Bracket(28Mtr) 1 Nos
b) Transformer Base Bracket(28Mtr) 2 Nos
c) Transformer Base Support Bracket(08Mtr) 2 Nos
7 MS Channel(75x40x40x6mm4) 158 Kgs 5485 86663
a) 11KV GOS Base Bracket(28Mtr) 2 Nos
b) 11KV GOS Base Support Bracket(08Mtr) 2 Nos
c) 11KV DOF Bracket(28Mtr) 2 Nos
d) 11KV GOS Handle Support Bracket(28Mtr) 1 Nos
e) Single Pole Top X-Arm(03Mtr) 1 Nos
f) Single Pole Bottom X-Arm(13Mtr) 1 Nos
g) Double Pole Top X-Arm( 22 Mtr) 1 Nos
h) Double Pole Bottom X-Arm(25 Mtr) 1 Nos
8 MS Angle(65x65x6mm3) 57 Kgs 5485 312645
a) Double pole Gurd Bkt( 25 Mtr) 1 No
b) Double Pole Guard X-Arm for Substation(3Mtr) 1 No
c) 11KV LA Bracket(28Mtr) 1 No
d) SinglePole Guard X-Arm (15Mtr) 4 No
9 Weasel ACSR (61259mm) 08 Km 190276 1522208
10 8 SWG GI Wire 35 Kgs 6732 23562
11 11KV Disc Insulator 18 Nos 2406 43308
12 11KV Disc Fittings 18 Nos 33766 607788
13 11KV Pin Insulator 18 Nos 5292 95256
14 GI Pin for 11KV Pin Insulator 18 Nos 8248 148464
15 11KV GOS (3 ph) 1 Set 7899 7899
16 11KV DOF (3 ph) 1 Set 5221 5221
17 11KV LA 3 Nos 369 1107
18 MS Nuts and Bolts of Assorted Size 40 Kgs 6871 27484
19 Stay Clamp by (50x6mm2) MS Flat 5 Pairs 495 2475
20 Bracket Clamp by (50x6mm2) MS Flat 60 Nos 48 2880
21 30Mtr long 40mm dia GI Pipe for Earthing 3 Nos 1605 4815
22 35 sqmm PVC insulated Al Conductor 48 Mtr 39386 1890528
22 16 sqmm PVC insulated Al Conductor 200 Mtr 22602 45204
23 100Amps Cutout 3 Nos 1926 5778
24 11 Kv Danger Plate 4 Nos 55 220
25 120sqmm Lugs 24 Nos 165 3960
TOTAL 15513150
say 155132
ABSTRACT OF COST
A Cost of Materials 155132
B Storage Charge 2 on A 310264
C Total (A + B) 15823464
D Erection Charge 15 on C 23735196
E Transportation Charge 3 on C 47470392
F TOTAL ( C+D+E) ) 1867168752
G Supervision Charge and Establishment Charge 10 on F 1867168752
H Total ( F+G) 2053885627
I Contingency Charge 2 on H 4107771254
J TOTAL ( H+I) 209496334
K Service charge 5on J 104748167
L TOTAL ( J+K) 2199711507
Say 219971
(Rupees two Lac nineteen thousand nine hundred seventy one )Only
Page 6: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

Work Estimate for Line

(AS Deb Barma)Sr ManagerBodhjungnagar Electrical Sub-DivisionTSECL

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division
WORK ESTIMATE
Extension of HT Line amp Construction of 63 KVA Substation for Providing of Service connection DTW scheme at kalitilla under Jirania RD Block under West Noabadi GP under Bodhjungnagar Electrical Sub-Division
Chargeable to - DEPOSIT WORK WITH WR SUBDIVISION JIRINA
A] COST OF MATERIALS FOR INSTALLATION OF ONE 63 KVA 110433KV DT WITH METERING CONNECTIONS- Chargeable to - DEPOSIT WORK WITH TIDC
B] COST OF MATERIALS FOR 11KV LINE EXTENSION
SlNO Description of work Qty Unit RateUnit Amount
1 9Mtr PCC Pole ( DP=10 nos SP= 15 Nos) 35 Nos 1015422 3553977
2 9mtr Long PCC Pole 25 Nos 2650 66250
3 Stay Set Complete 25 Sets 47025 1175625 29390625
4 Stay Insulator(11KV) 125 Nos 1092 1365 34125
5 Stay Wire (725mm) 24 Kgs 451 10824
6 MS Channel(75x40x40x6mm4) 116 Kgs 3352 388832
a) Double Pole X-Arm(22Mtr) 3 Nos
b) Single Pole Top X-Arm(03Mtr) 6 Nos
c) Single Pole Bottom X-Arm(12Mtr) 6 Nos
7 MS Angle(65x65x6mm3) 96 Kgs 321 30816
a) Double Pole Guard X-Arm (25Mtr) 3 Nos
b) SinglePole Guard X-Arm (15Mtr) 6 Nos
8 Weasel ACSR (61259mm) 12 Km 2061233 24734796 6183699
9 8 SWG GI Wire 80 Kgs 391 3128 782
10 11KV 45KN Disc Insulator 18 Nos 49487 890766 2226915
11 Single U Bolt type Disc Fittings 18 Nos 19352 348336
12 11KV Pin Insulator 27 Nos 991 26757 668925
13 GI Pin for 11KV Pin Insulator 27 Nos 561 15147
14 MS Nuts and Bolts of Assorted Size 20 Kgs 407 814
15 Stay Clamp by (50x6mm2) MS Flat 6 Pairs 495 297
16 Bracket Clamp by (50x6mm2) MS Flat 40 Nos 27 1080
17 Barbed Wire 22 Kgs 429 9438 23595
24 AddMetering Arrangement with Kiosk 1 Nos 50000 50000
18 30Mtr long 40mm dia GI Pipe Earthing 2 Nos 1605 3210
TOTAL 543610286 1359025715
say 163391
(One Lac sixty three thousand three hundred and ninety one only)
ABSTRACT OF COST 0
A Cost of Materials 163391 0
B Storage Charge 2 on A 326782
C Total (A + B) 16665882 0
D Erection Charge 15 on C 24998823
E Total (C + D) 191657643 0
F Transportation Charge 5 on C 8332941
G Supervision Charge and Establishment Charge 15 on E 2874864645
H Total (E + F + G) 2287392305
I Contingency Charge 3 on H 6862176914 0
GRAND TOTAL 2356014074
Say Rs 235601 0
(Rupees two Lacs thirty five thousand six hundred and one)Only
0
0
0
0
Page 7: TRIPURA STATE ELECTRICITY CORPORATION LIMITED A Govt of ... JRN... · Supply & Laying of 100mm dia G.I pipe for vertical fittings with two pole structure, S/S & road/drain crossing,

BID SCH

TRIPURA STATE ELECTRICITY CORPORATION LIMITED
A Govt of Tripura Enterprise)
Circle -Electrical Circle-ll Division Electrical Division Jirania
BIDDING SCHEDULE
Name of work-Extension of 11KV UG line inc construction of 2x100 KVA Sub-Station and phase extension for outdoor fittings for Boys and Girls Hostel in campus of Collage of Veterinary Science and AH RK Nagar under Bodhjungnagar Electrical Sub-Division
SlNo Description of items Unit Qty Supply Erection
Rate in Rs in digid Rate in Rs in word Amt in Rs Rate in Rs in digid Rate in Rs in word Amt in Rs
1 Detailed survey of the proposed underground cable route by taking a suitable number of trial pits along the route including submission of layout drawing of surveyed route with respect to landmark and showing and highlight all major parameters clearence with respect parameter installation of power lines bridges pipe lines telicom lines gas lines and other obstracles likly to be faced etc (Both over ground amp under ground during excution as necessary) Km 07 helliphelliphellip helliphelliphellip helliphelliphellip
2 Supply of 11 KV 3 phase 3 core 50 sqmm 63511KV XLPE insulated conductor amp insulation screened Aluminium power cable conductor as per IS 7098II1985 and latest amendments Km 083 TSECL SUPPLY helliphelliphellip helliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphellip
3 Laying amp comissioning of 3 phase 3 core 11KV XLPE insulated power cable in trenchs depth of 1100mm amp width of 500mm inc i)formation of trench by excavation of soil ii)spreading of sand in two layers each of 150 mm thick one on trench bed amp the other over the cable laid iii) Laying of consolidated plain brick solling ic supplying over 2nd layer of spreaded sand iv)Refilling and ramming of excavated soil over the flat brick solling work upto ground lavel for XLPE cable of size 50 sqmm Km 083 TSECL SUPPLY helliphelliphellip helliphellip
4 Supply of 1100 Volts three amp half (35) core Aluminium conductor XLPE insulated amp PVC sheathed Armoured (A2XFY) cable 120 Sqmm conforming to IS7098 (Pt-1) Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
5 Laying Erection amp comissioning of 1100Volts 3amp 12 Aluminium conductor XLPE insulated amp PVC Sheathed Armoured (A2XFY) cables 120 Sqmm conforming to IS7098 (Pt-1) inc exacavation of earth upto a depth of 1 Mtr and width of trench 040 Mtr Protection of cable using first class flat brick 3 inch single layer filling of trench with local sand upto a thicness of 03 mtr in two layers refilling available excaveted earth in trenches etc as per direction of Engineer-in-Charge Mt 200 helliphelliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
6 Supply and joints of out door type heat shrinke jointing Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 4
7 Supply and joints of straight through type heat shrinke joining Kit for XLPE insulated cable of grade 63511 KV (E)3 Ph3 core 50 sqmm cable Nos 1
8 Supply amp Laying of 100mm dia GI pipe for vertical fittings with two pole structure SS amp roaddrain crossing at crossing of water supply point Teliphone line etcfor UG Cable as reqd(Make TATA JINDAL BANSAL) Mt 36
9 T- Shaped pillar for cable line ID marking with caption 11KV UG CABLE ROUTE made of pre-cast RCCSize of pillar 3f x 033ft x 033ft and T section 1ft x 033ft x 033ft by excavating earth inc painting of engraded caption in black colour on yellow background as per technical requirment Nos 10
10 Erection of different size of PCC pole ST pole direct in earth inc excavation refilling ramming etc as requiredThe pole should be burried 16th of their length helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 90mt long Steel Pole Nos 4 TSECL SUPPLY helliphellip helliphellip
b 80mt long PCC Pole Nos 20 TSECL SUPPLY helliphellip helliphellip
11 Erection of painted stay set complete direct in earth with 16 mm dia 18 mtr long painted stay rod anchor plate of size 300x300x 8 mm thick turn buckle of length 356 mm with 300 mm long threaded adjustable 16 mm dia MS rod and thimble Set 18 TSECL SUPPLY helliphellip helliphellip
12 Supply amp fitting fixing of 28 mt long Substation cross arms of size 100x50x50x6mm MS Channel (6 Nos) Nos 6 TSECL SUPPLY helliphellip helliphellip
13 Supply amp fitting fixing of 08 mt long cross arms of size 100x50x50x6mm MS Channel (4 Nos) Nos 4 TSECL SUPPLY helliphellip helliphellip
14 Supply amp fitting fixing of 28 mt long Substation cross arms for GODO of size 75x40x40x6mm MS Channel (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
15 Supply amp fitting fixing of 28 mt long Substation cross arms for GOS handle of size 65x65x6mm MS Angle (2 Nos) Nos 2 TSECL SUPPLY helliphellip helliphellip
16 Supply amp fitting fixing of 055 mt long cross arm made up of 65x650x6mm MS Angle (8 Nos) Nos 8 TSECL SUPPLY helliphellip helliphellip
17 Fabrication of Cross arms as per specification helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a MS Channel 100x50x50x6mm75x40x40x6mm Kg 34344 TSECL SUPPLY helliphellip helliphellip
b MS angle 65x65x6mm 50x50x6mm Kg 58 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
18 Supply erection amp commissioning (including anchoring with pole by strain scrue and clamp etcas necessary as per engineering requirment) 3Ph 50Hzoutdoor type 110433KV distribution transformer complete with all necessary assessories inc necessary connection helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a 100 KVA Transformer Nos 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
19 Supply erection of Triple pole (3Ph12KV) 200 Amps manually gang operated air break switch including necessary connection as per TS Set 3 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
20 Supply amp erection of Triple pole (3Ph12KV) 200 Amps drop out fuse unit suitable for 11KV 50Hz AC system operation for air break switch including necessary connection as per TS Set 2 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
21 Supply amp erection of 9KV 5KA single pole metal oxide gapless surge type LA suitable for nominal system Voltage of 11 KV inc necessary connection as per TS Nos 6 TSECL SUPPLY helliphelliphelliphelliphelliphellip helliphellip
22 Supply and erection of earthing set by 25Mt long GI pipe (ISI marked) of 40 mm diameter with holes inc a pair of clamps of 50x6mm MS flat amp 12 mm dia galvanized nuts amp bolts long with alternate layers of salt amp charcoal with supply of GI pipe as per REC specification amp design Set 8
23 Supply and erection of C type bracket for LT 3 wire ( excluding the cost of back clamp Nuts amp Bolts) Nos 4 TSECL SUPPLY helliphelliphellip helliphelliphellip
24 Supply Laying and stringing of conductor 61259sqmm ACSR weasel inc laying hoisting binding etc complete as reqd Km 21 TSECL SUPPLY helliphelliphellip helliphelliphellip
25 Supply Laying and stringing of 8SWG dia GI Wire inc laying hoisting binding etc complete as reqd Km 09 TSECL SUPPLY helliphelliphellip helliphelliphellip
26 Supply and erection of LT shackle insulator of size 75mm x 90mm with straps Nuts amp Bolts on poles excluding the cost of straps Nuts and Bolts Nos 52 TSECL SUPPLY helliphelliphellip helliphelliphellip
27 Fabricated clamps made by 50x6mm MS flate as per design requirment of TSECL helliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphelliphellip
a Bracket Clamp Nos 38 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
b Stay Clamp pair 36 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
28 Fitting fixing of LT Cut Outs (set of 3 Nos) on wooden plank (Preferably karai wood) of size 24x10x15 and cable connections with termination by Lugs Thimble complete inc supply of wooden plank screwes amp MS clamps excluding the cost of Thimble Set 4 helliphelliphelliphellip helliphelliphelliphellip helliphelliphelliphellip
29 Supply of 19 mm dia polythine pipe for drawing GI wire throw it for earthing connection Mt 20 helliphelliphelliphellip helliphelliphelliphelliphellip helliphelliphelliphelliphellip
Sub Total
( Supply + Erection) total Rs
Rounded of Rs
(Rupees only)
Signature of bidder
Dy General Manager
Jirania Electrical Division

Recommended