TRT Leak Repair
Anatoli Romaniouk, 05.06.2013 1
EC leak tests
Side C
Side A
2
3
EC wheel type A connectivity
Electronics
Gas manifold
Gas
Straws/radiator
Electronics
Gas manifold
Gas
Straws/radiator
Gas IN
Gas OUTPEEK pipes shown in pink
Places of stress
Repair at the detector level
NutPEEK pipe
Most probable places of leaks
Insert
Steel pipe
Polyurethane joint
Connector
Removable steel road
5
Repair status
TRT Wheel Repair and tests CommentsA1 Done, failed
A2 Done, OK Leak fixed
A3 Done, OK Leak fixed
A4 Done, failed Large, Repair is OK but leak in the other place
A5 Done, OK No leak before
A6 Done, partially failed Leak reduced but still large. Repair is OK but there is still leak in the other place
B1 Done, OK No leak before
B2 Done OK No leak before
B3 Done, failed Leak still at the level of 2.5 l/h (can be controlled)
B4 Done OK Leak was small, now no remarkable leak
B5 Done, failed Leak still at the level of 0.25 l/h (can be controlled)
B6 Done, OK
B7 Done, OK
B8 Done, OK
6
Side A.
B3 OUTF 16
1155 mmCh. 9
NO Leak
B4 OUTF 18
1033 mmCh. 10
No Leak
B5 OUTF 20
910 mmCh. 11
Leak 9 l/hB6 OUTF 22
788 mmCh. 12
No Leak
B7 OUTF 24
665 mmCh. 13
No Leak
B8 OUTF 26
543 mmCh. 14
No Leak
A1 OUTF 28
2388 mmCh. 1
NO Leak
A2 OUTF 1
2099 mmCh. 2
NO Leak
A3 OUTF 3
1963 mmCh. 3
Leak 0.06 l/h
A4 OUTF 5
1814 mmCh. 4
Leak 0.8 l/h
A5 OUTF 7
1673 mmCh. 5
Leak 0.3 l/h
A6 OUTF 9
1526 mmCh. 6
Leak 4 l/h
B1 OUTF 11
1400 mmCh. 7
Leak 75 l/h
B2 OUTF 131278 mmCh. 8
No Leak
7
Side A: different design for connectors on the detector (has been assembled after lessons from side C)
Close to the detector pipes are glued to the plastic connector.That was the reason why the leaks on side A appeared later than on side C.
8
But still there are places with stress
It might be crack in the pipe(most likely just a defect)
9
The bigest problem the bracket regions
Cracks in the pipes
10
Now environment inside of the pipe is the same but technique should be adopted to this design.
There are 4 tubes which have larger wall thickness -> even endoscope cannot go inside.
Preventive repair: isolate bracket region from ozone installing 3 mm pipe deep behind of brackets.
11
Next steps (side A):
•3 lines repaired.
•7 more will be repaired today
•Repair of the remaining 4 with smaller inner diameter will be tested tomorrow. Hopefully will be repaired in Fr.
•Leak tests will continue may be Mo.-Tu.
•On We. - Th. we will look for faulty connections at PPF1
•Th.-Fr. Close side A.