+ All Categories
Home > Documents > Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation...

Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation...

Date post: 20-Jan-2016
Category:
Upload: elinor-dorsey
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
14
Trusted. Tested. Results.
Transcript
Page 1: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Trusted. Tested. Results.

Page 2: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Who We AreCreated in 2006 to address:

• Rail and Bus Transportation• Marquette Plan• Gary/Chicago International Airport

– $27.5 million annual budget (of which ~$10 million is now dedicated to rail construction and operations)

– Seven-member Board of Directors– Five-member staff

Trusted. Tested. Results.

Page 3: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Major Initiatives• Rail and Bus

Transportation– South Shore rail cars– ChicaGo Dash buses– Regional Bus

Authority– West Lake Corridor

• Gary/Chicago International Airport– Rail relocation

– Runway expansion

• Marquette Plan– Marquette Park– Wolf Lake– Portage Lakefront– Whiting Lakefront– Jeorse Beach

Trusted. Tested. Results.

Page 4: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

New ProjectsFuture RDA plans include:

• West Lake Corridor• Upgrades to existing South Shore line• Transit-Oriented Development (TOD)• Continued shoreline improvements• Encouraging development around the

Gary/Chicago International Airport

Trusted. Tested. Results.

Page 5: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

• Service from Dyer to Chicago beginning in 2023.

• 5,000 riders projected by 2033 bringing back $231million in personal income annually.

• Will create about 2,000 permanent jobs in NWI.

• Feds pay 50% of $571 million cost.

• State has committed $6 million/year, RDA has committed $8 million/year, local communities $4 million/year.

Trusted. Tested. Results.

New Projects

West Lake Corridor

1989

Page 6: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Existing South Shore LineNWI improvements include:• Continuous double track from Gary to Michigan

City.– Applying for $42 million in Regional Cities funding– One of 7 regions applying for 2 grants– Decision will be made by judging committee in

December

• New high-level boarding platforms in Miller and Portage/Ogden Dunes.– Partnered with Gary to apply for $21.05 million federal

TIGER grant

• Modernize Gary Metro Station.Trusted. Tested. Results.

New Projects

Page 7: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Transit-Oriented Development

Goal: Rebuild the middle class in NWI.

• Millennials drive less, want access to mass transit and “walkable communities.”

• NIRPC 2040 Plan.• Increases property values.• Attracts new business.• Public-private partnerships.• $6 million grant to Munster

for 45th and Calumet realignment to facilitate TOD

Trusted. Tested. Results.

New Projects

Page 8: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.
Page 9: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.
Page 10: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.
Page 11: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Shoreline Improvements: Whiting

2012

2013Trusted. Tested. Results.

New Projects

2014

Page 12: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Shoreline ImprovementsMarquette Plan• Ongoing work in East

Chicago.• Marquette Plan

updated.• Encourage

connections to transit.• Identify areas of

opportunity.

Trusted. Tested. Results.

New Projects

Page 13: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Gary AirportRunway expansion

COMPLETE!• Encourage

development around airport.

• Potential new casino at Buffington Harbor.

• Access improvements.• Clark Road upgrade.

Trusted. Tested. Results.

New Projects

Page 14: Trusted. Tested. Results.. Who We Are Created in 2006 to address: Rail and Bus Transportation Marquette Plan Gary/Chicago International Airport – $27.5.

Thank You!Bill HannaPresident and CEORegional Development Authority9800 Connecticut Dr., Crown Point,

IN [email protected]

Trusted. Tested. Results.


Recommended