B A
TSF-300A/300/120CENTER HUNG PACKAGES
INSTALLATION INSTRUCTIONS
INSERT THE SPINDLE INTO THE FLOOR HINGE.
1 4
5
2
3
PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OFSPINDLE SCREW READY ALREADY.
TURN THE ADJUSTMENT SCREW IN AANTICLOCKWISE AND RELEASE PIVOT PIN .INSTALL THE PIVOT INTO UPPER PART OF DOORFRAME. AND COVER IT.
INSERT PIVOT CHANNEL INTO TOP OF DOOR,INSTALL BEARING INSERT INTO PIVOT CHANNEL.TIGHTEN UP THE ADJUSTMENT SCREW ALMOSTAND CONTROL THE CENTER POINT OF PIVOT.FIX THE BEARING TO THE VERY PROPER LOCATION.
INSTALL IN THE CENTER OF THE FLOOR HINGECEMENT BOX AND TIGHTEN THE FASTENING SCREWS.
MAKE CEMENT BOX AND PUT THE FLOOR HINGEIN THE CEMENT BOX.
THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX.
(LH Door) (RH Door)
CAUTION - PUT THE WASHER FIRST.
SPINDLE SCREW
SPINDLE
WASHER
ADJUSTMENT SCREW
PIVOT
COVER PLATE
FOR SINGLE ACTIONOFFSET 3 °.
FOR DOUBLE ACTION
STANDARD TYPE SPINDLE
FLOOR FINISHED
BEARING INSERT
ADJUSTMENTSCREW
POIVOT CHANNEL
TO
P P
IVO
T
CAU
TIO
N:
1.D
imensio
n in
dic
ate
d is
not a
real s
ize.
2.D
imensio
ns a
re in
mm
.3.A
ll rein
forc
em
ent a
ccessorie
s fo
r botto
m a
rm s
hould
be p
repare
d b
y user.
3425
18
32Min 347
5
25
5
100
169
126
13
70
1479
70
4525
DO
OR G
AP 3
12.5
12.5
135
25
90
12
12
Hole
s fo
r pivo
t insert x 4
ea
Use Ø
5.1
drill fo
r M6 X
1.0
mech. S
cre
w.
Holes x 5 ea
Use
Ø 4.3 drill for M
5 x 0.8 mech. Screw
.
REAR vie
w
Door fra
me p
ositio
n
Fro
nt vie
w
SID
E vie
w
PLAN
E V
IEWR
65
DO
OR a
rea.
CO
VER P
LATE
C/L
BO
TTO
M A
RM
CAU
TIO
N:
1,D
imensio
n in
dic
ate
d is
not a
real s
ize.
2,D
imensio
ns a
re in
mm
.3,A
ll rein
forc
em
ent a
ccessorie
s fo
r botto
m a
rm s
hould
be p
repare
d b
y user.
Holes x 5 ea
Use
Ø4.3 drill for M
5 x 0.8 mech. Screw
.
2024
70
36
DO
OR G
AP 3
Floor area �nished
5940
5252
52
201
Fro
nt vie
w
Rear V
iew
R65
C/L
FASTENING SCREWS
B A
TSF-300A/300/120OFFSET HUNG PACKAGES
INSTALLATION INSTRUCTIONS
INSERT THE SPINDLE INTO THE FLOOR HINGE.
1 4
5
2
3
PUT THE WASHER FIRST AND FIT END SQUARED & ANGLED PART OF SPINDLE INTO HOLLOW AREA AND TIGHTEN IT BY USE OFSPINDLE SCREW READY ALREADY.
INSTALL TOP PIVOT
REMOVE CAP, PIVOT PIN AND THEN INSTALL TOP PIVOT.
INSTALL BOTTOM ARM.
INSTALL IN THE CENTER OF THE FLOOR HINGECEMENT BOX AND TIGHTEN THE FASTENING SCREWS.
MAKE CEMENT BOX AND PUT THE FLOOR HINGEIN THE CEMENT BOX.
THE UPPER PART OF THE CEMENT BOX SHOULD BE ON THE LEVEL WITH THE FLOOR SURFACE. THE CEMENT BOX SHOULD BE A LEVEL SURFACE. ADDITIONALLY THE CENTER OF SPINDLE HAS TO BE POSITED CORRECTLY. FULFILL GROUT AROUND CEMENT BOX.
(LH Door) (RH Door)
CAUTION - PUT THE WASHER FIRST.
SPINDLE SCREW
SPINDLE
WASHERFOR SINGLE ACTIONOFFSET 3 °.
FOR DOUBLE ACTION
STANDARD TYPE SPINDLE
FLOOR FINISHED
CAU
TIO
N:
1,D
imensio
n in
dic
ate
d is
not a
real s
ize.
2,D
imensio
ns a
re in
mm
.3,A
ll rein
forc
em
ent a
ccessorie
s fo
r botto
m a
rm s
hould
be p
repare
d b
y user.
FASTENING SCREWS
BOTTOM OF DOOR
OFFSET ART
FRAME POSITION
DOOR POSITIONPIVOT PIN
CAP
TO
P P
IVO
TO
FFSET A
RM
FR
ON
T V
IEW
FR
ON
T V
IEW
BAC
K V
IEW
BAC
K V
IEW
CAU
TIO
N:
1.D
imensio
n in
dic
ate
d is
not a
real s
ize.
2.D
imensio
ns a
re in
mm
.3.A
ll rein
forc
em
ent a
ccessorie
s fo
r botto
m a
rm s
hould
be p
repare
d b
y user.
INSTALL DOOR ADJUSTMENT THE GAP BETWEEN DOORAND FLOOR.(IF NEEDED)
6 7
WITH DOOR PARALLEL TO FRAME, PLACE BOTTOMARM ONTO CLOSER SPINDLE. ALIGN DOOR ANDFRAME POSTION OF TOP PIVOT. INSTALL PIVOT PINAND CAP. INSTALL COVER OVER OFFSET ARM.
THE FLOOR HINGES HEIGHT CAN BE UP AB. 4MM INTO THE CEMENT BOX. RELEASE THE FASTENING SCREW “A” AND TURN THE HEIGHT ADJUSTMENT SCREW “B” IN A CLOCKWISE PROPERLY. THE FLOOR HINGES SHOULD BE LEVEL OFF AND TIGHTEN THE FASTENING SCREW ”A” AGAIN. IN CASE BIGGER GAP IS NEEDED,MODIFY THE SPINDLE SIZE PROPERLY.
INSTALLATION- COVER PLATE OR DOORSILL.
11
Cement Case
PUT THE COVER PLATE PROPERLY TO THE DOOR POST AS PIG. AND PUT THE TAB PROPERLY AS WELL.DON’T FIX THE FLOOR HINGES TO THE DOORSILL,IF THERE IS DOORSILL.THE FLOOR HINGE CAN BE ADJUSTED IN THECEMENT BOX.
CAUTION:1,Dimension indicated is not a real size.2,Dimensions are in mm.3,Upper of cement box should be on a level with the floor surface finished.4,Cement box should be a level surface and parallel with door frame.5,Cement box should be made after positing the floor hinge in the center.
QTY (4)
TAB
78
TSF-300A/300 (60)TSF-120 (50)
(70)
(54
B A
± 3)
TSF-300A/300 (341)
TSF-120 (285)
C/L
C/L SIDE view
Cement Case
CLOSING SPEED CONTROL.8
TSF-300AVALVE “D”-TO CONTROL DOOR CLOSING SPEED BETWEEN FULLY OPENED DOOR AND 80 °.VALVE “E”- TO CONTROL DOOR CLOSING SPEED BETWEEN 80 ° AND 0 °.DELAYING ACTION-TURN VALVE ‘D” IN A CLOCKWISE AS MUCH AS YOU WANT.HOLD OPEN-TURN VALVE ‘D” COMPLETELY IN A CLOCKWISE. DOOR CAN BE HOLD OPEN ALWAYS OVER 80 °. HOLD OPEN POSITION HAS TO BE SETTLED AT LESS 4 °.VALVE “C” -START POSITION OF HOLD OPEN OR DELAYING ACTION CAN BE CONTROLLED WITH THIS. INCREASE SPEED ,TURN IN A CLOCKWISE (MAX 105°.)DECREASE SPEED,TURN IN A ANTICLOCKWISE (MIN.75 °.)
TSF-300/120
VALVE “D”-TO CONTROL DOOR CLOSING SPEED BETWEEN FULLY OPENED DOOR AND 15 °.VALVE “E”- TO CONTROL DOOR CLOSING SPEED BETWEEN 15 ° AND 0 °DELAYING ACTION-TURN VALVE ‘D” IN A CLOCKWISE AS MUCH AS YOU WANT.
HOLD OPEN : 90° MECHANICAL HOLD OPEN.
-+
A B A B
TSF-300A
TSF-300
TSF-120
A B A BA
BA
B
A B
B A
TSF-120
TSF-300
TSF-300/120
E
C
D
E
DE
D
DE
D
E