Airport Commission
,
Regular Meeting http://www.rochestermn.gov/
~ Agenda ~ Michon Rogers
507-328-2700
Tuesday, August 13, 2019 10:00 AM Room 104, City Hall
Airport Commission Page 1 Printed 8/9/2019
I. Call to Order
II. Approve Minutes
III. Airport Financials
IV. Action Items
1. Professional Services Agreement with Mead & Hunt for design, enginieering, bidding, and construction administration services for a project to purchase and install a backup generator for the Terminal Building.
V. Information Items
1. Airport Operational Data
2. Restaurant RFP Discussion
VI. Other Business
VII. Adjournment
X:\2879900\192442.01\CFEE\Agreement\Draft\Task Order 2016-10 Standby Generator Terminal Design & CA.docx 05-17
TASK ORDER #2016-10
TO
PROFESSIONAL SERVICES AGREEMENT
BETWEEN: City of Rochester (CLIENT)
AND: Mead & Hunt, Inc. (CONSULTANT)
A Wisconsin Corporation
EFFECTIVE DATE: August 9, 2019
RECITALS
This is the Task Order 2016-10 to the Professional Services Agreement dated effective August 9, 2019, between the
CLIENT and Mead & Hunt, Inc. The Professional Services Agreement effective May 16, 2016 is referred to herein as
the Contract.
AGREEMENT
1. Services to be provided. The Scope of Services is to provide a new Standby Generator for Terminal Engineering
Design, Bidding, and Construction Administration Services. The full Scope of Services is defined in Exhibit A.
2. Schedule. The project shall be completed as follows:
Design and Bidding Services: Within 90 days of Notice to Proceed.
Construction Administration: Within 90 days of approved construction completion.
3. Consideration. The services shall be provided for the lump sum of $NINETY NINE THOUSAND FOUR HUNDRED
EIGHTY FOUR Dollars ($99,484) as described in Exhibit B. Progress payments shall be made in accordance with
the Contract.
APPROVAL AND ACCEPTANCE: Approval and acceptance of the TASK ORDER including any attachments shall
incorporate this document as part of the CONTRACT between the OWNER and the CONSULTANT dated May 16,
2016. All work and services defined in this TASK ORDER shall be performed in accordance with the terms and
conditions of the aforementioned CONTRACT between the OWNER and CONSULTANT.”
Accepted by: CITY OF ROCHESTER
By:
Name:
Title:
The above person is authorized to sign for Client
and bind the Client to the terms hereof.
Date:
Approved by: MEAD & HUNT, INC.
By:
Name: Bryan Page
Title: Vice President
Date: August 8, 2019
4.1
Packet Pg. 2
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n
4.1
Packet Pg. 3
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n s
ervi
ces
X:\2879900\192442.01\CFEE\Agreement\Draft\RST Standby Generator Exh A v2.doc A-1 Mead & Hunt, Inc.
Exhibit A
Scope of Services
Provide New Standby Generator for Terminal
Engineering Design, Bidding, and Construction Administration Services
Rochester International Airport (RST)
Background
The scope of services for this Task Order 2016-10 includes design, bidding, and construction
administration associated with installation of a new standby generator at the Rochester International
Airport (RST). The objective for this project is to provide an optional standby backup power source that
will keep RST operational during times of power outages and sustain normal operations. RST has
experienced several power outages recently that have had a significant impact on operational costs as
well as passenger reliability. The base of understanding and assumptions made under this task order are
as follows:
• Actual peak demand information received from RPU indicates the peak demand over the past 18
months for the Terminal building is 366kW.
• There are plans for future expansions to the terminal which include a new boarding bridge as well
as an additional 10,000SF of holdroom space. These loads will be factored into the design
capacity of the new generator.
• RST has indicated that their boarding bridge usage is anticipated to increase. Specifically, with
regards to planes utilizing the Ground Power Unit connections at the ends of the boarding
bridges. An increase of this usage will drastically impact the boarding bridge demand.
• Of all the loads listed above, emergency loads (14.5kW demand), required standby loads (41.4
kW demand) and elevator loads (40kW demand) are currently backed by the existing 200kW
generator added as part of the CBP and terminal expansion project. All other loads (and
anticipated future loads) would be backed by the new generator we currently anticipating for this
project.
• The existing terminal building heat is sourced from the OPS building. Investigation will be
performed, and recommendations made to ensure terminal heating is operational during loss of
RPU power.
• The existing TUG lane will be impacted by construction. Design will be done to minimize TUG
traffic disruptions.
4.1
Packet Pg. 4
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n
X:\2879900\192442.01\CFEE\Agreement\Draft\RST Standby Generator Exh A v2.doc A-2 Mead & Hunt, Inc.
We have projected our design loadings for the existing terminal to be the following:
Estimated Loads (kW)
Load Connected Demand % of Demand
Emergency (egress lighting and fire alarm panel) 14.5 14.5 3.85%
Required Standby Loads (CBP, security, cameras, telecom,
minimal heat) 92 41.4 11.00%
Scanning Equipment & TSA Checkpoint 15.5 10 2.66%
Building HVAC Misc. 89 40.1 10.65%
Chiller 141 70.5 18.73%
Non-egress lighting 80 65 17.26%
Receptacles and Misc power 160 35 9.30%
Elevator Loads 75 40 10.62%
Boarding Bridges 360 60 15.94%
Total: 1027 376.5 100.00%
The proposed project site is identified on the attached sketch.
This scope of services for these two components of work includes four separate tasks. The tasks are
defined as:
• Task 1 – Standby Generator Design
• Task 2 – Bid Administration
• Task 3 – Construction Administration
• Task 4 – Project Closeout
Task 1 – Standby Generator Design
Subtask 1.1 – Coordination
Coordination will involve additional communication/coordination with the City, FAA, and MN/DOT for
establishing the grants for the project. During this process the Consultant will assist the Sponsor in
applying for the grant. Task included in this process are:
• Assistance in completing the programming sheets (e.g. Pre-Application, Final Application etc.)
• Process Notice of Proposed Construction (Form 7460) including Airport Safety Plan
• Environmental Checklist documentation
• Project Narrative
• Required photographic documentation of existing conditions
Under this task the Consultant will also communicate the details of the project options and will provide
information as necessary to gain approvals for the project.
Subtask 1.2 – Site Information Gathering
The Consultant will travel to the site for gathering necessary site information in order to complete the
design. The Consultant will investigate the components integral to the operations within the terminal
building that will need to be considered in the design of the new generator. The Consultant will use
existing as-built information to develop the plan sheets.
4.1
Packet Pg. 5
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n
X:\2879900\192442.01\CFEE\Agreement\Draft\RST Standby Generator Exh A v2.doc A-3 Mead & Hunt, Inc.
Subtask 1.3 – Project Engineering Narrative Report
The Consultant will provide a narrative report identifying the findings of the information gathering. The
report will identify recommended course of action including the size and location of the new unit. The
Consultant will also provide an anticipated schedule and opinion of probable construction cost.
Subtask 1.4 – Design and Construction Plan Sheets
The Consultant will provide a design and a set of plans for the new standby generator. The plan sheets
will include a Title Sheet, Construction Operations Plan, Project Layout and Details.
Subtask 1.5 – Design Specifications and Contract Legal Documents
Work under this task will include providing construction technical specifications and the contract legal
documents (e.g. bid form, wage rates, state requirements) for the project.
Subtask 1.6 – Construction Operations Plan / Construction Safety Phasing Plan (CSPP) / 7460
The Consultant shall prepare a Construction Operations Plan which complies with FAA Advisory Circular
5370-2G. The plan will identify construction runway safety areas (RSA’s), taxiway safety areas (TSA’s),
and object free areas (OFA’s). This plan will minimize construction time needed inside these areas. Haul
routes will be carefully considered and shown on the plan. Temporary traffic control needs will be
addressed. The Consultant will submit this plan to the Airport and FAA for Approval. Any agency
comments will be included in the plans.
The nature of this project will require a Construction Safety Phasing Plan (CSPP) for the project in
accordance with Federal Advisory Circular (AC) 150/5370-2G. Consultant shall complete a project
Operations Plan sheet that will depict the proposed improvements and show operational safety
requirements on the Airport during construction per AC 150/5370-2F. This work will also require
development of a Safety Plan Compliance Document (SPCD) for monitoring compliance with the plan.
This task will include assisting the Contractor in developing the SPCD plan and all coordination, edits and
approvals of the plan with the FAA.
Prepare FAA Form 7460-1. Consultant will review the 7460-1 information with the Airport and FAA and
upload the 7460-1 information utilizing the FAA Obstruction Evaluation/Airport Airspace Analysis
(OE/AAA) website.
Subtask 1.7 – Meetings
The Consultant will prepare for and attend a meeting at RST for discussing the proposed project with
RST representatives. The Consultant will also provide concept plan sheets to the City and communicate
via a telecon to discuss the progress of the design project.
Task 2 – Bid Administration
Subtask 2.1 – Furnish Bid Documents
Consultant shall prepare, reproduce, and distribute bidding documents to interested contractors and
suppliers. The Consultant shall keep a current list of plan holders and distribute this to interested parties
upon request. The Consultant will also post the Bid Documents to an electronic bid posting site for
electronic download for interested bidders. This task also includes coordination required to facilitate these
requests.
4.1
Packet Pg. 6
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n
X:\2879900\192442.01\CFEE\Agreement\Draft\RST Standby Generator Exh A v2.doc A-4 Mead & Hunt, Inc.
Subtask 2.2 – Respond to Bidders Questions
During the bidding process, the Consultant will be available to clarify bidding issues with contractors and
suppliers, and for consultation with the various entities associated with the project. This item also includes
contacting bidders to generate interest in the project.
Subtask 2.3 – Prepare and Distribute Addendums
Consultant shall issue addenda as appropriate to interpret, clarify, or change the bidding documents as
required by the Sponsor or the State. Addenda will be made available to the planholders, either through
mail, electronic mail, hand delivering or via facsimile transmission.
Subtask 2.4 – Pre-bid Conference
A Pre-Bid meeting will be held at RST to address bidder/contractor questions and to discuss operations at
airport during construction.
Subtask 2.5 – Bid Opening
Consultant shall attend the bid opening at City Hall, as identified in the Bid Advertisement and to process
the bid documents.
Subtask 2.6 – Bid Review and Bid Tabulation
Consultant shall advise the Sponsor as to the acceptability of any subcontractors, suppliers, and other
persons and organizations proposed by the bidders and as to the acceptability of substitute materials and
equipment proposed by bidders. The Consultant shall prepare a spreadsheet that includes all bid items
for the purpose evaluating the lowest bidder. The Consultant shall input the as-bid unit prices into the
spreadsheet and to verify mathematical computations of the bids. The Consultant will then provide
recommendations to the Sponsor as to the name of the apparent low bidder.
Subtask 2.7 – Prepare Recommendation for Award
The Consultant will prepare a recommendation of award for the Sponsor to accept or reject the bids as
submitted. If rejection is recommended, the Consultant will supply an explanation for their
recommendation and possible alternative actions the Sponsor can pursue to complete the project. Once
the Contract Award is made the Consultant will distribute the bid tabulations on request of the Sponsor.
Task 3 – Construction Administration and Observation
Subtask 3.1 Construction Administration and Observation
The Project Manager (PM) will provide required construction inspection, documentation and coordination
for the standby generator work. It is anticipated the project construction will be completed within 120
working days of construction contract award. Included in this effort are:
• A Pre-construction Conference conducted at RST and attended by the PM.
• Three site visits by the PM during construction. One trip at the beginning of project, one periodic
site visits during construction, and one trip at the end to observe the finished construction and to
develop a punch list as necessary.
• The PM shall coordinate and schedule construction, answer questions, observe quality control
activities, process progress reports, process pay requests, and record as-built changes.
4.1
Packet Pg. 7
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n
X:\2879900\192442.01\CFEE\Agreement\Draft\RST Standby Generator Exh A v2.doc A-5 Mead & Hunt, Inc.
• Construction progress documentation
• Reviewing and processing requests for payment
• Technical assistance
• Review and recommendations for approval of submittals
• Owner coordination
Task 4 – Project Closeout Services
Subtask 4.1 Project Closeout
The Project Manager (PM) will prepare the required final closeout documentation as required. Included in
this effort are:
• Final punch list as needed
• Record Drawings
• Project closeout forms
Deliverables
• Project Engineering Narrative Report
• CSPP and 7460
• Project Bidding Documents
• Final Closeout Documentation
• Proposal includes delivery of bidding documents.
Remarks:
• For paper reduction reasons, the deliverables shall be delivered in electronic format unless
otherwise noted.
• It should be noted that this Scope of Services does not include the electronic transfer of design
data or CAD files. If this information is requested by the Contractor or others, it shall be done
under a separate agreement with the Contractor.
• This agreement does not include any hazardous material mitigation.
End of Exhibit A
4.1
Packet Pg. 8
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n
Exhibit B Aviation Services Engineering Fee Proposal CLIENT RST
AIRPORT: PROJ. No: PendingLOCATION: DATE: 8/8/19
AIP PROJECT NO. REV. NO:
PROJECT DESCRIPTION:
TOTAL
Task 1 - Standby Generator Design 1.1 Coordination $5,099.001.2 Site Information Gathering $4,133.001.3 Project Engineering Narrative Report $9,468.001.4 Design and Construction Plan Sheets $20,304.001.5 Specifications and Contract Legal Documents $16,283.501.6 Construction Operations Plan / CSPP $1,479.501.7 Meetings $2,743.50
Expenses $4,050.00SUBTOTAL TASK 1 $63,560.50
Task 2 - Bid Administration 2.1 Furnish Bid Documents $1,062.002.2 Respond to Bidders Questions $2,837.002.3 Prepare and Distribute Addendums $375.502.4 Prebid Conference $2,624.002.5 Bid Opening $2,391.002.6 Bid Review and Tabulation $1,039.502.7 Prepare Recommendation for Award $375.50
Expenses $1,650.00SUBTOTAL TASK 2 $12,354.50
Task 3 - Construction Administration and Observation 3.1 Construction Administration and Observation $12,620.00
Expenses $3,900.00SUBTOTAL TASK 3 $16,520.00
Task 4 - Project Closeout Services 4.1 Project Closeout $6,424.00
Expenses $625.00SUBTOTAL TASK 4 $7,049.00
TOTAL $99,484.00
TOTAL MEAD & HUNT FEES $99,484.00
PrincipalProject Engineer Electrical (PM)
Project Engineer Civil Engineer III Tech III Technical Editor Admin Asst. Clerical Total Cost
$249.00 $164.00 $164.00 $128.00 $105.00 $92.00 $95.00 $72.00 Hours Summary
Task 1 - Standby Generator Design
1.1 Coordination
Estimated Total Man-hours 4 16 8 0 0 0 1 1 30 $5,099.00Summary Costs $996.00 $2,624.00 $1,312.00 $0.00 $0.00 $0.00 $95.00 $72.00 $5,099.00
1.2 Site Information Gathering
Estimated Total Man-hours 0 12 6 7 0 0 3 0 28 $4,133.00Summary Costs $0.00 $1,968.00 $984.00 $896.00 $0.00 $0.00 $285.00 $0.00 $4,133.00
1.3 Project Engineering Narrative Report
Estimated Total Man-hours 1 24 8 19 6 6 3 1 68 $9,468.00Summary Costs $249.00 $3,936.00 $1,312.00 $2,432.00 $630.00 $552.00 $285.00 $72.00 $9,468.00
1.4 Design and Construction Plan Sheets
Estimated Total Man-hours 2 52 12 43 32 2 2 1 146 $20,304.00Summary Costs $498.00 $8,528.00 $1,968.00 $5,504.00 $3,360.00 $184.00 $190.00 $72.00 $20,304.00
1.5 Specifications and Contract Legal Documents
Estimated Total Man-hours 0.5 47 5 26 20 18 5 1 122.5 $16,283.50Summary Costs $124.50 $7,708.00 $820.00 $3,328.00 $2,100.00 $1,656.00 $475.00 $72.00 $16,283.50
1.6 Construction Operations Plan / CSPP
Estimated Total Man-hours 0.5 1 2 6 0 0 1 0 10.5 $1,479.50Summary Costs $124.50 $164.00 $328.00 $768.00 $0.00 $0.00 $95.00 $0.00 $1,479.50
1.7 Meetings
Estimated Total Man-hours 0 8 8 0 0 0 0.5 1 17.5 $2,743.50Summary Costs $0.00 $1,312.00 $1,312.00 $0.00 $0.00 $0.00 $47.50 $72.00 $2,743.50
Expenses RateAuto Rental 0 0 0 0 0 0 0 0 0 Days $75.00 $0.00
Mileage 0 800 200 0 0 0 0 0 1000 Miles $0.75 $750.00Lodging 0 1 0 0 0 0 0 0 1 Days $125.00 $125.00
Survey Subcontract 0 0 0 0 0 0 0 0 1 $3,000.00 $3,000.00Meals 0 2 1 0 0 0 0 0 3 $25.00 $75.00
Reproductions 0 0 0 0 0 0 0 0 1 $100.00 $100.00Other 0 0 0 0 0 0 0 0 0 $50.00 $0.00
$4,050.00
Task 2 - Bid Administration 2.1 Furnish Bid Documents
Estimated Total Man-hours 0 1 2 0 0 0 6 0 9 $1,062.00Summary Costs $0.00 $164.00 $328.00 $0.00 $0.00 $0.00 $570.00 $0.00 $1,062.00
2.2 Respond to Bidders Questions
Estimated Total Man-hours 0 8 6 2 0 0 3 0 19 $2,837.00Summary Costs $0.00 $1,312.00 $984.00 $256.00 $0.00 $0.00 $285.00 $0.00 $2,837.00
2.3 Prepare and Distribute Addendums
Estimated Total Man-hours 0 1 1 0 0 0 0.5 0 2.5 $375.50Summary Costs $0.00 $164.00 $164.00 $0.00 $0.00 $0.00 $47.50 $0.00 $375.50
2.4 Prebid Conference
Estimated Total Man-hours 0 8 8 0 0 0 0 0 16 $2,624.00Summary Costs $0.00 $1,312.00 $1,312.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,624.00
2.5 Bid Opening
Estimated Total Man-hours 0 4 10 0 0 0 1 0 15 $2,391.00Summary Costs $0.00 $656.00 $1,640.00 $0.00 $0.00 $0.00 $95.00 $0.00 $2,391.00
2.6 Bid Review and Tabulation
Estimated Total Man-hours 0.5 1 4 0 0 0 1 0 6.5 $1,039.50Summary Costs $124.50 $164.00 $656.00 $0.00 $0.00 $0.00 $95.00 $0.00 $1,039.50
2.7 Prepare Recommendation for Award
Estimated Total Man-hours 0 1 1 0 0 0 0.5 0 2.5 $375.50Summary Costs $0.00 $164.00 $164.00 $0.00 $0.00 $0.00 $47.50 $0.00 $375.50
Expenses RateAuto Rental 0 0 0 0 0 0 0 0 0 Days $75.00 $0.00
Mileage 0 400 400 0 0 0 0 0 800 Miles $0.75 $600.00Lodging 0 0 0 0 0 0 0 0 0 Days $125.00 $0.00
Other 0 0 0 0 0 0 0 0 0 Trips $625.00 $0.00Meals 0 1 2 0 0 0 0 0 2 $25.00 $50.00
Reproductions 0 0 0 0 0 0 0 0 20 $50.00 $1,000.00Other 0 0 0 0 0 0 0 0 0 $52.00 $0.00Other 0 0 0 0 0 0 0 0 0 $450.00 $0.00Other 0 0 0 0 0 0 0 0 0 $100.00 $0.00Other 0 0 0 0 0 0 0 0 0 $50.00 $0.00
$1,650.00
Task 3 - Construction Administration and Observation 3.1 Construction Administration and Observation
Estimated Total Man-hours 4 30 28 8 4 0 4 4 82 $12,620.00Summary Costs $996.00 $4,920.00 $4,592.00 $1,024.00 $420.00 $0.00 $380.00 $288.00 $12,620.00
Expenses RateAuto Rental 0 0 0 0 0 0 0 0 0 Days $75.00 $0.00
Mileage 0 1200 600 200 0 0 0 0 2000 Miles $0.75 $1,500.00Lodging 0 3 0 0 0 0 0 0 3 Days $125.00 $375.00
Materials Testing 0 0 0 0 0 0 0 1 1 $1,800.00 $1,800.00Meals 0 3 3 1 0 0 0 0 7 $25.00 $175.00
Reproductions 0 0 0 0 0 0 0 0 0 $100.00 $0.00Survey Supplies 0 1 0 0 0 0 0 0 1 $50.00 $50.00
Other 0 0 0 0 0 0 0 0 0 $450.00 $0.00Other 0 0 0 0 0 0 0 0 0 $100.00 $0.00Other 0 0 0 0 0 0 0 0 0 $50.00 $0.00
$3,900.00
Task 4 - Project Closeout Services 4.1 Project Closeout
Estimated Total Man-hours 0 8 8 0 0 24 16 1 57 $6,424.00Summary Costs $0.00 $1,312.00 $1,312.00 $0.00 $0.00 $2,208.00 $1,520.00 $72.00 $6,424.00
Expenses RateAuto Rental 0 0 0 0 0 0 0 0 0 Days $75.00 $0.00
Mileage 0 400 200 0 0 0 0 0 600 Miles $0.75 $450.00Lodging 0 1 0 0 0 0 0 0 1 Days $125.00 $125.00
Other 0 0 0 0 0 0 0 0 0 Trips $625.00 $0.00Meals 0 1 1 0 0 0 0 0 0 $25.00 $0.00
Reproductions 0 0 0 0 0 0 0 0 1 $50.00 $50.00Survey Supplies 0 0 0 0 0 0 0 0 0 $50.00 $0.00
Other 0 0 0 0 0 0 0 0 0 $450.00 $0.00Other 0 0 0 0 0 0 0 0 0 $100.00 $0.00Other 0 0 0 0 0 0 0 0 0 $50.00 $0.00
$625.00
TOTAL $99,484.00
Rochester International AirportRochester, Minnesota
Design, Bidding, & CA for New Standby Generator for Terminal
Total Expenses
Item No.
Engineering Fee
Total Expenses
Total Expenses
Total Expenses
X:\2879900\192442.01\CFEE\Agreement\Draft\RST Standby Generator Exh B 1
4.1
Packet Pg. 9
Co
mm
un
icat
ion
: P
rofe
ssio
nal
Ser
vice
s A
gre
emen
t w
ith
Mea
d &
Hu
nt
for
des
ign
, en
gin
ieer
ing
, bid
din
g, a
nd
co
nst
ruct
ion
ad
min
istr
atio
n s
ervi
ces
for
a p
roje
ct t
o p
urc
has
e an
d in
stal
l a b
acku
p g
ener
ato
r fo
r th
e T
erm
inal
Bu
ildin
g.
5.1
Packet Pg. 10
Co
mm
un
icat
ion
: A
irp
ort
Op
erat
ion
al D
ata
(In
form
atio
n It
ems)
5.1
Packet Pg. 11
Co
mm
un
icat
ion
: A
irp
ort
Op
erat
ion
al D
ata
(In
form
atio
n It
ems)
5.1
Packet Pg. 12
Co
mm
un
icat
ion
: A
irp
ort
Op
erat
ion
al D
ata
(In
form
atio
n It
ems)
5.1
Packet Pg. 13
Co
mm
un
icat
ion
: A
irp
ort
Op
erat
ion
al D
ata
(In
form
atio
n It
ems)
5.1
Packet Pg. 14
Co
mm
un
icat
ion
: A
irp
ort
Op
erat
ion
al D
ata
(In
form
atio
n It
ems)
7/18/2019
1
Inside Concession ProgramInformation/Networking Meeting
July 16, 2019 1:30 p.m.
Second Floor Conference Room
• Welcome and Introductions
• Understanding Our Airport
• Review of Current Concessions Program
• Doing Business at the Airport
• Goals of New Concession RFP
• Business Arrangements
• ACDBE Program
• RFP Process
• Q&A
• Tour of Facilities
Agenda
1
2
5.2
Packet Pg. 15
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
2
• John Reed, Executive Director
• Tiana O’Connor, Marketing & Communications Manager
• Kurt Claussen, Deputy Airport Director
• Adam Holz, Finance Manager
• Lynn Leibowitz, Airport Financial Consultant
• Monica Weddle, Airport Financial Consultant
Welcome and Introductions
• The estimated population of the Rochester Metropolitan Statistical Area (MSA) in 2018 was 220,000. In addition, approximately 3 Million visitors came to Rochester in 2018.
• The Bureau of Economic Analysis estimated 32% of the total workforce of the Rochester MSA were in the healthcare and social assistance industry.
• The Mayo Clinic, headquartered in Rochester with campuses in Minnesota, Arizona and Florida, employs an estimated 35,000 employees locally.
• The Destination Medical Center (DMC) Act enacted in June 2013 seeks to expand the existing clinic into a worldwide premier DMC.
Understanding our AirportRST Community
3
4
5.2
Packet Pg. 16
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
3
Understanding our AirportRST Community
Understanding our AirportRST Community
5
6
5.2
Packet Pg. 17
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
4
Understanding our AirportRST Air Service
Understanding our AirportRST Passenger Activity
116,251 115,036
145,517
187,547
100,000
110,000
120,000
130,000
140,000
150,000
160,000
170,000
180,000
190,000
200,000
2015 2016 2017 2018
Historical Enplanements
7
8
5.2
Packet Pg. 18
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
5
Understanding our AirportRST Passenger Activity
‐
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
2015 2016 2017 2018
Historical Enplanements by Carrier
Delta American United Charters
Understanding our AirportSample Flight Schedule
Carrier Destination Departure Time Capacity **United Chicago 5:30 a.m. 50American Chicago 6:08 a.m. 70Delta Atlanta * 6:10 a.m. 70Delta Minneapolis 7:10 a.m. 50American Chicago 9:57 a.m. 70United Chicago 11:56 a.m. 50Delta Minneapolis 12:56 p.m. 70American Chicago 2:55 p.m. 50United Chicago 3:35 p.m. 50Delta Minneapolis 3:56 p.m. 70Delta Atlanta 3:54 p.m. 70Delta Minneapolis 5:46 p.m. 50American Chicago 6:05 p.m. 50
* Subject to seasonal adjustment
** Based on current aircraft that may be upgauged on peak days
Sample Departure Schedule - Subject to Change
9
10
5.2
Packet Pg. 19
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
6
• RST currently has 4 departure gates with one TSA Screening Checkpoint
• Gates 2 and 3 are located on the first floor
• Gate 1 is located on the second floor, northwest corner
• Gate 4 and anticipated Gate 5 are located on the second floor, northeast corner
• Airport controls gate assignments and usage
• Frequency of flights ranges from 12‐13 per day
• Non‐scheduled charter flights operate 1‐2 times per month
Understanding our AirportRST Gates and Holdrooms
Understanding our AirportCurrent Gate Configuration
11
12
5.2
Packet Pg. 20
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
7
• New Holdroom Seating recently installed
• Addition of Gate 5 anticipated in 2020
• In 2020, a 4‐year $67 million replacement of Runway 2‐20 will begin
• Long term Master Plan Study underway will be completed by late 2019/early 2020
• Airport recently completed installation of a new parking lot control system improving the ease of entering and exiting the parking facilities
Understanding our AirportCapital Improvement Program
• Post‐Security sit‐down, primarily made to order, dining facility approximately 3,655 square feet located on the first floor
• Pre‐security ordering available via dedicated phone
• Limited retail offerings
• Vending machines are located both pre and post security
Current Concession ProgramExisting Concession Spaces
13
14
5.2
Packet Pg. 21
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
8
Current Concession ProgramExisting Concession Area
Current Concession ProgramHistorical Concession Sales
$233,223
$268,358
$347,490
$422,716
$‐
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
2015 2016 2017 2018
Historical Gross Sales
Does not include vending
15
16
5.2
Packet Pg. 22
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
9
Current Concession ProgramHistorical Sales per Enplanement
Does not include vending
$2.01
$2.33
$2.39
$2.25
$1.80
$1.90
$2.00
$2.10
$2.20
$2.30
$2.40
$2.50
2015 2016 2017 2018
Historical Gross Sales Per Enplanement
• Airport’s discretion and direction on concessionaire hours
• Typically, the concession should be open when TSA opens and remain open until all flights have departed
• This is a requirement 365 days per year, including weekends and holidays
• Concessionaries are required to extend hours with little notice for irregular operations and airline schedule changes
• Cannot close during the day for breaks and lunches
Doing Business at the AirportHours of Operation
17
18
5.2
Packet Pg. 23
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
10
• Applicants must pass a 10‐year background check that includes fingerprinting
• Before a badge can be issued, applicant must attend security training and pass associated tests
• Currently there is an $80 fee for fingerprinting and security threat assessment per employee (for a two‐year badge) and an $80 badge renewal fee
• Additional fees are assessed for lost badges or badges unaccounted for
• The badging process can take up to two weeks or more
• Once at the airport, all associates go through security screening
Doing Business at the AirportStaffing Requirements - Badging
• Associates must be neat in appearance with clean uniforms and nametags
• Associates must be competent with good communications skills and able to handle the demands of a fast‐paced airport environment
• Customers are waiting to catch their flight – no room for error
• Concession must be adequately staffed as determined by the Airport with an on‐site manager overseeing the day to day operations
• Staffing is challenging in an airport due to fluctuations in flight schedules.
• Associates should be courteous and knowledgeable in addressing general inquiries about the Airport from customers
• Concessionaire staff, who drive to work, are required to park in the designated employee parking location, currently $60 annually per employee
Doing Business at the AirportStaffing Requirements
19
20
5.2
Packet Pg. 24
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
11
• The Airport concessionaire must understand it is operating in a highly secure environment. Penalties for security violations can be costly.
• In order to operate, you most likely will have “prohibited items” at your locations. You are solely responsible for ensuring the “prohibited items” stay securely in your possession.
• You are also responsible for employees working in the secured area that are under your supervision and control.
• You must be flexible. Security requirements change regularly and adaptation must not result in service interruptions.
Doing Business at the AirportTSA and Security
• Deliveries to the airport are unlike deliveries to a street location where the truck parks next to the store and transfers the supplies or products directly into the store
• At the Airport, delivery trucks unload at designated curbside locations
• Supplies/products are inspected/screened (meaning product must be packaged and delivered so that it can be screened)
• Product then delivered to designated location
Doing Business at the AirportProduct Deliveries
21
22
5.2
Packet Pg. 25
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
12
• Commercial General Liability
• Business Auto Liability
• All‐Risk Property
• Workers’ Compensation and Employer’s Liability
• Fidelity Bond
• Builder’s Risk (during construction)
• Business Interruption
Doing Business at the AirportInsurance Requirements
• In the store, associates must be able to conduct transactions (cash, credit, voucher) efficiently, securely, accurately and continuously
• Back of house – secure cash storage, transition, and transmission must be worked out by the concessionaire
• Airport has the right to audit
Doing Business at the AirportCash/Payment Management
23
24
5.2
Packet Pg. 26
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
13
• Airport approves which space(s) will serve alcohol
• Concessionaire must qualify for and obtain the required liquor licenses and will be required to maintain all conditions associated with the liquor license
• There is a reserved liquor license for an airport concessionaire
• https://www.rochestermn.gov/departments/city‐clerk/licenses‐and‐permits/liquor‐licensing
Doing Business at the AirportLiquor Licenses
• Utilities
• Taxes
• Grease interceptors and exhaust systems must be cleaned and maintained as required by the grease trap permit and at a frequency determined by the Airport
• Used cooking oil must be disposed of in accordance with applicable state, local, and federal laws and regulations
• Waste management and recycling
• Use of sustainable, recyclable products (no Styrofoam)
Doing Business at the AirportOther Costs and Factors
25
26
5.2
Packet Pg. 27
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
14
• Improve the traveler experience for those passing through RST
• Traveler Personas• Business Travelers• Patient Travelers & Their Caregivers• Local Leisure Travelers
• Special Travelers Needs• Medical Needs• Dietary Restrictions• Cultural Differences
• Provide an open, welcoming, relaxing space
Goals of Concession RFP
• Customer service
• Design/Aesthetics/Investment
• Local participation/local regional brands/themes (sense of place)
• Technology driven ordering system capability
• Revenue
• Price/value – Street pricing + 10%
• ACDBE goal/social responsibility
• Minimize administrative burden
Goals of Concession RFP
27
28
5.2
Packet Pg. 28
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
15
• Customer service
• We will be looking for:An ideal mix of Local, Regional and National concepts
An experienced concessionaire who has the ability to effectively execute in a fast paced and highly structured and regulated environment.
Goals of Concession RFP
• The current concession agreement expires January 31, 2020.
• Anticipate one 10‐year agreement to include retail and food & beverage including vending.
• Final determination on lease terms for the new terminal facilities will be published in the RFP.
Business ArrangementsLease Terms
29
30
5.2
Packet Pg. 29
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
16
• Initial minimum capital investment is anticipated to be not less than $500,000. The Airport will match $1 for every additional dollar over the minimum capital investment of $500,000 made by the Concessionaire.
• Anticipate Mid‐Term Refurbishment being needed during the term of the lease to be negotiated between the airport and Concessionaire
• Additional annual minimum maintenance expenditures of 0.5% of gross revenues is anticipated. Concessionaire must maintain its locations and resolve maintenance issues immediately without store closure.
• Theme, design and décor should be high grade. Plans and specifications for the construction at the concession locations must be submitted to the Airport for written approval.
Business ArrangementsCapital Investment
• The Airport will receive the greater of:
• The Minimum Annual Guarantee (MAG)
or
• A percentage of gross sales
• The opportunity to rent additional office and storage spaces
• Miscellaneous Fees – badging, parking, fines
Business ArrangementsRent
31
32
5.2
Packet Pg. 30
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
17
• For example, the 1st year MAG is $100,000 and the percentage of gross is 10%
• If gross sales for the year is $1,500,000, 10% is $150,000
• $150,000 is greater than the MAG of $100,000
• Rent for that year would be $150,000
Business ArrangementsMAG vs. Percentage Rent – Ex 1
• For example, the 1st year MAG is $100,000 and the percentage of gross is 10%
• If gross sales for the year is $900,000, 10% is $90,000
• $90,000 is less than the MAG of $100,000
• Rent for that year would be $100,000
Business ArrangementsMAG vs. Percentage Rent – Ex 2
33
34
5.2
Packet Pg. 31
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
18
• Street Pricing + 10%
• Based on the prices in the Rochester Area
• Airport will monitor pricing practices
• Airport employee discounts
Business ArrangementsPricing
• The United States Department of Transportation (USDOT) requires every airport that receives federal grants to maintain a Disadvantaged Business Enterprise (DBE) Program.
• The program for Airport Concession Disadvantaged Business Enterprise (ACDBE), is mandated by Title 49 Code of Federal Regulations part 23 (49 CFR 23).
• More information about the DBE and ACDBE Program can be found at:
https://www.faa.gov/about/office_org/headquarters_offices/acr/bus_ent_program/
• Airports have ACDBE Goals.
ACDBE Program
35
36
5.2
Packet Pg. 32
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
19
Large companies that specialize in Airport Concessions often partner with ACDBE certified business owners to help achieve airport goals.
The ACDBE program has two components – DBE and ACDBE
• Disadvantaged Business Enterprise (DBE) program relates to construction, including professional services
• Airport Concessions Disadvantaged Business Enterprise (ACDBE) program relates to concession or car rental, including professional services, and supplying materials
• Business obtain DBE or ACDBE certification through an application and interview process
ACDBE Program
• City/Airport Company will publish a formal public invitation to submit a proposal for consideration
• Those proposing must rigorously follow all instructions
• Proposals must match the format outlined in the RFP
• It is up to you to watch for RFP notifications and publications
RFP Process
37
38
5.2
Packet Pg. 33
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
20
July 16 Information/Networking Meeting
August Issue RFP
September Pre‐Proposal Meeting/Questions Due/Issue Addendum
October Proposals Due
November Review/Award Concession
Next Steps
Tiana O’Connor
Marketing & Communications Manager
Email: [email protected]
507‐282‐2328 extension 101
Contact Information
39
40
5.2
Packet Pg. 34
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)
7/18/2019
21
Questions / CommentsTour & Networking
41
5.2
Packet Pg. 35
Co
mm
un
icat
ion
: R
esta
ura
nt
RF
P D
iscu
ssio
n (
Info
rmat
ion
Item
s)