TUFF TURF Tuff Turf - The Natural Green Solution to Erosion Control. Why use Tuff Turf? # Cost Effective # Immediate and Permanent Erosion Control # Easy one step installation # Natural, Attractive Appearance #100% Australian Owned #Turf is supported with a UV stable mat, suitable for high water flow areas aiding in stability and erosion control. # Has been tested and shown to withstand flows of 5m/sec for 36 hours without soil loss. Tuff Turf is supplied in 1.2 metre wide rolls. Tuff Turf is ideal for stabilisation of- 1. Trunk drainage 2. Spillways and flood mitigation works 3. Bank stabilisation 4. Table drains 5. Anywhere concentrated water flows up to 5m/sec Tuff Turf can be supplied and installed for less than the supply price of traditional geotextiles that require back filling with soil then turfing or seeding. Turf Force provides its products and services to: Brisbane, Ipswich, Sunshine Coast, Gold Coast and some of the Northern Rivers Area. www.turfforce.com.au
Transcript
Page 1: Tuff Turf - The Natural Green Solution to Erosion Control.m.homeimprovementpages.com.au/creative/brochures/278958/turf_f… · geotextiles that require back filling with soil then

TUFF TURFTuff Turf - The Natural Green Solution to Erosion Control. Why use Tuff Turf?

# Cost Effective # Immediate and Permanent Erosion Control # Easy one step installation # Natural, Attractive Appearance #100% Australian Owned #Turf is supported with a UV stable mat, suitable for high water flow areas aiding in stability and erosion control. # Has been tested and shown to withstand flows of 5m/sec for 36 hours without soil loss.

Tuff Turf is supplied in 1.2 metre wide rolls.

Tuff Turf is ideal for stabilisation of- 1. Trunk drainage 2. Spillways and flood mitigation works 3. Bank stabilisation 4. Table drains 5. Anywhere concentrated water flows up to 5m/sec

Tuff Turf can be supplied and installed for less than the supply price of traditional geotextiles that require back filling with soil then turfing or seeding.

Turf Force provides its products and services to: Brisbane, Ipswich, Sunshine Coast, Gold Coast and some of the Northern Rivers Area.

www.turfforce.com.au

Page 2: Tuff Turf - The Natural Green Solution to Erosion Control.m.homeimprovementpages.com.au/creative/brochures/278958/turf_f… · geotextiles that require back filling with soil then

Ph: 1800 367 472 Email: [email protected] Web: www.turfforce.com.au

Tuff Turf®

Specification for Installation

Tuff Turf® is HDPE reinforced turf erosion control product, suitable for use in stormwater systems (channels, drains, detention basins, etc) and on embankments. When installed to this specification, the product will prevent soil erosion at water velocities up to 5m/s. This erosion control system relies upon the development of a deep well developed turf root system to bind the soil profile and healthy turf surface to prevent soil removal and to trap sediments. Channels and drains should be constructed to profiles specified by engineer. Sudden changes in grade or profile should be avoided, in order to prevent cavitation, hydraulic jumps and erosion above or behind the Tuff Turf® installation. Entries to, or exit from culverts shall be smooth, so as to limit turbulence at these points. For flush joints, recess bare soil surface 35 mm below adjacent concrete apron at headwalls, manholes or other drainage service fixtures. Tuff Turf® is supplied in maxi-roll form, i.e. 1.2m wide rolls. All installations should therefore be designed to suit multiples of 1.2m. Stormwater Systems Construct the profile to provide a firm surface for installation work. Avoid the use of loose sand, gravel, rocks or heavily compacted clays. Remove any soil clods or rocks which may create air pockets under the turf, as these will prevent root development. Tuff Turf® rolls shall be laid parallel to the invert of channels and drains. The centreline of single roll or multiple roll installations shall coincide with the invert of the channels or drain. At culvert headwalls the rolls shall be laid up to the height of the design profile. Above this point unreinforced turf products may be used to cover the soil surface. Where wingwalls are used in conjunction with headwalls, Tuff Turf® shall be laid up to the lower point of the splayed edge of the wingwalls. Lay unreinforced turf products above this point, to prevent soil loss from headwalls and wingwalls. The upstream edge of the Tuff Turf® rolls shall be buried. Dig a trench 150mm deep and turn down the edge of the roll into the trench. Stake this edge with minimum 3 timber stakes (similiar to survey pegs) per roll, then back fill and tamp soil flush with turf and upstream soil or concrete surface. At end to end roll joints, compress roll ends and stake upstream edge of lower roll. Longitudinal roll joints should be laid tight and flush by pulling edges together firmly with rakes. Longitudinal rools on the profile banks should also be pinned along their upper edges to hold them on the bank until established. Embankments Tuff Turf® rolls shall be laid perpendicular to the toe of the embankment. Extend the roll at least 0.5m over the upper edge and stake with minimum 3 Stakes per roll. Roll edges shall be pulled together firmly with rakes. Trim the top and bottom edges to a neat line. Establishment Tuff Turf is a Living product and requires water and nutrients for establishment. Lay rolls with 24 hours of harvest. Immediately after installation, water the turf heavily to ensure that water penetrates into the soil below the turf. Maintain moisture for a minimum of 2 weeks to ensure rapid root development. Irrigation frequency can be reduced after the turf is tightly bound to the soil profile. Apply slow release fertiliser prior to installation, or alternatively apply ECO 88 or “dynamic lifter” after root system has developed. Top dress as required. Remove stakes only after turf is tightly bound to soil profile.

Page 3: Tuff Turf - The Natural Green Solution to Erosion Control.m.homeimprovementpages.com.au/creative/brochures/278958/turf_f… · geotextiles that require back filling with soil then

Ph: 1800 367 472 Email: [email protected] Web: www.turfforce.com.au

J. Wyndham Prince & Associates Pty. Ltd. A.C.N. 002 671 016

Prospect Electricity Building P.O. Box 795, PENRITH NSW 2751 Cnr. Henry & Station Streets DX 8032 PENRITH PENRITH NSW 2750 Telephone: (047) 323 386 Fax: (047) 217 638

JWP; b1 16 June 1993 Walkers Civil Engineers ATTENTION: Mr. Craig Williams

Re: Tuff Turf Trial – Mt Annan 19/3/1993

A flume was constructed on the batter of a large dam with a slope of 2:1. The flume has been lined with Tuff Turf as supplied by George Barnes of Naturelink Environmental Services. A 6 inch pump was used to discharge water down the flume. Water flow rates Five metres / second was observed. The pump was operated all day (8 hours) and the Tuff Turf which has been laid eight days prior remained in tact and in place. Yours faithfully J. WYNDAM PRINCE & ASSOCIATES PTY. LTD. J. WYNDAM PRINCE Superintendent CONSULTING CIVIL ENGINEERS

Page 4: Tuff Turf - The Natural Green Solution to Erosion Control.m.homeimprovementpages.com.au/creative/brochures/278958/turf_f… · geotextiles that require back filling with soil then

Ph: 1800 367 472 Email: [email protected] Web: www.turfforce.com.au

J. Wyndham Prince COSULTING ENGINEER

Prospect Electricity Building P.O. Box 795, PENRITH NSW 2751 Cnr. Henry & Station Streets DX 8032 PENRITH PENRITH NSW 2750 Telephone: (047) 323 386 Fax: (047) 217 638

23 September, 1997

Re: TESTING TUFF TURF SHEAR STRENGTH

Tuff Turf is a product produced by growing grass through a HDPE netting. The netting used is UV Stable (20 years full sun) and had a high shear strength. Flume testing that simulates spillway conditions was carried out at Richmond using a 400 mm flood pump drawn by a 100 hp motor. On a slope of 2.5 to 1 (representing 0.4 m fall per metre) with a flow of 600 litres per second, the pump produced flows ranging in depth from 240 mm to 200 mm. The product tested has been in place for 7 days and the test lasted 18 hours. Using the lower flow depth of 200 mm gives a shear stress of 784 N/metre sq. J. Wyndam Prince Chartered Engineer

CONSULTING CIVIL ENGINEERS


Recommended