TUI CF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION Originating Workorder No: Date: Eng Serial No: Station: Eng Position: NAA Approval Ref: Aircraft Registration : GENERAL This form is to be used in conjunction with Thomson Airways Task Card 72-TOM- 001 to record borescope inspection findings for the combustion liner and HPT blades. Pages 2-3 should also be used as an aid to track the removal and installation of borescope plugs as the inspection proceeds. NOTES 1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT. PLEASE SCAN A COPY AND SEND TO: +POWERPLANT EMAIL GROUP. 2. RECORD ALL SIGNIFICANT FINDINGS ON PAGES 4-23 OF THIS DOCUMENT. IF NECESSARY, MAKE PHOTOCOPIES OF THESE ILLUSTRATIONS TO CAPTURE MULTIPLE FINDINGS. 3. PROVIDE DIMENSIONS AND PHOTOS (WITH FILE NAMES) WHERE AVAILABLE. WHERE POSSIBLE, PHOTOS SHOULD BE TAKEN USING BORESCOPE EQUIPMENT THAT HAS PROVISION FOR MEASUREMENT SUCH AS A STEREO MEASURING TIP. 4. THESE BOROSCOPE INSPECTIONS FORM PART OF THE ‘ON CONDITION’ MAINTENANCE PROGRAM SET OUT IN THE ENGINE MAINTENANCE PROGRAM. AS SUCH, A SIMPLE SERVICABLE / UNSERVICABLE IS NOT SUFFICIENT. THE RESULTS OF THIS BOROSCOPE MAY BE USED TO DETERMINE THE OVERHAUL DATE OR OTHER MAINTENANCE. 5. THE DEFINITION OF A SIGNIFCANT FINDING IS AS FOLLOWS: ANY DEFECT THAT REDUCES THE INTERVAL OF INSPECTIONS. ANY DEFECT THAT IS LIKELY TO REDUCE AN INSPECTION INTERVAL AT THE NEXT INSPECTION. ANY DEFECT THAT IS WORSE THAN THE GENERAL CONDITION OF THE ENGINE. ANY DEFECT THAT THE INDIVIDUAL INSPECTOR CONSIDERS UNUSUAL. FORM No: ENG/6801 – Issue 2 Page 1 of 28
Transcript
Page 1: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

OriginatingWorkorder No:

Date:

Eng Serial No: Station:Eng Position: NAA Approval Ref:AircraftRegistration:

GENERALThis form is to be used in conjunction with Thomson Airways Task Card 72-TOM-001 to recordborescope inspection findings for the combustion liner and HPT blades.Pages 2-3 should also be used as an aid to track the removal and installation of borescope plugs as the inspection proceeds.

NOTES1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.PLEASE SCAN A COPY AND SEND TO: +POWERPLANT EMAIL GROUP.

2. RECORD ALL SIGNIFICANT FINDINGS ON PAGES 4-23 OF THIS DOCUMENT. IF NECESSARY, MAKE PHOTOCOPIES OF THESE ILLUSTRATIONS TO CAPTURE MULTIPLE FINDINGS.

3. PROVIDE DIMENSIONS AND PHOTOS (WITH FILE NAMES) WHERE AVAILABLE. WHERE POSSIBLE, PHOTOS SHOULD BE TAKEN USING BORESCOPE EQUIPMENT THAT HAS PROVISION FOR MEASUREMENT SUCH AS A STEREO MEASURING TIP.

4. THESE BOROSCOPE INSPECTIONS FORM PART OF THE ‘ON CONDITION’ MAINTENANCE PROGRAM SET OUT IN THE ENGINE MAINTENANCE PROGRAM. AS SUCH, A SIMPLE SERVICABLE / UNSERVICABLE IS NOT SUFFICIENT.THE RESULTS OF THIS BOROSCOPE MAY BE USED TO DETERMINE THE OVERHAUL DATE OR OTHER MAINTENANCE.

5. THE DEFINITION OF A SIGNIFCANT FINDING IS AS FOLLOWS: ANY DEFECT THAT REDUCES THE INTERVAL OF INSPECTIONS. ANY DEFECT THAT IS LIKELY TO REDUCE AN INSPECTION INTERVAL AT THE NEXT

INSPECTION. ANY DEFECT THAT IS WORSE THAN THE GENERAL CONDITION OF THE ENGINE. ANY DEFECT THAT THE INDIVIDUAL INSPECTOR CONSIDERS UNUSUAL.

6. THE PURPOSE OF THE ENGINE CONDITION REPORT (PAGE 23) IS TO SUPPLY THE POWERPLANT DEPARTMENT WITH DETERIORATION DATA FOR ANALYSIS OF ENGINE CONDITION TO FACILITATE ENGINE REMOVAL PLANNING. IT IS AN ASSESSMENT OF THE GENERAL CONDITION OF THE ENGINE.PLEASE PROVIDE PHOTOS TO ILLUSTRATE THE GENERAL CONDITION OF THE ENGINE AND TO ASSIST INTERPRETATION OF THE ENGINE CONDITION REPORT.

FORM No: ENG/6801 – Issue 2 Page 1 of 23

Page 2: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

Combustion Section Borescope Port Locations (Sheet 1 of 2)

Plug Removedand securedMECH

Removedand securedINSP

Lubricatedand installedMECH

Lubricatedand installedINSP

B4-2 (if req)

FORM No: ENG/6801 – Issue 2 Page 2 of 23

Page 3: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

Combustion Section Borescope Port Locations (Sheet 2 of 2)

Plug Removedand secureMECH

Removedand secureINSP

Lubricatedand installedMECH

Lubricatedand installedINSP

B2-1

B2-2

B2-3

B2-4

B2-5

B3-1

B3-2

FORM No: ENG/6801 – Issue 2 Page 3 of 23

Page 4: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

Combustion Chamber Assembly Inspection (Sheet 1 of 2)

FORM No: ENG/6801 – Issue 2 Page 4 of 23

Page 5: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

Combustion Chamber Assembly Inspection (Sheet 2 of 2)

FORM No: ENG/6801 – Issue 2 Page 5 of 23

Page 6: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

Inner/Outer Liner Inspection (for the Pre Low Emission Combustors (Pre LEC)) (Sheet 1)

INSPECTION REF / WORKORDER No: A/C REG: POSN:

FORM No: ENG/6801 – Issue 2 Page 6 of 23

Page 7: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

ENGINE S/N: DATE:Inner/Outer Liner Inspection (for the Low Emission Combustors (LEC)) (Sheet 1)

FORM No: ENG/6801 – Issue 2 Page 7 of 23

Page 8: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

Combustion Dome and Splash Plate Inspection (Sheet 1)

FORM No: ENG/6801 – Issue 2 Page 8 of 23

Page 9: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 1 of 8)

FORM No: ENG/6801 – Issue 2 Page 9 of 23

Page 10: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 2 of 8)

FORM No: ENG/6801 – Issue 2 Page 10 of 23

Page 11: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 3 of 8)

FORM No: ENG/6801 – Issue 2 Page 11 of 23

Page 12: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 4 of 8)

FORM No: ENG/6801 – Issue 2 Page 12 of 23

Page 13: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 5 of 8)

FORM No: ENG/6801 – Issue 2 Page 13 of 23

Page 14: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 6 of 8)

FORM No: ENG/6801 – Issue 2 Page 14 of 23

Page 15: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 7 of 8)

FORM No: ENG/6801 – Issue 2 Page 15 of 23

Page 16: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

1st Stage High Pressure Turbine Rotor Blade Inspection (Sheet 8 of 8)

FORM No: ENG/6801 – Issue 2 Page 16 of 23

Page 17: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

HPT Stage 1 Blade Inner Platform Inspection (Sheet 1 of 2)

FORM No: ENG/6801 – Issue 2 Page 17 of 23

Page 18: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

HPT Stage 1 Blade Inner Platform Inspection (Sheet 2 of 2)

FORM No: ENG/6801 – Issue 2 Page 18 of 23

Page 19: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

2nd Stage High Pressure Turbine Rotor Blade Inspection (Sheet 1 of 4)

FORM No: ENG/6801 – Issue 2 Page 19 of 23

Page 20: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

2nd Stage High Pressure Turbine Rotor Blade Inspection (Sheet 2 of 4)

FORM No: ENG/6801 – Issue 2 Page 20 of 23

Page 21: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

2nd Stage High Pressure Turbine Rotor Blade Inspection (Sheet 3 of 4)

FORM No: ENG/6801 – Issue 2 Page 21 of 23

Page 22: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

2nd Stage High Pressure Turbine Rotor Blade Inspection (Sheet 4 of 4)

FORM No: ENG/6801 – Issue 2 Page 22 of 23

Page 23: TUI - Iss 02 - Dec... · Web view1. ON COMPLETION OF THE INSPECTION, THIS FORM MUST BE RETAINED IN THE WORKPACK WITH THE ORIGNATING WORKORDER AND AMOS TASK CERTIFICATION DOCUMENT.

TUICF6-80C2B COMBUSTION LINER AND HPT BLADES BORESCOPE INSPECTION

INSPECTION REF / WORKORDER No: A/C REG: POSN:ENGINE S/N: DATE:

The purpose of the Engine Condition Report is to supply the Powerplant department with deterioration data for analysis of engine condition to facilitate engine removal planning

COMBUSTION CHAMBER INNER LINER WALLS:

COMBUSTION CHAMBER OUTER LINER WALLS:

DOME HEAT SHIELDS AND FUEL NOZZLES:

HIGH PRESSURE TURBINE BLADES, STAGE 1

HIGH PRESSURE TURBINE BLADES, STAGE 2

INSPECTIONSTAMP