TUNNELING METHODS DEEPAK JAISWAL MOHAMMAD SALIK BY
Transcript
Page 1: Tunnel making methods and tunnel boring machine

TUNNELING METHODS

DEEPAK JAISWAL MOHAMMAD SALIK

BY

Page 2: Tunnel making methods and tunnel boring machine

CONTENTS

INTRODUCTION REQUIREMENTS OF TUNNEL MAIN PURPOSES PROCEDURES INVOLVED METHODS OF TUNELLING METHOD TO SELECTION THE OTHER SIDE

Page 3: Tunnel making methods and tunnel boring machine

INTRODUCTION

A tunnel is an underground passageway, completely enclosed except for openings for egress, commonly at each end.

A tunnel may be for road traffic,road traffic,canal,hydroelectric station,sewer etc.

The Delaware Aqueduct in New York USA is the longest tunnel, of any type, in the world at 137 km (85 mi)

Page 4: Tunnel making methods and tunnel boring machine

REQUIRMENTS OF

TUNNEL IT IS VERY USEFUL WHERE BRIDGE FAIL TO

FULFILL REQUIRMENTS LIKE IN SEA ,IN URBAN AREA ,AND IN MOUNTAINS.

EFFICIENT COPARED TO BRIDGES. IN WAR TIME IT IS MUCH DIFFICULT TO

DESTROY A TUNNEL BUT DESTRUCTION OF BRIDGE IS TOO EASY.

LOTS OF LAND AND TIME IS SAVED.

Page 5: Tunnel making methods and tunnel boring machine

MAIN PURPOSES

1.IN ROAD TRAFFICS2.IN SEWERS3.IN MININGS4.IN RAIL TRAFFICS5.IN HYDROELECTRIC STATIONS etc.

Page 6: Tunnel making methods and tunnel boring machine

The process for bored tunnelling involves all or some of the following operations:

Probe drilling (when needed) Grouting (when needed) Excavation (or blasting) Supporting Transportation of muck Lining or coating/sealing Draining Ventilation

Page 7: Tunnel making methods and tunnel boring machine

PROBE DRILLING This type of drilling is done in order to

find out suitable method for drilling .

It consist of drilling in sample, by various method to find most suitable .

It is necessary part of all drilling operation .

Page 8: Tunnel making methods and tunnel boring machine

GROUTING It is the process of providing additional

support to drilled mine.

It is done by a liquid called grout ,consist of water ,cement ,color tint and sometime fine gravel .

Good surface is achieved .

Page 9: Tunnel making methods and tunnel boring machine

EXCAVATION Excavation is the digging and recording of

artifacts at an archaeological site.

It is necessary to know the archaeological importance of a site before digging .

This is performed by experts in a scientific way.

Many governments grants permission for tunneling after finding a go certificate in excavation.

Page 10: Tunnel making methods and tunnel boring machine

SUPPORTING After initial mining , tunnel need

supports for further processing .

For the sake of life a perfect planning is needed for support.

In ancient time timber and masonry were the main methods.

Today support is provided by injecting final pipe or building it completely before further tunneling

Page 11: Tunnel making methods and tunnel boring machine

TRANSPORTATION OF MUCK

In ancient time transportation was done by steam engine and by Manual transport.

Today it is done by modern methods and process is automatic .

TBMs are also come with proper arrangment for the transport of muck.

Page 12: Tunnel making methods and tunnel boring machine

LINING OR COATING Lining of proper material is done by

modern methods like polishing ,painting to prevent wear and tear and corrosion.

Very necessary part where corrosive metals are being used.

Page 13: Tunnel making methods and tunnel boring machine

DRAINING Draining is the process to remove the

water or other liquid from working site .

Very important where water level is very high.

Pumps and pipes are used for this purpose.

Page 14: Tunnel making methods and tunnel boring machine

VENTILATION

Proper ventilation is required for safety of workers.

This is done by proper checking of oxygen and other parameters .

Proper installations for exit of hazardous gasses coming out from tunneling .

Page 15: Tunnel making methods and tunnel boring machine

tunnel construction methods: Classical methods Cut-and-cover Drill and blast Tunnel boring machines (TBMs) Immersed tunnels Tunnel jacking Other methods .

Page 16: Tunnel making methods and tunnel boring machine

Classical Methods Among the classical methods are the

Belgian, English, German, Austrian, Italian and American systems. These methods had much in common with early mining methods and were used until last half of the 19th century.

Excavation was done by hand or simple drilling equipment.

Supports were predominantly timber, and transportation of muck was done on cars on narrow gauge tracks and powered by steam.

Progress was typically in multiple stages i.e. progress in one drift, then support, then drift in another drift, and so on.

The lining would be of brickwork. These craft-based methods are no longer applicable, although some of their principles have been used in combination up to present day. Nevertheless some of the world’s great tunnels were built with these methods.

Page 17: Tunnel making methods and tunnel boring machine

The English method (crown-bar method, figure left) started from a central top heading which allowed two timber crown bars to be hoisted into place, the rear ends supported on a completed length of lining, the forward ends propped within the central heading. Development of the heading then allowed additional bars to be erected around the perimeter of the face with boards between each pair to exclude the ground. The system is economical in timber, permits construction of the arch of the tunnel in full-face excavation, and is tolerant of a wide variety of ground conditions, but depends on relatively low ground pressures.

Page 18: Tunnel making methods and tunnel boring machine

The Austrian (cross-bar) method required a strongly constructed central bottom heading upon which a crown heading was constructed. The timbering for full-face excavation was then heavily braced against the central headings, with longitudinal poling boards built on timber bars carried on each frame of timbering. As the lining advanced, so was the timbering propped against each length to maintain stability. The method was capable of withstanding high ground pressures but had high demand for timber.

Page 19: Tunnel making methods and tunnel boring machine

The German method (core-leaving method) provided a series of box headings within which the successive sections of the side walls of the tunnel were built from the footing upwards, thus a forerunner of the system of multiple drifts. The method depends on the central dumpling being able to resists without excessive movement pressure transmitted from the side walls, in providing support to the top 'key' heading prior to completion of the arch and to ensuring stability while the invert arch is extended in sections.

The Belgian system (underpinning or flying arch method) started from the construction of a top heading, propped approximately to the level of the springing of the arch for a horseshoe tunnel. This heading was then extended to each side to permit construction of the upper part of the arch, which was extended by under- pinning, working from side headings. The system was only practicable where rock loads were not heavy.

The first sizeable tunnel in soft ground was the Tronquoy tunnel on the St Quentin canal in France in 1803, where the method of construction, based on the use of successive headings to construct sections of the arch starting from the footing, was a forerunner to the German system described above.

Page 20: Tunnel making methods and tunnel boring machine

ROAD HEADERS

Page 21: Tunnel making methods and tunnel boring machine

CUT AND COVER METHOD

Page 22: Tunnel making methods and tunnel boring machine

CUT & COVER METHOD The principal problem to be solved in connection

with this construction method is to how to maintain surface traffic, with the least disturbance during the construction period. One method is to restrict traffic to a reduced street width, another to direct traffic to a bypassing street.

Another way of supporting the sidewalls of open trenches is to substitute sheet-pile walls by concrete curtain walls cast under bentonite slurry (ICOS method), and using steel struts. This is especially a requisite in narrower streets trimmed with old sensitive buildings with their foundation plane well above the bottom level of the pit. This type of trench wall becomes a requirement for maintenance of surface traffic due to the anticipation of vibration effects potentially harmful to the stability of buildings with foundations lying on cohesionless soils.

Page 23: Tunnel making methods and tunnel boring machine

DRILL AND

BLAST1.Before the advent of tunnel boring machines, drilling and blasting was the only economical way of excavating long tunnels through hard rock, where digging is not possible.

2.Even today, the method is still used in the construction of tunnels.

Page 24: Tunnel making methods and tunnel boring machine

HOW DRILL AND BLAST IS BEING DONE.

Page 25: Tunnel making methods and tunnel boring machine

MECHANICAL DRILLING AND CUTTING-CRUSHING STRENGTH OF ROCK

Page 26: Tunnel making methods and tunnel boring machine

TBM In various size Tunnel Boring

Machines(TBM) are used for drilling a vast type of tunnels .

Transportation of muck , supporting and all other actions are done automatically.

Very useful in boring tunnel where all other methods fail.

A main method in use in now a days.

Page 27: Tunnel making methods and tunnel boring machine
Page 28: Tunnel making methods and tunnel boring machine

IMMERSED TUNNELS1.THIS TYPE OF TUNNELS ARE PARTLY OR WHOLLY ARE UNDERWATWER.

2.THEY DO NOT BLOCK THE ROOT FOR SHIPS SO THERE IS NO PROBLEM OF CONGESSION OF TRAFFIC AS IN CASE OF BRIDGES OVER RIVERS OR SEAS.

Page 29: Tunnel making methods and tunnel boring machine

TUNNEL JACKING1.IT IS A PROCESS TO MAKE TUNNELS IN ALREADY EXISTING BOADIES SUCH AS ROADS ,RAILWAYS.

2.IN THIS METHOD ESPECIALLY MADE PIPES ARE PUSHED BY A HYDRAULIC RAM IN GROUND .

3.MAXIMUM DIAMETER OF TUNNEL BY THIS METHOD IS AROUND 2.4 METER.

Page 30: Tunnel making methods and tunnel boring machine
Page 31: Tunnel making methods and tunnel boring machine

The choice of tunnelling method may be dictated by:

geological and hydrological conditions, cross-section and length of continuous tunnel, local experience and time/cost considerations (what

is the value of time in the project), limits of surface disturbance, and many others

factors. Tunnel methods . Required speed of construction. Shape of tunnel. Managing the risk of variations in ground quality

Page 32: Tunnel making methods and tunnel boring machine

THE OTHER SIDE Beside of many security measures ,

tunnelling is still not full proof.

Failure of automatic system will cause deadly results as depicted in Hollywood flick Die Hard 4.0.

High cost than bridges , but more fruitful from previous.

Page 33: Tunnel making methods and tunnel boring machine

.

.

Page 34: Tunnel making methods and tunnel boring machine

QU

ER

IES

PLEA

SE !!!!