+ All Categories
Home > Documents > Tunneling Jumbos General Info

Tunneling Jumbos General Info

Date post: 22-Dec-2015
Category:
Upload: daniel-sopla-cubas
View: 27 times
Download: 9 times
Share this document with a friend
Description:
MAQUINARIA MINERA
38
Sandvik Mining and Construction SANDVIK DT/DTi SANDVIK DT/DTi SERIES SERIES Kings of the tunnel Kings of the tunnel
Transcript
Page 1: Tunneling Jumbos General Info

Sandvik Mining and Construction

SANDVIK DT/DTi SANDVIK DT/DTi SERIESSERIES

Kings of the tunnelKings of the tunnel

Page 2: Tunneling Jumbos General Info

Sandvik Mining and Construction

JUMBOS FOR ALL APPLICATIONS… 1/2

SANDVIK DT8

DT820

DT820-C

DT820-SC

DD530-S60C

SANDVIK DT10 / DT11 / DT12

DT1030

DT1030-SC

DT1030-C Data

DT1130

DT1130-S

DT1130-SC

DT1130-C Data

DT1230-SC

DT1230-C Data

SANDVIK DT8

SANDVIK DT10 DT11 DT12

Page 3: Tunneling Jumbos General Info

Sandvik Mining and Construction

…ALSO FOR SMALLER TUNNELS 2/2

SANDVIK DD310

SANDVIK DD210

SANDVIK DD420

SANDVIK DD320

Page 4: Tunneling Jumbos General Info

Sandvik Mining and Construction

A COMPLETE SERIES OF EQUIPMENT

Less is more with common components

Wide range of offering tailored to all applications

Commonality across product family Shared components and systems

across size classes

Vertical compatibility in matrix

Commonality across carrier size Same platform for different applications

Horizontal compatibility in matrix

DD / DT DSDL

LP

10

11

12

SPECIAL

32

4

5 / 8

2

31

9

Page 5: Tunneling Jumbos General Info

Sandvik Mining and Construction

Control system Model # of booms Coverage Feed length

Hydraulic THC DT 820 2 + basket (o) 12 - 110 m2 12 - 20 ftDT 1030 3 + basket (o) 20 - 128 m2 14 - 21 ftDT 1130 3 + basket (o) 20 - 183 m2 14 - 21 ft

Electric TPC DT 820-SC 2 + basket (o) 12 - 110 m2 12 - 20 ftDT 1030-SC 3 + basket (o) 20 - 128 m2 14 - 21 ftDT 1130-SC 3 + basket (o) 20 - 183 m2 14 - 21 ft

Automatic TDATA DT 1030-C DATA 3 + basket (o) 20 - 125 m2 14 - 21 ftDT 1130-C DATA 3 + basket (o) 20 - 177 m2 14 - 21 ftDT 1230-C DATA 3 + basket (o) 20 - 200 m2 14 - 21 ft

Automatic iDATA DT920i 2 + basket (o) 12 - 125 m2 12 - 21 ftDT1120i 2 + basket (o) 20 - 177 m2 12 - 21 ftDT1130i 3 + basket (o) 20 - 177 m2 12 - 21 ftDT1230i 3 + basket (o) 20 - 211 m2 12 - 21 ft

(o) = optional

SANDVIK DT SERIES (examples)

Page 6: Tunneling Jumbos General Info

Sandvik Mining and Construction

19.1 m

9,8 m

EXCELLENT COVERAGE WITH DT

15.68 m

10,92 m

11,9 m

18.28 m

0° lookout angle

8,42 m

DT10

DT12

DT11

DT8

14.20 mSANDVIK DT8

SANDVIK DT10

SANDVIK DT11

SANDVIK DT12

Page 7: Tunneling Jumbos General Info

Sandvik Mining and Construction

EASY TO USE CONTROLS 1/3

Hydraulic control system - THC Efficient hydraulics promote penetration and good drill steel economy

Optimized feed/percussion follow-up• No full power without proper drill string support

• No underfeed

Adjustable rotation speed• According to bit size and changing rock conditions

Anti-jamming automatics

Comfortable working environment Logical layout of the levers

Easy to learn

All boom movements fully proportional

Easy to adjust and troubleshoot

Page 8: Tunneling Jumbos General Info

Sandvik Mining and Construction

EASY TO USE CONTROLS 2/3

Electric control system - TPC Automatics combined with efficient hydraulics improve

productivity and quality in tunneling One hole automatics

• ”One touch” for normal drilling functions

Collaring automatics with• Rock detect

• Two ramps to full speed

Adaptive drilling• Adjusting feed/percussion

pressures in changing rock conditions

Operator friendly layout for 1-3 operators

TPC

Page 9: Tunneling Jumbos General Info

Sandvik Mining and Construction

EASY TO USE CONTROLS 3/3

Fully automatic control system - DATA Computerization improves productivity through accuracy and

repeatability Pre-programmed drill plans

Automatic boom positioning with• Find rock

• Correct function

User-friendly controls Operator as a supervisor

• Ergonomic control panel

• Easy to understand interface

Self-diagnostics• System messages on screen

• Alarm logTDATA

Page 10: Tunneling Jumbos General Info

Sandvik Mining and Construction

HIGH DRILLING PERFORMANCE 1/2

High efficiency 75 kW power packs with HFX5T rock drills

55 kW power packs with HLX5T rock drills

High penetration rate In all applications

In all rock formations

Very good stability due to the 2-stage stabilizer External / adjustable

Longer tool and drifter life

Good serviceability

HLX5 and HLX5T

Power class 20-22

kW

Percussion rate 62 Hz

Operating pressure 120…

220 bar

HFX5T

Power class 25 kW

Percussion rate 89 Hz

Operating pressure 120…

240 bar

Page 11: Tunneling Jumbos General Info

Sandvik Mining and Construction

HIGH DRILLING PERFORMANCE 2/2

Performance (results from the test mine)

Rock

Granodiorite rock 150-200 MPa, DRI45

Quarz 30-35%

THC (55 kW) Bit diameter 45mm 3.6 m/min in face drilling

Bit diameter 64mm 2.1 m/min in extension drilling

TPC (75 kW) Bit diameter 45mm 4.8 m/min in face drilling

Bit diameter 64mm 2.8 m/min in extension drilling

Page 12: Tunneling Jumbos General Info

Sandvik Mining and Construction

MADE TO TRAM AND DRILL 1/3

Made for tramming in the toughest surroundings Fast

• Powerful 4 x 4 wheel drive

• 110 kW Mercedes-Benz OM904LA (standard in TC8, TC9 and TC11)

• 170 kW Mercedes-Benz OM906LA (standard in TC12)

High ground clearance

Optimal dimensions for mobility• Both approaching and leaving angles

Endurable• Automatic altitude adjustment in diesel engine

• High cold resistance

• Heavy-duty axles

Page 13: Tunneling Jumbos General Info

Sandvik Mining and Construction

MADE TO TRAM AND DRILL 2/3

Emphasis on health and safety Safe

• Good stability with all boom configurations

• Big tires

• Safe brake systems

• Safety canopy and cabin FOPS, ISO 3449 certified

Ergonomic operator interface Good insulation of noise and vibration

• According to EN 791

Excellent visibility• Elevating cabin in SANDVIK DT9 – DT12

• Operator platform located optimally in canopy models

• High intensity discharge lights (35 W) Improved illumination power is noticeable

Page 14: Tunneling Jumbos General Info

Sandvik Mining and Construction

MADE TO TRAM AND DRILL 3/3

Emphasis on environment Engines meet with Tier 3 emission regulations

Biodegradable oils as option

Cleaner air due to restricted shank lubrication fume• Drain led to feed surfaces, where fume converts back to fluid

Most materials recyclable

Page 15: Tunneling Jumbos General Info

Sandvik Mining and Construction

ACCURATE AND FAST DRILLING

Feeds with good guidance Feed force max 25 kN

Length alternatives: 12’, 14’, 16’, 18’, 20’ and 21’

Centralizer wear pieces made of hardened steel

Durable hose reel

TFX telescopic feed as option

Strong booms Large coverage area with optimal shape

• Large swing angles

• Long boom arm / telescope

Full automatic parallelism ensures perfect control of booms

Full series with the same components• TB60, TB90, TB120 and TB150

Page 16: Tunneling Jumbos General Info

Sandvik Mining and Construction

• Less over-break, haulage and concrete needed for lining

• Less holes, better pull-out length• Fast tunnel advance• Less waiting times• Optimized tunneling process flow

ACCURACY Drilling accuracy is essential for good blasting and profile quality

OPTIMIZATION Whole drill and blast cycle can be analyzed and drill plan optimized for better fragmentation and more accurate tunnel profile

REPEATABILITY Even the most difficult drill plans can be repeated accurately round by round

SAVING TIME AND MONEY

Page 17: Tunneling Jumbos General Info

Sandvik Mining and Construction

TMS

Drill feed direction, hole depth and penetration rate measuring instrument

Drill bit position and feed direction measurement system

• Semi-DATA

Automatic control system of boom positioning and drilling functions

• Full DATA

Data logging and reporting system • Standard for TDATA • Optional for TCAD

TCAD

TLOGTDATA

INSTRUMENTATION LEVELS

Page 18: Tunneling Jumbos General Info

Sandvik Mining and Construction

DATA LOGGING AND REPORTING

Data logging Production statistics

Hole data as function of hole depth

Also for bolt holes

MWD information

Reporting and analysis Report generation with Visual

Tunneling software • Report for Windows

Printed or on-screen reports

Visual Tunneling

Page 19: Tunneling Jumbos General Info

Sandvik Mining and Construction

IMPROVED SERVICEABILITY 1/2

Strong structures Components protected against damage

All percussion parts inside one cylinder (rock drills)

Maintenance free hydraulic tubes (TC 11 and TC12)

Easy to access All daily service points

Most components accessible on ground level

Turning and lockable components (TC8)• Electric cabinet, water hose reel, water pump

Compressors can be pulled out along rails (TC8)

Page 20: Tunneling Jumbos General Info

Sandvik Mining and Construction

IMPROVED SERVICEABILITY 2/2

Quick diagnostics Simple and quick adjustments & diagnostics

Interactive documentation on CDs

Visual wear indicators on rock drills

Simple to maintain Rock drill modules can be serviced on feed beam

Percussion and rotation modules can be serviced independently

Wearing pieces can be changed w/o dismantling the boom

Clearances can be adjusted by conical cylinder pins

All hoses in boom end are of same length

Replaceable stainless steel strips in feeds• Fastening by bolts makes it easier to replace

• Replacement even in pieces

Page 21: Tunneling Jumbos General Info

Sandvik Mining and Construction

PLANNING THE TUNNEL PROJECT

Tunnel Study Program

For optimizing the work cycle

the resources

the fleet

For estimating drilling costs

cost savings

the fleet size

Page 22: Tunneling Jumbos General Info

Sandvik Mining and Construction

Sandvik DTi

Fast

Accurate

User friendly

Page 23: Tunneling Jumbos General Info

Sandvik Mining and Construction

Sandvik i-series

DT1120i

DT1130i

DT1230i

DT920i

Page 24: Tunneling Jumbos General Info

Sandvik Mining and Construction

OPERATOR INTERFACE

Page 25: Tunneling Jumbos General Info

Sandvik Mining and Construction

Safe and ergonomic work environment

Easy accessIlluminated stairs for cabin

Standard EN791-1:1995 ‘Drill rig safety’ FOPS approvedVibration dampened cabin

Safety barrier on doorway instead of safety beltThick windshield

Operator comfortPresent day coating materials and colours

A lot of storage (locker)Feeling of space

Noise level inside cabin: max. 75 dB(A)LED-type interior lights (minimized glare by reflection)

Good air conditionsAir flow to cabin optimized and measured

Filtering capacity added 33% Cabin air conditioning and heating during tramming as standard

The use of the cabin heating/cooling devise is simplifiedCD-player, ice-box as option

230VAC, 24VDC, 12VD outlets as standard Boot washer

Floor materials of the new cabin adopts the wet cleaning

Powerful lightingXenon lights with high lighting powerSame lights for drilling and tramming

Excellent visibilityIn all drilling applications (bottom holes, profile, standing operations etc.)

Also w/o cabin elevationWaistline 20cm lower and 20% larger windows

Battens between front windows as thin as possibleOperators seat as front as possible

Front window wipers optimized (size and operation)

OPERATOR INTERFACE

Page 26: Tunneling Jumbos General Info

Sandvik Mining and Construction

User interface

Page 27: Tunneling Jumbos General Info

Sandvik Mining and Construction

Sandvik Underground Rock Excavation software iSURE

Tunnel Line Design Drill Plan Design

Reporting

An integrated solution...

Page 28: Tunneling Jumbos General Info

Sandvik Mining and Construction

OverviewP

roje

ct

Tun

nel L

ine

Dri

ll &

Bla

st D

esig

n

Rep

orti

ng

Page 29: Tunneling Jumbos General Info

Sandvik Mining and Construction

Compatibility

no

TCAD, TDATA

iSURE

Curve

Report

Design

Visual Tunneling

..pla for conversion only

no

DrillPlan

Tunnel Line

Report

iDATA.dp

.tl

.ns

.zda

Page 30: Tunneling Jumbos General Info

Sandvik Mining and Construction

Economical Drilling & Blasting PlanTarget is obtained via defining the cracking zone per charge (oversimplification) and visualisation of the situation for profile, aidrow(x) and field holes upon request.User can use the maximum charge allowable in that place. Attention: burden area ≠ cracking circle !

Rc

Allowed cracking zone

Page 31: Tunneling Jumbos General Info

Sandvik Mining and Construction

New features of Reporting

Page 32: Tunneling Jumbos General Info

Sandvik Mining and Construction

New features of Reporting

Page 33: Tunneling Jumbos General Info

Sandvik Mining and Construction

New features of Reporting MWD data

1. Anti-Jamming State

2. Drilling Control Setting

3. Feed Pressure

4. Flushing Flow

5. Flushing Pressure

6. Penetration Rate

7. Percussion Pressure

8. Rock Detect

9. Rotation Pressure

10. Rotation Speed (control based)

11. Stabilator Pressure

12. State of Flushing Flow

13. Waterpump Pressure

Page 34: Tunneling Jumbos General Info

Sandvik Mining and Construction

An Example of Drill Plan Design

• Round bottom design can be adjusted any time, many times rounded design will improve the advance

• Individual hole depth can be adjusted to specialize i.e bottom corner design

Page 35: Tunneling Jumbos General Info

Sandvik Mining and Construction

An Example of Drill Plan Design

• Also orientation point tool is available (top and side view)

• Hole direction is done by setting the angle of few holes, direction-master holes.

• Other holes are interpolated according to them via the element

Page 36: Tunneling Jumbos General Info

Sandvik Mining and Construction

An Example of Drill Plan Design

• Sequence defines the drilling boom and order.• Other holes are interpolated according to them via the element• Waypoints can be added to route the feed unit via an alternative way

Page 37: Tunneling Jumbos General Info

Sandvik Mining and Construction

An Example of Drill Plan Design

• Roll-over angle defines roll-over joint angle for each hole.• Tools for roll-over angle interpolation and a ”hot spot” angle

definition for a group of holes are available

Page 38: Tunneling Jumbos General Info

Sandvik Mining and Construction

An Example of Drill Plan Design

• Setting of the detonator number


Recommended