• Evaluation of off-season [Walk-in Tunnels] tomatoes under sustainable/organic conditions.
• Use of nutrients & bio-pesticide as foliar with the interval of 10-days up to termination.
• Use of 1% Bio Gas waste water application in soil. [10ml / Pit] with the interval of 10-days up to termination.
• Study of high density plant population [8X8]
• Study of water use in respect of irrigations.
• Testing of PPP
14.10.2010 Sowing of tomatoes nursery on raised [email protected]
30.10.2010 [email protected]
26.11.2010 Installation of [email protected]
27.11.2010 [email protected]
27.11.2010 Fabrication of Mulching Paper [email protected]
28.11.2010 [email protected]
29.11.2010 Hole making for the transplanting of [email protected]
30.11.2010 [email protected]
30.11.2010 Tomatoes were transplanted; after irrigation in the holes on [email protected]
30.11.2010 Tomatoes were transplanted; after irrigation in the wholes on [email protected]
01.12.2010 After transplanting the tunnels were sealed with plastic; so that plants can get heat and establish root [email protected]
01.12.2010 [email protected]
02.12.2010 [email protected]
01.01.2011 Spray of Baking Soda [1%Solution] against fungal diseases due to high [email protected]
Daily opening of tunnels at 10am to 03pm to remove extra [email protected]
10.01.2011 2nd nutrients [NE-210] was given after 7-days [email protected]
11.01.2011 Pruning of auxiliary shoots and old [email protected]
Pruning is continuous process; as sprouting is natural [email protected]
11.01.2011 After [email protected]
12.01.2011 1st application 1% Bio Gas waste water application in soil. [10ml / Pit][email protected]
12.01.2011 1st application 1% Bio Gas waste water application in soil. [Pits][email protected]
13.01.2011 Sowing of [email protected]
Analysis Report. [email protected]
24.01.2011 4th Spray [email protected]
02.02.2011 Germination of [email protected]
24.03.2011 Calibration of water per furrow and per [email protected]
22.03.2011
• Water calibration per furrow was done by using 200 liter drum; which was filled and poured in furrow. The furrow was divided in three portions and was filled with measured water up to required level and it was found that one furrow was filled with 600 liters of water.
• Water used: 18TX2F=36X600=21600 liters/Acre.
27.03.2011 Completed remaining irrigation by canal [email protected]
26.04.2011 First picking of tomatoes [18.5 kg][email protected]
02.05.2011 2nd picking of tomatoes [28 kg][email protected]
03.05.2011 Fruiting load after 2nd [email protected]
03.05.2011 Fruiting load [email protected]
03.05.2011 Fruiting load [email protected]
09.05.2011 Tomatoes 3rd picking [email protected]
11.05.2011 Tomatoes 4th picking [email protected]
12.05.2011 Tomatoes 5th picking [email protected]
16.05.2011 Tomatoes 6th [email protected]
17.05.2011 Tomatoes 7th [email protected]
19.05.2011 Tomatoes 8th [email protected]
23.05.2011 Tomatoes 9th picking [email protected]
24.05.2011 Tomatoes Position after 8th picking [email protected]
Tomato Production in sustainable [Organic] Conditions
Plants Total Fruit Weight Total Damaged weight Borer Damage Fungus Damage A-Grede Fruit Total Plants/Tunnel Yield / Tunnels Yield / Ac
1 1.56 0.789 0.609 0.275 0.771 600 936 1.56
2 1.59 0.798 0.599 0.322 0.792 590 938.1 1.59
3 1.7 0.779 0.6 0.319 0.921 607 1031.9 1.7
4 1.61 0.814 0.588 0.273 0.796 575 925.75 1.61
5 1.65 0.89 0.671 0.173 0.76 599 988.35 1.65
6 1.2 0.709 0.48 0.14 0.491 601 721.2 1.2
7 1.44 0.689 0.725 0.252 0.751 590 849.6 1.44
8 1.68 0.645 0.511 0.325 1.04 589 989.52 1.685
9 1.66 0.715 0.566 0.295 0.945 603 1000.98 1.66
Average 1.566 0.759 0.594 0.264 0.807 594.889 931.267 8381.4
Tomato Production of Check Field
Plants Total Fruit Weight Total Damaged weight Borer Damage Fungus Damage A-Grede Fruit Total Plants/Tunnel Yield / Tunnels Yield / Ac
1 0.859 0.584 0.69 0.49 0.156 580 498.22 0.859
2 0.811 0.489 0.61 0.44 0.155 590 478.49 0.811
3 0.795 0.476 0.598 0.39 0.138 605 480.975 0.795
4 0.871 0.598 0.543 0.47 0.143 490 426.79 0.871
5 0.775 0.602 0.579 0.39 0.164 598 463.45 0.775
6 0.639 0.499 0.601 0.35 0.166 611 390.429 0.639
7 0.884 0.632 0.569 0.48 0.148 587 518.908 0.884
8 0.901 0.576 0.486 0.62 0.155 550 495.55 0.901
9 0.704 0.409 0.672 0.43 0.176 475 334.4 0.704
Average 0.804 0.541 0.594 0.451 0.156 565.111 454.135 [email protected]
Conclusion
Production
• Total Plants/Tunnel:600
• Production/Plant:1.56 kg
• Production/Tunnel:936 kg
• Production/acre:18.72 ton
• Fixed/Capital Cost: Rs:800000/-per acre.
• Per year: Rs: 160000/- [5-year plan].
• Consultancy: 200000/-
Value
• Rs:15000/=@25/plant
• @Rs:50/kg
• Rs:46800/- per tunnel
• Rs:936000/- per acre
• Net Profit 1st year:
• Rs: 5,76,000/-
• Less CC 160000/-
• Less Consultancy 200000/-