+ All Categories
Home > Documents > Turnkey solutionstechnomaps.veoliawatertechnologies.com/.../3806-AQA-TURNKEY-E… · Turnkey -...

Turnkey solutionstechnomaps.veoliawatertechnologies.com/.../3806-AQA-TURNKEY-E… · Turnkey -...

Date post: 08-Aug-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
2
WATER TECHNOLOGIES ONE STEP AHEAD! Turnkey - solutions for land-based Aquaculture
Transcript
Page 1: Turnkey solutionstechnomaps.veoliawatertechnologies.com/.../3806-AQA-TURNKEY-E… · Turnkey - solutions for land-based Aquaculture. FREDERIC GAUMET Sales Manager Aquaculture, GLOBAL

WATER TECHNOLOGIES

ONE STEP AHEAD!

Turnkey - solutions for land-based Aquaculture

Page 2: Turnkey solutionstechnomaps.veoliawatertechnologies.com/.../3806-AQA-TURNKEY-E… · Turnkey - solutions for land-based Aquaculture. FREDERIC GAUMET Sales Manager Aquaculture, GLOBAL

FREDERIC GAUMETSales Manager Aquaculture, GLOBAL +47 94 13 19 19 frederic. [email protected]

HEIDI KYVIK Sales Director Aquaculture +47 97 42 18 08

[email protected]

At Krüger Kaldnes, we develop solutions for complete delivery of land-based fish farms in collaboration with a building contractor. Our focus is on high quality, biosecure fish production and optimal logistics to create well-designed facilities for our clients. The key to our success is our close cooperation with clients during the pre-project planning phases as well as throughout the project execution.

KRÜGER KALDNES DELIVERY:

• RAS water treatment system• Oxygenation system• Chemical dosing system• Energy plant for heating/cooling water• Intake water treatment system• Dead fish management system• Sludge and waste water treatment systems• Complete piping layout• Hatchery• Lighting system• Feeding system

BUILDING CONTRACTOR DELIVERY:

• Complete buildingwith ventilationand heat recovery

Pre-project planning: In this phase, the concept and layout for the building and the process systems are developed in collaboration with the client.

Engineering phase: The project design is refined further with the preparation of detailed drawings and calculations for project execution.

Project execution: The project is executed on site in close cooperation with the building contractor and sub-suppliers.

Startup and Handover: Startup and commissioning are performed in collaboration with the client, and a performance test is conducted on each RAS department, to satisfy the process guarantee. Staff training and one-year process support (minimum) is provided with all our projects.

Krüger Kaldnes

Nordre Fokserød 9 • 3241 Sandefjord, Norwayoff. +47 91 60 80 00 - Fax: +47 33 48 50 01 - [email protected]

www.krugerkaldnes.nowww.veoliawatertechnologies.com

Turnkey-solutionsfor land-based fish farming

4 STEPS TO TURNKEY

1

2

3

4

TURNKEY DELIVERY IN COLLABORATION WITH BUILDING CONTRACTORLAND-BASED FISH FARMS WITH KALDNES® RAS

FREDERIC GAUMETSales Manager Aquaculture, GLOBAL +47 94 13 19 19 frederic. [email protected]

HEIDI KYVIK Sales Director Aquaculture +47 97 42 18 08

[email protected]

For more information visitwww.krugerkaldnes.no

or contact us directly:


Recommended