Review Depressuring Result
Hhmmm,,,, I guess that you know well this strip charts. Can you review this chart ? What do you think ?
Too many variable.. and also too fast in moving.It is very difficult to review the depressuring result using charts like this.
Process System2
This tutorial will guide you how to provide good result or report of depressuring study
Just example
Select Check only 3 or 4 variable.
Process System3
Click ADD VARIABLE, if required . Ex ; to review the Duty , and Tank Wetted Area. Click CREAT PLOT to make
new strip chart re name the LOGGER NAME
Now, click Create Plot to make separate strip charts for each variable, and for example rename as figure below. Make the default/the original as a master
Process System4
Check /"Active" the following Variable
Depressuring Load Vapor Out Mass Flow
Pressure Profile Vapor Pressure
Temperature Profile Vapor Temperature Vapor Out Temperature
Vessel Condition Duty Tank Wetted Area
Just sample. This is depend on the number of variable which is important to be reviewed.
Just sample
View Strip Charts . The result is like this
Right Click the chart Select Graph Control
Double Click
Select WHITE
Process System5
Select WHITE color
ACTIVE variable
Select 3 or 4
You can change the graphic appearance,Right Click the chart Select AutoScale All Axes for many variable in one strip charts
Process System6
hhmm,,It is the sample final strip chart : What do you think
Now, From this chart , it is more easy for you to see : that;The wetted area is decreaseThe duty is decreaseThe depressuring load is decrese(at any time)..etc
The strip chart too fast in moving, Now, we want to make slower moving.
Stop the dynamic running first.Click Simulation -Integrator
Process System7
Change the Acceleration to 0.5 or 0.3Then running dynamic again.
Provide Precise Value
Instead of using Strip chart use View Historical Data, which gives precise values
Select / Active only important variable
Process System8
View Historical Data
Just sample
You can make validation of Depressuring result using this hystorical data
Process System9