TVA Watts Bar Nuclear Plant Dog Bone Seal Failure, Installation, and Inspection Presented by: Billy Sharp Presented to: FSRUG January 28, 2016 1
Transcript
Page 1: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

TVA Watts Bar Nuclear PlantDog Bone Seal Failure, Installation,

and Inspection

Presented by: Billy SharpPresented to: FSRUG

January 28, 20161

Page 2: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Failure

• Watts Bar

– 2 unit, 4 Loop Westinghouse PWR.

– TVA designed Secondary Side

– Ingersol Rand Main Condenser

• WBN1 was manually tripped at 10:32 a.m. on 02/21/15 in anticipation of an automatic turbine and reactor trip due to low condenser vacuum.

2

Page 3: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

3

Dog Bone Seal FailureMain Condenser Design

Failure of C Zone Dog Bone Seal

3 Cascading Condenser Zones27,410 115ft-long Tubes

NormalVacuum Exhaust

Page 4: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Failure

4

Horizontal Tear along the clamping bar

Vertical Tear along the vulcanized splice

Page 5: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Failure

Splice Transition to seal

Outside deterioration of the seal

Internal deterioration of the seal

5

Page 6: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Water Seal

• In-service for the life of the failed seal

• Interior Durometerreadings were normal.

• Recommended to only use for air in-leakage troubleshooting.

• Water seal is shut off for new seal

6

Dog Bone Water Seal

Water inside seal

Water Seal Side

Condenser Side

Page 7: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Clamps

Seal, Clamp, Shield Side View

7

Clamping bar design is to hold on the bulb of the seal. Minimal pressure should be on the belt center.

Page 8: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Splice Thickness

• C Zone Splice • B Zone Splice • A Zone Splice

A Zone Thickness not

measured during failure analysis

8

Page 9: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Splice

• Single steps instead of multistep

• Prepared ends do not meet.

Splice Transition to seal

Failed Seal

Splice

New Seal

Splice

First Cut Second Cut

9

Page 10: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

After Vulcanization

Dog Bone Seal Splice

Original Seal Cap Strip Replacement Seal Cap Strip

10

Indicates insufficient compression during vulcanization

Smooth transition between cap strip and seal surface

Page 11: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal Inspections

• Visual Inspections of splice and locations on each wall each refueling outage– Cracks

– Blisters

– Delamination

– Bulging

• Durometer deadings of 4 walls and splice each refueling outage

• Future: Microwave scanning of splice inspecting for voids.

11

Page 12: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary

Dog Bone Seal

Questions???12