2019 Twelve Year Program Tom Wolf Governor Leslie S. Richards Secretary, PA Department of Transportation Chairperson, State Transportation Commission James D. Ritzman, P.E. Deputy Secretary for Planning State Transportation Commission August 2018
Transcript
Page 1: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019Twelve Year Program

Tom WolfGovernor

Leslie S. RichardsSecretary, PA Department of Transportation

Chairperson, State Transportation Commission

James D. Ritzman, P.E.Deputy Secretary for Planning

State TransportationCommission

August 2018

For More Information:Phone: (717) 783-2262Website: www.TalkPATransportation.com

Page 2: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

i

ABOUT THE PENNSYLVANIA State Transportation Commission

Capitol Building in Harrisburg, Dauphin County

State Transportation Commission2019 Twelve Year Program

The Pennsylvania State Transportation Commission (STC) is comprised of 15 members and is chaired by the Secretary of the Pennsylvania Department of Transportation (PennDOT). As the board of directors to PennDOT, the STC is charged with the high-level evaluation of Pennsylvania’s transportation system and provides policy-driven direction with respect to the development of the Twelve Year Transportation Program.

Page 3: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

TABLE of ContentsAbout the Pennsylvania State Transportation Commission.................................................................i

Message from the Chair, State Transportation Commission................................................................1

Transportation Planning in PA.....................................................................................................................2

The Twelve Year Program Process............................................................................................................3 Planning and Prioritizing Projects........................................................................................................3 The Statewide Transportation Improvement Program...........................................................................4 Regional Long Range Transportation Plans..........................................................................................4 Transportation Program Review and Approval......................................................................................4 From Plans to Projects..........................................................................................................................5Public Participation.......................................................................................................................................7 TYP Public Outreach Process................................................................................................................8 Public Comment Period.........................................................................................................................9 Online Public Meeting............................................................................................................................9 Online Transportation Survey...............................................................................................................10 Demographics.................................................................................................................11 Modes of Transportation......................................................................................................................12 Transportation Priorities........................................................................................................................13 Budgeting..............................................................................................................................14 Mapping Transportation Concerns........................................................................................................15

Transportation Funding in Pennsylvania................................................................................................16 Federal Funding....................................................................................................................................16 State Funding........................................................................................................................................16 Local Funding.......................................................................................................................................16 2019 Twelve Year Transportation Program Funding Level Summary...................................................17

Contact Us.....................................................................................................................................................18Twelve Year Transportation Program List of Projects........................................................................19

About the cover photographOpened on October 20, 2015, the 1,633-foot-long Hulton Bridge in Oakmont Borough, Allegheny County improves traveler mobility and safety throughout the region. The new bridge has two lanes in each direction, a four-foot median and five-foot sidewalk connecting Oakmont with Route 28 in Harmar. Photo taken by John Myler, P.E.

iiwww.TalkPATransportation.com

Page 4: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

MESSAGE FROM THE CHAIR, State Transportation Commission

“Planning for the many transportation

modes associated with Pennsylvania’s immense

transportation system impacts every resident,

business, and visitor of the Commonwealth.”

I am very pleased to present to you, on behalf of the Pennsylvania State Transportation Commission (STC), the Pennsylvania Department of Transportation (PennDOT), and our many Planning Partners, the:

2019 Pennsylvania Twelve Year Transportation Program

The Twelve Year Transportation Program, or TYP, is updated every two years in partnership with our Metropolitan and Rural Planning Organizations and many other key stakeholders including you.

This is Pennsylvania’s most comprehensive multimodal project identification and prioritization tool. As such, the 2019 TYP represents PennDOT’s continued commitment to enhanced decision-making and the purposeful planning initiatives launched during the 2017 program development process.

I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process, and extensive public engagement efforts.

And of course, my thanks to you, for contributing your time, comments, ideas and projects to our twelve year plan.

Planning for the many transportation modes associated with Pennsylvania’s immense transportation system impacts every resident, business, and visitor of the Commonwealth. Together, we will continue to find solutions to sustain and expand mobility throughout the Commonwealth today, and well into the future.

Sincerely,

Leslie S. Richards Secretary, PA Department of Transportation Chairperson, State Transportation Commission

1

Page 5: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

The Twelve Year Transportation Program (TYP) is Pennsylvania’s official mid-range planning tool used to identify and prioritize transportation projects. It is the outcome of a collaborative effort between the Pennsylvania Department of Transportation (PennDOT), State Transportation Commission, its Planning Partners and the public. The TYP represents all modes and means of transportation including highways, bridges, public transit, aviation, and rail, as well as non-motorized transportation such as bicycling and walking.

TRANSPORTATION PLANNING in Pennsylvania

Pennsylvania’s TYP is required by Act 120 of 1970 and must be submitted to the State Transportation Commission every two years. The TYP is a dynamic schedule of agreed-upon projects that PennDOT, with its various partners, will work to accomplish over a 12-year period.

The Twelve Year Transportation Program is separated into three four-year periods. The first four years corresponds with the federally required Statewide Transportation Improvement Program (STIP) and regional Transportation Improvement Programs (TIPs).

MESSAGE FROM THE CHAIR, State Transportation Commission

2www.TalkPATransportation.com

Route 35 Bridge Cleaning, Juniata County Route 22 near Gallitzin, Cambria County

Page 6: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

Walnut Street Bridge in Harrisburg, Dauphin County

Planning and Prioritizing ProjectsTransportation projects are listed on the TYP based upon delivery schedules, regional and statewide goals and targets for infrastructure performance and condition, and expected funding availability. Projects are organized by the associated Planning Partner and further delineated by transportation mode and county.

Transportation project costs are allocated over one or more four-year periods based on the anticipated schedule of the project. The TYP also includes line items by funding category which are typically seen in the second and third four-year program periods. As new projects are identified, the line items are adjusted to reflect the detailed phases and costs associated to advance the project, all within fiscal constraints.

THE TWELVE YEAR PROGRAM Process

3

Page 7: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

The Statewide Transportation Improvement Program The first four years of the TYP is the federally-required Statewide Transportation Improvement Program (STIP). The STIP includes the 24 individual regional TIPs representing each Planning Partner and one independent county (Wayne County). In Pennsylvania, MPOs and RPOs update their TIPs every two years during the TYP update process. Public involvement activities are required when developing these programs, which are specified in the regional Public Participation Plans designed and adopted by each MPO and RPO.

Regional Long Range Transportation Plans The federal government requires MPOs to prepare a Long Range Transportation Plan (LRTP) to receive federal funding for transportation projects. The LRTP includes a list of transportation projects that must be fiscally constrained and based on the amount of funding the MPO expects to receive over the next 20 years. The LRTP is updated every four or five years to reflect new data and changes to regional priorities for transportation investment.

Transportation Program Review and ApprovalThe STC reviews the TYP every two years. After STC approval, the STIP (the first four years of the TYP) is sent to the Federal Highway Administration, the Federal Transit Administration, and the Environmental Protection Agency for review and approval prior to the start of the federal fiscal year on October 1.

4

Transportation Program Development ProcessTwelve Year Program Cycle - 2019-2030

Twelve Year Program (TYP)

1st Four Years Transportation Improvement Program

(TIP) & Statewide Transportation Improvement Program (STIP)

2nd Four Years 3rd Four Years

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

www.TalkPATransportation.comRail Freight near Mifflin, Juniata County

Fox Hill Road in State College, Centre County

Pedestrian Bridge in Mifflintown, Juniata County

Page 8: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

5

Limited meansPlanning & Prioritizing

MPOs and RPOs compare the transportation needs identified by local stakeholders and the public with the available funding and conduct an initial analysis of potential impacts of proposed projects in assembling a draft TIP.

The STC and Planning Partners (Metropolitan and Rural Planning Organizations - MPOs/RPOs) request input from local stakeholders and thepublic on transportation needs to help identify projects that reflect community and regional goals. The STC's public outreach efforts for the update of the 2019 TYP received national recognition for effectiveness, innovation, participant diversity and quality feedback!

Input

i

The STC shares the information gathered with the MPOs and RPOs to help guide the update of their regional Transportation Improvement Program (TIP).Federal Law requires TIPs to be updated every four years. Pennsylvania’s MPOs and RPOs update their TIPs every two years during the TYP update process.

PennDOT reviews the projects included on the individual draft TIPs to ensure that they meet thestatewide transportation priorities, are fiscallyconstrained to fit within budget projections, andconform to air quality standards.

The MPOs and RPOs individually endorsetheir respective draft TIP. The projects included in the draft TIPs are added to the StatewideTransportation Improvement Program (STIP).

The projects included in the STIP (the first four years of the TYP) are scheduled for implementation. The TYP is a collaborative mid-range planning tool that spans a 12-year period and outlines the multimodal transportation improvements statewide. The TYP is reviewed and updated every two years.

MPOs and RPOs submit theirindividual draft TIPs to PennDOT.

PennDOT delivers an updated draftof the TYP to the STC for review and approval.

TYP

Our Planning Partners

MPORPOIndependentCounty

The State Transportation Commission (STC) releases a Transportation Performance Report that contains information about how PA’s transportation system performed over the most recent two year period. The public is encouraged to review this report before the STC seeks public input and feedback on local and statewide transportation priorities. The Transportation Performance Report and public feedback help guide the development of the Twelve Year Program (TYP).

The Program is submitted to theFederal Highway Administration,Federal Transit Administration, and the US Environmental Protection Agency for review and approval.

TIP

Plan & Prioritize4

Share Information3

Submit TIPs5

Listen & Identify Needs 2

Report 1

FROM PLANNING TO PROJECTSThe Twelve Year Program Process

PennDOT Review6

Draft TYP8

Endorse & Incorporate7

Programmed Projects10

FACT:

TIPs are regional

STIP is Statewide

TIP

STIP

STIP

LegendState TransportationCommission (STC) Planning Partners PennDOTState TransportationCommission (STC)

Federal HighwayAdministration/Federal Transit Administration

In order for a project to be placed on the TIP or TYP, it needs to align with the future vision of the region’sLong Range TransportationPlan (LRTP).

FACT:The TYP is a multimodal, fiscally-constrained programof transportation improvements spanning a 12-yearperiod. Multimodal means that the TYP includes alltravel modes, including highways, bridges, public transit,aviation, rail, freight, and bicycle and pedestrian facilities.

What is the Twelve Year Program?

Input

US Environmental Protection Agency

Federal Review9

Page 9: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

6

Limited meansPlanning & Prioritizing

MPOs and RPOs compare the transportation needs identified by local stakeholders and the public with the available funding and conduct an initial analysis of potential impacts of proposed projects in assembling a draft TIP.

The STC and Planning Partners (Metropolitan and Rural Planning Organizations - MPOs/RPOs) request input from local stakeholders and thepublic on transportation needs to help identify projects that reflect community and regional goals. The STC's public outreach efforts for the update of the 2019 TYP received national recognition for effectiveness, innovation, participant diversity and quality feedback!

Input

i

The STC shares the information gathered with the MPOs and RPOs to help guide the update of their regional Transportation Improvement Program (TIP).Federal Law requires TIPs to be updated every four years. Pennsylvania’s MPOs and RPOs update their TIPs every two years during the TYP update process.

PennDOT reviews the projects included on the individual draft TIPs to ensure that they meet thestatewide transportation priorities, are fiscallyconstrained to fit within budget projections, andconform to air quality standards.

The MPOs and RPOs individually endorsetheir respective draft TIP. The projects included in the draft TIPs are added to the StatewideTransportation Improvement Program (STIP).

The projects included in the STIP (the first four years of the TYP) are scheduled for implementation. The TYP is a collaborative mid-range planning tool that spans a 12-year period and outlines the multimodal transportation improvements statewide. The TYP is reviewed and updated every two years.

MPOs and RPOs submit theirindividual draft TIPs to PennDOT.

PennDOT delivers an updated draftof the TYP to the STC for review and approval.

TYP

Our Planning Partners

MPORPOIndependentCounty

The State Transportation Commission (STC) releases a Transportation Performance Report that contains information about how PA’s transportation system performed over the most recent two year period. The public is encouraged to review this report before the STC seeks public input and feedback on local and statewide transportation priorities. The Transportation Performance Report and public feedback help guide the development of the Twelve Year Program (TYP).

The Program is submitted to theFederal Highway Administration,Federal Transit Administration, and the US Environmental Protection Agency for review and approval.

TIP

Plan & Prioritize4

Share Information3

Submit TIPs5

Listen & Identify Needs 2

Report 1

FROM PLANNING TO PROJECTSThe Twelve Year Program Process

PennDOT Review6

Draft TYP8

Endorse & Incorporate7

Programmed Projects10

FACT:

TIPs are regional

STIP is Statewide

TIP

STIP

STIP

LegendState TransportationCommission (STC) Planning Partners PennDOTState TransportationCommission (STC)

Federal HighwayAdministration/Federal Transit Administration

In order for a project to be placed on the TIP or TYP, it needs to align with the future vision of the region’sLong Range TransportationPlan (LRTP).

FACT:The TYP is a multimodal, fiscally-constrained programof transportation improvements spanning a 12-yearperiod. Multimodal means that the TYP includes alltravel modes, including highways, bridges, public transit,aviation, rail, freight, and bicycle and pedestrian facilities.

What is the Twelve Year Program?

Input

US Environmental Protection Agency

Federal Review9

www.TalkPATransportation.com

Page 10: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

Public involvement is an important part of the TYP update process. It is through the STC’s Public Participation Process that all transportation stakeholders, especially the members of the public, communicate and provide feedback on local, regional and statewide transportation issues. This feedback and input plays a key role in the decision-making processes for programming and funding transportation projects.

Following the biennial release of the PA Transportation Performance Report, which assesses the condition of the PA transportation system with available resources, PennDOT, the STC and regional Planning Partners across the Commonwealth conduct extensive outreach to collect public feedback which is compiled, documented and analyzed for use in the TYP, regional TIPs, and regional Long Range Transportation Plans (LRTPs).

PUBLIC ParticipationFeedback and input plays a key role in the decision-making processes for programming and funding transportation projects.

7

Input

SAFETYFIRST

State Transportation Commission

PENNSYLVANIA 2017 Transportation Performance Report

February 2017

Transportation Performance Report

Bayfront Public Meeting PennDOT ConnectsUS 15 Smart Transportation Corridor Improvement Project

I-90 Section 1 Public Meeting

Page 11: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

TYP Public Outreach ProcessThe STC and PennDOT actively engage the citizens of Pennsylvania in the TYP Update process to better understand the Commonwealth’s transportation needs and priorities from the perspective of the system users. Throughout this process, the transportation stakeholders, particularly members of the public, interact, communicate and take part in the decision-making process regarding the identification and prioritization of transportation projects. The 2019 TYP public outreach process, which received national recognition, consisted of three primary tools to give the public convenient and user-friendly opportunities to provide feedback; namely:

1. A customized, interactive online survey that invited participants to:• Identify their preferred mode of transportation and frequency

of use

• Rank their transportation system priorities

• Develop their version of a multimodal transportation budget

• Map their transportation concerns throughout the state

• Voluntarily provide demographic information

2. An online public meeting• Aired live with an interactive audience of public participants

• Integrated with social media to expand public interaction opportunity

• Recorded and posted on the STC website for public access post-event

3. A standardized project feedback form• Provided an alternative format for submitting specific project

suggestions and details

8

A significant milestone was achieved by PennDOT and the STC in 2017 with national recognition of its outreach program by the American Association of State Highway and Transportation Officials (AASHTO) and the Transportation Research Board (TRB).

AASHTO recognized the campaign as part of its TransComm Skills Contest in the ‘Public Outreach Approach’ award category. Pennsylvania was also one of five successful states, out of 41 total, competing in TRB’s 11th annual John and Jane Q Public communications award competition. “Communicating the Value of Long-Term Transportation Planning” was the theme for the 2017 TRB competition, and as one of the four runners-up, the PennDOT team was invited to deliver a formal presentation and participate in a poster session at the January 2018 TRB Conference.

www.TalkPATransportation.com

The STC and PennDOT are committed to sustaining an effective and inclusive public outreach process and have continued to evaluate and improve the program’s effectiveness since the initiation of its modernization effort in 2013.

STC outreach team with Secretary Richards at the 2018 TRB Conference

Page 12: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

9

TYP Update Public Comment Period Several weeks after the release of the 2017 Transportation Performance Report in mid-February, the public comment period was announced and the new customized online transportation survey was launched on www.TalkPATransportation.com. The open public comment period ran for a 45-day time frame from March 6 through April 19, 2017.

The public feedback collected by the STC was summarized and shared with regional Planning Partners in advance of the development of their regional TIPs. Several STC members attended regional Planning Partner public meetings to present and receive additional feedback on the statewide and regional transportation survey results.

Online Public Meeting On March 21, 2017, PennDOT Secretary Leslie S. Richards, PennDOT executive staff and members of the STC conducted a one-

hour interactive online public meeting. Two-hundred fifty participants pre-registered online to attend the webcast; 124 live streams were documented with over 90 users documented streaming the meeting in its entirety from beginning to end. Secretary Richards opened the meeting with a review of the highlights from the 2017 Transportation Performance Report. Participants were invited to respond to poll questions pertinent to the topics of discussion to actively engage the live audience during the presentation period. The responses were tallied live and reported back to the participants as a part of the presentation. The second half of the meeting was dedicated to a live Q&A session. Participants submitted their questions through the meeting software or social media and the panel responded on-air to as many questions as possible during the last 30 minutes of the meeting. Written responses were provided to each of the participants who provided an email address including those whose questions were answered on air. A transcript of the questions asked and answers provided was also compiled and posted on www.TalkPATransportation.com.

March 21, 2017, Online Public Meeting

Page 13: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

10

The new customized online transportation survey was designed with a diverse public in mind, and for accessibility via mobile devices, tablets, and desktop computers. The purpose of the survey was to gather feedback from the public on a variety of transportation topics and to establish a baseline on the general participant demographics for future use.

The survey consisted of five distinct sections: demographics, modes of transportation, transportation priorities, budgeting, and mapping transportation concerns.

The hallmark of the survey was the mapping exercise. The mapping feature was linked to PennDOT’s MPMS IQ (now PennDOT One Map) – a web-based GIS mapping application for accessing highway and bridge project data for the Commonwealth.

Over 5,000 survey visits were documented; and of those, nearly 4,000 visitors completed the survey from beginning to end.

Online Transportation Survey

www.TalkPATransportation.com

By the Numbers• More than 5,200 visits to the survey• 3,600 issues were submitted• 520 concerns were already addressed• 87% identified themselves as members of the public• 250 people registered for the online public meeting• The website records over 1,000 page views per month

Railroad in Reading, Berks County

A view of Erie from the convention center, Erie CountyBicyclist on Schuylkill

River Trail, Berks County

ATI cargo plane departs Lehigh Valley International Airport

Photo taken by Craig Kackenmeister

Page 14: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

RESPONSES TO THE DEMOGRAPHIC QUESTIONS INCLUDED IN THE SURVEY WERE NOT REQUIRED TO SUCCESSFULLY COMPLETE THE SURVEY, YET

54%

46%

Respondents indicated a more balanced gender ratio than

those reported for the 2017 TYP Update (Male 63%, Female 37%).

Demographics

OF THE SURVEY RESPONDENTS PROVIDED ANSWERS.

95%

87%of respondents identified as being a member of the public rather than a transportation

stakeholder group

4%

22% 21% 20% 21%

10%

2%

18-24 25-34 35-44 45-54 55-64 65-74 75+

Age Groups of Respondents

11

State Transportation Commission2019 Twelve Year Program

Rockville Bridge, Dauphin County

Page 15: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

Survey participants were asked to rank various modes of transportation based on the frequency of their use. The ranking choices ranged from “never” to “every day”. The transportation modes included: public transit, driving alone, carpool/rideshare, motorcycles, bicycling, walking, aviation and passenger rail. Participants were also able to write in another mode or modes of their choice.

The ‘Drive Alone’ mode was ranked as an everyday or often occurrence more frequently than any other mode of transportation identified for this activity. A quarter of these respondents who indicated they drive alone less frequently also selected a wide range of alternative travel choices.

Modes of Transportation

12www.TalkPATransportation.com

25%of all respondents

use other modes of transportation on a

regular basis

MOST RESPONDENTS SAY THEY FREQUENTLY

DRIVE ALONE

Walking, Public Transit, Bicylcing, Carpool/Ridershare and

Passenger RailTraffic on I-83 in the vicinity of the

Union Deposit interchange

Pedestrian Bridge inMifflintown, Juniata County

Route 641 in Spring Run, Franklin CountyPhoto taken by Brian Link

Page 16: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

When asked to identify their individual transportation priorities, survey respondents ranked road pavement, traffic flow and bridges as their highest priorities. A total of 10 priorities were provided for respondents to rank.

Transportation Priorities

13

Identifying other Transportation AreasSurvey participants also had the opportunity to identify other transportation areas that were not included in the list of 10 transportation categories. The most frequent entries included litter/clean streets, public-private partnerships, electric car utilities and enforcement.

THIS SURVEY EXERCISE WAS DESIGNED TO DEMONSTRATE THE COMPLEXITY OF PENNSYLVANIA’S CHALLENGE TO BALANCE COMPETING TRANSPORTATION PRIORITIES

AND PLAN FOR DIVERSE TRANSPORTATION NEEDS.

BridgesRanked #3

Compressed natural gas station, a public-private partnership project

Traffic FlowRanked #2

Road PavementRanked #1

Page 17: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

14

FUNDING ALL OF PENNSYLVANIA’S TRANSPORTATION MODES REQUIRES A BALANCED BUDGET BASED ON AVAILABLE RESOURCES In the survey budgeting exercise, the user was given six transportation areas and a budget tool for each. The budget tool, depicted as a vehicle gauge, was shown with a dollar value that aligned with PennDOT’s current budget for each transportation area. The respondents were given a budget of $100, and were instructed to define their own budget for each transportation area. This exercise served an educational purpose. Putting too little or too much in any category turned the gauges red and triggered a corresponding error message. In order to add more funds to any one category, money had to be taken away from another. While somewhat simplified, this exercise helped to illustrate the complex nature of creating a balanced, multi-modal transportation budget. Users could only continue with the survey by achieving a balanced budget.

Budgeting

46%

35%

19%

Ride More,Drive Less

39%

33%

28%

More Lanes,New Roads

30%

38%

32%

Bicycling/Walking

24%

47%

29%

Maintenance

21%

54%

25%

Technology

32%

57%

11%

EconomicSupport

% whoincreased funding

% who agreedwith PennDOT

funding

% wholowered funding

The majority of survey

respondents agreed with PennDOT’s

current budget allocations.

www.TalkPATransportation.com

MAINTENANCE

$ 30

Maintenance gauge from the budget page of the Online

Transportation Survey

Page 18: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

The new customized survey included features that contained more useable data and enabled the user to provide feedback that required less refinement. For the first time, users were also able to decide whether a planned project on the current TYP would address the transportation concern they had mapped. The survey was linked to existing PennDOT MPMS IQ data (now PennDOT One Map) to alert the user, once they had mapped their concern, of a nearby project

or projects. Once the user reviewed this data, they were asked if an existing planned project would address their concern. If the user determined that the existing planned project would address their concern, they could submit that response and continue with the exercise. If they were not sure, or felt the planned projects provided would not adequately address their concern, they could proceed with submitting data on that specific issue.

Mapping Transportation Concerns

A total of 520 individual concerns were already being addressed by planned projects on the

existing TYP. Overall, nearly 3,600 transportation issues were mapped statewide. Roadway concerns were among the most frequently

reported with biking/walking coming in second.

15

THE MAPPING EXERCISE ALLOWED USERS STATEWIDE TO MARK THE GEOGRAPHIC LOCATION OF THEIR SPECIFIC TRANSPORTATION CONCERNS

Number of Issues Identified

1,684

Roadway317

Bridge30

Freight803

Biking/Walking

201Transit

520ConcernAlready

Addressed

The icons below correspond with the dots on the map.

Page 19: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

16www.TalkPATransportation.com

TRANSPORTATION FUNDING in PennsylvaniaTransportation projects on the TYP utilize a combination of federal, state, and local funds. The available funding levels over the twelve years reflect a reasonable estimate of anticipated funding, based upon authorized funding levels, actual and anticipated budgets and historical trends.

Aviation

Rail Freight

Public Transit

54.1% 42.5%

1.7%

0.6% 1.1%

2019-2030 Twelve Year Program Funding for all Modes

Federal Funding Federal funds are distributed to states through authorizing legislation that determines funding categories and amounts. The Fixing America’s Surface Transportation (FAST) Act, was passed in December 2015 and authorized a total of $305 billion through September 30, 2020 for Federal highway, transit and rail programs.

State Funding State funds for highways and bridges are provided through revenues received from sources such as the Gas Tax, registration and titling of vehicles. These revenues are placed in the Motor License Fund (MLF). The annual state budget process determines amounts available for highway and bridge projects on the TYP as well as for other uses such as highway maintenance and Pennsylvania State Police (PSP) operations. State funds for transit are supplied through various sources, most notably the Public Transportation Trust Fund. State funding levels for transit, rail and aviation projects are determined during the annual state budget process. The Multimodal Fund was created by Act 89 of 2013, which directs over $76 million annually in grants to aviation, freight and passenger rail, ports, and bicycle/pedestrian activities.

Local Funding Funds in the TYP may also be provided by local municipalities, private entities, toll authorities, and transit operators. These funds are most often included when a match is required for state or federal funds.

Highway/Bridges

Multimodal

Page 20: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

2019-2030 Funding Level Summary ($ millions)

Program 1st Four Years 2nd Four Years 3rd Four Years Total

Aviation $128 $128 $128 $384

Rail Freight $228 $229 $229 $686

Public Transit $9,616 $8,333 $9,253 $27,202

Highway/Bridge $11,530 $11,697 $11,393 $34,620

Multimodal $319 $348 $391 $1,058

Total $21,821 $20,735 $21,394 $63,950

2019 Twelve Year Transportation Program Funding Level Summary The 2019 TYP contains over $63 billion worth of projects involving all modes of transportation and intermodal connections. The table below shows the distribution of funding in millions of dollars for the first four years, the second four years, and the third four years, and the total TYP.

17

Page 21: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

Thank you to all who participated in the 2019 TYP update. Our website, www.TalkPATransportation.com, contains many resources about transportation planning. There is also a digital version of this report with enhanced features, such as a searchable Project Listing, and additional content available at www.TalkPATransportation.com/2019TYP.

If you have any questions or comments, please use the email address or phone number listed below to contact us. We look forward to hearing from you again during the 2021 TYP update.

18www.TalkPATransportation.com

CONTACT Us:Find Projects in Your NeighborhoodPennDOT has deployed several online interactive tools to map and provide information on its various transportation projects throughout the Commonwealth. Through the PA Transportation Projects, PennDOT One Map and the Open Data Portal system websites, PennDOT is helping customers locate projects and stay engaged.

PennDOT’s Center for Program Development and Management (Program Center) under the Office of Planning is responsible for developing, managing and updating the Commonwealth’s Twelve Year Program for highways and bridges, mass transit systems, airports and rail freight. It also coordinates with county and regional agencies on transportation long-range planning and short-range programming (Transportation Improvement Program/Statewide Transportation Improvement Program) issues. Members of the Program Center also serve as the Executive Staff to the State Transportation Commission.

PennDOT Office of Planning, Deputy Secretary James D. Ritzman, P.E.PennDOT Program Center, Bureau Director Larry S. ShiffletTransportation Planning Mark Tobin Twelve Year Program Jessica Clark Public Outreach Process Terry Pinder Data Inquiries Martin SargentMeeting Coordination Abdoul Ahmed Saidou

General Inquiries: (717) 783-2262 [email protected]

Page 22: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

2019 TWELVE YEAR PROGRAMList of Projects

adopted by the

State Transportation Commission on August 16, 2018

State TransportationCommission

Page 23: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

Keys to the TYP

Section Heading This groups the projects by location under the regional metropolitan planning organizations or rural planning areas. Statewide and interstate projects are grouped separately.

County Groups the projects by county

Mode Identifies the project mode in the following order:Highways, Bridges, Airport, Transit, Rail

Route The State Route (SR) shows the route on which the project is located. Local roads are coded 9900 or 9911.

Title/Sponsor A brief name given to the project, often referred to as the project’s “short title” or the Transit Entity sponsoring the project. The municipality where the project is located may be included.

Period

Denotes the time period in which the project is to be implemented:1 - First Four Years – October 2018 – September 20222 - Second Four Years – October 2022 – September 20263 - Third Four Years – October 2026 – September 2030

Costs

Depicts the costs in thousands of dollars associated with the following phases/items:

Study - projects that are studies or research projects

PE - preliminary engineering phase of the project developmentFD - final design phase of the project developmentUTL - utility relocations (electric, telecommunications, mechanical)ROW - right-of-way acquisitions of the projectCON - construction phase of the projectPRA - planning and research or administrative projectsTOTAL - total project cost

The following is an explanation of the codes used in the single-line computerized printout of the Twelve Year Transportation Program. The items in the heading are explained below. The column definitions proceed from left to right, top to bottom.

www.TalkPATransportation.com

A KEY TO THE Twelve Year Program

Page 24: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

TABLE of ContentsAdams County Transportation Planning Organization................................................................................1MPO for Blair County - Altoona MSA...........................................................................................................4Centre County MPO....................................................................................................................................8Delaware Valley Regional Planning Commission (DVRPC).......................................................................11Erie Area Transportation Study..................................................................................................................27Franklin County MPO................................................................................................................................31Harrisburg Area Transportation Study.......................................................................................................36Johnstown - Cambria County MPO...........................................................................................................52Lancaster County Transportation Study....................................................................................................58Lebanon County MPO...............................................................................................................................67Lehigh Valley Transportation Study...........................................................................................................71Northeastern Pennsylvania Alliance (NEPA MPO)..................................................................................78North Central Pennsylvania Regional Planning & Development Commission.......................................87Northern Tier Regional Planning and Development Commission........................................................100Northwest RPO........................................................................................................................................116Reading Area Transportation Study........................................................................................................130Southern Alleghenies Planning and Development Commission............................................................136Scranton/Wilkes-Barre - Lackawanna Luzerne MPO............................................................................147SEDA - Council of Governments MPO....................................................................................................157Southwestern Pennsylvania Commission MPO (SPC)...........................................................................174Shenango Valley Area Transportation Study MPO (SVTS).....................................................................227Wayne County.........................................................................................................................................232Williamsport Area Transportation Study.................................................................................................234York MPO................................................................................................................................................241Interstate........................................................................................................................................248Statewide Line Items (STWD Items).......................................................................................................256

State Transportation Commission2019 Twelve Year Program

www.TalkPATransportation.com

Page 25: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 1 of 259August 16, 2018

Planning Partner: Adams Mode: Highway County: AdamsTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Eisenhower Drive Extension New Roadway First 1,916 500 691 4,886 7,993 58137

Eisenhower Drive Extension New Roadway Second 3,000 3,000 58137

SRTP Rideshare Program Miscellaneous First 245 245 82372

Bridge Reserve Miscellaneous First 698 698 87792

Bridge Reserve Miscellaneous Second 1,034 1,034 87792

Bridge Reserve Miscellaneous Third 1,736 1,736 87792

Highway Reserve Miscellaneous First 2,187 2,187 87793

Highway Reserve Miscellaneous Second 5,213 5,213 87793

Highway Reserve Miscellaneous Third 22,961 22,961 87793

Delivery / Consult Assist Bridge Preservation Activities First 1,600 800 2,400 87807

HSIP Line Item Safety Improvement First 1,337 1,337 87811

HSIP Line Item Safety Improvement Second 1,012 1,012 87811

HSIP Line Item Safety Improvement Third 4,047 4,047 87811

DF Box Culvert Line Item Adams Miscellaneous First 350 350 102142

Road Safety Audit Line Item Safety Improvement First 30 30 106555

15 US-15/US-30 Interchange Interchange Improvement First 1,000 3,297 4,297 58136

15 US-15/US-30 Interchange Interchange Improvement Second 9,891 9,891 58136

15 US-15 Safety Improvements - Adams Safety Improvement First 4,952 4,952 102333

15 US 15/Franklin Crossing-Adams Safety Improvement First 800 800 106669

15 US 15/Franklin Crossing-Adams Safety Improvement Second 800 800 106669

15 US 15/Franklin Crossing-Adams Safety Improvement Third 5,000 5,000 106669

94 PA 94 and Berlin Road Intersection Improvement First 400 400 78672

94 94 & 394 Intersection Imp Intersection Improvement First 1,680 1,680 94894

94 94 & 234 Intersection Imp Intersection Improvement First 1,960 1,960 94897

97 Baltimore Pike Rsf 3 Resurface First 1,600 1,600 105336

2006 Plum Creek Brdg Bridge Preservation Activities Second 150 500 650 78651

3001 Baltimore Street Resurf Resurface Second 580 580 99866

Planning Partner: Adams Mode: Bridge County: AdamsTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

15 US 15 Bridge PM#2 Bridge Preservation Activities First 100 350 450 99727

30 Chambersburg Road Bridge Bridge Improvement First 281 281 99781

30 Chambersburg Road Bridge Bridge Improvement Second 950 950 99781

30 York Road Bridge Bridge Improvement First 300 300 99784

30 York Road Bridge Bridge Improvement Second 550 550 99784

Page 26: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 2 of 259August 16, 2018

Planning Partner: Adams Mode: Bridge County: AdamsTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

30 York Road over Brush Run Bridge Replacement Second 150 150 99830

30 York Road over Brush Run Bridge Replacement Third 750 750 99830

34 Carlisle Road Bridge 4 Bridge Replacement First 100 100 10 10 48 268 87433

34 Carlisle Road Bridge 4 Bridge Replacement Second 252 252 87433

97 Piney Creek Bridge - 1 Bridge Replacement Second 355 355 90686

97 Piney Creek Bridge 2 Bridge Improvement First 100 150 10 10 270 90692

97 Piney Creek Bridge 2 Bridge Improvement Second 240 240 90692

97 Piney Creek Bridge - 2 Bridge Improvement First 150 150 99786

97 Piney Creek Bridge - 2 Bridge Improvement Second 850 850 99786

116 West Middle Street Bridge Bridge Replacement Second 150 150 99776

116 West Middle Street Bridge Bridge Replacement Third 650 650 99776

116 Plum Creek Bridge Bridge Improvement First 250 250 99812

116 Plum Creek Bridge Bridge Improvement Second 1,600 1,600 99812

116 PA 116 over Trib Marsh Crk Bridge Rehabilitation First 75 50 125 106665

116 PA 116 over Trib Marsh Crk Bridge Rehabilitation Second 400 400 106665

116 PA 116/Trib Willoughby Run Bridge Improvement First 75 50 10 10 145 106666

116 PA 116/Trib Willoughby Run Bridge Improvement Second 300 300 106666

134 Taneytown Road Bridge Bridge Improvement First 150 150 99815

134 Taneytown Road Bridge Bridge Improvement Second 950 950 99815

194 Hanover Pike Bridge PM Bridge Preservation Activities Second 75 75 99660

194 Hanover Pike Bridge PM Bridge Preservation Activities Third 350 350 99660

194 Hanover Pike Bridge PM Bridge Preservation Activities Second 75 75 99675

194 Hanover Pike Bridge PM Bridge Preservation Activities Third 385 385 99675

234 Heildersburg Bridge-C Bridge Replacement First 550 550 87426

234 PA 234 Bridge-C Bridge Replacement First 1,000 1,000 90693

234 Narrows Road Bridge PM Bridge Preservation Activities Second 100 100 99679

234 Narrows Road Bridge PM Bridge Preservation Activities Third 300 300 99679

394 Shrivers Corner Bridge Bridge Improvement First 100 15 700 815 87672

394 Conewago Creek Bridge Bridge Improvement First 300 300 90698

394 Conewago Creek Bridge Bridge Improvement Second 1,198 1,198 90698

394 Conewago Creek Bridge Bridge Improvement Third 1,002 1,002 90698

1005 Latimore Valley Road Brg-C Bridge Rehabilitation First 900 900 73854

1005 Latimore Creek Bridge Bridge Replacement Second 200 200 90699

1005 Latimore Creek Bridge Bridge Replacement Third 750 750 90699

1005 Lake Meade Road Bridge PM Bridge Preservation Activities Second 100 100 99662

Page 27: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 3 of 259August 16, 2018

Planning Partner: Adams Mode: Bridge County: AdamsTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1005 Lake Meade Road Bridge PM Bridge Preservation Activities Third 260 260 99662

1007 Mud Run Bridge-C Bridge Rehabilitation First 600 600 78638

1009 Wierman Mill Bridge Bridge Rehabilitation First 125 15 10 575 725 87431

1015 Conewago Creek Bridge Bridge Improvement First 209 1,252 1,461 78640

1015 Conewago Creek Bridge Bridge Improvement Second 1,576 1,576 78640

1017 Conewago Creek Brdg2 Bridge Improvement First 250 250 78642

1017 Conewago Creek Brdg2 Bridge Improvement Second 5,132 5,132 78642

1019 Pine Run Road bridge Bridge Improvement First 100 100 90702

1019 Pine Run Road bridge Bridge Improvement Second 2,200 2,200 90702

1020 Bermudian Creek Bridge Bridge Improvement First 100 100 90707

1020 Bermudian Creek Bridge Bridge Improvement Second 400 400 90707

1020 Trib to Latimore Creek Bridge Replacement Second 147 147 90727

1020 Trib to Latimore Creek Bridge Replacement Third 250 250 90727

1022 Woodside Road Bridge PM Bridge Preservation Activities Second 100 100 99666

1022 Woodside Road Bridge PM Bridge Preservation Activities Third 910 910 99666

2006 Centenial Road Bridge PM Bridge Preservation Activities First 100 100 99743

2006 Centenial Road Bridge PM Bridge Preservation Activities Second 440 440 99743

2007 Edgegrove Road Bridge PM Bridge Preservation Activities Second 100 100 99749

2007 Edgegrove Road Bridge PM Bridge Preservation Activities Third 460 460 99749

2014 Alloway Creek Bridge Bridge Replacement Second 172 1,431 1,603 90740

2014 Alloway Creek Bridge Bridge Replacement Third 300 300 90740

2014 Piney Creek Bridge Bridge Replacement Second 100 100 90743

2014 Piney Creek Bridge Bridge Replacement Third 1,225 1,225 90743

2015 Brickcrafters Road Bridge Bridge Preservation Activities Second 75 75 99751

2015 Brickcrafters Road Bridge Bridge Preservation Activities Third 300 300 99751

2016 Sells Station Road Bridge Bridge Preservation Activities Second 75 75 99752

2016 Sells Station Road Bridge Bridge Preservation Activities Third 200 200 99752

2020 Sach's Road Bridge PM Bridge Preservation Activities Second 75 75 99761

2020 Sach's Road Bridge PM Bridge Preservation Activities Third 300 300 99761

2027 Bollinger Road Bridge PM Bridge Preservation Activities First 75 75 99756

2027 Bollinger Road Bridge PM Bridge Preservation Activities Third 200 200 99756

3001 State Street Bridge Bridge Improvement First 100 100 87432

3001 State Street Bridge Bridge Improvement Second 500 500 87432

3001 Carlisle Street Bridge Bridge Replacement Third 1,100 1,100 99821

3002 Rock Creek Bridge Bridge Improvement First 125 25 15 1,700 1,865 99832

Page 28: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 4 of 259August 16, 2018

Planning Partner: Adams Mode: Bridge County: AdamsTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3005 Millerstown Road Bridge Bridge Rehabilitation First 60 15 15 875 965 78662

3005 Pumping Station Road Brdg Bridge Preservation Activities Second 100 100 99836

3005 Pumping Station Road Brdg Bridge Preservation Activities Third 765 765 99836

3009 Harbaugh Valley Road Brdg Bridge Preservation Activities First 75 75 99862

3009 Harbaugh Valley Road Brdg Bridge Preservation Activities Second 250 250 99862

3010 Water Street Bridge-C Bridge Replacement First 400 400 87430

3017 Mummasburg Road Bridge Bridge Replacement First 50 15 10 350 425 87435

4001 Old Carlisle Road Bridge Bridge Replacement Second 100 100 92564

4001 Old Carlisle Road Bridge Bridge Replacement Third 350 350 92564

7207 Mengus Mill Rd Bridge Bridge Replacement First 200 50 75 900 1,225 18049

7218 Stoney Point Road Bridge Bridge Improvement First 225 250 50 75 600 18154

7218 Stoney Point Road Bridge Bridge Improvement Second 1,000 1,000 18154

Planning Partner: Altoona Mode: Highway County: BlairTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Bridge & Highway Reserve Administration First 543 543 50604

Bridge & Highway Reserve Administration Second 3,143 3,143 50604

Bridge & Highway Reserve Administration Third 8,765 8,765 50604

Local Bridge Line Item Bridge Preservation Activities First 27 27 75709

Local Bridge Line Item Bridge Preservation Activities Second 792 792 75709

Local Bridge Line Item Bridge Preservation Activities Third 3,454 3,454 75709

Community Park Rd Grade Xing #1 RR Warning Devices First 109 109 106258

Community Park Rd grade Xing #2 RR Warning Devices First 109 109 106288

Church Street Railroad Grade Xing RR Warning Devices First 500 500 106320

2019 RPM Installation Blair County Safety Improvement First 60 60 110136

2020 RPM Installation Blair County Safety Improvement First 60 60 110137

22 SR 3012 to Turkey Vlly Rd Resurface First 25 1,486 1,511 96398

22 SR 3012 to Turkey Vlly Rd Resurface Second 879 879 96398

22 US22/N Juniata St Intrsct Intersection Improvement First 2,830 2,830 98785

22 US22/N Juniata St Intrsct Intersection Improvement Second 1,445 1,445 98785

22 PA 36 to Village of Canoe Creek Resurface Second 100 2,000 2,100 106214

22 US 22 - SR 1011 to End of 4-Lane Resurface Second 100 800 900 108213

22 US 22 - SR 1011 to End of 4-Lane Resurface Third 2,000 2,000 108213

22 US 22 - Cambria Co Line to PA 764 Resurface Second 100 3,756 3,856 110430

22 US 22 - Cambria Co Line to PA 764 Resurface Third 1,044 1,044 110430

Page 29: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 5 of 259August 16, 2018

Planning Partner: Altoona Mode: Highway County: BlairTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

36 PA 36 - US 22 to Plank Road Resurface Second 100 100 108221

36 PA 36 - US 22 to Plank Road Resurface Third 3,000 3,000 108221

36 PA 36 - PA 164 Intersection ImprovementsIntersection Improvement First 250 250 110134

36 PA 36 - PA 164 Intersection ImprovementsIntersection Improvement Second 350 200 250 1,500 2,300 110134

36 PA 36 Corridor Safety Improvement Corridor Safety Improvement First 556 556 110155

453 Janesville Pike Rockfall Restoration Third 100 100 95291

453 Birmingham Pike Rockfall Restoration Third 175 175 96400

453 PA 453 - Huntingdon Co Line to I-99 Resurface First 250 200 50 75 307 882 108209

453 PA 453 - Huntingdon Co Line to I-99 Resurface Second 3,193 3,193 108209

453 PA 453 - I-99 to Beastons Road Resurface Second 62 952 1,014 108219

453 PA 453 - I-99 to Beastons Road Resurface Third 450 450 108219

764 6th Ave/7th Ave Int Imp Intersection Improvement First 275 50 750 809 1,884 94439

764 PA 764 - 17th St to Pleasant Valley Resurface First 75 75 110159

764 PA 764 - 17th St to Pleasant Valley Resurface Second 10 25 1,753 1,788 110159

1001 US 22 to SR 4004 Resurface First 3,410 3,410 96403

1001 SR 1001 - SR 4004 to PA 764 Resurface First 5,200 5,200 106215

1001 SR 1001 - Pinecroft to Grazierville InterchangesResurface Second 100 100 110458

1001 SR 1001 - Pinecroft to Grazierville InterchangesResurface Third 4,100 4,100 110458

1002 SR 1002 - PA 764 to US 22 Resurface First 2,000 2,000 106041

1009 SR 1009 - SR 1021 to PA 36 Resurface First 556 735 200 200 2,270 3,961 108201

2007 PA 36 to US 22 Resurface First 2,952 2,952 96410

3006 Dunnings Hwy-Bfrd Co Line Resurface Second 100 500 600 96460

3007 Cttntown Rd-Bdfrd Co Line Resurface Second 100 500 600 96461

3009 Poplar Run Rd - Old US 22 Resurface First 1,400 1,400 96463

3013 Sproul Interchange Rstrtn Restoration Second 50 50 96468

3013 Sproul Interchange Rstrtn Restoration Third 1,600 1,600 96468

4002 Tunnel Hill St to PA 764 Resurface Second 14 2,500 2,514 96472

4003 SR 4003 - PA 36 to SR 4024 Resurface First 156 10 25 1,578 1,769 108203

4004 SR 4004 - PA 764 to PA 36 Resurface First 850 850 106488

4009 SR 4009 - 19th St to SR 4015 Resurface First 100 50 50 550 750 106139

4009 SR 4009 - 19th St to SR 4015 Resurface Second 550 550 106139

4010 Pleas Vlly Blvd-Osgood Dr Restoration Second 50 2,500 2,550 94445

4027 Westvaco Paper Mill-PA350 Resurface Third 50 868 918 96480

Page 30: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 6 of 259August 16, 2018

Planning Partner: Altoona Mode: Bridge County: BlairTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

California Avenue Burgoon Bridge Improvement First 35 300 25 360 21821

California Avenue Burgoon Bridge Improvement Second 1,500 1,500 21821

36 PA36 Mill Run Bridge Bridge Improvement First 300 250 10 20 216 796 22078

36 PA36 Mill Run Bridge Bridge Improvement Second 1,278 1,278 22078

164 Marsh Run Culvert Bridge Replacement Second 275 275 22103

164 Marsh Run Culvert Bridge Replacement Third 250 100 25 1,300 1,675 22103

453 Tyrone Sink Run Culvert 2 Bridge Replacement Third 250 250 74362

453 PA453 Sink Run Culvert Bridge Improvement First 250 250 98732

453 PA453 Sink Run Culvert Bridge Improvement Second 200 25 225 1,500 1,950 98732

764 PA764 Culvert Replacement Bridge Improvement First 250 100 50 800 1,200 92661

865 North Bellwood Reservoir Bridge Replacement Second 200 200 92662

865 North Bellwood Reservoir Bridge Replacement Third 25 25 1,300 1,350 92662

867 Roaring Spring Cabbage Cr Bridge Replacement Second 275 225 100 30 630 22086

867 Roaring Spring Cabbage Cr Bridge Replacement Third 1,200 1,200 22086

1001 Trib Mill Run Br Replace Bridge Improvement First 350 150 200 1,500 2,200 98737

1003 Blairmont CC Brush Run Br Bridge Replacement Third 35 35 94440

1013 Sinking Run Bridge #1 Bridge Replacement Third 30 30 92642

1013 Sinking Run Bridge #3 Bridge Replacement Third 30 30 92643

1013 Sinking Run Bridge #5 Bridge Replacement Third 30 30 92644

1013 Sinking Run Culvert #1 Bridge Replacement Third 454 454 93762

1013 Sinking Run Culvert #2 Bridge Replacement Third 863 863 93766

1013 Sinking Run Culvert #3 Bridge Replacement Third 507 507 93767

2005 2019 DF Blair Box Culvert Bridge Improvement First 181 181 105855

2017 2020 DF Blair Box Culvert Bridge Improvement First 20 15 182 217 94441

2017 Fox Run Culvert Bridge Replacement Third 25 25 94442

2020 Royer SR 2020 Piney Creek Bridge Bridge Improvement First 50 50 533 633 106119

2020 Royer SR 2020 Piney Creek Bridge Bridge Improvement Second 866 866 106119

3006 Sproul Spring Run Culvert Bridge Replacement Third 100 50 50 1,000 1,200 94443

3013 Blair Gap Run Bridge Bridge Replacement Second 250 300 100 100 750 21964

3013 Blair Gap Run Bridge Bridge Replacement Third 50 4,400 4,450 21964

3013 SR3013 Dry Run Bridge Bridge Rehabilitation Second 250 50 25 325 92607

3013 SR3013 Dry Run Bridge Bridge Rehabilitation Third 3,000 3,000 92607

4002 Sugar Run Bridge Seg 110 Bridge Improvement First 50 50 1,350 1,450 74400

Page 31: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 7 of 259August 16, 2018

Planning Partner: Altoona Mode: Bridge County: BlairTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4004 58th Street Mill Run Brid Bridge Improvement First 350 250 100 50 750 22029

4004 58th Street Mill Run Brid Bridge Improvement Second 2,000 2,000 22029

4013 North Juniata Homers Gap Bridge Improvement First 150 50 50 550 800 74402

4013 North Juniata Homers Gap Bridge Improvement Second 700 700 74402

4015 Wopsononock Avenue Spring Bridge Improvement First 150 25 50 255 480 22088

4015 Wopsononock Avenue Spring Bridge Improvement Second 1,065 1,065 22088

4015 SR4015 Riggles Gap Run Bridge Replacement Second 25 25 50 94446

4015 SR4015 Riggles Gap Run Bridge Replacement Third 100 1,900 2,000 94446

4023 Three Springs Run Bridge Bridge Replacement Third 50 50 1,200 1,300 22127

4027 California Run Bridge Bridge Replacement Second 100 215 100 75 1,150 1,640 22083

4027 California Run Bridge Bridge Replacement Third 350 350 22083

4027 Grazierville Truss Rehab Bridge Rehabilitation First 100 1,167 1,267 92600

4027 Hutchinson Run Bridge Bridge Improvement First 150 75 75 1,180 1,480 92646

4029 Clay Ave Sinking Run Br Bridge Improvement First 150 50 50 1,275 1,525 92665

7205 T-378 West Loop Road Bridge Bridge Improvement First 300 300 10 10 199 819 21918

7205 T-378 West Loop Road Bridge Bridge Improvement Second 1,653 1,653 21918

7207 T-310 Friesville Bridge Bridge Improvement First 1,200 1,200 21908

7207 T-308 Sheetz Way Bridge Bridge Deck Replacement First 200 200 106418

7210 T-456 Old Mill Run Bridge Bridge Improvement First 50 50 22617

7210 T-456 Old Mill Run Bridge Bridge Improvement Second 50 10 10 276 346 22617

7301 5th Ave Mill Run Bridge Replace/Rehab First 237 237 10 10 665 1,159 110135

7301 5th Ave Mill Run Bridge Replace/Rehab Second 665 665 110135

Planning Partner: Altoona Mode: Transit County: BlairTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Operating Assistance First 18,717 18,717 64997

Maintenance Equipment First 65 65 64998

Office Equipment - IT First 40 40 64999

Office Equipment First 15 15 65000

Bus Spprt/facis -ITS First 20 20 77219

Building /Struct -eng First 15 15 77222

Replace 1 service Vehicle First 70 70 77234

Public information Aids First 10 10 84291

replace buses First 1,087 1,087 92775

Page 32: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 8 of 259August 16, 2018

Planning Partner: Altoona Mode: Transit County: BlairTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Security upgrades First 60 60 95561

3 (VOH) diesel electric First 975 975 107098

Buildings/Structures First 150 150 107100

Stations and Shelters First 80 80 107101

7 replacement Buses First 4,000 4,000 111295

Planning Partner: Centre Mode: Highway County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

East Hanna Lane RR Warn Dev RR Warning Devices First 150 150 105865

Valley Vista Path 2016 TAP Transportation Enhancement First 1,041 1,041 108119

26 SR 26/45 Shingletown Intersection Safety Improvement First 395 106 106 3,943 4,550 76136

26 SR 26/45 Shingletown Intersection Safety Improvement Second 1,802 1,802 76136

26 Jacksonville Road Betterment Restoration First 298 75 75 4,279 4,726 85965

26 Jacksonville Road Betterment Restoration Second 2,700 2,700 85965

26 Howard Intersection Intersection Improvement First 313 313 93262

26 Howard Intersection Intersection Improvement Second 345 87 145 2,090 2,666 93262

26 County Line to SR 3018 Resurface Third 800 800 100565

26 High Street to SR 9102 NB Resurface Third 600 600 100568

26 High Street to SR 9012 SB Resurface Third 600 600 100571

26 Bellefonte Interchange Safety Safety Improvement First 300 74 374 106282

45 Boalsburg East Add Lane Third 1,496 1,496 93267

45 SR 45 Rehab w/ turn Add Turning Lane Second 380 380 190 317 805 2,071 93367

45 SR 45 Rehab w/ turn Add Turning Lane Third 2,640 2,640 93367

45 Millhiem to County Line Resurface Third 3,240 3,240 100549

45 Old Fort to Spring Mills Resurface Third 1,002 1,002 100551

45 SR 45 Cedar Rn to Old Frt Resurface Second 700 700 101026

64 SR 64/550 Intersection Improvement Safety Improvement First 281 151 322 3,132 3,886 106034

144 Centre Hall Resurfacing Resurface Third 1,132 1,132 101028

150 SR 150 and Phoenix Ave Intersection Intersection Improvement First 500 500 1,000 106365

150 SR 150 and Phoenix Ave Intersection Intersection Improvement Second 290 406 5,970 6,666 106365

192 Livonia to County Line Resurface Third 923 923 100528

322 Philpsbrg to Port Mtn Resurface Third 5,089 5,089 93256

322 Western Interch -Mainline New Roadway First 30,000 30,000 96820

Page 33: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 9 of 259August 16, 2018

Planning Partner: Centre Mode: Highway County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

322 SR 322 Bypass-Boalsbrg EB Resurface Third 1,305 1,305 100583

322 SR 322 Bypass-Boalsbrg WB Resurface Third 1,305 1,305 100586

322 SR 322 Clearfld-Cold Strm Resurface Third 652 652 100594

350 Glass City Intersections Intersection Improvement Second 330 380 101 225 1,036 93260

350 Glass City Intersections Intersection Improvement Third 2,447 2,447 93260

350 Linnwood to Presqueisle Resurface Second 244 244 100559

350 Linnwood to Presqueisle Resurface Third 800 800 100559

350 SR 350 Blair-Sandy Ridge Resurface Second 900 900 100590

504 Black Bear Run to SR 3032 Resurface Third 900 900 100538

504 Blck Moshannon to Wallace Resurface Third 1,446 1,446 100560

550 SR 550 SR 8038 to SR 1005 Resurface Second 1,115 1,115 100578

550 SR 550 SR 3042 - Park Ave Resurface Third 1,218 1,218 100580

550 SR 550 Blair Co-Eagle Spr Resurface Third 1,633 1,633 101056

879 SR 879 Karthaus-Crossrds Resurface Third 1,100 1,100 101031

2012 Greenbriar to Coburn Road Resurface Third 433 433 100534

3003 Airport Intersection Intersection Improvement Second 326 326 196 220 1,068 93263

3003 Airport Intersection Intersection Improvement Third 1,634 1,634 93263

3005 SR 3007 to Fox Hill Road Resurface Third 720 720 100557

3007 Park Avenue Widening Add Turning Lane Second 1,013 633 1,351 2,998 2759

3007 Park Avenue Widening Add Turning Lane Third 1,305 1,305 2759

3014 Atherton Street Phase II Restoration First 6,704 6,704 98126

3014 Atherton Street Phase III Restoration First 50 275 259 4,867 5,450 101960

3014 Atherton Street Phase III Restoration Second 5,742 5,742 101960

3014 Atherton Street Phase IV Restoration Second 464 478 647 647 2,235 101961

3017 PA 550 to SR 3042 Resurface Third 345 345 100554

3020 Whitehall to Atherton St Resurface Second 200 200 100545

3027 SR 3049 to Stone Street Resurface Second 350 350 100564

Planning Partner: Centre Mode: Bridge County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

26 SR 26 ov Railroad Bridge Preserv. Bridge Preservation Activities First 254 254 3091

26 PA 26 Lick Run Br. Bridge Replacement First 25 1,584 1,609 3117

26 Seda-Cog/Nit & Bald Eagle Bridge Improvement Second 615 507 165 165 1,451 88169

Page 34: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 10 of 259August 16, 2018

Planning Partner: Centre Mode: Bridge County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

26 Seda-Cog/Nit & Bald Eagle Bridge Improvement Third 4,541 4,541 88169

26 2022 Centre Bridge Preservation Bridge Improvement First 225 50 50 1,664 1,989 110368

45 Centre 2016 Br. Preserv. Bridge Improvement Third 1,305 1,305 94957

64 Little Fishing Creek II Bridge Improvement Third 430 489 163 163 1,246 47617

64 2023 Centre Bridge Pres. Bridge Improvement Second 500 500 94972

64 2018 Bridge Preserv Bridge Rehabilitation First 175 175 110303

144 SR 144 over Potter Run Bridge Improvement Third 457 457 85145

144 South Fork Beech Creek Bridge Replacement First 1,056 1,056 88170

144 Trib Wallace Run Bridge Bridge Replacement First 772 772 98881

150 Holt Hollow Run Bridge Bridge Improvement Third 369 391 98 98 956 88222

445 Branch Elk Creek Bridge. Bridge Replacement First 25 880 905 88346

445 2023 Bridge Preservation Bridge Improvement First 100 50 50 200 110305

445 2023 Bridge Preservation Bridge Improvement Second 1,306 1,306 110305

504 SR 504 over Wallace Run Bridge Improvement Third 587 528 65 65 888 2,134 85133

504 Trib Bald Eagle Creek Bridge Improvement First 350 275 50 50 850 1,575 88344

504 2024 Centre Bridge Pres. Bridge Improvement Third 1,305 1,305 94974

504 Steel Arch Culvert Bridge Improvement Third 326 65 457 848 109582

879 2021 Centre Br. Preserv. Bridge Improvement First 206 25 25 1,214 1,470 3127

1002 2020 Centre Br. Preserv. Bridge Improvement First 200 75 75 1,653 2,003 3121

1002 SR 1002 Marsh Creek Br. Bridge Improvement First 500 350 133 100 1,083 91418

1002 SR 1002 Marsh Creek Br. Bridge Improvement Second 3,188 3,188 91418

1005 CEN Bridge Planks Bridge Rehabilitation First 968 968 92422

1006 SR 1006 Trib Bald Eagle BOX Bridge Improvement First 200 50 50 325 625 91416

2005 SR 2005 Sinking Cr Bridge Bridge Improvement First 366 285 75 75 801 91500

2005 SR 2005 Sinking Cr Bridge Bridge Improvement Second 2,575 2,575 91500

2006 Hayes Run Bridge Bridge Improvement Third 652 652 93268

2007 SR 2007 Trib Penns Creek Bridge Improvement First 405 50 60 2,428 2,943 91502

2007 SR 2007 over Br Spruce Creek Bridge Improvement Second 358 257 61 61 950 1,688 105926

2009 Br. Penns Creek BOX Bridge Replacement First 10 3 325 338 69467

2010 Trib to Muddy Run BOX Bridge Improvement First 190 23 32 443 688 93332

2011 SR 2011 over Mill Race Bridge Improvement First 400 366 49 49 1,254 2,117 105925

Page 35: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 11 of 259August 16, 2018

Planning Partner: Centre Mode: Bridge County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3006 Mill Race Bridge Bridge Improvement Second 380 95 95 570 76162

3006 Mill Race Bridge Bridge Improvement Third 2,425 2,425 76162

3010 2019 Centre Br. Preserv. Bridge Improvement First 75 55 2,211 2,341 3108

3025 SR 3025 Trib Bell Hollow BOX Bridge Improvement First 25 50 50 350 475 104206

3027 Trib to Trout Run BOX Bridge Replacement Third 144 40 34 426 643 84085

3040 SR 3040 Laurel Run Br #2 Bridge Replacement Second 469 369 92 92 1,023 88206

3040 SR 3040 Laurel Run Br #2 Bridge Replacement Third 2,283 2,283 88206

4004 Bridge ov Trib Wallace Run Bridge Improvement Third 326 65 457 848 109581

4005 SR 80-I 80 Bridge. Bridge Improvement First 317 317 88217

4005 SR 80-I 80 Bridge. Bridge Improvement Second 475 418 179 179 8,393 9,644 88217

4006 Six Mile Run Bridge Bridge Improvement First 275 50 55 1,000 1,380 3149

7207 T-419 Lower Georges Run Bridge Improvement First 50 50 1,419 1,519 95799

Planning Partner: Centre Mode: Transit County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

CATA Operating Assistance First 40,045 40,045 89928

Replace Paratransit Vans First 1,200 1,200 89932

Replace Service Vehicles First 57 57 89944

Buy Vans (Vanpool Expand) First 1,714 1,714 95505

Buy 12 Replacement Buses First 16,286 16,286 95508

Replace Para Transit Vans First 471 471 95509

Advanced Pub Transp Sys First 800 800 95510

Add Shelters & Amenities First 400 400 95511

Facility Improvements First 800 800 95512

Office, Shop, Maint Equip First 800 800 95513

Major Bus /Building Parts First 600 600 95515

CCOT Operating Assistance First 7,078 7,078 111016

Planning Partner: DVRPC Mode: Highway County: BucksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Delaware Canal Enhance Miscellaneous First 1,418 1,418 74827

Dist Proj Management "A" Miscellaneous First 3,000 3,000 75854

Dist Project Mgt "B"&"C" Miscellaneous First 3,000 3,000 75855

S T P Reserve Line Item Reconstruct First 580 580 79927

Page 36: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 12 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: BucksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

S T P Reserve Line Item Reconstruct Third 9 9 79927

S T U Reserve Line Item Miscellaneous First 1,306 1,306 79980

S T U Reserve Line Item Miscellaneous Second 2,465 2,465 79980

S T U Reserve Line Item Miscellaneous Third 46,391 46,391 79980

CMAQ Reserve Line Item Planning First 4,054 4,054 84318

CMAQ Reserve Line Item Planning Second 139,524 139,524 84318

CMAQ Reserve Line Item Planning Third 147,525 147,525 84318

Neshaminy Greenway Trail Pedestrian Facilities First 375 375 102830

Moland Park Trail Bicycle Facilities/Services First 500 500 108002

I-95-US13/132 Slip Ramp Interchange Improvement First 844 580 1,424 110309

I-95-US13/132 Slip Ramp Interchange Improvement Third 1,344 67 6,720 8,131 110309

Almshouse at Jacksonville Rd Add Turning Lane First 137 580 717 110310

Almshouse at Jacksonville Rd Add Turning Lane Third 34 34 1,183 1,251 110310

1 Route 1 Improvement-South (C) Corridor Safety Improvement First 31,888 31,888 93444

1 Route 1 Improvement-South (C) Corridor Safety Improvement Second 18,112 18,112 93444

1 Route 1 Improvement-North Corridor Safety Improvement First 5,305 23,325 28,630 93445

1 Route 1 Improvement-North Corridor Safety Improvement Second 108,741 108,741 93445

1 Route 1 Impr(Frontage) Corridor Safety Improvement First 2,731 7,956 10,687 93446

1 Route 1 Impr(Frontage) Corridor Safety Improvement Second 36,244 36,244 93446

1 Route 1 Impr(Frontage) Corridor Safety Improvement Third 36,244 36,244 93446

95 I95 Phila to Scudder Falls (C) Restoration First 3,769 3,769 92582

309 PA309:Sellersville Bypass Resurface First 3,161 4,753 580 580 20,286 29,360 86923

309 PA309:Sellersville Bypass Resurface Second 60,845 60,845 86923

313 PA 313: Ferry - Broad St Corridor Safety Improvement First 591 437 1,093 3,767 5,888 57619

313 PA 313: Ferry - Broad St Corridor Safety Improvement Second 11,301 11,301 57619

1001 Easton Rd. Roundabout Safety Improvement First 95 145 2,375 2,615 111024

2002 State Rd:Neshmny Ck-PA413 Drainage Improvement First 265 2,679 2,944 64778

2002 State Rd:Neshmny Ck-PA413 Drainage Improvement Second 2,026 1,330 3,356 64778

2002 State Rd:Neshmny Ck-PA413 Drainage Improvement Third 16,611 16,611 64778

2006 New Falls Rd HSIP Miscellaneous First 950 950 104365

2025 Bristol Rd Ext Study Relocation/Realignment First 1,273 1,273 12923

2025 Bristol Rd Ext Study Relocation/Realignment Second 1,791 692 3,654 6,137 12923

2025 Bristol Rd Ext Study Relocation/Realignment Third 14,258 14,258 12923

2025 Brstl Rd: Hulm-Old Linc Intersection Improvement First 11,383 11,383 13727

2025 Brstl Rd: Hulm-Old Linc Intersection Improvement Second 5,000 5,000 13727

Page 37: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 13 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: BucksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2028 Stoopville Phase II (D) Safety Improvement First 450 174 624 88083

2028 Stoopville Phase II (D) Safety Improvement Second 95 95 88083

2028 Stoopville Phase II (D) Safety Improvement Third 2,688 2,688 88083

2029 Oxford Vally@LincolnHw Intersection Improvement First 734 56 790 13635

2029 Oxford Vally@LincolnHw Intersection Improvement Second 13 4,722 4,735 13635

2029 Oxford Vally@LincolnHw Intersection Improvement Third 8,064 8,064 13635

2037 Old Lincoln/Hulmeville Int Improv Safety Improvement First 17 10 34 7 271 339 110966

2038 CountyLine Rd: Kulp Rd to PA 611 Widen/Resurfacing (no additional lanes) First 1,061 9,832 10,893 50634

2049 Langhorne-Yardley Rd Int Improv Intersection Improvement First 743 579 525 546 2,393 107794

2049 Langhorne-Yardley Rd Int Improv Intersection Improvement Third 8,090 8,090 107794

2069 Bridge Group U Bridge Replacement First 125 400 7,500 8,025 109599

4033 Lawn Ave:Maple-Farmers Reconstruct First 382 437 819 12965

4033 Lawn Ave:Maple-Farmers Reconstruct Second 1,900 1,900 12965

4033 Lawn Ave:Maple-Farmers Reconstruct Third 14,125 14,125 12965

4063 PortzerRd@OldBethlehem Intersection Improvement First 55 109 82 1,552 1,798 49315

9900 Mill St. Grade Xing RR Warning Devices First 225 225 36475

Planning Partner: DVRPC Mode: Bridge County: BucksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Bridge Reserve Line Item Bridge Replacement First 201 201 79929

Bridge Reserve Line Item Bridge Replacement Second 1,266 1,266 79929

Bridge Reserve Line Item Bridge Replacement Third 18,948 18,948 79929

County/City Brdg Reserv Bridge Replacement First 16,629 16,629 95447

County/City Brdg Reserv Bridge Replacement Second 69,050 69,050 95447

1 US1: Old Linc - PA413 Bridge Deck Rehabilitation First 19,666 19,666 13549

32 River Rd @GldnPheasnt ov DelCnl Bridge Replacement First 340 623 124 281 1,368 86244

32 River Rd @GldnPheasnt ov DelCnl Bridge Replacement Second 5,780 5,780 86244

32 River Rd o/ Trib Delaware Bridge Replacement First 56 56 112 90327

32 River Rd o/ Trib Delaware Bridge Replacement Second 1,267 1,267 90327

313 Bridge Group M Bridge Replacement First 5,517 5,517 102318

532 Holland@Buck Rd O/Mill Cr Bridge Replacement First 854 197 395 8,441 9,887 102272

532 Holland@Buck Rd O/Mill Cr Bridge Replacement Second 1,267 672 830 2,769 102272

532 Holland@Buck Rd O/Mill Cr Bridge Replacement Third 9,980 9,980 102272

663 PA 663 @ Allentown (2 Br) Bridge Replacement First 9,124 9,124 13440

1012 Hdquarters Rd/Tinicum Cr Bridge Rehabilitation First 4,404 4,404 13716

2036 Swamp Rd @ Pennswood Brdg Bridge Rehabilitation First 489 1,061 365 664 2,579 64781

Page 38: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 14 of 259August 16, 2018

Planning Partner: DVRPC Mode: Bridge County: BucksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2036 Swamp Rd @ Pennswood Brdg Bridge Rehabilitation Second 5,564 5,564 64781

2043 Brownsville Rd /Nesh Cr Bridge Replacement First 796 345 281 1,505 2,927 78516

2043 Brownsville Rd /Nesh Cr Bridge Replacement Second 6,202 6,202 78516

2047 Hulmeville Ave o/ CSX Bridge Replacement First 5,065 5,065 13606

2081 Worthington Mill Rd Br Bridge Replacement First 1,075 287 277 1,639 12931

2081 Worthington Mill Rd Br Bridge Replacement Second 8,372 8,372 12931

2101 Distr Wide Br Rehab Grp O Bridge Rehabilitation First 5,464 5,464 102319

4013 Main St over SEPTA Bridge Replacement First 4,562 4,562 13377

4033 U Ridge Rd O/Unami Cr Bridge Replacement First 106 3,710 3,816 13607

4059 Bridge Group V Bridge Replacement First 100 225 4,518 4,843 110660

4101 Old Bethlehem Rd O/Kimple Bridge Replacement First 3,946 3,946 13240

7009 Clay Ridge Rd Br#30 Bridge Rehabilitation First 233 74 64 1,631 2,002 13014

7009 Stone Rd O/Deep Run (L) Bridge Replacement First 1,858 1,858 13249

7009 Rickert Rd O/Morris Bridge Replacement First 2,505 2,505 13296

7009 King Rd Bridge o/ Herkaken Cr Bridge Replacement First 300 20 30 1,350 1,700 110091

Planning Partner: DVRPC Mode: Transit County: BucksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Levittown Station First 9,590 9,590 60655

Planning Partner: DVRPC Mode: Highway County: ChesterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Aerial Photography Miscellaneous First 915 915 48203

Schuylkill Riv Trail Bicycle Facilities/Services First 9,406 9,406 59434

McFarlan Road Sidewalks Pedestrian Facilities First 700 700 108003

Woodbine Rd Multi-Use Trail Pedestrian Facilities First 917 917 108004

Reedville Rd RR WD RR Warning Devices First 215 215 110451

1 US 1: Partnership Phs 2 Add Lane First 191 1,748 60 6,008 8,007 14541

1 US 1: MD/PA Ln - PA 896 Reconstruct First 6,139 713 2,768 9,620 14580

1 US 1: MD/PA Ln - PA 896 Reconstruct Second 43,498 43,498 14580

1 US 1: MD/PA Ln - PA 896 Reconstruct Third 63,964 63,964 14580

1 US 1: PA 896 - Schl Hs Reconstruct First 4,500 9,552 653 792 15,000 30,497 14581

1 US 1: PA 896 - Schl Hs Reconstruct Second 1,896 124,292 126,188 14581

10 PA 10 Shoulder Widening Safety Improvement First 200 200 110954

Page 39: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 15 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: ChesterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

29 Schuylkill Rvr Trail(Mont Clare Brg) Bicycle Facilities/Services First 1,145 1,145 61885

30 US 30: PA 10 - Exton Byp Reconstruct First 7,210 7,210 14532

30 Reconstruct US 30 Bypass Reconstruct First 9,670 22,419 845 4,289 37,223 87781

30 Reconstruct US 30 Bypass Reconstruct Second 10,000 10,000 87781

30 Reconstruct US 30 Bypass Reconstruct Third 449,648 449,648 87781

30 SR30/SR10 to Business 30 Int. Imp Interchange Improvement First 2,606 2,606 107551

30 SR30/SR10 to Business 30 Int. Imp Interchange Improvement Second 1,459 3,239 64,586 69,284 107551

30 SR30 & Airport Rd Interchange Imp. Interchange Improvement First 8,073 8,073 107553

30 SR30 & Airport Rd Interchange Imp. Interchange Improvement Second 4,516 4,858 2,130 11,504 107553

30 SR30 & Airport Rd Interchange Imp. Interchange Improvement Third 197,500 197,500 107553

30 US30 & PA82 Interchange Imp. Interchange Improvement First 6,144 6,144 107554

30 US30 & PA82 Interchange Imp. Interchange Improvement Second 3,437 3,239 15,159 21,835 107554

30 US30 & PA82 Interchange Imp. Interchange Improvement Third 137,500 137,500 107554

41 PA 41 & SR 841 Imprvmnts Safety Improvement First 319 382 66 326 4,278 5,371 102708

41 PA 41 & SR 926 Imprvmnts Safety Improvement First 265 53 179 1,900 2,397 102709

41 PA 41 at State Rd Intersection Improvement First 113 113 110311

41 PA 41 at State Rd Intersection Improvement Second 179 63 57 299 110311

41 PA 41 at State Rd Intersection Improvement Third 1,344 1,344 110311

82 Manor Rd. Roundabout Safety Improvement First 39 216 978 1,234 110963

202 SR 202 @ SR 926 Intersection Improvement First 131 106 3,278 3,515 95430

322 LancasterAve/BrandywinCk Bridge Rehabilitation First 265 21 44 7,316 7,646 86301

322 Horseshoe Pike @ Manor Rd. Safety Improvement First 17 12 6 270 305 110949

422 422: Hanover-PA100 Bridge Removal First 12,730 71,591 84,321 14698

422 Keim St & PA 724 Interchg Reconstruct First 1,644 3,376 638 927 6,585 64220

422 Keim St & PA 724 Interchg Reconstruct Second 36,724 36,724 64220

422 Keim St & PA 724 Interchg Reconstruct Third 9,181 9,181 64220

3046 Baltimore Pike/ Newark Rd. Intersection Improvement First 608 1,060 2,426 4,094 110312

3046 Baltimore Pike/ Newark Rd. Intersection Improvement Second 6,674 6,674 110312

3095 Brandywine Crk Slope Restoration Restoration First 6,000 6,000 108920

Planning Partner: DVRPC Mode: Bridge County: ChesterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Twp Co Brg 297 o/ W BigElk Bridge Replacement First 300 40 40 1,270 1,650 86276

52 Lenape Rd O/Brandywine Cr Bridge Rehabilitation First 106 11 5 122 102853

52 Lenape Rd O/Brandywine Cr Bridge Rehabilitation Third 6,720 6,720 102853

282 Creek Rd o/ E Brandywine Bridge Replacement First 63 106 2,732 2,901 81286

Page 40: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 16 of 259August 16, 2018

Planning Partner: DVRPC Mode: Bridge County: ChesterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

282 Bridge Group N Bridge Replacement First 424 7,647 8,071 107544

322 Dwnngtwn Pk o/EBr Brndywn Bridge Replacement First 232 1,055 1,287 92733

322 Dwnngtwn Pk o/EBr Brndywn Bridge Replacement Second 6,202 6,202 92733

372 L Valley O/Officers Run Bridge Replacement First 3,463 3,463 69919

1001 Ship Rd o/ Valley Creek Bridge Replacement First 133 55 82 1,159 1,429 98039

1005 N. Valley Rd o/Amtrak Bridge Rehabilitation First 1,732 6,375 8,107 47979

1005 N. Valley Rd o/Amtrak Bridge Rehabilitation Second 12,750 12,750 47979

1023 Merlin Rd o/ Pigeon Run Bridge Replacement First 133 11 71 1,159 1,374 98036

1024 Art School Rd O/ Brh Pickering Crk Bridge Replacement First 85 137 17 84 1,159 1,482 107945

1030 Birchrun Rd o/ Birch Run Bridge Replacement First 117 55 82 1,159 1,413 98041

2020 Boot Road o/ Amtrak Bridge Rehabilitation First 8,216 8,216 90612

4006 Lt Wshngtn Rd O/Clbrtsn Bridge Replacement First 74 150 3,376 3,600 14236

7015 Rudolph&Arthur CvrBrdg#26 Bridge Rehabilitation First 29 50 2,500 2,579 14351

7015 Hadfield Rd o/Beaver Cr. Bridge Replacement First 430 280 54 1,005 1,769 86064

7015 Watermark Rd o/ Muddy Run Bridge Replacement First 424 52 65 2,732 3,273 86696

7410 W Bridge St O/AMTRAK Bridge Replacement First 6,365 6,365 14134

Planning Partner: DVRPC Mode: Transit County: ChesterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Paoli Transport. Center First 6,770 6,770 60574

Paoli Transport. Center Second 41,000 41,000 60574

Paoli Transport. Center Third 10,197 10,197 60574

Downingtown Train Station First 55 55 93586

Exton Train Station First 9,530 9,530 93588

Exton Train Station Second 31,500 31,500 93588

Exton Train Station Third 7,836 7,836 93588

Planning Partner: DVRPC Mode: Highway County: DelawareTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Hwy Restoration /Rehab Miscellaneous Second 6,289 6,289 17876

Hwy Restoration /Rehab Miscellaneous Third 18,084 18,084 17876

Ozone Action Program Transportation Enhancement First 250 250 17928

Transp Managemnt Assoc Planning First 2,658 2,658 48199

Regional GIS Support Miscellaneous First 700 700 48202

Jansen Ave Grade Xing Safety Improvement First 273 273 103216

Page 41: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 17 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: DelawareTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Erickson Ave. Grade Cross RR Warning Devices First 218 218 104610

Radnor Township Trail Bicycle Facilities/Services First 1,000 1,000 107995

Ave. of the States Streetscape Street Scapes First 913 913 108005

1 1:Chester Cnty Ln - Pole Cat Rd Resurface First 53 16 69 88400

1 1:Chester Cnty Ln - Pole Cat Rd Resurface Second 10,454 10,454 88400

95 I-95 Chester City Noise Abatement Noise Barriers First 530 530 108910

95 I-95 Chester City Noise Abatement Noise Barriers Second 1,194 1,194 108910

95 I-95 Chester City Noise Abatement Noise Barriers Third 672 672 10,751 12,095 108910

202 SR202/SR1 Loop Rd System Intersection Improvement First 579 281 164 1,024 95429

202 SR202/SR1 Loop Rd System Intersection Improvement Third 4,435 4,435 95429

202 US 202/US 1 ITS Corridor Existing Signal Improvement First 2,798 2,798 107652

291 SR 291 Drainage Improvmnt Drainage Improvement First 80 53 80 1,126 1,339 99668

322 US 322: Fthrbd - I-95 Widen First 6,461 83,736 90,197 69817

322 US 322: Fthrbd - I-95 Widen Second 156,640 156,640 69817

352 US 1/PA 352 Interchange Interchange Improvement First 6,499 6,499 15251

352 US 1/PA 352 Interchange Interchange Improvement Second 20,293 5,067 17,100 42,460 15251

352 US 1/PA 352 Interchange Interchange Improvement Third 17,100 145,000 162,100 15251

420 Kedron Ave @ Franklin Intersection Improvement First 32 1,485 1,517 64791

2005 Main Street Darby Boro. Safety Improvement First 1,476 2,852 142 5,464 9,934 103217

2006 I-476 MacDade Boulevard Intersection Improvement First 150 11,818 11,968 70228

2006 Macdade Blvd. Corridor Safety Improvement First 180 120 2,796 3,095 110951

2024 Marshall Rd. Safety Improv Safety Improvement First 322 2,947 3,269 110965

2025 Morton Ave: 9th - Swrthmr Widen First 4,180 4,180 57757

3009 Chichester Ave. Safety Safety Improvement First 55 36 849 940 111022

3017 Bethel Rd. Roundabout Safety Improvement First 47 352 1,163 1,561 111021

3018 Bridgewater Rd Ext New Roadway First 1,194 1,194 79329

3018 Bridgewater Rd Ext New Roadway Second 1,008 1,008 20,764 22,780 79329

7301 Lloyd St O/AMTRAK Bridge Removal First 2,185 51 5,796 8,032 57773

7410 Folcroft Ave O/AMTRAK Bridge Removal First 350 2,185 2,535 15008

9900 DVRPC CMAQ Program Miscellaneous First 45,297 45,297 48201

Planning Partner: DVRPC Mode: Bridge County: DelawareTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1 State Rd o/Darby Creek Bridge Rehabilitation First 1,591 530 530 8,345 10,996 93105

Page 42: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 18 of 259August 16, 2018

Planning Partner: DVRPC Mode: Bridge County: DelawareTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

95 I-95 Overhead Bridges(C) Bridge Rehabilitation First 2,732 2,732 88407

322 SR322 over CSX Bridge Replacement First 1,061 1,093 1,093 18,756 22,003 104343

322 SR322 over CSX Bridge Replacement Second 9,378 9,378 104343

420 Wanamaker Ave o/ Darby Ck Bridge Replacement First 530 393 380 1,303 92323

420 Wanamaker Ave o/ Darby Ck Bridge Replacement Second 14,376 14,376 92323

1002 Manoa Rd:Brg O/ Ck Bridge Replacement First 2,213 2,213 15368

1018 Ardmore Ave O/SEPTA Bridge Replacement First 5,832 5,832 15225

2024 Marshall Rd o/ Cobbs Crk Bridge Rehabilitation First 250 870 120 60 1,300 92808

2024 Marshall Rd o/ Cobbs Crk Bridge Rehabilitation Third 11,014 11,014 92808

2031 Sellers Ave O/AMTRAK Bridge Replacement First 7,957 7,957 15306

3030 Glenn Riddle o/Chrome Run Bridge Replacement First 200 500 75 1,000 1,775 92739

3101 S.Creek Rd O/Brandywine Bridge Replacement First 849 135 317 1,301 69665

3101 S.Creek Rd O/Brandywine Bridge Replacement Second 17,833 17,833 69665

7023 Station Rd Brg/Chstr #234 Bridge Replacement First 477 68 13 2,814 3,372 15183

7023 New Rd O/Chester Cr Bridge Rehabilitation First 3,994 3,994 47992

7023 Mount Alverno Rd/ChestrCk Bridge Replacement First 3,030 3,030 86368

7023 TribettAve/HermesprotaCk Bridge Replacement First 60 2,970 3,030 86370

9911 Third St Dam Repair (L) Bridge Replacement First 60 60 2,185 2,305 47147

Planning Partner: DVRPC Mode: Transit County: DelawareTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Elwyn to Wawa Rail Restor First 151,046 151,046 60636

Villanova Intermodal Stat First 1,550 1,550 84427

Villanova Intermodal Stat Second 3,326 3,326 84427

Villanova Intermodal Stat Third 7,742 7,742 84427

Planning Partner: DVRPC Mode: Highway County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Ridge Pk: Butler-Crescent Reconstruct First 1,857 164 1,912 3,933 16577

Ridge Pk: Butler-Crescent Reconstruct Second 25,028 25,028 16577

Whitemarsh Street Imprv Safety Improvement First 1,843 1,843 74816

NorthWalesBoro Imp.(SRTS) (C) Miscellaneous First 797 797 87099

Expwy Ptrl 2013-16 Suburb Corridor Safety Improvement First 4,700 4,700 92182

Municipal Brdg Line Item Bridge Rehabilitation First 13,549 13,549 102105

Municipal Brdg Line Item Bridge Rehabilitation Second 3,125 3,125 102105

Page 43: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 19 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SD Bridge Line Item Bridge Rehabilitation Second 42,592 42,592 102106

SD Bridge Line Item Bridge Rehabilitation Third 80,087 80,087 102106

Bridge OnDemand Line Item Bridge Replacement First 4,800 4,800 102107

Study Line Item Transportation Study First 500 500 102275

Study Line Item Transportation Study Second 3,400 3,400 102275

Study Line Item Transportation Study Third 4,300 4,300 102275

Signal Upgrade Line Item Existing Signal Improvement First 1,000 1,000 102665

Travel Monitoring Planning First 240 240 104639

First Av Linear Prk/Strsc Bicycle Facilities/Services First 1,200 1,200 105134

Circuit Line Item Pedestrian Facilities First 6,000 6,000 105291

Traffic Signal Modernization Existing Signal Improvement First 11 11 105677

Traffic Signal Modernization Existing Signal Improvement Second 161 161 105677

Union Street Grade X-ing RR Warning Devices First 208 208 106326

Sink Holes Line Item Miscellaneous First 750 750 106648

StormwaterPermits/Envrnmntl Mitigtn Miscellaneous First 750 750 106649

Sign Structure Repair Line Item Miscellaneous First 800 800 106651

Abington Township Trail Bicycle Facilities/Services First 450 450 107996

Limerick Township Trail Bicycle Facilities/Services First 970 970 108006

Tookany Creek Trail Phase 3 Bicycle Facilities/Services First 700 700 108008

Local Hwys & Bridge Data Collection Miscellaneous First 100 100 108554

ROW Divestment 6-0 Restoration First 750 750 109847

LED Lighting Conver 6-0 Lighting First 750 750 109848

D6 Modeling Assistance Planning First 460 460 110127

Philmnt/Tomlinson/Pine Rd Int Intersection Improvement First 450 450 110315

Philmnt/Tomlinson/Pine Rd Int Intersection Improvement Second 716 716 110315

Philmnt/Tomlinson/Pine Rd Int Intersection Improvement Third 336 672 5,874 6,882 110315

Mobility AT Programs (MAP) Miscellaneous First 1,200 1,200 110429

Commuter Svcs/MAP Shared Ride Miscellaneous First 502 502 110460

Wrong Way Safety Safety Improvement First 250 1,750 2,000 110469

RTMC General Contract Facility Improvement - Buildings & Grounds Org3500First 1,500 2,500 500 500 13,000 18,000 110494

RTMC Electrical Contract Facility Improvement - Buildings & Grounds Org3500First 4,000 4,000 110496

RTMC HVAC Contract Facility Improvement - Buildings & Grounds Org3500First 4,000 4,000 110497

Page 44: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 20 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

RTMC Plumbing Contract Facility Improvement - Buildings & Grounds Org3500First 4,000 4,000 110498

Conshohocken Garage Transit System Improvement First 2,000 2,000 111005

Conshohocken Garage Transit System Improvement Second 8,000 8,000 111005

Cannon Ave. Grade Xing RR Warning Devices First 310 310 111129

23 23: Moore to Geerdes Relocation/Realignment First 1,109 1,016 5,566 7,691 48172

23 23: Moore to Geerdes Relocation/Realignment Second 11,000 11,000 48172

23 PA23/US422 Int & N Gulph Interchange Improvement First 2,897 13,506 16,403 66952

63 PA 63:Welsh Rd@Limkiln(H) Intersection Improvement First 2,000 2,000 48174

63 PA 63:Welsh Rd@Limkiln(H) Intersection Improvement Second 9,406 13,111 22,517 48174

73 Church Rd:Greenwd-Rice's Existing Signal Improvement First 335 723 240 1,773 9,004 12,075 16334

202 US 202: Markley St (SB) Reconstruct First 2,865 3,925 6,790 16665

202 US202:Johnson-Swede #4 Widen First 1,855 40,155 42,010 63486

202 US202:Johnson-Swede #4 Widen Second 13,384 13,384 63486

202 US202:Swede-Morris #2 Widen First 7,717 19,190 26,907 63490

202 US202:Swede-Morris #2 Widen Second 5,000 5,000 63490

202 US202:Morris-Swedesfd #3 Widen First 4,244 17,048 21,292 63491

202 US202:Morris-Swedesfd #3 Widen Second 50,150 50,150 63491

320 PA320 @ Hanging Rock Restoration First 530 530 11,740 12,800 16599

422 US 422:Park to Norfolk Reconstruct First 849 1,273 38,364 40,486 16738

422 US 422:Park to Norfolk Reconstruct Second 25,573 25,573 16738

422 US 422:WofRoysfd-WofSntga Resurface First 4,210 4,210 86924

463 Main St. RR WD RR Warning Devices First 320 320 110455

1008 309 Cnntr: Allntwn Rd-Souderton Pk New Roadway First 4,615 1,093 3,278 7,628 16,614 77211

1008 309 Cnntr: Allntwn Rd-Souderton Pk New Roadway Second 22,884 22,884 77211

1008 PA 309 Connector New Roadway First 2,814 2,814 105803

1008 PA 309 Connector New Roadway Second 3,800 24,493 28,293 105803

1008 PA 309 Connector New Roadway Third 20,434 39,914 60,348 105803

1017 Old Skippack Rd. Roundabout Safety Improvement First 27 220 663 910 110961

2034 Edge Hill Rd & Tyson Av Reconstruct First 11,924 11,924 57865

2034 Edge Hill Rd & Tyson Av Reconstruct Second 6,502 6,502 57865

3009 Main St. Safety Improv Safety Improvement First 307 205 34 68 4,774 5,388 110971

3020 Barbadoes St Connector Road New Roadway First 6,988 6,988 106068

3037 Balligomingo Rd Restoration(Parent) Restoration First 4,774 4,774 107697

3039 S.Gulph & Henderson Widen First 856 553 14,366 15,775 48187

Page 45: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 21 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3045 Rock Hil Rd@Belmont Av Corridor Safety Improvement Third 44,721 44,721 64795

3053 Ridge Pike & Joshua Rd Reconstruct First 640 640 74937

9102 Lafayette St:Ford - Consh New Roadway First 500 2,000 2,500 57858

9102 Lafayette St(Brbds-Frd(2) (C) Widen First 2,500 2,500 79864

9900 Chester Valley Trail Ext Bicycle Facilities/Services First 239 1,836 14,428 16,503 16705

9900 Reliance Rd Grade X-ing RR Warning Devices First 268 268 36878

Planning Partner: DVRPC Mode: Bridge County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Ridge Pk:Norris-Butler(W) Bridge Rehabilitation First 9,832 9,832 48175

Ridge Pike/two RR Bridges Bridge Rehabilitation First 1,061 287 12,016 13,364 92839

Waverly Rd O/Tacony Cr Bridge Replacement First 300 25 25 1,300 1,650 103372

Belmont Ave. Bridge o/ Schuykill River Bridge Rehabilitation First 318 788 1,106 110313

Belmont Ave. Bridge o/ Schuykill River Bridge Rehabilitation Third 12,095 12,095 110313

Ridge Pike (School-Belvoir) Bridge Replacement First 530 1,092 562 4,370 17,982 24,536 110444

Ridge Pike (School-Belvoir) Bridge Replacement Second 5,089 5,089 110444

29 Main St O/Perkiomen Bridge Replacement First 99 117 216 57849

29 Main St O/Perkiomen Bridge Replacement Second 4,032 4,032 57849

63 PA 63 O/Unami & Perkiomen Bridge Replacement First 3,049 3,049 50646

73 Skippack Pk o/Skippack Cr Bridge Replacement First 279 279 4,371 4,929 92807

152 Limekiln Pike o/SEPTA RR Bridge Rehabilitation First 4,031 4,031 83643

611 PA611 - Old York Rd/SEPTA Bridge Replacement First 10,924 10,924 16214

663 PA 663 o/Ministers Crk Bridge Deck Replacement First 318 338 2,731 3,387 16741

663 West King St O/Manatawney Cr Bridge Replacement First 530 106 80 6,956 7,672 78736

1001 Distr Wide Br Rehab Grp P Bridge Rehabilitation First 232 7,647 7,879 102320

1035 Niantic Rd o/Perkiomen Cr Bridge Replacement First 21 80 1,391 1,492 98037

1050 Congo Rd o/ Middle Creek Bridge Replacement First 162 162 324 86336

1050 Congo Rd o/ Middle Creek Bridge Replacement Second 2,388 2,388 86336

2040 WarminsterRd/Pennypack Ck Bridge Replacement First 100 3,279 3,379 16726

3001 TownshipLineO/StoneyCr(C) Bridge Replacement First 200 250 450 67404

3001 TownshipLineO/StoneyCr(C) Bridge Replacement Third 135 135 5,711 5,981 67404

4030 New Hanover Sqr Rd Bridge Bridge Replacement First 435 65 131 631 16239

4030 New Hanover Sqr Rd Bridge Bridge Replacement Third 2,688 2,688 16239

Page 46: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 22 of 259August 16, 2018

Planning Partner: DVRPC Mode: Bridge County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4031 2nd Collegeville Br X-ing New Bridge First 2,404 2,404 102273

4031 2nd Collegeville Br X-ing New Bridge Second 2,217 633 1,267 28,705 32,822 102273

7046 Fruitville Rd O/Perkiomen Bridge Replacement First 657 75 73 805 16408

7046 Fruitville Rd O/Perkiomen Bridge Replacement Third 8,812 8,812 16408

7046 Valley Green Rd Brg O/Wis Bridge Replacement First 564 122 3,376 4,062 72355

7046 Fttrs Mll O/Pnnpck Cr Bridge Replacement First 2,732 2,732 80052

7046 Keim St o/Schuylkll Riv Bridge Replacement First 675 80 15,004 15,759 83742

7046 Keim St o/Schuylkll Riv Bridge Replacement Second 7,502 7,502 83742

7102 Tokany Pkwy/Jenkintown Cr Bridge Replacement First 102 61 56 1,748 1,967 16150

7104 Pennswood Rd O/AMTRAK Bridge Replacement First 5,217 5,217 16216

7220 E Church Rd O/SEPTA Bridge Replacement First 4,598 4,598 16396

7412 N Narberth Ave O/AMTRAK Bridge Replacement First 4,050 1,233 5,464 10,747 64798

Planning Partner: DVRPC Mode: Transit County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Cap Operating Assistance First 7,865 7,865 59935

Ardmore Transport Center Third 10,000 10,000 73214

Transp Capital Improvmnts First 1,102 1,102 95739

Planning Partner: DVRPC Mode: Highway County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

RideECO Marketing PR Miscellaneous First 500 500 17891

ITS Program Integrator Traffic Control Center First 2,456 2,456 51095

City 3R Bttrmnts Line Itm Reconstruct First 2,960 873 3,833 57902

City 3R Bttrmnts Line Itm Reconstruct Second 1,135 20,000 21,135 57902

City 3R Bttrmnts Line Itm Reconstruct Third 24,000 24,000 57902

Regional Hwy Safety Initiativ Safety Improvement First 56,502 56,502 57927

Regional Hwy Safety Initiativ Safety Improvement Second 57,012 57,012 57927

Regional Hwy Safety Initiativ Safety Improvement Third 57,012 57,012 57927

On Road Bike Retrofits Bicycle Facilities/Services First 500 500 63406

Trans&Comm Dev Init(TCDI) Planning First 1,500 1,500 64652

TAP/HTS/SR2S Line Item Transportation Enhancement First 15,728 15,728 64984

TAP/HTS/SR2S Line Item Transportation Enhancement Second 15,728 15,728 64984

TAP/HTS/SR2S Line Item Transportation Enhancement Third 15,728 15,728 64984

Transit Flex - SEPTA Transit System Improvement First 68,332 68,332 65109

Transit Flex - SEPTA Transit System Improvement Second 68,332 68,332 65109

Page 47: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 23 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Transit Flex - SEPTA Transit System Improvement Third 68,332 68,332 65109

TAP Project Engr/Mgment Transportation Enhancement First 1,350 1,350 66460

CMAQ Proj Engr/Mgmt Transportation Enhancement First 450 450 66461

Swnsn St: Dela-Orgn (L) New Roadway First 1,107 4,152 5,259 70231

Swnsn St: Dela-Orgn (L) New Roadway Second 4,152 15,120 19,272 70231

Transportation Systems Mgmt & Operations(TSMO)Intermodal Services First 1,400 1,400 72738

American Cities Earmark Bike/Ped Safety Education First 3,252 3,252 74828

N Dela GreenTrail Sec1 Transportation Enhancement First 3,000 3,000 79830

N Del Green Trail Sec3 Transportation Enhancement First 3,779 3,779 79832

N H P P Reserve Item Reconstruct First 5,532 5,532 82216

N H P P Reserve Item Reconstruct Second 38,073 38,073 82216

N H P P Reserve Item Reconstruct Third 44,365 44,365 82216

ADA Ramps Miscellaneous Second 1,814 1,814 83743

ADA Ramps Miscellaneous Third 9,690 9,690 83743

Signal re-timing Prog Existing Signal Improvement First 1,050 1,050 84457

Travel Simulation Model Miscellaneous First 908 908 86077

Philadelphia SRS Miscellaneous First 1,000 1,000 87107

Expwy Ptrl 2011-14 Phila Corridor Safety Improvement First 4,400 4,400 91490

Philadelphia SgnlRetim(C) Existing Signal Improvement First 1,000 1,000 96223

TCDI Administration Planning First 240 240 97311

Ashton Rd Grade Xing Safety Improvement First 215 215 103218

Blue Grass Rd Grade Xing Safety Improvement First 214 214 103219

I-95: Bridge St. Ramps New Roadway First 5,000 8,485 36,699 50,184 103563

I-95: Bridge St. Ramps New Roadway Second 45,242 45,242 103563

Citywide Resurf/Ramps 105 Resurface First 900 16,710 17,610 105488

I-95 Transp Demand Mgmt TMA Planning First 450 450 106654

I-95 Planning Assistance Planning First 400 400 106708

5th Street Signal Improvements Safety Improvement First 520 520 106991

2nd Street Signal Improvements Safety Improvement First 1,228 1,228 106992

Safe Spaces for Cyclists Pedestrian Facilities First 300 300 107198

S. 53rd St. & Baltimore Ave. Safety ImprovSafety Improvement First 600 600 107999

Demand-Driven Indego Expansion Bicycle Facilities/Services First 985 985 108009

Page 48: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 24 of 259August 16, 2018

Planning Partner: DVRPC Mode: Highway County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Citywide Resurf/Ramps 106 Resurface First 546 11,250 11,796 108090

Citywide Resurf/Ramps 107 Resurface First 601 9,196 9,797 108092

Citywide Resurf/Ramps 107 Resurface Second 4,305 4,305 108092

Citywide Resurf/Ramps 108 Resurface First 606 4,406 5,012 108095

Citywide Resurf/Ramps 108 Resurface Second 9,100 9,100 108095

Citywide Resurf/Ramps 109 Resurface First 328 5,796 6,124 108097

Citywide ADA Ramps 2 Pedestrian Facilities First 700 344 1,044 108098

Citywide ADA Ramps 2 Pedestrian Facilities Second 5,219 5,219 108098

Schuylkill Banks Trail-Chrstn-Crsnt Bicycle Facilities/Services First 25,500 25,500 110415

Schuylkill Banks Trail-Chrstn-Crsnt Bicycle Facilities/Services Second 7,500 7,500 110415

13 Frankford Avenue Signal Improvements Safety Improvement First 1,607 1,607 106993

95 I-95: Shackamaxon - Ann Reconstruct First 500 21,500 22,000 17821

95 I-95: Shackamaxon - Ann Reconstruct Second 1,000 15,000 16,000 17821

95 I-95: Shackamaxon - Ann Reconstruct Third 6,000 6,000 17821

95 I-95: Cornwell Hgts Shuttle Miscellaneous First 2,613 2,613 17918

95 I-95: Columbia - Ann(C) Reconstruct First 1,000 1,000 79686

95 I-95: Allegheny AdvCntrc (C) Widen First 15,000 15,000 79911

95 Penn's Landing Project Development Miscellaneous First 2,000 20,000 10,000 10,000 65,000 107,000 106264

95 Penn's Landing Project Development Miscellaneous Second 90,000 90,000 106264

1001 Rising Sun Avenue Signal Imp. Safety Improvement First 1,257 1,257 106994

1004 Erie Ave o/ Conrail Bridge Removal First 54 4,379 4,433 17407

1005 Castor Ave. Roundabout Safety Improvement First 46 762 808 110958

2003 Fifth Street over Conrail Bridge Removal First 4,244 4,244 69914

3013 Islnd Ave: Elmwd - Suflk Existing Signal Improvement First 1,711 14,205 15,916 17697

8061 DRPA B Frnkln Sfy Imp Existing Signal Improvement First 95 820 28 4,057 5,000 72597

8061 B Franklin Br Op Impvmnt Intersection Improvement First 820 870 1,690 105290

8061 B Franklin Br Op Impvmnt Intersection Improvement Second 30 4,434 4,464 105290

Planning Partner: DVRPC Mode: Bridge County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

30th St. Viaduct o/ 30th St. Lower Bridge Rehabilitation First 1,080 1,039 2,119 110314

30th St. Viaduct o/ 30th St. Lower Bridge Rehabilitation Third 9,839 9,839 110314

1 City Ave o/ SEPTA Bridge Replacement First 530 1,350 58 58 1,996 17511

1 City Ave o/ SEPTA Bridge Replacement Second 8,500 8,500 17511

1 Rsvlt Blvd o/Wayne Junc Bridge Rehabilitation First 52,180 52,180 83736

Page 49: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 25 of 259August 16, 2018

Planning Partner: DVRPC Mode: Bridge County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1 Rsvlt Blvd o/Wayne Junc Bridge Rehabilitation Second 19,106 19,106 83736

3 Chestnut St@30th St o/Sch (C) Bridge Rehabilitation First 2,500 17,022 19,522 17816

13 Roosevelt Blvd Exit Bridge Rehabilitation First 250 1,044 61 1,355 92809

13 Roosevelt Blvd Exit Bridge Rehabilitation Second 326 5,067 5,393 92809

30 W Girard Ave O/CSX Bridge Replacement First 647 990 1,020 2,657 78764

30 W Girard Ave O/CSX Bridge Replacement Third 7,922 7,922 78764

76 I-76 Bridge Repair Bridge Preservation Activities First 5,000 5,000 107698

95 I-95 Design Support Serv Miscellaneous First 8,000 8,000 46959

95 I-95 Bridge Repairs Bridge Rehabilitation First 358 13,224 13,582 107709

95 I-95 Bridge Repairs Bridge Rehabilitation Second 13,224 13,224 107709

1011 Willits Road Bridge Bridge Deck Rehabilitation First 310 319 319 948 69909

1011 Willits Road Bridge Bridge Deck Rehabilitation Second 4,038 4,038 69909

2007 Frankford Av/Frankford Ck Bridge Replacement First 250 1,011 1,463 113 2,837 81292

2007 Frankford Av/Frankford Ck Bridge Replacement Second 8,481 8,481 81292

3003 34th Street/CSX Rail Bridge Replacement First 895 978 68 68 2,009 75804

3003 34th Street/CSX Rail Bridge Replacement Third 6,416 6,416 75804

3009 Ridge Ave o/ AMTRAK Bridge Replacement First 901 820 656 2,377 92554

3009 Ridge Ave o/ AMTRAK Bridge Replacement Second 6,524 6,524 92554

3010 Market Street Bridge Bridge Deck Rehabilitation First 1,061 14,853 9,420 25,334 69828

3010 Market Street Bridge Bridge Deck Rehabilitation Second 65,926 65,926 69828

3019 Passyunk Ave Drawbridge(C) Bridge Deck Rehabilitation First 2,500 2,500 62694

3028 JFK Blvd @ 32nd St. o/ SEPTA Bridge Rehabilitation First 2,121 1,093 2,251 11,254 16,719 78757

3028 JFK Blvd @ 32nd St. o/ SEPTA Bridge Rehabilitation Second 5,627 5,627 78757

4011 Coulter St./SEPTA *B2 Bridge Replacement First 1,061 950 307 1,848 4,166 17409

4011 Coulter St./SEPTA *B2 Bridge Replacement Second 1,848 1,848 17409

7301 Montgmry Av O/AMTRAK Bridge Replacement First 14,840 14,840 57276

7301 Byberry Road/ CSX Bridge Replacement First 1,351 1,093 219 13,140 15,803 88085

Planning Partner: DVRPC Mode: Transit County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Capital Asset Lease Prog First 220,658 220,658 59966

Capital Asset Lease Prog Second 246,365 246,365 59966

Capital Asset Lease Prog Third 266,833 266,833 59966

Utility Fleet Renewal Pro First 26,000 26,000 59973

Utility Fleet Renewal Pro Second 24,000 24,000 59973

Utility Fleet Renewal Pro Third 24,000 24,000 59973

Page 50: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 26 of 259August 16, 2018

Planning Partner: DVRPC Mode: Transit County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Debt Service First 251,125 251,125 60275

Debt Service Second 281,790 281,790 60275

Debt Service Third 212,157 212,157 60275

Federal Preventive Maint First 181,000 181,000 60317

Federal Preventive Maint Second 181,000 181,000 60317

Federal Preventive Maint Third 181,000 181,000 60317

City Hall/15th St Station First 33,865 33,865 60335

City Hall/15th St Station Second 56,119 56,119 60335

Parking Improvements First 16,651 16,651 60540

Parking Improvements Second 40,302 40,302 60540

Parking Improvements Third 102,434 102,434 60540

Vehicle Overhaul Program First 321,435 321,435 60582

Vehicle Overhaul Program Second 332,876 332,876 60582

Vehicle Overhaul Program Third 342,000 342,000 60582

Paratransit Vehicle Purch First 28,000 28,000 60599

Paratransit Vehicle Purch Second 28,000 28,000 60599

Paratransit Vehicle Purch Third 28,000 28,000 60599

Fare Collection System First 97,956 97,956 60611

Regional Rail Car Acqu First 227,697 227,697 60638

Regional Rail Car Acqu Second 315,100 315,100 60638

Regional Rail Car Acqu Third 403,761 403,761 60638

Substation & Power Improv First 164,977 164,977 60651

Substation & Power Improv Second 102,469 102,469 60651

Substation & Power Improv Third 34,801 34,801 60651

Trans & Reg Rail Stations First 166,354 166,354 77183

Trans & Reg Rail Stations Second 98,795 98,795 77183

Trans & Reg Rail Stations Third 155,678 155,678 77183

Infra. Safety & Renewal P First 190,005 190,005 90497

Infra. Safety & Renewal P Second 204,000 204,000 90497

Infra. Safety & Renewal P Third 220,000 220,000 90497

SEPTA Bus Purchase Prog First 281,547 281,547 90512

SEPTA Bus Purchase Prog Second 134,672 134,672 90512

SEPTA Bus Purchase Prog Third 131,672 131,672 90512

SEPTA Bridge Program First 29,139 29,139 95402

SEPTA Bridge Program Second 99,191 99,191 95402

SEPTA Bridge Program Third 95,279 95,279 95402

Track Improvment Program First 38,395 38,395 102565

Track Improvment Program Second 18,148 18,148 102565

Page 51: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 27 of 259August 16, 2018

Planning Partner: DVRPC Mode: Transit County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Track Improvment Program Third 33,190 33,190 102565

Roof Improvement Program First 38,224 38,224 102567

Roof Improvement Program Second 18,890 18,890 102567

Roof Improvement Program Third 40,030 40,030 102567

Maint. & Trans Facilities First 111,454 111,454 102569

Maint. & Trans Facilities Second 87,862 87,862 102569

Maint. & Trans Facilities Third 69,450 69,450 102569

Comm. Sig. & Tech. Improv First 157,227 157,227 102571

Comm. Sig. & Tech. Improv Second 65,508 65,508 102571

Comm. Sig. & Tech. Improv Third 51,000 51,000 102571

Safety & Security Impvmts First 61,315 61,315 107011

Safety & Security Impvmts Second 42,234 42,234 107011

Safety & Security Impvmts Third 26,050 26,050 107011

Planning Partner: Erie Mode: Highway County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

McBride Viaduct Bridge Removal First 1,100 1,100 58232

Econ. Dev. Line Item Miscellaneous First 3,100 3,100 75532

Erie Local Brdg Line Item Bridge Rehabilitation First 2,850 2,850 98256

Erie Local Brdg Line Item Bridge Rehabilitation Second 2,375 2,375 98256

Erie Local Brdg Line Item Bridge Rehabilitation Third 1,104 1,104 98256

Erie Highway/Bridge Line Item Miscellaneous First 12,612 12,612 106421

Erie Highway/Bridge Line Item Miscellaneous Second 21,296 21,296 106421

Erie Highway/Bridge Line Item Miscellaneous Third 12,628 12,628 106421

Erie Betterment Line Item Resurface First 1,186 1,186 106424

Erie Betterment Line Item Resurface Second 27,900 27,900 106424

Erie 2019 AWPM Reflective Pavement Markers First 95 95 106441

Erie 2020 AWPM Reflective Pavement Markers First 95 95 106442

Caughey Road ADA Ramps Pedestrian Facilities First 335 335 106865

Erie Local Fed Aid Rt Line Item Resurface First 1,700 1,700 106874

Erie Local Fed Aid Rt Line Item Resurface Second 2,000 2,000 106874

Erie Local Fed Aid Rt Line Item Resurface Third 2,000 2,000 106874

Little Italy Sidewalk Recon - Ph 2 Transportation Enhancement First 176 176 108024

Erie 2021 AWPM Reflective Pavement Markers First 95 95 109895

Erie 2022 AWPM Reflective Pavement Markers First 95 95 109896

Erie Loop Bikeway Greengarden Blvd Pavement Preservation First 700 700 110377

Page 52: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 28 of 259August 16, 2018

Planning Partner: Erie Mode: Highway County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Erie Loop Bikeway French St Pavement Preservation First 700 700 110379

Huntley Road RR Crossing RR Warning Devices First 350 350 111147

5 PA 5: West 12th Street Resurface Third 2,750 2,750 90286

5 PA 5: Gorman-Brewster Existing Signal Improvement Second 250 100 100 100 550 99057

5 PA 5: Gorman-Brewster Existing Signal Improvement Third 800 800 99057

5 PA 5: Lincoln Ave-State St Resurface Third 5,000 5,000 99763

5 PA 5: East Side Access to Franklin Ave Restoration First 651 651 109748

6 US 6: Washington St - Warren Resurface Second 2,000 2,000 99696

6 Union City Signals Safety Improvement First 100 1,183 1,283 110342

8 PA 8: Bldwin-N. of Casier Resurface Third 3,750 3,750 99049

8 Pine Ave/Old French Rd/28th St IntersectionIntersection Improvement First 600 600 106444

18 PA 18: Crawford Co- US 6N Resurface Third 1,200 1,200 99701

19 N Waterford Improvements Safety Improvement First 1,736 1,736 91394

19 Peach Street Turning Lane Add Turning Lane Third 11,000 11,000 97888

19 US 19: Dorn Rd-Robinson Safety Improvement Second 3,300 3,300 98308

19 US 19: Millcreek Mall-Metz St Resurface Second 3,000 3,000 99804

19 Peach St. Safety & Mobility Imp. Safety Improvement First 400 400 107348

20 US 20: Cumberland Rd to Davison Rd Resurface First 3,940 3,940 99015

20 US 20: Millfair - Brown Existing Signal Improvement Second 200 100 25 25 350 99059

20 US 20: Millfair - Brown Existing Signal Improvement Third 800 800 99059

20 US/SR 20 : Zuck to Chestnut Resurface First 50 80 4,000 4,130 99729

20 US/SR 20: Millfair to Zuck Resurface First 100 80 100 7,000 7,280 110339

79 I-79: Milepost 178-182.2 Resurface Third 22,700 22,700 99062

89 PA 89: Smith Rd to PA 426 Restoration First 70 1,800 1,870 109143

90 I-90 Cable Median Barrier Safety Improvement First 269 269 110094

98 PA 98/Sterrettania Rd Intersection Safety Improvement First 77 77 105776

197 PA 197 & I-90 Interchange Interchange Improvement Second 150 100 15 25 350 640 101502

290 PA 290: Bayfront Connector Resurface Second 3,500 3,500 99000

290 PA 290: Bayfront Connector Resurface Third 1,000 1,000 99000

426 PA 426 & SR 2029 Corry Restoration First 100 5,600 5,700 109141

531 PA 531: Depot Road, Section 2 Reconstruct First 150 60 30 3,700 3,940 102468

Page 53: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 29 of 259August 16, 2018

Planning Partner: Erie Mode: Highway County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

531 PA 531: Depot Road, Section 4 Reconstruct First 150 100 10 180 440 106586

531 PA 531: Depot Road, Section 4 Reconstruct Second 1,200 1,200 106586

699 PA 699: US 6N-Old St Road Resurface Second 1,300 1,300 99746

3006 SR 3006 Roundabout Intersection Improvement Third 5,000 5,000 97883

3006 US 6N & PA 99 Intersection ImprovementsIntersection Improvement First 150 10 50 1,000 1,210 109901

3006 US 6N Underpass - Springfield Twp Restoration First 300 300 80 3,500 4,180 110343

4008 Hamot Rd/Oliver Rd Intersection Safety Improvement First 2,200 2,200 102069

4010 SR 4010:Hershey Rd-PA 99 Intersection Improvement Second 3,800 3,800 98322

4012 SR 4012: Intrchng Rd Impr Widen First 3,500 3,500 95558

4015 Zuck Rd: Zimmerly to 26th St Restoration First 60 15 25 3,380 3,480 109147

4027 SR 4027: Water Street Resurface Second 711 711 99758

4034 Central Bayfront Prkwy Multimodal Safety Improvement First 2,000 1,000 1,500 10,500 15,000 108952

4034 Bayfront Parkway at 6th Street Intersection Impr.Intersection Improvement First 550 550 110836

8170 I-86 High Speed Ramp to I-90 Safety Improvement First 200 200 109997

Planning Partner: Erie Mode: Bridge County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

5 PA 5 Bridge/Wensel Run Bridge Rehabilitation Second 50 10 60 97170

5 PA 5 Bridge/Wensel Run Bridge Rehabilitation Third 300 300 97170

6 US 6 over Keppels Run Bridge Rehabilitation First 100 10 590 700 88605

6 US 6 Bridge/French Ck. Trib Bridge Rehabilitation Second 50 10 400 460 97240

8 PA 8 Brdg/French Ck. W. Brch Bridge Rehabilitation First 1,050 1,050 97215

8 Erie 2022 Bridge Shotcrete Group Bridge Preservation Activities First 150 1,000 1,150 109893

18 PA 18 Bridge over I-90 Bridge Replacement Third 500 200 50 5,000 5,750 97239

19 US 19 over LeBoeuf Creek Bridge Replacement First 1,600 1,600 600

20 US 20 over CN RR Bridge Rehabilitation First 100 50 1,300 1,450 1172

20 US 20 Bridge over Elk Creek Bridge Preservation Activities First 800 800 1271

20 US 20 over Trout Run Bridge Rehabilitation Second 50 10 60 88472

20 US 20 over Trout Run Bridge Rehabilitation Third 300 300 88472

20 US 20 Bridge/16 Mile Creek Bridge Rehabilitation Second 50 10 60 97205

20 US 20 Bridge/16 Mile Creek Bridge Rehabilitation Third 300 300 97205

20 US 20 Bridge/Unknown Stream Bridge Rehabilitation Second 50 10 80 140 97208

97 PA 97: French Ck Brdg Bridge Rehabilitation Second 50 10 60 622

Page 54: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 30 of 259August 16, 2018

Planning Partner: Erie Mode: Bridge County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

97 PA 97: French Ck Brdg Bridge Rehabilitation Third 300 300 622

215 PA 215 Bridge over I-90 Bridge Replacement Third 500 150 50 5,000 5,700 97138

290 PA 290: Wintergreen Gorge Br Bridge Preservation Activities Second 10 740 750 97187

299 PA 299 Bridge/CSX & NS RR Bridge Preservation Activities Second 10 150 160 1211

505 PA 505 Bridge/Mill Ck #2 Bridge Rehabilitation Second 50 10 300 360 97213

505 PA 505 Bridge/Mill Creek #1 Bridge Rehabilitation Second 50 10 300 360 97214

699 PA 699: Edinboro Rd/I-90 Br Bridge Replacement First 50 25 4,000 4,075 47505

699 PA 699 Edinboro Rd Br over Walnut Creek BranchBridge Replacement First 45 250 295 110080

1001 SR 1001 Brdg/Fr Ck N Brch Bridge Rehabilitation First 150 50 1,850 2,050 97150

1004 SR 1004 Brdg/Townley Run Bridge Preservation Activities Second 50 50 97222

1004 SR 1004 Brdg/Townley Run Bridge Preservation Activities Third 300 300 97222

1006 Moorheadville Rd Br/I-90 Bridge Replacement Third 150 50 950 1,150 47508

1013 SR 1013 Bridge over I-86 Bridge Rehabilitation Second 100 10 640 750 97176

1013 SR 1013 Bridge/I-90 Bridge Rehabilitation Second 100 10 110 97221

1013 SR 1013 Bridge/I-90 Bridge Rehabilitation Third 850 850 97221

1019 Gay Road over I-90 Bridge Replacement Second 3,000 3,000 1288

1103 Remington Rd/I-90 Bridge Rehabilitation Third 3,250 3,250 1280

2002 SR 2002 Brdg/Spring Creek Bridge Rehabilitation First 150 150 72629

2003 SR 2003: Main St/Fr. Ck Bridge Preservation Activities First 100 25 1,000 1,125 1133

2006 SR 2006 over French Creek Bridge Rehabilitation First 50 10 1,400 1,460 88462

2006 Erie 2019 Bridge Shotcrete Group Bridge Preservation Activities First 350 350 106443

2008 SR 2008/French Ck Trib Bridge Rehabilitation First 200 200 940

2025 SR 2025 Brdg/Hare Creek Bridge Preservation Activities Second 10 10 72641

3002 SR 3002 Brdg/Conneaut Ck Bridge Preservation Activities Second 10 50 60 72410

3006 SR 3006 Brdg/Conneaut Ck Bridge Rehabilitation Second 140 10 1,000 1,150 97241

3006 SR 3006 (Crossingville Rd.) Bridge over Marsh RunBridge Replacement First 150 150 110156

3008 SR 3008 Brdg/Temple Creek Bridge Rehabilitation Second 100 50 350 500 97173

3010 SR 3010 Br/Cssg Ck W Brch Bridge Rehabilitation First 100 10 700 810 97126

3014 SR 3014 over I-79 Bridge Rehabilitation First 30 1,100 1,130 88463

3015 SR 3015,Lexington Rd/I-90 Bridge Preservation Activities Second 10 100 110 1125

3017 SR 3017 over Temple Creek Bridge Rehabilitation First 100 500 600 88474

Page 55: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 31 of 259August 16, 2018

Planning Partner: Erie Mode: Bridge County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3102 Huntley Road/I-90 Bridge Replacement Second 200 100 50 3,150 3,500 82924

4011 SR 4011 Brdg/Walnut Ck Bridge Replacement First 150 150 97243

4011 SR 4011 Brdg/Walnut Ck Bridge Replacement Second 50 1,100 1,150 97243

4015 SR 4015/Cascade Ck Branch Dept. Force Culvert Replacement First 60 25 500 585 90147

4032 Erie Preserve Br Group Bridge Rehabilitation First 200 200 95613

4105 SR 4105 Bridge over I-90 Bridge Rehabilitation First 100 10 110 97171

4105 SR 4105 Bridge over I-90 Bridge Rehabilitation Second 1,000 1,000 97171

4106 SR 4106 Bridge/I-90 Bridge Rehabilitation Second 90 10 700 800 97218

4107 Moore House Rd/I-90 Br Bridge Rehabilitation Second 90 10 600 700 47500

4108 SR 4108: Jordan Rd/I-90 Bridge Rehabilitation Second 300 150 450 47501

4108 SR 4108: Jordan Rd/I-90 Bridge Rehabilitation Third 3,000 3,000 47501

8170 SR 8170 Brdg/Rohl Road Bridge Rehabilitation Second 90 10 1,100 1,200 72647

Planning Partner: Erie Mode: Transit County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Replace Fixed Route Buses First 5,000 5,000 77126

Engines/Transmissions First 350 350 77128

Replace Paratransit Buses First 1,800 1,800 77129

Acquire Shop Equipment First 100 100 77131

Acquire Misc. Equipment First 88 88 77132

Technology Upgrades First 100 100 77135

Replace Non-Revenue Veh First 100 100 95298

Facility Improvements First 100 100 102491

Shelter Amenities First 63 63 102492

FY 2019 Operating Subsidy First 13,434 13,434 106591

FY 2020 Operating Subsidy First 13,433 13,433 106592

FY 2021 Operating Subsidy First 13,486 13,486 110881

FY 2022 Operating Subsidy First 13,461 13,461 110882

Planning Partner: Franklin Mode: Highway County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Franklin Bridge Reserve Miscellaneous First 2,214 2,214 87804

Franklin Bridge Reserve Miscellaneous Second 3,999 3,999 87804

Franklin Bridge Reserve Miscellaneous Third 2,968 2,968 87804

Page 56: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 32 of 259August 16, 2018

Planning Partner: Franklin Mode: Highway County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Highway Reserve Miscellaneous First 833 833 87805

Highway Reserve Miscellaneous Second 541 541 87805

Highway Reserve Miscellaneous Third 17,168 17,168 87805

Delivery/Consult Assist Miscellaneous First 1,600 800 2,400 87810

HSIP Line Item Miscellaneous First 863 863 87816

HSIP Line Item Miscellaneous Second 2,500 2,500 87816

HSIP Line Item Miscellaneous Third 4,881 4,881 87816

SRTP Rideshare Program Miscellaneous First 383 383 88666

DF Box Culvert Line Item Franklin Miscellaneous First 450 450 102147

South Third St Crossing RR Warning Devices First 285 285 102974

Road Safety Audit Line Item Safety Improvement First 30 30 106536

11 US 11/Molly Pitcher Hghwy Resurface Second 150 1,500 1,650 100308

11 Chambersburg Signal Imp. Existing Signal Improvement First 4,081 4,081 102384

11 US11 & SR3012 Intersection Intersection Improvement First 250 50 100 1,190 1,590 106711

11 US11 & SR3012 Intersection Intersection Improvement Second 810 810 106711

16 SR 16 Retaining Wall Safety Improvement Second 150 150 90205

16 SR 16 Retaining Wall Safety Improvement Third 1,500 1,500 90205

16 I-81/Buchanan Trail Impr Existing Signal Improvement Third 300 300 95662

16 Buchanan Trail West 2 Resurface Second 50 50 100287

30 Lincoln Hghwy Resurfacing Resurface Second 50 50 100303

75 Path Valley Rd Resurf #3 Resurface Second 50 50 97964

81 I-81 New Interchange (Exit 12) New Interchange First 2,063 2,027 2,100 4,012 10,202 93055

81 I-81 New Interchange (Exit 12) New Interchange Second 25,801 25,801 93055

456 Little Cove Rd Resurface Resurface Second 50 50 90918

997 Anthony Highway Realign Relocation/Realignment Second 300 300 97159

997 Anthony Highway Realign Relocation/Realignment Third 1,500 1,500 97159

997 PA997 & SR2015 Intersection Intersection Improvement First 200 250 50 100 600 106709

997 PA997 & SR2015 Intersection Intersection Improvement Second 1,864 1,864 106709

1006 Main Street-Scotland Reconstruct First 4,480 4,480 79700

1006 Scotland Main St Sidewalk Pedestrian Facilities First 498 498 107986

2007 Old Forge Road Intersection Improvement Second 50 50 97147

2010 Old Route 16 Resurfacing Resurface Second 50 50 91184

4004 Horse Valley Rd Resurface Resurface Second 50 50 91187

Page 57: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 33 of 259August 16, 2018

Planning Partner: Franklin Mode: Bridge County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 West King Street Bridge Bridge Replacement First 160 1,100 1,260 19304

11 US 11 Conococheague Cr Br-A Bridge Replacement First 1,020 1,020 87446

11 Trib Conococheague Cr Br Bridge Replacement Second 50 50 87461

11 Trib Conococheague Cr Br Bridge Replacement Third 250 250 87461

11 Falling Spring Run Bridge-A Bridge Replacement First 1,140 1,140 87680

11 US 11 over Muddy Run Bridge Replacement Second 50 50 100054

11 US 11 over Muddy Run Bridge Replacement Third 750 750 100054

11 US11 over Wet Weather str Bridge Replacement Second 150 150 100132

11 US11 over Wet Weather str Bridge Replacement Third 750 750 100132

16 Buck Run Bridge Bridge Replacement Second 150 150 90812

16 Buck Run Bridge Bridge Replacement Third 400 400 90812

16 Marsh Run Road Bridge Replacement First 920 920 90813

16 PA16 Bridge PM 1 Bridge Preservation Activities Second 150 150 100012

16 PA16 Bridge PM 1 Bridge Preservation Activities Third 400 400 100012

16 Main Street Bridge 2 Bridge Replacement Second 150 150 100016

16 Main Street Bridge 2 Bridge Replacement Third 1,250 1,250 100016

16 PA16 over Red Run 1 Bridge Replacement Second 150 150 100023

16 PA16 over Red Run 1 Bridge Replacement Third 750 750 100023

16 PA16 over Red Run 2 Bridge Replacement Second 150 150 100027

16 PA16 over Red Run 2 Bridge Replacement Third 900 900 100027

16 PA 16 over Red Run 3 Bridge Replacement Second 150 150 100028

16 PA 16 over Red Run 3 Bridge Replacement Third 600 600 100028

30 Lincoln Highway Bridge 1-A Bridge Rehabilitation First 955 955 90322

30 Lincoln Highway Bridge 2-A Bridge Rehabilitation First 180 50 93 1,081 1,404 90323

30 Lincoln Highway Bridge 3-A Bridge Rehabilitation First 679 679 90324

30 Rocky Mountain Creek Br Bridge Replacement First 3,400 3,400 90839

30 US 30 over Campbell Run-A Bridge Replacement First 210 60 60 1,456 1,786 100046

30 US30 over trib of Back Cr-A Bridge Replacement First 210 65 45 1,254 1,574 100051

30 US30/trib to Campbell Run Bridge Replacement Second 150 150 100174

30 US30/trib to Campbell Run Bridge Replacement Third 750 750 100174

30 US30 over Conococheague Br PM Bridge Preservation Activities First 345 345 100237

30 US 30 Pipe Replacment-A Reconstruct First 600 600 107589

75 SR 75 O/Bucks Run 1 Bridge Preservation Activities First 100 100 78690

75 SR 75 O/Bucks Run 1 Bridge Preservation Activities Second 300 300 78690

Page 58: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 34 of 259August 16, 2018

Planning Partner: Franklin Mode: Bridge County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

75 Path Valley Bridge Bridge Replacement Second 150 150 87684

75 Path Valley Bridge Bridge Replacement Third 250 250 87684

75 Wet Weather Stream Bridge Bridge Replacement Second 100 400 500 90841

75 Path Valley Road Bridge Bridge Replacement Second 150 150 92588

75 Path Valley Road Bridge Bridge Replacement Third 600 600 92588

233 Little Antietam Creek Bridge Replacement Second 100 400 500 90845

233 PA233 over Rocky Mtn Crk-C Bridge Rehabilitation First 800 800 100149

316 PA316/Little Antietam Crk Bridge Replacement Second 150 150 100165

316 PA316/Little Antietam Crk Bridge Replacement Third 950 950 100165

316 PA316/trib to W Antietam Bridge Replacement Second 150 150 100169

316 PA316/trib to W Antietam Bridge Replacement Third 850 850 100169

433 Rowe Run Road ov Rowe Run Bridge Preservation Activities Second 150 150 100267

433 Rowe Run Road ov Rowe Run Bridge Preservation Activities Third 300 300 100267

641 SR 641 O/Trout Run Bridge Preservation Activities Second 150 850 1,000 78692

641 Newburg Road/Laughlin Run Bridge Preservation Activities Second 150 150 100256

641 Newburg Road/Laughlin Run Bridge Preservation Activities Third 250 250 100256

641 Spring Run Road Bridge PM Bridge Preservation Activities Second 150 150 101402

641 Spring Run Road Bridge PM Bridge Preservation Activities Third 250 250 101402

696 South Fayette Road Bridge Bridge Preservation Activities First 100 100 101401

696 South Fayette Road Bridge Bridge Preservation Activities Second 500 500 101401

995 Welsh Run Road Bridge PM Bridge Preservation Activities Second 150 150 101404

995 Welsh Run Road Bridge PM Bridge Preservation Activities Third 300 300 101404

997 W Branch of Antietam Ck-A Bridge Replacement First 225 310 15 25 1,350 1,925 90856

997 Black Gap Rd bridge PM Bridge Preservation Activities Second 200 600 800 99971

997 PA997 over Conodoguinet 3 Bridge Replacement Second 150 150 100039

997 PA997 over Conodoguinet 3 Bridge Replacement Third 850 850 100039

1001 Mount Pleasant Rd Bridge Bridge Preservation Activities Second 150 150 100249

1001 Mount Pleasant Rd Bridge Bridge Preservation Activities Third 400 400 100249

2002 Leitersburg RD/ Marsh Run Bridge Replacement Second 150 150 100042

2002 Leitersburg RD/ Marsh Run Bridge Replacement Third 750 750 100042

2006 Iron Bridge Rd Bridge Bridge Preservation Activities Second 150 150 100225

2006 Iron Bridge Rd Bridge Bridge Preservation Activities Third 400 400 100225

2007 SR2007 O/Little Antietam Bridge Preservation Activities Third 150 655 805 78714

2016 SR 2016/I-81 Bridge Bridge Preservation Activities Second 200 200 63179

2016 SR 2016/I-81 Bridge Bridge Preservation Activities Third 750 750 63179

Page 59: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 35 of 259August 16, 2018

Planning Partner: Franklin Mode: Bridge County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2031 Mont Alto Road Bridge-A Bridge Rehabilitation First 119 200 319 93208

3001 Williamsport Pike Bridge Bridge Replacement Second 150 150 91340

3001 Williamsport Pike Bridge Bridge Replacement Third 300 300 91340

3004 Bino Road Bridge PM Bridge Preservation Activities Second 150 150 99967

3004 Bino Road Bridge PM Bridge Preservation Activities Third 405 405 99967

3007 Lemar Road Bridge Bridge Preservation Activities First 100 100 78699

3007 Lemar Road Bridge Bridge Preservation Activities Second 525 525 78699

3009 Church Hill Road Bridge Bridge Preservation Activities Second 150 150 78703

3009 Church Hill Road Bridge Bridge Preservation Activities Third 300 300 78703

3009 Oregon St ov Steigers Run Bridge Preservation Activities Second 150 400 550 100261

3011 Stoney Battery Rd Bridge Bridge Replacement Second 150 250 400 87447

3011 Mountain Rd ovr Buck Run Bridge Replacement First 150 700 850 100163

3011 Stoney Battery Rd Bridge Bridge Preservation Activities Second 150 150 101403

3011 Stoney Battery Rd Bridge Bridge Preservation Activities Third 300 300 101403

3012 Social Island Road Bridge-C Bridge Replacement First 350 65 35 1,500 1,950 90969

3012 Jack Road Bridge Bridge Replacement Second 150 150 91343

3012 Jack Road Bridge Bridge Replacement Third 350 350 91343

3026 Mill Road over Carters Cr Bridge Preservation Activities Second 150 150 100245

3026 Mill Road over Carters Cr Bridge Preservation Activities Third 500 500 100245

4001 Bear Valley Rd/ Broad Run Bridge Preservation Activities Second 150 150 99964

4001 Bear Valley Rd/ Broad Run Bridge Preservation Activities Third 500 500 99964

4005 Amberson Road Bridge2 Bridge Preservation Activities Second 150 150 99929

4005 Amberson Road Bridge2 Bridge Preservation Activities Third 300 300 99929

4005 Amberson Road Bridge 3 Bridge Preservation Activities Second 150 150 99938

4005 Amberson Road Bridge 3 Bridge Preservation Activities Third 300 300 99938

4006 Stone Bridge Road Bridge Bridge Replacement First 200 200 63174

4006 Stone Bridge Road Bridge Bridge Replacement Second 1,300 1,300 63174

4007 Back Road over Dry Run Bridge Replacement Second 150 150 99942

4007 Back Road over Dry Run Bridge Replacement Third 1,000 1,000 99942

4018 Maclays Mill Road Bridge Bridge Replacement First 75 50 850 975 19188

4018 Paxton Run Rd Bridge Bridge Replacement Second 150 150 63175

4018 Paxton Run Rd Bridge Bridge Replacement Third 750 750 63175

4018 Paxton Run Rd Bridge 1 Bridge Replacement Second 150 150 100138

4018 Paxton Run Rd Bridge 1 Bridge Replacement Third 1,000 1,000 100138

Page 60: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 36 of 259August 16, 2018

Planning Partner: Franklin Mode: Bridge County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4018 Paxton Run Road Bridge 2 Bridge Replacement Second 150 150 100143

4018 Paxton Run Road Bridge 2 Bridge Replacement Third 750 750 100143

7209 Heisey Road T330 CO#121 Bridge Rehabilitation First 2,250 2,250 92543

Planning Partner: Harrisburg Mode: Highway County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Gettysburg Rd Realignment Relocation/Realignment First 1,903 1,903 101966

Fairgrounds Trail Bicycle Facilities/Services First 5,380 5,380 107834

11 King St & Ritner Hwy Resurface Pavement Preservation First 5,106 5,106 101266

11 Camp Hill - Capital Implementation Planning First 300 300 111000

581 American Ex-POW Mem Hwy Resurface Second 2,840 2,840 88314

581 Creekview Rd Interchange Interchange Improvement First 4,139 4,139 102755

641 Trindle/St Johns Church Intersection Improvement Third 250 1,200 1,450 94913

1013 Good Hope Road Resurface Pavement Preservation Second 50 50 90868

2016 Eastern Cumberland County Resurface Second 50 2,500 2,550 96458

2017 Rossmoyne Roundabout Intersection Improvement First 750 750 102741

Planning Partner: Harrisburg Mode: Bridge County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

W Shore Connection Bridge Pedestrian Facilities First 1,400 1,400 102756

11 Ritner Highway Bridge 1-A Bridge Replacement First 1,300 1,300 87369

11 HBG Pike SB over Bypass Bridge Preservation Activities First 150 1,200 1,350 99674

11 US-11 NB over Conodoguine Bridge Preservation Activities First 350 350 99678

11 US-11 NB over Conodoguine Bridge Preservation Activities Second 3,657 3,657 99678

11 Carlisle Pike over T Sprg Bridge Replacement First 225 1,500 1,725 99708

11 North Enola Road Bridge Bridge Replacement Third 150 600 750 100100

34 Holly Pike over Letort Sp Bridge Replacement First 200 200 99722

34 Holly Pike over Letort Sp Bridge Replacement Second 950 950 99722

34 Spring Run Road Bridge Bridge Replacement First 175 175 100080

34 Spring Run Road Bridge Bridge Replacement Second 550 550 100080

74 Waggoners Gap Rd Bridge Bridge Preservation Activities Third 150 950 1,100 99663

74 York Rd over Yellow Breec Bridge Preservation Activities First 200 200 99684

74 York Rd over Yellow Breec Bridge Preservation Activities Second 950 950 99684

74 Waggoners Gap Rd Bridge Bridge Preservation Activities Third 150 175 325 99723

Page 61: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 37 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

74 York Road Bridge Bridge Replacement Third 150 600 750 100097

114 PA 114 / Conodoguinet Cr Br Bridge Preservation Activities Third 300 2,100 2,400 99685

174 Walnut Bottom Road Bridge-A Bridge Replacement First 1,334 1,334 74051

233 Doubling Gap Road Bridge Bridge Replacement Third 150 400 550 100015

233 Doubling Gap Rd Bridge 2 Bridge Replacement Third 150 550 700 100073

233 Doubling Gap Rd Bridge 3 Bridge Replacement Third 150 550 700 100076

233 PA 233 over Mountain Crk Bridge Replacement Third 150 550 700 100084

533 Shippensburg Rd over RR Bridge Preservation Activities Third 150 950 1,100 99667

581 PA 581 BRPM ov Trindle Rd Bridge Preservation Activities Third 150 100 250 80968

581 PA-581 Brdg over Loc Ln 1 Bridge Preservation Activities Third 150 625 775 99725

581 PA-581 Brg over Loc Ln 2 Bridge Preservation Activities Third 150 510 660 99748

581 PA-581 Brg over Conodo 1 Bridge Preservation Activities Third 150 3,900 4,050 99754

581 PA-581 Br over Condo 2 Bridge Preservation Activities Third 150 3,050 3,200 99760

581 PA-581 Br over Ramps A&B Bridge Preservation Activities Third 150 3,500 3,650 99764

581 PA-581 over Carlisle Pike Bridge Preservation Activities Third 150 1,500 1,650 99769

581 PA-581 over Sporting Hill Bridge Preservation Activities Third 150 525 675 99772

581 Wet Weather Stream Bridge Bridge Preservation Activities Second 150 150 99775

581 Wet Weather Stream Bridge Bridge Preservation Activities Third 450 450 99775

581 PA-581 over St Johns Ch R Bridge Preservation Activities Third 150 530 680 99780

641 Mill Race Bridge Bridge Replacement First 175 175 87425

641 Mill Race Bridge Bridge Replacement Second 200 200 87425

641 Newville Rd over Peebles Bridge Preservation Activities Second 150 150 99787

641 Newville Rd over Peebles Bridge Preservation Activities Third 350 350 99787

641 Green Spring Road Bridge Bridge Replacement Third 150 450 600 100034

696 Shippensburg Rd ov Condo Bridge Preservation Activities Third 150 260 410 99791

696 Newburg Run Bridge Bridge Replacement Third 150 450 600 100041

696 Shippensburg Road Bridge Bridge Replacement Third 150 550 700 100071

944 Locust Creek Bridge Bridge Rehabilitation First 1,000 1,000 78648

944 Enola Road over Bloser Creek Bridge Replacement First 150 150 87419

944 Enola Road over Bloser Creek Bridge Replacement Second 400 400 87419

944 Wertzville Rd Bridge Bridge Replacement Third 150 400 550 100018

Page 62: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 38 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

944 Wertzville Rd Bridge 2 Bridge Replacement Third 150 450 600 100035

944 Wertzville Road Bridge 1 Bridge Replacement Third 150 450 600 100044

944 Wertzville Road Bridge 3 Bridge Replacement Third 150 450 600 100048

944 Enola Road Bridge Bridge Replacement Third 150 550 700 100087

944 Wertzville Road Bridge 2 Bridge Replacement Third 150 650 800 100103

944 Wertzville Road Bridge 4 Bridge Replacement Third 150 850 1,000 100106

997 Trib 3 Square Hollow Run Bridge Replacement First 175 500 675 78655

997 Roxbury Road Bridge Bridge Replacement Second 75 75 90346

997 Roxbury Road Bridge Bridge Replacement Third 700 700 90346

997 Roxbury Road Bridge 2 Bridge Replacement First 150 150 90734

997 Roxbury Road Bridge 2 Bridge Replacement Second 350 350 90734

997 Roxbury Road Bridge 4 Bridge Replacement Third 150 450 600 100049

997 Roxbury Road Bridge 1 Bridge Replacement Third 150 550 700 100093

1004 Valley Road Bridge Bridge Replacement Third 150 400 550 100021

1005 N Middlesex Rd over Condo Bridge Preservation Activities Third 150 620 770 99799

1011 Lambs Gap Rd over Creek Bridge Preservation Activities Third 150 950 1,100 99669

1013 Good Hope Rd over Conodoguinet Bridge Preservation Activities First 30 30 99688

1013 Good Hope Rd over Conodoguinet Bridge Preservation Activities Second 100 1,200 1,300 99688

1013 Good Hope Rd ov Sears Run Bridge Preservation Activities Second 150 150 99800

1013 Good Hope Rd ov Sears Run Bridge Preservation Activities Third 225 225 99800

1014 Camp Hill Bypass ov Trib Bridge Preservation Activities Third 150 70 220 99801

2003 Walnut St over Storm Chan Bridge Preservation Activities Third 150 50 200 99803

2004 Lisburn Road Bridge Bridge Replacement Third 150 450 600 100037

2010 Winding Hill Rd over US15 Bridge Preservation Activities Third 150 800 950 99689

2014 Hummel Ave over NS Bridge Preservation Activities Third 150 380 530 99690

2019 Old Forge Rd over Yellow Bridge Preservation Activities Third 150 50 200 99813

2021 Cedar Run Bridge Bridge Replacement Third 150 400 550 100025

2031 Lisburn Rd ov Cedar Creek Bridge Preservation Activities Third 150 200 350 79535

2033 Creek Road Bridge-C Bridge Replacement First 1,200 1,200 87413

2035 Third Street over NS Bridge Preservation Activities Third 150 700 850 99691

3001 South Queen St over NS Bridge Preservation Activities Third 150 250 400 99692

Page 63: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 39 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3001 Britton Rd over Burd Run Bridge Preservation Activities Second 150 150 99693

3001 Britton Rd over Burd Run Bridge Preservation Activities Third 450 450 99693

3005 Oakville Road Bridge Bridge Replacement Second 150 150 100052

3005 Oakville Road Bridge Bridge Replacement Third 600 600 100052

3006 Pine Road Bridge # 3 Bridge Replacement First 150 150 87659

3006 Pine Road Bridge # 3 Bridge Replacement Second 652 652 87659

3006 Pine Road over Spruce Run Bridge Preservation Activities Second 150 150 99841

3006 Pine Road over Spruce Run Bridge Preservation Activities Third 350 350 99841

3007 Big Spring Creek Bridge Bridge Rehabilitation First 120 120 90741

3007 Big Spring Creek Bridge Bridge Rehabilitation Second 50 325 375 90741

3010 Goodyear Road Bridge Bridge Replacement Second 150 150 100055

3010 Goodyear Road Bridge Bridge Replacement Third 450 450 100055

3011 Hays Grove Road Bridge Bridge Replacement Second 150 150 90749

3011 Hays Grove Road Bridge Bridge Replacement Third 500 500 90749

4005 Three Square Hollow Rd Br Bridge Replacement Second 150 150 101268

4005 Three Square Hollow Rd Br Bridge Replacement Third 585 585 101268

4006 Brandy Run Rd over Conodo Bridge Preservation Activities Second 150 150 99695

4006 Brandy Run Rd over Conodo Bridge Preservation Activities Third 1,000 1,000 99695

4006 Brandy Run Road 2 Bridge Replacement Second 150 150 101270

4006 Brandy Run Road 2 Bridge Replacement Third 650 650 101270

4008 Center Road Bridge 2 Bridge Replacement Second 150 150 101274

4008 Center Road Bridge 2 Bridge Replacement Third 600 600 101274

4011 Brandy Run Road 3 Bridge Replacement Second 150 150 100013

4011 Brandy Run Road 3 Bridge Replacement Third 600 600 100013

4021 Bloserville Rd over Condo Bridge Preservation Activities Second 150 1,000 1,150 99699

4025 Old Mill Rd over Conodoguinet Bridge Preservation Activities Second 150 50 1,000 1,200 99702

7103 Orrs Bridge T-618 Bridge Replacement First 4,375 4,375 18486

7212 Hempt Road Bridge Bridge Rehabilitation First 100 75 100 1,200 1,475 102271

7213 Kunkle Bridge Bridge Replacement First 2,000 2,000 103317

9900 Wolf Bridge T-508 Bridge Replacement First 3,063 3,063 18433

Planning Partner: Harrisburg Mode: Highway County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

HATS SD Br Reserve Bridge Rehabilitation First 6,294 6,294 84324

HATS SD Br Reserve Bridge Rehabilitation Second 10,339 10,339 84324

HATS SD Br Reserve Bridge Rehabilitation Third 11,372 11,372 84324

Page 64: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 40 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Highway County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

TAP Line Item Transportation Enhancement First 1,480 1,480 88058

TAP Line Item Transportation Enhancement Second 1,860 1,860 88058

TAP Line Item Transportation Enhancement Third 1,859 1,859 88058

HSIP Line Item Safety Improvement First 4,645 4,645 88060

HSIP Line Item Safety Improvement Second 10,928 10,928 88060

HSIP Line Item Safety Improvement Third 12,429 12,429 88060

Highway Reserve Restoration First 10,750 10,750 88061

Highway Reserve Restoration Second 48,260 48,260 88061

Highway Reserve Restoration Third 37,426 37,426 88061

STU Line Item Restoration First 1,438 1,438 88068

STU Line Item Restoration Second 20,017 20,017 88068

STU Line Item Restoration Third 24,878 24,878 88068

Delivery/ Consult Assist Miscellaneous First 2,000 3,200 5,200 88069

SRTP Rideshare Program Miscellaneous First 2,052 2,052 94635

CAT Allocated CMAQ Transit System Improvement First 4,304 4,304 94636

CMAQ Line Item Miscellaneous First 10,542 10,542 102173

CMAQ Line Item Miscellaneous Second 20,220 20,220 102173

CMAQ Line Item Miscellaneous Third 20,020 20,020 102173

Ann Street Resurfce Resurface First 555 555 103138

CAT BRT Signal Preemption Existing Signal Improvement First 900 900 106549

Riverwalk Slabs and Sidewalk Pedestrian Facilities First 1,000 1,000 107985

HATS Bikeshare Bicycle Facilities/Services First 168 168 111064

22 US 22/322 PM Concrete Rehabilitation First 100 100 88316

22 US 22/322 PM Concrete Rehabilitation Second 2,750 2,750 88316

22 River Relief Route Restoration First 150 4,000 4,150 97254

22 River Relief Route Restoration Second 6,000 6,000 97254

81 I-81/I-83 Noise Walls Noise Barriers First 510 750 50 100 10,400 11,810 105864

147 Upper Daupin Park-n- Ride Park and Ride Lot First 200 200 106548

209 US 209 Resurfacing Resurface Second 150 150 100202

230 SR 230/Front Street Resurface Resurface First 50 2,916 2,966 107022

283 PA-283/I-76 Interchange Interchange Improvement First 2,585 2,585 84548

300 PA 283 Reconstruction 3 Reconstruct First 42,738 42,738 19016

322 US 322 & Chambers Hill Rd Intersection Improvement First 1,000 250 600 10,500 12,350 92945

322 US 322 Ramp Ext Reconstruct First 5,344 5,344 96198

Page 65: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 41 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Highway County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

325 Clarks Valley Road Resurface Second 150 150 90883

743 Laudermilch Resurface Resurface Second 75 75 96753

2019 Nyes/Dvnshre Hts Safety Intersection Improvement First 2,667 2,667 47521

2019 Milroy Road Underpass Widen Second 2,500 2,500 85337

2019 Milroy Road Underpass Widen Third 25,000 25,000 85337

2036 Hershey Drive Resurface Resurface First 50 2,000 2,050 96752

3009 Greenbelt 39 to Ft Hunter Bicycle Facilities/Services First 1,493 1,493 102757

3012 Derry Street Safety Imprv Safety Improvement First 250 2,500 2,750 102378

3018 Herr Street Improvements Resurface First 800 800 110486

3026 Elmerton Avenue Resurface Resurface Second 50 50 96302

3032 Airport Conn North Bound Resurface Second 50 50 100110

3032 Airport Conn North Bound Resurface Third 5,000 5,000 100110

3032 Airport Conn South Bound Resurface Second 50 5,000 5,050 100184

Planning Partner: Harrisburg Mode: Bridge County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

CAT Intermodal Bridge Bridge Rehabilitation First 1,456 1,456 102733

CAT Intermodal Bridge Bridge Rehabilitation Second 744 744 102733

11 US-11 over Juniata River Bridge Preservation Activities Third 200 4,800 5,000 99848

22 I-81 River Relief Bridge Bridge Preservation Activities First 8,687 8,687 80696

22 Clarks Ferry Bridge PM Bridge Preservation Activities First 375 15,615 15,990 93178

22 Clarks Ferry Bridge PM Bridge Preservation Activities Second 6,400 6,400 93178

22 Wm Penn Hwy over Clarks R Bridge Preservation Activities Third 150 300 450 99852

22 US-22 over Roberts Valley Bridge Preservation Activities Third 150 350 500 99858

22 US-22 over NS 1 Bridge Preservation Activities Third 150 1,800 1,950 99861

22 US-22 over NS 2 Bridge Preservation Activities Third 150 1,800 1,950 99863

22 Allentn Blvd ov MandaTrib Bridge Replacement Second 150 150 99988

22 Allentn Blvd ov MandaTrib Bridge Replacement Third 1,500 1,500 99988

22 Allentn Blvd over Bow Cr Bridge Replacement Second 150 150 99997

22 Allentn Blvd over Bow Cr Bridge Replacement Third 1,800 1,800 99997

22 I-81 River Relief Bridge 2 Bridge Rehabilitation First 6,500 6,500 109713

25 Berrysburg Rd ov Little W Bridge Replacement Second 150 150 100001

25 Berrysburg Rd ov Little W Bridge Replacement Third 800 800 100001

25 Lykens Valley Rd ov Pine Bridge Preservation Activities Second 150 150 100008

Page 66: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 42 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

25 Lykens Valley Rd ov Pine Bridge Preservation Activities Third 500 500 100008

25 Lykens Valley Road over T Bridge Preservation Activities Second 150 150 100024

25 Lykens Valley Road over T Bridge Preservation Activities Third 500 500 100024

147 South River Road Bridge Bridge Replacement First 200 200 90771

147 South River Road Bridge Bridge Replacement Second 100 2,592 2,692 90771

147 Market Street Bridge-A Bridge Replacement First 75 1,500 1,000 2,575 90772

147 S River Rd over NS Bridge Preservation Activities Second 150 150 99865

147 S River Rd over NS Bridge Preservation Activities Third 1,000 1,000 99865

147 Mill Race Bridge Bridge Replacement Second 150 150 99887

147 Mill Race Bridge Bridge Replacement Third 900 900 99887

209 Wiconisco Creek Bridge 1 Bridge Preservation Activities Third 150 450 600 99868

209 Wiconisco Creek Bridge 2 Bridge Preservation Activities Third 150 420 570 99870

209 Union Street Bridge Bridge Replacement Second 150 150 99882

209 Union Street Bridge Bridge Replacement Third 650 650 99882

209 US 209 Bridge Bridge Replacement Second 150 150 100234

209 US 209 Bridge Bridge Replacement Third 500 500 100234

225 PA 225 Bridge-A Bridge Replacement First 900 900 90773

225 Armstrong Valley Rd Brg Bridge Replacement Second 150 150 93583

225 Armstrong Valley Rd Brg Bridge Replacement Third 750 750 93583

225 N Market St ov Wiconisco Bridge Preservation Activities Third 150 390 540 99875

225 Armstrong Street over Arm Bridge Preservation Activities Second 150 150 100036

225 Armstrong Street over Arm Bridge Preservation Activities Third 500 500 100036

225 Armstrong Valley Rd Brdg Bridge Replacement Second 150 150 100268

225 Armstrong Valley Rd Brdg Bridge Replacement Third 600 600 100268

230 Cameron St ovr Asylum Run Bridge Replacement First 150 150 87454

230 Cameron St ovr Asylum Run Bridge Replacement Second 75 1,500 1,575 87454

230 E Hbg Pike over Lynch Run Bridge Replacement Second 150 150 99888

230 E Hbg Pike over Lynch Run Bridge Replacement Third 1,000 1,000 99888

230 E Main St over Mill Race Bridge Replacement Second 150 150 99891

230 E Main St over Mill Race Bridge Replacement Third 650 650 99891

230 Second Street over Buser Bridge Replacement Second 150 150 100050

230 Second Street over Buser Bridge Replacement Third 950 950 100050

230 Second Street over Bird R Bridge Replacement Second 150 150 100053

230 Second Street over Bird R Bridge Replacement Third 1,000 1,000 100053

230 Harrisburg Pike Bridge 2 Bridge Replacement Second 150 150 100247

Page 67: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 43 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

230 Harrisburg Pike Bridge 2 Bridge Replacement Third 600 600 100247

300 PA 283 over Mill Road Bridge Replacement Third 150 2,772 2,922 90778

300 PA-283 over Conewago 1 Bridge Preservation Activities Third 150 780 930 99880

300 PA-283 over Conewago 2 Bridge Preservation Activities Third 150 780 930 99884

300 PA-283 Over Colebrook 1 Bridge Preservation Activities Third 150 600 750 99886

300 PA 283 West over Old Hers Bridge Preservation Activities Third 150 700 850 100056

322 Paxton St ov Penhar Rd 1 Bridge Preservation Activities Third 150 950 1,100 99890

322 Paxton St ov Penhar Rd 2 Bridge Preservation Activities Third 150 950 1,100 99892

325 Clarks Valley Rd Brg Bridge Replacement Second 150 150 74523

325 Clarks Valley Rd Brg Bridge Replacement Third 800 800 74523

341 Colebrook Road Bridge Bridge Replacement Second 150 150 100272

341 Colebrook Road Bridge Bridge Replacement Third 450 450 100272

422 US-422 Bridge over US-322 Bridge Preservation Activities Second 150 150 99895

422 US-422 Bridge over US-322 Bridge Preservation Activities Third 1,200 1,200 99895

441 Canal Street Bridge-A Bridge Replacement First 1,120 1,120 87456

441 Oberlin Rd over Ramp Bridge Preservation Activities Second 150 150 99900

441 Oberlin Rd over Ramp Bridge Preservation Activities Third 900 900 99900

443 Fishing Creek Brg over NS Bridge Preservation Activities Second 150 150 80978

443 Fishing Creek Brg over NS Bridge Preservation Activities Third 1,500 1,500 80978

743 Cocoa Avenue over Tributa Bridge Replacement Second 150 150 100059

743 Cocoa Avenue over Tributa Bridge Replacement Third 750 750 100059

1002 Pottsville St over Bear C Bridge Preservation Activities Third 150 150 300 100060

1003 Mountain House Rd Bridge Bridge Replacement Third 150 275 425 87653

1003 Mountain House Rd over Cr Bridge Preservation Activities Third 150 70 220 100063

1005 Railroad Street over Wico Bridge Preservation Activities Third 150 230 380 100068

1007 Wilhour Rd over Wiconisco Bridge Preservation Activities Third 150 750 900 99912

1013 Erdman Rd over Pine Creek Bridge Preservation Activities Third 150 490 640 99913

1016 East Middle Road Bridge Bridge Replacement Third 150 550 700 100241

1017 Honeymoon Trail Bridge Bridge Replacement Second 150 500 650 87459

1017 Honeymoon Trail Rd over T Bridge Replacement First 200 450 650 100074

1020 Valley Road Bridge Bridge Replacement Third 150 450 600 99876

1021 North Church Street Brdg Bridge Replacement Third 150 600 750 100253

Page 68: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 44 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1023 Small Valley Road Bridge Bridge Replacement Third 150 600 750 100258

2003 Vine St Bridge #2 PM Bridge Preservation Activities First 275 2,600 2,875 80973

2003 Middletown Rd over US-322 Bridge Preservation Activities Third 150 850 1,000 99915

2005 Roundtop Road Bridge Bridge Replacement Third 150 263 413 90781

2005 Roundtop Road over Iron M Bridge Preservation Activities Third 150 77 227 100083

2007 Deodate Rd Over PA-283 Bridge Preservation Activities Third 150 825 975 99925

2010 Union Deposit Road over K Bridge Replacement Second 200 200 100090

2010 Union Deposit Road over K Bridge Replacement Third 1,000 1,000 100090

2011 Hockersville Road over Sp Bridge Preservation Activities Third 150 170 320 100095

2011 Bachmanville Road Bridge Bridge Replacement Third 150 450 600 100208

2013 Schoolhouse Road over Hof Bridge Replacement Second 150 150 100098

2013 Schoolhouse Road over Hof Bridge Replacement Third 700 700 100098

2015 Sand Beach Rd over Swatar Bridge Preservation Activities Third 150 815 965 80971

2015 Manada Gap Road Bridge Bridge Replacement Second 150 150 90783

2015 Manada Gap Road Bridge Bridge Replacement Third 450 450 90783

2019 Nyes Rd over Beaver Creek Bridge Preservation Activities Second 150 150 99934

2019 Nyes Rd over Beaver Creek Bridge Preservation Activities Third 600 600 99934

2019 Nyes Road over Tributary Bridge Replacement Second 150 150 100105

2019 Nyes Road over Tributary Bridge Replacement Third 450 450 100105

2023 Toll House Rd over PA-283 Bridge Preservation Activities Third 150 1,000 1,150 99939

2026 Green Hill Road Bridge Bridge Replacement Second 150 150 19075

2026 Green Hill Road Bridge Bridge Replacement Third 450 450 19075

2030 Blue Ridge Ave Brg Bridge Replacement First 150 500 650 73893

2033 Fairville Ave overI-81 Bridge Preservation Activities First 225 2,500 2,725 99917

2040 Rosedale Ave over Airport Bridge Preservation Activities Third 150 1,000 1,150 99920

2042 Spring Garden Rd over Con Bridge Preservation Activities Third 150 1,000 1,150 99945

2043 Schoolhouse Rd ov PA-283 Bridge Preservation Activities Third 150 1,100 1,250 99844

3005 40th Bridge St over NS Bridge Preservation Activities Third 150 500 650 99957

3007 19th Street Bridge Bridge Preservation Activities Second 225 2,000 2,225 90837

3009 Paxton St over NS Bridge Replacement Second 150 150 74520

3009 Paxton St over NS Bridge Replacement Third 12,000 12,000 74520

3009 North Front Street Bridge Bridge Replacement Third 150 450 600 99879

Page 69: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 45 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3009 North Front Street over F Bridge Replacement Third 150 1,200 1,350 100108

3009 Front Street Bridge Repl Bridge Replacement Second 150 150 100263

3009 Front Street Bridge Repl Bridge Replacement Third 850 850 100263

3009 E Shore Connection Bridge Pedestrian Facilities First 1,230 1,230 102785

3010 Paxton Street over Spring Bridge Replacement Second 150 150 100109

3010 Paxton Street over Spring Bridge Replacement Third 1,000 1,000 100109

3012 Market St Bridge West Bridge Rehabilitation First 1,450 300 1,750 93176

3012 Market St Bridge West Bridge Rehabilitation Second 29,223 29,223 93176

3012 Market St Bridge East Bridge Rehabilitation First 1,000 1,550 2,550 93177

3012 Market St Bridge East Bridge Rehabilitation Second 20,083 20,083 93177

3013 29th Street Bridge Bridge Replacement Second 200 2,500 2,700 90838

3013 29th St Bridge over I-83 Bridge Preservation Activities Second 150 150 99968

3013 29th St Bridge over I-83 Bridge Preservation Activities Third 400 400 99968

3022 Maclay Street Bridge Bridge Replacement First 750 150 200 25,017 26,117 74521

3022 Maclay Street Bridge Bridge Replacement Second 1,283 1,283 74521

3024 Locust Lane over Tributar Bridge Preservation Activities Second 150 150 100117

3024 Locust Lane over Tributar Bridge Preservation Activities Third 450 450 100117

3026 Elmerton Ave over I-83 Bridge Preservation Activities Second 150 150 99975

4001 Rutter Road Bridge Bridge Replacement Second 200 175 1,259 1,634 78706

4002 Luxemburg Road Bridge 2 Bridge Replacement Second 300 300 19110

4002 Luxemburg Road Bridge 2 Bridge Replacement Third 1,350 1,350 19110

4002 Shippen Dam Road Bridge Bridge Replacement Third 150 189 339 90844

4002 Luxemburg Road over Tribu Bridge Preservation Activities Third 150 120 270 100119

4004 Rutter Road Bridge 2 Bridge Replacement Second 150 150 78741

4004 Rutter Road Bridge 2 Bridge Replacement Third 500 500 78741

4004 Straws Church Road over T Bridge Preservation Activities Second 150 150 100121

4004 Straws Church Road over T Bridge Preservation Activities Third 250 250 100121

4006 Tourist Park Road Bridge Bridge Replacement First 200 300 500 90846

4006 Enders Road Bridge Bridge Replacement Second 150 150 99885

4006 Enders Road Bridge Bridge Replacement Third 600 600 99885

4010 Phillips Road over Little Bridge Replacement Second 150 150 100123

4010 Phillips Road over Little Bridge Replacement Third 450 450 100123

4010 Phillips Road Bridge Bridge Replacement Second 150 150 100233

4010 Phillips Road Bridge Bridge Replacement Third 500 500 100233

Page 70: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 46 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4013 Powells Valley Rd Bridge Bridge Replacement Second 150 150 74522

4013 Powells Valley Rd Bridge Bridge Replacement Third 880 880 74522

4013 Rattling Creek Bridge Bridge Replacement Second 150 150 90849

4013 Rattling Creek Bridge Bridge Replacement Third 1,250 1,250 90849

4013 Market St ov Rattling Cr Bridge Preservation Activities Second 150 150 99980

4013 Market St ov Rattling Cr Bridge Preservation Activities Third 400 400 99980

4013 Powell's Valley Rd Brdg 2 Bridge Replacement Second 150 150 100115

4013 Powell's Valley Rd Brdg 2 Bridge Replacement Third 450 450 100115

4013 Powell's Valley Rd ov Cr Bridge Replacement Second 150 150 100129

4013 Powell's Valley Rd ov Cr Bridge Replacement Third 400 400 100129

4013 Powell's Valley Rd Brdg 1 Bridge Replacement Second 150 150 100221

4013 Powell's Valley Rd Brdg 1 Bridge Replacement Third 500 500 100221

7206 West Cross Rd Bridge Bridge Rehabilitation First 100 100 106563

7206 West Cross Rd Bridge Bridge Rehabilitation Second 750 750 106563

7208 Red Top Road Bridge Bridge Replacement First 1,125 1,125 18998

7208 Jonestown Road Bridge Bridge Replacement First 1,012 1,012 92841

7211 Potato Valley Rd Bridge Bridge Replacement First 1,350 1,350 19131

8037 Wm Penn Hwy EB ov US 11 Bridge Preservation Activities Second 150 150 99984

8037 Wm Penn Hwy EB ov US 11 Bridge Preservation Activities Third 400 400 99984

9410 Paxton St Brg over I-83 Bridge Preservation Activities Second 150 150 99962

9410 Paxton St Brg over I-83 Bridge Preservation Activities Third 550 550 99962

Planning Partner: Harrisburg Mode: Transit County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

ADA Line Item First 2,399 2,399 102464

Safety & Security First 300 300 102467

Preventative Maintenance First 15,000 15,000 102469

Capital Lease Tires First 332 332 102470

Cptl Cost of Contracting First 2,318 2,318 102472

Shop Equipment First 425 425 102473

Office Equipment First 438 438 102474

Comm. / Intell. Trans. First 875 875 102475

Facility Improvements First 691 691 102476

Transit Bus Purchase First 3,641 3,641 102482

Page 71: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 47 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Transit County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

CAT Operating First 40,265 40,265 102484

Shared Ride Vehicle First 1,775 1,775 102485

Planning Partner: Harrisburg Mode: Highway County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 Susquehanna Trail Perry C Resurface Second 150 150 100142

11 Rock Slope 11 Perry Safety Improvement Second 500 5,000 5,500 110555

17 Tuscarora Road Resurface Resurface Second 30 30 96292

17 Tuscarora Path Resurface Resurface Second 30 30 96294

17 Raccoon Valley Resurface Resurface Second 150 3,425 3,575 96295

22 William Penn Hwy Resurf Resurface Second 50 21,000 21,050 101156

34 PA 34 & PA 850 Intersect. Safety Improvement First 1,568 1,568 85655

34 Shermansdale Park-n-Ride Park and Ride Lot First 750 750 100011

34 Meck's Corner Intersection Intersection Improvement First 250 150 100 100 600 106551

34 Meck's Corner Intersection Intersection Improvement Second 1,500 1,500 106551

104 Mill Road Resurface Resurface Second 35 35 96943

274 Big Spring Road Resurface Pavement Preservation Second 2,500 2,500 105346

849 Creek Road Resurface Pavement Preservation Second 2,500 2,500 105347

1015 Millerstown Park-n-Ride Park and Ride Lot First 550 550 100007

Planning Partner: Harrisburg Mode: Bridge County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 State Road Bridge Bridge Replacement Third 150 275 425 87462

11 Cove Creek Bridge Bridge Replacement Second 150 150 99950

11 Cove Creek Bridge Bridge Replacement Third 500 500 99950

11 Susq Trail over Sherman C Bridge Preservation Activities First 250 250 100250

11 Susq Trail over Sherman C Bridge Preservation Activities Second 125 2,000 2,125 100250

11 Susq Trail over Fisher Bridge Preservation Activities Second 150 750 900 100259

11 Susq Trail over PA-274 Bridge Preservation Activities Second 150 150 100266

11 Susq Trail over PA-274 Bridge Preservation Activities Third 1,300 1,300 100266

11 Susq Trail over Li Juni C Bridge Preservation Activities Second 300 150 450 100271

11 Susq Trail over Li Juni C Bridge Preservation Activities Third 3,000 3,000 100271

11 Susq Trail over Butchers Bridge Preservation Activities Second 150 150 100277

11 Susq Trail over Butchers Bridge Preservation Activities Third 590 590 100277

17 Marsh Run Rd Bridge-A Bridge Replacement First 710 710 73959

Page 72: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 48 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

17 Sunbury Path Bridge Bridge Replacement Second 100 100 87473

17 Sunbury Path Bridge Bridge Replacement Third 550 550 87473

17 PA 17 BR over Raccoon Crk Bridge Replacement Second 150 150 87485

17 PA 17 BR over Raccoon Crk Bridge Replacement Third 750 750 87485

17 Tuscarora Road Bridge Bridge Replacement Second 100 100 90703

17 Tuscarora Road Bridge Bridge Replacement Third 800 800 90703

17 Raccoon Valley Rd Bridge1 Bridge Replacement Second 150 150 90704

17 Raccoon Valley Rd Bridge1 Bridge Replacement Third 400 400 90704

17 Raccoon Valley Rd Bridge2 Bridge Rehabilitation First 100 100 90706

17 Raccoon Valley Rd Bridge2 Bridge Rehabilitation Second 300 300 90706

17 Sunbury Path Bridge Bridge Replacement Second 150 450 600 99893

17 PA 17 ovr Trib Panther Ck Bridge Replacement Second 150 150 99969

17 PA 17 ovr Trib Panther Ck Bridge Replacement Third 550 550 99969

17 Raccoon Val Rd over Juni Bridge Preservation Activities First 5,000 5,000 100167

17 Tuscarora Path over Pnthr Bridge Preservation Activities Second 150 300 450 100281

17 Sunbury St over Susq Trib Bridge Preservation Activities Second 150 150 100285

17 Sunbury St over Susq Trib Bridge Preservation Activities Third 350 350 100285

22 US 22 Bridges over PA 34 Bridge Rehabilitation First 4,300 4,300 89276

22 US 22 over Perry Valley Rd Br PM Bridge Preservation Activities First 150 550 700 100173

22 William Penn Hwy ov Fy Rd Bridge Preservation Activities First 150 150 100181

22 William Penn Hwy ov Fy Rd Bridge Preservation Activities Second 450 450 100181

22 Wm Penn Hwy over Ramps Bridge Preservation Activities First 150 150 100186

22 Wm Penn Hwy over Ramps Bridge Preservation Activities Second 700 700 100186

22 Wm Penn Hwy over Sunbury Bridge Preservation Activities First 150 150 100195

22 Wm Penn Hwy over Sunbury Bridge Preservation Activities Second 900 900 100195

22 Wm Penn Hwy over Sunbury Bridge Preservation Activities First 150 150 100210

22 Wm Penn Hwy over Sunbury Bridge Preservation Activities Second 900 900 100210

22 Wm Penn Hwy over Owl Holw Bridge Preservation Activities First 150 150 100218

22 Wm Penn Hwy over Owl Holw Bridge Preservation Activities Second 300 300 100218

22 Wm Penn Hwy over Owl Holw Bridge Preservation Activities First 150 150 100223

22 Wm Penn Hwy over Owl Holw Bridge Preservation Activities Second 300 300 100223

22 Wm Penn Hwy over M Grov 1 Bridge Preservation Activities First 150 150 100230

22 Wm Penn Hwy over M Grov 1 Bridge Preservation Activities Second 1,165 1,165 100230

22 Wm Penn Hwy over M Grov 2 Bridge Preservation Activities First 150 150 100231

22 Wm Penn Hwy over M Grov 2 Bridge Preservation Activities Second 1,165 1,165 100231

Page 73: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 49 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 Wm Penn Hwy over Amity 1 Bridge Preservation Activities First 150 150 100238

22 Wm Penn Hwy over Amity 1 Bridge Preservation Activities Second 350 350 100238

22 Wm Penn Hwy over Amity 2 Bridge Preservation Activities Second 150 350 500 100244

34 Spring Road Bridge 1 Bridge Replacement Second 100 450 550 90708

34 Spring Road Bridge 2 Bridge Replacement Second 100 100 90709

34 Spring Road Bridge 2 Bridge Replacement Third 300 300 90709

34 Carlisle Street Bridge Bridge Rehabilitation First 100 100 90710

34 Carlisle Street Bridge Bridge Rehabilitation Second 600 600 90710

34 Spring Road over Little J Bridge Replacement First 150 150 101093

34 Spring Road over Little J Bridge Replacement Second 800 800 101093

74 Waggoners Gap Rd Bridge Bridge Replacement Second 150 150 90711

74 Waggoners Gap Rd Bridge Bridge Replacement Third 500 500 90711

74 Green Valley Run 1 Bridge Bridge Replacement Second 150 150 99896

74 Green Valley Run 1 Bridge Bridge Replacement Third 450 450 99896

74 Tuscarora Road Bridge Bridge Replacement Second 150 500 650 99959

74 Waggoners Gap Rd over McC Bridge Preservation Activities Second 150 150 100300

74 Waggoners Gap Rd over McC Bridge Preservation Activities Third 750 750 100300

74 Waggoners Gap Rd over Bak Bridge Preservation Activities First 200 550 750 100304

74 Waggoners Gap Rd ov GV 2 Bridge Replacement Second 150 150 101094

74 Waggoners Gap Rd ov GV 2 Bridge Replacement Third 700 700 101094

104 PA 104 Bridge Bridge Replacement Second 150 750 900 87466

233 Greenpark Road Bridge Bridge Replacement Second 150 550 700 99976

274 PA 274 Bridge # 1 Bridge Replacement Second 150 150 87478

274 PA 274 Bridge # 1 Bridge Replacement Third 400 400 87478

274 PA 274 Bridge # 2 Bridge Replacement Second 200 750 950 87488

274 PA 274 Bridge # 3 Bridge Replacement Second 150 150 87489

274 PA 274 Bridge # 3 Bridge Replacement Third 650 650 87489

274 Big Spring Rd Bridge 1 Bridge Replacement Second 125 250 375 90712

274 Big Spring Rd Bridge 3 Bridge Replacement Second 125 125 90714

274 Big Spring Rd Bridge 3 Bridge Replacement Third 250 250 90714

274 Bowers Run Bridge Bridge Replacement Second 150 500 650 99963

274 Spring Run Bridge Bridge Replacement Second 150 150 99979

274 Spring Run Bridge Bridge Replacement Third 550 550 99979

274 Montour Creek Bridge Bridge Replacement First 150 150 99983

Page 74: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 50 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

274 Montour Creek Bridge Bridge Replacement Second 550 550 99983

274 Shermans Val Rd ov Mo Cr Bridge Preservation Activities Second 150 150 100359

274 Shermans Val Rd ov Mo Cr Bridge Preservation Activities Third 350 350 100359

274 Shermans Valley Rd ov Rac Bridge Replacement Second 150 150 101102

274 Shermans Valley Rd ov Rac Bridge Replacement Third 350 350 101102

849 Creek Road Bridge-A Bridge Replacement First 673 673 90715

849 Horting Run Bridge Bridge Replacement Second 150 150 99898

849 Horting Run Bridge Bridge Replacement Third 450 450 99898

849 Newport Road over Susqueh Bridge Preservation Activities Second 150 1,200 1,350 100360

850 Fort Robinson Road Bridge Bridge Replacement Second 150 150 99947

850 Fort Robinson Road Bridge Bridge Replacement Third 450 450 99947

850 Fort Robinson Rd ov Trib Bridge Replacement Second 150 400 550 101096

850 Landisburg Rd ov BakeTrib Bridge Replacement Second 150 150 101104

850 Landisburg Rd ov BakeTrib Bridge Replacement Third 450 450 101104

850 PA 850 over Trib Shermans Bridge Replacement First 100 450 550 101108

850 Landisburg Rd ov Baker Cr Bridge Replacement Second 150 150 101131

850 Landisburg Rd ov Baker Cr Bridge Replacement Third 650 650 101131

1007 Saint Samuel Bridge Bridge Replacement Second 150 150 87476

1007 Saint Samuel Bridge Bridge Replacement Third 475 475 87476

1007 St Samuels Rd over Trib Bridge Preservation Activities Second 150 150 100364

1007 St Samuels Rd over Trib Bridge Preservation Activities Third 500 500 100364

1008 Pfoutz Valley Rd over Coc Bridge Preservation Activities Second 150 450 600 100368

1010 Perry Valley Rd ov Wild C Bridge Replacement Second 150 150 101126

1010 Perry Valley Rd ov Wild C Bridge Replacement Third 500 500 101126

1010 Perry Valley Rd over Trib Bridge Replacement Second 150 150 101138

1010 Perry Valley Rd over Trib Bridge Replacement Third 650 650 101138

1012 Old Ferry Road Bridge Bridge Replacement Second 150 250 400 90718

1015 Juniata Parkway Bridge Bridge Rehabilitation First 150 150 20576

1015 Juniata Parkway Bridge Bridge Rehabilitation Second 1,000 1,000 20576

1015 Juniata Parkway Bridge-A Bridge Replacement First 685 685 87463

1015 Juniata Parkway Bridge #2 Bridge Replacement Second 150 700 850 87479

1015 Juniata Parkway Bridge 2 Bridge Replacement Second 150 250 400 90720

1015 Market Street over US 22 Bridge Preservation Activities First 150 1,000 1,150 100372

1015 Juniata Parkway ov Trib 1 Bridge Replacement Second 150 150 101111

Page 75: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 51 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1015 Juniata Parkway ov Trib 1 Bridge Replacement Third 450 450 101111

1016 Cherry Rd ov Hunters Run Bridge Replacement Second 150 150 101116

1016 Cherry Rd ov Hunters Run Bridge Replacement Third 450 450 101116

1018 Bucks Valley Road over Ho Bridge Replacement Second 150 150 101121

1018 Bucks Valley Road over Ho Bridge Replacement Third 450 450 101121

1019 Chicken Hollow Rd over Tr Bridge Preservation Activities Second 150 150 100377

1019 Chicken Hollow Rd over Tr Bridge Preservation Activities Third 300 300 100377

1024 Oak Hall Road Bridge Bridge Rehabilitation First 300 1,000 1,300 20577

2003 Mountain View Road Bridge-A Bridge Replacement First 582 582 87464

2005 Paradise Road Bridge Bridge Replacement First 300 300 79072

2005 Paradise Road Bridge Bridge Replacement Second 1,200 1,200 79072

3001 Center Road Bridge Bridge Rehabilitation First 150 150 20578

3001 Center Road Bridge Bridge Rehabilitation Second 275 275 20578

3001 Center Square Road over S Bridge Preservation Activities First 75 500 575 100381

3002 Horse Valley Rd over Ho 1 Bridge Preservation Activities First 75 200 275 100391

3002 Horse Valley Rd over Ho 2 Bridge Preservation Activities First 75 150 225 100394

3004 Fowlers Hollow Rd over Sz Bridge Preservation Activities First 100 450 550 100400

3006 Manassas Rd over Shermans Bridge Preservation Activities Third 150 590 740 100421

3007 Airport Road over Bixler Bridge Preservation Activities First 75 250 325 100425

3008 Couchtown Rd over ShmTrib Bridge Replacement Third 150 450 600 100429

3010 Hidden Valley Rd over Shm Bridge Preservation Activities First 150 900 1,050 100441

3011 Weavers Mill Rd Bridge Bridge Rehabilitation First 200 2,000 2,200 79039

3011 Weavers Mill Road Bridge Bridge Replacement Second 250 250 81012

3011 Weavers Mill Road Bridge Bridge Replacement Third 1,300 1,300 81012

3016 Pisgah State Road BR #2 Bridge Replacement First 125 200 325 87490

3016 Pisgah State Road BR #2 Bridge Replacement Second 870 870 87490

3016 Pisgah State Road Bridge Bridge Replacement Second 400 400 91396

4002 Liberty Valley Road BR Bridge Replacement Third 150 152 302 91402

4004 Cherry Valley Rd over Trb Bridge Replacement Third 150 450 600 100444

4005 Cold Storage Road Bridge Bridge Replacement First 150 150 91397

4005 Cold Storage Road Bridge Bridge Replacement Second 503 503 91397

4006 Buckwheat Val Rd over Bck Bridge Preservation Activities First 75 300 375 100449

4007 Stone Arch Rd over Trib Bridge Preservation Activities Second 100 50 500 650 100456

Page 76: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 52 of 259August 16, 2018

Planning Partner: Harrisburg Mode: Bridge County: PerryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4008 Big Buffalo Creek Bridge Bridge Rehabilitation First 150 150 63084

4008 Big Buffalo Creek Bridge Bridge Rehabilitation Second 200 1,450 1,650 63084

4010 Little Buffalo Rd ov L 1 Bridge Preservation Activities First 75 650 725 100466

4010 Little Buffalo Rd ov L 2 Bridge Preservation Activities Third 150 125 275 100476

7203 Dix Hill Br T-422 Bridge Replacement First 710 710 20546

7210 Center Rd Bridge T-403 Bridge Rehabilitation First 100 75 175 106558

7210 Center Rd Bridge T-403 Bridge Rehabilitation Second 778 778 106558

7212 Linton Hill Road Bridge Bridge Replacement First 60 10 370 440 20503

7215 T-339 Laurel Run Br No.3 Bridge Replacement First 890 890 20494

Planning Partner: Johnstown Mode: Highway County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Bridge & Highway Reserve Administration First 430 430 22437

Bridge & Highway Reserve Administration Second 4,944 4,944 22437

Bridge & Highway Reserve Administration Third 15,427 15,427 22437

Local Br Line Item Bridge Preservation Activities Second 2,943 2,943 94756

Local Br Line Item Bridge Preservation Activities Third 3,336 3,336 94756

Hastings Industrial Park Access Road New Roadway First 578 578 106077

Hickory St CSXT Grade Crossing RR Warning Devices First 500 500 106260

Poplar Street over CSXT Railroad RR Warning Devices First 100 100 106287

2019 RPM Installation Cambria County Safety Improvement First 100 100 110120

2020 RPM Installation Cambria County Safety Improvement First 100 100 110121

22 US 22 - Munster to Blair County Line Resurface Second 200 7,199 7,399 110421

22 US 22 - US 219 to PA 164 Resurface Second 200 200 110424

22 US 22 - US 219 to PA 164 Resurface Third 6,500 6,500 110424

36 PA36 Realignment SR 4013 Relocation/Realignment Third 100 100 98740

36 PA36/3rd Ave Lft Trn Lane Safety Improvement Third 100 100 98745

36 PA 36 Clear Zone Widening Safety Improvement Third 100 100 98748

56 Hofmn Ave to Kernvle Vdct Resurface Third 100 5,500 5,600 91638

56 PA 56 - US 219 to T-346 Resurface First 709 709 106052

56 PA 56 - US 219 to T-346 Resurface Second 791 791 106052

56 Scalp Ave Signal Improvements Existing Signal Improvement First 50 10 60 110153

56 Scalp Ave Signal Improvements Existing Signal Improvement Second 966 966 110153

56 Scalp Ave Signal Improvements Existing Signal Improvement Third 147 147 110153

Page 77: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 53 of 259August 16, 2018

Planning Partner: Johnstown Mode: Highway County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

160 PA756 Int Realignment Intersection Improvement First 2,070 2,070 92748

164 N RR Ave to Blair Co Line Resurface First 5,500 5,500 96487

219 US219 TSM Improvements Transportation Study Third 2,000 1,000 1,000 4,000 22670

219 US219 Carrolltown Improve Restoration First 4,490 4,490 96488

219 Sunset Road to 10th St Resurface First 50 100 2,000 2,150 106064

219 US 219 - PA 53 to US 422 Resurface Second 100 100 110437

219 US 219 - PA 53 to US 422 Resurface Third 6,800 6,800 110437

271 PA 271 - Woodmont Rd to Haynes St Resurface Second 100 100 91636

271 PA 271 - Woodmont Rd to Haynes St Resurface Third 2,000 2,000 91636

271 PA 271 - Woodmont Road to SR 3037 Resurface First 5,000 5,000 106513

271 PA 271 - US 22 to US 422 Resurface Second 200 1,800 2,000 110423

271 PA 271 - US 22 to US 422 Resurface Third 700 700 110423

403 Somerset Co Line to PA 56 Resurface First 4,000 4,000 106051

756 PA 756 Elton Road Congestion Corridor Safety Improvement First 250 250 110117

756 PA 756 - PA 160 to Industrial Park Rd Resurface First 100 100 110118

756 PA 756 - PA 160 to Industrial Park Rd Resurface Second 50 25 50 2,000 2,125 110118

756 PA 756 - Lamberd Ave to Alvin St Corridor Safety Improvement First 400 400 110119

756 PA 756 - Lamberd Ave to Alvin St Corridor Safety Improvement Second 250 10 50 3,000 3,310 110119

756 D9 RSA Cambria RT 756 Safety Improvement First 300 300 110866

865 PA 865 - SR 1024 to Clearfield County LineResurface Third 100 1,500 1,600 110439

1006 Saint Mary Street - PA 53 Resurface First 776 776 96495

1006 Saint Mary Street - PA 53 Resurface Second 324 324 96495

1009 RJ Corman Grade Crossings ImprovementRR Warning Devices Second 2,400 2,400 110225

1021 SR1021 - PA36 to PA 53 Resurface First 10 50 752 812 92613

1021 SR1021 - PA36 to PA 53 Resurface Second 5,498 5,498 92613

3011 Franklin Street Improvements Intersection Improvement First 250 250 300 3,000 3,800 99282

3011 SR 3011 - PA 985 to Southmont Blvd. Resurface First 1,865 1,865 106053

3016 SR 3016 Lulay St to Demuth St Corridor Safety Improvement First 7,464 7,464 94476

3016 SR 3016 Lulay St to Demuth St Corridor Safety Improvement Second 2,386 2,386 94476

3016 Bedford St Grade Crossing Impr RR Warning Devices First 230 230 110459

3016 Bedford St Grade Crossing Impr RR Warning Devices Second 770 770 110459

3024 Mount Hope Intrscn Improv Safety Improvement First 1,792 1,792 96506

3029 Solomon Run Road to PA 271 Resurface First 2,700 2,700 106056

Page 78: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 54 of 259August 16, 2018

Planning Partner: Johnstown Mode: Highway County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3030 SR 3030 - SR 3035 to SR 3043 Resurface Second 100 100 108182

3030 SR 3030 - SR 3035 to SR 3043 Resurface Third 1,600 1,600 108182

3034 SR 3034 - PA 271 to US 22 Resurface Second 100 100 91649

3034 SR 3034 - PA 271 to US 22 Resurface Third 2,300 2,300 91649

4019 Carroll Road to Huber Street Resurface First 2,850 2,850 106057

4025 Municipal Rd-Clrfld Co Ln Resurface First 500 500 96512

4025 Municipal Rd-Clrfld Co Ln Resurface Second 1,760 1,760 96512

4027 Phil Ave to Shawna Road Resurface First 490 490 96513

4027 Phil Ave to Shawna Road Resurface Second 1,850 1,850 96513

8004 US22 Interchanges Camb Co Concrete Rehabilitation First 686 686 105116

8004 US22 Interchanges Camb Co Concrete Rehabilitation Second 12,128 12,128 105116

Planning Partner: Johnstown Mode: Bridge County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

PA160 Trib Conemaugh Rvr Bridge Improvement First 300 25 50 400 775 22495

PA160 Trib Conemaugh Rvr Bridge Improvement Second 2,921 2,921 22495

PA160 Trib Conemaugh Rvr Bridge Improvement Third 179 179 22495

T-476 Vic Miller Road Bridge Bridge Improvement First 198 198 109185

36 Lit. Brubaker Run Br Bridge Replacement Third 50 1,500 1,550 22441

53 N Frugality Powell Rn Cvt Bridge Improvement First 250 25 20 100 395 22564

53 N Frugality Powell Rn Cvt Bridge Improvement Second 900 900 22564

53 PA 53 Pattys Run Bridge Bridge Improvement First 250 250 22622

53 PA 53 Pattys Run Bridge Bridge Improvement Second 200 30 874 1,104 22622

53 PA53 Sandy Run Culvert Bridge Improvement First 250 25 20 120 415 22624

53 PA53 Sandy Run Culvert Bridge Improvement Second 635 635 22624

53 PA 53/Fallentimber Bridge Improvement First 250 10 20 200 480 22625

53 PA 53/Fallentimber Bridge Improvement Second 490 490 22625

53 PA53 Lilly Burgoon Rn Cul Bridge Rehabilitation First 1,640 1,640 74358

53 Brubaker Run Bridge Bridge Replacement Third 60 60 88597

53 PA53 Cassandra Culvert Bridge Rehabilitation First 2,296 2,296 88695

53 US 22 Bridge Raise Bridge Preservation Activities Second 182 182 93708

53 US 22 Bridge Raise Bridge Preservation Activities Third 13,700 13,700 93708

53 Bradley Run Bridge Bridge Improvement First 53 53 98750

53 Bradley Run Bridge Bridge Improvement Second 10 874 884 98750

53 PA 53 Lost Creek Bridge Bridge Improvement First 300 300 98753

53 PA 53 Lost Creek Bridge Bridge Improvement Second 200 25 1,303 1,528 98753

Page 79: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 55 of 259August 16, 2018

Planning Partner: Johnstown Mode: Bridge County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

53 PA53 Clear Creek Bridge Bridge Improvement First 250 10 50 200 510 98757

53 PA53 Clear Creek Bridge Bridge Improvement Second 460 460 98757

56 Point Stadium Br Rehab Bridge Rehabilitation First 1,000 1,000 96514

160 South Wilmore Little Cone Bridge Improvement First 250 50 50 270 620 22492

160 South Wilmore Little Cone Bridge Improvement Second 1,630 1,630 22492

160 PA160 Laurel Run Brdg #3 Bridge Replacement Third 100 100 92692

160 Settlemyer Run Culvert Bridge Improvement First 250 50 50 200 550 98760

160 Settlemyer Run Culvert Bridge Improvement Second 700 700 98760

253 E Glasgow Muddy Run Cul Bridge Improvement First 975 975 22568

253 Trib to Muddy Run Bridge Bridge Improvement First 700 700 88139

271 Coal Pit Run Bridge Bridge Improvement First 971 971 22486

271 Coal Pit Run Bridge Bridge Improvement Second 460 460 22486

271 PA271 Susquehanna Rvr Br Bridge Replacement Second 325 2,200 2,525 91675

271 PA271 Susquehanna Rvr Br Bridge Replacement Third 1,000 1,000 91675

271 PA271 Trib Blacklick Crk Bridge Replacement First 829 829 92693

271 PA271 Trib Blacklick Crk Bridge Replacement Second 150 150 92693

271 PA 271 over Hinckston Run Bridge Improvement First 830 830 94467

271 PA 271 Elk Creek Bridge Bridge Rehabilitation Second 100 25 10 135 94468

271 PA 271 Elk Creek Bridge Bridge Rehabilitation Third 500 500 94468

271 PA 271 Browns Run Bridge Bridge Replacement Second 100 75 25 900 1,100 94469

271 PA 271 Browns Run Bridge Bridge Replacement Third 500 500 94469

865 Lloydsville Run Bridge Bridge Replacement Third 100 100 100 400 700 98762

865 PA865 Powell Run Bridge Bridge Replacement Second 100 100 100 300 98764

865 PA865 Powell Run Bridge Bridge Replacement Third 500 500 98764

869 PA869 Trib L Conemaugh Rv Bridge Improvement First 650 650 92694

869 PA869 Beaverdale Culvert Bridge Improvement First 400 400 94470

1009 Dutch Rd Bridge Replace Bridge Rehabilitation First 234 234 22445

1009 Dutch Rd Bridge Replace Bridge Rehabilitation Second 1,266 1,266 22445

1021 SR1021 Dutch Run Bridge Bridge Rehabilitation Third 100 100 94471

2007 2019 DF Cambria Box Culvert Bridge Improvement First 207 207 107159

2014 N Br Conemaugh Rn Br Bridge Improvement First 50 50 22570

2014 N Br Conemaugh Rn Br Bridge Improvement Second 10 1,200 1,210 22570

3015 Little Paint Ck Br Bridge Improvement First 1,200 1,200 22635

3015 Little Paint Ck Br Bridge Improvement Second 300 300 22635

Page 80: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 56 of 259August 16, 2018

Planning Partner: Johnstown Mode: Bridge County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3016 Scalp Ave over PA 756 Bridge Rehabilitation Third 300 300 94477

3026 Franklin Borough Clapboar Bridge Improvement First 50 50 22491

3026 Franklin Borough Clapboar Bridge Improvement Second 25 1,160 1,185 22491

3055 Franklin Street Br Rehab Bridge Rehabilitation First 282 282 94478

3055 Franklin Street Br Rehab Bridge Rehabilitation Second 1,219 1,219 94478

4004 Bakerton Br ovr Susqu Rvr Bridge Replacement Second 150 50 200 94479

4004 Bakerton Br ovr Susqu Rvr Bridge Replacement Third 1,000 1,000 94479

4005 SR4005 Blacklick Crk Br Bridge Improvement First 175 50 50 535 810 91717

4005 SR4005 Blacklick Crk Br Bridge Improvement Second 150 150 91717

4016 2020 DF Cambria Box Culvert Bridge Improvement First 30 20 190 240 107160

4017 N Patton Chest Creek Brdg Bridge Replacement Second 325 918 1,243 94491

4017 N Patton Chest Creek Brdg Bridge Replacement Third 1,782 1,782 94491

7203 T509 N Brnch Blacklick Cr Bridge Replacement First 1,000 1,000 22596

7210 Cambria Local Bridge Preservation Bridge Deck Replacement First 1,016 1,016 106748

7210 Cambria Local Bridge Preservation Bridge Deck Replacement Second 34 34 106748

7216 T-419 Blackburn Road Bridge Bridge Improvement First 368 368 109188

7301 Ash Street over Solomon Run Bridge Improvement First 274 274 109190

7301 D Street over St Clair Run Bridge Bridge Improvement First 167 167 109191

7301 McMillan Street over Solomon Run Bridge Bridge Improvement First 149 149 109193

7301 Mine Place Street Bridge Bridge Improvement First 112 112 109194

7301 Oak Street over Solomon Run Bridge Bridge Improvement First 162 162 109195

7422 Lang Avenue Bridge Bridge Improvement First 159 159 109197

7422 Magee Avenue Bridge Bridge Improvement First 159 159 109198

7425 Paint Creek Bridge #2 Bridge Improvement First 152 152 22475

9900 16th Street Bridge Bridge Improvement First 150 25 40 850 1,065 22552

9900 16th Street Bridge Bridge Improvement Second 350 350 22552

Planning Partner: Johnstown Mode: Transit County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Security / Oper Assist First 35,619 35,619 70579

Purchase (veh/Equip) First 2,800 2,800 70582

Capital Assistance - ADA First 1,200 1,200 70597

Vehi replacement - Rural First 40 40 77243

Replace 1 service vehicle First 60 60 84274

Page 81: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 57 of 259August 16, 2018

Planning Partner: Johnstown Mode: Transit County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

incline Rehabilitation First 10,000 10,000 90116

Replace Incline Roof First 100 100 95560

Rural transfer Center First 1,000 1,000 102526

Facility Improvements First 50 50 102529

Repl Urban buses w CNG First 2,400 2,400 102530

Securtiy Impr -urban & ru First 76 76 106931

Facility Improve - Urban First 30 30 106960

Facility Improvements-Rur First 100 100 106962

Shop Tools-Equip-Incline First 200 200 106963

Shop Tools & Equipment-ru First 200 200 106964

Farebox system - Rural First 700 700 106966

Computer Hardware/Softwa First 100 100 106967

Communication Upgrades/Ra First 15 15 106968

Vehicle Replacement - Rur First 67 67 106972

Bus Mid-Life overhauls-Ur First 500 500 106974

Bus Replacement-Rural Div First 425 425 106976

Bus Replacement-Rural Div First 350 350 106977

Computer Replacement -Urb First 150 150 106978

Bus Mid-Life overhauls-Ur First 230 230 106979

Replace Loader (Urban) First 52 52 106980

Bus Replacement-Rural Div First 433 433 106981

Vehicle Replacement-Urban First 40 40 106982

Vehicle Replacement-Urban First 65 65 106983

Office Furniture and Equi First 50 50 106985

Replace Technology Equip- First 10 10 106986

Communications Equipment- First 12 12 106987

Rural Facility Rehabilita First 500 500 111052

Shop Tools & Equipment-Ur First 200 200 111053

Replace Bus with CNG Bus First 610 610 111054

Bus Replacement-Urban Div First 1,900 1,900 111055

Page 82: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 58 of 259August 16, 2018

Planning Partner: Johnstown Mode: Transit County: CambriaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Mid-Life overhaul Bus (90 First 1,250 1,250 111056

Bus Midlife Overhaul-Rura First 250 250 111057

Bus Replacement-Urban Div First 635 635 111058

Planning Partner: Lancaster Mode: Highway County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

TAP Line Item Transportation Enhancement First 840 840 87823

TAP Line Item Transportation Enhancement Second 1,680 1,680 87823

TAP Line Item Transportation Enhancement Third 1,681 1,681 87823

HSIP Line Item Safety Improvement First 4,965 4,965 87825

HSIP Line Item Safety Improvement Second 10,944 10,944 87825

HSIP Line Item Safety Improvement Third 10,943 10,943 87825

Bridge Reserve. Bridge Replacement First 1,603 1,603 87826

Bridge Reserve. Bridge Replacement Second 10,476 10,476 87826

Bridge Reserve. Bridge Replacement Third 4,286 4,286 87826

Highway Reserve Restoration First 5,033 5,033 87827

Highway Reserve Restoration Second 925 925 87827

Highway Reserve Restoration Third 0 0 87827

CMAQ Line Item Miscellaneous First 11,102 11,102 87832

CMAQ Line Item Miscellaneous Second 19,116 19,116 87832

CMAQ Line Item Miscellaneous Third 19,115 19,115 87832

Delivery/ Consult Assist Miscellaneous First 3,200 1,600 4,800 87848

Smart Growth Program Miscellaneous First 3,000 3,000 93151

SRTP Rideshare Program Miscellaneous First 1,380 1,380 94572

Centerville Road Widening Widen First 893 893 101505

Centerville Road Widening Widen Second 19,949 19,949 101505

Enola Trail Bridge over US-222 Bicycle Facilities/Services First 52 52 102532

Safe Harbor Trestle Bridge Transportation Enhancement First 1,648 1,648 106626

Conestoga Pines Connection Pedestrian Facilities First 962 962 107987

Water Street Bicycle Blvd Bicycle Facilities/Services First 1,481 1,481 110552

Complete St Implem Guide Bicycle Facilities/Services First 66 66 110553

Planning Assistance Line Item Planning First 300 300 110972

Active Transportation Plan Implementation Line ItmPlanning First 300 300 110973

23 PA 23 / PA 741 Int. Imp. Intersection Improvement Third 1,000 1,000 94912

23 Main Street Sidewalk Impr Pedestrian Facilities First 819 819 110556

Page 83: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 59 of 259August 16, 2018

Planning Partner: Lancaster Mode: Highway County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

30 US 30 Improvements Intersection Improvement First 750 6,736 7,486 97250

30 ITS - Lancaster Phase 4 Traffic System Management First 2,500 2,500 106587

30 US30/Harrisburg Pike Interchange Add Turning Lane First 4,000 4,000 107807

222 US 30/US 222 Interchange Improvements Restoration First 2,500 2,860 5,360 97013

222 US 30/US 222 Interchange Improvements Restoration Second 19,920 19,920 97013

222 US 222 Reconstruction 1 Reconstruct First 2,500 3,000 100 1,000 6,600 109618

222 US 222 Reconstruction 1 Reconstruct Second 74,369 74,369 109618

222 US 222 Reconstruction 2 Reconstruct First 950 950 109620

222 US 222 Reconstruction 2 Reconstruct Second 3,500 100 1,000 4,600 109620

222 US 222 Reconstruction 2 Reconstruct Third 95,593 95,593 109620

222 PA324/US222/Fairview Ave Intersection Improvement First 450 400 2,200 3,050 110507

230 Elizabethtown Borough Bike-Ped Pedestrian Facilities First 400 400 107988

272 PA 272 Intersection Impvt Intersection Improvement First 2,128 2,128 90490

272 Nottingham Rd Rsf 2 Resurface Second 50 50 100383

300 PA 283 Diamond Grinding 1 Miscellaneous First 300 1,650 1,950 91030

322 US222/322 Interchange Imp Intersection Improvement First 6,752 6,752 90491

324 Pequea Blvd Resurface Resurface First 2,299 2,299 100475

324 Pequea Blvd Resurface Resurface Second 150 150 100475

441 Boro Signal Coordination Existing Signal Improvement First 288 288 98280

472 Deep Excavations - Lancaster Drainage Improvement First 1,125 1,125 106588

722 State Rd Interchange-Amtrak Safety Improvement First 20,745 20,745 64829

772 Mount Joy Pedestrian Safety Pedestrian Facilities First 1,337 1,337 95715

772 Rothsville Road Resurface Resurface First 1,375 1,375 96331

772 Intercourse Village Safety Imp Safety Improvement First 1,365 1,365 110557

1010 Main St Curb and Sidewalk Pedestrian Facilities First 1,000 1,000 107989

1040 Colonel Howard Blvd Imp Intersection Improvement First 450 450 97251

1040 Colonel Howard Blvd Imp Intersection Improvement Second 800 200 150 1,150 97251

1040 Colonel Howard Blvd Imp Intersection Improvement Third 8,000 8,000 97251

2041 Lancaster City Resurface Resurface Second 2,832 2,832 93088

3029 N/S Duke St Conn/Realign Reconstruct First 497 497 102513

4020 US30/Hbg Pike Interchange Interchange Improvement Third 3,390 3,390 80930

4020 Hbg. Pike Corridor Improv Restoration Second 150 150 80931

4020 Hbg. Pike Corridor Improv Restoration Third 25,000 25,000 80931

Page 84: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 60 of 259August 16, 2018

Planning Partner: Lancaster Mode: Highway County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4042 Chester Rd Left Turn Lane Intersection Improvement First 800 800 109307

4057 Centerville Rd Interchang Interchange Improvement First 19,653 19,653 64767

7214 Holland Street BR Removal Bridge Removal First 500 500 20053

7413 S. Jacob St Bridge Bridge Removal First 800 800 19828

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

10 Twin County Road Bridge Bridge Replacement Second 250 250 78833

10 Twin County Road Bridge Bridge Replacement Third 4,000 4,000 78833

23 Marietta Avenue over NS Bridge Rehabilitation First 150 150 100531

23 Marietta Avenue over NS Bridge Rehabilitation Second 3,700 3,700 100531

23 Marietta Avenue Bridge PM Bridge Preservation Activities Second 150 1,100 1,250 101282

23 New Holland Pk Bridge PM Bridge Preservation Activities Second 100 100 101295

23 New Holland Pk Bridge PM Bridge Preservation Activities Third 1,100 1,100 101295

23 New Holland Pike/ US 30 Bridge Preservation Activities Second 150 150 101318

23 New Holland Pike/ US 30 Bridge Preservation Activities Third 1,100 1,100 101318

30 Lincoln Hwy Bridge # 3 Bridge Rehabilitation First 188 50 50 850 1,138 87500

30 US 30 Bridge Bridge Rehabilitation First 188 50 50 500 788 87535

30 Fruitville Pike Bridge PM Bridge Rehabilitation First 250 75 4,400 4,725 94924

30 US 30 over Lititz Pike Bridge Preservation Activities Second 150 150 101307

30 US 30 over Lititz Pike Bridge Preservation Activities Third 2,000 2,000 101307

30 US 30/Little Conestoga Bridge Preservation Activities Second 150 150 101316

30 US 30/Little Conestoga Bridge Preservation Activities Third 1,575 1,575 101316

72 PA 72 over Chiques Creek Bridge Preservation Activities First 255 255 101300

72 PA 72 over Chiques Creek Bridge Preservation Activities Second 650 650 101300

222 US 222/Conowingo Creek Bridge Preservation Activities Second 150 150 100439

222 US 222/Conowingo Creek Bridge Preservation Activities Third 1,450 1,450 100439

222 US 222/Beaver Creek Bridge Preservation Activities Second 200 200 100458

222 US 222/Beaver Creek Bridge Preservation Activities Third 400 400 100458

222 US 222 over US 30 Bridge Preservation Activities First 150 150 100536

222 US 222 over US 30 Bridge Preservation Activities Second 1,650 1,650 100536

222 US 222 S/Muddy CR Bridge Preservation Activities First 150 150 100598

222 US 222 S/Muddy CR Bridge Preservation Activities Second 1,600 1,600 100598

222 US 222 N/Muddy Creek Bridge Preservation Activities First 150 150 101020

222 US 222 N/Muddy Creek Bridge Preservation Activities Second 1,600 1,600 101020

Page 85: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 61 of 259August 16, 2018

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

222 US 222 N/Little Muddy Cr Bridge Preservation Activities First 75 75 101034

222 US 222 N/Little Muddy Cr Bridge Preservation Activities Second 800 800 101034

222 US 222 SB Bridge PM Bridge Preservation Activities Second 150 875 1,025 101328

230 Market Street Bridge Bridge Improvement First 150 500 650 90854

230 Harrisburg Pike Bridge-B Bridge Replacement First 225 75 50 1,575 1,925 90855

272 N Reading over Muddy Cr Bridge Replacement First 1,500 1,500 97263

322 US 322 over Cocalico Cr Bridge Preservation Activities First 150 150 101103

322 US 322 over Cocalico Cr Bridge Preservation Activities Second 593 593 101103

322 US 322/Trib to Conestoga Bridge Preservation Activities Second 100 100 101105

322 US 322/Trib to Conestoga Bridge Preservation Activities Third 350 350 101105

340 Old Phila Pike/Mill Creek Bridge Preservation Activities First 150 150 101106

340 Old Phila Pike/Mill Creek Bridge Preservation Activities Second 482 482 101106

340 Old Phila Pike over US30 Bridge Preservation Activities Second 150 150 101279

340 Old Phila Pike over US30 Bridge Preservation Activities Third 2,400 2,400 101279

372 South Bridge Street Brdg Bridge Improvement First 250 2,400 2,650 19916

372 East State Street Bridge Bridge Preservation Activities Second 150 150 101120

372 East State Street Bridge Bridge Preservation Activities Third 1,200 1,200 101120

441 River Road Bridge Bridge Replacement First 500 500 90342

441 Water Street Bridge Bridge Replacement First 150 150 90852

441 River Road Bridge # 2 Bridge Replacement First 275 275 91261

441 River Road over Conoy Creek PM Bridge Preservation Activities First 750 750 100537

441 Water Street/Stamens Run Bridge Preservation Activities First 150 150 101122

441 Water Street/Stamens Run Bridge Preservation Activities Second 50 750 800 101122

462 Veteran's Mem Br -Susq Rv Bridge Rehabilitation First 3,500 19,910 23,410 79020

462 Veteran's Mem Br -Susq Rv Bridge Rehabilitation Second 24,607 24,607 79020

462 PA 462 Little Conestoga Bridge Replacement Second 150 150 93581

462 PA 462 Little Conestoga Bridge Replacement Third 500 500 93581

472 S Lime Street Bridge-B Bridge Replacement First 175 110 50 900 1,235 19952

501 PA 501 over Hammer Creek Bridge Rehabilitation Second 325 250 1,600 2,175 89271

625 Reading Road/Conestoga Br PM Bridge Preservation Activities First 350 350 101124

722 Oregon Rd over Shirks Run Bridge Preservation Activities First 150 150 100541

741 Strasburg Road Bridge-B Bridge Replacement First 225 35 25 1,300 1,585 74961

741 Strasburg Road Bridge Bridge Improvement First 150 350 500 87553

Page 86: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 62 of 259August 16, 2018

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

741 Millersville Rd Bridge Bridge Improvement First 125 50 50 1,300 1,525 100543

741 Bridge Street over AMTRAK Bridge Preservation Activities First 150 150 101125

741 Bridge Street over AMTRAK Bridge Preservation Activities Second 650 650 101125

743 Maytown Road over AMTRAK Bridge Preservation Activities First 150 150 101128

743 Maytown Road over AMTRAK Bridge Preservation Activities Second 430 430 101128

772 Rife Run Bridge Bridge Replacement First 1,525 1,525 19862

772 West Orange Street Bridge Bridge Improvement First 150 500 650 87538

772 Marietta /Mt. Joy Ave Brg-B Bridge Replacement First 225 50 100 1,500 1,875 87703

772 Mount Joy Road Bridge PM Bridge Preservation Activities First 50 50 100567

772 Mount Joy Road Bridge PM Bridge Preservation Activities Second 150 150 100567

772 Newport Rd over SR 6023 Br PM Bridge Preservation Activities Second 150 150 100570

772 Newport Rd over SR 6023 Br PM Bridge Preservation Activities Third 1,800 1,800 100570

772 Mt Joy Rd/Little Chiques Bridge Preservation Activities First 150 150 101129

772 Mt Joy Rd/Little Chiques Bridge Preservation Activities Second 599 599 101129

772 Mount Joy Road/PA 283 Bridge Preservation Activities First 150 150 101132

772 Mount Joy Road/PA 283 Bridge Preservation Activities Second 968 968 101132

772 Newport Road/Cocalico Cr Bridge Preservation Activities First 150 150 101135

772 Newport Road/Cocalico Cr Bridge Preservation Activities Second 571 571 101135

772 State Street over Groffs Bridge Preservation Activities Second 150 150 101305

772 State Street over Groffs Bridge Preservation Activities Third 450 450 101305

896 Georgetown Rd over AMTRAK Bridge Preservation Activities Second 150 150 101140

896 Georgetown Rd over AMTRAK Bridge Preservation Activities Third 1,200 1,200 101140

897 W Main St/Cocalico Cr Bridge Preservation Activities Second 150 150 101141

897 W Main St/Cocalico Cr Bridge Preservation Activities Third 650 650 101141

1001 Greenfield Rd over US 30 Bridge Preservation Activities Second 150 150 101272

1001 Greenfield Rd over US 30 Bridge Preservation Activities Third 825 825 101272

1003 Horseshoe Rd over Amtrak Bridge Preservation Activities First 150 650 800 100592

1003 Quarry Road Bridge PM Bridge Preservation Activities Second 150 150 100595

1003 Quarry Road Bridge PM Bridge Preservation Activities Third 800 800 100595

1007 Centerville Road Bridge Bridge Replacement Second 150 150 91264

1007 Centerville Road Bridge Bridge Replacement Third 1,000 1,000 91264

1010 East Main Street Bridge Bridge Replacement Second 150 150 87541

1010 East Main Street Bridge Bridge Replacement Third 500 500 87541

1013 Peters Road over Mill Cre Bridge Preservation Activities Second 150 150 101145

1013 Peters Road over Mill Cre Bridge Preservation Activities Third 1,350 1,350 101145

Page 87: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 63 of 259August 16, 2018

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1013 Cider Mill Rd/Conestoga Bridge Preservation Activities Second 100 100 101148

1013 Cider Mill Rd/Conestoga Bridge Preservation Activities Third 450 450 101148

1019 California Rd Bridge #1 Bridge Replacement First 150 500 650 79025

1020 Br Rpl SR 1020-Middle Crk Bridge Replacement Second 150 150 78890

1020 Br Rpl SR 1020-Middle Crk Bridge Replacement Third 2,500 2,500 78890

1020 Meadow Valley Road Bridge Bridge Preservation Activities First 150 500 650 101002

1024 Br Rpl SR 1024-Hammer Crk Bridge Rehabilitation First 75 50 1,308 1,433 78893

1024 Lincoln Road Bridge Bridge Replacement Second 200 200 87701

1024 Lincoln Road Bridge Bridge Replacement Third 1,140 1,140 87701

1026 HopeLand Road Bridge Bridge Improvement First 50 200 250 87564

1029 Butter Rd over Kurtz Run PM Bridge Preservation Activities First 250 250 101004

1030 Stevens Road Bridge PM Bridge Preservation Activities First 150 350 500 101009

1031 Creek Road Bridge Bridge Replacement First 450 450 79023

1032 North Third Street Bridge-B Bridge Deck Replacement First 600 600 101015

1035 Kleinfeltersville Road BR Bridge Replacement First 300 300 91267

1035 SR 1035 over Middle Cr Bridge Preservation Activities Second 150 150 101151

1035 SR 1035 over Middle Cr Bridge Preservation Activities Third 575 575 101151

1037 Speedwell Forge Road BR Bridge Replacement Second 75 75 91269

1037 Speedwell Forge Road BR Bridge Replacement Third 450 450 91269

1037 SR 1037 over Hammer Cr Bridge Preservation Activities Second 100 100 101153

1037 SR 1037 over Hammer Cr Bridge Preservation Activities Third 660 660 101153

1044 Little Muddy Creek Bridge Bridge Improvement First 150 100 25 50 1,000 1,325 78906

1044 Red Run Rd/Muddy Cr Bridge Replacement Second 200 200 100530

1044 Red Run Rd/Muddy Cr Bridge Replacement Third 2,800 2,800 100530

1044 North Churchtown Rd Brdg Bridge Preservation Activities First 75 275 350 101018

1046 Fivepointville Rd Bridge Bridge Preservation Activities First 150 150 101022

1046 Fivepointville Rd Bridge Bridge Preservation Activities Second 600 600 101022

1046 Maple Grove Rd Bridge PM Bridge Preservation Activities Second 75 250 325 101033

1047 Church Street/Cocalico Cr Bridge Preservation Activities Second 150 150 101155

1047 Church Street/Cocalico Cr Bridge Preservation Activities Third 500 500 101155

1051 1051 over Stony Run Creek Bridge Preservation Activities Second 600 600 94765

1053 Greenville Road Bridge-B Bridge Replacement First 250 35 50 2,054 2,389 63227

1061 Willow Street Bridge Bridge Replacement Second 150 150 87524

Page 88: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 64 of 259August 16, 2018

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1061 Willow Street Bridge Bridge Replacement Third 1,000 1,000 87524

1088 Bowmansville Rd/US 222 PM Bridge Preservation Activities First 1,100 1,100 101037

1090 Willow Road Bridge PM Bridge Preservation Activities Second 1,100 1,100 101158

1092 Hartman Station Br. PM Bridge Preservation Activities Second 1,600 1,600 101159

1901 Grist Mill Road Bridge Bridge Replacement First 2,240 2,240 101036

2007 Lloyd Road Bridge PM Bridge Preservation Activities First 150 150 101038

2007 Spruce Grove Road Bridge Bridge Deck Rehabilitation First 150 150 101044

2009 Br Rpl SR 2009 over WB Octor.Ck Bridge Replacement First 75 50 1,150 1,275 78965

2011 BrRpl SR2011-TBWBOctor.Cr Bridge Replacement Second 150 150 78978

2011 BrRpl SR2011-TBWBOctor.Cr Bridge Replacement Third 450 450 78978

2014 Coopers Run Bridge Bridge Replacement First 150 484 634 91326

2014 Maple Shade Road Bridge Bridge Replacement Second 50 200 250 91327

2015 Pumping Station Road BR Bridge Replacement Second 150 150 91395

2015 Pumping Station Road BR Bridge Replacement Third 1,000 1,000 91395

2015 May Post Office Road Brdg Bridge Preservation Activities Second 150 150 101161

2015 May Post Office Road Brdg Bridge Preservation Activities Third 250 250 101161

2019 North Church St Brdg PM Bridge Preservation Activities First 50 50 101055

2019 North Church St Brdg PM Bridge Preservation Activities Second 50 300 350 101055

2019 Main Street/ Groff Run Bridge Preservation Activities Second 100 100 101263

2019 Main Street/ Groff Run Bridge Preservation Activities Third 550 550 101263

2029 Wheatland Mills Bridge Bridge Replacement Second 200 200 19763

2029 Wheatland Mills Bridge Bridge Replacement Third 1,600 1,600 19763

2029 Bunker Hill Bridge Bridge Improvement First 50 50 87555

2029 Bunker Hill Bridge Bridge Improvement Second 301 301 87555

2029 Bunker Hill Rd Bridge PM Bridge Preservation Activities First 150 150 101061

2029 Bunker Hill Rd Bridge PM Bridge Preservation Activities Second 750 750 101061

2031 Walnut Run Road Bridge Bridge Improvement First 150 150 87550

2031 Walnut Run Road Bridge Bridge Improvement Second 530 530 87550

2031 Walnut Run Road Bridge Bridge Preservation Activities Second 150 150 101267

2031 Walnut Run Road Bridge Bridge Preservation Activities Third 600 600 101267

2033 Leacock Road Bridge Bridge Rehabilitation First 300 250 100 100 750 87545

2033 Leacock Road Bridge Bridge Rehabilitation Second 2,875 2,875 87545

2035 Queen Road over Pequea Cr Bridge Preservation Activities Second 100 100 101271

2035 Queen Road over Pequea Cr Bridge Preservation Activities Third 500 500 101271

Page 89: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 65 of 259August 16, 2018

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2039 Gypsy Hill Road Bridge PM Bridge Preservation Activities First 150 150 101063

2039 Gypsy Hill Road Bridge PM Bridge Preservation Activities Second 150 500 650 101063

3008 Cardinal Road Bridge PM Bridge Preservation Activities Second 150 150 101069

3008 Cardinal Road Bridge PM Bridge Preservation Activities Third 300 300 101069

3009 Rawlinsville Rd Bridge Bridge Rehabilitation First 750 750 101070

3015 Cinder Road Bridge Bridge Preservation Activities Second 150 150 101273

3015 Cinder Road Bridge Bridge Preservation Activities Third 1,500 1,500 101273

3016 Fairview Rd/Beaver Cr Bridge Improvement First 150 150 100436

3016 Fairview Rd/Beaver Cr Bridge Improvement Second 450 450 100436

3017 River Road Bridge Bridge Improvement First 150 150 87540

3017 River Road Bridge Bridge Improvement Second 475 475 87540

3017 Safe Harbor Road over Conestoga River Bridge Preservation Activities First 1,000 1,000 101074

3017 River Road Bridge PM Bridge Preservation Activities First 150 150 101077

3017 River Road Bridge PM Bridge Preservation Activities Second 1,000 1,000 101077

3017 Safe Harbor Road Bridge Bridge Preservation Activities Second 150 150 101275

3017 Safe Harbor Road Bridge Bridge Preservation Activities Third 150 150 101275

3017 Safe Harbor Road Bridge Bridge Preservation Activities Second 150 150 101280

3017 Safe Harbor Rd/Indian Run Bridge Preservation Activities Second 150 150 101281

3018 Martic Heights Drive BR Bridge Improvement First 75 150 225 91336

3018 Truce Road Bridge Bridge Preservation Activities Second 50 512 562 101284

3027 Walnut Hill Bridge Bridge Replacement Second 50 291 341 87542

3027 Walnut Hill Rd Bridge PM Bridge Preservation Activities First 150 150 101127

3027 Walnut Hill Rd Bridge PM Bridge Preservation Activities Second 325 325 101127

3028 Pitney Rd over Amtrak Br Bridge Rehabilitation First 300 1,013 1,313 84016

3028 Pitney Rd over Amtrak Br Bridge Rehabilitation Second 1,687 1,687 84016

3028 Lampeter Road/Mill Creek Bridge Preservation Activities Second 50 438 488 101287

3030 Long Ln over Stehman Run Bridge Preservation Activities Second 150 150 300 101130

3036 Franklin Rd/Strickler Run Bridge Preservation Activities Second 150 250 400 101290

3038 Bridge Valley Road Bridge Bridge Improvement First 100 500 600 91338

3040 Smithville Road Bridge PM Bridge Preservation Activities First 75 75 101136

3040 Smithville Road Bridge PM Bridge Preservation Activities Second 200 200 101136

4001 Spooky Nook Rd ovr Amtrak Bridge Preservation Activities Second 1,000 1,000 101144

4002 Donegal Springs Rd Bridge Bridge Replacement Second 543 543 87537

Page 90: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 66 of 259August 16, 2018

Planning Partner: Lancaster Mode: Bridge County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4002 Donegal Springs Road Brdg Bridge Preservation Activities Second 150 150 101294

4003 Kinderhook Rd over Little Chiques Crk Bridge Improvement First 150 75 100 3,750 4,075 78995

4004 Stacktown Road Bridge Bridge Improvement First 50 50 87559

4004 Stacktown Road Bridge Bridge Improvement Second 350 350 87559

4004 Stackstown Road Bridge PM Bridge Preservation Activities Second 150 275 425 101150

4008 Elizabethtown Road Bridge Bridge Preservation Activities Second 75 150 225 101152

4008 Elizabethtown Rd Bridge 2 Bridge Preservation Activities Second 150 150 101157

4008 East High St over PA 283 Bridge Preservation Activities Second 50 50 101296

4008 East High St over PA 283 Bridge Preservation Activities Third 810 810 101296

4018 West Harrisburg Avenue Br Bridge Improvement First 150 150 87508

4018 West Harrisburg Avenue Br Bridge Improvement Second 1,800 1,800 87508

4019 Bossler Rd over Conoy Crk Bridge Preservation Activities Second 50 275 325 101162

4020 Chickies Creek Bridge Bridge Replacement Third 3,800 3,800 91107

4020 Harrisburg Pike Bridge PM Bridge Preservation Activities Second 50 50 101264

4020 Harrisburg Pike Bridge PM Bridge Preservation Activities Third 1,250 1,250 101264

4025 Colebrook Rd over Amtrak Bridge Preservation Activities Second 50 50 101298

4025 Colebrook Rd over Amtrak Bridge Preservation Activities Third 1,500 1,500 101298

4026 Old Line Rd over Rife Run Bridge Preservation Activities Second 50 50 101301

4026 Old Line Rd over Rife Run Bridge Preservation Activities Third 500 500 101301

4030 Newport Road Bridge Bridge Replacement First 450 450 87712

4033 Meadow View Rd Bridge Bridge Improvement First 341 250 50 461 1,102 20149

4033 Meadow View Rd Bridge Bridge Improvement Second 1,493 1,493 20149

4037 Bellaire Rd/Conewago Cr Bridge Preservation Activities Second 50 350 400 101302

4041 Ridge Road over PA 283 Bridge Preservation Activities First 150 750 900 101039

7215 S Ronks Rd over Pequea Cr Bridge Replacement First 3,456 3,456 94753

7219 T-325 over Peters Creek Bridge Replacement First 430 430 94754

7226 Pequea Val over Pequea Cr Bridge Replacement First 1,070 1,070 94751

7405 Weaver Rd Bridge Bridge Improvement First 350 350 700 110475

7405 Weaver Rd Bridge Bridge Improvement Second 50 2,400 2,450 110475

7409 Cedar St over Lititz Run Bridge Replacement First 1,210 1,210 94747

7410 S. Oak St Bridge Bridge Replacement Second 350 350 110483

Planning Partner: Lancaster Mode: Transit County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Page 91: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 67 of 259August 16, 2018

Planning Partner: Lancaster Mode: Transit County: LancasterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Operating Assistance First 28,213 28,213 102410

Queen St Station I Upgrad First 625 625 102414

ADA Services First 2,422 2,422 102417

Computer/Security Upgrade First 150 150 102425

Purchase Maint. Equipment First 305 305 102426

Purchase Three (3) Buses First 1,250 1,250 106686

Purchase One (1) Bus First 576 576 106687

Purchase Paratransit Vans First 1,000 1,000 106689

Replace Telephone System First 75 75 106690

Purchase Paratransit Vans First 900 900 106692

Operations Center Upgrade First 625 625 106693

Purchase One (1) Bus First 591 591 106695

Replace Superv Vehicle First 25 25 106696

Paratransit Facility First 9,009 9,009 110255

Bus Shelter Replment Prog First 250 250 110256

Lanc Non-Rev Vehicle Rep First 32 32 110261

Purchase One (1) Bus First 700 700 110262

Upgrade AVL System First 1,000 1,000 110263

QSS Prking Garage Upgrade First 1,250 1,250 110265

Fare Collection Equipment First 938 938 110266

Purchase Paratransit Vans First 1,375 1,375 110268

Purchase One (1) Bus First 591 591 110270

Repl Supervisory Vehicle First 25 25 110271

Purchase Paratransit Vans First 938 938 110273

Operations Center Upgrade First 1,563 1,563 110274

TDP Update First 250 250 110276

Purchase Office Equipment First 50 50 110277

Purchase One (1) Bus First 591 591 110278

Planning Partner: Lebanon Mode: Highway County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SRTP Rideshare Program Miscellaneous First 368 368 82375

Page 92: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 68 of 259August 16, 2018

Planning Partner: Lebanon Mode: Highway County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

ITS Lebanon Traffic System Management Second 250 250 83615

ITS Lebanon Traffic System Management Third 5,000 5,000 83615

Bridge Reserve Miscellaneous First 2,683 2,683 87835

Bridge Reserve Miscellaneous Second 4,162 4,162 87835

Bridge Reserve Miscellaneous Third 14 14 87835

Highway Reserve Miscellaneous First 2,734 2,734 87838

Highway Reserve Miscellaneous Second 5,570 5,570 87838

Highway Reserve Miscellaneous Third 467 467 87838

CMAQ Line Item Miscellaneous First 800 800 87841

CMAQ Line Item Miscellaneous Second 4,252 4,252 87841

CMAQ Line Item Miscellaneous Third 3,165 3,165 87841

Delivery/Consult Assist Administration First 1,600 800 2,400 87842

HSIP Line Item Miscellaneous First 1,789 1,789 87847

HSIP Line Item Miscellaneous Second 4,612 4,612 87847

HSIP Line Item Miscellaneous Third 4,611 4,611 87847

STU (HATS) Miscellaneous First 199 199 88057

DF Box Culvert Line Item Lebanon Miscellaneous First 225 225 102148

Lebanon City Resurfacing Resurface First 3,085 3,085 106393

Lebanon City Resurfacing Resurface Second 4,724 4,724 106393

72 PA72 Congested Corr Study Transportation Study Second 300 300 88741

72 PA72/Isabel Drive Improvements Intersection Improvement First 100 200 75 1,136 1,511 106537

72 PA72/Isabel Drive Improvements Intersection Improvement Second 664 664 106537

241 Colebrook Road Improvemt Safety Improvement First 2,799 2,799 96783

322 Horseshoe Pike Resurface Resurface First 581 581 100243

422 US422/Main Street Rsf Resurface First 148 148 100251

2001 Cornwall Traffic Signals Intersection Improvement Third 250 1,500 1,750 97161

2001 Cornwall & Wilhelm Inters Intersection Improvement First 1,904 1,904 99081

3017 Lingle Road Reconstruct Reconstruct First 500 350 100 50 601 1,601 97153

3017 Lingle Road Reconstruct Reconstruct Second 4,399 4,399 97153

Planning Partner: Lebanon Mode: Bridge County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 Allentown Blvd over Beach-B Bridge Replacement First 125 10 50 805 990 97148

22 Earlakill Run Bridge Bridge Replacement Second 150 1,200 1,350 100332

22 Allentown Blvd/Fisher Ave Bridge Preservation Activities Second 150 570 720 100333

Page 93: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 69 of 259August 16, 2018

Planning Partner: Lebanon Mode: Bridge County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 US 22 over Deep Run Brdg Bridge Replacement Second 150 150 100337

22 US 22 over Deep Run Brdg Bridge Replacement Third 1,600 1,600 100337

22 Allentown Blvd/Kevins Run-B Bridge Replacement First 125 10 25 400 560 100340

22 Allentown Blvd/Trib Racc Bridge Replacement Second 150 150 100343

22 Allentown Blvd/Trib Racc Bridge Replacement Third 1,000 1,000 100343

22 Allentown Blvd East Brdg-B Bridge Replacement First 125 10 35 900 1,070 100348

22 US 22 over Reeds Ck Brdg Bridge Replacement Second 150 150 100349

22 US 22 over Reeds Ck Brdg Bridge Replacement Third 800 800 100349

72 PA 72 over Snitz Creek Bridge Replacement First 621 621 78735

72 Ebenezer Road Bridge Bridge Replacement Third 150 650 800 90340

72 Ebenezer Road Bridge-B Bridge Rehabilitation First 125 10 30 575 740 100314

72 Ebenezer Rd/Swatara Cr Bridge Preservation Activities First 100 100 100331

72 Ebenezer Rd/Swatara Cr Bridge Preservation Activities Second 1,500 1,500 100331

72 Ebenezer Rd/US 22 Bridge Preservation Activities First 175 175 100336

72 Ebenezer Rd/US 22 Bridge Preservation Activities Second 1,591 1,591 100336

72 Ebeneezer Rd/Snitz Cr Bridge Replacement Third 150 500 650 100338

72 Ebenezer Rd over Forge Ck Bridge Replacement Third 150 500 650 100351

117 SR 117 Over Conewago Crk Bridge Preservation Activities Third 150 600 750 78751

322 US322 over Quentin Rd Bridge Preservation Activities Third 150 350 500 100282

322 Horseshoe Pike ov Beck Cr Bridge Replacement Third 150 500 650 100291

322 Horseshoe Pike/Quentin Rd Bridge Preservation Activities Third 150 400 550 100330

343 Pine Grove St Bridge PM Bridge Preservation Activities Third 150 500 650 100350

419 PA-419 over Hammer Cr-B Bridge Rehabilitation First 125 10 30 690 855 100292

422 US 422 Bridge-B Bridge Replacement First 225 30 50 1,500 1,805 91345

422 Cumberland Street Bridge Bridge Rehabilitation First 50 10 15 440 515 100293

422 Cumberland St Bridge 2 Bridge Replacement Third 150 850 1,000 100305

422 Lincoln Avenue Bridge Bridge Replacement Third 150 1,000 1,150 100317

422 Cumberland Street Brdg 3-B Bridge Replacement First 225 30 50 1,800 2,105 100342

443 Mountain Road Bridge Bridge Replacement Third 150 600 750 100354

501 PA 501 Bridge-B Bridge Replacement First 225 95 60 1,300 1,680 91346

501 PA 501 Bridge 2 Bridge Replacement Third 150 550 700 91347

934 Bellegrove Road Bridge-B Bridge Improvement First 175 10 35 460 680 90999

Page 94: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 70 of 259August 16, 2018

Planning Partner: Lebanon Mode: Bridge County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

934 Fisher Avenue/ Swatara Cr Bridge Preservation Activities Third 300 1,300 1,600 100326

934 PA 934 ovr Indiantown Run Bridge Rehabilitation First 75 25 25 650 775 100329

1003 Lancaster Street Bridge Bridge Replacement First 489 489 100278

1007 Beach Run Bridge Bridge Replacement Third 150 550 700 100352

1011 Mount Zion Road Bridge-B Bridge Replacement First 1,000 1,000 90998

1014 Greble Road Bridge Bridge Replacement Third 150 550 700 100353

1020 East Main Street Bridge Bridge Rehabilitation First 75 75 87477

1020 East Main Street Bridge Bridge Rehabilitation Second 350 350 87477

1022 Bohns Lane over I-81 Bridge Preservation Activities Third 250 800 1,050 100262

2001 Cornwall Rd ovr Snitz Ck Bridge Replacement Third 150 700 850 100347

2011 Weavertown Road over NS Bridge Rehabilitation Third 150 560 710 100279

2017 Millbach Road ov Mill Cr Bridge Replacement Third 150 450 600 100283

2019 Sheridan Rd over Mill Cr Bridge Replacement Third 150 1,100 1,250 100312

3007 Lawn Rd over Conewago Crk Bridge Replacement Third 150 850 1,000 100311

3025 22nd Street/ Quittapahill Bridge Replacement Third 150 600 750 100299

4005 SR 4005/Trib Swatara Cr Bridge Replacement Third 150 500 650 100294

4008 Palmyra Bellegrove Road 2-B Bridge Rehabilitation First 440 440 91348

4008 Harrison Rd ovr Spring Cr Bridge Replacement Third 150 600 750 100302

4010 Syner Road Bridge-B Bridge Replacement First 175 10 60 1,700 1,945 91350

4013 Jonestown Road Bridge-B Bridge Replacement First 800 800 74924

4013 Plesant View Drive Bridge Bridge Replacement Third 150 400 550 91351

4013 Jonestown Rd/Raccoon Cr Bridge Replacement Third 150 718 868 100309

4017 Harrison Road over I-81 Bridge Preservation Activities Third 200 650 850 100264

4019 SR 4019 over Vesle Run Bridge Replacement Third 150 850 1,000 88973

4020 Fisher Ave over Forge Ck Bridge Replacement Third 150 800 950 100327

4027 Lincoln Schl Rd/Mill Cr Bridge Replacement Second 150 600 750 100306

7101 S Spruce St Bridge A-1 Bridge Replacement First 278 278 20392

7201 Golf Rd/Trib Swatara Cr Bridge Improvement First 253 253 100328

7201 Golf Rd/Trib Swatara Cr Bridge Improvement Second 739 739 100328

7205 Reilly Road over Tulpehoc Bridge Replacement Second 250 3,418 3,668 100280

7207 Yordys Road Bridge CO-22 Bridge Replacement Second 200 200 20364

Page 95: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 71 of 259August 16, 2018

Planning Partner: Lebanon Mode: Bridge County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7207 Yordys Road Bridge CO-22 Bridge Replacement Third 363 363 20364

7214 Levan's Iron Bridge CO-5 Bridge Replacement Second 188 739 926 20299

7215 Inwood Iron Bridge Bridge Replacement First 5,986 5,986 20328

7301 N Lincoln Ave Leb-5 Bridge Improvement First 250 250 500 20217

7301 N Lincoln Ave Leb-5 Bridge Improvement Second 1,500 1,500 20217

Planning Partner: Lebanon Mode: Transit County: LebanonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Paratransit Vehicles First 242 242 102440

Operating Assistance First 12,497 12,497 102442

Fixed Route Vehicles First 3,250 3,250 111032

Replace Bus Wash System First 95 95 111033

Fixed Route Vehicles First 1,050 1,050 111034

Paratransit Vehicles First 365 365 111035

Replace Staff Vehicle First 35 35 111036

Fixed Route Vehicles First 3,155 3,155 111037

Replace Staff Vehicle First 35 35 111038

Capital Improvements First 47 47 111039

Planning Partner: Lehigh Valley Mode: Highway County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

LVTS CMAQ-LANTA Flex Transit System Improvement First 3,840 3,840 64729

Corridor Signal Impr LI Corridor Safety Improvement First 462 462 82804

Corridor Signal Impr LI Corridor Safety Improvement Second 558 558 82804

Corridor Signal Impr LI Corridor Safety Improvement Third 10,818 10,818 82804

TAP Line Item Transportation Enhancement First 2,419 2,419 82806

TAP Line Item Transportation Enhancement Second 2,644 2,644 82806

TAP Line Item Transportation Enhancement Third 2,644 2,644 82806

Safety Line Item_LVTS Safety Improvement First 375 375 82807

Safety Line Item_LVTS Safety Improvement Second 7,670 7,670 82807

Safety Line Item_LVTS Safety Improvement Third 13,390 13,390 82807

Urban Line Item Reserve Restoration First 697 697 82810

Urban Line Item Reserve Restoration Second 1,316 1,316 82810

Urban Line Item Reserve Restoration Third 1,467 1,467 82810

Delivery_Consult Assist Bridge Rehabilitation First 4,000 4,000 83086

Delivery_Consult Assist Bridge Rehabilitation Second 3,500 3,500 83086

Page 96: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 72 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Highway County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Transp Alternative/Multimodal Project MngmtTransportation Enhancement First 230 230 89055

Environmental Impacts Resolution LI Environmental Mitigation First 200 200 95400

Construction Assistance Miscellaneous First 25 25 97325

Construction Assistance Resurface First 25 25 97953

LVTS Highway & Bridge LI Resurface First 7,061 7,061 102201

LVTS Highway & Bridge LI Resurface Second 17,819 17,819 102201

LVTS Highway & Bridge LI Resurface Third 116,503 116,503 102201

LVTS TrafficReview Assist Miscellaneous First 60 60 102761

Ruppsville Rd RR Warning Devices First 270 270 102868

Penn Ave Alburtis RRX RR Warning Devices First 281 281 102870

Canal Rd Allentown RRX RR Warning Devices First 350 350 102979

Union Street RR Upgrade RR Warning Devices First 185 185 106142

AWPM LVTS Counties 2019 Reflective Pavement Markers First 700 700 109972

22 22 Sec 400- Ph 2 (LRB) Reconstruct First 4,169 4,169 57615

22 US 22 Widening Widen First 35 16,974 2,386 6,753 26,148 96384

22 US 22 Widening Widen Second 144,622 144,622 96384

22 US 22 Widening Widen Third 114,759 114,759 96384

22 US 22 Resurf 15th Street to SR 309 Resurface First 103 5,305 5,408 96385

22 US 22 Resurf 309 to I-78 Split Resurface First 412 328 2,814 3,553 110069

22 US 22 Resurf 309 to I-78 Split Resurface Second 5,065 5,065 110069

22 LVTS Urban ITS Variable Message Signs First 309 318 55 53 2,950 3,685 110086

29 SR 29/Cedar Crest Blvd Adpt Signal UpgradeExisting Signal Improvement First 656 675 113 1,443 110169

29 SR 29/Cedar Crest Blvd Adpt Signal UpgradeExisting Signal Improvement Second 60 3,075 3,134 110169

29 SR 29 - Shimersville Hill Safety Imprv Safety Improvement First 424 437 225 328 1,500 2,914 110183

29 SR 29 - Shimersville Hill Safety Imprv Safety Improvement Second 4,690 4,690 110183

78 Freeway Service Patrol Traffic System Management First 775 775 68190

78 ITS Sign Upgrades - Turnpike Variable Message Signs First 100 100 110559

100 PA 100 Reconstruction Reconstruct First 106 18,025 18,131 102311

145 MacArthur Road Resurface Resurface First 16 4,917 4,933 96387

145 7thSt Multimodal Corridor Corridor Safety Improvement First 118 53 52 2,060 2,283 99697

145 Route 145 Safety Improvements Safety Improvement First 1,030 546 225 273 4,500 6,575 109971

145 Route 145 Safety Improvements Safety Improvement Second 1,877 1,877 109971

145 MacArthur Rd Adpt Signal Upgrade Existing Signal Improvement First 530 546 56 55 1,188 110170

Page 97: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 73 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Highway County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

145 MacArthur Rd Adpt Signal Upgrade Existing Signal Improvement Second 4,058 4,058 110170

145 MacArthur Rd Multimodal Study Transportation Study First 219 219 110388

145 Summit Lawn to Amer Pkway Connectivity StudyTransportation Study First 200 200 110396

145 Summit Lawn to Amer Pkway Connectivity StudyTransportation Study Second 138 138 110396

222 222 & Shantz & 863 Improv Safety Improvement First 11,300 11,300 79554

222 222 N. Widen-LVTS Widen Second 615 615 97227

309 PA 309-4010 to 100 Resurface Second 580 478 61 60 3,813 4,991 96386

309 309 & Tilghman I/C Recon Interchange Improvement First 4,738 2,230 3,517 54,636 65,121 96432

309 309 Center Valley IC Interchange Improvement First 2,652 2,652 102160

309 309 Center Valley IC Interchange Improvement Second 3,478 239 1,159 14,498 19,373 102160

309 309 Center Valley IC Interchange Improvement Third 16,249 16,249 102160

309 PA 309 Resurface Restoration First 1,030 2,434 3,489 7,103 14,056 102312

309 LVTS High Friction Sites - 2019 Safety Improvement First 950 950 110038

309 SR 309 Coopersburg Adpt Signal UpgradeExisting Signal Improvement First 424 563 56 1,043 110173

309 SR 309 Coopersburg Adpt Signal UpgradeExisting Signal Improvement Second 58 2,388 2,446 110173

378 SR 378 Lighting Lighting Second 174 92 24 1,353 1,643 110398

987 FedEx Roadway Improvemnts Widen First 5,000 5,000 102873

1004 Lehigh Race St Intersectn Intersection Improvement First 467 6,652 7,119 57433

1009 Schoenersville Road Corridor Corridor Safety Improvement First 393 393 98174

1009 Weaversville Curve Study Transportation Study First 155 155 110071

1017 Mauch Chunk Rd Adpt Signal Upgrade Existing Signal Improvement First 159 109 56 55 675 1,055 110174

2003 15th Street Corridor Corridor Safety Improvement First 2,861 2,861 102155

2005 Lehigh St Betterment Resurface First 506 506 96413

2005 Lehigh St Betterment Resurface Second 464 179 116 5,851 6,610 96413

Planning Partner: Lehigh Valley Mode: Bridge County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 LVTS Bridge Preservation & Repair #4 Bridge Preservation Activities First 450 450 105949

29 PA 29 over Norfolk Southern RR Bridge Bridge Replacement First 9,373 9,373 11419

29 PA29/100 ovr Indian Creek Bridge Rehabilitation First 296 296 85676

143 SR143 ovr Trib Ontelaunee Bridge Rehabilitation Second 6 18 24 85677

145 Wire Mill Bridge Replace/Rehab First 52 7,900 7,952 94682

145 LVTS BR Preserve&Repair 3 Bridge Preservation Activities First 250 250 94895

Page 98: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 74 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Bridge County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

145 Jordan Creek Brg Replacement Replace/Rehab First 2,000 2,000 110076

145 Jordan Creek Brg Replacement Replace/Rehab Second 814 1,791 80 597 4,000 7,282 110076

145 Jordan Creek Brg Replacement Replace/Rehab Third 8,299 8,299 110076

329 Cementon Bridge Replace/Rehab First 1 1,545 716 1,030 13,792 17,084 11413

378 Hill to Hill Bridge Rehabilitation Replace/Rehab First 4,147 7,376 11,523 93630

378 Hill to Hill Bridge Rehabilitation Replace/Rehab Second 5,373 5,796 31,846 43,016 93630

378 Hill to Hill Bridge Rehabilitation Replace/Rehab Third 62,854 62,854 93630

873 Gap Bridge Repairs Replace/Rehab First 2,060 1,250 3,310 107552

873 Gap Bridge Repairs Replace/Rehab Second 438 12 58 16,717 17,225 107552

1002 Tilghman St o/Lehigh & RR Bridge Rehabilitation First 1,470 1,470 11565

1004 Race Street over Lehigh River Replace/Rehab First 515 1,093 563 44 2,214 108134

1004 Race Street over Lehigh River Replace/Rehab Second 6,956 6,956 108134

1007 N. Dauphin St over Trib to Lehigh Bridge Replacement Second 522 430 19 61 823 1,856 110067

1015 Front Street Bridge Replace/Rehab First 212 106 57 11 281 668 11406

1019 CC Blvd o/Lil Cedar Crk Bridge Replacement First 10 10 79088

2015 Schantz Rd /trib Cedar Creek Replace/Rehab First 849 849 92049

2015 Schantz Rd /trib Cedar Creek Replace/Rehab Second 927 24 81 1,075 2,107 92049

2018 Indian Creek Rd over Leibert Creek Replace/Rehab First 355 355 79127

2018 Indian Creek Rd over Leibert Creek Replace/Rehab Second 377 18 87 597 1,079 79127

2024 Mill Rd over Saucon Creek Replace/Rehab First 335 301 11 27 650 1,324 81664

2024 Mill Rd over Saucon Creek Replace/Rehab Second 277 277 81664

2025 Powder Valley Rd over Indian Creek Replace/Rehab First 335 292 16 27 1,038 1,707 109237

2027 SR2027 BR/HOSENSACK Bridge Replacement Second 6 18 24 11587

2029 Limeport Pike ovr Saucon Crk trib Replace/Rehab First 546 546 39 1,132 94249

2029 Limeport Pike ovr Saucon Crk trib Replace/Rehab Second 16 23 2,319 2,358 94249

3015 Adams Road Bridge over I-78 Replace/Rehab First 375 375 110072

3015 Adams Road Bridge over I-78 Replace/Rehab Second 300 754 49 116 3,750 4,969 110072

3015 Adams Road Bridge over I-78 Replace/Rehab Third 3,414 3,414 110072

4003 Kernsville Road Bridge Replace/Rehab First 515 546 56 1,118 89627

4003 Kernsville Road Bridge Replace/Rehab Second 29 4,057 4,086 89627

4003 Kecks Road over I-78 Replace/Rehab First 250 250 110073

4003 Kecks Road over I-78 Replace/Rehab Second 200 537 49 119 4,919 5,826 110073

4009 Hollenbachs Bridge Replace/Rehab First 503 495 191 1,189 11390

4009 Hollenbachs Bridge Replace/Rehab Second 81 1,507 1,588 11390

4014 SR 4014 ovr Trib Mill Crk Bridge Rehabilitation Second 6 18 24 85689

Page 99: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 75 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Bridge County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4024 Mosserville Rd ovr Ontelaunee Cr Replace/Rehab First 355 355 85692

4024 Mosserville Rd ovr Ontelaunee Cr Replace/Rehab Second 319 18 29 1,134 1,500 85692

7301 Gordon Street Bridge Bridge Replacement First 10 3,914 3,924 72773

7404 Coplay-Northampton Bridge Replace/Rehab First 12,059 12,059 11614

7408 South Walnut Street Bridge Replace/Rehab First 361 53 57 5,835 6,305 94680

Planning Partner: Lehigh Valley Mode: Transit County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Purchase Van/Minibuses First 5,704 5,704 95008

PM Maintenance (Federal) First 20,600 20,600 95010

ADA Para Trans Serv Cap First 3,400 3,400 95015

Heavy-Duty Bus Purchase First 17,449 17,449 95019

ITS and Security Project First 522 522 95178

Service Vehicles Replace First 180 180 95180

Sign, Shelters and Enhanc First 78 78 95183

LANta Enhanced BRT Projec First 5,390 5,390 106530

LANta Operating Assist. First 73,777 73,777 106703

Share Ride Operate Assist First 14,908 14,908 106704

Associated Cap. Maint First 1,800 1,800 110171

LANta Facility Improve First 2,048 2,048 110172

Planning Partner: Lehigh Valley Mode: Highway County: NorthamptonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Easton Two Way St Conversions Corridor Safety Improvement First 184 58 60 1,739 2,041 102223

Two Rivers Trail Gap 9A Transportation Enhancement First 225 225 107761

22 SR 22 - 25th St to Farmersville Rd Restoration First 5,150 5,150 12319

22 22& 13th St Interchange Interchange Improvement Third 7,129 7,129 103938

22 22 from Farmersville Rd to 512 Resurface First 515 546 109 5,000 6,171 110070

22 22 from Farmersville Rd to 512 Resurface Second 2,879 2,879 110070

33 PA33 Preservation SR 22-Belfast Pavement Preservation First 1,100 1,100 12178

33 Pave PA 33_I-78 to US 22 Resurface Second 478 507 32 1,016 96423

33 Pave PA 33_I-78 to US 22 Resurface Third 34 8,063 8,097 96423

191 Broad St Nazareth RRX RR Warning Devices First 732 732 98094

248 Route 248 Realignment Relocation/Realignment First 670 212 515 4,031 5,428 86853

Page 100: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 76 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Highway County: NorthamptonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

248 Bath Pk_ 329 to Hollow Resurface Second 391 403 67 862 96426

248 Bath Pk_ 329 to Hollow Resurface Third 38 3,137 3,174 96426

248 Resurface 248_191 to 33 Resurface Second 369 507 63 939 96430

248 Resurface 248_191 to 33 Resurface Third 34 3,897 3,931 96430

248 SR 248 Adaptive Signal Upgrade Existing Signal Improvement First 318 219 55 844 1,436 110176

512 Resurface Walnut Street Resurface Second 123 127 63 313 96427

512 Resurface Walnut Street Resurface Third 34 1,344 1,378 96427

512 SR 512 (Midway Street) NS RRX RR Warning Devices First 284 284 102869

512 SR 512 Adaptive Signal Upgrade Existing Signal Improvement First 530 250 56 837 110177

512 SR 512 Adaptive Signal Upgrade Existing Signal Improvement Second 313 58 1,739 2,110 110177

611 611 Retaining Wall Rehab - Easton Miscellaneous First 164 164 110179

611 611 Retaining Wall Rehab - Easton Miscellaneous Second 348 119 23 1,791 2,282 110179

987 Resurface Chestnut Street Resurface First 93 239 332 96428

2012 25th Street Hill Improvement Corridor Safety Improvement First 530 1,639 2,170 105959

2017 13th Street I/C Improvements Safety Improvement First 350 350 107725

2020 Easton Ave Corridor Imprv Corridor Safety Improvement First 27 1,530 1,556 102156

3005 Resurf Main_Washington St Resurface First 437 338 56 831 96424

3005 Resurf Main_Washington St Resurface Second 1,449 1,449 96424

3011 Center Street Resurface Resurface First 100 100 96429

3015 Linden Street Reconstruct First 743 563 4,500 5,805 11981

3015 Linden Street Reconstruct Second 1,690 1,690 11981

3015 Bethlehem Corr. Safety RR Warning Devices First 1,160 1,160 102864

Planning Partner: Lehigh Valley Mode: Bridge County: NorthamptonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

33 PA 33 Bushkill Creek Bridges Bridge Replacement First 1,030 11 103 10,927 12,071 96431

191 LVTS Bridge Overlay Bundle Bridge Preservation Activities First 3,000 3,000 110186

248 SR 248 ovr Hokendauqua Cr Bridge Rehabilitation First 1,545 1,545 85939

248 248/trib to Hokendauqua C Bridge Rehabilitation First 1,236 1,236 91992

248 PA 248 /E Br Monocacy Crk Bridge Rehabilitation First 1,030 1,030 92062

512 SR 512 o/ Brush Meadow Cr Bridge Rehabilitation Second 6 18 24 85945

512 Beth-Bath Pike over Monocacy Creek Replace/Rehab First 656 656 85946

512 Beth-Bath Pike over Monocacy Creek Replace/Rehab Second 580 18 87 1,433 2,117 85946

512 Box Culvert Bundle-Round 2 Bridge Replacement First 500 500 110066

Page 101: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 77 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Bridge County: NorthamptonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

512 Box Culvert Bundle-Round 2 Bridge Replacement Second 1,188 1,194 1,500 3,882 110066

512 Box Culvert Bundle-Round 2 Bridge Replacement Third 2,934 2,934 110066

611 Richmond Bridge Replace/Rehab First 464 371 22 53 1,639 2,549 12084

611 Williams Twp Canal Wall Replacements Miscellaneous First 773 546 225 27 1,571 79468

611 Williams Twp Canal Wall Replacements Miscellaneous Second 2,898 2,898 79468

611 611 Culvert Replacement Bridge Replacement First 412 437 11 11 871 110055

611 611 Culvert Replacement Bridge Replacement Second 869 869 110055

987 Airport Rd ovr Abandoned RR Bridge Rehabilitation Second 369 507 127 1,002 12307

987 Airport Rd ovr Abandoned RR Bridge Rehabilitation Third 34 2,016 2,049 12307

987 LVTS BR Preserve&Repair 5 Bridge Preservation Activities First 200 2,000 2,200 106237

1002 1002 over Shoeneck Creek Bridge Replacement Second 6 18 24 110083

1004 SR 1004 o/Trib Delwr Riv Bridge Rehabilitation Second 6 18 24 85929

1015 SR 1015 o/Martins Creek Bridge Rehabilitation First 530 33 42 2,185 2,791 85930

1032 SR 1032 o/Jacoby Cr -Mill Replace/Rehab First 155 2,971 3,125 85935

1039 SR 1039 o/Trib Del Rvr-01 Bridge Rehabilitation First 17 17 85937

1039 SR 1039 o/Trib Del Rvr-01 Bridge Rehabilitation Second 6 6 85937

1039 SR 1039 o/Trib Del Rvr-02 Bridge Rehabilitation First 17 17 85938

1039 SR 1039 o/Trib Del Rvr-02 Bridge Rehabilitation Second 6 6 85938

2006 Easton Rd over Saucon Crk E. Branch Bridge Rehabilitation Second 388 338 19 31 1,900 2,676 93631

2006 Raubsville Road over Frey's Run Replace/Rehab First 309 219 11 55 1,126 1,719 109914

2027 SR 2027 Hecktown Rd Br Replace/Rehab First 382 338 84 805 89614

2027 SR 2027 Hecktown Rd Br Replace/Rehab Second 60 2,508 2,567 89614

2029 Farmersville Road Bridge over US 22 Replace/Rehab First 382 382 71707

2029 Farmersville Road Bridge over US 22 Replace/Rehab Second 348 60 87 3,463 3,957 71707

2031 Country Club Rd o/US22 Replace/Rehab First 382 338 84 805 89616

2031 Country Club Rd o/US22 Replace/Rehab Second 58 3,463 3,521 89616

3004 Water St (3004) ov Saucon Creek Replace/Rehab First 103 4,017 4,120 89641

3016 Indian Trail Road ov'r Hokendauqua CreekReplace/Rehab First 849 33 85 1,033 1,999 12310

3016 Indian Trail Road ov'r Hokendauqua CreekReplace/Rehab Second 2,344 2,344 12310

3017 Howertown Road Bridge Replace/Rehab First 100 424 109 159 1,639 2,432 105371

3018 Old Carriage Rd Bridge Replace Replace/Rehab First 335 355 17 27 734 110058

3018 Old Carriage Rd Bridge Replace Replace/Rehab Second 985 985 110058

3020 Newburg Rd (SR 3020) o/Trib Monocacy CreekReplace/Rehab First 335 328 56 719 85940

3020 Newburg Rd (SR 3020) o/Trib Monocacy CreekReplace/Rehab Second 17 2,087 2,104 85940

Page 102: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 78 of 259August 16, 2018

Planning Partner: Lehigh Valley Mode: Bridge County: NorthamptonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3020 SR 3020 o/E Branch Monocacy Crk Bridge Rehabilitation First 84 84 85941

3020 SR 3020 o/E Branch Monocacy Crk Bridge Rehabilitation Second 29 29 85941

4007 Hoch Road Bridge_28783 Bridge Rehabilitation First 17 17 86110

4007 Hoch Road Bridge_28783 Bridge Rehabilitation Second 6 6 86110

4007 Box Culvert Bundle-Round 1 Bridge Replacement First 1,591 1,126 2,717 110062

4007 Box Culvert Bundle-Round 1 Bridge Replacement Second 4,057 4,057 110062

4007 Hoch Road Bridge_28784 Bridge Rehabilitation First 17 17 110063

4007 Hoch Road Bridge_28784 Bridge Rehabilitation Second 6 6 110063

4019 SR 4019 o/Trib Bushkill C Bridge Rehabilitation First 17 17 85943

4019 SR 4019 o/Trib Bushkill C Bridge Rehabilitation Second 6 6 85943

4019 SR 4019 over Horn Creek Bridge Rehabilitation First 17 17 85944

4019 SR 4019 over Horn Creek Bridge Rehabilitation Second 6 6 85944

4019 SR 4019 Super Replacement Bridge Replacement First 5 138 143 106296

Planning Partner: NEPA Mode: Highway County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Urban Line Item Reserve Restoration First 314 314 70239

Safety Line Item Reserve Safety Improvement First 376 376 75578

Safety Line Item Reserve Safety Improvement Second 1,460 1,460 75578

Safety Line Item Reserve Safety Improvement Third 2,069 2,069 75578

CMAQ Line Item Reserve Corridor Safety Improvement First 995 995 82784

CMAQ Line Item Reserve Corridor Safety Improvement Second 5,655 5,655 82784

CMAQ Line Item Reserve Corridor Safety Improvement Third 7,209 7,209 82784

Delivery_Consult Assist Miscellaneous First 3,234 3,234 83087

Transp Enhance/Alternative Project MngmtMiscellaneous First 160 160 89057

Environmental Impacts Resolution LI Environmental Mitigation First 140 140 97326

Construction Assistance Miscellaneous First 300 300 97421

Construction Assistance Resurface First 100 100 97944

NEPA Hwy & Bridge Reserve Restoration First 1,174 1,174 102240

NEPA Hwy & Bridge Reserve Restoration Second 1,925 1,925 102240

NEPA Hwy & Bridge Reserve Restoration Third 55,905 55,905 102240

NEPA Traffic ReviewAssist Miscellaneous First 769 769 102762

209 Patterson St Resurface Resurface First 63 63 83085

209 Interchange Rd Slope Failure Resurface First 1,000 1,000 83088

209 Mansion Hill Rock Slide Mitigation Safety Improvement First 3,000 3,000 107079

Page 103: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 79 of 259August 16, 2018

Planning Partner: NEPA Mode: Highway County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

209 Jim Thorpe Retaining Wall Drainage Improvement First 150 52 52 3,700 3,953 109540

248 PA 248 Retaining Wall Rep Concrete Rehabilitation Second 950 555 13 163 2,500 4,181 96418

248 PA 248 Retaining Wall Rep Concrete Rehabilitation Third 5,577 5,577 96418

248 PA 248 Rehabilitation Restoration First 400 400 96478

248 PA 248 Rehabilitation Restoration Second 400 11,941 12,341 96478

248 SR 248 Wall Ground Anchors Reconstruct First 766 766 108970

309 PA 309 Rehabilitation Restoration Third 67 715 782 96419

443 443 Roadway Improvements Safety Improvement First 14,602 14,602 66296

443 443 Roadway Improvements Safety Improvement Second 11,072 11,072 66296

902 SpringGarden-N Pine Resur Resurface First 100 100 96435

902 SpringGarden-N Pine Resur Resurface Second 100 50 50 650 850 96435

903 903 Resurface -2 Resurface Third 713 4,562 5,275 96436

940 PA 940 Resurface Resurface Third 713 2,994 3,707 96437

1005 Tannery Rd RR Crossing RR Warning Devices First 182 182 95270

2002 Delaware Ave Resurface Resurface First 50 700 750 96438

Planning Partner: NEPA Mode: Bridge County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 NEPA Bridge Overlay Bundle Bridge Preservation Activities First 3,183 3,183 110383

93 NEPA Brg Preserve & Repair 5 Bridge Preservation Activities First 3,077 3,077 105952

209 US 209 over NRR Removal Bridge Removal First 50 400 450 91990

209 NEPA BR Preserve&Repair 4 Bridge Preservation Activities First 186 186 104353

248 PA 248 over SR 2002 Replace/Rehab Third 507 507 92083

903 903 over Mud Run Bridge Replacement First 350 300 40 30 976 1,696 109967

903 903 over Mud Run Bridge Replacement Second 824 824 109967

2002 Hunter Creek Bridge Replace/Rehab Second 350 430 127 123 1,000 2,030 96416

2002 Hunter Creek Bridge Replace/Rehab Third 520 520 96416

3001 Fritz Valley Rd over Normal Creek Replace/Rehab First 5 5 89629

3005 SR 3005 over Mahoning Creek Bridge Replacement First 500 350 35 885 11013

3005 SR 3005 over Mahoning Creek Bridge Replacement Second 15 1,500 1,515 11013

7211 T-516 County Bridge #12 Bridge Replacement First 195 33 98 1,300 1,626 11140

Planning Partner: NEPA Mode: Transit County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

CCCT Van/Minibus Purchase First 806 806 95359

Page 104: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 80 of 259August 16, 2018

Planning Partner: NEPA Mode: Transit County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Tech Assist. Service First 100 100 95361

CCCT comp. system upgrade First 68 68 95362

CCCT Operating Assist First 1,188 1,188 106894

Shared Ride Oper Assist First 2,656 2,656 106895

Planning&Programming Dev First 120 120 110582

Signs,Shelters&Enhance First 24 24 110584

Planning Partner: NEPA Mode: Highway County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Summit Avenue RRXing Upgrade RR Warning Devices First 240 240 109712

AWPM NEPA D5 Counties - 2019 Reflective Pavement Markers First 400 400 110035

33 PA 33 Median Barrier SR 115 to SR 2002 Safety Improvement First 336 27 4,609 4,972 96414

33 PA 33 Median Barrier SR 115 to SR 2002 Safety Improvement Second 2,511 2,511 96414

33 PA 33 Median Barrier US 209 to SR 611 Safety Improvement First 233 111 344 110456

33 PA 33 Median Barrier US 209 to SR 611 Safety Improvement Second 7,265 7,265 110456

33 PA 33 Median Barrier SR 2002 to SR 2008Safety Improvement Second 340 27 4,400 4,767 110457

33 PA 33 Median Barrier SR 2002 to SR 2008Safety Improvement Third 6,426 6,426 110457

115 SR 115 Corridor Imp-Effort Corridor Safety Improvement First 114 56 2,200 2,370 102167

209 209/115 Int. Imp - Phase2 Intersection Improvement First 11,575 11,575 88935

209 209 Mt Nebo to Municipal Safety Improvement First 350 250 250 1,200 2,050 95398

209 SR 209 Frable Road to Lesh Road Safety Improvement Second 350 750 250 2,000 3,350 95517

209 SR 209 Frable Road to Lesh Road Safety Improvement Third 2,500 2,500 95517

209 SR 209 Gilbert Road to Leslie Drive Safety Improvement Second 480 800 300 2,990 4,570 95518

209 SR 209 Gilbert Road to Leslie Drive Safety Improvement Third 2,810 4,500 7,310 95518

209 Hamilton West Resurface-Sciota Resurface First 300 300 100 100 1,875 2,675 95574

209 Hamilton West Resurface-Sciota Resurface Second 4,125 4,125 95574

209 Hamilton West Resurface 33 to 80 Resurface First 6,000 6,000 96442

209 209 -Schafer School House Safety Improvement First 450 80 80 5,380 5,990 104432

380 TOC Operator - NEPA Traffic Control Center First 438 438 91624

611 Scotrun - Swiftwater Safety Improvement First 10 10 11817

611 611 /715 Improvements Safety Improvement First 1,000 500 1,285 13,300 16,085 74979

611 PA 611 Retaining Wall Reh Reconstruct Second 1,000 1,000 500 500 2,500 5,500 96481

611 PA 611 Retaining Wall Reh Reconstruct Third 7,500 7,500 96481

715 SR 715/ 611 Intersection Safety Improvement First 1,200 570 1,800 5,000 8,570 79473

Page 105: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 81 of 259August 16, 2018

Planning Partner: NEPA Mode: Highway County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

715 SR 715/ 611 Intersection Safety Improvement Second 9,500 9,500 79473

2012 209 BUS (SR 2012) Mt Tom Road to Airport RoadSafety Improvement First 360 500 250 2,000 3,110 95516

2012 209 BUS (SR 2012) Mt Tom Road to Airport RoadSafety Improvement Second 2,500 2,500 95516

Planning Partner: NEPA Mode: Bridge County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

NEPA Brg Preserve & Repair 6 Bridge Preservation Activities First 750 1,402 2,152 109334

NEPA Brg Preserve & Repair 6 Bridge Preservation Activities Second 4,974 4,974 109334

NEPA Br Pres & Rep 7 Bridge Preservation Activities First 750 750 109826

NEPA Br Pres & Rep 7 Bridge Preservation Activities Second 6,376 6,376 109826

191 Stites Tunnel Bridge Bridge Replacement First 1,533 1,533 11872

191 PA 191 Brodhead Cr. Br. Replace/Rehab Third 672 672 134 9,542 11,020 76370

209 209 & 33 NB over Appenzell Creek Replace/Rehab First 500 600 50 1,150 109964

209 209 & 33 NB over Appenzell Creek Replace/Rehab Second 20 4,000 4,020 109964

390 PA 390 over Leavitts Branch Bridge Rehabilitation First 1 1 76369

447 SR 447 over Brodhead Crk. Bridge Replacement First 25 25 79160

447 SR 447 over Goose Pond Run Replace/Rehab First 109 55 1,200 1,364 85859

715 SR 715 over Pocono Creek Replace/Rehab First 371 27 106 2,000 2,503 79163

715 SR 715 over Pocono Creek Replace/Rehab Second 746 746 79163

715 PA 715 Stone Arch Replace Replace/Rehab Second 400 400 50 50 1,250 2,150 96434

715 PA 715 Stone Arch Replace Replace/Rehab Third 350 350 96434

715 715 over McMichael's Crk II Replace/Rehab First 100 100 1,800 2,000 102423

1004 SR 1004 Swiftwater Creek Bridge Replacement First 400 250 35 296 981 79171

1004 SR 1004 Swiftwater Creek Bridge Replacement Second 10 704 714 79171

1006 Red Rock Road (T565) over Forest Hill RunReplace/Rehab First 250 25 15 500 790 79205

1017 Golf Drive(SR 1017) Buck Hill Branch Br Bridge Rehabilitation First 450 250 15 25 1,000 1,740 94363

2010 SR 2010 over McMichael's Creek Bridge Rehabilitation First 1,450 1,450 79178

2012 SR 2012 over Pocono Creek Bridge Rehabilitation First 1,300 1,300 79179

2012 209 Bus over Kettle Creek Replace/Rehab First 500 149 13 18 978 1,658 85882

2012 209 Bus over Kettle Creek Replace/Rehab Second 636 636 85882

2023 Hollow Road Bridge Replace/Rehab First 350 100 50 450 950 47668

2024 SR 2024 Ridgeway Street Replace/Rehab First 300 5,500 5,800 67265

2030 SR 2030 Ramp Brg over I-80 Replace/Rehab First 2,784 2,784 11851

2036 SR 2036 over PA 33 Replace/Rehab First 500 500 85808

Page 106: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 82 of 259August 16, 2018

Planning Partner: NEPA Mode: Bridge County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2036 SR 2036 over PA 33 Replace/Rehab Second 500 75 50 3,800 4,425 85808

3003 SR 3003 over Chapple Crk Bridge Replacement First 5 5 85813

3004 3004 over Meixell Creek Replace/Rehab First 600 450 50 50 1,150 109994

3004 3004 over Meixell Creek Replace/Rehab Second 1,200 1,200 109994

3010 Mill Pond Road over Pohopoco Crk Bridge Rehabilitation First 1,500 1,500 85818

3023 SR 3023 Replacement Replace/Rehab First 750 750 93634

3023 SR 3023 Replacement Replace/Rehab Second 750 100 125 2,000 2,975 93634

4002 Long Pond Road ov'rTunkhannock Crk Replace/Rehab First 650 350 25 30 736 1,791 85846

4002 Long Pond Road ov'rTunkhannock Crk Replace/Rehab Second 1,764 1,764 85846

4004 SR 4004 Over Pocono Creek Bridge Rehabilitation First 25 400 425 11802

4008 Tobyhanna Crk Br II Bridge Replacement First 8 8 102216

7205 County Bridge #8 - Foundry Rd (T-231 ) Replace/Rehab First 300 200 10 15 1,200 1,725 11728

8004 SR 8004 Ramp Br Replace/Rehab Second 400 350 750 89630

8004 SR 8004 Ramp Br Replace/Rehab Third 2,500 2,500 89630

8024 I-80 Bridge Ramp to SR 8024 Bridge Replacement First 2,500 2,500 76371

Planning Partner: NEPA Mode: Transit County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Traffic Signal (MCTA) First 250 250 93601

LDP 1: Park and Ride First 2,000 2,000 95350

LDP 2: Maint Facility First 3,000 3,000 95352

Wash Bay Overhaul First 745 745 98056

LD Planning (Phase II) First 120 120 98067

Bus Shelter Bike Rack -16 First 16 16 106922

AED Battery Pack Replace First 30 30 106923

Surveillance Cameras First 50 50 106927

SR Bus Replace/108-110 First 225 225 106939

SR Bus Replace/111-116 First 355 355 106940

FR Bus Replacement/501 First 546 546 106941

FR Bus Replace/701-702 First 1,092 1,092 106942

FR Bus Replace/901-904 First 2,184 2,184 106943

Admin Sup Veh Rep/304-305 First 50 50 106944

Garage Serv/Truck Rep/953 First 80 80 106945

Page 107: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 83 of 259August 16, 2018

Planning Partner: NEPA Mode: Transit County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Garage Serv Veh Rep/954 First 50 50 106946

Garage Serv Veh Rep/306 First 30 30 106947

Garage Skid Steer Rep First 30 30 106950

Garage Fork Lift Rep First 30 30 106951

Perimeter Fence Repair First 50 50 106952

Operating Assist/URBAN First 1,000 1,000 106953

SR Diagnostic Tool First 20 20 111301

Planning Partner: NEPA Mode: Highway County: PikeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

NEPA 4-0 Highway Line Item Reconstruct First 3,847 3,847 73295

NEPA 4-0 Highway Line Item Reconstruct Second 5,028 5,028 73295

NEPA 4-0 Highway Line Item Reconstruct Third 6,338 6,338 73295

NEPA 4-0 Project Delivery Administration First 100 100 86916

Pike Bridge Preservation Line Item Bridge Preservation Activities First 200 200 106027

6 Milford to Matamoras Bet Restoration First 4,500 4,500 57765

6 MEC Phase 14 - Completing the ConnectionTransportation Enhancement First 515 515 107968

447 SR 447 Slide Restoration Second 403 1,500 1,903 102029

590 SR 590 Safety Improvements Safety Improvement Second 350 350 101981

590 Group 4-15-ST 9 Resurface Third 2,200 2,200 101992

590 Group 4-18-ST 3 Resurface Third 1,200 1,200 102070

739 SR 739 Should / Widening Safety Improvement First 4,000 4,000 94686

1005 Group 4-17-ST 8 Resurface Third 1,200 1,200 67229

1005 Group 4-18-ST 9 Resurface Third 1,200 1,200 102077

2001 Milford - Bushkill # 5 Surface Treatment First 500 500 70038

2001 Milford - Bushkill # 5 Surface Treatment Second 6,000 6,000 70038

2002 SR 2002 Slide Restoration First 1,000 1,000 96806

2002 Group 4-17-ST 3 Resurface Third 1,200 1,200 102017

4006 Group 4-16-ST 9 Restoration Third 1,200 1,200 102006

Planning Partner: NEPA Mode: Bridge County: PikeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

NEPA 4-0 Bridge Review Bridge Rehabilitation First 100 100 84386

6 SR 6 over Wallenpaupack Creek and PPand L FlumeBridge Deck Rehabilitation First 300 4,300 4,600 68758

Page 108: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 84 of 259August 16, 2018

Planning Partner: NEPA Mode: Bridge County: PikeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 SR 6 over Wallenpaupack Creek and PPand L FlumeBridge Deck Rehabilitation Second 100 100 68758

6 SR 6 over Sawkill Creek Bridge Replacement Second 300 1,000 1,300 68790

6 SR 6 over Vandermark Creek Replace/Rehab First 300 300 600 68801

6 SR 6 over Vandermark Creek Replace/Rehab Second 1,200 1,200 68801

6 SR 6 over Delaware River Replace/Rehab First 300 2,852 3,152 89017

6 SR 6 over Delaware River Replace/Rehab Second 1,648 1,648 89017

209 SR 209 over Sawkill Creek Replace/Rehab First 350 50 2,735 3,135 68813

390 SR 390 over Bridge Creek Replace/Rehab First 350 375 725 68829

390 Fairview Outlet Bridge Bridge Rehabilitation First 920 920 68833

390 SR 390 over outlet Promised Land Lake Replace/Rehab First 300 750 1,050 94304

402 SR 402 over inlet to Pecks Pond Replace/Rehab Second 300 300 67511

402 SR 402 over inlet to Pecks Pond Replace/Rehab Third 900 900 67511

402 SR 402 over Shohola Creek Bridge Replacement Second 300 300 68837

402 SR 402 over Shohola Creek Bridge Replacement Third 1,500 1,500 68837

434 SR 434 over Branch Ballard Creek Bridge Replacement Second 300 300 68843

434 SR 434 over Branch Ballard Creek Bridge Replacement Third 500 500 68843

507 SR 507 over Tributary to Lake Wallenpaupack 1Replace/Rehab First 300 700 1,000 9379

507 SR 507 over Tributary to Lake Wallenpaupack 1Replace/Rehab Second 300 300 9379

507 SR 507 over Tributary to Lake Wallenpaupack 2Bridge Replacement Second 300 750 1,050 9422

507 Pike County SD Structures Bridge Rehabilitation Second 500 500 107244

507 Pike County SD Structures Bridge Rehabilitation Third 3,000 3,000 107244

590 SR 590 Pipes Bridge Replacement First 300 1,250 1,550 57769

590 SR 590 Pipes Bridge Replacement Second 2,250 2,250 57769

1006 SR 1006 over Shohola Creek Replace/Rehab First 300 300 9411

1006 SR 1006 over Shohola Creek Replace/Rehab Second 4,000 4,000 9411

1014 SR 1014 over Westcolang Creek Replace/Rehab First 300 300 68869

1014 SR 1014 over Westcolang Creek Replace/Rehab Second 850 850 68869

2001 SR 2001 over Dingmans Creek Bridge Replacement Second 300 300 67506

2001 SR 2001 over Dingmans Creek Bridge Replacement Third 1,500 1,500 67506

2004 SR 2004 over Little Bushkill Creek Bridge Preservation Activities First 583 583 85737

3001 SR 3001 over East Branch of Wallenpaupack CreekBridge Replacement First 300 300 68878

3001 SR 3001 over East Branch of Wallenpaupack CreekBridge Replacement Second 1,500 1,500 68878

3001 SR 3001 over East Branch of Wallenpaupack CreekBridge Replacement Third 1,300 1,300 68878

3012 SR 3012 over Wallenpaupack Creek Replace/Rehab First 300 300 79548

3012 SR 3012 over Wallenpaupack Creek Replace/Rehab Second 2,000 2,000 79548

Page 109: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 85 of 259August 16, 2018

Planning Partner: NEPA Mode: Bridge County: PikeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4003 SR 4003 over Masthope Creek Bridge Replacement Second 300 800 1,100 9343

4003 SR 4003 over Masthope Creek Bridge Replacement Third 200 200 9343

4004 SR 4004 over Billings Creek Bridge Rehabilitation Second 300 300 9354

4004 SR 4004 over Billings Creek Bridge Rehabilitation Third 2,000 2,000 9354

4004 SR 4004 over Outlet to Fairview Lake Bridge Replacement Third 300 1,200 1,500 68893

7206 T-301 over Little Bushkill Creek Replace/Rehab First 350 300 650 85707

7206 T-301 over Little Bushkill Creek Replace/Rehab Second 1,500 1,500 85707

Planning Partner: NEPA Mode: Highway County: SchuylkillTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Tidewood Industrial Park Access Road Add Lane First 42 897 939 107578

Delano Industrial Park Access Rd New Roadway First 15 325 341 107676

Reading BM&N RR Yield Signs Signing First 10 10 111133

61 SR61/209 Intersection Safety Improvement First 20 442 2,930 3,391 72466

61 SR 2014-PSU Restoration Restoration First 1,000 1,000 91112

61 SR 2014-PSU Restoration Restoration Second 1,000 2,000 500 500 4,000 91112

61 SR 2014-PSU Restoration Restoration Third 6,250 6,250 91112

61 St.Clair to Frackville Reconstruction Reconstruct First 5,000 1,900 4,000 5,611 16,511 96470

61 St.Clair to Frackville Reconstruction Reconstruct Second 28,719 28,719 96470

61 St.Clair to Frackville Reconstruction Reconstruct Third 25,669 25,669 96470

61 Schuylkill Haven-St. Clair Restoration Resurface Second 4,000 4,750 1,267 10,017 96565

61 Schuylkill Haven-St. Clair Restoration Resurface Third 317 1,000 45,668 46,985 96565

309 PA 309 - McAdoo Resurface First 1,568 1,568 96484

309 309 Resurface-Ben Titus Road North Resurface First 200 200 50 2,000 2,450 109993

309 309 Resurface-Ben Titus Road North Resurface Second 7,004 7,004 109993

309 309 Resurface-Lofty Hill to McAdoo Resurface First 2,700 2,700 110103

443 Post & Cable Guide Rail Guiderail Improvement First 100 3,000 3,100 90318

443 MainSt SchuylkillHaven RR RR Warning Devices First 600 600 95262

901 NEPA High Friction Surface-2019 Safety Improvement First 350 350 110039

924 Gold Star HighwyResurface Resurface First 7,957 7,957 93710

1001 Non Composite Adjacent Box Beam Bridge Improvement First 215 215 107585

Planning Partner: NEPA Mode: Bridge County: SchuylkillTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

125 PA 125 /Swatara Creek Replace/Rehab First 500 400 61 56 2,087 3,104 91993

Page 110: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 86 of 259August 16, 2018

Planning Partner: NEPA Mode: Bridge County: SchuylkillTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

209 US 209 ovr Swatara Creek Replace/Rehab First 300 209 50 50 500 1,109 81682

209 US 209 ov Wabash Ck Arch Bridge Replacement First 35 35 99705

309 SR 309 o/Read/North/Cars Bridge Rehabilitation Second 896 615 61 307 2,500 4,379 91674

309 SR 309 o/Read/North/Cars Bridge Rehabilitation Third 3,372 3,372 91674

443 Columbia Street Arch Bridge Replace/Rehab First 600 63 500 3,354 4,516 85830

443 Columbia Street Arch Bridge Replace/Rehab Second 546 546 85830

443 PA 443 over Swatara Creek Replace/Rehab Second 788 800 100 100 5,000 6,788 85835

443 443 over Mill Creek Bridge Replacement First 450 400 40 50 750 1,690 109995

443 443 over Mill Creek Bridge Replacement Second 850 850 109995

901 PA 901 over Schuylkill Rr Bridge Replacement First 3,500 3,500 85828

924 PA 924 over SR 4030 RR & Creek Bridge Replacement First 14,500 14,500 85815

924 Main Blvd over Trib of Catawissa Crk (3) Bridge Rehabilitation Second 1,194 922 18 49 2,500 4,684 85817

924 Main Blvd over Trib of Catawissa Crk (3) Bridge Rehabilitation Third 984 984 85817

1001 SR 1001 over Mill Creek Bridge Replacement First 5 5 79118

1006 SR 1006 over W. Branch Sch Rvr Bridge Replacement First 5 5 79120

1011 SR 1011 o/Locust Creek Replace/Rehab Second 551 299 6 76 1,305 2,236 12704

1021 SR 1021 (Lincoln Drive) over Railroad Replace/Rehab First 500 500 200 200 1,600 3,000 85750

2003 SR 2003 (New Philadelphia Rd) ov Pine CkBridge Replacement First 1,150 1,150 89618

2009 Berne Drive over Red Creek Bridge Replace/Rehab First 250 200 10 50 800 1,310 94305

3005 Beckville Rd o'r WB Schuylkill River Bridge Replacement First 3,000 3,000 91997

4011 Pine Creek Bridge Bridge Replacement First 30 30 12713

4017 Honeymoon Trail Rd over Pine Creek Bridge Rehabilitation Second 400 300 31 62 2,750 3,542 85721

4022 Mahantango Creek Bridges Bridge Replacement First 40 40 12707

4026 Dutchtown Rd (SR 4026) over Mahanoy CkReplace/Rehab Second 600 430 6 12 1,880 2,929 85718

4026 Dutchtown Rd (SR 4026) over Mahanoy CkReplace/Rehab Third 780 780 85718

4042 Minersville Arch Bridge Replace/Rehab Second 700 600 100 100 3,444 4,944 12611

7233 Co. Br. 114 (Zimmerman Br) over L. L. Swatara Crk.Bridge Rehabilitation First 300 50 50 1,300 1,700 110329

Planning Partner: NEPA Mode: Transit County: SchuylkillTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

STS New Facility First 25,000 25,000 95301

Small Transit Vehicle (6) First 582 582 107146

Small Transit Vehicle (4) First 428 428 107147

Page 111: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 87 of 259August 16, 2018

Planning Partner: NEPA Mode: Transit County: SchuylkillTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

STS CNG Bus Purchase First 2,500 2,500 109132

Small Transit Vehicle (6) First 600 600 110803

(1) CNG Bus Purchase First 250 250 110804

Small Transit Vehicle (4) First 475 475 110805

(2) CNG Bus Purchase First 1,500 1,500 110817

Onboard Camera Update Sys First 106 106 111202

Planning Partner: North Central Mode: Highway County: CameronTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

120 Driftwood - Clinton Line Resurface Second 290 179 119 6,149 6,738 93334

120 Elk Co Lin/Empor Resurfac Resurface Third 200 200 93363

120 Stlhos Rn Rd to Trib Sinm Resurface Third 1,749 1,749 100500

120 Trib Sinmh to Drftwd Boro Resurface Third 464 464 100503

120 Driftwood Resurface Resurface Second 1,026 1,026 100506

120 SR 120 East Driftwood Slide Slides Correction First 258 11 11 279 110554

120 SR 120 East Driftwood Slide Slides Correction Second 2,898 2,898 110554

4004 Select Mill & Fill Resurfacing Resurface Third 750 750 102087

7205 T-330, Salt Run Bridge Removal First 35 30 10 10 75 160 95989

Planning Partner: North Central Mode: Bridge County: CameronTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

46 SR 46 over North Creek Bridge Improvement Second 380 380 85085

46 SR 46 over North Creek Bridge Improvement Third 298 67 67 1,179 1,611 85085

46 North Creek Bridge Bridge Improvement First 350 275 52 55 922 1,653 94693

120 2019 N. Central Bridge Preservation Bridge Preservation Activities First 25 15 2,530 2,570 4354

120 SR 120 ov W Creek Bridge Bridge Improvement Second 443 443 74082

120 SR 120 ov W Creek Bridge Bridge Improvement Third 269 65 65 3,153 3,552 74082

120 SR 120 over Mason Run Bridge Improvement Second 369 369 85056

120 SR 120 over Mason Run Bridge Improvement Third 269 65 65 1,075 1,474 85056

155 Portage Creek Bridge Improvement First 410 350 50 50 860 82190

155 Portage Creek Bridge Improvement Second 2,898 2,898 82190

2001 2021 Bridge Preservation Bridge Preservation Activities First 265 52 58 3,500 3,875 110331

4004 SR 4004 Driftwood Br Sinne. Br Bridge Improvement First 388 350 10 10 758 2676

4004 SR 4004 Driftwood Br Sinne. Br Bridge Improvement Second 1,739 1,739 2676

Planning Partner: North Central Mode: Highway County: Clearfield

Page 112: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 88 of 259August 16, 2018

Planning Partner: North Central Mode: Highway County: ClearfieldTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SD Bridge /Betterment Line Item Bridge Improvement First 832 832 84344

Local Retro's Bridge Improvement First 4,000 4,000 88619

Sandy Twp Industrial Drive New Roadway First 900 900 106745

Beaver Drive Walkway 2016 TAP Transportation Enhancement First 700 700 108120

Maintenance/Betterment Line Item Pavement Preservation First 12,000 12,000 109839

Cooper Rd, RR Warn Device RR Warning Devices First 50 50 110875

Cooper Rd, RR Warn Device RR Warning Devices Second 200 200 110875

53 PA 53 Philipsbrg-Kylertwn Resurface Third 3,375 3,375 100553

53 PA53 Irvona-Osceola Mills Resurface Second 4,484 4,484 100573

119 Jefferson Co Ln to US 219 Resurface Third 2,027 2,027 101269

153 Clfd. Congestion Imprv Safety Improvement First 672 672 93330

153 Clfd. Congestion Imprv Safety Improvement Second 304 615 615 1,806 3,340 93330

153 Clfd. Congestion Imprv Safety Improvement Third 5,807 5,807 93330

153 153 Sullivan Hill-Penfld Resurface Second 369 76 4,400 4,845 93341

153 Penfield North Resurface Resurface First 300 53 5,000 5,353 96271

153 153 Clovr Hill Rd to Clfd Resurface Third 575 575 100552

153 Brisbin SR 2007-W SR 2024 Resurface Second 3,493 3,493 101091

153 PA153 N to GlenRchy Hwy Resurface Third 1,100 1,100 101310

153 Front St. Betterment Restoration First 275 50 50 7,164 7,539 108139

219 Grampian Intersection Add Turning Lane Second 600 269 277 321 614 2,081 92695

219 Grampian Intersection Add Turning Lane Third 1,416 1,416 92695

219 Bells Landing to Grampian Resurface Third 330 330 93337

219 219 Gramp.-Chestnut Grov Resurface Third 2,609 2,609 101001

219 219 Dubois St-Jeffersn Co Resurface Third 2,934 2,934 101023

219 219 Falls Creek-Sandy Twp Resurface Second 1,267 1,267 101030

219 219 Burnside to Mahaffey Resurface Third 3,999 3,999 101092

219 Luthersburg to DuBois Resurface Third 4,306 4,306 101286

219 SR 219, Main St, RR Warn Devices RR Warning Devices First 250 250 110876

253 SR 253 Janesville-Ramey Resurface Second 1,781 1,781 100579

253 PA 253 Ramey-Houtzdale Resurface Second 1,350 1,350 100581

253 253 Allemans-Janesville Resurface Second 1,433 1,433 101048

Page 113: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 89 of 259August 16, 2018

Planning Partner: North Central Mode: Highway County: ClearfieldTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

255 SR 255 Sabula-Winterburn Resurface Third 250 200 100 100 1,841 2,491 93338

255 Penfield to County LIne Resurface Third 200 200 93340

255 SR 255 Penfield Resurface Resurface Third 1,200 1,200 101137

322 Philipsburg Add Center Ln Add Lane First 150 360 12,748 13,258 93329

322 SR322 Walker's Approach Safety Improvement First 76 76 93675

322 Minl Sprgs to Walker Appr Resurface Third 1,445 1,445 96258

322 322 Baretts Crve-Minrl Sp Resurface Third 1,996 1,996 101265

322 Turner Rd to Blue Ball Resurface Third 4,000 4,000 101297

453 SR 3007 to SR 2015 Resurf Resurface Second 500 500 96260

453 Blair Co Line to PA 253 Resurface Second 700 700 101053

729 PA 729 PA 969 to US 219 Resurface Second 725 725 100547

729 SR 729 Janesville-PA 969 Resurface Second 2,133 2,133 101059

879 879 Truck Stop-Shawville Resurface Third 400 400 93339

879 879 Grampian-Arnoldtwn Rd Resurface Second 500 500 100591

879 879Lecontes Mills-Keewayd Resurface Second 1,200 1,200 101005

879 SR 879 Clearfield to I-80 Resurface Third 2,300 2,300 101143

879 SR 879 Clearfield Bypass Resurface Third 2,500 2,500 101149

879 SR879 Shawville-Bald Hill Resurface Third 2,003 2,003 101160

1001 NC Bridge Planks Bridge Rehabilitation First 901 901 92420

1004 SR 1004 Woodland Rd Restoration First 50 100 50 3,500 3,700 96253

1011 1011 Kylertown-Karthaus Resurface Third 250 3,000 3,250 96254

1011 1011 Karthaus-Cameron Co Resurface Third 1,500 1,500 101011

1012 2012 Nw Milprt to SR 2023 Resurface Third 300 300 100542

2013 North Central Channel Beams Bridge Rehabilitation First 425 425 96558

3007 Glen Richey to PA 453 Resurface Second 550 550 96261

3016 3016 Cherry Crn Rd-PA 729 Resurface Third 244 1,850 2,094 96272

4014 Rockton to Dubois Resurface Third 250 250 100 150 5,250 6,000 93336

7222 T-566 over Clearfield Crk Bridge Removal First 75 40 10 10 150 285 95990

7226 T-206 Anderson Creek Bridge Removal First 75 40 10 10 100 235 3608

Planning Partner: North Central Mode: Bridge County: Clearfield

Page 114: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 90 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: ClearfieldTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

36 SR 36 over Wilson Run Bridge Replacement First 297 297 69431

36 SR 36 over Chest Creek Bridge Replacement First 300 300 72461

36 SR 36 over Snyder Run Bridge Replacement First 105 105 85131

36 SR 36 over Moss Run Bridge Improvement First 350 350 85134

36 SR 36 over Moss Run Bridge Improvement Second 377 87 87 1,194 1,745 85134

53 N. Central 2021 Br. Pres. Bridge Preservation Activities Third 811 811 69455

53 SR 0053 over Blue Run Bridge Improvement First 356 356 85071

53 SR 0053 over Blue Run Bridge Improvement Second 358 90 90 922 1,460 85071

53 SR 0053 over Hickory Run Bridge Improvement First 356 356 85072

53 SR 0053 over Hickory Run Bridge Improvement Second 388 90 90 922 1,490 85072

53 PA 53 ov Beaver Run Brdg Bridge Replacement Second 380 380 88627

53 PA 53 ov Beaver Run Brdg Bridge Replacement Third 269 65 65 1,384 1,783 88627

153 PA 153 Beaver Run Br. Bridge Improvement Second 443 443 3557

153 PA 153 Beaver Run Br. Bridge Improvement Third 269 65 65 1,315 1,714 3557

153 SR 153 ov Whiteside Run Bridge Improvement Second 317 317 85073

153 SR 153 ov Whiteside Run Bridge Improvement Third 269 65 65 1,384 1,783 85073

219 SR 219 over Lee Run Bridge Improvement Second 430 430 85077

219 SR 219 over Lee Run Bridge Improvement Third 979 979 85077

219 SR 219 Pentz Run Bridge Improvement Second 310 307 123 123 863 85080

219 SR 219 Pentz Run Bridge Improvement Third 1,305 1,305 85080

219 SR 0219 ov Trib Wolf Run Bridge Improvement Second 443 443 85081

219 SR 0219 ov Trib Wolf Run Bridge Improvement Third 326 65 65 1,075 1,532 85081

219 SR 219 over Martin Run Bridge Replacement First 337 337 85198

219 SR 219 over Trib. Susque Bridge Replacement First 683 683 85199

219 2019 NC Bridg Preserv, SR 219 Bridge Improvement First 25 50 25 2,581 2,681 85201

255 SR 255 ov Bennett Br. Brg Bridge Improvement Second 380 380 69475

255 SR 255 ov Bennett Br. Brg Bridge Improvement Third 349 67 67 3,153 3,637 69475

255 Heath Run Bridge Bridge Improvement Third 200 200 69479

255 SR 255 ov Br Heath Run Bridge Improvement Second 369 369 85084

255 SR 255 ov Br Heath Run Bridge Improvement Third 269 65 65 1,008 1,407 85084

322 SR 322 ov Br Roaring Run Bridge Improvement Second 310 369 123 123 925 69383

322 SR 322 ov Br Roaring Run Bridge Improvement Third 1,305 1,305 69383

410 SR 410 Stump Creek Bridge Bridge Improvement First 300 350 50 50 750 91543

410 SR 410 Stump Creek Bridge Bridge Improvement Second 869 869 91543

Page 115: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 91 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: ClearfieldTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

453 PA 453 Clearfield Ck. Replace/Rehab First 75 30 25 2,261 2,391 3568

729 Little Muddy Run Bridge Improvement First 352 275 50 50 727 93723

729 Little Muddy Run Bridge Improvement Second 1,449 1,449 93723

879 2018 Bridge Preserv, SR 879 Bridge Preservation Activities First 1,297 1,297 105933

1004 SR 1004 over Montgomery Run Bridge Replacement First 75 100 50 1,660 1,885 85091

1009 Emigh Run Bridge Bridge Improvement First 50 285 25 50 1,000 1,410 3279

1009 Emigh Run Bridge Bridge Improvement Second 650 650 3279

2021 Branch Moshannon Crk BOX Bridge Improvement First 75 53 52 350 530 3616

2023 SR 2023 over UNT to Little Clfd Creek Bridge Replacement First 15 10 10 1,017 1,052 85097

2039 SR 2039 over Browns Run BOX Bridge Improvement First 200 22 45 266 85101

2039 SR 2039 over Browns Run BOX Bridge Improvement Second 406 406 85101

2051 Moshannon Ck.Br. BOX Bridge Improvement First 200 200 56823

2051 Moshannon Ck.Br. BOX Bridge Improvement Second 406 406 56823

3001 SR 3001 ov Deer Rn BOX Bridge Replacement First 26 10 10 276 322 69470

3003 SR 3003 over Barrett Run Bridge Improvement Second 443 443 85117

3003 SR 3003 over Barrett Run Bridge Improvement Third 269 101 101 1,038 1,509 85117

3005 South Witmer Run Br Bridge Improvement First 325 284 52 52 1,890 2,602 83532

3005 South Witmer Run Br Bridge Improvement Second 711 711 83532

3014 North Camp Run Bridge Bridge Improvement First 350 76 96 521 83531

3014 North Camp Run Bridge Bridge Improvement Second 1,159 1,159 83531

3016 SR 3016 Campbell Run BOX Bridge Improvement First 200 40 36 388 663 91509

4010 Little Anderson Crk BOX Bridge Improvement First 195 27 55 250 527 91505

4013 SR 4013 ov Dresler Rn STA Bridge Improvement Second 317 317 85130

4013 SR 4013 ov Dresler Rn STA Bridge Improvement Third 336 67 79 831 1,313 85130

7217 T-420 over Curry Run Bridge Improvement Third 500 500 85525

7409 Good Street Bridge Bridge Improvement First 338 338 3286

7409 Good Street Bridge Bridge Improvement Second 358 60 90 1,230 1,737 3286

Planning Partner: North Central Mode: Highway County: ElkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

St Marys Airport Ind Park Access Rd Restoration First 523 523 109963

Stony Hill Rd, RR Warn Devices RR Warning Devices First 50 50 110879

Stony Hill Rd, RR Warn Devices RR Warning Devices Second 200 200 110879

120 St Marys to Elk Co Line Resurface Third 200 150 50 50 4,050 4,500 93368

219 Wilcox to McKean County Resurface Third 1,891 1,891 101097

Page 116: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 92 of 259August 16, 2018

Planning Partner: North Central Mode: Highway County: ElkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

255 Micale Rd to PA 948 Int Resurface Second 361 234 138 138 2,139 3,011 93352

255 St Marys to Johnsonburg Resurface First 4,441 4,441 101101

255 255 Clearfield Co-Rita Ln Resurface Third 4,325 4,325 101147

555 Weedville twd Benezette Resurface Third 1,950 1,950 101107

555 W. Benezette to Cameron Resurface Third 2,500 2,500 101110

949 Mahood Run twd Island Run Resurface Third 2,382 2,382 101115

949 W.Island Run to PA 948 Resurface Third 1,100 1,100 101123

1001 Glen Hazel Rd N. Section Resurface Third 675 675 96255

1001 Washington St to Glen Hzl Resurface Third 675 675 96262

1001 Glen Hazel Rd S. Section Resurface Third 600 600 96263

2004 Medix Run to Cameron Co Resurface Third 700 700 101142

3002 SR 3002/T307 Federal Forest Access Restoration First 1,996 1,996 109733

Planning Partner: North Central Mode: Bridge County: ElkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

120 Bridge over Trib Elk Cr. Bridge Improvement First 388 388 69080

120 Bridge over Trib Elk Cr. Bridge Improvement Second 358 90 90 922 1,460 69080

120 Bridge over Big Run Bridge Improvement Second 430 348 779 69085

120 Bridge over Big Run Bridge Improvement Third 65 65 1,344 1,474 69085

120 SR 120 Retaining Wall Bridge Rehabilitation First 50 52 155 515 771 110461

255 N. Central 2020 Br. Pres. Bridge Improvement Third 811 811 69371

255 SR 255 over Silver Run Bridge Replacement First 800 800 85153

255 Kersey Run Bridge Bridge Improvement First 15 150 50 1,910 2,125 88186

255 SR 255 over Powers Run Bridge Improvement First 388 388 109706

255 SR 255 over Powers Run Bridge Improvement Second 388 60 119 1,163 1,730 109706

555 Caledonia Run Bridge Improvement First 275 200 25 25 525 4024

555 Caledonia Run Bridge Improvement Second 1,343 1,343 4024

949 Maxwell Run Bridge Improvement First 350 350 89347

949 Maxwell Run Bridge Improvement Second 358 90 90 1,476 2,013 89347

1005 Trib to Elk Creek Bridge Improvement First 356 356 85158

1005 Trib to Elk Creek Bridge Improvement Second 358 90 90 1,163 1,700 85158

1009 East Branch of Clarion Rv Bridge Improvement Second 633 403 67 134 1,238 89982

1009 East Branch of Clarion Rv Bridge Improvement Third 3,461 3,461 89982

3005 2023 NC Bridge Preservation Bridge Improvement First 207 207 110672

Page 117: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 93 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: ElkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3005 2023 NC Bridge Preservation Bridge Improvement Second 2,319 2,319 110672

4001 SR 4001 Wingwalls Bridge Rehabilitation First 319 319 105889

7207 T-368 over W. Clarion Cre Bridge Improvement Third 500 500 85532

Planning Partner: North Central Mode: Transit County: ElkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

St. Marys - Canopy First 350 350 102487

Punxsy - Canopy First 350 350 102489

DUB Facility Renovations First 10,000 10,000 102545

Vehicle Replacement - HD First 7,200 7,200 107081

Planning Partner: North Central Mode: Highway County: JeffersonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Jeff Hwy/Bridge Line Item Bridge Preservation Activities First 199 199 68204

Jefferson DFB Line Item Bridge Replacement First 105 54 54 998 1,211 106463

South Park Street Crossing RR Warning Devices First 50 50 109387

South Park Street Crossing RR Warning Devices Second 150 150 109387

Mitchell Avenue Crossing RR Warning Devices First 250 250 110767

28 PA 28/US 322 Brookville Intersection Intersection Improvement First 4,795 4,795 26064

28 SR 28 Summerville South Safety Improvement Second 3,976 3,976 91389

28 PA28 Martini Rd. to US219 Resurface Third 1,350 1,350 100188

28 PA28 US 322-EaglesNest Rd Resurface Third 3,354 3,354 100216

36 PA 36/436 Int. Improve. Safety Improvement Third 2,969 2,969 75975

36 Punxsy Curb Ramps Improve Safety Improvement Second 972 972 88949

36 PA 36 Indiana Co to US119 Resurface Third 1,850 1,850 99712

36 PA 36 US119-Cemetery Hill Resurface Second 4,962 4,962 100229

36 PA 36 SR 3005 to US 322 Resurface Second 2,521 2,521 100255

36 SR 36 / Cloe Crossing RR Gates First 315 315 105549

36 PA 36 Brookville North PM Resurface First 3,739 3,739 106458

36 PA 36 Hudson PM Resurface First 3,993 3,993 106460

80 I-80 Brookville West Reconstruction Reconstruct Third 1,500 1,500 1,000 4,000 106029

80 I-80 Brookville East Reconstruction Reconstruct Third 1,500 1,500 1,000 4,000 106223

80 I-80 Reynoldsville Reconstruction Reconstruct Third 1,500 1,500 801 3,801 106225

Page 118: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 94 of 259August 16, 2018

Planning Partner: North Central Mode: Highway County: JeffersonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

119 Indiana Hill Bridge Bridge Removal First 300 300 74335

119 US 119 Big Run Curve Resurface Second 3,319 3,319 105973

119 US 119 Big Run Curve Resurface Third 9,106 9,106 105973

219 US 219 - SR 1008 to PA 28 Resurface First 1,633 1,633 100260

322 US 322 Rynoldsvile Signal Intersection Improvement Second 283 283 25993

322 Main/Pickering St. Sig. Existing Signal Improvement Second 283 283 99463

322 Main & Richrds St. Signal Intersection Improvement Second 283 283 99714

322 US 322 Segmnt 300-PA950 Resurface First 5,000 5,000 100226

322 US322 Clarion to Roseville Resurface First 354 354 100252

322 US322 Clarion to Roseville Resurface Second 1,335 1,335 100252

410 PA 410 Resurfacing Resurface First 2,000 2,000 110141

830 Falls Crk West Resurface Resurface Second 1,188 1,188 92620

949 PA 949 US 322 to PA 36 Resurface Second 2,051 2,051 91377

949 PA 949 PA 36 to Elk Cty Resurface Second 2,914 2,914 91392

3007 SR3007-SR 3005 to PA28 #2 Resurface First 1,000 1,000 91379

3031 SR3031 SR 3005-Belshazzar Resurface Second 2,000 2,000 100242

7216 T-385 Dobson Road Bridge Bridge Removal First 35 30 10 80 155 98132

9900 T-396 Seldom Seen Bridge Bridge Removal First 45 30 10 100 185 25944

Planning Partner: North Central Mode: Bridge County: JeffersonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Ugly Run Bridge Bridge Replacement First 26 31 10 491 558 109571

Local Retro Line Item Bridge Improvement First 1,000 1,000 109836

28 Simpson Run Bridge Bridge Replacement First 361 328 38 55 1,584 2,365 26100

28 Simpson Run Bridge Bridge Replacement Second 893 893 26100

28 Coder Bridge #2 Bridge Improvement First 318 328 646 26101

28 Coder Bridge #2 Bridge Improvement Second 15 15 1,049 1,079 26101

28 Thompson Run Bridge #1 Bridge Replacement First 4,456 4,456 105165

119 US 119 ov Br. of Stump Ck Bridge Replacement Second 1,095 1,095 26073

322 US 322 over Campbell Run Bridge Replacement Second 1,700 1,700 84828

830 Falls Creek Bridge #1 Bridge Replacement First 2,060 2,060 26146

949 949 NE of Clear Crk Brdg Bridge Replacement Third 1,806 1,806 83303

949 PA 949 over I-80 EB/WB Bridge Rehabilitation Third 3,800 3,800 99502

Page 119: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 95 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: JeffersonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

949 Jefferson Short Span Length Group BridgesBridge Rehabilitation First 618 637 93 82 3,337 4,767 106459

949 Jefferson Short Span Length Group BridgesBridge Rehabilitation Second 815 815 106459

1830 Mill Creek Bridge Bridge Replacement First 1,236 1,236 78127

2011 SR 2011 ov Trib Canoe Creek Bridge Improvement First 426 281 34 56 798 83322

2011 SR 2011 ov Trib Canoe Creek Bridge Improvement Second 1,079 1,079 83322

3003 SR 3003 over Redbank Cr. Bridge Rehabilitation Third 1,400 1,400 99498

3004 East Dora Bridge #1 Bridge Replacement First 1,061 1,061 74334

3007 SR 3007 over Beaver Run Bridge Replacement Second 2,000 2,000 78131

3033 SR 3033 over Redbank Cr. Bridge Preservation Activities Third 1,650 1,650 99464

3033 Brookville 2nd Street Br Bridge Rehabilitation First 2,884 2,884 105052

3039 Beech Hollow Bridge Bridge Replacement First 312 312 107616

4005 Richardsville Bridge Bridge Replacement First 3,090 3,090 26022

4005 SR 4005 Br. over I-80 EB Bridge Rehabilitation Second 2,393 2,393 26041

4005 SR 4005 Br. over I-80 EB Bridge Rehabilitation Third 1,972 1,972 26041

7205 T-357 over Mill Run Bridge Replacement Second 898 898 95887

7205 T-357 over Mill Run Bridge Replacement Third 1,262 1,262 95887

7408 Andrson Rd ovr Runawy Run Bridge Replacement Second 2,110 2,110 26059

9900 T-472 over North Fork Cr. Bridge Replacement Second 2,170 2,170 25959

Planning Partner: North Central Mode: Highway County: McKeanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Center Street RR Warn Device RR Warning Devices First 300 300 109569

Lewis Run Access Rd Improvements Restoration First 690 690 109863

WNYPA Corridor RR Warning Device RR Warning Devices First 200 200 111079

WNYPA Corridor RR Warning Device RR Warning Devices Second 1,300 1,300 111079

6 Kane Boro Reconstruct Reconstruct First 1,506 1,506 93354

6 Resurface PA 155-Mill St Resurface Third 500 500 101317

6 Port Allegany Betterment Restoration First 275 75 75 3,645 4,070 106371

46 Resurface US 6 to PA 646 Resurface First 264 27 55 502 848 101326

46 Resurface US 6 to PA 646 Resurface Second 4,000 4,000 101326

46 Kendall Crk to ByPass Resurface Third 800 800 101330

46 Kendall Ave BPRR Upgrade RR Warning Devices First 230 230 102727

59 US 219 to Smethport Resurface Second 2,471 2,471 93358

Page 120: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 96 of 259August 16, 2018

Planning Partner: North Central Mode: Highway County: McKeanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

219 Bradford Bypass Restoration First 219 219 4405

219 Bradford Bypass Restoration Second 8,115 8,115 4405

219 Elk Co. Line to Halsey Resurface Third 750 750 96266

219 Lntz Crnrs to Lfyette Twp Resurface Second 1,500 1,500 101346

346 Willow Creek to Vernon Ln Resurface Third 750 750 101331

346 Warren to Willow Crk Brdg Resurface Third 750 750 101333

346 US 219 to PA 446 Resurface Third 705 705 101349

346 SR 346/4009 Signal Improvements Existing Signal Improvement First 546 546 109873

346 SR 346/4009 Signal Improvements Existing Signal Improvement Second 464 116 116 6,063 6,759 109873

446 PA 46 to State Line Road Resurface Second 2,000 2,000 101336

4002 Owens Hwy RR Warning Dev RR Warning Devices First 175 175 102728

4005 High Street Resurfacing Resurface Second 500 500 93347

4005 Main Street II Resurface Resurface Second 500 500 93348

7203 T-437 Oswayo Creek Bridge Removal First 40 40 10 10 100 200 4383

Planning Partner: North Central Mode: Bridge County: McKeanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 SR 6 ov Kane Br of Marvin Bridge Replacement First 25 10 1,077 1,112 85212

6 SR 6 over Br. Marvin Crk Bridge Improvement Second 430 430 85254

6 SR 6 over Br. Marvin Crk Bridge Improvement Third 261 130 130 1,008 1,530 85254

46 Br Potato Crk Bridge Improvement First 75 266 36 52 935 1,363 81996

46 SR 46 Lost Run Bridge Bridge Improvement First 75 266 36 52 935 1,363 91526

46 Br. Potato Creek Bridge Bridge Improvement First 250 250 93719

46 Br. Potato Creek Bridge Bridge Improvement Second 418 60 90 1,150 1,717 93719

59 SR 59 over Warner Brook Bridge Replacement First 35 919 954 84098

59 Three Mile Run Bridge Bridge Replacement First 20 52 993 1,065 88639

66 SR 66 ov Wind Rn BOX Bridge Improvement First 20 371 391 85258

146 SR 146 ov Warner Brook BOX Bridge Improvement First 288 288 85214

146 SR 146 ov Warner Brook BOX Bridge Improvement Second 358 60 60 1,163 1,641 85214

146 SR 146 Red Mill Brook Br Bridge Improvement First 50 313 52 51 1,238 1,703 91527

155 SR 155 over Birch Run Bridge Replacement First 50 19 25 1,241 1,335 85216

246 SR 246 Baker Run Bridge Improvement First 300 76 46 421 81410

246 SR 246 Baker Run Bridge Improvement Second 1,449 1,449 81410

Page 121: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 97 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: McKeanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

246 SR 246 over Baker Run BOX Bridge Improvement First 50 39 26 266 382 85229

321 SR 321 over Five Mile Run Bridge Bridge Replacement First 52 52 936 1,039 85230

346 Windfall Run BOX Bridge Improvement First 200 53 53 285 591 81411

346 Gates Hollow Bridge Improvement First 325 325 85232

346 Gates Hollow Bridge Improvement Second 348 75 58 896 1,377 85232

346 Foster Brook BOX Bridge Improvement First 201 35 35 271 85261

346 Foster Brook BOX Bridge Improvement Second 406 406 85261

346 Bridge on Tram Hollow Run Bridge Improvement First 375 375 88628

346 Bridge on Tram Hollow Run Bridge Improvement Second 348 58 58 1,493 1,956 88628

346 Tram Hollow Run BOX Bridge Improvement First 200 42 28 285 555 88633

346 2020 NC Bridge Preservation Bridge Improvement First 52 52 1,000 1,103 110669

346 2022 NC Bridge Preservation Bridge Improvement First 110 73 73 852 1,109 110671

346 2022 NC Bridge Preservation Bridge Improvement Second 3,000 3,000 110671

446 SR 446 Canfield Creek Bridge Improvement Second 369 369 85236

446 SR 446 Canfield Creek Bridge Improvement Third 261 65 65 672 1,063 85236

446 SR 446 over Br. Allegheny Bridge Improvement Second 380 380 85264

446 SR 446 over Br. Allegheny Bridge Improvement Third 269 67 67 692 1,095 85264

646 Pennbrook Run Bridge 2 Bridge Improvement Second 443 443 4334

646 Pennbrook Run Bridge 2 Bridge Improvement Third 1,038 1,038 4334

1011 SR 1011 over Meeks Run Bridge Improvement First 388 58 58 309 813 85253

1011 SR 1011 over Meeks Run Bridge Improvement Second 1,004 1,004 85253

1011 SR 1011 over Fowler Run Bridge Improvement Second 492 492 85269

1011 SR 1011 over Fowler Run Bridge Improvement Third 391 65 65 1,344 1,866 85269

2001 SR 2001 over Smith Run Bridge Improvement Third 246 65 65 672 1,048 85241

2001 Five Mile Run BOX Bridge Improvement Second 317 51 67 435 93333

2001 Five Mile Run BOX Bridge Improvement Third 692 692 93333

3006 Kinzua Creek Bridge Bridge Improvement First 350 75 75 3,007 3,507 4460

3006 SR 3006 over Windfall Run Bridge Improvement Second 443 443 85250

3006 SR 3006 over Windfall Run Bridge Improvement Third 67 67 1,038 1,173 85250

3009 Kinzua Creek Bridge Bridge Replacement Second 570 349 67 67 1,054 4497

3009 Kinzua Creek Bridge Bridge Replacement Third 2,353 2,353 4497

4007 SR 4007 Toad Hollw STA Bridge Replacement First 125 74 52 1,576 1,826 85251

4013 SR 4013 Bolivar Run Bridge Improvement First 300 300 69304

4013 SR 4013 Bolivar Run Bridge Improvement Second 348 290 290 2,388 3,316 69304

Page 122: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 98 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: McKeanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

9900 Elm Street Bridge DB Bridge Improvement First 375 50 50 2,358 2,833 4435

Planning Partner: North Central Mode: Transit County: McKeanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Bradford Terminal First 4,400 4,400 106998

Planning Partner: North Central Mode: Highway County: PotterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 Fessenden Road to Mina Resurface Second 500 500 96267

6 Mina to Coudersport Resurface Second 500 500 96268

6 West Pike to Stockpile Resurface Second 1,455 1,455 96269

6 West Pike to Stockpile Resurface Third 800 800 96269

6 McKean Co to Fishing Crk Resurface First 236 502 738 100555

6 McKean Co to Fishing Crk Resurface Second 1,000 1,000 100555

6 Fishing Crk toward Mina Resurface Second 500 500 100556

6 PA 44 to State Police Rd Resurface Second 800 800 100566

6 PA 44 to State Police Rd Resurface Third 1,227 1,227 100566

6 Nine Mile to Leek Hollow Resurface Second 642 642 100569

6 Nine Mile to Leek Hollow Resurface Third 500 500 100569

44 PA 49 to Coneville Resurface Second 1,800 1,800 100577

44 Coudersport twd PA 49 Resurface Second 500 500 101046

49 SR 49 Route 44 to Gold Resurface Second 4,013 4,013 93351

49 Gold to Mills Resurfacing Resurface Second 2,365 2,365 100587

244 Adrw Set/Gensee Resurfac Resurface Second 307 253 123 123 1,806 2,613 93353

244 Coneville twd Woodville Resurface Second 500 500 101006

244 Woodville to Andrews Stl Resurface Second 633 633 101012

449 PA 49 to New York Resurface Second 500 500 101040

449 US 6 to PA 49 Resurface Second 500 500 101049

872 Wharton to SR 3003 Resurface Second 500 500 101032

7204 T-300 over Oswayo Creek, Bridge Removal First 40 40 10 10 75 175 85535

Planning Partner: North Central Mode: Bridge County: PotterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 SR 6 Lehman Run Bridge Replacement First 52 52 1,061 1,164 85487

6 2020 Bridge Preservation Bridge Preservation Activities First 265 28 35 2,768 3,095 110330

Page 123: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 99 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: PotterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

44 SR 44 over Steer Brook Bridge Improvement First 125 55 52 983 1,214 85307

44 SR 44 over Campbell Run Bridge Improvement First 311 200 50 50 611 85308

44 SR 44 over Campbell Run Bridge Improvement Second 1,159 1,159 85308

49 Trib to Genesee River Bridge Improvement First 385 385 84099

49 Trib to Genesee River Bridge Improvement Second 358 90 90 922 1,460 84099

49 SR 49 over Steer Run Bridge Improvement Third 489 415 69 69 1,426 2,469 85310

49 SR 49 over Ludington Rn Bridge Improvement Third 326 277 138 69 1,426 2,236 85489

144 SR 0144 ov So.Side Crk BOX Bridge Improvement First 200 25 25 285 535 85315

144 SR 144 Ives Run Bridge Bridge Improvement First 50 275 25 25 925 1,300 91623

244 2020 Bridge Preservation ROW Bridge Improvement First 35 35 110847

449 SR 449 over Pine Creek Bridge Replacement First 150 55 52 1,160 1,416 85501

449 SR 449 ov Trib Genesee Bridge Replacement First 150 55 52 925 1,181 85502

449 SR 449 over Pine Creek Bridge Improvement First 50 285 25 25 814 1,199 105915

872 SR 0872 over Woods Run Bridge Improvement First 125 55 52 937 1,168 85324

1001 Cushing Creek II Bridge Improvement First 312 55 55 1,182 1,603 82191

1003 SR 1003 ov Calif Crk BOX Bridge Replacement First 25 25 25 260 335 85387

1005 Phoenix Run Bridge Bridge Improvement Second 369 369 69438

1005 Phoenix Run Bridge Bridge Improvement Third 269 65 65 1,008 1,407 69438

1011 SR 1011 over Genesee Riv Bridge Improvement First 350 55 55 1,246 1,705 4902

1022 SR 1022 over Pine Creek Bridge Improvement First 350 350 78637

1022 SR 1022 over Pine Creek Bridge Improvement Second 300 75 75 2,659 3,109 78637

1022 SR 1022 ov S. Br Pine Crk Bridge Improvement Third 652 346 69 1,426 2,493 78639

3001 2020 Bridge Preservation ROW Bridge Improvement First 35 35 110848

3002 SR 3002 Cowley Run Bridge Bridge Improvement Second 369 369 83526

3002 SR 3002 Cowley Run Bridge Bridge Improvement Third 269 65 65 2,309 2,708 83526

3007 SR 3007 ov Card Creek BOX Bridge Replacement Third 489 69 69 713 1,341 85396

4001 2018 N. Central Br. Pres. Bridge Improvement Third 811 811 83035

4003 SR 4003 Wokeley Hollow Br Bridge Improvement Second 369 369 4751

4003 SR 4003 Wokeley Hollow Br Bridge Improvement Third 65 65 1,008 1,138 4751

4003 SR 4003 Bradley Run Bridge Improvement Third 457 415 104 104 1,426 2,505 83051

4009 Baker Creek BOX Bridge Improvement First 233 47 45 260 585 4913

4013 SR 4013 over Allegheny Rv Bridge Improvement First 50 325 50 25 2,391 2,841 85399

Page 124: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 100 of 259August 16, 2018

Planning Partner: North Central Mode: Bridge County: PotterTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4016 SR 4016 over Orebed Crk BOX Bridge Improvement First 25 35 25 382 467 85400

4025 Brizzie Hollow Run Bridge Improvement First 325 325 83527

4025 Brizzie Hollow Run Bridge Improvement Second 348 87 87 896 1,417 83527

Planning Partner: Northern Tier Mode: Highway County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SR220 Major Guide Signs Signing Third 100 100 99158

NTIER Cable Guide Rail Upgrade Guiderail Improvement First 30 30 106267

NTIER Cable Guide Rail Upgrade Guiderail Improvement Second 30 35 35 900 1,000 106267

18-19RPM Contract NTIER Reflective Pavement Markers First 30 30 106270

19-20RPM Contract NTIER Reflective Pavement Markers First 30 30 106271

Districtwide Long Term UBE Guiderail Improvement First 200 200 106885

20-21 RPM Contract NTIER Reflective Pavement Markers First 30 30 110324

21-22RPM Contract NTIER Reflective Pavement Markers First 30 30 110325

6 Lime Hill Rd to Wyalusing Resurface First 545 545 97681

6 From Main St to Sugar Crk Resurface First 10 10 99148

6 River Rd to Tracy Rd Resurface First 10 10 99311

6 Township Rd to Old Mills Rd Safety Improvement First 25 3,000 3,025 99418

6 Township Rd to Old Mills Rd Safety Improvement Second 500 500 99418

6 Old Mills Rd to Main St Reconstruct Second 125 50 175 101052

6 Old Mills Rd to Main St Reconstruct Third 650 11,000 11,650 101052

6 SR6 & SR 187 Intersection Intersection Improvement First 125 100 200 200 1,305 1,930 101100

6 SR6 & SR 187 Intersection Intersection Improvement Second 3,215 3,215 101100

6 SR6 Reconstruction Towanda Borough Reconstruct Third 1,250 1,000 1,500 500 13,606 17,856 110394

6 SR6 from Tracey Rd to Rummerfield Rd Resurface Third 50 3,000 3,050 110406

14 Windfall Rd to Tennessee Gas Rd Restoration First 100 50 3,500 3,650 99156

154 South Ave to SR 414 Resurface First 10 10 102991

187 SR 467 to Taylor Hill Rd Resurface First 10 10 98975

199 NFSR to Chemung Rv. Resurface First 10 10 98979

199 Satterlee Street to NY State Line Reconstruct First 2,000 1,862 14,000 17,862 99157

220 SR199 to NY State Line NB Resurface First 20 20 5319

220 SR199 to NY State Line NB Resurface Second 3,500 3,500 5319

220 Monroeton to Dunn Road Resurface First 20 20 99421

Page 125: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 101 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Highway County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

220 SR199 to NY State Line SB Resurface First 20 20 101109

220 SR199 to NY State Line SB Resurface Second 5,058 5,058 101109

414 Little St to McFadden Rd Resurface First 10 10 98980

414 Towanda Creek to SR 220 Resurface First 20 20 99349

1043 James St to Hornbrook Rd Resurface First 1,070 1,070 99011

1043 Potter Rd to NY Line Resurface Second 20 20 99018

2038 SR 2025 to US 6 Resurface First 450 450 97725

3003 Lycoming Co to Grover Rd Resurface First 50 50 97726

3009 PA 414 to Old Plank Rd Resurface First 150 150 97693

3012 SR 14 to SR 154 Resurface First 125 125 99084

3020 State St to Bridge St Reconstruct Second 200 100 100 1,200 1,600 99146

3020 State St to Bridge St Reconstruct Third 3,200 3,200 99146

4017 SR 6 to Springfield Rd Resurface First 1,000 1,000 106166

4017 SR 6 to Springfield Rd Resurface Second 317 317 106166

4022 SR4022 ov US220 Safety Improvement First 80 80 99076

4022 SR4022 ov US220 Safety Improvement Second 20 20 40 99076

4022 SR4022 ov US220 Safety Improvement Third 2,365 2,365 99076

Planning Partner: Northern Tier Mode: Bridge County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-553 ov Wallace Run Bridge Replacement First 100 20 400 520 57557

T-105 over Cayuta Creek Bridge Replacement First 2,556 2,556 88852

T-762 ov Seeley Creek #38 Bridge Rehabilitation First 59 100 5 10 1,800 1,974 102862

Group Non-composite Deck Bridge Deck Replacement First 200 100 1,456 1,756 106247

Group Non-composite Deck Bridge Deck Replacement Second 44 44 106247

6 Sugar Creek to Gulf Rd Resurface First 5,978 5,978 87973

6 Brdfrd Preserv Bridge Preservation Activities First 543 543 97579

6 SR 6 ov Mill Creek Bridge Rehabilitation First 10 10 700 720 97585

14 SR 14 over Tannery Creek Bridge Improvement First 25 20 30 1,013 1,088 88915

14 SR 14 over Tb South Creek #1 Bridge Improvement First 20 20 30 900 970 91435

14 SR 14 over Tb South Creek #2 Bridge Improvement First 20 20 30 450 520 94631

14 SR 14 over Tb South Creek #2 Bridge Improvement Second 450 450 94631

187 SR187ovTribWappasening Cr Bridge Replacement First 1,581 1,581 79243

187 SR 187 ov Tr Wysox Cr Bridge Improvement First 60 20 20 20 120 97621

Page 126: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 102 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

187 SR 187 ov Tr Wysox Cr Bridge Improvement Second 400 400 97621

187 SR 187 over Parks Creek Bridge Improvement First 80 25 20 20 145 97628

187 SR 187 over Parks Creek Bridge Improvement Second 1,500 1,500 97628

187 PA187ovTbSugarCrk Bridge Improvement First 25 20 20 700 765 98916

187 SR187 over Wysox Creek Bridge Improvement First 80 25 20 20 145 99278

187 SR187 over Wysox Creek Bridge Improvement Second 1,500 1,500 99278

220 SR 220 over Cash Creek Bridge Replacement First 339 339 96677

220 SR 220 over Beaver Run Bridge Improvement First 20 10 20 10 200 260 110157

514 SR 514 ov Tb Sugar Creek Bridge Improvement First 30 20 20 20 350 440 89728

514 SR 514 ov Tb Sugar Creek Bridge Improvement Second 350 350 89728

1011 SR 1011 ov Ross Creek Bridge Improvement First 50 10 10 70 89750

1011 SR 1011 ov Ross Creek Bridge Improvement Second 20 10 150 180 89750

1012 SR 1012 over Trib to Cold Creek Bridge Replacement First 50 50 110238

1012 SR 1012 over Trib to Cold Creek Bridge Replacement Second 10 20 20 150 200 110238

1021 SR1021 ov Rummerfield Crk Bridge Replacement Second 252 100 20 20 523 915 98534

1021 SR1021 ov Rummerfield Crk Bridge Replacement Third 523 523 98534

1022 SR 1022 over North Branch Susquehanna RiverBridge Preservation Activities Second 20 5 25 110163

1022 SR 1022 over North Branch Susquehanna RiverBridge Preservation Activities Third 1,000 1,000 110163

1023 SR 1023 over South Creek Bridge Rehabilitation Second 64 10 20 20 114 5142

1023 SR 1023 over South Creek Bridge Rehabilitation Third 500 500 5142

1029 SR 1029 over Pond Hill Run Bridge Improvement Second 74 20 20 20 134 110161

1029 SR 1029 over Pond Hill Run Bridge Improvement Third 1,345 1,345 110161

1029 SR 1029 over Bullards Creek Bridge Replacement First 50 50 110241

1029 SR 1029 over Bullards Creek Bridge Replacement Second 10 20 20 150 200 110241

1040 SR1040ovPrinceHollowRun Bridge Rehabilitation First 25 10 20 20 75 99358

1041 SR 1041 ov Susq Riv Bridge Painting Third 2,500 2,500 97635

1043 SR1043ovSpauldingsCreek Bridge Rehabilitation Second 20 20 99142

1043 SR1043ovSpauldingsCreek Bridge Rehabilitation Third 10 700 710 99142

1043 SR 1043 over Tributary to Susquehanna RiverBridge Replacement Second 50 50 110272

1043 SR 1043 over Tributary to Susquehanna RiverBridge Replacement Third 10 20 20 160 210 110272

1046 SR1046 ov Tb Bullards Crk Bridge Replacement First 80 80 89905

1049 SR 1049 over Cold Brook Bridge Replacement First 40 20 20 150 230 5241

1049 SR 1049 over Trib Pendleton Crk Bridge Rehabilitation Second 74 20 20 20 134 5289

1049 SR 1049 over Trib Pendleton Crk Bridge Rehabilitation Third 1,863 1,863 5289

Page 127: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 103 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1049 SR1049ovPrinceHollowRun Bridge Rehabilitation Second 100 100 78772

1049 SR1049ovPrinceHollowRun Bridge Rehabilitation Third 20 20 20 2,152 2,212 78772

1049 SR1049ovRusselRun Bridge Rehabilitation Second 25 10 20 20 75 99063

1049 SR1049 ov Pendleton Crk Bridge Replacement First 30 25 53 108 102032

1049 SR 1049 over Branch of Pendleton Creek Bridge Rehabilitation Second 30 30 110264

1049 SR 1049 over Branch of Pendleton Creek Bridge Rehabilitation Third 10 20 20 250 300 110264

1055 SR 1055 Over Parks Creek Bridge Deck Rehabilitation First 10 10 78773

1055 SR 1055 Over Parks Creek Bridge Deck Rehabilitation Second 5 60 65 78773

1056 SR 1056 over Susquehanna River Bridge Preservation Activities Second 20 5 25 110164

1056 SR 1056 over Susquehanna River Bridge Preservation Activities Third 550 550 110164

1058 SR1058ovTbSatterleeCrk Bridge Replacement Second 50 10 20 20 75 175 98910

1058 SR1058ovTbSatterleeCrk Bridge Replacement Third 75 75 98910

1058 SR1058ovSackett Run Bridge Replacement Second 50 10 20 20 75 175 99360

1058 SR1058ovSackett Run Bridge Replacement Third 75 75 99360

2007 SR2007 ov Sugar Run Bridge Rehabilitation Second 10 5 60 75 78776

2009 SR 2009 over Trib to Foster Branch Bridge Replacement First 50 50 110242

2009 SR 2009 over Trib to Foster Branch Bridge Replacement Second 10 20 20 150 200 110242

2010 SR2010ovTbSugarRun Bridge Replacement First 80 25 20 1,652 1,777 5084

2010 Bradford Bridge Painting Bridge Painting First 1,233 1,233 106246

2018 SR 2018 ov Tb Susq River Bridge Replacement First 25 1,193 1,218 5243

3001 SR3001ovTowandaCreek Bridge Rehabilitation Second 10 5 15 78786

3001 SR3001ovTowandaCreek Bridge Rehabilitation Third 895 895 78786

3008 SR3008 over Towanda Creek Bridge Rehabilitation Third 1,852 1,852 87922

3009 SR3009ovSugarCreek Bridge Rehabilitation First 10 5 60 75 78794

3011 SR 3011 over Pine Run Bridge Replacement Third 50 10 20 20 150 250 110294

3013 SR 3013 ov Tb Towanda Ck Bridge Replacement First 20 20 20 150 210 68004

3016 SR 3016 over Mill Creek Bridge Replacement First 40 25 20 500 585 5135

3026 SR 3023 over Tributary to Sugar Creek Bridge Replacement Second 50 10 20 20 100 110253

3026 SR 3023 over Tributary to Sugar Creek Bridge Replacement Third 150 150 110253

4011 SR4011 ov Tomjack Creek Bridge Replacement First 45 20 20 20 75 180 106238

4011 SR4011 ov Tomjack Creek Bridge Replacement Second 75 75 106238

4014 SR4014 over West Branch Tomjack CreekBridge Replacement Second 50 10 20 20 100 110254

4014 SR4014 over West Branch Tomjack CreekBridge Replacement Third 150 150 110254

4014 SR 4014 over Seeley Creek Bridge Replacement Third 50 10 20 20 150 250 110295

Page 128: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 104 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4015 SR 4015 ov Tb Sugar Creek Bridge Replacement First 40 10 20 20 75 165 89906

4015 SR 4015 ov Tb Sugar Creek Bridge Replacement Second 75 75 89906

4016 SR 4016 Over South Creek Bridge Rehabilitation Second 10 5 60 75 78797

4020 SR 4020 ov Tb Tutelow Crk Bridge Replacement First 20 10 20 20 75 145 89907

4020 SR 4020 ov Tb Tutelow Crk Bridge Replacement Second 150 150 89907

4022 SR4022 ov Chemung River Bridge Rehabilitation First 100 100 76157

4022 SR4022 ov Chemung River Bridge Rehabilitation Second 50 20 20 4,461 4,551 76157

4022 SR4022 ov Chemung River Bridge Rehabilitation Third 1,000 1,000 76157

4022 SR4022 ov Chemung River Paint Bridge Painting Second 25 25 110252

4022 SR4022 ov Chemung River Paint Bridge Painting Third 2,400 2,400 110252

4027 SR 4027 over South Creek Bridge Rehabilitation Second 27 20 20 20 1,029 1,116 5137

4027 SR 4027 over Buck Creek Bridge Replacement First 80 80 5138

4027 SR 4027 over Buck Creek Bridge Replacement Second 20 20 20 900 960 5138

4027 SR4027 ov Bucks Cr Bridge Replacement First 80 80 97644

4027 SR4027 ov Bucks Cr Bridge Replacement Second 20 20 20 1,100 1,160 97644

4031 SR4031ovTbBeckwithCrk Bridge Replacement First 45 45 99309

4031 SR4031ovTbBeckwithCrk Bridge Replacement Second 10 20 20 150 200 99309

4034 SR 4034 over Roaring Run Bridge Replacement Third 50 20 20 20 150 260 5088

4034 SR 4034 over Trib to Roaring Run Bridge Replacement First 45 10 20 20 150 245 110185

9900 T-821 over Beckwith Creek Bridge Replacement Second 180 100 20 20 700 1,020 5166

9900 T-821 over Beckwith Creek Bridge Replacement Third 700 700 5166

Planning Partner: Northern Tier Mode: Transit County: BradfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Support Vehicles First 50 50 95522

Purchase Mini Buses First 85 85 95525

Purchase Mini Vans First 898 898 95526

Purchase Non Access MV's First 511 511 95527

Support Equipment First 100 100 95528

Spare Components First 100 100 95529

Towanda Transit Center First 50 50 95530

Buses 27 Passengers First 710 710 106425

Garage & Office Fac Impvt First 3,000 3,000 106426

Planning Partner: Northern Tier Mode: Highway County: Sullivan

Page 129: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 105 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Highway County: SullivanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

42 Spring St to US 220 Resurface First 10 10 99220

42 SR220 to Muncy Valley Road Resurface Second 150 100 3,500 3,750 99422

42 Lakewood Ave to Spring St Resurface First 75 75 1,104 1,254 99447

42 Lakewood Ave to Spring St Resurface Second 3,266 3,266 99447

42 SR42 N of SR220 to Lakewood Ave Resurface Third 50 5,200 5,250 110404

87 Scar Run to Loyalsock Crk Resurface First 10 10 99103

87 Splash Dam Rd to Scar Run Resurface First 200 200 99108

87 Lylsck Crk to Splsh Dm Rd Resurface First 200 200 99110

87 LycoCotoLoyalsockCrk Resurface Second 2,093 2,093 99159

87 WampoleRunRdtoSR220 Reconstruct Second 150 150 50 500 850 99166

87 WampoleRunRdtoSR220 Reconstruct Third 8,300 8,300 99166

87 Lambert Hill to L.Loyalsock Resurface Second 10 10 99376

154 SR 154 Soil Slide Repair Slides Correction First 1,500 1,500 96679

154 Shanerburg Rd to SR 3009 Resurface First 400 400 99382

154 Shanerburg Rd to SR 3009 Resurface Second 505 505 99382

154 US220 to Shanerburg Rd Resurface First 850 850 101276

220 Lycoming Co to Sonestown Reconstruct First 25 25 7030

220 Lycoming Co to Sonestown Reconstruct Second 2,645 2,645 7030

220 US 220 Climbing Lane Reconstruct First 700 650 650 2,000 93017

220 US 220 Climbing Lane Reconstruct Second 1,000 14,000 15,000 93017

220 SR 87 to Marsh Crk Resurface Second 10 10 99114

220 Maple Leaf to Bradford Co Resurface First 10 10 99117

220 OldRt220 to SR42 Resurface First 20 2,300 2,320 99423

220 SR 42 to Loyalsock Cr Surface Treatment Micro-surfacing Second 10 10 102938

Planning Partner: Northern Tier Mode: Bridge County: SullivanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-346 over Kings Creek Bridge Replacement Second 180 100 20 20 300 620 67743

T-346 over Kings Creek Bridge Replacement Third 500 500 67743

T-420 over Elk Creek Bridge Replacement Second 181 181 67746

T-420 over Elk Creek Bridge Replacement Third 419 419 67746

T-424 over Elk Creek Bridge Replacement First 500 500 67747

T-441 Cherry Township Bridge Replacement First 650 650 110239

T-410 over N Branch of Mehoopany CreekBridge Replacement Third 250 150 30 30 790 1,250 110435

Page 130: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 106 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: SullivanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

87 SR 87 over Dry Run Bridge Improvement First 40 10 50 7006

87 SR 87 over Dry Run Bridge Improvement Second 400 400 7006

87 SR 87 over Slab Run Bridge Improvement First 40 10 50 7007

87 SR 87 over Slab Run Bridge Improvement Second 400 400 7007

87 SR87 ov Kettle Creek Bridge Rehabilitation First 20 10 30 78938

87 SR87 ov Kettle Creek Bridge Rehabilitation Second 200 200 78938

87 SR 87 over Loyalsock Creek Gravel Bar Bridge Improvement First 15 5 10 200 230 107731

87 SR 87 over Little Loyalsock Creek Bridge Improvement First 115 115 110166

87 SR 87 over Little Loyalsock Creek Bridge Improvement Second 85 100 20 20 1,500 1,725 110166

87 SR 87 over Little Loyalsock Creek Bridge Improvement Third 700 700 110166

87 SR87 over Loyalsock Creek Bridge Improvement Third 1,091 1,091 110438

87 SR87 over Loyalsock Creek Bridge Improvement Third 2,200 2,200 110440

87 SR87 over Loyalsock Creek Bridge Improvement Third 1,091 1,091 110441

87 SR87 over Little Loyalsock Creek Bridge Improvement Third 1,092 1,092 110442

154 SR 154 ovr Hoagland Brnch Bridge Replacement First 700 700 6930

154 SR154 ov Kings Creek Bridge Replacement First 35 150 185 6963

220 US220 over Payne Run Bridge Replacement First 1,482 1,482 99105

220 SR220 over Marsh Creek Bridge Improvement First 150 100 20 20 290 99275

487 SR 487 over Birch Creek Bridge Replacement First 20 20 20 20 977 1,057 90005

487 SR 487 over Birch Creek Bridge Replacement Second 900 900 90005

1001 SR 1001 over Tribute to Loyalsock Creek Bridge Replacement Second 50 50 110267

1001 SR 1001 over Tribute to Loyalsock Creek Bridge Replacement Third 10 20 20 150 200 110267

1002 SR1002 over Branch of Little Loyalsock CreekBridge Replacement Second 50 10 20 20 100 110259

1002 SR1002 over Branch of Little Loyalsock CreekBridge Replacement Third 150 150 110259

1002 SR 1002 over Trib to Pigeon Creek Bridge Replacement Second 50 50 110275

1002 SR 1002 over Trib to Pigeon Creek Bridge Replacement Third 10 20 20 150 200 110275

1006 SR1006 over Trib to Birch Creek Bridge Improvement First 50 50 110243

1006 SR1006 over Trib to Birch Creek Bridge Improvement Second 10 20 20 150 200 110243

2002 SR2002 ov Long Brook Bridge Replacement First 25 150 175 97568

2002 SR2002 over Tributary to Muncy Creek Bridge Replacement Third 50 10 20 20 150 250 110293

2003 SR 2003 over Bloody Run Bridge Rehabilitation Second 40 10 20 20 71 161 110251

2003 SR 2003 over Bloody Run Bridge Rehabilitation Third 79 79 110251

3001 SR 3001 over Spring Run Bridge Improvement First 50 10 20 20 75 175 110188

3001 SR 3001 over Spring Run Bridge Improvement Second 75 75 110188

Page 131: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 107 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: SullivanTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4005 SR 4005 over Tributary to Hoagland BranchBridge Improvement First 50 10 20 20 100 110235

4005 SR 4005 over Tributary to Hoagland BranchBridge Improvement Second 150 150 110235

4006 SR4006ovPorterCreek Bridge Replacement First 10 20 20 150 200 99363

4020 SR4020 over Lick Creek Bridge Improvement First 50 50 110240

4020 SR4020 over Lick Creek Bridge Improvement Second 10 20 20 150 200 110240

9900 T-416 over Porter Creek Bridge Replacement Third 100 80 10 10 500 700 6936

Planning Partner: Northern Tier Mode: Highway County: SusquehannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

NTier D4 Hwy Reserve Reconstruct First 4,359 4,359 73298

NTier D4 Hwy Reserve Reconstruct Second 12,258 12,258 73298

NTier D4 Hwy Reserve Reconstruct Third 3,097 3,097 73298

Susquehanna/Wyoming Asset ManagementMiscellaneous Second 1,500 3,000 4,500 106280

Susquehanna/Wyoming Asset ManagementMiscellaneous Third 3,000 3,000 106280

Lanesboro Borough Streetscape Project Transportation Enhancement First 578 578 107969

11 SR 11 Shoulders / ELRS Safety Improvement First 1,400 1,400 94737

11 SR 11 Shoulders / ELRS Safety Improvement Second 1,251 1,251 94737

11 SR 11 Shoulders / ELRS Safety Improvement Third 805 805 94737

11 SR 11 Shoulder / ELRS Safety Improvement First 350 2,053 2,403 94740

11 SR 11 Shoulder / ELRS Safety Improvement Second 1,361 1,361 94740

11 SR 11 Shoulder / ELRS. Safety Improvement First 36 36 94741

11 SR 11 Shoulder / ELRS. Safety Improvement Third 1,806 1,806 94741

29 Group 4-17-ST 4 Restoration Third 6,000 6,000 102021

171 SR 171 Slide Restoration First 1,650 1,650 96811

171 Group 4-15-ST 4 Resurface First 500 500 101932

267 Group 4-16-ST 10 Resurface Third 5,000 5,000 102008

267 Northern Tier Paving 4-3-4 Resurface Third 8,000 8,000 106303

706 Bradford to Rush Restoration First 4,000 4,000 9745

706 Group 4-16-ST 4 Resurface Second 600 600 91222

706 Group 4-16-ST 4 Resurface Third 4,400 4,400 91222

Planning Partner: Northern Tier Mode: Bridge County: SusquehannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Carmalt Rd Bridge T-695 Replace/Rehab First 625 625 83013

11 SR 11 over East Branch Martins Creek Bridge Replacement First 50 50 9699

11 SR 11 over East Branch Martins Creek Bridge Replacement Second 750 750 9699

Page 132: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 108 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: SusquehannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 SR 11 over Tributary Salt Lick Creek Bridge Replacement First 50 50 67550

11 SR 11 over Tributary Salt Lick Creek Bridge Replacement Second 750 750 67550

11 SR 11 over Township Road Replace/Rehab First 250 250 96728

11 SR 11 over Township Road Replace/Rehab Second 1,000 1,000 96728

29 SR 29 over Branch of Wyalusing Creek Bridge Replacement First 75 75 9698

29 SR 29 over Branch of Wyalusing Creek Bridge Replacement Second 500 500 9698

29 SR 29 over Snake Creek Bridge Replacement First 350 350 9701

29 SR 29 over Snake Creek Bridge Replacement Second 750 750 9701

92 SR 92 over Hillborn Creek Bridge Replacement First 75 75 9704

92 SR 92 over Hillborn Creek Bridge Replacement Second 900 900 9704

92 SR 92 over Tributary Tunkhannock Creek Bridge Replacement First 75 75 85729

92 SR 92 over Tributary Tunkhannock Creek Bridge Replacement Second 650 650 85729

167 SR 167 over Martins Creek Replace/Rehab First 350 350 68936

167 SR 167 over Martins Creek Replace/Rehab Second 300 3,500 3,800 68936

167 SR 167 over Hop Bottom Creek Bridge Replacement First 350 350 107950

167 SR 167 over Hop Bottom Creek Bridge Replacement Second 300 1,500 1,800 107950

171 SR 171 over Canawacta Creek Bridge Replacement First 350 350 47034

171 SR 171 over Canawacta Creek Bridge Replacement Second 1,750 1,750 47034

171 SR 171 over Lackawanna River Replace/Rehab First 350 288 638 68940

171 SR 171 over Lackawanna River Replace/Rehab Second 1,750 1,750 68940

171 SR 171 over High Bridge Creek Replace/Rehab First 100 750 850 101043

247 SR 247 over Dundaff Creek Replace/Rehab First 300 1,150 1,450 68954

267 SR 267 over Middle Branch Wyalusing CreekBridge Replacement First 75 75 67523

267 SR 267 over Middle Branch Wyalusing CreekBridge Replacement Second 750 750 67523

267 SR 267 over Branch Little Meshoppen CreekBridge Replacement First 75 75 109879

267 SR 267 over Branch Little Meshoppen CreekBridge Replacement Third 2,000 2,000 109879

367 SR 367 over Branch Tuscarora Creek Bridge Rehabilitation First 300 300 9709

367 SR 367 over Branch Tuscarora Creek Bridge Rehabilitation Second 1,000 1,000 9709

367 SR 367 over Tuscarora Creek Bridge Rehabilitation First 900 900 9739

492 SR 492 over Little Butler Creek Replace/Rehab First 100 100 9723

492 SR 492 over Little Butler Creek Replace/Rehab Second 750 750 9723

547 SR 547 over Branch Butler Creek Bridge Replacement First 50 50 9726

547 SR 547 over Branch Butler Creek Bridge Replacement Second 750 750 9726

706 SR 706 over Branch Wyalusing Creek Replace/Rehab First 300 300 9668

706 SR 706 over Branch Wyalusing Creek Replace/Rehab Second 1,000 1,000 9668

Page 133: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 109 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: SusquehannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

706 SR 706 over Deuel Creek Bridge Replacement First 300 300 9720

706 SR 706 over Deuel Creek Bridge Replacement Second 750 750 9720

706 SR 706 over East Branch Wyalusing CreekReplace/Rehab First 350 300 650 67525

706 SR 706 over East Branch Wyalusing CreekReplace/Rehab Third 4,500 4,500 67525

706 SR 706 over Branch Wyalusing Creek 2 Replace/Rehab First 350 288 638 96730

706 SR 706 over Branch Wyalusing Creek 2 Replace/Rehab Second 900 900 96730

706 SR 706 over Snell Creek Bridge Replacement First 350 350 109880

706 SR 706 over Snell Creek Bridge Replacement Second 300 900 1,200 109880

858 SR 858 over Apolacon Creek Replace/Rehab First 1,150 1,150 96731

1007 SR 1007 over South Branch Canawacta CreekReplace/Rehab First 75 75 9631

1007 SR 1007 over South Branch Canawacta CreekReplace/Rehab Third 1,250 1,250 9631

1009 SR 1009 over Starrucca Creek Replace/Rehab First 380 3,000 3,380 85730

1010 SR 1010 over Lewis Creek Replace/Rehab First 350 1,300 1,650 9572

1016 Meylert Creek Bridge Bridge Rehabilitation First 800 800 9525

1016 New Milford RR Bridge Bridge Replacement First 4,000 4,000 9580

1018 SR 1018 over Tributary Dubois Creek Bridge Replacement First 350 350 85720

1018 SR 1018 over Tributary Dubois Creek Bridge Replacement Second 300 750 1,050 85720

1018 SR 1018 over Snake Creek Bridge Replacement Second 100 1,000 1,100 89698

1033 SR 1033 over Tributary Susquehanna RiverReplace/Rehab First 1,265 1,265 9707

1049 SR 1049 over Branch of Snake Creek Replace/Rehab First 100 750 850 100596

2002 SR 2002 over Outlet Lakeside Pond Bridge Replacement First 300 750 1,050 69010

2011 SR 2011 over Tributary to Meshoppen CreekBridge Replacement First 1,000 1,000 109881

2016 SR 2016 over Tributary E. Branch Tunkhannock CreekBridge Replacement First 75 75 69016

2016 SR 2016 over Tributary E. Branch Tunkhannock CreekBridge Replacement Third 750 750 69016

2021 SR 2021 over East Branch Tunkhannock CreekBridge Rehabilitation First 900 900 9658

2023 SR 2023 over Outlet Lewis Lake Bridge Rehabilitation First 100 100 109882

2023 SR 2023 over Outlet Lewis Lake Bridge Rehabilitation Second 450 450 109882

2036 SR 2036 over Rock Hill Creek Bridge Replacement First 50 50 9643

2036 SR 2036 over Rock Hill Creek Bridge Replacement Second 445 445 9643

2036 SR 2036 over Overflow Channel Replace/Rehab First 50 50 69023

2036 SR 2036 over Overflow Channel Replace/Rehab Second 750 750 69023

2043 SR 2043 over Millard Creek Bridge Rehabilitation First 75 75 85731

2043 SR 2043 over Millard Creek Bridge Rehabilitation Second 750 750 85731

2046 SR 2046 over West Branch Lackawanna RiverReplace/Rehab First 400 400 89711

Page 134: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 110 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: SusquehannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2067 SR 2067 over Tunkhannock Creek Bridge Replacement First 300 300 89699

2067 SR 2067 over Tunkhannock Creek Bridge Replacement Second 288 1,650 1,938 89699

2096 SR 2096 over Horton Creek Bridge Replacement First 75 75 9654

2096 SR 2096 over Horton Creek Bridge Replacement Second 1,000 1,000 9654

3004 SR 3004 over Riley Creek Replace/Rehab First 75 75 67548

3004 SR 3004 over Riley Creek Replace/Rehab Second 650 650 67548

3004 SR 3004 over Riley Creek Bridge Deck Replacement Third 1,000 1,000 79570

3029 SR 3029 over East Branch Wyalusing CreekBridge Replacement First 300 750 1,050 9462

3029 SR 3029 over East Branch Wyalusing CreekBridge Replacement Second 750 750 9462

3029 SR 3029 over Forest Lake Creek Replace/Rehab First 75 75 96735

3029 SR 3029 over Forest Lake Creek Replace/Rehab Third 2,500 2,500 96735

3029 SR 3029 over Tributary Forest Lake CreekReplace/Rehab First 288 750 1,038 100532

3037 SR 3037 over Wyalusing Creek Replace/Rehab First 350 350 96717

3037 SR 3037 over Wyalusing Creek Replace/Rehab Second 300 2,000 2,300 96717

4002 SR 4002 over Snake Creek Bridge Preservation Activities First 1,000 1,000 100452

4008 SR 4008 over Laurel Lake Creek Replace/Rehab First 350 350 56738

4008 SR 4008 over Laurel Lake Creek Replace/Rehab Second 300 1,800 2,100 56738

4008 SR 4008 over Silver Creek Bridge Rehabilitation First 350 350 67560

4008 SR 4008 over Silver Creek Bridge Rehabilitation Second 300 1,150 1,450 67560

7409 Church Street over Salt Lick Creek Bridge Deck Replacement First 200 200 65189

Planning Partner: Northern Tier Mode: Highway County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SR15 Guide Sign Upgrade Signing First 75 75 99164

Marsh Creek Greenway Transportation Enhancement First 932 932 105066

Marsh Creek Greenway Transportation Enhancement Third 7,000 7,000 105066

6 US6 ov Tb Charleston Crk Safety Improvement First 1,341 1,341 87923

6 Dantz Run to PA 287 Resurface First 7,000 7,000 99387

6 Sassafras Street to Old Mainesburg Rd Reconstruct First 475 150 625 99424

6 Sassafras Street to Old Mainesburg Rd Reconstruct Second 200 350 150 6,000 6,700 99424

6 Old Mainesburg Rd to Strange Rd Resurface First 575 169 744 99426

6 Old Mainesburg Rd to Strange Rd Resurface Second 273 500 455 11,000 12,227 99426

6 US6 & PA660 Intersection Intersection Improvement First 500 271 150 150 1,071 101292

6 US6 & PA660 Intersection Intersection Improvement Second 3,000 3,000 101292

6 SR6 from SR2018 to SR660 Resurface Third 50 4,055 4,105 110405

Page 135: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 111 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Highway County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

15 Tioga US 15 MCGR3 Guiderail Improvement First 1,399 1,399 99162

15 Tioga US 15 MCGR3 Guiderail Improvement Second 379 379 99162

15 Tioga River to SR2005 Resurface First 15 15 99427

15 Welcome Center to NY Line Resurface First 25 2,366 2,391 101335

15 Welcome Center to NY Line Resurface Second 2,044 2,044 101335

49 TaftAve to Barney Hill Rd Resurface First 25 25 99168

49 WaterTowerRdtoSR287 Reconstruct First 2,473 2,473 99169

49 East St to Renkin St Resurface First 10 10 99388

287 SR15 to Mitchell Creek Rd Restoration First 50 75 125 99170

287 Lake Nessmuk to Pearl St Resurface First 20 20 99389

287 SR15 to Tioga River Resurface Second 125 100 50 100 375 99428

287 SR15 to Tioga River Resurface Third 13,000 13,000 99428

287 CrookedCrktoBentleyCrk Resurface First 10 10 99429

287 Wilson Cr to Wellsboro Surface Treatment Micro-surfacing First 10 10 106728

349 Ladd Rd to SR 49 Reconstruct First 175 500 175 2,124 2,974 99171

349 Ladd Rd to SR 49 Reconstruct Second 4,876 4,876 99171

349 SR349 Sabinsville Slide Slides Correction Second 750 750 101278

414 SR 414 Slide Morris Twp Slides Correction First 2,500 2,500 87879

414 SR15 to SR2005 Reconstruct First 4,000 4,000 99173

2005 Covington to Cowan Rd Resurface Second 20 20 99191

2005 Main St to Decker St Reconstruct First 75 75 100 250 101285

2005 Main St to Decker St Reconstruct Second 4,500 4,500 101285

2005 SR 2005 Two-Way Left Turn Lane Safety Improvement Second 479 479 108985

2005 SR 2005 Two-Way Left Turn Lane Safety Improvement Third 200 250 216 2,250 2,916 108985

2023 Mt Top Rd to SR 2016 Resurface First 430 430 106164

Planning Partner: Northern Tier Mode: Bridge County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-706 ov Marvin Crk Bridge Replacement First 359 359 104093

T-723 Brookfield Twp RBR Bridge Replacement First 500 500 104651

6 US 6 ov Tb Charleston Crk #2 Bridge Replacement First 20 20 20 800 860 7248

6 US 6 over Marsh Creek Bridge Rehabilitation First 20 20 20 600 660 97669

6 US 6 over Long Run Bridge Rehabilitation First 10 20 10 250 290 97673

6 US 6 over Long Run Bridge Rehabilitation Second 250 250 97673

Page 136: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 112 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 US6 over Phoenix Run Bridge Replacement First 20 20 20 1,616 1,676 97674

6 US6 over Phoenix Run Bridge Replacement Second 140 140 97674

6 US6ovTb N Elk Run Bridge Replacement First 10 20 20 500 550 99107

6 US6ovTb N Elk Run Bridge Replacement Second 1,026 1,026 99107

6 US6 ov Morris Branch Bridge Rehabilitation First 1,629 1,629 102014

6 US6 ov Tioga River Bridge Preservation Activities Second 300 300 106243

15 Tioga SR 15 Bridge Preservation Bridge Preservation Activities First 995 995 108142

15 Tioga Bridge Contract Bridge Improvement First 20 5 517 542 110158

49 SR 49 over Cowanesque River Bridge Painting Second 20 5 25 7372

49 SR 49 over Cowanesque River Bridge Painting Third 1,967 1,967 7372

249 SR249 ov Trib. Crooked Crk Bridge Replacement First 20 20 20 250 310 106234

249 SR249 ov Trib. Crooked Crk Bridge Replacement Second 250 250 106234

287 SR 287 over Tioga River Bridge Rehabilitation Second 3,889 3,889 7039

414 SR414 ov W Mill Creek Bridge Replacement First 50 50 106235

414 SR414 ov W Mill Creek Bridge Replacement Second 10 20 20 700 750 106235

1001 SR1001 ov Lambs Creek Bridge Rehabilitation Second 100 45 145 97677

1001 SR1001 ov Lambs Creek Bridge Rehabilitation Third 200 20 2,820 3,040 97677

1004 SR 1004 over Bailey Creek Bridge Rehabilitation Third 40 10 20 20 150 240 110296

1013 SR1013 ov Hammond Creek Bridge Improvement First 40 10 20 20 90 99365

1013 SR1013 ov Hammond Creek Bridge Improvement Second 150 150 99365

1022 SR1022 ov Unnamed Tributary to Hammond CreekBridge Replacement First 20 150 170 97571

1022 SR1022 ov Allen Creek #2 Bridge Replacement First 10 20 20 150 200 99367

1028 SR 1028 over Smith Creek Bridge Replacement Second 50 50 110289

1028 SR 1028 over Smith Creek Bridge Replacement Third 10 20 20 150 200 110289

2011 SR2011 ov Blockhouse Crk Bridge Improvement First 50 50 99368

2011 SR2011 ov Blockhouse Crk Bridge Improvement Second 10 20 20 150 200 99368

2016 SR 2016 over Dyke Creek Bridge Replacement Second 50 10 20 20 100 7315

2016 SR 2016 over Dyke Creek Bridge Replacement Third 150 150 7315

2016 SR2016 ov Bellman Run Bridge Replacement Second 100 50 20 20 190 98539

2016 SR2016 ov Bellman Run Bridge Replacement Third 1,550 1,550 98539

2017 SR2017 ov Tioga River Bridge Rehabilitation Second 40 10 20 20 90 97680

2017 SR2017 ov Tioga River Bridge Rehabilitation Third 1,426 1,426 97680

2017 SR 2017 ov Taylor Run Bridge Rehabilitation Second 40 10 20 20 90 98465

2017 SR 2017 ov Taylor Run Bridge Rehabilitation Third 1,250 1,250 98465

Page 137: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 113 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2017 SR 2017 over West Mill Creek Bridge Replacement Second 50 50 110290

2017 SR 2017 over West Mill Creek Bridge Replacement Third 10 20 20 150 200 110290

2017 SR 2017 over Carpenter Run Bridge Replacement Third 50 10 20 20 150 250 110297

2020 SR2020 ov N Elk Run Bridge Rehabilitation Second 100 50 20 20 240 430 98470

2020 SR2020 ov N Elk Run Bridge Rehabilitation Third 660 660 98470

2021 SR 2021 over Tributary to South Creek Bridge Replacement Second 50 50 110269

2021 SR 2021 over Tributary to South Creek Bridge Replacement Third 10 20 20 150 200 110269

2022 SR 2022 over Gaffers Crk Bridge Rehabilitation First 60 60 78954

2022 SR2022 Ov Tb to Corey Crk Bridge Rehabilitation First 50 50 98478

2022 SR2022 Ov Tb to Corey Crk Bridge Rehabilitation Second 10 20 20 250 300 98478

2022 SR2022 ov Howland Crk Bridge Replacement Second 40 10 20 20 90 99369

2025 SR 2025 over Marvin Creek Bridge Replacement Third 50 10 20 20 150 250 110299

2027 SR2027 ov Canoe Camp Crk Bridge Rehabilitation Second 100 50 20 20 100 290 98514

2027 SR2027 ov Canoe Camp Crk Bridge Rehabilitation Third 800 800 98514

3007 SR 3007 ovr Tb Stoney Frk Bridge Replacement Second 50 10 20 20 75 175 7371

3007 SR 3007 ovr Tb Stoney Frk Bridge Replacement Third 155 155 7371

3007 SR3007ovWBrStoneyFork Bridge Replacement Second 50 10 20 20 75 175 99370

3007 SR3007ovWBrStoneyFork Bridge Replacement Third 155 155 99370

3009 SR3009ovCharlestonCreek Bridge Rehabilitation First 330 330 99377

3014 SR 3014 over Tributary to Zimmerman CreekBridge Replacement Third 50 10 20 20 150 250 110300

3016 SR3016ovTbZimmermanCrk Bridge Replacement Second 50 10 20 20 100 99412

3016 SR3016ovTbZimmermanCrk Bridge Replacement Third 250 250 99412

3023 SR3023ovHeiseRun #2 Bridge Improvement First 20 10 20 20 70 99413

3023 SR3023ovHeiseRun Bridge Improvement First 20 10 20 50 99414

3098 SR3098 ov Tb E Br Stony Fork Creek Bridge Replacement First 84 84 97573

4001 SR4001 ovTb Wattles Run Bridge Replacement First 10 25 20 75 130 97574

4001 SR4001 ovTb Wattles Run Bridge Replacement Second 75 75 97574

4001 SR4001 ov Potter Brook Bridge Improvement First 40 40 99415

4001 SR4001 ov Potter Brook Bridge Improvement Second 10 20 20 150 200 99415

4002 SR 4002 ovr Charleston Rn Bridge Improvement First 80 80 7327

4002 SR 4002 ovr Charleston Rn Bridge Improvement Second 20 200 20 1,100 1,340 7327

4007 SR4007 ov N Brook Bridge Replacement Second 180 100 20 20 400 720 97684

4007 SR4007 ov N Brook Bridge Replacement Third 613 613 97684

4012 SR 4012 over Mill Creek Bridge Replacement Third 50 10 20 20 150 250 110302

Page 138: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 114 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4017 SR 4017 over Buckley Hollow Run Bridge Replacement Second 50 50 7266

4017 SR 4017 over Buckley Hollow Run Bridge Replacement Third 10 20 20 150 200 7266

4021 SR4021 ov Cowanesque River Bridge Improvement First 120 50 20 20 210 106236

4021 SR4021 ov Cowanesque River Bridge Improvement Second 2,223 2,223 106236

4027 SR4027ovBrCummingsCrk Bridge Improvement First 40 40 99416

4027 SR4027ovBrCummingsCrk Bridge Improvement Second 10 20 20 150 200 99416

4027 SR4027ovTrbCrookedCrk Bridge Replacement First 10 20 20 150 200 102033

4027 SR4027 over Tributary to Cummings CreekBridge Improvement First 40 10 20 20 90 110236

4027 SR4027 over Tributary to Cummings CreekBridge Improvement Second 150 150 110236

4027 SR 4027 over Tributary to Crooked Creek Bridge Replacement Third 50 10 20 20 150 250 110304

4039 SR4039 ov Hills Creek Bridge Rehabilitation First 60 60 98515

9900 CO #6 ov Elkhorn Crk Bridge Replacement First 150 100 20 20 200 490 47714

9900 CO #6 ov Elkhorn Crk Bridge Replacement Second 400 400 47714

Planning Partner: Northern Tier Mode: Transit County: TiogaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

CNG Fuel Station Tioga Co First 500 500 106428

Planning Partner: Northern Tier Mode: Highway County: WyomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 Bridge Preservation Reconstruct First 400 400 107009

6 Bridge Preservation Reconstruct Second 1,000 1,000 107009

6 Bridge Preservation Reconstruct Third 3,000 3,000 107009

29 SR 29/3003 Sugar Hollow Safety Improvement First 250 1,306 1,556 94688

29 SR 29 Slide Repair Restoration First 1,000 1,000 97847

87 SR 87 Slide Restoration First 5,000 5,000 96909

87 SR 87 Slide Restoration Second 1,000 1,000 96909

87 Group 4-15-ST 12 Resurface Third 8,000 8,000 101998

1001 Group 4-16-ST 6 Resurface Third 5,000 5,000 91230

Planning Partner: Northern Tier Mode: Bridge County: WyomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 SR 6 over Branch of Tunkhannock Creek Bridge Replacement First 350 350 10222

6 SR 6 over Branch of Tunkhannock Creek Bridge Replacement Second 350 350 10222

6 SR 6 over Branch of Tunkhannock Creek Bridge Replacement Third 4,000 4,000 10222

6 SR 6 over South Branch of Tunkhannock CreekBridge Replacement First 403 350 500 1,253 10223

6 SR 6 over South Branch of Tunkhannock CreekBridge Replacement Second 2,000 2,000 10223

11 SR 11 over Branch of Tunkhannock CreekReplace/Rehab First 75 75 101154

Page 139: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 115 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: WyomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 SR 11 over Branch of Tunkhannock CreekReplace/Rehab Third 750 750 101154

29 SR 29 over Inlet Lake Carey Replace/Rehab First 300 1,150 1,450 10224

87 SR 87 over Little Mehoopany Creek Bridge Rehabilitation First 75 75 85773

87 SR 87 over Little Mehoopany Creek Bridge Rehabilitation Second 1,500 1,500 85773

92 SR 92 over Monroe Creek Replace/Rehab First 1,500 1,500 10174

92 SR 92 over Field Brook Bridge Replacement First 75 75 10181

92 SR 92 over Field Brook Bridge Replacement Third 2,000 2,000 10181

92 SR 92 over Fitch Creek Replace/Rehab First 300 300 10228

92 SR 92 over Fitch Creek Replace/Rehab Second 1,000 1,000 10228

92 SR 92 over Tributary of Susquehanna RiverBridge Rehabilitation First 200 1,000 1,200 10229

267 SR 267 over Meshoppen Creek Bridge Replacement First 350 350 10139

267 SR 267 over Meshoppen Creek Bridge Replacement Second 300 2,500 2,800 10139

307 SR 307 over Branch Osterhout Creek Bridge Replacement First 75 75 10232

307 SR 307 over Branch Osterhout Creek Bridge Replacement Second 500 500 10232

1015 SR 1015 over Fieldbrook Creek Bridge Rehabilitation First 350 350 10137

1015 SR 1015 over Fieldbrook Creek Bridge Rehabilitation Second 300 1,150 1,450 10137

2001 SR 2001 over South Run Creek C-3 Bridge Rehabilitation First 100 1,150 1,250 68808

2002 SR 2002 over Mill Creek Replace/Rehab First 50 50 33169

2002 SR 2002 over Mill Creek Replace/Rehab Second 900 900 33169

2007 SR 2007 over Tributary to Susquehanna RiverReplace/Rehab First 300 1,500 1,800 96750

2012 SR 2012 over Tunkhannock Creek Bridge Rehabilitation First 300 800 1,100 10138

2018 SR 2018 over Leonard Creek Replace/Rehab First 75 75 68841

2018 SR 2018 over Leonard Creek Replace/Rehab Second 650 650 68841

2021 SR 2021 over Beaver Creek Replace/Rehab First 750 750 96746

2031 SR 2031 over Outlet Lake Winola Replace/Rehab First 300 1,150 1,450 96756

3001 SR 3001 over Kasson Brook Bridge Rehabilitation First 75 75 101146

3001 SR 3001 over Kasson Brook Bridge Rehabilitation Third 1,250 1,250 101146

3002 SR 3002 over Bowmans Creek Bridge Rehabilitation First 300 300 10192

3002 SR 3002 over Bowmans Creek Bridge Rehabilitation Second 1,750 1,750 10192

3002 SR 3002 over Stone Run Replace/Rehab First 350 350 68874

3003 SR 3003 over Sugar Hollow Creek Replace/Rehab First 75 75 10162

3003 SR 3003 over Sugar Hollow Creek Replace/Rehab Third 2,000 2,000 10162

4002 SR 4002 over Little Mehoopany Creek Replace/Rehab First 300 1,150 1,450 96757

4002 SR 4002 over Little Mehoopany Creek Bridge Preservation Activities First 1,000 1,000 100469

Page 140: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 116 of 259August 16, 2018

Planning Partner: Northern Tier Mode: Bridge County: WyomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4006 SR 4006 over Little Tuscarora Creek Replace/Rehab First 350 350 96747

4006 SR 4006 over Little Tuscarora Creek Replace/Rehab Second 288 900 1,188 96747

7210 T-337 Dietz Mountain Road over Leonard CreekBridge Replacement First 200 200 64091

7210 T-337 Dietz Mountain Road over Leonard CreekBridge Replacement Third 2,250 2,250 64091

Planning Partner: Northwest Mode: Highway County: ClarionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Clarion DFB Line Item Bridge Replacement First 1,244 1,244 106522

36 PA 36 Resurfacing Resurface Second 1,790 1,790 91309

36 PA 36 Frills Corner North Resurface Second 2,567 2,567 100156

36 Leeper North PM Resurface First 2,600 2,600 106515

58 PA 58: AlumRock to Callensburg Resurface Third 1,639 1,639 99837

58 PA 58: Callensburg to Sligo Resurface Third 1,289 1,289 99839

58 PA 58 St. Petersburg West Resurface Third 2,590 2,590 100140

58 PA58 SligoEastResurfacing Resurface Second 847 847 100147

58 PA58 SligoEastResurfacing Resurface Third 1,496 1,496 100147

66 Limestone North PM Resurface First 2,237 2,237 99585

66 Arthurs 3R Restoration First 6,432 6,432 106569

68 PA 68/Dolby Street Intersection Intersection Improvement First 9,555 9,555 24890

68 PA 68/2007 Safety Improvements Intersection Improvement Second 3,843 3,843 99515

68 PA 68 Dolby Street to Trout Run Safety Improvement First 874 113 987 106502

68 PA 68 Dolby Street to Trout Run Safety Improvement Second 841 1,090 634 3,837 6,400 106502

68 PA 68 Dolby Street to Trout Run Safety Improvement Third 1,674 1,674 106502

68 East Brady N PM Resurface First 3,979 3,979 106517

68 PA 68 Trout Run to Boundary Street Safety Improvement Third 400 400 200 1,400 2,327 4,727 106627

80 I-80 Strattanville Reconstruction Reconstruct Second 748 748 106030

80 I-80 Strattanville Reconstruction Reconstruct Third 752 1,500 1,000 12,685 15,937 106030

322 US 322 Clarion Resurface Resurface Third 2,164 2,164 99659

338 Knox Resurfacing Resurface Second 1,790 1,790 91307

338 Knox North PM Resurface Second 1,790 1,790 99588

861 Leatherwood East PM Resurface First 4,024 4,024 99596

861 Leatherwood East PM Resurface Second 816 816 99596

861 New Bethlehem West PM Resurface Second 1,790 1,790 99597

1009 SR 1009 Stoney Lonesome Resurface Third 2,069 2,069 99840

Page 141: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 117 of 259August 16, 2018

Planning Partner: Northwest Mode: Highway County: ClarionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2005 Fenstermaker RR Br Removal Bridge Removal First 494 494 92622

2019 SR 2019 Oak Ridge Road Resurface Second 1,804 1,804 99838

4017 Wolfs Corners Bridge Bridge Replacement First 26 52 10 505 593 83262

Planning Partner: Northwest Mode: Bridge County: ClarionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Clarion Hwy/Bridge Line Reconstruct First 62 62 70209

58 Hodil Run Bridge Bridge Rehabilitation First 281 6 17 984 1,288 83218

58 Turnip Hole Bridge #3 Bridge Replacement First 712 712 103249

66 Greenville Pike Bridge #1 Bridge Preservation Activities Second 1,855 1,855 99325

66 Greenville Pike Bridge #2 Bridge Preservation Activities Second 1,790 1,790 99461

68 Little Licking Creek Bridge #1 Bridge Replacement First 328 321 28 51 728 25170

68 Little Licking Creek Bridge #1 Bridge Replacement Second 1,507 1,507 25170

68 Reidsburg Bridge #1 Bridge Rehabilitation Second 2,663 2,663 25172

68 Craggs Run Bridge #3 Bridge Improvement First 309 46 52 1,379 1,786 109635

322 Elmo Bridge Bridge Replacement First 309 36 46 1,202 1,594 99710

322 US 322 Paint Creek Bridge Bridge Replacement First 379 379 110093

322 US 322 Paint Creek Bridge Bridge Replacement Second 383 23 35 2,898 3,339 110093

861 South Leatherwood Bridge Bridge Replacement First 6 1,692 1,698 74288

1007 Greenville Pike Culvert Bridge Replacement Third 3,651 3,651 98386

2001 Birch Road Bridge Bridge Replacement First 336 336 79610

2003 Jack Run Bridge Bridge Replacement First 304 10 23 1,061 1,398 106520

2007 Curllsville Bridge #2 Bridge Replacement First 358 5 16 1,399 1,778 25005

2007 Piney Bridge #3 Bridge Replacement Second 926 926 99462

2007 Piney Bridge #3 Bridge Replacement Third 3,529 3,529 99462

2009 SR 2009 Rimersburg Bridge Bridge Replacement First 379 379 110092

2009 SR 2009 Rimersburg Bridge Bridge Replacement Second 348 12 23 1,364 1,746 110092

3006 SR 3006 Catfish Run Br Bridge Rehabilitation First 41 21 955 1,017 95845

3020 Kahle Bridge Bridge Replacement First 799 799 92664

4004 Lickingville Bridge #2 Bridge Replacement First 270 321 28 51 670 83250

4004 Lickingville Bridge #2 Bridge Replacement Second 1,101 1,101 83250

4004 Tylersburg Bridge #2 Bridge Replacement First 328 273 601 83251

4004 Tylersburg Bridge #2 Bridge Replacement Second 1,650 1,650 83251

Page 142: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 118 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: ClarionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7201 T-865 Coffman Road Bridge Bridge Replacement Second 654 654 103405

7201 T-865 Coffman Road Bridge Bridge Replacement Third 2,617 2,617 103405

7220 T-345 Mehrten Bridge Bridge Rehabilitation Second 1,963 1,963 25014

Planning Partner: Northwest Mode: Highway County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Mt Pleasant Rd RR Crossing RR Warning Devices First 319 319 106162

Porter St Ped Bridge Rehab Transportation Enhancement First 220 220 108096

City of Meadville Local Fed Aid Routes Resurface First 1,344 1,344 110948

Mead Ave RR Crossing RR Warning Devices First 50 50 111140

Mead Ave RR Crossing RR Warning Devices Second 200 200 111140

6 US 6: Reynolds St - Baldwin St Ext Reconstruct First 1,200 1,200 85776

6 US 6: 9th St - Cnnt Boro Resurface Second 150 1,000 1,150 98690

6 US 6: Linden St. to Reynolds Ave. Reconstruct First 1,225 1,225 98854

6 US 6: Veng Ave - Cmbrdg Resurface Second 250 1,000 1,250 98875

6 US 6/Cotton & Hollis Intersection Safety Improvement Second 300 250 550 106659

6 US 6/Cotton & Hollis Intersection Safety Improvement Third 3,000 3,000 106659

6 Conneaut Lake Revitalization Phase 2 Transportation Enhancement First 475 475 108089

6 US 6: Conneaut Lake to Murray Road Reconstruct Second 15,000 15,000 110842

6 US 6: Roundabout at Oncology Drive Intersection Improvement Second 3,500 3,500 110851

6 US 6: Roundabout at Oncology Drive Intersection Improvement Third 250 250 110851

6 US 6: Perry Highway to North Dawn Drive Resurface Third 8,200 8,200 110857

8 PA 8 and PA 77 Intersection Safety Improvement First 1,000 1,000 109996

18 PA 18: Summerhil-Sprgboro Resurface First 150 1,500 1,650 98720

18 PA 18: SR 3016-Cnntville Resurface Second 200 200 98746

18 PA 18: Cntvile-Springboro Resurface Second 100 100 98897

18 PA 18: Cntvile-Springboro Resurface Third 1,200 1,200 98897

18 PA 18: Sprngboro-Erie Co Resurface Second 200 200 98899

18 PA 18: Sprngboro-Erie Co Resurface Third 3,000 3,000 98899

19 US 19/Movies Drive Intersection Imp. Intersection Improvement First 300 150 100 100 2,300 2,950 96708

19 US 19: Mercer Co Line - PA 285 Restoration First 1,800 1,800 109138

27 PA 27: Venango Co-Oil Ck Bridge Resurface Second 250 2,600 2,850 97874

27 PA 27: Wayland's Curve Corridor Safety Improvement Third 250 200 300 3,000 3,750 98307

Page 143: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 119 of 259August 16, 2018

Planning Partner: Northwest Mode: Highway County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

27 PA 27: North St. & 27 to Meadville Cty LineResurface First 50 3,100 3,150 98901

27 Grade Crossing SR 27 Safety Improvement First 240 240 103198

27 PA 27: PA 173 to Venango Cty Line Restoration First 4,500 4,500 109112

27 PA 27: Kennedy St - Townline Rd Restoration First 250 3,500 3,750 109133

79 I-79 MM 154 - 165 Restoration Third 24,350 24,350 109812

198 PA 198: SR 4007 - PA 98 Resurface Second 150 150 98976

198 PA 198: SR 4007 - PA 98 Resurface Third 1,400 1,400 98976

322 US 322: Pine Rd to US 6 Resurface Second 1,855 1,855 99603

322 US 322: West Mead-Cochran Resurface Second 1,100 1,100 99640

322 US 322: Linden Street Drainage Improvement Third 1,000 1,000 110853

322 US 322: Ohio Line to Bush Road Resurface Third 4,100 4,100 110854

408 PA 408 and Maplewood Rd. Intersection Imp.Restoration First 200 150 100 100 2,500 3,050 47272

408 PA 408: Shriner Rd - Hydtwn Resurface First 2,000 2,000 99637

886 PA 886: Cmbrdg Springs-US 6 Resurface Second 100 100 98818

886 PA 886: Cmbrdg Springs-US 6 Resurface Third 1,500 1,500 98818

1016 Cambridge Springs RR Corridor RR Warning Devices First 450 450 106283

2008 SR 2008 Wilson Chute/Town Safety Improvement First 320 320 103206

2034 SR 2034: Spring Street Viaduct Transportation Study First 150 100 250 413

2034 SR 2034: Spring Street Viaduct Transportation Study Second 3,000 3,000 413

2034 Crawford Co. SR 2034 & SR 2040 Resurface First 1,500 1,500 98950

2035 SR 2035: PA 27 to Devour Rd Resurface First 2,420 2,420 98956

Planning Partner: Northwest Mode: Bridge County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

South Perry St. Bridge Bridge Rehabilitation First 100 100 5 1,000 1,205 281

South Perry St. Bridge Bridge Rehabilitation Second 525 525 281

Wallace Ave Bridge/Linesville Ck Bridge Rehabilitation First 600 600 527

6 US 6 French Creek Br #1 Bridge Replacement First 200 100 4,000 4,300 573

6 US 6 Br over French Ck Bridge Replacement First 5,000 5,000 57940

6 US 6 French Ck Br #3 Bridge Replacement First 500 200 100 4,000 4,800 57945

6 US 6 over West NY & PA RR Bridge Rehabilitation Second 150 50 650 850 78836

6 Cussewago St/French Creek Bridge Replacement First 500 200 100 800 82113

6 Cussewago St/French Creek Bridge Replacement Second 5,000 5,000 82113

Page 144: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 120 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 US 6 Bridge ov Fr Ck Trib Bridge Replacement Third 150 10 600 760 89125

8 PA 8 Bridge/Thompson Ck Bridge Rehabilitation Second 100 50 650 800 514

18 PA 18 over Cemetary Run Bridge Rehabilitation First 75 15 100 190 479

18 PA 18 ov Conneaut Ck Trib Bridge Replacement First 75 15 300 390 93590

18 PA 18 Brdg/Conneaut Ck Trib Bridge Rehabilitation First 500 500 97107

18 PA 18 Brdg/Conneaut Ck Trib Bridge Rehabilitation Second 200 100 4,000 4,300 97107

27 PA 27 over Oil Creek Trib Bridge Replacement First 700 700 74605

27 PA 27 Bridge/Oil Creek Bridge Preservation Activities Third 100 10 540 650 97119

77 PA 77 over Trib Muddy Ck Bridge Rehabilitation Second 100 50 650 800 78841

98 PA 98 Bridge/Van Horne Run Bridge Replacement First 140 10 140 290 576

98 PA 98 Bridge/Van Horne Run Bridge Replacement Second 800 800 576

98 PA 98 Bridge/Cuswgo Ck Trib Bridge Rehabilitation Third 50 50 500 600 97090

198 PA 198 over Woodcock Ck Bridge Rehabilitation First 10 1,800 1,810 88444

198 PA 198 Bridge ov Cuss Trib Dept. Force Culvert Replacement First 260 260 90030

198 PA 198 over Cussewago Ck Dept. Force Culvert Replacement First 200 200 90034

285 PA 285 Bridge/Turkey Run Bridge Rehabilitation Third 50 300 350 97060

322 US 322: Pymatuning Res Br Bridge Replacement First 25 800 825 374

322 US 322 Br/Crooked Ck Trib Bridge Replacement First 500 500 78683

322 US 322 Bridge/Cnnt Ck Trib Bridge Rehabilitation Second 75 100 175 97115

408 PA 408/Sugar Ck E. Branch Bridge Replacement First 100 150 250 93591

408 PA 408 Church St Bridge Bridge Replacement First 150 150 97051

618 PA 618 Bridge/Conneaut Lake Trib Dept. Force Culvert Replacement First 100 100 89106

1001 SR 1001 Brdg/Mill Run Bridge Preservation Activities Second 10 240 250 97063

1003 SR 1003/Woodcock Ck Trib Bridge Rehabilitation First 120 1,600 1,720 93169

1006 SR 1006 Bridge/Coulter Run Bridge Preservation Activities First 75 15 150 240 97064

1007 SR 1007: Bidley Crns Brdg Bridge Replacement Third 100 50 25 25 600 800 505

1011 SR 1011 Brdg/Oil Creek Bridge Rehabilitation Second 100 300 400 97091

1018 SR 1018 Brdg/Muddy Ck #2 Bridge Preservation Activities Third 10 150 160 97067

1024 SR 1024 Brdg/Britton Run Bridge Replacement Second 140 850 990 585

1033 SR 1033: Muddy Ck Brdg Bridge Rehabilitation First 50 10 60 57972

1033 SR 1033: Muddy Ck Brdg Bridge Rehabilitation Second 190 190 57972

Page 145: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 121 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1034 SR 1034 Brdg/Clr Lk Trib Bridge Preservation Activities Third 10 150 160 97068

1035 Brown Hill Rd Br/Muddy Ck Bridge Rehabilitation Third 50 10 720 780 82116

1037 SR 1037: Federal Run Brdg Bridge Replacement First 800 800 57974

1037 SR 1037 Brdg/Lil Fed Run Bridge Replacement First 140 10 350 500 97086

1039 SR 1039: Mosey Run Brdg Bridge Replacement Third 50 10 870 930 57975

2005 SR 2005 over Conneaut Ck. Bridge Rehabilitation First 100 10 775 885 74698

2007 SR 2007 over Mud Run Bridge Replacement First 80 10 90 74664

2007 SR 2007 over Mud Run Bridge Replacement Second 400 400 74664

2010 SR 2010: Pwdr Mill Run Br Bridge Rehabilitation Third 50 10 300 360 141

2016 2019 Crawford & Forest Shotcrete Group Bridge Preservation Activities First 1,300 1,300 106580

2019 East Br Sugar Ck Brdg Bridge Replacement First 100 100 57979

2019 East Br Sugar Ck Brdg Bridge Replacement Second 50 650 700 57979

2024 SR 2024 Brdg/Hammond Run Bridge Preservation Activities Third 10 150 160 97069

2031 SR 2031 over Thompson Run Bridge Rehabilitation First 100 10 800 910 78854

2034 SR 2034 Brdg/I-79 Bridge Rehabilitation Third 150 10 1,300 1,460 97095

2039 SR 2039: Dunham Rd Br Bridge Rehabilitation First 120 50 2,000 2,170 516

2101 SR 2101 Bridge over US 6 Bridge Rehabilitation Second 50 10 1,000 1,060 97096

3004 SR 3004 Brdg/I-79 Bridge Rehabilitation Second 50 10 1,000 1,060 97056

3004 SR 3004/Michael Run Trib Bridge Preservation Activities Third 10 150 160 97070

3004 SR 3004 Brdg/Crooked Ck Bridge Rehabilitation First 120 10 900 1,030 97122

3009 SR 3009 Brdg/Bennett Run Bridge Rehabilitation First 100 10 500 610 497

3011 Pymatuning Reservoir Br Bridge Rehabilitation First 50 20 500 570 57984

3015 SR 3015 Brdg/McCowell Run Bridge Preservation Activities Third 10 150 160 97071

3016 SR 3016 Brdg/B&LE RR Bridge Rehabilitation First 90 10 100 589

3016 SR 3016 Brdg/B&LE RR Bridge Rehabilitation Second 800 800 589

3016 Harmonsburg Rd Br/I-79 Bridge Rehabilitation Second 140 10 1,200 1,350 88440

3021 SR 3021 Brdg/Geneva Creek Bridge Preservation Activities Third 10 150 160 97073

3023 SR 3023-Watson Run Br #2 Bridge Replacement First 150 50 1,300 1,500 74683

4001 SR 4001/Conneaut Ck E Brch Bridge Rehabilitation Third 50 10 750 810 88461

4001 SR 4001 Brg/Padan Ck Trib Bridge Preservation Activities Third 10 150 160 97074

4001 SR 4001/Cnnt Ck W. Branch Bridge Preservation Activities Third 10 150 160 97075

Page 146: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 122 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4001 SR 4001/Cnnt Ck E. Branch Bridge Preservation Activities Third 10 150 160 97076

4006 SR 4006/Turkey Track Run Bridge Preservation Activities Third 10 150 160 97077

4007 SR 4007 Br/Watson Run #2 Bridge Preservation Activities Third 10 150 160 97078

4008 SR 4008/Conneaut Ck E. Brch Bridge Rehabilitation First 75 15 100 190 74579

4008 SR 4008 over Conneaut Ck Bridge Rehabilitation First 800 800 78857

4009 SR 4009 over Hubert Run Bridge Replacement First 100 20 700 820 90152

4010 SR 4010 Brdg/Cussewago Ck Bridge Preservation Activities Third 10 180 190 97079

4011 SR 4011 Brdg/Cussewago Ck Bridge Replacement Third 200 100 900 1,200 97081

4012 SR 4012 Brdg/Conneaut Ck Bridge Preservation Activities Third 10 150 160 97082

4013 SR 4013 Brdg/Carr Run Bridge Preservation Activities Third 10 150 160 97083

9900 Wightman Rd (T-620) Br Bridge Deck Rehabilitation First 50 50 323

9900 Wightman Rd (T-620) Br Bridge Deck Rehabilitation Second 210 5 25 1,300 1,540 323

9900 Dotyville Rd (T-926) Br Bridge Replacement Second 175 5 25 1,200 1,405 328

9900 Center St Br/Conneaut Ck Bridge Replacement Third 150 1,000 1,150 360

9900 Island Avenue ovr W Shreve Run Bridge Replacement Third 100 150 25 575 850 526

9900 West Rd (T-605) Br Bridge Replacement First 40 150 5 25 380 600 528

9900 West Rd (T-605) Br Bridge Replacement Second 220 220 528

9900 Spring Road ovr Carr Run Trib Bridge Rehabilitation Third 100 10 20 1,000 1,130 534

Planning Partner: Northwest Mode: Transit County: CrawfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Purchase Fleet Vehicles First 160 160 89724

Revenue Fleet Purchase First 1,600 1,600 94836

IT Infrastructure First 44 44 110573

Revneue Fleet Vehicles First 1,700 1,700 110574

Bus Shelters First 45 45 110576

Maintenance Equipment First 50 50 110578

Planning Partner: Northwest Mode: Highway County: ForestTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

62 Hunter's Station to PA 36 Restoration First 40 1,700 1,740 109111

62 US 62: County Line to PA 36 Resurface Second 3,000 3,000 110841

66 PA 66: PA 899 to Forest St. Restoration First 100 1,000 1,100 109134

66 PA 66: PA 899 to Forest St. Restoration Second 80 80 109134

Page 147: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 123 of 259August 16, 2018

Planning Partner: Northwest Mode: Highway County: ForestTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

66 PA 66: PA 899 to Forest St. Restoration Third 80 80 109134

666 PA 666 Retaining Wall #1 Slides Correction First 150 40 1,000 1,190 97040

899 PA 899: Jefferson Co-Bear Run Resurface Second 3,000 3,000 99811

Planning Partner: Northwest Mode: Bridge County: ForestTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

36 PA 36 over Tionesta Creek Bridge Rehabilitation First 150 50 4,000 4,200 74693

36 PA 36 Bridge/Hunter Run #3 Bridge Rehabilitation Second 40 100 140 97259

62 US 62 Bridge over Prather Run Bridge Rehabilitation Third 20 10 200 230 88475

127 PA 127 Bridge/Allegheny River Bridge Preservation Activities Second 250 250 97247

127 PA 127 Bridge/Allegheny River Bridge Preservation Activities Third 3,000 3,000 97247

1003 Blue Jay Ck Br #2 Bridge Replacement Second 150 100 25 25 700 1,000 1414

1005 SR 1005 Brdg/Bogus Run Bridge Preservation Activities Second 10 150 160 97248

3001 SR 3001 Brdg/Korb Run Bridge Preservation Activities Third 10 150 160 97257

3001 SR 3001 Br/Lil Tionsta Ck Bridge Preservation Activities Third 10 105 115 97265

3002 SR 3002 Brdg/Holeman Run Bridge Preservation Activities Third 10 150 160 97249

4002 SR 4002 ov Dawson Run Bridge Replacement Third 50 10 300 360 78839

4002 SR 4002 Br/W. Hickory Ck Bridge Preservation Activities Third 10 150 160 97252

4004 SR 4004 Br/Ross Run Brch Bridge Rehabilitation Second 10 10 300 320 97245

Planning Partner: Northwest Mode: Highway County: VenangoTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

NW Local Brdg Line Item Bridge Replacement Second 225 225 98262

NW Local Brdg Line Item Bridge Replacement Third 780 780 98262

NW Highway/Bridge Line Item Miscellaneous First 12,693 12,693 106422

NW Highway/Bridge Line Item Miscellaneous Second 26,221 26,221 106422

NW Highway/Bridge Line Item Miscellaneous Third 24,452 24,452 106422

Northwest 2019 AWPM Reflective Pavement Markers First 160 160 106576

Northwest 2020 AWPM Reflective Pavement Markers First 160 160 106577

NW Local Fed Aid Rt Line Item Resurface First 2,001 2,001 106581

NW Local Fed Aid Rt Line Item Resurface Second 4,000 4,000 106581

NW Local Fed Aid Rt Line Item Resurface Third 4,000 4,000 106581

NW Betterment Line Item Restoration First 8,000 8,000 106582

NW Betterment Line Item Restoration Second 46,000 46,000 106582

NW Betterment Line Item Restoration Third 50,000 50,000 106582

Page 148: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 124 of 259August 16, 2018

Planning Partner: Northwest Mode: Highway County: VenangoTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Northwest 2021 AWPM Reflective Pavement Markers First 160 160 110477

Northwest 2022 AWPM Reflective Pavement Markers First 160 160 110478

City of Oil City Local Fed Aid Routes Resurface First 306 306 110952

8 PA 8: Barkeyville to Franklin Restoration First 40,000 40,000 61354

8 PA 8: Polk Cutoff to US 62 Restoration First 120 3,000 3,120 76890

8 PA 8: Brdg/T-371 - Polk Resurface Third 5,136 5,136 98519

8 PA 8: Barkeyville-Exprway Resurface Second 4,350 4,350 98527

8 PA 8: County Line to Georgetown Rd Pavement Preservation Second 7,000 7,000 110840

62 US 62: Liberty to Front St Safety Improvement First 2,300 2,300 98571

62 US 62: Pittsburgh Avenue Resurface First 785 785 100069

62 US 62: PA 8 to 8th Street Restoration First 250 100 100 2,224 2,674 109153

62 US 62: PA 8 to 8th Street Restoration Second 200 200 109153

62 Liberty & 12th Inter. Imp Intersection Improvement First 250 200 100 100 150 800 109736

62 Liberty & 12th Inter. Imp Intersection Improvement Second 3,000 3,000 109736

208 PA 208: PA 38 - Mercer Co Resurface Second 300 3,000 3,300 98555

208 PA 208: PA 38 - Mercer Co Resurface Third 1,000 1,000 98555

322 8th St Br/Allegheny River Bridge Rehabilitation First 40 500 540 58253

322 US 322: 28th Div Hwy Resurface Third 6,576 6,576 90272

322 US 322: Liberty Street Resurface Third 2,500 2,500 110855

417 PA 417: Keeley Rd - PA 8 Resurface Third 6,000 6,000 98532

427 PA 427: Academy-Deeter Resurface Second 250 2,000 2,250 98524

428 PA 428: PA 8 to Cherrytree Rd Restoration First 50 3,600 3,650 109151

4004 Atlantic Ave. Restoration First 760 760 109152

Planning Partner: Northwest Mode: Bridge County: VenangoTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Dotter Rd (T-522) Brdg Bridge Replacement First 600 600 2208

Acel Rd (T-647) Bridge Bridge Replacement Second 125 100 5 20 900 1,150 2260

Miller Farm (T-635) Br Bridge Rehabilitation Second 588 150 25 1,800 2,563 2263

Williams Road ovr M. Branch Sugar Ck Bridge Replacement First 175 5 25 1,100 1,305 78464

Sugar Ck Dr Brdg (T-685) Bridge Replacement Second 1,010 1,010 98296

8 PA 8 Bridge over Cherry Run Bridge Preservation Activities Third 10 150 160 88510

8 PA 8 Bridge/Oil Creek Bridge Preservation Activities Third 10 450 460 97365

Page 149: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 125 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: VenangoTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

8 PA 8 Bridge/Wolf Ck Trib Bridge Replacement First 400 400 97374

8 PA 8 Bridge/PA 308 Bridge Rehabilitation First 100 10 500 610 97375

27 PA 27 Bridge/Pine Ck Trib Bridge Replacement Third 150 10 300 460 97410

38 PA 38 Bridge/Richey Run 2 Bridge Rehabilitation Third 50 10 450 510 97361

38 PA 38 Bridge/Bear Run Bridge Rehabilitation Third 100 300 400 97362

62 US 62 Bridge/Sage Run #2 Bridge Rehabilitation First 20 200 220 58244

62 US 62 Bridge/Sage Run #8 Bridge Rehabilitation First 20 110 130 58247

62 US 62 over Lil Sandy Ck Bridge Replacement First 150 10 1,300 1,460 84946

62 SR 62 Bridge over Conrail R.R. & Allegheney RiverBridge Preservation Activities First 278 278 88509

62 US 62 Bridge/Sage Run #3 Bridge Rehabilitation First 20 220 240 97363

62 US 62 Bridge/Hemlock Creek Bridge Preservation Activities First 50 200 250 97368

62 US 62 Bridge/Sage Run #7 Bridge Rehabilitation First 10 120 130 97391

62 US 62 Bridge/Sage Run #4 Bridge Rehabilitation First 25 270 295 97396

62 US 62 Bridge/Sage Run #9 Bridge Rehabilitation First 20 150 170 97397

62 US 62 Bridge/Sage Run #5 Bridge Rehabilitation First 20 150 170 97399

62 US 62 Bridge/Sage Run #6 Bridge Rehabilitation First 20 150 170 97400

80 I-80 EB Brdg/Coal Vly Rd Bridge Rehabilitation Third 100 10 540 650 97377

157 PA 157 Bridge/Horse Ck Brch Bridge Rehabilitation Second 10 300 310 97389

208 PA 208 over McKees Run Bridge Replacement Third 200 100 25 25 700 1,050 93161

208 PA 208 Bridge over I-80 Bridge Rehabilitation First 140 140 97401

208 PA 208 Bridge over I-80 Bridge Rehabilitation Second 10 1,750 1,760 97401

227 PA 227 Bridge/Cherry Run #3 Bridge Rehabilitation Third 10 500 510 97369

427 PA 427 Bridge/Sugar Ck Brch Bridge Replacement Third 100 50 150 97339

427 PA 427 Bridge/Sugar Ck #2 Bridge Rehabilitation First 140 140 97402

427 PA 427 Bridge/Sugar Ck #2 Bridge Rehabilitation Second 10 700 710 97402

1004 Petroleum Center Br. Bridge Rehabilitation Second 100 100 50 250 2107

1004 Petroleum Center Br. Bridge Rehabilitation Third 1,750 1,750 2107

1004 SR 1004 Brdg/Cherry Run Bridge Preservation Activities Second 10 150 160 97343

1004 SR 1004 Brdg/Muskrat Run Bridge Preservation Activities Second 10 150 160 97344

2004 SR 2004 over Tarklin Run Bridge Rehabilitation First 10 350 360 78872

3003 SR 3003 Brdg/I-80 EB Bridge Rehabilitation First 100 10 110 97364

Page 150: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 126 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: VenangoTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3003 SR 3003 Brdg/I-80 EB Bridge Rehabilitation Second 600 600 97364

3003 SR 3003 Brdg/I-80 WB Bridge Rehabilitation First 100 20 120 98177

3003 SR 3003 Brdg/I-80 WB Bridge Rehabilitation Second 900 900 98177

3006 SR 3006 Rankin Chapel Road Bridge Bridge Replacement First 100 100 110077

3007 SR 3007 Bridge/I-80 Bridge Rehabilitation Third 10 100 50 600 760 97395

3009 SR 3009 Bridge over I-80 Bridge Rehabilitation Second 10 90 10 500 610 97398

3013 SR 3013/Scrbgras Ck Trib Bridge Preservation Activities Third 10 150 160 97350

3013 SR 3013/Scbgras Ck Trb 2 Bridge Preservation Activities Third 10 150 160 97351

3017 SR 3017 Brdg/Mill Creek Bridge Preservation Activities Third 10 150 160 97352

3017 SR 3017 Brdg/Lil Sandy Ck Bridge Rehabilitation Third 50 10 450 510 97379

3017 SR 3017 Brdg/FrenchCreek Bridge Preservation Activities Second 10 600 610 97384

3024 SR 3024/Lil Sandy Ck Trib Bridge Preservation Activities Third 10 150 160 97354

3101 SR 3101 Bridge over I-80 Bridge Rehabilitation Second 100 10 110 97340

3101 SR 3101 Bridge over I-80 Bridge Rehabilitation Third 600 600 97340

3102 SR 3102 Bridge over PA 8 Bridge Rehabilitation Second 100 10 110 97380

3102 SR 3102 Bridge over PA 8 Bridge Rehabilitation Third 600 600 97380

4003 SR 4003 Brdg/Patchel Run Bridge Preservation Activities Third 10 150 160 97355

4003 SR 4003 Bridge/Wolf Run Bridge Rehabilitation Second 50 50 97405

4003 SR 4003 Bridge/Wolf Run Bridge Rehabilitation Third 100 100 97405

4011 SR 4011 Brdg/Prather Ck Bridge Preservation Activities Third 10 150 160 97356

4016 SR 4016 Brdg/Beatty Run Bridge Preservation Activities Third 10 150 160 97358

7220 Fisherman's Cove (T-370) Br Bridge Replacement First 800 800 78465

9900 McClelland Ave Bridge Bridge Rehabilitation First 750 750 2150

9900 Dean Road ovr Little Sandy Creek Bridge Replacement First 175 5 25 205 2161

9900 Dean Road ovr Little Sandy Creek Bridge Replacement Second 900 900 2161

Planning Partner: Northwest Mode: Highway County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

City of Warren Local Fed Aid Routes Resurface First 248 248 110950

6 US 6: Pittsfield-Mead Run Resurface Third 1,300 1,300 98032

6 US 6 & RR St Intersection Intersection Improvement First 250 250 98580

6 US 6 & RR St Intersection Intersection Improvement Second 200 50 50 1,500 1,800 98580

6 US 6: PA 666 to McKean Co Resurface Second 2,000 2,000 100318

Page 151: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 127 of 259August 16, 2018

Planning Partner: Northwest Mode: Highway County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 US 6: Erie Co-Freehold Resurface First 1,000 1,000 100335

6 US 6 Ramp to SR 1027 Main St Overpass-East SideNew Roadway First 300 300 110397

6 US 6: Segment 520 to Yankee Bush Rd Resurface Second 7,900 7,900 110839

27 PA 27 & US 6 Intersection Intersection Improvement First 100 15 60 800 975 98579

62 US 62:Waid Run-Slater Run Resurface Second 35 50 3,000 3,085 97922

62 US 62: Market Street Ext Restoration First 6,600 6,600 100320

62 US 62: Hatch Run Rd - NY Line Resurface First 170 170 106658

62 US 62: Hatch Run Rd - NY Line Resurface Second 5,400 5,400 106658

62 US 62: Betts Park to Market St Restoration First 150 1,800 1,950 109137

957 PA 957: Bly Hill Rd - Pg Hlw Resurface Second 250 150 50 1,200 1,650 97923

1017 Pennsylvania Ave/Market St Intersection Intersection Improvement First 150 100 100 3,500 3,850 100323

1021 SR 1021: Jackson Avenue Resurface Second 310 310 100498

3005 SR 3005 Structural Overlay Restoration Second 3,000 3,000 110392

6006 SR 6006: Pennsylvania Ave Resurface Third 1,547 1,547 110856

Planning Partner: Northwest Mode: Bridge County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Ludwick Rd Bridge T-508 Bridge Replacement Third 150 150 50 600 950 78474

Miles Run Road (T-388) Bridge Bridge Replacement Second 175 5 25 205 79261

Miles Run Road (T-388) Bridge Bridge Replacement Third 700 700 79261

T-444 Irvine Rn Rd Bridge Bridge Replacement Third 125 100 5 15 625 870 79268

6 US 6 Bridge/Dtchman Run #1 Bridge Rehabilitation Second 50 10 60 57178

6 US 6 Bridge/Dtchman Run #1 Bridge Rehabilitation Third 250 250 57178

6 US 6 Bridge over Ludlow St Bridge Rehabilitation First 800 800 57180

6 US 6 over Ott Run Bridge Rehabilitation Third 200 200 84950

6 US 6 Bridge/Stone Run Bridge Replacement Second 150 10 160 97411

6 US 6 Bridge/Stone Run Bridge Replacement Third 450 450 97411

6 US 6 Br/2 Mile Run Brch 1 Bridge Replacement First 50 100 50 400 600 97413

6 US 6 Bridge/Coffee Run Brch Bridge Rehabilitation Second 100 100 97426

6 US 6 Bridge/Coffee Run Brch Bridge Rehabilitation Third 300 300 97426

6 US 6 Bridge/Private Drive Bridge Rehabilitation Second 50 10 60 97445

6 US 6 Bridge/Private Drive Bridge Rehabilitation Third 500 500 97445

6 US 6 Bridge/A&E Railroad Bridge Rehabilitation First 200 10 1,200 1,410 97449

Page 152: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 128 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

6 US 6 Br/Dutchmans Run #1 Bridge Rehabilitation Second 50 300 350 97458

27 PA 27: Grand Street Bridge Bridge Replacement Third 150 50 500 700 2477

27 PA 27 Bridge over Telic Run Bridge Replacement Third 150 10 400 560 57184

27 PA 27: Mathews Run Bridge Bridge Rehabilitation Third 450 450 58298

27 PA 27 over Browns Run Bridge Replacement First 160 160 74612

27 PA 27 Bridge/Browns Run Bridge Replacement Second 80 10 480 570 97412

59 PA 59: Morrison Run Bridge Bridge Replacement Third 150 100 50 4,000 4,300 58301

59 James Morrison Bridge Rehab Bridge Rehabilitation First 50 2,000 2,050 97459

59 James Morrison Brdg Rehab Ph 2 Bridge Rehabilitation First 500 500 110818

62 US 62 Bridge/Valentine Ck. Bridge Rehabilitation Second 50 10 60 74673

62 US 62 Bridge/Valentine Ck. Bridge Rehabilitation Third 250 250 74673

62 US 62 Bridge/Dale Run Bridge Preservation Activities Second 50 50 97415

62 US 62 Bridge/Dale Run Bridge Preservation Activities Third 250 250 97415

62 US 62 Bridge/Waid Run Bridge Preservation Activities First 50 200 250 97418

62 US 62 over Conrail RR Bridge Rehabilitation First 100 25 800 925 106585

69 PA 69/Jaksn Run Brch #2 Bridge Rehabilitation Third 50 10 450 510 74602

69 PA 69/StillH2O Ck Brch #2 Bridge Preservation Activities Third 10 150 160 97434

69 PA 69 Bridge/Stillwater Ck Bridge Preservation Activities Third 10 180 190 97435

69 PA 69 Bridge/Jackson Run #2 Bridge Replacement Second 150 50 1,200 1,400 97451

127 PA 127 Bridge/Allegheny River Bridge Preservation Activities First 200 50 4,000 4,250 97419

426 PA 426: Corry Road Bridge Bridge Replacement Third 100 10 600 710 2474

426 PA 426 Br/Brokenstraw Ck. Bridge Rehabilitation First 10 1,000 1,010 2523

426 PA 426/Brokenstraw Br. #1 Bridge Rehabilitation Third 50 10 450 510 74601

426 PA 426/Brokenstraw Br #3 Bridge Replacement First 75 15 200 290 74610

666 PA 666 Bridge/Tionesta Ck Bridge Preservation Activities Third 10 300 310 97436

957 PA 957: Kanetone Ck Bridge Bridge Replacement Second 150 50 640 840 58306

957 PA 957 Bridge / Brokenstraw Ck Bridge Preservation Activities Third 10 240 250 97437

957 PA 957/Cool Springs Brook Bridge Rehabilitation Third 10 300 310 97438

1005 SR 1005 Br/Kiantone Ck #1 Bridge Preservation Activities Third 10 150 160 97439

1006 SR 1006 Brdg/Hemlock Run Bridge Replacement Third 150 50 1,120 1,320 97450

1012 SR 1012: Priest Hlw Rd Br Bridge Replacement Second 500 75 575 2479

Page 153: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 129 of 259August 16, 2018

Planning Partner: Northwest Mode: Bridge County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1012 SR 1012 Brdg/Akeley Run Bridge Rehabilitation Third 10 10 600 620 97446

1013 SR 1013 ov Fishburn Run Bridge Rehabilitation Second 100 350 450 84955

1015 SR 1015/Store House Run Bridge Preservation Activities Third 10 150 160 97440

1016 SR 1016 Br/Vanarsdale Run Bridge Preservation Activities Third 10 150 160 97441

1027 SR 1027 Bridge over US 6 Bridge Rehabilitation Third 50 10 300 360 88492

2002 SR 2002 Br/Lwr Sherif Run Bridge Preservation Activities Third 10 50 60 97442

2010 Browns Run Road Bridge Bridge Rehabilitation Second 270 150 50 600 1,070 2545

3002 SR 3002: McGraw Road Bridge over Pine CreekBridge Replacement First 150 150 2530

3009 SR 3009 Brdg/Gilmore Run Bridge Rehabilitation Third 50 10 450 510 78962

3009 SR 3009 Brdg/Tidioute Ck Bridge Rehabilitation Third 50 10 600 660 78976

3012 SR 3012: Cemetery Rd Brdg Bridge Rehabilitation First 400 400 2343

3012 SR 3012: Cemetery Rd Brdg Bridge Rehabilitation Third 250 100 10 360 2343

3014 SR 3014 Br/Brokenstraw Ck Bridge Rehabilitation Third 50 10 1,184 1,244 97448

3016 SR 3016 Brdg/Brknstraw Ck Bridge Rehabilitation Second 100 10 900 1,010 97432

3022 SR 3022 Br/Brokenstraw Ck Bridge Rehabilitation Second 150 10 1,000 1,160 88491

3022 SR 3022 Brdg/Brknstrw Ck Bridge Preservation Activities Third 10 450 460 97443

3022 SR 3022 Brdg/B&P Railroad Bridge Preservation Activities Third 10 210 220 97447

4004 SR 4004 Brdg/Pine Valley Bridge Rehabilitation Third 10 10 450 470 78945

4007 SR 4007/Lil Brkstrw Trib Bridge Replacement First 75 15 150 240 97444

4015 SR 4015 Brdg/ Mill Brook Bridge Rehabilitation Third 50 10 600 660 78952

9900 Stewart Rd (T-639) Br Bridge Replacement First 150 5 25 730 910 2560

9900 Stewart Rd (T-639) Br Bridge Replacement Second 270 270 2560

9900 Jones Hill Rd (T-458) Br Bridge Replacement First 600 600 2566

Planning Partner: Northwest Mode: Transit County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Shared Ride Bus Procureme First 960 960 106432

TIRE MACHINE First 6 6 110569

CAMERAS First 10 10 110571

PARKING LOT First 10 10 110572

GARAGE FLOOR First 30 30 110575

SWEEPER First 40 40 110577

Page 154: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 130 of 259August 16, 2018

Planning Partner: Northwest Mode: Transit County: WarrenTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

ROTARY LIFT First 80 80 110579

FIXED ROUTE BUS PROCUREME First 2,195 2,195 110580

BUS WASH MACHINE First 250 250 110581

Planning Partner: Reading Mode: Highway County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

RATS BARTA Flex Transit System Improvement First 3,600 3,600 69335

CMAQ Reserve Line Item Corridor Safety Improvement First 794 794 82791

CMAQ Reserve Line Item Corridor Safety Improvement Second 684 684 82791

CMAQ Reserve Line Item Corridor Safety Improvement Third 253 253 82791

TAP Reserve L I Transportation Enhancement First 1,112 1,112 82793

TAP Reserve L I Transportation Enhancement Second 1,112 1,112 82793

TAP Reserve L I Transportation Enhancement Third 1,113 1,113 82793

Safety Reserve Line Item Safety Improvement First 72 72 82795

Safety Reserve Line Item Safety Improvement Second 625 625 82795

Safety Reserve Line Item Safety Improvement Third 6,004 6,004 82795

Urban Reserve Line Item Restoration First 555 555 82796

Urban Reserve Line Item Restoration Second 1,272 1,272 82796

Urban Reserve Line Item Restoration Third 570 570 82796

Delivery_Consult Assist Replace/Rehab First 4,000 4,000 83081

Berks Commuter Services Miscellaneous First 1,104 1,104 86420

Transp Alternative Project Mngmt Transportation Enhancement First 100 100 89056

Environmental Impacts Resolution LI Environmental Mitigation First 100 100 95399

Construction Assistance Miscellaneous First 50 50 97417

Construction Assistance Resurface First 50 50 97838

RATS Hwy & Bridge Reserve Restoration First 3,565 3,565 102189

RATS Hwy & Bridge Reserve Restoration Second 5,958 5,958 102189

RATS Hwy & Bridge Reserve Restoration Third 49,955 49,955 102189

RATS Traffic ReviewAssist Miscellaneous First 160 160 102763

Schuylkill River Trail N Gap Improvement ProjectTransportation Enhancement First 910 910 107978

District 5 AWPM Berks 2019 Reflective Pavement Markers First 1,077 1,077 109991

12 SR 12 Elizabeth Avenue Safety Improvement First 1,000 1,200 1,000 3,200 79467

12 SR 12 Elizabeth Avenue Safety Improvement Second 713 441 688 9,552 11,395 79467

12 SR 12 and SR 73 Intersection Improvement First 412 113 212 2,652 3,389 88781

12 PA 12 Resurfacing Resurface First 309 53 43 14,322 14,727 89215

Page 155: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 131 of 259August 16, 2018

Planning Partner: Reading Mode: Highway County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

12 SR 12 Median Barrier Median Barrier First 517 517 106483

12 SR 12 Alsace Manor Int Intersection Improvement First 408 408 110318

12 SR 12 Alsace Manor Int Intersection Improvement Second 348 478 580 2,985 4,390 110318

29 PA 29 Resurface Resurface First 375 375 96372

61 PA 61 Restoration Phase 2 Restoration First 2,185 2,185 10867

61 PA 61 Restoration Phase 2 Restoration Second 1,159 60 116 23,881 25,216 10867

61 PA 61 Restoration Phase 1 Restoration First 710 710 96373

61 PA 61 Restoration Phase 1 Restoration Second 580 106 348 8,955 9,989 96373

61 Shoemaker Av-PottsvillePk Restoration First 4,746 4,746 96376

61 SR 61 Med Barr-Perry Wind Guiderail Improvement First 515 515 97258

61 61 Med Barr - Tilden Twp Guiderail Improvement First 515 515 109337

73 SR 73/662 Corridor Safety Intersection Improvement First 4,138 4,138 92921

73 SR 73 and 1005 Intersection ImprovementSafety Improvement First 103 11 106 546 766 109222

78 TOC Operator-Berks Traffic Control Center First 125 125 91658

100 PA 100 Resurface Resurface First 400 400 96382

176 I-176 Median Barrier Safety Improvement First 4,657 4,657 104435

183 SR 183/4016 (Schaeffers) Intersection Improvement First 1,833 1,833 57840

183 River Road Extension New Roadway First 6,191 6,191 70274

222 SR 222 Widening Widen First 2,814 1,194 4,062 1,450 9,520 61972

222 SR 222 Widening Widen Second 33,315 33,315 61972

222 SR 222 & Long Lane Intersection Improvement First 206 1,402 7,508 9,117 90569

222 SR 222_73 & Genesis Dr Intersection Improvement First 18,605 18,605 92414

222 222 N. Kutz to Lehigh CL Widen First 5,333 5,333 97234

222 222 N. Kutz to Lehigh CL Widen Second 3,939 2,866 5,565 26,250 38,620 97234

222 222 N. Kutz to Lehigh CL Widen Third 10,646 10,646 97234

222 222 Slab Stabilization Restoration First 1,688 1,688 106496

222 222 SB Auxiliary Lane Add Lane First 1,875 1,875 109788

222 222 Warren Street Wyomissing Resurface First 618 42 42 9,679 10,381 110007

222 222 Warren Street Wyomissing Resurface Second 400 400 110007

222 222 Hard Shoulder Widen First 309 318 1,093 1,720 110008

222 222 from 61 to BUS 222 Resurface First 258 265 2,471 2,994 110009

222 222 from 61 to BUS 222 Resurface Second 1,900 1,900 110009

422 US 422 Reconstruction Reconstruct First 9,270 3,875 5,808 18,953 72814

Page 156: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 132 of 259August 16, 2018

Planning Partner: Reading Mode: Highway County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

422 US 422 Reconstruction Reconstruct Second 6,255 39,563 45,817 72814

422 US 422 Reconstruction Reconstruct Third 186,921 186,921 72814

422 SR 422 in Sinking Spring Intersection Improvement First 361 133 2,122 2,690 5,305 87688

422 SR 422 in Sinking Spring Intersection Improvement Second 2,938 2,938 87688

422 Freeway Service Patrol Traffic System Management First 901 901 94900

422 SR 422 Ben Frankling Corridor Existing Signal Improvement Second 580 239 253 123 625 1,820 110075

422 SR 422 Ben Frankling Corridor Existing Signal Improvement Third 2,034 2,034 110075

662 Fleetwood Rdway Restore Restoration First 1,000 1,000 88385

662 Richmond St Fleetwood RRX RR Warning Devices First 250 250 102865

724 724 Fence Barrier Safety Improvement First 1,688 1,688 110012

1010 RATS High Friction Surface 2019 Safety Improvement First 812 812 109992

2004 Bingaman St Resurface Resurface First 60 60 96379

2006 SR 2006 Resurface Resurface First 330 11 10 3,183 3,533 96381

2006 Reading NS RRX Corridor RR Warning Devices First 592 592 106140

2014 SR 2014 Corridor Improvem Corridor Safety Improvement First 3,914 3,914 102162

2021 Bus 422 Resurface Reconstruct First 4,500 4,500 96377

2033 Gibraltar and Shelbourne Int Intersection Improvement First 77 11 53 273 415 110206

2082 Trap Rock Br (Remove) Bridge Removal Second 119 123 13 384 253 893 89634

3023 SR 3023 State Hill Road Safety ImprovementsCorridor Safety Improvement Second 318 219 169 98 212 1,016 105954

3023 SR 3023 State Hill Road Safety ImprovementsCorridor Safety Improvement Third 4,032 4,032 105954

3422 US 422 Business Resurface Restoration First 21 4,774 4,795 110010

4028 SR 4028 Old Route 22 Greenwich Twp Resurface First 824 824 110081

4040 SR 4040 Old Route 22 - Tulpehocken Resurface First 1,126 1,126 110082

7412 Penn Avenue over Maiden Creek Bridge Removal Second 358 123 61 930 1,473 110079

7412 Penn Avenue over Maiden Creek Bridge Removal Third 300 300 110079

Planning Partner: Reading Mode: Bridge County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

10 Morgantown Rd ovr trib Conestoga Crk Replace/Rehab First 361 273 11 27 379 1,052 10943

10 Morgantown Rd ovr trib Conestoga Crk Replace/Rehab Second 938 938 10943

61 SR 61 Bridge Rehabilitation Replace/Rehab First 1,030 656 56 109 7,250 9,101 109894

61 SR 61 Bridge Rehabilitation Replace/Rehab Second 12,435 12,435 109894

61 RATS Bridge Preservation #8 Bridge Rehabilitation First 546 1,800 2,346 110032

61 RATS Bridge Preservation #8 Bridge Rehabilitation Second 3,828 3,828 110032

Page 157: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 133 of 259August 16, 2018

Planning Partner: Reading Mode: Bridge County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

143 PA143 ov'rTrib Maiden Crk Replace/Rehab First 477 265 2 32 777 85632

143 PA143 ov'rTrib Maiden Crk Replace/Rehab Second 869 869 85632

143 SR143 / Kistler Crk Br Replace/Rehab First 477 338 29 56 900 94317

143 SR143 / Kistler Crk Br Replace/Rehab Second 1,015 1,015 94317

183 Schuylkill Ave Bridge SB Replace/Rehab First 53 265 6,002 6,320 91091

183 PA183/Little Northkill Cr Bridge Replacement Second 696 861 12 86 1,934 3,588 91976

183 PA183/Little Northkill Cr Bridge Replacement Third 600 600 91976

222 RATS Bridge Preservation #7 Bridge Preservation Activities First 515 6,556 7,071 110006

419 North Third Str ovr Tulpehocken Crk Replace/Rehab First 494 494 91908

419 North Third Str ovr Tulpehocken Crk Replace/Rehab Second 125 358 31 90 3,690 4,293 91908

419 Rehrersburg Rd ovr Mill Creek Replace/Rehab First 437 310 56 803 92079

419 Rehrersburg Rd ovr Mill Creek Replace/Rehab Second 29 811 840 92079

419 419 ovr Trib Mill Creek Bridge Replacement Second 464 615 12 31 1,520 2,642 110014

422 US 422 over Tulpehocken Bridge Replacement Second 811 1,230 31 92 3,200 5,365 10927

422 US 422 over Tulpehocken Bridge Replacement Third 2,500 2,500 10927

422 Penn Ave ovr Cacoosing Crk Bridge Replacement Second 696 984 25 55 1,520 3,280 92070

501 Lancaster Ave ovr Swatara Creek Bridge Replacement Second 464 492 12 31 1,267 2,265 110016

562 SR 562 ovr Manatawny Crk Replace/Rehab First 1,631 1,631 85667

562 SR 562 ovr Monocacy Creek Replace/Rehab First 52 1,236 1,288 85668

568 Green Hills Road over Allegheny Cr Replace/Rehab First 412 292 16 53 1,071 1,844 79086

645 Camp Swatara Road ovr Little Swatara Replace/Rehab First 583 328 338 84 1,375 2,708 85670

645 Camp Swatara Road ovr Little Swatara Replace/Rehab Second 2,114 2,114 85670

662 SR 662 over Furnace Creek Replace/Rehab First 412 212 28 27 844 1,524 79013

662 Berks Box Culvert Bundle Replace/Rehab First 1,273 400 1,673 110011

662 Berks Box Culvert Bundle Replace/Rehab Second 500 4,057 4,558 110011

662 SR 662 Ovr Branch Creek Replace/Rehab First 23 23 110187

662 SR 662 Ovr Branch Creek Replace/Rehab Second 14 14 110187

724 Main Street over Allegheny Creek Replace/Rehab First 546 546 10700

724 Main Street over Allegheny Creek Replace/Rehab Second 348 597 12 2,460 3,416 10700

724 RATS Bridge Preservation #5 Bridge Preservation Activities First 300 300 105951

737 SR 737 /trib Sacony Creek Replace/Rehab First 1,591 1,591 92028

1003 SR 1003 ovr Schuylkill Rv Replace/Rehab First 45 45 79012

1015 SR 1015 ovr Trib Mill Crk Replace/Rehab First 23 23 85640

1015 SR 1015 ovr Trib Mill Crk Replace/Rehab Second 14 14 85640

Page 158: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 134 of 259August 16, 2018

Planning Partner: Reading Mode: Bridge County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1015 Donat Road ovr Stoney Run Replace/Rehab First 437 281 12 28 927 1,686 85643

1015 RATS Bridge Preservation #6 Bridge Preservation Activities First 6,180 6,180 107673

1017 SR 1017 over Kistlers Crk Replace/Rehab First 437 114 110 1,721 2,381 10588

1018 SR 1018 ovr Maiden Crk Replace/Rehab First 424 250 674 85648

1018 SR 1018 ovr Maiden Crk Replace/Rehab Second 256 6 23 1,791 2,077 85648

1021 Forgedale Rd Bridge Replace/Rehab First 283 11 93 902 1,289 10746

1025 Centennial Road ovr Little Lehigh Crk Replace/Rehab First 52 10 265 327 94373

1026 West Pine Crk Bridge Replace/Rehab First 23 23 94287

1026 West Pine Crk Bridge Replace/Rehab Second 14 14 94287

1026 1026 Long Lane Bridge Replace/Rehab First 20 20 99519

1035 Valley Road ovr Toad Creek Replace/Rehab First 23 23 85650

1035 Valley Road ovr Toad Creek Replace/Rehab Second 14 14 85650

2005 5th St (SR 2005) Bridge Replace/Rehab First 437 281 718 93626

2005 5th St (SR 2005) Bridge Replace/Rehab Second 12 18,985 18,997 93626

2016 2016o/Readng/BM/Northn RR Replace/Rehab First 530 109 54 4,350 5,043 10527

2017 SR 2017 ovr Schuylkill Rv Replace/Rehab First 1,903 1,903 78894

2023 SR 2023 ov Antietam Creek Replace/Rehab First 77 3,296 3,373 91932

2032 SR 2032 /Br W. Swamp Crk Replace/Rehab First 52 5 6 371 434 10616

2032 Hill Church Road Br Replace/Rehab First 23 23 10859

2032 Hill Church Road Br Replace/Rehab Second 14 14 10859

2041 Weavertown Road Bridge Replace/Rehab First 361 27 103 2,229 2,719 10753

2057 Tollgate Rd over Leaf Creek Replace/Rehab First 412 265 11 27 788 1,503 92043

2087 SR 2087 /Norfolk Southern Replace/Rehab First 524 53 169 5,373 6,119 91995

3003 Freemansville Rd over Angelica CR. Replace/Rehab First 361 265 11 27 675 1,338 79079

3024 SR 3024 ovr I-176 Replace/Rehab First 637 450 39 1,126 110017

3024 SR 3024 ovr I-176 Replace/Rehab Second 12 4,057 4,069 110017

3037 SR 3037 / Mill Race Br Replace/Rehab First 424 169 23 616 94290

3037 SR 3037 / Mill Race Br Replace/Rehab Second 17 580 597 94290

3422 Penn St Bridge Bridge Rehabilitation First 835 835 10740

4015 Tilden Road Bridge Replace/Rehab First 492 281 34 807 10702

4015 Tilden Road Bridge Replace/Rehab Second 12 896 907 10702

4015 SR 4015 o/Trib Irish Cr Replace/Rehab First 60 60 10747

4025 Shoemakersville Bridge Replace/Rehab First 150 150 10701

Page 159: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 135 of 259August 16, 2018

Planning Partner: Reading Mode: Bridge County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4028 Mill Creek Bridge-Hamburg Replace/Rehab First 53 52 1,591 1,696 10693

4040 SR 4040 Bridge Rehab Bundle Replace/Rehab First 1,030 1,093 4,053 6,176 110013

4040 SR 4040 Bridge Rehab Bundle Replace/Rehab Second 2,700 2,700 110013

4040 SR 4040 ovr Northkill Creek Replace/Rehab First 382 382 110078

4040 SR 4040 ovr Northkill Creek Replace/Rehab Second 348 12 29 836 1,225 110078

4040 Old Rte 22 Ovr Birch Creek Replace/Rehab First 21 15 37 110189

4040 SR 4040 over Birch Creek Replace/Rehab First 21 15 37 110191

4040 SR 4040 ovr Trib Birch Crk Replace/Rehab First 21 15 37 110192

4040 SR 4040 over Mollhead Creek Replace/Rehab First 21 15 37 110193

4040 SR 4040 ovr Trib Mollhead Crk Replace/Rehab First 21 15 37 110194

7103 High Boulevard Bridge Bridge Rehabilitation Second 492 253 32 63 840 110088

7103 High Boulevard Bridge Bridge Rehabilitation Third 2,688 2,688 110088

7203 Blacksmith Road Bridge Bridge Rehabilitation First 60 60 103136

7207 Hartz Mill Bridge Replace/Rehab First 1,365 1,365 103141

7212 Glendale Bridge Bridge Replacement First 125 40 35 1,650 1,850 110247

7214 Harvey Ave Bridge Replace/Rehab First 600 600 103149

7214 Gibraltar Road Bridge Replace/Rehab First 309 21 53 1,803 2,186 103884

7222 Schaeffer Rd Bridge Replace/Rehab First 13 13 10718

7227 T-575 Fisher Mill Rd Br Replace/Rehab First 855 855 10766

7233 Rock Hollow Bridge Bridge Rehabilitation Second 553 380 63 127 1,123 110089

7233 Rock Hollow Bridge Bridge Rehabilitation Third 2,688 2,688 110089

7237 Dwight Street Bridge Bridge Rehabilitation Second 369 507 32 127 1,034 10727

7237 Dwight Street Bridge Bridge Rehabilitation Third 2,688 2,688 10727

7243 Burkeys Bridge Replace/Rehab First 50 2,575 2,625 103135

7410 Peach Street Bridge Replace/Rehab First 361 53 52 1,989 2,454 102959

7417 Park View Road Bridge Bridge Replacement Second 567 430 32 127 960 2,116 10774

7417 Park View Road Bridge Bridge Replacement Third 1,728 1,728 10774

7419 Pigeon Creek Bridge Bridge Replacement Second 492 380 63 127 1,062 56728

7419 Pigeon Creek Bridge Bridge Replacement Third 2,688 2,688 56728

Planning Partner: Reading Mode: Transit County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

BARTA Operating Assist. First 37,694 37,694 102286

BARTA ADA Services First 1,908 1,908 102289

Page 160: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 136 of 259August 16, 2018

Planning Partner: Reading Mode: Transit County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

BARTA Cap. Improv. Shop First 280 280 102300

BARTA Cap. Impr. IT Equip First 160 160 102301

BARTA Facility Improve First 4,061 4,061 102302

BARTA Non-Rev. vehicles First 110 110 102303

Purchase Paratransit Vans First 988 988 106740

Replace Telephone System First 75 75 106741

Purchase Office Equipment First 115 115 106742

Preventive Maintenance First 825 825 110608

BARTA Vehicle Replacement First 16,138 16,138 110609

Upgrade AVL System First 1,000 1,000 110613

TDP Update First 250 250 110614

Bus Shelter Replacement First 250 250 110615

Planning Partner: S. Alleghenies Mode: Highway County: BedfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Local Bridge Reserve Bridge Preservation Activities First 459 459 22594

Local Bridge Reserve Bridge Preservation Activities Second 4,842 4,842 22594

Local Bridge Reserve Bridge Preservation Activities Third 14,619 14,619 22594

SA Bridge & Hwy Reserve Administration First 1,475 1,475 72234

SA Bridge & Hwy Reserve Administration Second 6,464 6,464 72234

SA Bridge & Hwy Reserve Administration Third 6,705 6,705 72234

2019 RPM Installation - SA Safety Improvement First 200 200 110132

2020 RPM Installation - SA Safety Improvement First 200 200 110133

26 PA26 Riddlesburg - Saxton Restoration First 1,000 1,000 98773

26 PA26 Riddlesburg - Saxton Restoration Second 4,960 4,960 98773

30 US30 Breezewood Resurface Resurface First 3,750 3,750 91606

30 US 30 Slide Stabilization Safety Improvement Third 10 10 93145

30 US 30 Left Turn Lane at T-455 Safety Improvement First 1,000 1,000 106005

30 US 30 - Scenic Rd to SR 4010 Resurface First 50 50 108154

30 US 30 - Scenic Rd to SR 4010 Resurface Second 3,300 3,300 108154

56 PA56/SR4028 Intersection Intersection Improvement First 4,200 4,200 88524

56 PA 56 - PA 96 to SR 4032 Resurface Second 100 100 107205

56 PA 56 - PA 96 to SR 4032 Resurface Third 2,476 2,476 107205

56 PA 56 Pleasantville Mountain Safety ImprovementsSafety Improvement First 200 249 76 1,524 2,049 110468

Page 161: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 137 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Highway County: BedfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

56 PA 56 Pleasantville Mountain Safety ImprovementsSafety Improvement Second 396 396 110468

70 CMB I-70 Town Hill to Tpike Ramps Safety Improvement First 50 1,600 1,650 110863

96 96 Mryland Ln-Washgtn St Resurface First 75 100 475 650 96349

96 96 Mryland Ln-Washgtn St Resurface Second 6,235 6,235 96349

220 US 220 - Maryland State Line to Narrow LaneResurface Second 100 100 108163

220 US 220 - Maryland State Line to Narrow LaneResurface Third 50 20 25 2,500 2,595 108163

220 US 220 - Cumberland Valley Rd to Turnpike InterResurface Second 100 100 110492

220 US 220 - Cumberland Valley Rd to Turnpike InterResurface Third 4,200 4,200 110492

869 D9 2019 HSIP HFST Safety Improvement First 50 1,900 1,950 110865

913 PA 913 - PA 26 to Huntingdon Co Line Resurface Second 100 100 110499

913 PA 913 - PA 26 to Huntingdon Co Line Resurface Third 2,000 2,000 110499

1019 SR 1019 - PA 26 to PA 26 Resurface First 1,800 1,800 96524

1033 SR 1033 - US 30 to SR 1001 Resurface Second 100 100 108153

2002 SR 2002 - PA 326 to PA 26 Resurface Second 100 100 108192

2002 SR 2002 - PA 326 to PA 26 Resurface Third 1,940 1,940 108192

Planning Partner: S. Alleghenies Mode: Bridge County: BedfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

31 PA31 Kinton Bridge Bridge Rehabilitation First 200 200 596 996 21562

31 PA31 Kinton Bridge Bridge Rehabilitation Second 6,404 6,404 21562

31 Manns Choice Buffalo Run Bridge Improvement First 300 300 96675

31 Manns Choice Buffalo Run Bridge Improvement Second 200 25 2,328 2,553 96675

56 Gordon Creek Bridge Bridge Replacement Second 75 25 25 558 683 92559

56 Gordon Creek Bridge Bridge Replacement Third 558 558 92559

56 Trib Barefoot Run Bridge Improvement First 1,500 1,500 105996

56 PA 56 Tributary to Barefoot Run Bridge Bridge Replacement Second 75 25 10 687 797 110422

96 Gravl Pit/Tar Water Ck Br Bridge Improvement First 150 25 75 274 524 21454

96 Gravl Pit/Tar Water Ck Br Bridge Improvement Second 746 746 21454

96 PA96 Sulphur Sprng Crk Br Bridge Improvement First 150 75 25 522 772 21617

96 PA96 Sulphur Sprng Crk Br Bridge Improvement Second 498 498 21617

96 Trib Little Wills Crk Brg Bridge Improvement First 150 10 50 510 720 88118

96 Trib Little Wills Crk Brg Bridge Improvement Second 510 510 88118

96 PA96 N Bard Trib Culvert Bridge Improvement First 150 50 25 510 735 88119

96 PA96 N Bard Trib Culvert Bridge Improvement Second 510 510 88119

96 PA96 Trib Thompson Run Br Bridge Replacement Second 50 25 1,500 1,575 92701

Page 162: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 138 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Bridge County: BedfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

867 Halter Creek Trib Bridge Improvement First 350 350 74381

869 Osterburg Scrubgrass Crk Bridge Improvement First 25 50 945 1,020 21449

869 Osterburg Scrubgrass Crk Bridge Improvement Second 945 945 21449

869 Bobs Creek Bridge Bridge Rehabilitation Second 100 25 5 731 861 21570

869 Bobs Creek Bridge Bridge Rehabilitation Third 731 731 21570

1005 S Loysburg Beaver Crk Brg Bridge Rehabilitation Second 250 150 20 1,452 1,872 21366

1005 S Loysburg Beaver Crk Brg Bridge Rehabilitation Third 726 726 21366

1015 SR 1015 Beaver Crk Bridge Bridge Improvement First 10 25 1,066 1,101 21465

1015 SR 1015 Beaver Crk Bridge Bridge Improvement Second 234 234 21465

1015 2019 DF Bedford Box Culvert Bridge Improvement First 195 195 21466

1016 2021 DF Bedford Box Culvert Bridge Improvement First 20 10 175 205 74395

1018 Oppenheimer Run Bridge Bridge Rehabilitation Second 50 50 25 1,500 1,625 88124

1020 SR 1020 Pipers Run Bridge Bridge Rehabilitation First 300 300 106489

1034 Sandy Run Bridge Bridge Improvement First 1,200 1,200 21362

1042 SR 1042 Halter Crk Bridge Bridge Improvement First 750 750 98778

3003 Evitts Creek Bridge Bridge Improvement First 940 940 21464

3007 Trib to Sweet Root Creek Culvert Bridge Replacement First 680 680 88129

3011 Evitts Creek Trib Bridge Rehabilitation Second 50 25 25 100 74407

3011 Evitts Creek Trib Bridge Rehabilitation Third 1,000 1,000 74407

3021 Cumberland Vlly Run Br Bridge Replacement Second 75 25 20 525 645 88131

4009 Dunnings Creek Trib Bridg Bridge Improvement First 1,000 1,000 74411

4009 Brush Run Bridge Bridge Improvement First 1,000 1,000 88133

7202 T-609 Snyder Creek Road Bridge Bridge Rehabilitation First 30 10 86 126 96030

7203 T-575 Cold Spring Road Bridge Bridge Improvement First 30 10 441 481 88098

7204 T-357 Harrieta Lane Bridge Bridge Rehabilitation First 30 10 137 177 96031

7207 Oppenheimer Road Bridge Bridge Rehabilitation First 50 353 403 22045

7212 T-613 Colebaugh Road Bridge Bridge Improvement First 30 10 129 169 109135

7216 T-317 Mtn Road Bridge Bridge Improvement First 150 150 88101

7216 T-317 Mtn Road Bridge Bridge Improvement Second 130 10 10 800 950 88101

7217 T-386 Akers Road Bridge Bridge Rehabilitation First 30 10 279 319 96035

7217 T-353 Rice Road Bridge Bridge Improvement First 30 10 154 194 109136

Planning Partner: S. Alleghenies Mode: Transit County: Bedford

Page 163: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 139 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Transit County: BedfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Replace 12 Vehicles 18/19 First 548 548 102501

Tablet Replacement First 20 20 111146

Replace 14 Vehicles 19/20 First 663 663 111148

Replace 17 Vehicles 20/21 First 668 668 111150

Replace 11 Vehicles 21/22 First 611 611 111152

Planning Partner: S. Alleghenies Mode: Highway County: FultonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

16 US 522 - Franklin Co Line Safety Improvement First 600 500 100 3,788 4,988 96544

522 US522 - US 30 to Turnpike Resurface First 100 100 96543

522 US522 - US 30 to Turnpike Resurface Second 20 50 2,201 2,271 96543

522 US522 - US 30 to Turnpike Resurface Third 1,300 1,300 96543

Planning Partner: S. Alleghenies Mode: Bridge County: FultonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

522 US 522 White Oak Run Bridge Improvement First 200 200 110123

522 US 522 White Oak Run Bridge Improvement Second 100 20 800 920 110123

915 Sidlng Hll Ck Br 2 Bridge Replacement Second 250 250 22846

915 Sidlng Hll Ck Br 2 Bridge Replacement Third 200 10 25 1,000 1,235 22846

928 Esther Run Bridge Bridge Rehabilitation Second 300 150 10 460 74377

928 Esther Run Bridge Bridge Rehabilitation Third 1,300 1,300 74377

1005 Little Aughwick Creek Bridge Bridge Rehabilitation First 460 460 74444

2005 2019 DF Fulton Box Culvert Bridge Improvement First 178 178 107162

3013 Barnett's Run Bridge Replacement Second 250 200 10 460 22790

3013 Barnett's Run Bridge Replacement Third 1,361 1,361 22790

3013 Sipes Mill Bridge Bridge Replacement First 1,240 1,240 22802

3013 2020 DF Fulton Box Culvert Dept. Force Culvert Replacement First 15 180 195 107161

3017 SR 3017 - South Brush Creek Bridge Bridge Rehabilitation First 336 336 106491

4007 2017 DF Fulton Box Culvert Dept. Force Culvert Replacement Second 200 150 10 750 1,110 88144

7201 T-338 Laurel Ridge Road Bridge Bridge Improvement First 30 10 209 249 109200

7201 T-372 Ravensburg Road Bridge Bridge Improvement First 30 10 148 188 109201

7205 Tannery Road Bridge Bridge Improvement First 200 10 30 725 965 106419

7206 T-404 Reunion Ground Road Bridge Bridge Improvement First 30 10 132 172 109202

7207 T-437 Wooden Bridge Road Bridge Rehabilitation First 30 10 191 231 107469

7208 T-331 East Pittman Road Bridge Bridge Improvement First 30 10 388 428 109203

Page 164: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 140 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Bridge County: FultonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7210 T-366 Old Route 126 Bridge Bridge Improvement First 30 10 249 289 109204

7210 T-340 Fairview Rd over Indian Grave Run Bridge Improvement First 230 230 110104

7210 T-340 Fairview Rd over Indian Grave Run Bridge Improvement Second 100 10 10 700 820 110104

Planning Partner: S. Alleghenies Mode: Highway County: HuntingdonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 Old Rt 22 Rd - PA 26 Resurface First 2,374 2,374 96597

22 US 22 - Mifflin Line to SR 1010 Resurface First 20 10 4,468 4,498 105978

22 US 22 - Mifflin Line to SR 1010 Resurface Second 2,732 2,732 105978

26 Jackson Corner Slide Safety Improvement Third 100 100 50725

26 Bedford Co. Line-Mtn Rd Resurface First 2,613 2,613 91663

26 Bedford Co. Line-Mtn Rd Resurface Second 8,387 8,387 91663

26 US 22 to Mtn Road Resurface First 450 35 200 685 96568

26 US 22 to Mtn Road Resurface Second 11,200 11,200 96568

522 PA 522 - Keystone Rd to Mifflin County LineResurface Second 100 10 110 108316

522 PA 522 - Keystone Rd to Mifflin County LineResurface Third 2,400 2,400 108316

522 US 522 - Cromwell St to PA 53 Restoration Second 150 150 109604

522 US 522 - Cromwell St to PA 53 Restoration Third 10 20 3,600 3,630 109604

655 Wall St to Front Mtn Road Resurface First 50 50 2,700 2,800 91659

913 Wildcat Rock Slide Stabilization Slides Correction First 50 25 1,178 1,253 106006

913 Wildcat Rock Slide Stabilization Slides Correction Second 322 322 106006

1002 SR 1002 - PA 655 to Front Mountain Rd Resurface Second 100 100 110509

1002 SR 1002 - PA 655 to Front Mountain Rd Resurface Third 500 500 110509

1003 SR 1003 - Brady Twp Line to SR 1001 Resurface Second 100 1,273 1,373 108310

1015 SR 1015 - PA 26 to PA 305 Resurface First 50 50 108261

1015 SR 1015 - PA 26 to PA 305 Resurface Second 1,500 1,500 108261

1025 SR 1025 - SR 1019 to SR 1023 Resurface Second 100 100 108298

2018 Fulton Co to Franklin Co Resurface First 800 800 96584

2021 SR 2021 - SR 2019 to SR 2019 Resurface Second 100 1,000 1,100 108313

2025 SR 2025 - PA 747 to US 522 Resurface First 50 50 733 833 105932

3023 SR 3023 - PA 655 to PA 994 Resurface Second 100 2,000 2,100 108318

3051 SR 3051 - PA 829 to Juniata Twp Line Resurface Second 100 443 543 108308

Planning Partner: S. Alleghenies Mode: Bridge County: HuntingdonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

26 PA26 over Muddy Run Clvrt Bridge Improvement First 855 855 92696

Page 165: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 141 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Bridge County: HuntingdonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

45 PA45 Spruce Creek Bridge Bridge Improvement First 250 250 92714

45 PA45 Spruce Creek Bridge Bridge Improvement Second 200 25 2,560 2,785 92714

103 PA 103/Barnes Run Bridge Rehabilitation Second 250 200 25 475 23133

103 PA 103/Barnes Run Bridge Rehabilitation Third 850 850 23133

305 Herod Run Bridge Bridge Improvement First 900 900 22990

305 Derry Run Bridge Seg 20 Bridge Improvement First 100 100 74436

305 Derry Run Bridge Seg 20 Bridge Improvement Second 10 75 750 835 74436

350 Trib Warriors Mark Run Bridge Replacement Second 250 250 105999

350 Trib Warriors Mark Run Bridge Replacement Third 200 50 50 4,000 4,300 105999

641 PA 641 Trib Shade Creek Bridge Improvement First 175 100 50 616 941 23104

641 PA 641 Trib Shade Creek Bridge Improvement Second 484 484 23104

641 PA 641/Shade Creek Bridge Improvement First 150 40 50 125 365 23105

641 PA 641/Shade Creek Bridge Improvement Second 725 725 23105

747 Hill Valley Creek Bridge #2 Bridge Improvement First 50 50 1,100 1,200 22961

829 PA829 N Spring Crk Bridge Bridge Improvement First 50 50 340 440 88148

829 PA829 N Spring Crk Bridge Bridge Improvement Second 561 561 88148

913 Great Trough Crk Bridge 2 Bridge Improvement First 2,250 2,250 23038

913 PA 913 Sugar Camp Run Bridge Replacement Second 250 200 15 25 750 1,240 91441

994 PA994 Tatman Run Bridge Bridge Improvement First 50 50 440 540 88149

994 PA994 Tatman Run Bridge Bridge Improvement Second 560 560 88149

1009 Huntingdon Boro Muddy #2 Bridge Improvement First 1,275 1,275 88150

1009 Huntingdon Boro Muddy #3 Bridge Improvement First 1,245 1,245 88151

1009 Huntingdon Boro Muddy #4 Bridge Replacement Second 150 200 200 50 1,400 2,000 92697

1013 2020 DF Huntingdon Box Culvert Bridge Rehabilitation First 163 163 74445

1023 Standing Stone Ck #2 Bridge Rehabilitation First 490 490 23036

2004 Lick Run Bridge Bridge Rehabilitation First 50 50 49336

2004 Lick Run Bridge Bridge Rehabilitation Second 10 420 430 49336

2005 SR 2005-Three Springs Creek Bridge Bridge Rehabilitation First 600 600 106492

2009 SR2009 Tuscarora Creek Br Bridge Improvement First 25 50 852 927 23091

2009 Tuscarora Creek Br. Bridge Replacement Second 150 20 170 23115

2009 Tuscarora Creek Br. Bridge Replacement Third 2,000 2,000 23115

2009 Tuscarora Creek Br 4 Bridge Replacement Second 50 10 60 23129

2009 Tuscarora Creek Br 4 Bridge Replacement Third 1,300 1,300 23129

2009 Parsons Run Bridge Bridge Replacement Second 50 50 23130

Page 166: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 142 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Bridge County: HuntingdonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2009 Parsons Run Bridge Bridge Replacement Third 10 20 1,000 1,030 23130

3005 Entriken SR 3005 Coffee Run Bridge Bridge Replacement Second 50 50 110431

3005 Entriken SR 3005 Coffee Run Bridge Bridge Replacement Third 25 25 1,200 1,250 110431

3029 Hares Valley Crk Seg 260 Bridge Rehabilitation Second 250 250 74468

3029 Hares Valley Crk Seg 260 Bridge Rehabilitation Third 200 100 25 1,605 1,930 74468

4019 2019 DF Huntingdon Box Culvert Bridge Improvement First 20 30 15 224 289 23092

7206 T-358 Covered Bridge Road Bridge Bridge Improvement First 30 10 191 231 109205

7211 T-529 Miller Rd over Laurel Run Bridge Improvement First 150 150 50 50 400 110100

7211 T-529 Miller Rd over Laurel Run Bridge Improvement Second 1,100 1,100 110100

7225 T-368 Gr Trough Cr 1 Bridge Improvement First 200 200 23009

7225 T-368 Gr Trough Cr 1 Bridge Improvement Second 100 10 10 1,292 1,412 23009

7411 Hill Valley Creek Bridge Bridge Improvement First 139 50 50 1,180 1,419 106420

Planning Partner: S. Alleghenies Mode: Highway County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

CSX Grade Xing Improvemnt RR Warning Devices First 500 500 103035

CSX Grade Xing Improvemnt RR Warning Devices Second 660 660 103035

Windber Borough 15th St Grade Crossing RR Warning Devices First 200 200 106261

30 PA 160 to Bedford Co Line Resurface First 50 1,766 1,816 96599

30 US 30 - US 219 to PA 985 Resurface First 3,310 3,310 105931

30 US 30 - US 219 to PA 281 Resurface Second 100 30 60 2,000 2,190 110443

30 US 30 - US 219 to PA 281 Resurface Third 2,000 2,000 110443

30 US 30 - Westmorland Co Line to PA 985 Resurface Second 100 100 110491

30 US 30 - Westmorland Co Line to PA 985 Resurface Third 2,400 2,400 110491

31 PA 31 - Westmoreland Co Line to SR 3037Resurface Second 50 10 60 108265

31 PA 31 - Westmoreland Co Line to SR 3037Resurface Third 2,450 2,450 108265

40 Addison Resurface Resurface First 50 50 2,738 2,838 92711

40 Addison Resurface Resurface Second 2,992 2,992 92711

160 Wellersburg Truck Ramp Safety Improvement First 500 500 110160

160 PA 160 - US 30 to State Route 1016 Resurface Second 100 100 110495

160 PA 160 - US 30 to State Route 1016 Resurface Third 3,500 3,500 110495

219 Brotherton Rd to Berlin/Somerset InterchangeResurface First 4,300 4,300 91671

219 Meyersdale Bps-Berlin Resurface First 300 100 150 550 96601

219 Meyersdale Bps-Berlin Resurface Second 18,000 18,000 96601

219 US 219 Salisbury Rockfall Slides Correction First 175 100 150 2,000 2,425 105110

Page 167: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 143 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Highway County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

219 US 219 Salisbury Rockfall Slides Correction Second 1,000 1,000 105110

219 US 219 - MD line to Meyersdale Bypass Resurface First 100 100 105980

219 US 219 - MD line to Meyersdale Bypass Resurface Second 75 30 40 2,201 2,346 105980

219 US 219 - MD line to Meyersdale Bypass Resurface Third 1,300 1,300 105980

403 Wilbur Rd-Cambria Co Line Resurface First 800 100 150 10,010 11,060 96607

1017 SR 1017 - SR 1015 to US 30 Resurface Second 100 100 108275

1017 SR 1017 - SR 1015 to US 30 Resurface Third 2,129 2,129 108275

1018 SR 1018 - PA 160 to SR 1035 Resurface Second 100 100 105983

1018 SR 1018 - PA 160 to SR 1035 Resurface Third 2,000 2,000 105983

1025 SR 1025 - SR 1021 School Rd to PA 403 Resurface Second 100 100 110516

1025 SR 1025 - SR 1021 School Rd to PA 403 Resurface Third 4,500 4,500 110516

1029 SR 1029 - PA 160 to PA 403 Resurface Second 100 100 110517

1029 SR 1029 - PA 160 to PA 403 Resurface Third 3,000 3,000 110517

1031 SR 1031 - Ridge Road to PA 601 Resurface Second 222 222 110524

1031 SR 1031 - Ridge Road to PA 601 Resurface Third 4,000 4,000 110524

1033 Somerset Ave Grade Crossing RR Warning Devices First 250 250 106262

2001 SR 2001 - PA 669 to SR 2003 St Paul Rd Resurface Second 100 100 110515

2001 SR 2001 - PA 669 to SR 2003 St Paul Rd Resurface Third 2,000 2,000 110515

2003 SR 2003 - PA 669 to Mt Davis Rd Resurface Second 100 100 110525

2003 SR 2003 - PA 669 to Mt Davis Rd Resurface Third 1,627 1,627 110525

2004 Mount Davis Road Grade Crossing RR Warning Devices First 225 225 106263

2004 SR 2004 - Rockdale Rd to Masion Dixon RdResurface Second 100 100 110472

2004 SR 2004 - Rockdale Rd to Masion Dixon RdResurface Third 10 680 690 110472

2005 SR 2005 - Mt Davis Rd to Summit Mills Resurface Second 100 100 110505

2005 SR 2005 - Mt Davis Rd to Summit Mills Resurface Third 2,000 2,000 110505

2006 SR 2006 - Grant St to Warrens Mill Resurface Second 100 100 110501

2006 SR 2006 - Grant St to Warrens Mill Resurface Third 4,000 4,000 110501

2010 SR 2010 - SR 2012 to MD State Line Resurface First 1,910 1,910 106474

2016 SR 2016 - Mt Davis Rd to Rockwood Resurface Second 100 100 110511

2016 SR 2016 - Mt Davis Rd to Rockwood Resurface Third 6,000 6,000 110511

2017 SR 2017 - PA 160 to SR 2020 Resurface Second 100 100 110476

2017 SR 2017 - PA 160 to SR 2020 Resurface Third 1,421 1,421 110476

2020 SR 2020 - PA 160 to Glen Savge Rd Resurface Second 100 100 110506

2020 SR 2020 - PA 160 to Glen Savge Rd Resurface Third 449 449 110506

2023 SR 3023 - Cumberland Hwy to White Horse RdResurface Second 100 100 110520

Page 168: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 144 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Highway County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2023 SR 3023 - Cumberland Hwy to White Horse RdResurface Third 2,500 2,500 110520

2023 SR 2023 - PA 160 ro PA 31 Resurface Second 220 220 110523

2023 SR 2023 - PA 160 ro PA 31 Resurface Third 4,800 4,800 110523

2035 SR 2035 - St Paul Rd to Mount Davis Rd Resurface Second 100 100 110450

2035 SR 2035 - St Paul Rd to Mount Davis Rd Resurface Third 5,000 5,000 110450

3002 Braddocks Run Rd to SR 3043 Resurface First 2,472 2,472 96641

3002 Braddocks Run Rd to SR 3043 Resurface Second 853 853 96641

3002 SR 3002 - SR 3043 to US 40 Resurface Second 4,350 4,350 96642

3003 SR 3003 - Ursina to Fairview Ave Resurface Second 100 100 110514

3003 SR 3003 - Ursina to Fairview Ave Resurface Third 5,000 5,000 110514

3005 SR 3005 - PA 281 to Dead End Resurface Second 100 100 107215

3005 SR 3005 - PA 281 to Dead End Resurface Third 120 120 107215

3007 SR 3007 - PA 281 to SR 3006 Casselman RdResurface Second 100 100 110519

3007 SR 3007 - PA 281 to SR 3006 Casselman RdResurface Third 2,000 2,000 110519

3010 Mud Pike Improvements Restoration First 11,300 11,300 21592

3010 SR 3010 - SR 3037 to SR 2031 Resurface First 2,412 2,412 106475

3010 SR 3010 - SR 3037 to SR 2031 Resurface Second 588 588 106475

3011 SR 3011 - PA 281 to SR 2016 Resurface Second 100 100 110473

3011 SR 3011 - PA 281 to SR 2016 Resurface Third 3,321 3,321 110473

3015 SR 3015 - Mud Pike to Main St Resurface Second 100 100 110493

3015 SR 3015 - Mud Pike to Main St Resurface Third 2,000 2,000 110493

3017 SR 3017 - SR 3008 to SR 3015 Resurface Second 100 100 105990

3017 SR 3017 - SR 3008 to SR 3015 Resurface Third 10 2,800 2,810 105990

3019 SR 3019 - SR 3008 to SR 3010 Resurface Second 100 100 108293

3019 SR 3019 - SR 3008 to SR 3010 Resurface Third 2,500 2,500 108293

3033 SR 3033 - PA 653 to Copper Kettle Hwy Resurface Second 100 100 110508

3033 SR 3033 - PA 653 to Copper Kettle Hwy Resurface Third 2,500 2,500 110508

4002 SR 4002 - SR 4013 to SR 4015 Resurface First 150 75 1,500 1,725 106472

4005 PA 31 to Westmoreland County Resurface First 2,440 2,440 96647

4005 PA 31 to Westmoreland County Resurface Second 1,560 1,560 96647

4007 SR 4007 - W Patriot to Felgar Rd Resurface Second 100 100 110500

4007 SR 4007 - W Patriot to Felgar Rd Resurface Third 500 500 110500

4015 SR4009 to SR4023 Resurfac Resurface Second 50 2,500 2,550 105276

4017 SR4017 - PA 281 to US 30 Resurface First 1,835 1,835 96650

4017 SR4017 - PA 281 to US 30 Resurface Second 1,165 1,165 96650

Page 169: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 145 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Highway County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4018 SR 4018 - Northfork Rd to Cambria Co LineResurface Second 100 100 110521

4018 SR 4018 - Northfork Rd to Cambria Co LineResurface Third 2,000 2,000 110521

4022 SR 4022 - PA 403 to PA 601 Resurface Second 100 100 108280

4022 SR 4022 - PA 403 to PA 601 Resurface Third 1,900 1,900 108280

4023 SR 4023 - PA 985 to PA 601 Resurface Second 100 1,680 1,780 108289

4028 SR 4028 - US 30 to PA 281 Resurface Second 100 100 105939

4028 SR 4028 - US 30 to PA 281 Resurface Third 1,000 1,000 105939

4037 SR 4037 - PA 601 to PA 403 Resurface Second 100 100 107211

4037 SR 4037 - PA 601 to PA 403 Resurface Third 200 200 107211

Planning Partner: S. Alleghenies Mode: Bridge County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

31 PA31 Trib Stonycreek Br 1 Bridge Improvement First 75 50 2,685 2,810 92702

160 Dark Shade Creek Bridge Bridge Improvement First 225 100 60 2,100 2,485 23434

160 South Berlin PA 160 Buffalo Creek Bridge Bridge Replacement Second 250 200 20 3 944 1,417 110427

601 Holsopple Bridge Bridge Improvement First 190 190 23450

601 Holsopple Bridge Bridge Improvement Second 60 200 50 25 800 1,135 23450

601 PA 601/Shade Creek Bridge Improvement First 400 50 150 2,700 3,300 23566

601 N Ferrellton PA 601 Trib Quemahoning CrkBridge Replacement Second 100 20 15 700 835 110428

653 PA653 Laurel Hill Crk Brg Bridge Replacement Second 400 300 25 50 1,100 1,875 23462

653 PA653 Laurel Hill Crk Brg Bridge Replacement Third 1,100 1,100 23462

985 PA 985/Bens Run Bridge Replacement Second 75 150 75 25 1,150 1,475 23576

985 PA985 Trb Beaverdam Rn Br Bridge Improvement First 200 10 15 630 855 92699

985 PA985 Trib Bens Crk Br Bridge Improvement First 1,150 1,150 92700

1004 East Shanksville Bens Run Bridge Replacement Second 25 50 800 875 74450

1007 North Shanksville Trib Bridge Improvement First 50 25 550 625 74452

1007 N. Shanksville Grove Run Bridge Improvement First 50 25 525 600 91444

1015 Juniata Rv Raystwn Br Brg Bridge Improvement First 25 50 1,000 1,075 23589

1018 S Central City Brdg Replace/Rehab First 300 300 21615

1021 Miller Run BR Bridge Rehabilitation Second 75 75 74460

1021 Miller Run BR Bridge Rehabilitation Third 10 25 1,300 1,335 74460

2001 SR2001 Laurel Crk Bridge Bridge Replacement Second 75 75 88159

2001 SR2001 Laurel Crk Bridge Bridge Replacement Third 50 5 25 1,500 1,580 88159

2010 Little Piney Run BR Bridge Rehabilitation Second 75 25 10 20 553 683 74469

Page 170: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 146 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Bridge County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2016 Rhoads Creek Bridge Bridge Improvement First 1,300 1,300 74476

2017 Hillegas Run Bridge Bridge Replacement Second 75 10 10 95 88162

2017 Hillegas Run Bridge Bridge Replacement Third 1,000 1,000 88162

2020 Poorbaugh Run BR Bridge Rehabilitation Second 100 10 110 74481

2020 Poorbaugh Run BR Bridge Rehabilitation Third 1,300 1,300 74481

3015 Rockwood Trib Coxes Creek #1 Bridge Improvement First 500 500 105997

3015 Rockwood Trib Coxes Creek #2 Bridge Improvement First 600 600 105998

3029 Middle Creek Bridge Bridge Replacement Second 75 50 20 20 165 23458

3029 Middle Creek Bridge Bridge Replacement Third 1,409 1,409 23458

3039 Triple Creek Road over Allen Creek Bridge Replacement First 506 506 56644

4001 Schaffer Run Bridge Bridge Rehabilitation First 75 75 23316

4001 Schaffer Run Bridge Bridge Rehabilitation Second 50 5 15 824 894 23316

4004 2019 DF Somerset Box Culvert Bridge Improvement First 162 162 74493

4004 Beaver Dam Creek Bridge Bridge Improvement First 50 50 600 700 106000

4008 2020 DF Somerset Box Culvert Bridge Improvement First 20 20 198 238 107165

4013 SR4013 Spruce Run Bridge Bridge Replacement Second 75 15 90 88166

4013 SR4013 Spruce Run Bridge Bridge Replacement Third 1,500 1,500 88166

4023 Black Hills Rd Beaver Dam Crk Replace/Rehab First 100 100 110129

4023 Black Hills Rd Beaver Dam Crk Replace/Rehab Second 10 25 1,229 1,264 110129

4041 Stony Creek Trib Br Bridge Replacement Second 50 50 100 469 669 23551

4041 Stony Creek Trib Br Bridge Replacement Third 437 437 23551

7201 T-858 Braddocks Run Bridge Bridge Rehabilitation First 235 235 106427

7203 T-501 Beagle Road Bridge Bridge Rehabilitation First 30 10 195 235 96052

7205 T-676 Glessner Road Bridge Bridge Rehabilitation First 30 10 273 313 88100

7205 T-800 Abex Road Bridge Bridge Improvement First 30 10 960 1,000 109208

7206 T-323 Tub Mill Run Rd Br Bridge Rehabilitation First 260 260 96053

7210 T-586 Brehm Road Bridge Bridge Rehabilitation First 30 10 98 138 96054

7216 T-755 Tooland Road Bridge Bridge Improvement First 30 10 241 281 109209

7217 T-773 Crescent Drive Bridge Bridge Rehabilitation First 30 10 189 229 96056

7218 T-804 Spruce Street Bridge Bridge Improvement First 30 10 125 165 88105

7219 T-611 Dunmyer Road Bridge Bridge Rehabilitation First 30 10 213 253 96058

7219 T-640 Reffner Rd Br Replace/Rehab First 260 260 96059

Page 171: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 147 of 259August 16, 2018

Planning Partner: S. Alleghenies Mode: Bridge County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7220 T-712 Rockingham Bridge Bridge Improvement First 200 200 72477

7220 T-712 Rockingham Bridge Bridge Improvement Second 100 50 50 1,100 1,300 72477

7221 T-519 Waltersmill Road Bridge Bridge Rehabilitation First 30 10 234 274 96060

7221 T-524 Sechler Road Bridge Bridge Improvement First 30 10 215 255 109210

7223 T-539 Baltzer Bridge Road Bridge Improvement First 30 10 128 168 109211

7224 T-504 Ficke Bridge Bridge Improvement First 250 200 100 100 650 23357

7224 T-504 Ficke Bridge Bridge Improvement Second 885 885 23357

7411 Walnut St Bridge Rehab Bridge Rehabilitation First 30 10 214 254 96062

9900 24th Street Bridge Bridge Improvement First 250 250 23532

9900 24th Street Bridge Bridge Improvement Second 150 50 50 1,000 1,250 23532

9900 S. 22nd Street Brdg. Bridge Improvement First 40 40 23534

9900 S. 22nd Street Brdg. Bridge Improvement Second 10 125 135 23534

Planning Partner: S. Alleghenies Mode: Transit County: SomersetTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3 New ADA Vans 2019/20 First 200 200 106920

3 Share Ride Vans 20/21 First 200 200 111154

3 Share Ride Vans 21/22 First 200 200 111155

3 Share Ride Vans 19/20 First 200 200 111156

New Phone System First 15 15 111276

Replace Tablets First 9 9 111277

Planning Partner: Scranton/W-B Mode: Highway County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Scranton-NYC RR Line Item Transportation Study First 10 10 57729

FAS-Loc, Lackawanna Co. Restoration First 800 800 70194

FAS-Loc, Lackawanna Co. Restoration Second 1,600 1,600 70194

LLTS Highway Reserve Reconstruct First 9,706 9,706 73300

LLTS Highway Reserve Reconstruct Second 44,109 44,109 73300

LLTS Highway Reserve Reconstruct Third 43,850 43,850 73300

Lck Co 'K' Rts Line Item Resurface First 800 800 73359

Lck Co 'K' Rts Line Item Resurface Second 1,600 1,600 73359

Dunmore Boro 5 Leg Miscellaneous First 400 400 74716

Old Forge Local Miscellaneous First 200 200 74718

LLTS Bridge Review Bridge Rehabilitation First 1 1 84388

Page 172: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 148 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Highway County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

LLTS Project Delivery Restoration First 100 100 86914

Main St Corridor Ph IIIA Traffic Signals Existing Signal Improvement First 2,600 2,600 105173

Keystone College Community Gateway ProjectTransportation Enhancement First 49 49 107971

Lackawanna River Heritage Trail- Dickson CityTransportation Enhancement First 80 80 108122

Archbald Corridor RR Warning Devices First 582 582 111112

6 SR 6 (Robert P. Casey Highway) to SR 6006Restoration First 2,500 2,000 8,000 12,500 61813

6 SR 6 (Robert P. Casey Highway) to SR 6006Restoration Second 27,200 27,200 61813

11 Group 4-18-ST 10 Restoration Second 6,500 6,500 100540

11 Group 4-18-ST 1 Restoration Third 6,500 6,500 102067

81 Drinker St NB Exit Signal Safety Improvement First 1,000 1,000 95263

106 Group 4-21-ST 1 Restoration Second 6,500 6,500 102096

107 Group 4-19-ST 4 Restoration Third 6,500 6,500 102090

247 SR 247 Expand Jessup Borough Park and RidePark and Ride Lot First 100 2,500 2,600 106681

307 Structure Asset Management Bridge Improvement First 1,500 6,000 7,500 106618

307 Structure Asset Management Bridge Improvement Third 3,000 24,000 27,000 106618

348 SR 348 Intersection Imp Safety Improvement First 3,000 3,000 94567

438 Group 4-22-ST 1 Restoration Second 5,500 5,500 102117

524 Group 4-20-ST 1 Resurface First 5,000 5,000 101999

590 Group 4-22-ST 1 Resurface First 7,000 7,000 102012

690 Bridge Preservation 1 Bridge Preservation Activities First 1,500 1,500 95487

690 Bridge Preservation 1 Bridge Preservation Activities Second 2,000 2,000 95487

690 Bridge Preservation 1 Bridge Preservation Activities Third 8,000 8,000 95487

690 Group 4-20-ST 1 Restoration Second 6,300 6,300 102092

1005 SR 11; SR 1005; SR 6006 Paving Restoration Third 6,500 6,500 102061

1006 Group 4-18-ST 7 Restoration Third 6,500 6,500 102072

1012 Group 4-16-ST 7 Restoration Second 7,000 7,000 102004

1013 Group 4-15-ST 7 Restoration Second 6,200 6,200 101984

2009 Fed Aid Paving 4-21-FP1 Resurface Second 12,000 12,000 102557

2103 Fed Aid Paving 4-22-FP1 Resurface First 8,500 8,500 102558

3013 SR 3013 Main Street Signal Corridor Safety Improvement First 3,000 3,000 102866

3014 SR 3014 Dalton Street Railroad Lights /GatesRR Warning Devices First 60 60 106131

Page 173: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 149 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Highway County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3017 SR 3017 Main Street Railroad Lights /GatesRR Warning Devices First 48 48 106134

8002 Tigue Street Park N Ride Park and Ride Lot First 1,500 1,500 92949

Planning Partner: Scranton/W-B Mode: Bridge County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T437 College Av Marcomis Replace/Rehab First 262 262 67085

T437 College Av Marcomis Replace/Rehab Second 1,500 1,500 67085

Goers Hill Bridge No. 3 over White Oak RunBridge Replacement First 450 450 67170

Goers Hill Bridge No. 3 over White Oak RunBridge Replacement Second 250 250 67170

Goers Hill Bridge No. 3 over White Oak RunBridge Replacement Third 1,680 1,680 67170

11 SR 11 over Theodore Street Bridge Preservation Activities First 1,500 1,500 68746

11 SR 11 over SR 6011 Bridge Preservation Activities First 100 1,000 1,100 68754

11 US 11 over Railroad Bridge Preservation Activities First 1,000 1,000 95454

107 SR 107 over Branch Tunkhannock Creek Replace/Rehab First 250 800 1,050 67227

307 SR 307 over Interstate 380 Bridge Preservation Activities First 50 3,000 3,050 8238

307 Shady Lane Arch Bridge Replacement First 750 750 8259

307 SR 307 over Green Run Replace/Rehab First 400 300 1,000 1,700 8312

307 SR 307 over Williams Bridge Reservoir Replace/Rehab First 350 1,750 2,100 67203

407 SR 407 over Lackawanna Lake Bridge Rehabilitation First 100 2,500 2,600 8242

435 SR 435 over Lackawanna County Railroad AuthorityBridge Replacement First 400 400 8191

435 SR 435 over Lackawanna County Railroad AuthorityBridge Replacement Second 5,000 5,000 8191

435 SR 435 over Interstate 84 Bridge Preservation Activities First 350 2,500 2,850 97930

435 SR 435 over Roaring Brook Bridge Replacement First 500 500 109778

435 SR 435 over Roaring Brook Bridge Replacement Second 3,500 3,500 109778

438 SR 438 over South Branch Tunkhannock CreekBridge Preservation Activities First 650 650 8245

632 SR 632 over Ackerly Creek Replace/Rehab First 250 250 96719

632 SR 632 over Ackerly Creek Replace/Rehab Second 1,000 1,000 96719

632 SR 632 over Tributary Lily Lake Replace/Rehab First 350 300 650 100487

632 SR 632 over Tributary Lily Lake Replace/Rehab Second 1,250 1,250 100487

690 SR 690 over Van Brunt Creek Bridge Rehabilitation First 350 300 650 8174

690 SR 690 over Van Brunt Creek Bridge Rehabilitation Second 1,500 1,500 8174

1015 SR 1015 over I-81 Bridge Replacement First 100 100 68836

1015 SR 1015 over I-81 Bridge Replacement Second 3,050 3,050 68836

1019 SR 1019 over SR 6 Bridge Preservation Activities First 2,500 2,500 101498

Page 174: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 150 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Bridge County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2001 SR 2001 over Outlet Kizer Pond Replace/Rehab First 850 850 67205

2013 SR 2013 over Meadow Brook Bridge Replacement First 100 100 79521

2013 SR 2013 over Meadow Brook Bridge Replacement Second 1,000 1,000 79521

2013 SR 2013 over Pond Creek Bridge Rehabilitation First 800 800 97105

3002 SR 3002 over Gardner and Pond Creeks Bridge Preservation Activities First 100 100 97020

3002 SR 3002 over Gardner and Pond Creeks Bridge Preservation Activities Second 750 750 97020

3006 SR 3006 over Gardner Creek Bridge Replacement First 300 300 8308

3006 SR 3006 over Gardner Creek Bridge Replacement Second 1,000 1,000 8308

3012 SR 3012 over Keyser Creek Replace/Rehab First 400 350 750 8156

3012 SR 3012 over Keyser Creek Replace/Rehab Second 1,500 1,500 8156

3015 SR 3015 over Lackawanna River Bridge Rehabilitation First 2,500 2,500 8230

3017 SR 3017 over Lackawanna River Bridge Rehabilitation First 400 350 750 8182

3017 SR 3017 over Lackawanna River Bridge Rehabilitation Second 1,000 1,000 8182

3020 SR 3020 over Lackawanna County Rail AuthorityReplace/Rehab First 400 400 8384

3020 SR 3020 over Lackawanna County Rail AuthorityReplace/Rehab Second 350 5,000 5,350 8384

3023 SR 3023 over Roaring Brook Replace/Rehab First 400 300 700 67199

3023 SR 3023 over Roaring Brook Replace/Rehab Second 7,000 7,000 67199

4005 SR 4005 over D&H RR Replace/Rehab First 4,000 4,000 68853

4011 SR 4011 over South Branch Tunkannock CreekReplace/Rehab First 350 350 67234

4011 SR 4011 over South Branch Tunkannock CreekReplace/Rehab Second 300 1,000 1,300 67234

4023 SR 4023 over Spillway Griffin Reservoir Bridge Rehabilitation First 350 300 650 97932

4023 SR 4023 over Spillway Griffin Reservoir Bridge Rehabilitation Second 750 750 97932

4036 SR 4036 over Branch Falls Creek Replace/Rehab First 275 1,000 1,275 100499

6006 SR 6006 over Lackawanna River Bridge Preservation Activities Second 500 500 90260

6011 SR 6011 Green Ridge Street over Lackawanna RiverBridge Replacement First 450 6,000 6,450 84368

7204 T-309 over Lehigh River Bridge Replacement First 438 3,500 3,938 7924

7301 6th Ave.Bridge,Carbondale Bridge Replacement First 2,000 2,000 8040

7302 West Lackawanna Ave. Bridge over Conrail RailroadReplace/Rehab First 400 10 8,000 8,410 7764

7302 North Main Avenue Bridge over Leggetts CreekReplace/Rehab First 288 288 7911

7302 North Main Avenue Bridge over Leggetts CreekReplace/Rehab Second 1,500 1,500 7911

7302 Parker Street Bridge over Lackawanna RiverReplace/Rehab First 250 250 80797

7302 Parker Street Bridge over Lackawanna RiverReplace/Rehab Second 520 520 80797

7302 Parker Street Bridge over Lackawanna RiverReplace/Rehab Third 1,680 1,680 80797

7302 Elm Street Bridge over Lackawanna River Bridge Rehabilitation First 345 345 106314

Page 175: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 151 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Bridge County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7302 Elm Street Bridge over Lackawanna River Bridge Rehabilitation Second 3,125 3,125 106314

8001 SR 8001 ramp over Route 11 Bridge Replacement First 518 518 8256

8001 SR 8001 ramp over Route 11 Bridge Replacement Second 8,500 8,500 8256

8008 SR 8008 over I-84 / I-380 Bridge Preservation Activities First 1,550 1,550 8257

8015 SR 8015 over Leggett's Creek Replace/Rehab First 350 300 650 69210

8015 SR 8015 over Leggett's Creek Replace/Rehab Second 2,750 2,750 69210

8025 SR 8025 over Roaring Brook and Service RoadBridge Rehabilitation First 450 450 106664

8025 SR 8025 over Roaring Brook and Service RoadBridge Rehabilitation Second 600 6,800 7,400 106664

8041 SR 8041 over SR 11 Bridge Preservation Activities First 50 2,000 2,050 69172

Planning Partner: Scranton/W-B Mode: Transit County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Preventative Maintanence First 2,250 2,250 70517

Tire Lease First 300 300 70518

COLTS Patransit Vans First 483 483 102137

Purchase 3 CNG buses First 6,600 6,600 111244

ADA paratranist service First 1,120 1,120 111245

Shared Ride Van First 65 65 111247

Service Vehicle First 110 110 111249

IT Software & equip First 50 50 111250

Planning Partner: Scranton/W-B Mode: Highway County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

FAS-Loc, Luzerne Co. Reconstruct First 850 850 82906

FAS-Loc, Luzerne Co. Reconstruct Second 1,600 1,600 82906

K-Route Luzerne County Resurface First 850 850 95494

K-Route Luzerne County Resurface Second 1,600 1,600 95494

SR 315 / 2017 Inters Imp Safety Improvement First 4,050 4,050 102011

SR 2002 (San Souci Parkway) ReconstructionRestoration First 2,000 2,000 102030

SR 2002 (San Souci Parkway) ReconstructionRestoration Third 26,500 26,500 102030

SR 239 Safety Improvements Safety Improvement First 350 1,500 1,850 105164

SR 2027 McAlpine Street over Mill Creek RR Warning Devices First 82 82 106127

Commerce Boulevard Crossing RR Warning Devices First 300 300 106324

Greater Hazleton Rails to Trails (GHRT) PH IIITransportation Enhancement First 270 270 108017

C and H Corridor RR Warning Devices First 500 500 111134

Page 176: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 152 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Highway County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 SR 11 Main St & SR 2027 McAlpine St Safe ImproveIntersection Improvement First 2,500 2,500 79522

11 Group 4-20-ST 2 Restoration Third 11,300 11,300 102093

11 Group 4-20-ST 4 Restoration Second 6,000 6,000 102095

11 Fed Aid Paving 4-20-FP1 Resurface Third 10,000 10,000 102556

81 Blackman St SB Ramp Miscellaneous First 450 2,500 2,950 85008

81 Blackman St SB Ramp Miscellaneous Second 2,500 2,500 85008

93 Group 4-19-ST 5 Restoration Third 9,800 9,800 102091

115 SR 115 Pipe Replacement Drainage Improvement First 100 100 101479

115 SR 115 Pipe Replacement Drainage Improvement Second 2,500 2,500 101479

115 Group 4-18-ST 2 Restoration Third 7,000 7,000 102068

115 Fed Aid Paving 4-24-FP1 Surface Treatment Second 11,300 11,300 102563

118 Cooks Store Intersection Safety Improvement First 2,600 2,600 92444

118 Group 4-19-ST 2 Restoration Second 3,800 3,800 102088

118 Group 4-21-ST 2 Restoration Third 7,100 7,100 102113

309 Butler Twp. Park & Ride Park and Ride Lot First 350 300 2,000 2,650 64481

309 Union St @ 309 Park-Ride Park and Ride Lot First 300 2,560 2,860 93038

309 Fed Aid Paving SR 309 (FFY 19) Resurface First 10,000 10,000 102562

309 SR 309 Signal Corridor Safety Improvement First 400 400 110327

309 SR 309 Signal Corridor Safety Improvement Second 2,000 2,000 110327

315 Fed Aid Paving 4-25-FP1 Surface Treatment Third 10,000 10,000 102568

339 SR 339 Reconstruction Restoration First 1,000 1,000 104265

424 Ext of 424 to SR 924 New Roadway First 20,000 20,000 70467

487 Group 4-16-ST 8 Restoration Third 6,500 6,500 102005

502 Bridge Preservation 2 Bridge Preservation Activities First 1,500 1,500 95486

502 Bridge Preservation 2 Bridge Preservation Activities Second 2,000 2,000 95486

502 Bridge Preservation 2 Bridge Preservation Activities Third 8,000 8,000 95486

502 Fed Aid Paving 4-26-FP1 Surface Treatment Third 10,000 10,000 102570

1032 Group 4-15-ST 8 Restoration Second 6,200 6,200 101988

2002 Nanticoke Streetscape Transportation Enhancement First 3,808 3,808 74761

2002 Luzerne SR 2002 (San Souci Parkway) PavingResurface First 2,500 2,500 93945

2002 Luzerne SR 2002 (San Souci Parkway) PavingResurface Second 3,400 3,400 93945

2002 Nanticoke Streetscaping Transportation Enhancement First 2,000 2,000 105050

Page 177: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 153 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Highway County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2005 SR 2005 Reconstruction Restoration First 400 7,000 7,400 102116

2006 Group 4-17-ST 8 Restoration Third 6,500 6,500 102062

2015 SR 2015 / 2004 Int Imprv Safety Improvement First 2,800 2,800 102007

2019 Group 4-15-ST 2 Resurface Third 7,000 7,000 101928

2028 Group 4-18-ST 8 Restoration Third 7,000 7,000 102073

2031 SR 2031 Stephenson Street Railroad Lights /GatesRR Warning Devices First 106 106 106130

2035 CP Pittston / Dupont Corr RR Warning Devices First 900 900 103196

8035 Group 4-17-ST 2 Resurface Third 6,500 6,500 102013

9900 Chase Road (County Rd 13) Restoration First 1,500 1,500 8606

9900 Hillside-Huntsville CR 16 Restoration Second 250 2,800 3,050 8608

Planning Partner: Scranton/W-B Mode: Bridge County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SR 2005 over Bowman Spring Run Bridge Preservation Activities First 450 450 8999

SR 6309 over Luzerne County Rail AuthorityReplace/Rehab First 403 403 67410

SR 6309 over Luzerne County Rail AuthorityReplace/Rehab Second 9,500 9,500 67410

SR 29 over New Commerce Boulevard Bridge Preservation Activities First 400 350 750 69228

SR 29 over New Commerce Boulevard Bridge Preservation Activities Second 2,250 2,250 69228

11 SR 11 over Hunlock Creek Bridge Replacement First 350 300 650 67296

11 SR 11 over Hunlock Creek Bridge Replacement Second 1,750 1,750 67296

11 SR 11 over Railroad and Mill Creek Bridge Rehabilitation First 2,500 2,500 67434

11 SR 11 over SR 2037, Susquehanna River and RailroadReplace/Rehab First 3,250 3,250 93931

11 SR 11 over SR 2037, Susquehanna River and RailroadReplace/Rehab Second 3,750 3,750 93931

11 SR 11 over SR 2037, Susquehanna River and RailroadReplace/Rehab Third 50,000 50,000 93931

29 SR 29 over Pikes Creek Bridge Preservation Activities First 300 300 101386

29 SR 29 over Pikes Creek Bridge Preservation Activities Second 288 1,000 1,288 101386

92 SR 92 over Lewis Creek Replace/Rehab First 288 50 1,000 1,338 67471

93 SR 93 over Nescopeck Creek Bridge Replacement First 730 2,250 2,980 9079

115 SR 115 over I-81 Interchange Improvement First 1,250 25,000 26,250 9128

115 SR 115 over Reading Blue Mt and Northern RailroadBridge Replacement First 350 350 67304

115 SR 115 over Reading Blue Mt and Northern RailroadBridge Replacement Second 400 2,750 3,150 67304

118 SR 118 over Tributary Huntsville ReservoirReplace/Rehab First 275 950 1,225 68918

239 SR 239 over Branch Huntington Creek Replace/Rehab First 250 250 68933

239 SR 239 over Branch Huntington Creek Replace/Rehab Second 750 750 68933

Page 178: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 154 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Bridge County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

239 SR 239 over Pine Creek Bridge Replacement First 350 300 650 110085

239 SR 239 over Pine Creek Bridge Replacement Second 2,500 2,500 110085

309 SR 309 over Branch Fern Creek Replace/Rehab First 750 750 9174

309 SR 309 over Toby Creek Bridge Replacement First 400 4,000 4,400 56623

309 SR 309 over Leonards Creek Bridge Replacement First 350 350 67283

309 SR 309 over Leonards Creek Bridge Replacement Second 300 2,500 2,800 67283

309 SR 309 over SR 2022 and Railroad Bridge Preservation Activities First 7,000 7,000 67366

309 SR 309 over Wilkes Barre Boulevard Bridge Preservation Activities First 2,800 2,800 67417

309 SR 309 over SR 2022 Bridge Rehabilitation First 2,500 2,500 79594

309 SR 309 over Laurel Run Creek Bridge Rehabilitation First 1,250 1,250 84374

309 SR 309 over Nescopeck Ck Bridge Replacement First 5,000 5,000 93006

309 SR 309 over SR 8039 Ramp A Bridge Rehabilitation First 350 6,000 6,350 97941

309 SR 309 over Toby Creek 1 Replace/Rehab First 350 4,000 4,350 97942

309 SR 309 over Toby Creek 2 Bridge Rehabilitation First 350 4,000 4,350 97943

309 SR 309 over SR 1013 Union St & SR 309 ov Evans StBridge Preservation Activities First 6,000 6,000 105115

315 SR315 over Trib Gardners Creek Replace/Rehab First 1,000 1,000 9181

315 SR 315 over Reading Blue Mt and Northern RailroadBridge Preservation Activities First 403 350 753 67491

315 SR 315 over Reading Blue Mt and Northern RailroadBridge Preservation Activities Second 2,500 2,500 67491

437 SR 437 over Railroad Bridge Preservation Activities First 50 1,000 1,050 101927

924 SR 924 over SR 81 Bridge Preservation Activities First 100 100 9084

924 SR 924 over SR 81 Bridge Preservation Activities Second 3,750 3,750 9084

924 TR 924 Over Conrail,Hazle Bridge Rehabilitation First 2,500 2,500 67456

1005 SR 1005 over Becker's Creek Replace/Rehab First 250 750 1,000 100508

1012 SR 1012 ov Harvey's Creek Bridge Replace/Rehab First 350 300 650 57671

1012 SR 1012 ov Harvey's Creek Bridge Replace/Rehab Second 750 750 57671

1012 SR 1012 over Br Harvey's Creek Replace/Rehab First 1,050 1,050 68966

1012 SR 1012 over Tributary Harvey's Creek Replace/Rehab First 400 350 750 96721

1012 SR 1012 over Tributary Harvey's Creek Replace/Rehab Second 1,000 1,000 96721

1014 SR 1014 Overbrook over SR 309 Bridge Rehabilitation First 60 2,000 2,060 68977

1025 SR 1025 over Hicks Creek Replace/Rehab First 350 1,000 1,350 89712

1036 SR 1036 over Leonards Creek Bridge Preservation Activities First 50 550 600 9024

1036 SR 1036 over Abrahams Creek Bridge Preservation Activities First 100 100 101388

Page 179: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 155 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Bridge County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1036 SR 1036 over Abrahams Creek Bridge Preservation Activities Second 1,000 1,000 101388

1038 SR 1038 over Obendorfers Creek Replace/Rehab First 750 750 67470

1044 SR 1044 over Abraham's Creek Replace/Rehab First 300 300 96722

1044 SR 1044 over Abraham's Creek Replace/Rehab Second 2,000 2,000 96722

1048 SR 1048 over Harvey's Creek Bridge Replacement First 300 1,000 1,300 68992

1050 SR 1050 over Toby Creek Bridge Replacement First 1,750 1,750 9175

1415 SR 1415 over Tributary Harvey's Lake CreekBridge Replacement First 350 350 67291

1415 SR 1415 over Tributary Harvey's Lake CreekBridge Replacement Second 750 750 67291

2002 SR 2002 over Warrior Creek Bridge Replacement First 350 300 650 67408

2002 SR 2002 over Warrior Creek Bridge Replacement Second 2,600 2,600 67408

2010 SR 2010 over SR 29 Bridge Rehabilitation First 450 450 9087

2010 SR 2010 over SR 29 Bridge Rehabilitation Second 400 4,000 4,400 9087

2010 SR 2010, SR 1036, SR 3024 Bridge PreservationBridge Preservation Activities First 2,500 2,500 102000

2019 SR 2019 over I-81 Bridge Preservation Activities First 100 100 69001

2019 SR 2019 over I-81 Bridge Preservation Activities Second 750 750 69001

2026 SR 2026 over Gardner's Creek Bridge Preservation Activities First 100 650 750 9006

2035 SR 2035 Suscon Road over Bear Creek Replace/Rehab First 300 250 550 8741

2035 SR 2035 Suscon Road over Bear Creek Replace/Rehab Second 1,000 1,000 8741

2036 SR 2036 over Red Run Bridge Replacement First 35 35 67280

2036 SR 2036 over Red Run Bridge Replacement Second 500 500 67280

2040 SR 2040 over Kendall Creek Replace/Rehab First 350 350 94303

2040 SR 2040 over Kendall Creek Replace/Rehab Second 300 1,500 1,800 94303

2041 SR 2041 over Bear Creek Bridge Replacement First 350 350 79532

2041 SR 2041 over Bear Creek Bridge Replacement Second 1,500 1,500 79532

2042 SR 2042 over Little Wapwallopen Creek Replace/Rehab First 350 300 650 96724

2042 SR 2042 over Little Wapwallopen Creek Replace/Rehab Second 1,000 1,000 96724

2045 SR 2045 over Bow Creek Bridge Replacement First 875 875 67449

3004 SR 3004 over Turtle Run Creek Replace/Rehab First 350 350 67450

3004 SR 3004 over Turtle Run Creek Replace/Rehab Second 300 1,000 1,300 67450

3004 SR 3004 over Espy Run Replace/Rehab First 350 350 67482

3004 SR 3004 over Espy Run Replace/Rehab Second 300 1,000 1,300 67482

3007 SR 3007 over Little Wapwallopen Creek Replace/Rehab First 288 50 1,000 1,338 67409

3010 SR 3010 over Branch Wapwallopen CreekReplace/Rehab First 400 400 93036

3010 SR 3010 over Branch Wapwallopen CreekReplace/Rehab Second 325 2,750 3,075 93036

Page 180: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 156 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Bridge County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3014 SR 3014 over Nescopeck Creek Replace/Rehab First 2,050 2,050 8868

3019 SR 3019 over Hazle Creek Bridge Replacement First 1,750 1,750 79534

3034 SR 3034 over Nescopeck Creek Bridge Rehabilitation First 1,250 1,250 8434

3040 SR 3040 over Tributary Nescopeck Creek Replace/Rehab First 400 50 1,000 1,450 67333

3040 SR 3040 over Tributary Nescopeck Creek Replace/Rehab First 350 350 67460

3040 SR 3040 over Tributary Nescopeck Creek Replace/Rehab Second 300 1,000 1,300 67460

4004 SR 4004 ov Shickshinny Ck Bridge Replacement First 500 500 9025

4010 SR 4010 over Tributary Huntington Creek Replace/Rehab First 1,000 1,000 67298

4015 SR 4015 over Kitchen Creek Bridge Rehabilitation First 1,000 1,000 101387

4016 SR 4016 over Reyburn Creek Replace/Rehab First 300 50 1,000 1,350 67329

4024 SR 4024 over Laurel Run Replace/Rehab First 350 350 79525

4024 SR 4024 over Laurel Run Replace/Rehab Second 300 750 1,050 79525

4025 SR 4025 over Roaring Brook Replace/Rehab First 500 500 89913

4033 SR 4033 over Branch Pine Creek Replace/Rehab First 1,000 1,000 67290

4035 SR 4035 over Pine Creek Bridge Rehabilitation First 350 300 650 101925

4035 SR 4035 over Pine Creek Bridge Rehabilitation Second 2,500 2,500 101925

7204 SR 7204 over Nescopeck Creek Bridge Replacement First 288 938 1,225 8759

7215 T-375 over Hollenback Bridge Bridge Replacement First 100 100 8756

7215 T-375 over Hollenback Bridge Bridge Replacement Second 100 313 63 125 600 8756

7215 T-375 over Hollenback Bridge Bridge Replacement Third 630 630 8756

7215 T-392 over Wapwallopen Creek Bridge Bridge Replacement Third 150 80 1,000 1,230 8765

7217 T-482 over Huntington Creek Bridge Replacement First 100 100 8757

7217 T-482 over Huntington Creek Bridge Replacement Second 100 300 2,000 2,400 8757

7217 T-472 over Huntington Creek Bridge Replacement Third 150 80 1,000 1,230 8767

7230 T338 Lit. Nescopeck Brg Bridge Replacement Second 300 300 8758

7230 T338 Lit. Nescopeck Brg Bridge Replacement Third 1,500 1,500 3,000 8758

7304 N Washington St. over Luzerne/Susquehanna RailroadReplace/Rehab First 100 100 103454

7304 N Washington St. over Luzerne/Susquehanna RailroadReplace/Rehab Second 100 300 63 125 588 103454

7304 N Washington St. over Luzerne/Susquehanna RailroadReplace/Rehab Third 1,500 1,500 103454

7401 Rogers Avenue over Solomon Creek Bridge Replacement First 350 350 73756

7401 Carey St over Solomon Creek Replace/Rehab First 350 350 73757

Planning Partner: Scranton/W-B Mode: Transit County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Page 181: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 157 of 259August 16, 2018

Planning Partner: Scranton/W-B Mode: Transit County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

ADA Paratransit program First 1,400 1,400 70505

Leasing of Bus Tires First 320 320 70506

Signing /Ground Maint First 100 100 70508

computer Software First 60 60 77343

Preventive Maint. First 8,000 8,000 83642

Safety & Security Items First 50 50 86456

Operating Assistance First 30,342 30,342 89293

Battery Packs First 320 320 95550

Purchase new Buses First 4,113 4,113 102692

replace 2011 ADA van First 53 53 105486

Purchase 2013 ADA Van First 55 55 107275

3 - 29 ft transit buses First 1,512 1,512 111242

1 CNG 29 ft transit Bus First 1,028 1,028 111243

Computer hardware First 68 68 111251

Paratransit Vehicle purch First 1,600 1,600 111252

Shop tools & equip First 20 20 111253

Support Vehicle Purchase First 100 100 111254

Bus Shelters First 75 75 111255

scenic Beautification /Ma First 20 20 111256

Planning Partner: SEDA-COG Mode: Highway County: ClintonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Reserve Betterment/Safety Line Item Bridge Replacement First 1,647 1,647 68128

Reserve Betterment/Safety Line Item Bridge Replacement Second 900 900 68128

Line Item Safety Safety Improvement Third 3,705 3,705 76205

Retro Local Bridge Bridge Replacement First 1,500 1,500 83139

Walnut Street RR Warn Dev RR Warning Devices First 375 375 105866

Spook Hollow RR Warning Device RR Warning Devices First 100 100 111078

Spook Hollow RR Warning Device RR Warning Devices Second 200 200 111078

120 Slide Hazards Reconstruct First 435 293 100 5,074 5,901 3808

120 Farwell to Roadside Rest Resurface Second 4,654 4,654 99981

120 Bucktail Trail Hwy II Resurface Second 1,418 1,418 99985

Page 182: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 158 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Highway County: ClintonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

120 Cameron toward Martin Ln Resurface Second 5,503 5,503 99992

144 SR 144 Resurfacing Resurface Third 848 848 99956

150 Lock Haven Signal Improvement Existing Signal Improvement First 1,300 1,300 93343

150 SR 150 Lock Haven Signals Existing Signal Improvement First 248 248 109872

477 Salona East Resurface Second 1,614 1,614 99965

7215 T-537 over Fishing Creek Bridge Bridge Removal First 40 40 10 10 100 200 3763

Planning Partner: SEDA-COG Mode: Bridge County: ClintonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

44 PA 44/Pine Creek Br. Bridge Improvement Third 652 522 65 4,438 5,678 3859

64 Big Fishing Creek Br 2 Bridge Replacement First 955 955 89985

64 Big Fishing Creek Br #3 Bridge Improvement First 400 325 50 50 1,877 2,702 93356

120 PA 120/Montours Run Bridge Replacement First 73 73 3797

120 2018 SEDACOG Bridge Preservation Bridge Preservation Activities First 1,014 1,014 4601

120 Mill Run Bridge Bridge Replacement First 150 150 69493

120 Milligan Run Bridge Bridge Improvement Second 435 358 60 60 1,350 2,262 69505

120 SR 120 Upper Stimpson Run Bridge Improvement Second 435 358 60 60 1,150 2,062 91546

120 Norfolk Southern Bridge Bridge Improvement Third 489 424 130 130 6,192 7,367 93317

120 SR 120 over Grimes Run Bridge Improvement Second 448 61 61 652 1,223 109719

120 2021 Bridge Preservation Bridge Preservation Activities First 200 50 2,326 2,576 110354

150 Laurel Run Bridge Bridge Improvement Third 587 457 1,305 2,349 3861

150 Hollenback Run Bridge Bridge Improvement First 25 260 50 50 1,052 1,437 69422

150 SR 150 over Bitner Run Bridge Improvement First 25 260 50 50 1,050 1,435 105918

150 2022 Bridge Preservation Bridge Preservation Activities First 215 106 107 427 110355

150 2022 Bridge Preservation Bridge Preservation Activities Second 3,864 3,864 110355

477 PA 477 Fishing Ck Br. Bridge Improvement First 300 50 50 1,750 2,150 3784

477 Long Run Bridge II Bridge Improvement First 300 50 50 1,875 2,275 88181

477 2023 SEDA-COG Br. Pres. Bridge Improvement Third 500 500 94969

880 SR 0880 over Rauchtown Cr Bridge Improvement Third 391 65 65 1,179 1,700 85148

880 SR 0880 Rauchtown Cr II Bridge Improvement First 325 325 85149

880 SR 0880 Rauchtown Cr II Bridge Improvement Second 406 87 87 1,433 2,013 85149

1001 SR 1001 Improvements Bridge Replacement First 7,377 7,377 3850

Page 183: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 159 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: ClintonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1001 Croak Hollow Run BOX Bridge Replacement First 25 295 320 93303

1002 SR 1002 W.Br. Susq Rvr Bridge Improvement Second 406 358 119 80 963 93318

1002 SR 1002 W.Br. Susq Rvr Bridge Improvement Third 6,312 6,312 93318

1004 Little Plum Run BOX Bridge Improvement First 25 25 25 240 315 93272

1008 Plum Run BOX Bridge Improvement First 195 34 25 245 499 93274

1010 Mill Race BOX Bridge Improvement First 195 45 28 387 655 93301

2012 Harvey Run BOX Bridge Improvement Third 228 65 65 457 815 93302

2015 SR 2015 Bridge ov SEDACOG JRA Bridge Improvement Second 553 443 127 127 1,250 106306

2015 SR 2015 Bridge ov SEDACOG JRA Bridge Improvement Third 5,703 5,703 106306

2018 Cedar Run BOX Bridge Improvement Third 228 65 65 457 815 93304

4001 SC Bridge Channel beams Bridge Rehabilitation First 278 278 92421

7405 Peale Avenue Bridge Bridge Improvement First 400 50 50 1,713 2,213 102502

Planning Partner: SEDA-COG Mode: Highway County: ColumbiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3-0 SEDA-COG Line Item Bridge Replacement First 360 360 68016

3-0 SEDA-COG Line Item Bridge Replacement Second 6,436 6,436 68016

3-0 SEDA-COG Line Item Bridge Replacement Third 10,985 10,985 68016

I-80 Major Guide Sign #1 Signing Third 100 100 99283

I-80 Major Guide Sign #2 Signing Third 60 60 99317

18-19 RPM Contract SEDA-COG Reflective Pavement Markers First 77 77 106276

19-20 RPM Contract SEDA-COG Reflective Pavement Markers First 77 77 106277

20-21 RPM Contract SEDA-COG Reflective Pavement Markers First 77 77 110152

21-22 RPM Contract SEDA-COG Reflective Pavement Markers First 77 77 110154

NSHR Corridor RRX RR Warning Devices First 590 590 110889

11 SR 11 from East Main St to 6th St Reconstruct First 200 500 250 100 2,550 3,600 94702

11 SR 11 from East Main St to 6th St Reconstruct Second 2,450 2,450 94702

11 US 11 Signals Berwick Boro Intersection Improvement Third 445 445 97648

11 SR 11 from 6th St to Park St Resurface First 75 90 950 1,115 98962

11 US 11 from Low St to Berwick Boro line Resurface First 15 15 99404

11 US 11 from Low St to Berwick Boro line Resurface Second 3,400 3,400 99404

42 SR 42 from Hill Road to SR 442 Resurface First 500 500 87884

42 SR42 from Poor House Rd to Catawissa CrkResurface First 25 25 100443

42 SR42 from Poor House Rd to Catawissa CrkResurface Second 25 5,525 5,550 100443

Page 184: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 160 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Highway County: ColumbiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

44 SR 44 from SR 42 to Fire Hall Road Restoration First 100 250 350 100406

80 I-80 from Hetlerville Road to Luzerne Co Resurface First 25 3,200 3,225 97546

80 I-80 East Bound Rest Area Reconstruct First 500 4,501 5,001 97736

80 Hetlerville Rd to Rest Area Wbl Surface Treatment Micro-surfacing First 20 450 470 99144

80 I-80 East Bound from Montour County to SR 4009Resurface Second 250 200 3,750 4,200 105528

80 I-80 East Bound from Montour County to SR 4009Resurface Third 6,150 6,150 105528

80 I-80 HTCMB from Susq Rv Br to Rest AreaGuiderail Improvement First 400 400 107265

80 Hetlerville Rd to Rest Area WB Resurface Second 15 15 1,880 1,910 110221

80 Hetlerville Rd to Rest Area WB Resurface Third 2,600 2,600 110221

254 SR 254 from Litttle Fishing Creek to SR 4041Resurface First 1,100 1,100 87885

339 SR 339 from West St to Smith Hollow Rd Resurface First 1,381 1,381 87882

339 Catawissa Crk. to SR 2009 Resurface Second 250 200 1,623 2,073 98483

339 SR 339 from Smith Hollow Rd to Nescopeck BoroResurface First 600 50 200 4,350 5,200 109587

339 SR 339 from Smith Hollow Rd to Nescopeck BoroResurface Second 1,150 1,150 109587

487 SR 487 from Susquehanna River to SR 1004Reconstruct First 150 450 350 250 3,971 5,171 97652

487 SR 487 from Susquehanna River to SR 1004Reconstruct Second 1,529 1,529 97652

487 SR 487 over Abandoned RR Bridge Removal Second 175 150 45 1,500 1,870 103011

2009 SR 2009 Soil Slide Repair Slides Correction Third 200 200 99147

Planning Partner: SEDA-COG Mode: Bridge County: ColumbiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-667 over Raven Creek Bridge Replacement First 1,100 1,100 93624

Adjacent Box Beam Bridge Bundle Bridge Rehabilitation First 200 200 107019

Adjacent Box Beam Bridge Bundle Bridge Rehabilitation Second 175 40 60 1,373 1,648 107019

11 US 11 over Montour Run Bridge Replacement Third 225 150 50 30 700 1,155 98392

11 Columbia & Northumberland Counties Bridge PaintingBridge Preservation Activities First 15 2,072 2,087 110115

44 SR 44 over Tb Mud Creek Bridge Replacement Second 200 120 20 340 98928

44 SR 44 over Tb Mud Creek Bridge Replacement Third 40 600 640 98928

80 Columbia Co Brg Overlays Bridge Preservation Activities Second 15 850 865 98395

80 I-80 Bridge Piers Rehab Bridge Rehabilitation Second 120 75 195 109577

93 SR 93 over Tb Briar Creek Bridge Rehabilitation First 100 100 5600

93 SR 93 over Tb Briar Creek Bridge Rehabilitation Second 50 40 40 350 480 5600

118 SR118 ov E Br Fishing Crk Bridge Rehabilitation Third 500 500 97622

239 SR 239 over Fishing Creek Bridge Rehabilitation First 150 150 106181

Page 185: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 161 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: ColumbiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

239 SR 239 over Fishing Creek Bridge Rehabilitation Second 95 35 1,750 1,880 106181

254 SR 254 ov Tb Fishing Crk Bridge Replacement Second 200 200 98941

254 SR 254 ov Tb Fishing Crk Bridge Replacement Third 120 40 20 800 980 98941

339 PA 339 over Beaver Run Bridge Replacement First 30 25 800 855 5585

339 SR339 ov Tb Catawissa Crk Bridge Replacement Second 225 125 30 25 700 1,105 97636

487 SR 487 ov Tb Roaring Crk Bridge Replacement First 100 100 5635

487 SR 487 ov Tb Roaring Crk Bridge Replacement Second 45 15 35 400 495 5635

487 SR 487 over Tributary to Fishing Creek Bridge Replacement First 1,000 1,000 88797

487 SR 487 ov Tb Roaring Crk Bridge Replacement Second 250 250 88803

487 SR 487 ov Tb Roaring Crk Bridge Replacement Third 150 50 50 950 1,200 88803

487 SR 487 over Tributary to Fishing Creek Bridge Replacement First 175 125 40 40 1,200 1,580 91431

1001 SR 1001 over Tributary to Susquehanna RiverBridge Replacement First 70 70 93643

1001 SR 1001 over Tributary to Susquehanna RiverBridge Replacement Second 35 25 25 150 235 93643

1012 SR 1012 over Tributary to Briar Creek Bridge Replacement First 40 35 25 100 98396

1012 SR 1012 over Tributary to Briar Creek Bridge Replacement Second 40 160 200 98396

1013 SR 1013 over Stony Brook Bridge Replacement First 40 35 30 25 130 98398

1013 SR 1013 over Stony Brook Bridge Replacement Second 10 160 170 98398

1014 SR1014ovTb E Br Briar Crk Bridge Replacement First 50 50 98400

1014 SR1014ovTb E Br Briar Crk Bridge Replacement Second 40 10 25 150 225 98400

1017 SR 1017 over Branch of Briar Creek Bridge Replacement First 150 150 93579

1020 SR 1020 over Pine Creek Bridge Rehabilitation Second 30 850 880 82774

1020 SR 1020 over Fishing Creek Bridge Rehabilitation Second 30 20 1,050 1,100 88051

1022 SR 1022 ov Fishing Creek Bridge Rehabilitation Second 57 57 5621

1022 SR 1022 ov Fishing Creek Bridge Rehabilitation Third 94 75 25 20 700 914 5621

1022 SR 1022 over Old Channel Bridge Rehabilitation Second 57 57 5622

1022 SR 1022 over Old Channel Bridge Rehabilitation Third 94 75 25 20 700 914 5622

1025 SR 1025 over Tb Briar Crk Bridge Rehabilitation Third 100 60 80 35 400 675 5536

1025 SR 1025 over East Branch of Briar Creek Bridge Replacement First 55 55 97557

1035 SR 1035 over Raven Creek Bridge Replacement First 65 35 40 25 150 315 98404

2003 SR 2003 over Mill Creek Bridge Replacement First 28 35 35 150 248 93580

2005 SR 2005 over Tributary to Roaring Creek Bridge Replacement First 45 40 25 160 270 5637

2005 SR 2005 over Roaring Creek Bridge Rehabilitation First 75 75 88034

2005 SR 2005 over Roaring Creek Bridge Rehabilitation Second 75 50 35 510 670 88034

2005 SR 2005 over Roaring Creek Bridge Rehabilitation Third 990 990 88034

Page 186: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 162 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: ColumbiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4008 SR 4008 ov Tb Fishing Crk Bridge Replacement Second 60 35 25 120 88777

4008 SR 4008 ov Tb Fishing Crk Bridge Replacement Third 25 500 525 88777

Planning Partner: SEDA-COG Mode: Highway County: JuniataTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

River Road RR Warning Device RR Warning Devices First 50 50 111074

River Road RR Warning Device RR Warning Devices Second 250 250 111074

22 US 22 to Perry County Line Restoration First 189 189 106305

35 Mifflintown Area Resurface Second 1,326 1,326 100339

35 Smith Rd to Snyder Co. Resurface Third 7,176 7,176 100370

35 SR 35 Stop 35 to Sheetz Area Restoration First 337 337 105566

75 Commuter Parking Study Park and Ride Lot Second 348 426 119 418 1,852 3,163 82994

75 PA 75 Honey Grove Resurf Resurface Second 369 65 65 499 96273

75 PA 75 Honey Grove Resurf Resurface Third 2,650 2,650 96273

235 Greenwood Twp to Del Crk Resurface Second 3,983 3,983 100362

333 Main St and PA 333 Resurface Second 2,591 2,591 99998

333 Thompsontown Rehabilitation Resurface First 100 22 52 3,472 3,646 99999

333 PA 35 to Van Dyke Road Resurface Second 1,968 1,968 100365

Planning Partner: SEDA-COG Mode: Bridge County: JuniataTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 2023 SEDACOG Bridge Preservation Bridge Improvement First 286 286 69423

22 2023 SEDACOG Bridge Preservation Bridge Improvement Second 2,319 2,319 69423

35 2019 SEDA-COG Br. Preservation Bridge Improvement First 85 2,141 2,226 4641

35 SR 35 Trib Cocolamus Crk Bridge Improvement Third 504 391 65 65 2,824 3,850 81406

35 SR0035 over Trib Lick Run Bridge Improvement First 25 275 52 52 1,000 1,403 85165

35 Cocolamus Crk Br #2 STA Bridge Replacement First 50 50 85172

35 SR 0035 over Willow Run Bridge Improvement First 25 275 52 50 1,000 1,402 85182

35 Trib Cocolamus Crk Bridge Bridge Improvement First 25 275 52 52 1,000 1,403 88175

35 SR 35 Trib. Doyle Run Br Bridge Replacement First 75 75 93955

35 SR 35 over Trib to Lost Creek Bridge Improvement Second 418 338 61 61 1,486 2,365 105920

75 Bridge over NS Railroad Bridge Improvement First 75 138 318 4,752 5,283 4190

75 SR 0075 over Trib Tuscaro Bridge Improvement Second 430 253 65 65 814 85178

75 SR 0075 over Trib Tuscaro Bridge Improvement Third 1,305 1,305 85178

Page 187: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 163 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: JuniataTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

75 Trib to Tuscarora Crk II Bridge Improvement Second 430 253 65 65 814 85179

75 Trib to Tuscarora Crk II Bridge Improvement Third 1,305 1,305 85179

75 SR 0075 over Trib Tuscaro Bridge Replacement First 50 15 36 745 846 85180

75 SR 75 Eshs Run Bridge Bridge Replacement First 50 26 26 775 876 91515

75 SR 75 over Trib to Tuscarora Creek Bridge Improvement Second 448 369 61 61 1,579 2,518 105921

235 Stoney Run Bridge Bridge Improvement Second 448 369 61 61 940 4160

235 Stoney Run Bridge Bridge Improvement Third 979 979 4160

333 Trib. Juniata Rv BOX Bridge Replacement First 15 285 300 4191

333 SR 0333 over Trib Juniata BOX Bridge Improvement First 195 50 50 295 85183

333 SR 0333 over Trib Juniata BOX Bridge Improvement Second 406 406 85183

333 SR 0333 ovTrib. Juniata Bridge Improvement First 347 276 34 25 568 1,248 85186

333 SR 0333 ovTrib. Juniata Bridge Improvement Second 1,000 1,000 85186

850 Tuscarora Creek Br. Bridge Improvement Second 461 412 65 65 1,003 4208

850 Tuscarora Creek Br. Bridge Improvement Third 1,305 1,305 4208

850 SR 0850 Little Laurel Run Bridge Improvement First 427 427 69512

850 SR 0850 Little Laurel Run Bridge Improvement Second 358 90 90 1,230 1,767 69512

1002 SR 1002 Trib. Lost BOX Bridge Improvement First 195 17 27 242 480 85184

1006 SR 1006 Horning Run Br Bridge Replacement First 100 100 4169

2002 SR 2002 ov Trib. Doe Run BOX Bridge Improvement First 325 325 85187

2002 SR 2002 ov Trib. Doe Run BOX Bridge Improvement Second 896 896 85187

2003 SR 2003 over Doe Run Bridge Improvement Second 429 61 61 552 109716

2003 SR 2003 over Doe Run Bridge Improvement Third 852 852 109716

2003 SR 2003 over Doe Run Bridge Improvement Second 448 61 61 571 109717

2003 SR 2003 over Doe Run Bridge Improvement Third 952 952 109717

2006 SR 2006 over Delaware Crk Bridge Replacement Second 461 412 65 65 1,003 4161

2006 SR 2006 over Delaware Crk Bridge Replacement Third 1,305 1,305 4161

2006 Juniata Brdg Preserve 1 Bridge Improvement Second 448 61 61 571 90248

2006 Juniata Brdg Preserve 1 Bridge Improvement Third 852 852 90248

2007 SR 2007 over Doe Run Bridge Improvement Second 418 338 61 61 1,203 2,083 85188

2012 Trib Stony Run BOX Bridge Improvement Second 418 61 61 1,230 1,771 93721

3002 Horning Run Bridge Bridge Replacement First 1,321 1,321 4196

3002 SR 3002 over Locust Run Bridge Improvement First 350 327 55 55 786 85191

3002 SR 3002 over Locust Run Bridge Improvement Second 1,043 1,043 85191

3008 SR 3008 Trib Doyle Run Br Bridge Replacement First 15 35 32 755 837 104627

Page 188: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 164 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: JuniataTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3013 SR 3013 over Trib. Tuscar Bridge Replacement First 75 75 85192

3014 SR 3014 Doyle Run Br Bridge Improvement Second 448 369 61 61 940 91516

3014 SR 3014 Doyle Run Br Bridge Improvement Third 979 979 91516

3014 2024 SEDA-COG Br. Pres. Bridge Improvement Second 702 702 94970

3016 SR 3016 McKinley Rn BOX Bridge Improvement First 195 55 25 387 661 85193

3017 SR 3017 Markee Crk BOX Bridge Improvement First 15 34 28 275 352 85205

3021 SR 3021 over Trib. Tuscar Bridge Improvement First 50 50 85194

3023 SR 3023 over Tuscarora Cr Bridge Improvement First 425 300 52 52 1,382 2,209 85206

3023 SR 3023 over Tuscarora Cr Bridge Improvement Second 1,000 1,000 85206

Planning Partner: SEDA-COG Mode: Highway County: MifflinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Lewistown Signal Reconstruction Existing Signal Improvement First 125 100 2,000 2,225 4689

Monument Square Phase V 2016 TAP Transportation Enhancement First 608 608 108121

Chestnut St, RR Warn Device RR Warning Devices First 75 75 110869

22 Lewistown Narrows Rehab Restoration Third 5,371 5,371 4582

22 SR 22 Lewistown Paving Resurface Second 358 369 61 61 3,668 4,518 93313

22 SR 22 Lewistown Paving Resurface Third 2,850 2,850 93313

22 McVeytown Strodes Mills Resurface First 96 4,884 4,979 93314

22 McVeytown Strodes Mills Resurface Second 3,850 3,850 93314

22 US Route 22 High Friction Surface HSIP Safety Improvement First 239 1,800 2,039 109871

322 Reedsville to Burnham Resurface First 2,980 2,980 93312

522 Lewistown to Co. Line Betterment Resurface Third 500 500 72767

655 Co. Line to Belleville Resurface Third 8,807 8,807 81491

655 SR 4005 to Interchange Resurface Second 1,777 1,777 100405

655 SR 4005 to Interchange Resurface Third 1,514 1,514 100405

1005 Ele. Ave. Betterment Restoration First 366 350 4,884 5,600 93316

1005 Lewistown Safety Corridor Safety Improvement First 73 163 3,369 3,606 101959

3002 Business 22 Resurfacing Restoration First 350 75 75 4,484 4,984 101897

7205 T-420 over Kish Creek Bridge Removal First 50 40 10 10 250 360 110175

Planning Partner: SEDA-COG Mode: Bridge County: MifflinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 Long Hollow Run Bridge Bridge Improvement First 427 427 69387

22 Long Hollow Run Bridge Bridge Improvement Second 358 90 90 1,537 2,075 69387

Page 189: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 165 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: MifflinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 Br Long Hollow II Bridge Improvement First 300 427 54 54 834 85276

22 Br Long Hollow II Bridge Improvement Second 869 869 85276

22 SR 0022 over Trib Juniata Bridge Improvement Second 461 318 65 202 1,046 85277

22 SR 0022 over Trib Juniata Bridge Improvement Third 1,305 1,305 85277

22 SR 0022 over Trib Juniata Bridge Improvement Third 461 1,341 1,802 85278

22 SR 0022 over Town Run Bridge Improvement Second 461 412 65 65 1,003 85289

22 SR 0022 over Town Run Bridge Improvement Third 1,305 1,305 85289

22 SR 22 ov Branch Long Hollow Run Bridge Improvement First 300 300 105922

22 SR 22 ov Branch Long Hollow Run Bridge Improvement Second 348 87 87 1,493 2,014 105922

103 2020 SEDACOG Bridge Preservation Bridge Improvement First 25 75 2,750 2,850 106321

522 SR 0522 over Jacks Creek Bridge Improvement First 460 460 85290

522 SR 0522 over Jacks Creek Bridge Improvement Second 87 174 1,791 2,052 85290

522 2022 SEDA-COG Br. Pres. Bridge Improvement Third 500 500 94968

1002 SR 1002 over Dry Creek Bridge Improvement First 426 426 4551

1002 SR 1002 over Dry Creek Bridge Improvement Second 358 90 179 1,476 2,103 4551

1002 SR 1002 over Dry Creek Bridge Improvement Third 489 424 65 65 1,305 2,349 85291

1003 Treaster Run Bridge Bridge Improvement Third 489 424 65 65 1,696 2,740 4679

1005 Tea Creek Bridge #2 Bridge Improvement Third 652 2,420 3,072 81529

1012 SR 1012 Laurel Run Br Bridge Improvement First 300 55 55 409 91608

1012 SR 1012 Laurel Run Br Bridge Improvement Second 1,739 1,739 91608

2002 Kish Creek Bridge Bridge Replacement First 100 100 4643

2004 Jacks Creek Bridge Bridge Improvement First 75 100 2,652 2,827 4719

2004 SR 0322 Bridge Bridge Improvement Second 478 430 123 123 3,800 4,954 69507

2004 SR 2004 over SR 22-PA 22 Bridge Improvement Second 448 61 61 571 109718

2004 SR 2004 over SR 22-PA 22 Bridge Improvement Third 1,052 1,052 109718

2005 SR 2005 Br. Kish Cr. BOX Bridge Improvement Second 155 60 60 707 981 81528

2008 SR 2008 over Jacks Creek Bridge Improvement Second 464 397 60 101 1,578 2,600 105923

3001 SR 3001 Kish Creek Br Bridge Replacement First 55 4,044 4,099 91609

3006 2020 SEDA-COG Br. Preserv Bridge Improvement Second 444 444 4705

3006 Lewistown Bridge Bridge Improvement Second 478 369 184 184 1,216 85299

3006 Lewistown Bridge Bridge Improvement Third 4,436 4,436 85299

3006 Lewistown Bridge II Bridge Improvement Second 478 369 184 184 1,216 85300

3006 Lewistown Bridge II Bridge Improvement Third 4,436 4,436 85300

Page 190: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 166 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Transit County: MifflinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Bus Replacement First 1,260 1,260 89582

Office Equipment First 5 5 102582

Bus Replacement First 450 450 102583

Computers First 8 8 110604

Tablets First 5 5 110605

Replace Compact Sedan First 18 18 110606

Software Upgrade First 22 22 110607

Planning Partner: SEDA-COG Mode: Highway County: MontourTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-308 over Beaver Run Bridge Removal Bridge Removal First 40 30 10 80 160 103841

T-392 over Mud Run Bridge Removal Bridge Removal First 30 10 585 625 106671

54 SR 54 from SR 44 to SR 3008 Resurface Third 3,330 3,330 100483

54 SR 54 Corridor Safety Improvement Safety Improvement First 357 1,000 2,778 4,135 103853

54 SR 54 Corridor Safety Improvement Safety Improvement Second 1,389 1,389 103853

54 SR 44 to SR 3008 Surface Treatment Micro-surfacing First 557 557 110526

254 SR 254 from Cromley Dr to Columbia County LineResurface First 180 180 88939

2008 Cherry St to Byrd Ave Resurface Second 200 200 400 98610

2008 Cherry St to Byrd Ave Resurface Third 1,600 1,600 98610

2008 SR 2008 from Byrd Ave to Grovania Drv Resurface First 25 25 100451

2008 SR 2008 from Byrd Ave to Grovania Drv Resurface Second 25 1,500 1,525 100451

2054 Danville Borough RRX RR Warning Devices First 382 382 110888

Planning Partner: SEDA-COG Mode: Bridge County: MontourTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Montour St over Mahoning Creek Bridge Rehabilitation First 180 180 103842

11 US 11 over Tb Sechler Run Bridge Replacement Second 250 250 97641

11 US 11 over Tb Sechler Run Bridge Replacement Third 150 50 50 1,200 1,450 97641

11 US 11 over Sechler Run Bridge Replacement Second 250 250 97643

11 US 11 over Sechler Run Bridge Replacement Third 150 50 50 1,200 1,450 97643

54 SR 54 over Stony Brook Bridge Replacement First 90 80 50 220 93524

54 SR 54 over Stony Brook Bridge Replacement Second 1,200 1,200 93524

54 SR 54 Wbl ov Mahoning Crk Bridge Rehabilitation First 175 125 10 310 98991

54 SR 54 Wbl ov Mahoning Crk Bridge Rehabilitation Second 30 800 830 98991

80 East SEDA-COG Bridge Epoxy Ovelay Bridge Preservation Activities First 15 425 440 110139

Page 191: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 167 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: MontourTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 East SEDA-COG Bridge Epoxy Ovelay Bridge Preservation Activities Second 475 475 110139

254 SR 254 over Tributary to Mud Creek Bridge Replacement First 40 35 40 150 265 98438

642 SR 642 over Beaver Run Bridge Replacement First 55 45 35 35 170 98507

642 SR 642 over Beaver Run Bridge Replacement Second 150 150 98507

642 SR 642 over Beaver Run Bridge Replacement First 35 40 25 160 260 98510

3007 SR 3007 over Tributary to Mauses Creek Bridge Rehabilitation Second 25 20 25 150 220 93650

9900 T-396 over East Branch Chillisquaque CreekBridge Replacement Second 260 150 50 25 900 1,385 6303

Planning Partner: SEDA-COG Mode: Transit County: MontourTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Buses, Radios & Base First 963 963 93436

Planning Partner: SEDA-COG Mode: Highway County: NorthumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 SR 11 from SR 147 to C Street Resurface First 10 400 410 99176

11 SR 11 from SR 147 to C Street Resurface Second 405 405 99176

11 US 11 from SR 1024 to Montour County LineResurface Second 30 30 99177

11 US 11 from SR 1024 to Montour County LineResurface Third 3,000 3,000 99177

11 US 11 from the West Branch River Bridge to SR 147Resurface First 2,825 2,825 107751

44 SR 44 & SR 1006 ; SR 44 & SR 1014 IntersectionsIntersection Improvement Third 500 500 99243

54 SR 54 from Montour County to Boyd StationResurface First 235 200 250 250 3,500 4,435 87909

54 SR 54 from south of SR 901 to Locust GapResurface Second 10 10 97708

54 SR 54 Soil Slide Repair Slides Correction Third 75 75 50 2,400 2,600 99238

54 SR 54 Mine Entrance Bridge Removal First 35 25 350 410 106084

61 SR 61 from Lancaster Switch to Coal Twp Resurface First 10 1,020 1,030 87944

61 PA 890 to 7th Street Resurface First 10 10 99183

61 SR 61 from 5th St to Dark Run Reconstruct Second 1,500 1,000 400 1,250 4,150 99327

61 SR 61 from 5th St to Dark Run Reconstruct Third 600 10,125 10,725 99327

61 SR 61 from North Lombard St to Shamokin CreekReconstruct Third 2,693 2,693 99329

61 Kulpmont to Lancaster Switch Resurface Second 250 150 965 1,365 99391

61 Kulpmont to Lancaster Switch Resurface Third 1,550 1,550 99391

61 Miles Rd to Hollow Rd (SR 4015) Resurface First 10 10 108431

61 SR 61 from North Lombard St to Shamokin CrResurface First 20 550 570 110223

61 SR 61 from 5th St to Dark Run Surface Treatment Micro-surfacing First 20 100 120 110224

61 SR 61 from 5th St to Dark Run Surface Treatment Micro-surfacing Second 100 100 110224

Page 192: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 168 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Highway County: NorthumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 East Bound Lane from SR 405 to Montour CountyResurface First 15 15 97564

80 I-80 East Bound Lane from SR 405 to Montour CountyResurface Second 1,100 1,100 97564

80 I-80 West Bound Lane from Union Co to Montour CoResurface First 10 10 20 105519

80 I-80 West Bound Lane from Union Co to Montour CoResurface Second 950 950 105519

80 I-80 HTCMB Phase 3 Guiderail Improvement First 650 650 108355

80 SR 405 to Montour Co EB Resurface Third 15 15 4,100 4,130 110226

80 Union Co to Montour Co WB Resurface Third 15 15 4,300 4,330 110227

147 SR 147 from SR 45 to I-80 Surface Treatment Micro-surfacing First 900 900 87947

147 SR 147 from Packer Island Bridge to 8th StReconstruct First 1,919 1,919 96678

147 PA 45 to Muddy Run Resurface Third 1,760 1,760 99188

147 Muddy Run to I-80 Resurface Third 330 330 99193

147 SR 147 North Bound from SR45 to I-80 Surface Treatment Micro-surfacing First 1,160 1,160 104408

147 SR 147 from Blacksmith Hill St to Toad Valley RdResurface First 10 10 106284

147 SR 147 (CSVT Gap) from Eighth St to SR 405Resurface First 2,350 2,350 109833

180 I-180 from SR 54 to SR 147 Resurface First 130 4,500 4,630 97549

180 I-180 from SR 54 to SR 147 Resurface Second 3,450 3,450 97549

405 SR 147 to Housels Run Resurface Second 200 200 98674

405 SR 147 to Housels Run Resurface Third 150 150 250 2,500 3,050 98674

642 W Br Susq Rvr to Milton Resurface Second 150 100 75 325 97679

901 SR 901 from SR 54 to Stein Road Reconstruct First 250 250 97655

901 SR 901 from SR 54 to Stein Road Reconstruct Second 125 75 75 5,000 5,275 97655

1024 CSVT Ridge Road Widen First 15,071 15,071 102810

4004 SR 4004 from Riverside to Sunbury Rd Resurface First 500 500 103240

4004 SR 4004 from SR 61 to Mile Post Rd Resurface First 10 10 106286

4010 SR 4010 from SR 147 to Eleventh St Resurface First 10 10 106285

Planning Partner: SEDA-COG Mode: Bridge County: NorthumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-802 over South Branch of Roaring CreekBridge Replacement First 135 20 20 800 975 93642

11 US 11 over Tb Susq River Bridge Replacement Second 200 200 63639

11 US 11 over Tb Susq River Bridge Replacement Third 120 40 20 800 980 63639

11 SR 11 over Packer Run Bridge Rehabilitation Second 200 200 98993

11 SR 11 over Packer Run Bridge Rehabilitation Third 120 40 20 900 1,080 98993

44 SR 44 over Tb Chill Creek Bridge Replacement Third 100 60 80 35 446 721 99001

Page 193: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 169 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: NorthumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

45 SR 45 over Chillisquaque Creek Bridge Rehabilitation First 1,700 1,700 6754

45 Northumberland County Bridge Epoxy OverlayBridge Preservation Activities First 15 1,900 1,915 110138

54 SR 54 over Diebler Creek Bridge Replacement First 150 150 88778

54 SR 54 over Diebler Creek Bridge Replacement Second 125 65 1,390 1,580 88778

54 SR 54 over Delaware Run Bridge Replacement Second 175 175 99002

54 SR 54 over Delaware Run Bridge Replacement Third 100 40 20 450 610 99002

54 SR 54 ov Tb Shamokin Crk Bridge Replacement First 200 200 99004

54 SR 54 ov Tb Shamokin Crk Bridge Replacement Second 120 40 20 900 1,080 99004

61 SR 61 over Shamokin Creek Bridge Replacement Second 300 125 80 40 1,550 2,095 6704

61 SR 61 over Shamokin Creek Bridge Replacement Third 2,850 2,850 6704

61 SR 61 over Quaker Run Bridge Replacement First 220 220 97588

61 SR 61 over Quaker Run Bridge Replacement Second 110 35 50 700 895 97588

61 SR 61 over Dark Run Bridge Rehabilitation Second 225 225 99006

61 SR 61 over Dark Run Bridge Rehabilitation Third 150 50 50 800 1,050 99006

61 SR 61 over SR 2029 & 901 Bridge Rehabilitation Second 225 225 99009

61 SR 61 over SR 2029 & 901 Bridge Rehabilitation Third 150 50 50 1,500 1,750 99009

61 SR 61 over Lick Run Bridge Rehabilitation First 180 180 99017

61 SR 61 over Lick Run Bridge Rehabilitation Second 120 30 30 550 730 99017

125 SR 125 over Carbon Run Bridge Replacement Third 50 35 120 25 500 730 91430

147 SR 147 over Tributary to Susquehanna RiverBridge Rehabilitation First 75 100 40 30 1,000 1,245 85623

147 SR 147 over Tb Susq River Bridge Rehabilitation Second 80 80 99099

147 SR 147 over Tb Susq River Bridge Rehabilitation Third 60 30 35 400 525 99099

405 SR 405 ov Tb Delaware Run Bridge Replacement Second 50 50 85622

405 SR 405 ov Tb Delaware Run Bridge Replacement Third 35 25 25 600 685 85622

890 Substructure Contract Bridge Preservation Activities First 50 45 25 120 88798

890 Substructure Contract Bridge Preservation Activities Second 900 900 88798

901 SR 901 over SEDA-COG Railroad Bridge Deck Replacement First 242 130 30 402 6725

901 SR 901 over SEDA-COG Railroad Bridge Deck Replacement Second 30 950 980 6725

1005 SEDA-COG Scour Contract Bridge Preservation Activities Second 50 45 900 995 87994

1007 SR 1007 over Tributary of Warrior Run CreekBridge Replacement First 40 32 35 107 98531

1007 SR 1007 over Tributary of Warrior Run CreekBridge Replacement Second 150 150 98531

2008 SR 2008 over Tributary to Shamokin CreekBridge Replacement First 550 550 87990

2019 SR 2019 over Quaker Run Bridge Replacement First 60 35 40 25 150 310 98538

2022 SR 2022 over Tributary to Shamokin CreekBridge Replacement First 25 35 25 150 235 6766

Page 194: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 170 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: NorthumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2024 SR2024 ov SBr Roaring Crk Bridge Rehabilitation Third 100 60 30 35 500 725 97550

3018 SR 3018 over Mahantango Creek Bridge Rehabilitation Second 20 35 25 500 580 79049

3018 SR 3018 over Mahantango Creek Bridge Rehabilitation Third 600 600 79049

3024 SR 3024 over Tributary to Mahantango CreekBridge Replacement First 35 150 185 88801

4004 SR 4004 over Tributary N Branch Susquehanna RiverBridge Replacement First 75 50 40 25 300 490 98540

4019 SR 4019 over Tributary of Littte Mahanoy CreekBridge Replacement First 35 35 25 150 245 98542

Planning Partner: SEDA-COG Mode: Transit County: NorthumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

LATS Bus Purchase First 510 510 102246

Purchase Bus First 175 175 102584

Planning Partner: SEDA-COG Mode: Highway County: SnyderTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Cent. Susq. Val. Sty New Roadway First 11,201 10,125 975 3,125 25,426 7588

11 US 11 from US 522 to Roosevelt Ave Resurface First 1,936 1,936 87896

11 SR 11 from Ulsh Road to Penn's Creek Resurface First 15 15 99241

11 SR 11 from Ulsh Road to Penn's Creek Resurface Second 15 8,800 8,815 99241

11 SR 11 North Bound from Penns Creek to SR 522Surface Treatment Micro-surfacing First 500 500 106278

11 Penns Creek to SR 522 SB Surface Treatment Micro-surfacing First 500 500 106279

11 Penns Cr to SR 522 NB Resurface Second 200 200 110228

11 Penns Cr to SR 522 NB Resurface Third 2,600 2,600 110228

11 Penns CR to SR 522 SB Resurface Second 200 200 110229

11 Penns CR to SR 522 SB Resurface Third 2,600 2,600 110229

15 CSVT Southern Section New Roadway First 89,000 89,000 76401

15 CSVT Southern Section New Roadway Second 46,061 46,061 76401

15 CSVT Paving South Sec New Roadway First 29,851 29,851 76403

15 CSVT PA 61 Connector New Roadway First 23,779 23,779 76404

15 CSVT PA 61 Connector New Roadway Second 20,496 20,496 76404

15 CSVT ITS Variable Message Signs First 10,811 10,811 102811

15 CSVT ITS Variable Message Signs Second 5,792 5,792 102811

104 SR 3006 to Middleburg Boro Resurface First 1,250 1,250 87889

522 US 522 from Bridge St to US11 Resurface First 10 10 97714

522 SR 522 from Willow Ave to Swinehart Dr Resurface First 10 700 710 104616

1014 SR 204 to SR 11 Resurface Second 15 1,000 1,015 98885

Page 195: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 171 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Highway County: SnyderTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1019 SR 1023 to SR 1017 Resurface Second 20 20 40 98887

2017 SR 2017 from Sand Hill Rd to US 522 Resurface First 1,492 1,492 88942

4008 SR 4003 to SR 4006 Resurface First 20 875 895 99245

Planning Partner: SEDA-COG Mode: Bridge County: SnyderTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

11 SR 11 over NS Rr Bridge Replacement Third 210 130 30 30 1,513 1,913 98898

11 SR 11 over NS Rr Bridge Replacement Third 210 130 30 30 1,513 1,913 98900

15 SR 15 over Carrie Run Bridge Replacement Second 124 124 98894

15 SR 15 over Carrie Run Bridge Replacement Third 101 130 40 30 1,040 1,341 98894

15 SR 15 over Tb Susq River Bridge Replacement Second 225 130 30 30 1,600 2,015 98906

35 SR 35 ov Tb Middle Creek Bridge Replacement Second 250 250 99120

35 SR 35 ov Tb Middle Creek Bridge Replacement Third 150 50 50 1,000 1,250 99120

35 SR 35 over Tb Middle Creek Bridge Replacement Second 50 35 35 120 99121

35 SR 35 over Tb Middle Creek Bridge Replacement Third 40 600 640 99121

104 SR 104 over Mahantango Creek Bridge Rehabilitation First 300 185 45 35 1,035 1,600 106155

104 SR 104 over Mahantango Creek Bridge Rehabilitation Second 1,365 1,365 106155

522 US 522 over Beaver Creek Bridge Replacement First 40 30 1,800 1,870 6872

522 SR 522 over Tb Middle Crk Bridge Replacement Second 250 150 25 425 6885

522 SR 522 over Tb Middle Crk Bridge Replacement Third 40 1,800 1,840 6885

522 US 522 over Tributary to Middle Creek Bridge Replacement First 150 75 65 350 640 6886

522 US 522 over Tributary to Middle Creek Bridge Replacement Second 950 950 6886

522 SR 522 over Beaver Creek Bridge Replacement First 150 65 215 6899

522 SR 522 over Beaver Creek Bridge Replacement Second 75 1,800 1,875 6899

522 SR 522 over Tb Middle Crk Bridge Replacement First 250 250 6902

522 SR 522 over Tb Middle Crk Bridge Replacement Second 175 150 40 950 1,315 6902

522 SR 522 over Tb Middle Crk Bridge Replacement First 150 100 20 270 6907

522 SR 522 over Tb Middle Crk Bridge Replacement Second 63 750 813 6907

522 SR 522 ov Tb Middle Creek Bridge Replacement First 150 100 20 270 6909

522 SR 522 ov Tb Middle Creek Bridge Replacement Second 63 750 813 6909

522 US 522 ov Tb Middle Creek Bridge Replacement Second 210 210 97590

522 US 522 ov Tb Middle Creek Bridge Replacement Third 130 40 30 1,000 1,200 97590

522 SR 522 ov S Br Middle Crk Bridge Replacement Second 100 100 98877

522 SR 522 ov S Br Middle Crk Bridge Replacement Third 175 160 120 40 1,200 1,695 98877

522 SR 522 over Tb Middle Crk Bridge Rehabilitation First 200 200 99143

522 SR 522 over Tb Middle Crk Bridge Rehabilitation Second 120 30 30 550 730 99143

Page 196: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 172 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: SnyderTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1011 SR 1011 over Tb Penn's Crk Bridge Replacement First 50 50 98548

1011 SR 1011 over Tb Penn's Crk Bridge Replacement Second 40 30 25 150 245 98548

1016 Snyder & Union County Bridge Epoxy OverlayBridge Preservation Activities First 15 202 217 110140

1016 Snyder & Union County Bridge Epoxy OverlayBridge Preservation Activities Second 98 98 110140

2006 SR 2006 over Tributary to Chapman CreekBridge Replacement First 35 50 30 150 265 93606

2006 SR 2006 over Tributary to Chapman CreekBridge Rehabilitation First 60 60 98554

2007 SR 2007 over Tributary to Middle Creek Bridge Replacement First 45 45 93607

2007 SR 2007 over Tributary to Middle Creek Bridge Replacement First 65 45 35 35 165 345 93648

2010 SR 2010 over Tributary to Middle Creek Bridge Replacement First 30 35 25 150 240 98577

3010 SR 3010 over Middleworth Run Bridge Replacement First 40 50 40 35 165 98578

3010 SR 3010 over Middleworth Run Bridge Replacement Second 150 150 98578

3012 SR 3012 over Unnamed Tributary to Beaver CreekBridge Replacement First 25 40 25 100 190 98598

4006 SR 4006 over Middle Creek Bridge Replacement Second 70 70 97589

4006 SR 4006 over Middle Creek Bridge Replacement Third 110 120 50 35 1,400 1,715 97589

4012 SR 4012 over Kreb Gap Run Bridge Replacement First 65 65 98589

4012 SR 4012 over Kreb Gap Run Bridge Replacement Second 40 25 25 150 240 98589

4016 SR 4016 over Tributary to N Branch of Middle CreekBridge Replacement First 35 150 185 98661

9900 T-469 over Swift Run Bridge Replacement First 60 20 20 800 900 6846

Planning Partner: SEDA-COG Mode: Highway County: UnionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-357 ov N Branch of Buffalo Creek Bridge RemovalBridge Removal First 40 50 10 10 150 260 110337

15 CSVT Paving North Section New Roadway First 40,000 40,000 76400

15 US15 North Bound Lane Soil Slide Repair Slides Correction Third 60 35 35 400 530 99242

15 Country Cupboard RR Xing RR High Type Crossing First 150 150 110599

45 SR 45 from Kaiser Run Rd to SR 3010 Surface Treatment Micro-surfacing Second 10 1,100 1,110 87904

45 UCIR Corridor 2 RRX RR Warning Devices First 1,400 1,400 110892

80 Mile Run to SR 1010 Surface Treatment Micro-surfacing First 50 1,500 1,550 97540

80 Mile Run to SR 1010 Surface Treatment Micro-surfacing Second 100 100 97540

80 I-80 West Bound Lane from Mile Run to SR 1010Resurface Second 20 20 900 940 105514

80 Mile Run to SR 1010 EB Resurface Third 15 15 30 110231

80 Mile Run to SR 1010 WB Resurface Third 15 15 30 110233

304 Front St to Stein Ln Resurface Second 10 10 1,400 1,420 98903

Page 197: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 173 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Highway County: UnionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

304 SR 45 to Orchard Ln Resurface First 300 300 110828

1018 Airport Rd to SR 15 Resurface First 10 10 106438

2004 SR 2004 from SR 304 to Brouse Rd Resurface First 1,150 1,150 102942

2007 SR 2007 from Smoketown Rd to William Penn DrResurface First 10 10 106449

Planning Partner: SEDA-COG Mode: Bridge County: UnionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

T-321 over Sweitzers Run Bridge Replacement First 150 20 20 650 840 72351

T-383 over Rapid Run Bridge Replacement First 60 25 60 330 475 72354

T-383 over Rapid Run Bridge Replacement Second 390 390 72354

T-359 over North Branch of Buffalo Creek Bridge Replacement First 235 235 93615

15 US 15 over Winfield Creek Bridge Rehabilitation Third 175 100 120 35 498 928 97633

15 SR 15 over Turtle Creek Bridge Replacement Third 80 60 15 15 450 620 98883

15 SR 15 ov Tb Limestone Run Bridge Replacement First 125 125 99448

15 SR 15 ov Tb Limestone Run Bridge Replacement Second 60 30 30 500 620 99448

45 SR 45 ov Limestone Run Bridge Replacement Second 60 60 97592

45 SR 45 ov Limestone Run Bridge Replacement Third 35 120 25 500 680 97592

45 SR 45 over Cold Run Bridge Replacement First 220 220 97646

45 SR 45 over Cold Run Bridge Replacement Second 110 45 30 750 935 97646

45 SR 45 over Limestone Run Bridge Replacement Second 60 60 99134

45 SR 45 over Limestone Run Bridge Replacement Third 35 40 25 300 400 99134

80 I-80 West Bound Lane over SR 1010 Bridge Replacement First 200 400 15 2,800 3,415 98685

192 SR 192 Union County Bridge Painting Bridge Preservation Activities First 19 180 199 98735

235 SR 235 over Tributary to Laurel Run Bridge Replacement First 140 500 640 93646

1003 SR 1003 over Tributary to Litttle Buffalo CreekBridge Replacement First 25 50 25 150 250 98755

1003 SR 1003 over Tributary to Little Buffalo CreekBridge Replacement First 40 40 35 25 165 305 98772

1011 SR 1011 over White Deer Creek Bridge Rehabilitation First 100 300 50 1,500 1,950 78979

1011 SR1011 over Tb Susq River Bridge Replacement First 125 125 99137

1011 SR1011 over Tb Susq River Bridge Replacement Second 60 50 30 400 540 99137

1011 SR 1011 over Tributary to Susquehanna RiverBridge Replacement Second 250 120 40 410 99141

1011 SR 1011 over Tributary to Susquehanna RiverBridge Replacement Third 50 1,000 1,050 99141

1014 SR 1014 over South Creek Bridge Replacement First 40 50 40 35 165 98777

1014 SR 1014 over South Creek Bridge Replacement Second 150 150 98777

2001 SR 2001 over Buffalo Crk Bridge Rehabilitation Second 85 50 25 160 74042

Page 198: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 174 of 259August 16, 2018

Planning Partner: SEDA-COG Mode: Bridge County: UnionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2001 SR 2001 over Buffalo Crk Bridge Rehabilitation Third 25 1,500 1,525 74042

2003 SR 2003 over Tributary to Buffalo Creek Bridge Replacement First 40 45 50 35 170 98786

2003 SR 2003 over Tributary to Buffalo Creek Bridge Replacement Second 150 150 98786

3001 SR 3001 over Tributary to Penns Creek Bridge Rehabilitation First 20 30 25 150 225 93644

3004 SR 3004 over Unnamed Tributary to Penn's CreekBridge Replacement First 87 87 7427

3006 SR 3006 over Cold Run Bridge Replacement First 50 50 98826

3006 SR 3006 over Cold Run Bridge Replacement Second 40 10 25 160 235 98826

3012 SR 3012 ov Sweitzers Run Bridge Replacement First 175 125 35 335 97591

3012 SR 3012 ov Sweitzers Run Bridge Replacement Second 25 500 525 97591

3014 SR 3014 over Turkey Run Bridge Replacement First 60 60 98828

3014 SR 3014 over Turkey Run Bridge Replacement Second 40 25 25 150 240 98828

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

TMA Annual Funding Administration First 3,000 3,000 69837

Alleg. Co Local Br. (S/L) Bridge Replacement First 12,000 12,000 69839

Alleg. Co Local Br. (S/L) Bridge Replacement Second 11,339 11,339 69839

Alleg. Co Local Br. (S/L) Bridge Replacement Third 12,000 12,000 69839

Betterment Reserve Allegheny Restoration First 7,220 38,928 46,148 75341

Betterment Reserve Allegheny Restoration Second 8,506 17,676 26,182 75341

Betterment Reserve Allegheny Restoration Third 31,305 31,305 75341

Slide Line Item Slides Correction First 5,150 5,150 75669

SPC Reg. Safety Line Item Safety Improvement First 31,337 31,337 76430

SPC Reg. Safety Line Item Safety Improvement Second 45,592 45,592 76430

SPC Reg. Safety Line Item Safety Improvement Third 45,591 45,591 76430

Bridge - Allegheny County Bridge Rehabilitation First 4,000 26,557 30,557 76458

Bridge - Allegheny County Bridge Rehabilitation Second 10,477 3,644 14,121 76458

Bridge - Allegheny County Bridge Rehabilitation Third 67,881 67,881 76458

Retaining Walls - Alleg Bridge Rehabilitation First 1,000 1,000 76461

PAAC Bus Procurement Miscellaneous First 24,689 24,689 77273

PAAC Bus Procurement Miscellaneous Second 24,689 24,689 77273

PAAC Bus Procurement Miscellaneous Third 24,689 24,689 77273

SPC Region TAP Line Item Transportation Enhancement First 7,025 7,025 82754

SPC Region TAP Line Item Transportation Enhancement Second 7,252 7,252 82754

SPC Region TAP Line Item Transportation Enhancement Third 7,251 7,251 82754

Penn Ave Resurf. Ph 2 Resurface First 500 3,000 3,500 83136

Penn Ave Resurf. Ph 2 Resurface Second 3,000 3,000 83136

Page 199: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 175 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SPC CMAQ Line Item Safety Improvement First 1,077 1,077 84078

SPC CMAQ Line Item Safety Improvement Second 85,610 85,610 84078

SPC CMAQ Line Item Safety Improvement Third 89,359 89,359 84078

Allegheny Cty Local Rdwy Restoration First 3,000 3,000 86487

Allegheny Co Loc Br Pres. Bridge Preservation Activities First 11,250 11,250 87777

SPC Smart Tr. Initiative Miscellaneous First 12,000 12,000 94698

SPC Smart Tr. Initiative Miscellaneous Second 3,190 3,190 94698

SPC Smart Tr. Initiative Miscellaneous Third 12,000 12,000 94698

PAAC-TransitSignalBRT Transit System Improvement First 1,957 1,957 100316

PPC - Marine Eng Retrofit IV Intermodal Services First 2,448 2,448 100367

SPC - Traffic Signal 4 Existing Signal Improvement First 5,625 5,625 100382

Gap to the Point Bicycle Facilities/Services First 398 398 104469

Penn Circle Conversion Safety Improvement First 8,000 8,000 105053

PGH - South Side Signals Existing Signal Improvement First 1,620 1,620 105603

Pittsburgh City Corridor Crossings (AVRR)RR Warning Devices First 344 344 106074

Smart Transportation/TAP Admin Transportation Enhancement First 1,250 1,250 106080

Browns Hill Road Restoration First 3,500 3,500 106268

Neville Road Restoration First 250 250 106269

Neville Road Restoration Second 6,000 6,000 106269

2019 ADA Curb Ramp Project Safety Improvement First 2,000 2,000 106387

2020 ADA Curb Ramp Project Safety Improvement First 2,000 2,000 106388

AWPM 2019 Safety Improvement First 330 330 106391

AWPM 2020 Safety Improvement First 330 330 106392

SPC - Traffic Signal 5 Safety Improvement First 313 313 106593

SPC - Traffic Signal 5 Safety Improvement Second 938 3,750 4,688 106593

PAAC - Carnegie Park and Ride Park and Ride Lot First 13,000 13,000 106594

Monroeville Blvd Safety Improvement (ACDPW)Corridor Safety Improvement First 683 683 106771

Allegheny County Roads RDIP - ACDPW Safety Improvement First 178 178 106772

Liberty Ave Safety Improvement First 500 5,400 5,900 106773

Millvale/Shaler/Etna TRHT Connection Transportation Enhancement First 1,000 1,000 107441

Washington Blvd Multimodal Path Transportation Enhancement First 561 561 107442

Brownsville Road Streetscape Improvement ProjectTransportation Enhancement First 1,453 1,453 108116

Page 200: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 176 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Bridge Street RR Etna (NS) RR Warning Devices First 440 440 108118

2021 ADA Curb Ramp Project Safety Improvement First 2,000 2,000 109353

2022 ADA Curb Ramp Project Safety Improvement Second 2,000 2,000 109357

AWPM 2021 Safety Improvement First 300 300 109517

AWPM 2022 Safety Improvement First 300 300 109518

Smart Spines (ATCMTD) Intersection Improvement First 24,987 24,987 109691

CBD Signal Phase 4 Existing Signal Improvement First 4,000 4,000 109746

CBD Signal Phase 4 Existing Signal Improvement Second 1,000 1,000 109746

Homestead-Duquesne Rd Betterment Resurface First 1,250 1,250 109846

2023 ADA Curb Ramp Project Safety Improvement Second 2,000 2,000 110357

TDM Coordinator and Outreach Program Planning First 1,193 1,193 110378

Expansion of RideACTA Last Mile Service Safety Improvement First 350 350 110381

District 9 & 11 Local Roads Safety Project (LTAP)Safety Improvement First 310 310 110471

8 PA 8- Washington Drive Reconstruct Second 7,176 7,176 91694

8 Fifth Avenue - Washington Blvd Reconstruct Second 3,500 3,500 100760

19 US 19/Washington Rd (South Hills) Adaptive SignalExisting Signal Improvement First 820 820 26454

19 US 19, Washington Road Reconstruct First 6,000 6,000 81856

19 US 19/West End Bypass - Pkwy West Reconstruct First 3,013 3,013 96562

19 Saw Mill Rn Blvd - Parkway West Concrete Rehabilitation Second 2,600 2,600 100764

19 Cochran Rd - Wash Rd Resurface Second 665 665 100765

19 Marshall Ave - Sorrell St Resurface Second 865 865 100766

19 Washington Road Resurface First 100 7,326 7,426 109388

19 US 19/Banksville Rd Adaptive Signal Existing Signal Improvement First 700 700 109556

22 US Route 22 - Washington Concrete Rehabilitation Third 8,100 8,100 100768

22 US 22 - US 30 to McKee Rd Concrete Rehabilitation Second 5,676 5,676 100769

22 US 22 - McKee Rd to Parkw Reconstruct Second 5,614 5,614 100770

22 US 22 /SR 48 to Westmoreland Co Restoration First 11,265 11,265 105449

28 Ravine Street DSI Removal Drainage Improvement First 3,475 3,475 74980

28 Allegheny Valley Expressway Resurface Third 1,500 1,500 91782

28 PA 28/Highland Park Br Interchange Interchange Improvement First 4,000 1,000 800 25,462 31,262 91845

28 PA 28/Highland Park Br Interchange Interchange Improvement Second 29,538 29,538 91845

Page 201: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 177 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

28 PA 28: Millvale-Etna Interchange Reconstruct Third 8,000 8,000 92271

28 PA 28 - Etna Inter-Bypass Reconstruct Third 4,000 4,000 92272

28 PA 28/Etna Bypass - Highland Pk Br Restoration First 100 7,500 7,600 92273

28 PA 28/Etna Bypass - Highland Pk Br Restoration Second 5,315 5,315 92273

28 PA 28: Highland Park - RIDC Reconstruct Second 29,013 29,013 92274

28 PA 28 RIDC Park - Harmarville Reconstruct Third 5,000 5,000 92275

28 PA 28: Harmarville-Russelton Restoration Third 6,000 6,000 92276

28 PA 28 Russelton - Butler Co Resurface First 10,030 10,030 92277

28 PA 28 / East Ohio Street Concrete Rehabilitation Third 5,200 5,200 100773

28 PA 28 / Allegheny Valley Reconstruct Second 8,750 8,750 100774

28 PA 28 / East Ohio Street Reconstruct Third 14,300 14,300 100775

28 PA 28- Highlnd Pk to RIDC Reconstruct Third 11,375 11,375 100776

28 PA 28-Yutes Rn to Bull Ck Reconstruct Third 11,960 11,960 100777

28 PA 28- Bull Ck to Butler Reconstruct Third 19,825 19,825 100778

28 Noble Street Slide Slides Correction First 50 50 2,000 2,100 110617

30 Lincoln Hwy: I-376 to Westinghouse BridgeResurface Second 8,775 8,775 88441

30 Lincoln Hwy/Westinghouse Br to Westmoreland CoRestoration First 100 15,640 15,740 91696

30 Ardmore Blvd- Adaptive Traffic Signal SystemSafety Improvement First 1,222 1,222 106516

48 PA 48, Scenery Drive Slide Slides Correction First 3,000 3,000 81738

48 PA 48-Cowan Dr to Valley Resurface Second 1,280 1,280 100780

48 Mosside Blvd-PA 130 to Haymaker Restoration Second 7,800 7,800 100782

48 Jacks Run Rd - Main St Resurface Third 2,000 2,000 100783

50 PA 50 -Thoms Rn to Mayer St Widen First 1,500 3,000 2,000 16,000 22,500 28010

50 Thoms Run Road-Landgraf Resurface Third 4,000 4,000 92936

50 PA 50/Chartiers Street Add Lane First 600 1,000 500 10,800 12,900 100607

50 PA 50-Wash County Line Concrete Rehabilitation Second 14,441 14,441 100784

51 Island Avenue Bridge Bridge Removal First 2,000 2,000 78176

51 PA 51 Resurface Resurface Second 3,000 3,000 91718

51 Saw Mill Rn Blvd - Whited Add Lane Third 1,500 1,500 100787

51 Saw Mill Run Blvd: PA 88 to US 19 Reconstruct Second 15,000 15,000 100789

51 PA 51-Lebanon Church Resurface Second 7,300 7,300 100793

Page 202: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 178 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

51 Saw Mill Run Restoration First 3,888 3,888 109374

51 Stoops Ferry Rd/McGovern Blvd Restoration Second 6,300 6,300 109384

51 PA 51-Clairton Blvd-Adaptive Traffic Signal SystemExisting Signal Improvement First 1,980 1,980 110369

60 Steubenville Pike Reconstruct Second 3,200 3,200 91723

60 Steubenville Pike - Adaptive Traffic Signal SystemSafety Improvement First 239 239 106509

65 PA 65: Fort Duquesne to Kendal Resurface Second 7,000 7,000 79448

65 PA 65: Frt Duquesne Br to Cal Ave Reconstruct Third 9,000 9,000 92279

65 PA 65/Emsworth to Sewickley Br Reconstruct Second 9,000 9,000 97934

65 Ohio Rver Blvd-Terrace Av Resurface Second 3,257 3,257 100796

65 Ohio Rver Blvd-River Ave Resurface Second 1,400 1,400 100797

65 Ohio Rver Blvd-Ped Walkwa Resurface Second 2,150 2,150 100798

65 PA 65/Emsworth to I-79 Resurface Second 16,212 16,212 109349

79 Southern Beltway Connector Widen First 10,000 10,000 28281

79 I-79 at PA 910 Interchange Interchange Improvement First 700 700 104328

79 I-79 at PA 910 Interchange Interchange Improvement Second 19,036 19,036 104328

88 PA 88 & SR 3004 Widening Add Turning Lane First 2,500 2,500 102961

88 PA 88-Library Rd- Adaptive Traffic Signal SystemExisting Signal Improvement First 1,170 1,170 110371

136 Rainbow Rn Rd -Bunola Rv Resurface Third 3,050 3,050 100803

148 Fifth Ave to Pennsylv Ave Resurface Third 1,270 1,270 100805

286 PA 286/Sandune-Logans Add Turning Lane Third 20,000 20,000 27505

286 286/Sagamore-Sandune PH2 Add Lane Third 27,000 27,000 80508

376 Pkwy East Corridor Transp Safety Improvement First 500 500 3,500 4,500 94651

376 Pkwy East Corridor Transp Safety Improvement Second 3,500 3,500 94651

376 I-376/Banksville Interchange Interchange Improvement First 2,400 500 500 25,115 28,515 97028

376 I-376/Banksville Interchange Interchange Improvement Second 6,000 6,000 97028

376 Almono - TIIF Reconstruct First 2,885 2,885 104228

376 I-376 Above 2nd Ave Wall Replacement Safety Improvement First 1,000 10,000 11,000 105465

400 Frankstown Road Resurface Second 450 450 91739

400 PA 400/Craig - Tokay Reconstruct Second 6,000 6,000 91787

400 Bennett Street Reconstruct Third 2,985 2,985 91788

400 PA 400- Ross St to Baum Reconstruct Second 9,091 9,091 100808

Page 203: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 179 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

400 Bigelow Boulevard Restoration Second 7,500 7,500 109383

579 I-579 "Cap" Project New Bridge First 26,440 26,440 97846

791 Rodi Rd-Ramp to Frankstown Reconstruct Third 3,085 3,085 91842

837 PA 837 Pedestrian Bridge Pedestrian Facilities First 600 50 200 6,000 6,850 27991

837 Seventh Ave/W. Eigth Ave. Resurface Second 6,550 6,550 96559

837 PA 837/33rd St to Smithfield Safety Improvement First 5,028 5,028 98085

837 PA 837, Carson Street Reconstruct First 6,412 6,412 98105

837 State St - St. Clair St Resurface Third 1,425 1,425 100812

837 East Carson St Mill and Overlay Resurface Second 3,000 3,000 110352

885 Blvd of Allies/Bates to I-376 Restoration First 7,380 7,380 91790

885 PA 885 - Second Avenue Resurface Second 1,200 1,200 100817

978 Millers Run Road - PA 50 Resurface Third 1,000 1,000 100818

1001 SR 1001,Main St - Powers to Water Resurface Second 1,533 1,533 100819

1001 Tenth Ave - Lawton to Sax Resurface Second 3,520 3,520 100821

1001 Butler St - Etna to 28th Resurface Third 1,000 1,000 100822

1001 SR 1001 - Fox Ridge Farms Resurface Second 1,300 1,300 100824

1001 SR 1001-Freeport Rd-Adaptive Traffic Signal SystemExisting Signal Improvement First 1,760 1,760 110372

1001 SR 1001/PA 910 Adaptive Traffic Signal SystemExisting Signal Improvement First 830 830 110373

1008 Gulf Lab Rd - Gibsonia Rd Resurface Second 860 860 100825

1014 Tawney Run Rd - Yutes Run Resurface Third 1,000 1,000 100826

1015 Russellton Rd - RR Ovrpas Resurface Second 1,755 1,755 100827

1016 Lefever Road Reconstruct Third 2,450 2,450 91772

1017 SR 1017 - Pittsburgh St Resurface Second 1,015 1,015 100829

1020 SR 1020 - Christine Rd Resurface Second 740 740 100830

1020 Cedar Ridge Road - Middle Resurface Second 1,500 1,500 100831

1026 SR 1026- Starr Road Resurface Second 754 754 100834

1030 SR 1030- Russelton Road Resurface Third 355 355 100835

1032 Oak Manor Road Slide Slides Correction First 650 650 109533

1045 Armstrong Rd - Bakerstown Resurface Second 630 630 100838

2015 SR 2015,Third Ave-Bayard Reconstruct Third 1,200 1,200 91849

Page 204: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 180 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2021 SR 2021- Santa Monica St Resurface Second 840 840 100840

2023 SR 2023 - Lovedale Road Resurface Second 869 869 100841

2023 Harrison Hollow Road Slide Slides Correction First 750 750 100842

2026 SR 2026 - McKeesport Blvd Resurface Second 960 960 100843

2035 McKee Road - Jacks Run Rd Resurface Second 1,360 1,360 100847

2040 SR 2040/Keenan Dr to Curry Hollow CenterRestoration First 250 833 1,111 20,571 22,765 26623

2040 Lebanon Church Rd - Adaptive Traffic Signal SystemSafety Improvement First 2,058 2,058 106507

2046 Streets Run Road Restoration Second 18,348 18,348 91796

2048 SR 2048: Thompson Run - PA 48 Restoration Third 9,456 9,456 27225

2049 SR 2049 - Greensprings Av Resurface Second 750 750 100849

2051 SR 2051-Pallas to Maple Relocation/Realignment Third 3,100 3,100 91858

2051 Brinton Road - Dinell Dr Resurface Second 500 500 100850

2056 School Street Resurfacing Resurface Second 215 215 100852

2061 Jefferson Rd-Old Wil Pen Resurface Third 1,250 1,250 100856

2063 Frey Road - Thomp Run Rd Resurface Third 845 845 100857

2065 SR 2065, Larimer Avenue Slide Slides Correction First 100 25 50 800 975 105458

2066 SR 2066, Main St to David Resurface Third 1,115 1,115 100858

2070 Indiana Road Slide Slides Correction First 750 750 109532

2075 New Texas-Loga Fer-Saltsb Resurface Second 840 840 100861

2075 New Texas-Loga Fer-Golden Resurface Second 490 490 100862

2075 Leechburg Rd- Ross Hollow Resurface Third 2,600 2,600 100863

2078 Hammil Rd, SR 2078 Resurface Second 940 940 100864

2080 SR 2080, Plum Ave Resurface Second 1,590 1,590 100865

2081 Old Northern Pike Resurface Second 500 500 100866

2084 SR 2084, Mill Street Resurface Second 1,274 1,274 100868

2088 Sardis Rd- Webster Rd Resurface Third 2,300 2,300 100869

2090 Webster Rd-Logans Ferry Resurface Second 1,268 1,268 100870

2128 Tenth Street Bypass Reconstruct Second 5,000 5,000 81750

3004 McLaughlin Rn Rd@McMillia Add Lane First 500 5,200 5,700 100963

3009 3009/South Park @Logan Rd Intersection Improvement First 2,100 2,100 100970

Page 205: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 181 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3009 SR 3009-Brightwood to Logan Resurface Third 3,000 3,000 100973

3015 Snowden Rd -Stone Church Resurface Third 1,700 1,700 100873

3016 Single Track Road Resurface Second 835 835 100874

3017 Gill Hall Road Resurface Second 2,022 2,022 100875

3020 Irishtown Road Resurface Third 1,000 1,000 100876

3037 Castle Shannon Trans Vill Intersection Improvement First 500 500 83157

3048 SR 3048, Noblestown Rd Slide RemediationSlides Correction First 1,250 1,250 105462

3052 Greentree/Cochran Road Restoration First 100 5,812 5,912 97931

3066 SR 3066, Steubenville Pike Slide RemediationSlides Correction First 160 1,200 1,360 105464

3069 Liberty Tunnel Phase 5 Restoration First 4,000 4,000 92930

3069 West Liberty Ave-Port Aut Resurface Second 1,000 1,000 100889

3069 SR 3069 -Wash Rd/W. Liberty Ave Adaptive Traffic SExisting Signal Improvement First 1,250 1,250 110374

3083 South Petrie Rd-Forest Gr Reconstruct Third 3,040 3,040 91876

3100 Glass Run Rd-Mellot Rd Resurface Third 285 285 100895

3160 Thorn Run Rd Interchange Interchange Improvement First 9,001 9,001 86859

4003 SR 4003 - East Street to Babcock Blvd Resurface Second 16,650 16,650 110353

4011 SR 4011, Rochester Rd Restoration Second 3,090 3,090 91819

4011 Rochester Rd-Ross Twp Lin Resurface Third 1,670 1,670 100898

4011 SR 4011, Rochester Slide Remediation Slides Correction First 150 1,500 1,650 105461

4028 Redgate Road Slide Slides Correction First 250 250 109534

4030 Ferry Rd-Merriman Road Resurface Third 1,000 1,000 100903

4034 SR 4034-Fern Hollow Rd Reconstruct Third 3,100 3,100 91881

4034 Audubon Rd-Fern Hollow Rd Resurface Third 1,340 1,340 100904

4039 Audubon Rd-Magee Rd Resurface Third 1,740 1,740 100905

4045 Hitzel Hill Rd-Camp Meet Resurface Third 1,000 1,000 100907

4055 Pittsburgh - Rochester Rd Reconstruct Third 3,032 3,032 91775

4059 Mars Valencia Road ET Resurface Second 90 90 100763

4060 Kleber Road Resurface Third 905 905 100909

4061 Franklin Road Reconstruct Third 3,180 3,180 91777

4084 Western Ave- West End Concrete Rehabilitation Third 6,500 6,500 100915

Page 206: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 182 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7301 Wenzell Av/Carnahan Rd Br Reconstruct First 2,409 2,409 58561

9900 Campbell's Run Road Reconstruct First 3,750 12,500 16,250 27219

9900 Campbell's Run Road Reconstruct Second 5,900 5,900 27219

9900 Beck's Run Road Reconstruct First 4,500 4,500 27491

9900 Painters Run- Bower Hill to Cedar Blvd Reconstruct First 250 250 27492

9900 Smithfield St Reconstruct, Ph 1 Reconstruct First 1,200 500 3,750 5,450 27493

9900 Smithfield St Reconstruct, Ph 1 Reconstruct Second 3,750 3,750 27493

9900 Unity Trestle Road Restoration Second 3,000 3,000 28372

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Lime Hollow Rd ov Lime Rn Bridge Rehabilitation Second 850 850 100672

Bridge Wash 2019 Bridge Preservation Activities First 1,200 1,200 106389

Bridge Wash 2020 Bridge Preservation Activities First 1,200 1,200 106390

8 Will Flynn ov WB Deer Ck Bridge Replacement Third 3,000 3,000 100600

8 Penn Ave ov Storm Sewer Bridge Preservation Activities Third 1,250 1,250 100601

8 62nd Street Bridge Bridge Preservation Activities Third 18,000 18,000 100958

19 Twp Road 51 SB ov I-376 Bridge Rehabilitation Third 750 750 100602

19 Twp Road 19 NB ov I-376 Bridge Rehabilitation Third 500 500 100603

19 West End Bridge Bridge Preservation Activities Third 20,000 20,000 100956

22 22/30 over the Parkway West Bridge Replacement First 500 500 27445

22 22/30 over the Parkway West Bridge Replacement Third 15,000 15,000 27445

28 PA 28 NB over PA 910 Bridge Preservation Activities Third 12,000 12,000 100959

30 Ardmore Blvrd Br over Falls Run Bridge Replacement First 2,400 2,400 28155

30 US 30 over Falls Run Bridge Replacement First 3,200 3,200 28593

30 Ardmore Blvrd Br ov Br. Falls Run Bridge Replacement First 1,700 1,700 100604

48 PA 48/Boston Hollow Road Br Bridge Replacement First 720 720 28132

48 Boston Hollow ov Boston Hollow Rn Bridge Replacement First 3,300 3,300 78175

48 Boston Hollow Road over Wylie Run Bridge Replacement First 2,500 2,500 93784

48 Scenery Dr ov Douglas Run Bridge Replacement First 1,000 1,000 100605

48 Jack Run Rd Br ov Jacks R Bridge Replacement Third 800 800 100606

48 Boston Bridge Bridge Preservation Activities Third 4,500 4,500 100950

50 PA 50 over Chartiers Ck Bridge Rehabilitation Third 2,300 2,300 100608

Page 207: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 183 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

51 Clairton Blvd Br ov Falle Bridge Rehabilitation Third 357 357 62681

51 4th St. ov McCabe Run Bridge Replacement First 1,500 1,500 78178

51 Elizabeth Bridge Bridge Rehabilitation First 7,600 7,600 88335

51 Coraopolis Blvd Bridge Bridge Preservation Activities Third 1,050 1,050 100609

51 Saw Mill Run Br ov Weyman Bridge Rehabilitation Third 800 800 100610

51 Saw Mill Run Br ov Saw Mi Bridge Preservation Activities Third 850 850 100611

51 Stoops Ferry Road Bridge Bridge Replacement First 3,500 3,500 100612

51 PA 51 over Lewis Run Bridge Preservation Activities Second 600 600 100943

51 PA 51 over Lewis Run 2 Bridge Preservation Activities Second 600 600 100944

60 Steubenville Pike @ E Win Bridge Rehabilitation Third 1,250 1,250 100613

60 Thornburg Bridge Bridge Preservation Activities First 250 750 50 50 7,200 8,300 109510

65 PA 65,Ohio River Blvd. Bridge Replacement Second 2,000 2,000 27264

65 PA 65 over Fremont Street Bridge Rehabilitation Second 3,484 3,484 100935

65 PA 65 ov Allegheny Ave Bridge Preservation Activities Third 1,200 1,200 100960

65 PA 65/Spruce Run Rd Bridge Bridge Preservation Activities First 3,800 3,800 106072

88 PA 88 - Clifton Road Bridge Replacement Third 3,500 3,500 100972

121 Greentree Rd ov Parkway W Bridge Preservation Activities Third 1,500 1,500 100945

130 Allegheny River Blvd B Bridge Replacement Third 1,500 1,500 78180

130 Broadway Blvd ov. Br TCk Bridge Rehabilitation Third 500 500 78182

130 PA 130 ov Allegh Riv Blvd Bridge Rehabilitation Third 1,400 1,400 100614

130 Beulah Rd ov Chalfont Run Bridge Rehabilitation Third 800 800 100615

130 Watkins Ave ov Patton St. Bridge Rehabilitation Third 1,300 1,300 100616

130 Brown Ave ov Saw Mill Run Bridge Rehabilitation Second 2,300 2,300 100617

136 Monongahela Rd ov Beckets Bridge Replacement Third 1,500 1,500 100618

136 W Newton Rd ov Twp Rd 51 Bridge Rehabilitation Second 2,000 2,000 100619

136 PA 136 ov Perry Mill Run Bridge Preservation Activities Second 1,250 1,250 100620

136 PA 136 ov Sunfish Run Bridge Preservation Activities Second 1,250 1,250 100621

136 Monongahela City Bridge Bridge Preservation Activities Third 1,200 1,200 100957

148 Lysle Blvd ov Crooked Run Bridge Rehabilitation Third 2,000 2,000 100622

286 Golden Mile Hwy ov Abers Bridge Preservation Activities Third 1,250 1,250 100623

Page 208: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 184 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

286 Golden Mile Hwy ov Humms Bridge Replacement Third 3,000 3,000 100806

366 Tarentum Bridge Ramp 'A' Bridge Preservation Activities First 5,000 5,000 63306

366 Tarentum Bridge Ramp 'B' Bridge Preservation Activities First 10,000 10,000 63307

366 Tarentum Bridge ov NS RR Bridge Rehabilitation First 1,500 800 800 10,000 13,100 100624

366 Tarentum Bridge ov NS RR Bridge Rehabilitation Second 20,000 20,000 100624

376 I-376/Ardmore to Bus 22 Bridge Preservation Activities First 250 250 110558

400 Saltsburg Rd ov Plum Ck Bridge Rehabilitation Third 1,080 1,080 100625

400 7th Ave ov Interstate 579 Bridge Preservation Activities Third 1,500 1,500 100626

400 Baum Blvd ov East Bus way Bridge Preservation Activities Third 1,200 1,200 100627

837 Eighth Ave ov Homestead Run Bridge Replacement First 3,000 3,000 78441

837 Eighth Ave Br ov Baldwin Bridge Rehabilitation Third 6,525 6,525 100628

837 Kennywood Park Bridge Bridge Improvement First 4,000 4,000 100629

837 Eighth Ave over Carson St Bridge Rehabilitation Third 7,000 7,000 100630

885 MA08 - Glenwood Bridge Bridge Preservation Activities First 1,500 1,500 93419

885 PA 885 Mifflin Rd - Glenw Bridge Rehabilitation Third 1,200 1,200 100631

885 Mifflin Rd Br - Glenwood Bridge Preservation Activities Third 1,500 1,500 100946

910 PA 910 at SR 1022 ov Deer Crk Bridge Replacement First 4,500 4,500 63322

910 PA 910 over Deer Creek Bridge Rehabilitation Second 1,200 1,200 100634

910 PA 910 over Rawlins Run Bridge Replacement Second 1,200 1,200 100635

910 PA 910 over Deer Creek 3 Bridge Deck Replacement Third 1,500 1,500 109557

910 PA 910 over Deer Creek 2 Bridge Replacement Third 2,000 2,000 109558

978 Bateman Road Bridge Bridge Replacement First 450 450 63330

978 Bateman Road Bridge Bridge Replacement Third 750 750 63330

978 Millers Run ov Dolphin Rn Bridge Replacement Second 1,500 1,500 100636

978 Clinton Rd ov NB Robinson Bridge Rehabilitation Third 1,850 1,850 100637

978 Bateman Road Bridge Bridge Preservation Activities Third 1,000 1,000 100638

1001 State Route 1001 Bridge Bridge Rehabilitation Third 1,000 1,000 100639

1003 North Canal St over Seitz Bridge Preservation Activities Third 1,500 1,500 100640

1005 Highland Park Bridge Reha Bridge Rehabilitation Third 1,500 1,500 100641

1005 Ramp ES of Highland Pk Br Bridge Preservation Activities Third 2,400 2,400 100642

1005 Highland Park Bridge Bridge Preservation Activities First 550 550 109549

Page 209: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 185 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1005 Highland Park Bridge Bridge Preservation Activities Third 5,000 5,000 109549

1010 Harts Rn Rd and SR 1006 Bridge Preservation Activities Third 1,500 1,500 100643

1014 SR 1014 Hite Road Bridge Deck Replacement First 2,116 2,116 78227

1014 SR 1014 NE of Turnpike Bridge Rehabilitation Second 1,250 1,250 100644

1015 Little Deer Ck Rd Bridge Bridge Replacement Second 1,500 1,500 28606

1015 Little Deer Creek Rd #1 Bridge Replacement Third 2,000 2,000 63346

1015 SR 1015 ov Little Deer Ck Bridge Rehabilitation Second 1,500 1,500 100645

1015 Little Deer Cr. Rd Bridge Bridge Replacement Second 1,200 1,200 100646

1015 Orange Belt X to Little D Bridge Preservation Activities Second 1,500 1,500 100647

1016 SR 1016 Cove Run Road Bridge Deck Replacement First 1,250 1,250 78230

1019 Days Run Bridge Bridge Replacement First 1,000 1,000 63351

1019 SR 1019 (Butler Logan Rd) ov AV Exp. Bridge Deck Replacement First 3,750 3,750 100648

1019 Days Run Rd Br to Days Rn Bridge Replacement Second 1,984 1,984 100649

1027 SR 1027 / Pleasantville Road Bridge Rehabilitation First 1,000 1,000 89097

1027 Pleasantville Rd Br Bridge Rehabilitation Second 2,000 2,000 100650

1028 SR 1028/ Little Bull Ck Bridge Replacement Second 1,000 1,000 63358

1028 SR 1028 ov Bessemer Bridge Rehabilitation Second 1,500 1,500 100651

1028 Bakerstown Rd Br@ Deer Ck Bridge Preservation Activities Second 1,500 1,500 100652

1031 Lardintown Road Bridge Bridge Replacement First 1,600 1,600 63360

1033 Howes Run Rd ov McDow Rn Bridge Replacement Second 1,000 1,000 100654

1038 New Kensington Bridge Bridge Preservation Activities First 500 4,000 4,500 63515

1038 New Ken Rd Br to SR 9109 Bridge Preservation Activities Second 400 400 100655

2001 McKeesport Road Bridge Bridge Rehabilitation First 2,500 2,500 100656

2001 SR 2001 ov Mon Rd Br Bridge Replacement Second 1,000 1,000 100657

2005 Kelly Run Road Bridge Bridge Replacement Second 800 800 28609

2008 Mill Hill Road Bridge Bridge Rehabilitation Second 1,500 1,500 100658

2009 Wylie Road Bridge Bridge Rehabilitation Second 1,500 1,500 100659

2010 Lovedale Rd Br/Wylie Rn Bridge Replacement Third 500 500 74319

2013 Ella Hollow Road Bridge Bridge Replacement Second 500 500 100661

2014 Boyd's Hollow Run Bridge Bridge Preservation Activities Second 1,500 1,500 100663

Page 210: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 186 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2017 Pineview Drive Bridge Bridge Replacement Second 1,000 1,000 28440

2017 Buena Vista Rd Br Bridge Replacement Second 1,200 1,200 100664

2018 West Smithfield Bridge Bridge Replacement Second 1,800 1,800 27284

2022 Stewartsville Road Bridge Bridge Replacement Second 2,500 2,500 100666

2031 SR 2031 ov Long Run Bridge Replacement Third 2,500 2,500 89129

2045 SR 2045 Br ov Maple Ave Bridge Preservation Activities Second 2,800 2,800 100667

2046 SR 2046 ov Streets Run Bridge Replacement Second 1,500 1,500 100668

2052 SR 2052 over Thompson Run Bridge Preservation Activities Third 950 950 100669

2053 SR 2053 over Duffs Run Rd Bridge Preservation Activities Third 950 950 100670

2058 Verona Road Bridge Bridge Replacement First 400 400 89077

2058 Verona Road Bridge Bridge Replacement Third 1,500 1,500 89077

2058 SR 2058 over Plum Creek Bridge Preservation Activities Third 1,500 1,500 100671

2066 Old Frankstown Rd Bridge Bridge Replacement Second 500 500 100673

2073 SR 2073 over Plum Creek Bridge Preservation Activities Second 1,500 1,500 100674

2074 Hulton Road Bridge Bridge Replacement Second 1,450 1,450 28549

2075 Logans Ferry Rd ov Pucketa Crk Bridge Rehabilitation First 1,500 1,500 27275

2075 New Texas Road Br Bridge Replacement Second 1,000 1,000 28615

2075 New Texas Road Bridge Bridge Rehabilitation Second 500 500 100675

2075 SR 2075 ov Little Plum Ck Bridge Rehabilitation Second 1,000 1,000 100676

2086 Leechburg Rd ov Plum Ck Bridge Rehabilitation Second 1,000 1,000 100677

2094 Jerome Street Bridge Bridge Rehabilitation First 13,000 13,000 28345

2094 Jerome Street Bridge Bridge Rehabilitation Second 1,600 1,600 100678

2112 Electric Ave ov Falls Run Bridge Replacement First 250 450 100 100 900 78232

2112 Electric Ave ov Falls Run Bridge Replacement Second 20,000 20,000 78232

2114 McKeesport Duqusne Bridge Bridge Preservation Activities First 800 900 300 300 6,000 8,300 63583

2114 McKeesport Duqusne Bridge Bridge Preservation Activities Second 5,000 5,000 63583

2146 Webster Ave ov I- 579 Bridge Preservation Activities Third 1,100 1,100 100953

2152 Ramp - Rodi Rd/Chalfont R Bridge Replacement First 1,200 1,200 28159

3001 Millers Run/Br Millers Bridge Replacement Third 1,500 1,500 78234

3004 McLaughlin Run Rd #2 Bridge Replacement First 400 400 63558

3005 Mayview Road Bridge Bridge Replacement First 2,000 2,000 28520

Page 211: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 187 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3007 Walton Road Bridge Bridge Preservation Activities Third 1,200 1,200 100698

3012 Sleepy Hollow Road Bridge Bridge Preservation Activities Third 950 950 100681

3015 SR 3015 ov Lick Run Creek Bridge Replacement First 400 400 105451

3015 SR 3015 ov Lick Run Creek Bridge Replacement Third 500 500 105451

3017 Gill Hall Road Bridge Bridge Deck Replacement First 100 100 100683

3018 Lobbs Run Bridge Bridge Preservation Activities Third 1,000 1,000 100684

3021 Snowden Road Bridge Bridge Replacement Second 1,600 1,600 100962

3026 Millers Run Bridge Bridge Preservation Activities Third 1,500 1,500 100685

3027 Smithfield Street Bridge Bridge Preservation Activities First 500 800 100 400 4,000 5,800 28525

3027 Smithfield Street Bridge Bridge Preservation Activities Second 8,000 8,000 28525

3028 Grant St Br ov Robinson Bridge Rehabilitation Second 1,800 1,800 100686

3028 Presto Sygan Road Bridge Bridge Replacement Second 2,000 2,000 109548

3034 McMillan over McLaughlin Bridge Replacement Third 1,000 1,000 78164

3034 McMillan Road Bridge Bridge Rehabilitation Second 1,000 1,000 100687

3035 SR 3035/Weyman Br ov Saw Mill Rn Bridge Replacement First 500 1,200 1,700 73051

3037 Castle Shannon Blvd Br Bridge Rehabilitation Third 1,250 1,250 100689

3039 SR 3039/Conrail RR, Robinson Bridge Rehabilitation First 1,300 8,400 9,700 26546

3048 NoblestownBr Robinson Bridge Replacement Second 3,233 3,233 74330

3048 SR 3048 Grant St/Rbsn Run Bridge Replacement Third 1,000 1,000 78162

3048 SR 3048 ov Robinson Run Bridge Painting First 1,800 1,800 100690

3048 SR 3048 ov Robinson Rn #3 Bridge Rehabilitation Third 1,000 1,000 100691

3051 Half Crown Road Bridge Bridge Preservation Activities Third 1,500 1,500 100692

3070 SR 3070 ov Montour Run Bridge Rehabilitation Second 500 500 78272

3070 McClaren and Main St Br Bridge Preservation Activities Third 1,000 1,000 100694

3070 McClaren Road Bridge Bridge Preservation Activities Third 1,500 1,500 100695

3071 SR 3071 ov B/Potato Grdn Bridge Replacement Third 1,000 1,000 78147

3078 Burgettstown Road Bridge Bridge Replacement Third 1,000 1,000 28546

3082 Murdocksville Road Br Bridge Replacement Second 1,000 1,000 100699

3084 SR 3084, Spring Run Road Bridge Replacement Second 1,200 1,200 100940

3089 Flaugherty Run ov Bus 60 Bridge Rehabilitation Second 1,800 1,800 28140

3104 McKees Rocks Bridge Phase 2 Bridge Preservation Activities First 1,500 2,000 3,500 28344

Page 212: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 188 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3104 McKees Rocks Bridge Phase 2 Bridge Preservation Activities Second 11,000 11,000 28344

3104 McKees Rocks Bridge 2 Bridge Rehabilitation Third 12,325 12,325 100701

3111 Sugar Grove Rd ov Shouse Bridge Replacement Second 1,000 1,000 78408

3144 SR 3144 ov PA 60 Bridge Rehabilitation Second 1,200 1,200 100938

4003 McKnight Rd ov Girtys Run Bridge Rehabilitation Third 2,200 2,200 100703

4003 McKnight Rd ov Pine Creek Bridge Rehabilitation Third 4,000 4,000 100704

4003 McKnight Rd ov Ingomar Rd Bridge Rehabilitation Third 2,900 2,900 100705

4009 SR 4009 ov Girty-Br Rehab Bridge Rehabilitation Third 250 250 100706

4009 Peoples Road Bridge Bridge Preservation Activities Third 950 950 100707

4009 SR 4009 ov Girty -Br Pres Bridge Preservation Activities Third 1,500 1,500 100708

4009 Babcock Blvd ov Girty#1 Bridge Preservation Activities Second 1,000 1,000 100709

4009 Babcock Blvd ov Girty#2 Bridge Preservation Activities Second 1,000 1,000 100710

4012 Union Ave over Spruce Run Bridge Preservation Activities Third 1,000 1,000 100711

4012 Union Ave over I-279 Bridge Preservation Activities Third 1,000 1,000 100712

4012 Union Ave ov Spruce Run#2 Bridge Preservation Activities Third 1,000 1,000 100713

4017 Pine Creek Road Bridge #2 Bridge Rehabilitation Third 1,000 1,000 100714

4019 Mt Royal Blvd ov Pine Ck Bridge Preservation Activities Third 950 950 100715

4019 Butler St ov Pine Creek Bridge Preservation Activities Third 2,400 2,400 100716

4021 Lowries Run Bridge Bridge Rehabilitation Third 1,250 1,250 100717

4023 New Brighton Road Bridge Bridge Rehabilitation Second 300 300 100718

4025 Sewickley Bridge Preservation Bridge Preservation Activities Third 15,000 15,000 69076

4028 SR 4028 Red Gt/Hays Run Bridge Replacement Third 1,000 1,000 78149

4036 Big Sewickley Creek 2 Bridge Replacement Second 2,000 2,000 78415

4036 Big Sewickley Creek Road Bridge Bridge Replacement First 3,250 3,250 89117

4039 Sewickley Ck Rd ov LSC Bridge Replacement Second 750 750 78419

4039 Audubon Road Bridge Preservation Activities Second 750 750 100720

4050 Shenot Road Bridge Bridge Replacement Third 1,200 1,200 100722

4053 SR 4053/Wexford Run Road Bridge Preservation Activities First 400 500 20 10 2,500 3,430 91596

4053 Reichold Rd ov Wexford Rn Bridge Preservation Activities Second 950 950 100723

4058 SR 4058, Leet Street Br Bridge Rehabilitation Second 1,000 1,000 100725

Page 213: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 189 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4064 Peebles Road Bridge Bridge Rehabilitation Second 1,460 1,460 100726

4070 Wildwood Rd over BP RR Bridge Preservation Activities First 3,000 3,000 78427

4084 W Ohio St/Ridge Ave Br's. Bridge Rehabilitation First 4,200 4,200 27300

4165 Glenfield Viaduct Bridge Bridge Preservation Activities Second 2,000 2,000 109570

7105 Sutersville Bridge YR01 Bridge Preservation Activities First 800 550 50 3,000 4,400 93913

7110 (OB04) Fleming Park Br. Bridge Preservation Activities First 4,000 4,000 78212

7113 Old William Penn Highway over Thompson RunBridge Replacement Second 1,500 1,500 109347

7115 CM05 Campbells Run Bridge Replacement First 1,200 1,200 27753

7116 JA04 Jacks Run Bridge No. 4 Bridge Deck Replacement First 975 975 27332

7116 Thompson Rn Rd Br (TN03) Bridge Replacement Second 900 900 27514

7118 Pine Creek Br 16 (PI16) Bridge Rehabilitation Third 1,250 1,250 110316

7202 Bull Creek Br No 7 (BF07) Bridge Replacement Second 1,032 1,032 57074

7202 Bull Creek Br No 8 BF08 Bridge Replacement Second 500 500 79252

7207 Pine Creek Br 35 (PI35) Bridge Rehabilitation Second 1,300 1,300 110317

7209 Little Deer Cr Br 4 (DL04 Bridge Deck Replacement Second 1,100 1,100 27481

7301 28th Street Bridge Bridge Rehabilitation First 750 517 1,267 27144

7301 28th Street Bridge Bridge Rehabilitation Second 4,739 4,739 27144

7301 McFarren Street Bridge Replacement Bridge Replacement First 3,874 3,874 27462

7301 Swinburne Bridge Bridge Rehabilitation First 800 650 1,450 27747

7301 Swinburne Bridge Bridge Rehabilitation Second 6,000 6,000 27747

7301 6th Street Bridge Rehab Bridge Rehabilitation First 8,000 8,000 76388

7301 6th Street Bridge Rehab Bridge Rehabilitation Second 15,252 15,252 76388

7301 South Negley Ave. Bridge Bridge Replacement First 1,000 50 4,500 5,550 83137

7301 9th Street Bridge Rehab Bridge Rehabilitation First 26,875 26,875 88719

7301 Charles Anderson Bridge Bridge Replacement First 1,800 100 5,000 6,900 91907

7301 Charles Anderson Bridge Bridge Replacement Second 18,000 18,000 91907

7301 AR01 - Armstrong Tunnel Bridge Improvement First 5,000 5,000 93922

7301 AL05- 16th Street Bridge Bridge Preservation Activities First 1,500 1,500 95796

7301 BC01 Becks Run No 1 Bridge Replacement First 250 250 103344

7301 BC03 Becks Run Rd over Becks Run Bridge Replacement First 250 250 103347

7301 Larimer Avenue Bridge Bridge Rehabilitation First 800 800 106386

Page 214: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 190 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7420 Coraopolis Bridge Bridge Preservation Activities First 500 500 28426

7420 Coraopolis Bridge Bridge Preservation Activities Second 500 5,000 5,500 28426

7449 Dooker's Hollow Br (DK01) Bridge Replacement First 12,000 12,000 76393

7456 Kenmawr Ave Ramp Bridge Rehabilitation First 1,000 3,000 4,000 93917

7463 Kenmawr Bridge over NS RR Bridge Replacement First 10,500 10,500 27543

7479 Patton St Bridge (TL13) Bridge Rehabilitation First 500 500 1,000 93371

7479 Patton St Bridge (TL13) Bridge Rehabilitation Second 10,000 10,000 93371

8002 Blvd of Allies - Ramp H Bridge Preservation Activities First 1,000 1,000 106110

8002 Blvd of Allies - Ramp H Bridge Deck Replacement Third 7,000 7,000 109562

8004 Blvd of the Allies Ramp U Bridge Preservation Activities First 2,500 2,500 100632

8004 Boulevard of Allies Ramps Bridge Preservation Activities First 1,700 2,250 5,000 8,950 100728

8004 Boulevard of Allies Ramps Bridge Preservation Activities Second 16,000 16,000 100728

8015 Neville Island Bridge Ramps - Phase 2 Bridge Preservation Activities Third 6,000 6,000 100941

8017 Local Ramp to PA 65 North Bridge Rehabilitation Second 1,710 1,710 100939

8041 SR 8041 RAMPJ Bridge Rehabilitation Third 500 500 100730

9900 Thompson Rn Rd Br TN02 Bridge Replacement Second 1,000 1,000 27513

Planning Partner: SPC Mode: Transit County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Cap. Cost Cntrct- Access First 64,842 64,842 65465

InfrastructureSfty&Renewl First 25,158 25,158 65510

Preventive Maintenance First 65,037 65,037 65535

Support Vehicles First 10,000 10,000 65541

Vehicle Overhaul Program First 25,483 25,483 65550

CCOC First 3,555 3,555 71104

Bus Procurement First 117,134 117,134 71148

Preventive Maintenance First 2,000 2,000 77739

PAAC Cap.BondDept.Service First 88,343 88,343 77757

Operating Assistance First 1,073,082 1,073,082 84311

Operating Assistance First 1,000 1,000 90068

Transit Security Grant First 2,000 2,000 90171

Fixed Guidway Mod Program First 80,000 80,000 90349

Fixed Facility Imp. First 77,411 77,411 95003

Page 215: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 191 of 259August 16, 2018

Planning Partner: SPC Mode: Transit County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Fixed Guideway Bridge First 80,000 80,000 95004

IT Hardware/Software First 20,000 20,000 95005

Preventive Maint - Rail First 71,098 71,098 95006

Shop Equipment First 12,237 12,237 95007

Operating Assistance First 3,120 3,120 106606

Shared Ride First 60,924 60,924 106644

Pittsburgh Bus Rapid Tran First 117,300 117,300 110895

Operating Assistance First 4,238 4,238 111095

Planning Partner: SPC Mode: Highway County: ArmstrongTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SPC D-10 Hwy/Bridge Line Miscellaneous First 320 320 79843

Armstrong DFB Line Item Bridge Replacement First 1,211 1,211 106476

Local Road Enhancements Safety Improvement First 15 25 210 250 109652

28 Goheenville Dip Safety Improvement First 309 16,898 17,207 69141

28 Goheenville Dip Safety Improvement Second 40 40 69141

28 Hays Run 3R Safety Improvement Second 2,000 1,000 3,000 6,000 91262

28 Hays Run 3R Safety Improvement Third 14,500 14,500 91262

28 PA 28 Butler Co. to SR 3023 Resurface Second 2,000 2,000 99673

28 PA 28 Resurfacing Resurface Second 3,947 3,947 99933

28 Slabtown South Reconstruct Third 8,200 8,200 101134

28 Spaces Corners Resurfacing Resurface First 1,854 1,854 109610

56 PA 56/SR 2052 Int. Intersection Improvement Second 1,200 1,200 98077

66 PA 66/SR 2065 Int. Safety Improvement Second 1,560 1,560 95902

66 PA 66 - SR 2019 Resurface Second 1,750 1,750 99677

128 PA 128 Cadogan to PA 28 Resurface Second 1,307 1,307 99728

210 PA 56 to Elderton Resurf. Resurface Second 2,730 2,730 99928

422 Margaret Rd Intersection Intersection Improvement First 824 338 508 1,670 85574

422 Margaret Rd Intersection Intersection Improvement Second 30,140 30,140 85574

422 Kittanning Elementary Intersection Safety Improvement First 3,280 3,280 91249

422 US 422 ITS - Armstrong Variable Message Signs Second 1,275 1,275 98078

422 Dunbar Dip Reconstruct Third 11,492 11,492 98689

Page 216: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 192 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: ArmstrongTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

422 Shelocta West Resufacing Resurface First 2,915 2,915 105891

1032 Boggs Township #1 Slide Safety Improvement First 531 531 109692

1040 SR 1040/Water St. Signal Safety Improvement Second 600 600 91277

Planning Partner: SPC Mode: Bridge County: ArmstrongTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

28 Poverty Hill Bridge Bridge Replacement First 318 383 17 55 772 24056

28 Poverty Hill Bridge Bridge Replacement Second 2,087 2,087 24056

28 Goheenville Bridge #1 Bridge Replacement Second 2,600 2,600 24059

56 PA 56 Apollo Group Bridges Bridge Replacement First 6,180 6,180 103146

66 Guffy Run Br. Replacement Bridge Replacement Second 1,955 1,955 23999

85 East of Rural Valley Br. Bridge Replacement Second 2,967 2,967 98896

128 Transylvania Bridge No. 1 Bridge Replacement Second 2,020 2,020 83209

268 Parker Bridge #1 Bridge Rehabilitation Second 1,845 1,845 24082

268 Foxburg Bridge #2 Bridge Replacement Second 1,500 1,500 24083

268 PA 268 Ramps Bridge Bridge Rehabilitation Second 2,000 2,000 98057

839 PA 839 over Mahoning Cr. Bridge Replacement Second 4,108 4,108 99129

1028 Cowanshannock Twp. N. of Rural Valley Bridge - DFBBridge Replacement First 26 31 10 424 491 109615

1030 East of Templeton Bridge Bridge Replacement Second 2,020 2,020 83226

2001 Rural Valley Bridge #4 Bridge Replacement First 273 265 16 21 1,069 1,645 83245

2003 South of Rural Valley Bridge #3 Bridge Replacement First 294 32 36 1,311 1,673 109614

2005 Brick Church Bridge #2 Bridge Replacement First 366 366 24136

2005 Brick Church Bridge #2 Bridge Replacement Second 348 41 46 1,507 1,942 24136

2027 Fagley Run Bridge #2 Bridge Replacement First 589 589 91794

2033 Baker Hollow Bridge Bridge Replacement First 318 273 33 38 638 1,301 109617

2033 Baker Hollow Bridge Bridge Replacement Second 600 600 109617

2036 Upper Mateer Bridge #2 Bridge Improvement First 258 32 26 874 1,189 24145

2063 Brady's Run Bridge #3 Bridge Replacement First 283 265 33 43 1,069 1,693 86017

2066 Stitts Run Bridge #1 Bridge Replacement First 77 52 1,411 1,540 83272

3005 Pony Farm Road Bridge #2 Bridge Replacement First 335 318 27 43 1,688 2,411 74208

3027 Dock Hollow Run Br. #1 Bridge Replacement Second 1,765 1,765 23641

4003 Bradys Bend Bridge #16 Bridge Replacement First 2,215 2,215 77924

4008 Walkchalk Bridge No.3 Bridge Replacement Second 1,518 1,518 83287

Page 217: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 193 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: ArmstrongTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4035 Craigsville Bridge Bridge Replacement First 3,289 3,289 24159

7203 T-427 over Sugar Creek Bridge Replacement Second 1,563 1,563 95853

7206 T-487 Smeltzer Bridge Bridge Replacement Second 1,563 1,563 95855

7207 T-763 West Hills Bridge Bridge Preservation Activities First 16 1,910 1,925 24211

7210 T-858 Dunmire Bridge Bridge Replacement Second 1,563 1,563 107268

7211 T-644 over N. Br. Cherry Run Bridge Replacement Second 1,562 1,562 99403

7217 T-346 over Bear Creek Bridge Replacement Second 1,563 1,563 77906

7217 T-840 over Valley Run Bridge Replacement Second 1,563 1,563 95858

7219 T-591 over Cherry Run Bridge Replacement Second 1,563 1,563 23810

7219 T-518 over Cherry Run Bridge Replacement Second 1,563 1,563 95859

7227 T-738 over S.Fork Pine Cr Bridge Replacement Second 1,563 1,563 23819

Planning Partner: SPC Mode: Transit County: ArmstrongTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Operating Assistance First 5,451 5,451 83884

FR Vehicle Replacement First 362 362 106635

SR Vehicle Replacement First 1,112 1,112 106640

Bus Wash Rack First 275 275 111103

Replace Phone System First 20 20 111104

Security Router First 13 13 111105

Server Upgrade First 12 12 111106

Update Security Equipment First 103 103 111107

Workstation Replacement First 15 15 111108

Planning Partner: SPC Mode: Highway County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Betterment Reserve Beaver Restoration First 4,000 12,300 16,300 75342

Betterment Reserve Beaver Restoration Third 24,574 24,574 75342

Beaver - Bridge Line Item Bridge Rehabilitation First 4,000 3,915 7,915 76582

Beaver - Bridge Line Item Bridge Rehabilitation Third 17,823 17,823 76582

NS RR Crossings in Darlington and Big BeaverRR Warning Devices First 100 100 106078

NS RR Crossings in Darlington and Big BeaverRR Warning Devices Second 500 500 106078

18 PA 18 -7th Ave & 7th St. Bridge Restoration First 7,000 7,000 29094

18 Third Ave/YMCA Dr to 5th Ave Reconstruct First 4,000 4,000 105862

Page 218: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 194 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

30 US 30 Upgrade Reconstruct First 9,998 9,998 29045

30 US 30/WV State Line to PA 168 Resurface First 3,200 3,200 81652

30 US 30/PA 168 to PA 151 Reconstruct Third 1,500 1,500 88258

51 PA 51/McKinley - Ohio State Reconstruct Third 15,500 15,500 101232

51 Constitution Boulevard Restoration First 12,000 12,000 105454

51 Constitution Blvd Restoration Second 9,600 9,600 109352

65 PA 65 - Eighth Street to Mercer Rd Resurface Second 10,320 10,320 110356

68 Midland Beaver Road Restoration Second 12,058 12,058 109356

151 Bocktown Road Slide Slides Correction First 150 150 109531

168 PA 168/Moore - Second Resurface Third 4,510 4,510 101209

551 PA 551/ 37th - EchoValley Resurface Third 1,780 1,780 101211

1002 SR 1002/Cherry Hill Road Reconstruct Third 3,120 3,120 91742

1011 SR 1011/Zelienople - Camp Rn Reconstruct Third 3,150 3,150 91744

1019 Brush Crk/Mecklem to PA 588 Resurface Third 550 550 101215

1029 SR 1029/PA 588 to SR 1014 Reconstruct Second 1,200 1,200 28264

2004 Freedom Rd Upgrade - Ph C Relocation/Realignment First 22,000 22,000 67016

2004 Freedom Rd Upgrade - Ph C Relocation/Realignment Second 8,000 8,000 67016

2005 SR 2005 Slide Repair Safety Improvement Third 1,800 1,800 92934

2006 SR 2006/Lovi Road Reconstruct Second 4,500 4,500 91710

2006 2006/FreedomCrider-Sunset Resurface Third 4,415 4,415 101217

3005 SR 3005 to Center Grange Reconstruct Third 3,140 3,140 91748

3005 SR 3005/Center Grange - Brodhead Reconstruct Second 3,100 3,100 91750

3005 Chapel Road Slide Slides Correction First 800 800 109530

3007 SR 3007/Frankfort Rd - Allegheny Co LineRestoration Second 13,039 13,039 105453

3008 SR 3008/Montgomery Dam - Frankf Resurface Third 1,027 1,027 101220

3010 Moffett Mill Road Slide II Slides Correction First 500 500 29046

3011 SR 3011/Gringo Clinton Rd Reconstruct Second 3,180 3,180 91712

3014 SR 3014/DeadEnd-Mill St Reconstruct Third 3,175 3,175 91732

3023 SR 3023/Lincoln Hwy - Clearview Resurface Third 3,855 3,855 101222

4009 Watts Mill Road Bridge Bridge Removal First 500 500 28959

4029 SR 4029/Tuscarawas - Blackhawk Resurface Third 3,620 3,620 101226

Page 219: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 195 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4030 SR 4030/Leopard Lane Resurface Second 3,165 3,165 91716

4042 SR 4042 - SR 8039 to Madison St Resurface Third 1,000 1,000 101227

4043 Kelley/Wolf Run - Engle Road Resurface Third 1,075 1,075 101228

4044 PA Ave - PA 51 to PA 18 Resurface Third 605 605 101229

Planning Partner: SPC Mode: Bridge County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

18 Frankfort ov Traverse Ck Bridge Rehabilitation Third 1,250 1,250 78319

18 Frankfort Road Bridge Bridge Replacement First 300 700 50 50 1,100 101165

18 Frankfort Road Bridge Bridge Replacement Second 10,000 10,000 101165

18 PA Ave/Markey's Run Bridge Preservation Activities Third 1,500 1,500 101167

18 PA 18 Bridge ov Beaver River Bridge Preservation Activities Third 13,000 13,000 105441

18 Rochester-Monaca Bridge Bridge Preservation Activities First 500 500 20 10 1,030 109376

18 Rochester-Monaca Bridge Bridge Preservation Activities Second 5,000 5,000 109376

51 Constitution Blvd/Creek Bridge Rehabilitation Third 1,500 1,500 102045

65 Mercer Rd Br ov Connoquenessing Creek Bridge Replacement First 550 550 35156

65 Mercer Rd Br ov Connoquenessing Creek Bridge Replacement Second 7,000 7,000 35156

65 Mercer Road Bridge Bridge Replacement Third 1,200 1,200 109390

151 Bocktown ov Br Raredon Rn Bridge Rehabilitation Second 750 750 78322

151 PA 151/Branch of Obney Rn Bridge Preservation Activities Third 1,500 1,500 101171

151 PA 151/ br. of Obney Run Bridge Preservation Activities Third 1,500 1,500 101195

168 PA 168 over Jordan Run Bridge Replacement First 450 450 101173

168 PA 168 over Jordan Run Bridge Replacement Second 2,000 2,000 101173

251 PA 251 over Brush Run Bridge Replacement Third 1,800 1,800 101174

351 PA 351/Koppel Bridge Bridge Replacement First 3,000 3,000 28734

588 PA 588 over Small Stream Bridge Preservation Activities Third 1,500 1,500 101176

588 PA 588 over Barris Creek Bridge Preservation Activities Third 950 950 101177

588 PA 588/Connoquenessing Ck Bridge Preservation Activities Third 1,500 1,500 101178

588 PA 588 over Bennett Run Bridge Preservation Activities Third 1,500 1,500 101179

1005 Chapel Drive ov Brush Ck Bridge Replacement Second 5,700 5,700 78326

1009 Fombell Road over Camp Run Bridge Replacement First 1,700 1,700 78329

1019 Brush Ck Br/BrBrush Ck Bridge Replacement Second 1,000 1,000 99795

1019 Brush Creek Road Bridge Bridge Replacement Third 1,000 1,000 101182

Page 220: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 196 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1024 Deer Lane Extension ov Ck Bridge Rehabilitation Second 1,500 1,500 78301

1029 SR1029/Br. of Brush Creek Bridge Rehabilitation Second 1,000 1,000 102047

2004 Freedom Criders Bridge 1 Bridge Rehabilitation Third 1,200 1,200 28857

2004 Freedom Crider Bridge Bridge Rehabilitation Second 1,500 1,500 101184

2006 Freedom-Lovi Road Bridge Bridge Replacement Second 1,000 1,000 101186

3005 Chapel Road over Elkhorn Bridge Preservation Activities Third 950 950 101187

3016 SR 3016 over Elkhorn Run Bridge Preservation Activities Third 1,500 1,500 101190

3022 SR 3022 ov Service Creek Bridge Replacement Third 1,850 1,850 101191

3027 Georgetown Road Br #1 Bridge Replacement Second 1,000 1,000 70806

3050 SR 3050 Bridge Bridge Rehabilitation Second 1,120 1,120 29023

4005 New Galilee ov N Fork Ck Bridge Rehabilitation First 1,500 1,500 78308

4011 Elmbrook ov Br Small Run Bridge Replacement Third 1,200 1,200 78309

4012 Brady Run Road Bridge Bridge Rehabilitation Third 1,000 1,000 109391

4017 Shenango over Wallace Run Bridge Rehabilitation Second 950 950 78311

4019 Park Road Bridge Bridge Preservation Activities Third 1,500 1,500 101197

4020 Dutch Ridge Rd Br/I-376 Bridge Replacement First 4,500 4,500 29075

4021 Shenango Road Bridge Bridge Preservation Activities Second 1,500 1,500 101198

4034 Wolf Run Rd ov Wolf Run Bridge Rehabilitation Second 1,000 1,000 78314

4042 SR 4042/Beaver River, Conrail Bridge Deck Replacement Second 5,550 5,550 28918

4042 SR 4042 over PA 18 Bridge Preservation Activities Second 1,800 1,800 101200

4043 Kelly Road over Wolf Run Bridge Replacement Second 2,000 2,000 101201

4049 Riverside Dr ov Trib Beav Bridge Rehabilitation Third 1,000 1,000 78317

4053 Georgetown Br over PA 51 Bridge Rehabilitation Third 2,500 2,500 70793

7216 CB52-McHenry Brdg #1 Bridge Replacement First 1,400 1,400 28831

7412 CB # 24 Brickyard Bridge Bridge Replacement First 725 725 28806

7423 Pittsfield Br - NB5 Bridge Replacement First 1,120 1,120 28904

Planning Partner: SPC Mode: Transit County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Purchase Paratrnsit Buses First 923 923 65404

Support Equipment First 485 485 70708

Computer hard/software First 253 253 83817

Page 221: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 197 of 259August 16, 2018

Planning Partner: SPC Mode: Transit County: BeaverTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

ETC Renovations First 1,360 1,360 94985

Operating Asst. - Rural First 2,253 2,253 94986

Preventive Maintenance First 5,809 5,809 105099

Stationary Security Cams First 75 75 111093

Planning Partner: SPC Mode: Highway County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Butler Multi-Modal Center Transit System Improvement First 2,875 2,875 88989

Butler DFB Line Item Bridge Replacement First 1,211 1,211 106487

PA 68 Park and Ride Program Park and Ride Lot First 3,750 3,750 106605

Maple Avenue Crossing RR Warning Devices First 250 250 110766

8 Hansen Ave. Int. Improve. Intersection Improvement Second 1,320 1,320 98080

8 PA 8 South: Old Rt 8 - Airport Rd Resurface Second 3,050 3,050 100276

8 PA 8 Resurfacing - Allegheny to PA 228 Resurface First 2,364 2,364 109628

8 PA 8 Main Street Signal Improvements Existing Signal Improvement First 500 3,000 3,500 110464

19 Zelienople Signal Upgrade Safety Improvement Second 1,500 1,500 90310

19 Morgans Bridge Preserv. Bridge Rehabilitation Third 5,700 5,700 98023

19 US 19/PA 68 Int. Improve. Intersection Improvement Second 1,300 1,300 98083

19 Portersville North Resurf Resurface Second 2,161 2,161 100017

19 Zelienople Revitalize/Econ. Dev. Project Phase 2Transportation Enhancement First 465 465 107823

19 Cranberry North Resurfacing Resurface First 6,793 6,793 109627

19 Cranberry North Resurfacing Resurface Second 1,184 1,184 109627

38 Upgrades to the PA 38 Crash Avoidance SystemsSafety Improvement First 10 100 110 110827

58 PA 58 Resurfacing Resurface Second 2,245 2,245 100033

68 New Castle St. Safety Imp Safety Improvement Second 3,956 3,956 98095

68 Butler North Resurfacing Resurface Second 1,500 1,500 98108

68 PA 66: Cunningham St. Signal Existing Signal Improvement Second 125 125 99149

68 PA 68: Jefferson St. Signal Existing Signal Improvement Second 125 125 99150

68 PA 68 Corridor Improvements Safety Improvement First 5 106 318 1,705 2,134 106568

68 Harmony Slide Safety Improvement First 284 284 109690

68 PA 68 Zelienople Curve Safety Improvement First 85 80 25 10 1,000 1,200 110826

79 Cranberry Interchange New Interchange Second 1,500 1,500 1,500 2,186 4,496 11,182 106617

Page 222: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 198 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

79 Cranberry Interchange New Interchange Third 24,500 24,500 106617

108 PA 108/173/258 Slippery Rock IntersectionIntersection Improvement First 268 165 432 72378

228 Pittsburgh Street Intersection Safety Improvement First 4,806 4,806 91285

228 Three Degree Rd Intersection Resurface First 1,449 4,635 21,749 27,833 91286

228 Balls Bend Relocation/Realignment First 523 570 3,628 11,542 16,263 91288

228 Balls Bend Relocation/Realignment Second 15,858 15,858 91288

228 Mars RR Bridge West Expansion Widen First 1,299 1,957 8,868 12,124 92908

228 Mars RR Bridge West Expansion Widen Second 55,930 55,930 92908

228 Mars RR Bridge West Expansion Widen Third 21,000 21,000 92908

228 PA 228/UPMC Enhancements Add Lane First 5,000 5,000 104231

228 Ekastown West 3R Resurface First 281 690 2,122 6,866 9,959 105900

258 Slippery Rock Northwest Resurface Second 1,500 1,500 34914

288 Zelienople Railroad Corridor RR Warning Devices First 678 678 105574

356 Lernerville North 3R Resurface Third 2,000 2,000 91287

356 PA 356 Corridor Improvements Transportation Enhancement First 406 546 1,093 6,472 8,517 106486

356 PA 356 Moraine Pointe to Campus Ln Signal UpgradeExisting Signal Improvement First 300 1,500 1,800 110462

422 Shearer Bridge Pres. Bridge Rehabilitation Third 1,850 1,850 98028

422 422 Summit Twp. Widening Widen Third 2,240 2,240 98098

422 US 422 ITS - Butler Variable Message Signs Second 1,500 1,500 99145

422 Interstate 79 West Resurf Resurface Second 3,370 3,370 100061

422 Butler Bypass Resurface First 10,019 10,019 105905

3020 Freedom Road Improvement Widen Second 17,470 17,470 72377

3021 10-2 SR 3021 Corridor Improvements Safety Improvement First 300 200 6,500 7,000 110783

Planning Partner: SPC Mode: Bridge County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

8 South of Cooperstown Br #1 Bridge Replacement First 258 53 52 1,858 2,220 24715

8 South of Cooperstown Br #2 Bridge Replacement First 258 11 52 1,421 1,740 24716

8 South of Cooperstown Br #3 Bridge Replacement First 258 11 52 1,421 1,740 24717

8 PA 8 over Muddy Creek Bridge Replacement Second 2,475 2,475 24722

8 Harrisville Bridge #1 Bridge Rehabilitation First 309 292 82 80 1,463 2,226 24725

19 US 19 over Coal Run Bridge Replacement Second 2,450 2,450 99683

58 PA 58 over McMurray Run Bridge Replacement Third 1,500 1,500 24679

Page 223: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 199 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

68 PA 68 over Buffalo Creek Bridge Replacement First 252 154 3,183 3,590 24740

68 Karns Crossing Bridge Bridge Improvement First 309 706 265 345 1,625 86105

68 Karns Crossing Bridge Bridge Improvement Third 27,000 27,000 86105

68 NE of Evans City Bridge Bridge Replacement Third 1,500 1,500 90001

138 Southwest of Euclid Bridge Bridge Improvement First 290 338 39 45 712 24682

138 Southwest of Euclid Bridge Bridge Improvement Second 1,159 1,159 24682

268 PA 268 over Lowrey Run Bridge Replacement First 56 1,517 1,574 24755

268 PA 268 ovTrib.S.Br. Bear Ck Bridge Replacement Second 1,825 1,825 83317

356 PA 356 over Tributary to Coal Run Bridge Rehabilitation First 292 273 23 44 893 1,525 24759

356 PA 356 over Tributary to Coal Run Bridge Rehabilitation Second 176 176 24759

422 US 422 over PA 356 Bridge Replacement Second 3,350 3,350 24663

422 US 422 Shawood Pipe Drainage Improvement Third 8,695 8,695 83611

488 Portersville Bridge Bridge Improvement First 412 492 28 16 948 98730

488 Portersville Bridge Bridge Improvement Second 5,796 5,796 98730

528 PA 528 over Lake Arthur Reconstruct Second 5,257 5,257 24241

528 PA 528 over Lake Arthur Reconstruct Third 14,243 14,243 24241

528 PA 528 over Big Run Bridge Replacement Third 1,825 1,825 83323

1004 SR 1004 ov Trib. to Silver Ck Bridge Replacement Third 2,020 2,020 83324

1019 West Winfield Bridge #1 Bridge Replacement First 1,228 1,228 24817

1021 Rattigan Bridge #1 Bridge Improvement First 328 338 45 62 773 24819

1021 Rattigan Bridge #1 Bridge Improvement Second 1,507 1,507 24819

2004 East Butler Borough Br. Bridge Replacement Second 3,152 3,152 24781

2007 Saxonburg Boulevard Br #2 Bridge Replacement First 309 53 53 1,311 1,727 78000

2011 Lardintown Bridge #2 Bridge Replacement First 451 451 24824

3014 SR 3014 Callery Bridge Bridge Replacement First 328 338 34 51 750 89972

3014 SR 3014 Callery Bridge Bridge Replacement Second 1,391 1,391 89972

3015 SR 3015 over Trib. to Breakneck Creek Bridge Replacement First 301 310 39 45 695 83336

3015 SR 3015 over Trib. to Breakneck Creek Bridge Replacement Second 1,043 1,043 83336

3020 Freedom Rd Turnpike Bridge Bridge Replacement First 2,122 2,122 67185

3022 SR 3022 over Brush Creek Bridge Replacement Third 1,500 1,500 24790

3034 Prospect Bridge #3 Bridge Replacement First 26 31 10 371 438 24794

4012 SR 4012 Group Bridges Bridge Replacement First 3,960 3,960 102618

Page 224: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 200 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

7101 T-306 ov Little Connoquenessing Bridge Replacement Third 1,563 1,563 95865

7208 T-631 ov Trib Little Buffalo Bridge Replacement Third 1,563 1,563 77934

7208 T-630 over Little Buffalo Run Bridge Replacement Third 1,563 1,563 77937

7209 T-570 over Goldscheitter Cr. Bridge Replacement Third 1,563 1,563 95874

7209 T-573 Wylie & T-554 Brickyard Hill BridgesBridge Replacement First 618 32 101 2,404 3,155 95875

7209 T-840 over Davis Run Bridge Replacement Third 1,563 1,563 95876

7215 T-360 Marshall Bridge Bridge Replacement Third 1,563 1,563 24420

7231 T-846 over Rough Run Bridge Replacement Third 1,563 1,563 77954

8005 SR 8005 over Glade Run Bridge Replacement Second 1,600 1,600 92660

9900 T-318 over Muddy Creek Bridge Replacement Second 2,280 2,280 24866

Planning Partner: SPC Mode: Transit County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Operating Assistance First 7,610 7,610 77852

Bus Shelters First 100 100 83836

CNG Gillig Buses First 1,562 1,562 102345

Planning Partner: SPC Mode: Highway County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

HS Gen GC Marshall Plan 2 Transportation Enhancement First 999 999 73363

Dist12 Hwy/Brdg Line Item Reconstruct First 13,893 13,893 76508

Dist12 Hwy/Brdg Line Item Reconstruct Second 52,518 52,518 76508

Dist12 Hwy/Brdg Line Item Reconstruct Third 77,940 77,940 76508

D12 Bridge Preservation Design Bridge Preservation Activities First 1,000 1,000 81229

D12 Pvmt Presv Design Restoration First 950 950 101968

21 PA 21:River Ave to PA 166 Resurface Third 3,500 3,500 98417

21 PA 21 Fayatte Co Corridor HSIP Safety Improvement First 1,300 1,300 106559

40 US 40: PA 281 to Yough Brdg Resurface Third 1,830 1,830 98432

40 US 40: US 119 to Lick Hollow Rd Resurface Third 1,850 1,850 98488

40 US 40: PA 281 to Yough Brg Restoration Third 3,875 3,875 98502

40 US 40: PA 43 to Dearth Rd Restoration Third 5,775 5,775 98505

40 US 40: Dearth Rd to SR 4039 Restoration Third 4,663 4,663 99547

40 D12 Mountain Signage Safety Improvement First 500 500 109870

119 McClure/Kingview Road Interchange Safety Improvement First 3,500 2,250 4,000 9,750 96661

Page 225: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 201 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

119 McClure/Kingview Road Interchange Safety Improvement Second 35,000 35,000 96661

119 US 119 Connellsville CMAQ New Traffic Signal First 200 100 563 863 110402

201 PA 201: SR 4028 to PA 51 Resurface Third 2,310 2,310 98415

201 PA 201: US 119 to Vanderbilt Boro Resurface Third 1,500 1,500 98494

201 PA 201: Fayette City to West Co Line Resurface Third 2,558 2,558 98501

201 PA 201: PA 819 to SR 4028 Resurface Third 750 750 99570

281 PA 281:Tub Run to Cowden Rd Resurface Third 750 750 98873

381 PA 381: Melcroft Rd to Co Line Rd Resurface Second 975 975 98297

381 PA 381: PA 711 to Imel Rd Resurface Third 3,019 3,019 98427

381 PA 381: Imel Road to Melcroft Resurface Third 1,000 1,000 98428

381 PA 381: Melcroft to Co Line Resurface Third 1,000 1,000 98429

381 Ohiopyle Multimodal Gateway Pedestrian Facilities First 13,500 13,500 107346

653 PA 653: Taby Rd to Somerset Co Line Resurface Third 750 750 99554

906 PA 906 Slide & Realignment Slides Correction First 14,200 14,200 95794

1004 SR 1004: Banning Rd to Chaintown Rd Resurface Third 500 500 99589

1012 Franklin School Road Resurface Third 500 500 99610

1025 Country Club Road Resurface Third 657 657 99617

1041 School Road Resurface Third 750 750 99618

1041 Dawson Corridor Crossbuck Signs First 900 900 106060

1054 SR 1054: PA 381 to Co Line Rd Resurface Third 1,235 1,235 99633

2002 Kirby Road Resurface Third 750 750 99631

2008 Old Mill Road Resurface Third 600 600 99626

2012 Sugar Loaf Road Resurface Third 750 750 99627

2031 SR 2031: Jeffries St to US 40 Resurface Third 500 500 99584

3001 Stewartstown Road Resurface Third 500 500 99613

3004 SR 3004: Rubles Run Br to Gans Rd Resurface Third 500 500 99586

3004 Wymps Gap Road Resurface Third 850 850 99632

3007 Rubles Mill Road Resurface Third 743 743 99620

3012 SR 3012: SR 3009 to US 119 Resurface Third 1,307 1,307 99630

3013 Palmer Road Resurface Third 500 500 99612

Page 226: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 202 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3017 SR 3017: Amend Rd to Walnut Hill Rd Resurface Third 500 500 99587

3023 Footdale Road Resurface Third 1,000 1,000 99590

3027 Hopwood Fairchance Rd Resurface Third 750 750 99548

4001 Rush Run Rd Resurfacing Resurface Third 1,850 1,850 98481

4010 12-14-PB-SI1 Resurface Third 500 500 101931

4014 Waltersburg Road Resurface Third 500 500 99616

4016 Smock Road Resurface Third 750 750 99615

4017 Cemetery Road Resurface Third 888 888 99625

4020 SR 4020: Labelle Rd to FSCI Resurface Third 500 500 99608

4020 SR 4020: Bull Run Rd to Bunker Rd Resurface Third 500 500 99609

4027 Gillespie Road Resurface Third 500 500 99611

4028 SR 4028: SR 4007 to PA 51 Resurface Third 755 755 99628

4030 Reservoir Road Resurface Third 750 750 99622

4036 Newell Road Resurface Third 850 850 99629

Planning Partner: SPC Mode: Bridge County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Districtwide DFB Line Item Bridge Improvement First 825 825 105858

21 PA 21 over PA 166 Bridge Improvement First 100 100 6,000 6,200 79306

40 US 40 over Beaver Run Bridge Rehabilitation Second 500 500 75989

40 US 40 ov Jennings Run Restoration Third 2,025 2,025 98655

40 US 40 ov Yough River Dam Restoration Third 44 44 98734

40 US 40 ov SR 8008 Restoration Third 44 44 98736

40 2019 Arch Preservation-2 Bridge Rehabilitation First 2,000 2,000 106880

51 PA51 ov Br Washington Run Restoration Third 44 44 98744

119 US 119 ov Cheat River Restoration Third 2,350 2,350 98546

119 US 119 ov Mounts Crk Restoration Third 240 240 98639

119 US 119 ov Georges Crk Restoration Third 44 44 98727

119 2018 Fayette/Wash Co Bridges Bridge Replacement First 2,350 2,350 106881

166 PA 166 over Cats Creek-DFB Bridge Rehabilitation Second 100 100 75991

166 PA 166 ov George Crk Restoration Third 44 44 98749

201 PA 201 over Trib Mon River Bridge Improvement Second 630 630 75999

Page 227: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 203 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

201 PA 201 ov Br Redstone Ck Bridge Rehabilitation Third 373 373 76002

281 PA 281 over Pinkham Run-DFB Bridge Replacement Second 377 377 90750

281 PA 281 over Br Hall Run-DFB Bridge Replacement Second 315 315 90754

281 PA 281 ov Hall Run Restoration Third 60 60 98592

281 PA 281 ov Yough River Restoration Third 740 740 98676

381 PA 381 BR2 ov Meadow Run Bridge Replacement Third 1,770 1,770 74173

381 PA 381 ov Br Meadow Run-DFB Bridge Replacement Third 500 500 76003

381 PA 381 over Stoney Run Bridge Rehabilitation First 150 150 76005

381 PA 381 ov Yough River Restoration Second 2,380 2,380 98845

711 PA 711 Crawford Ave Bridge Bridge Replacement First 2,500 1,000 1,000 5,000 9,500 74342

711 PA 711 Crawford Ave Bridge Bridge Replacement Second 5,000 5,000 74342

982 PA 982 ov Mounts Crk Restoration Third 360 360 98656

1005 SR 1005 ov Back Crk Restoration Third 150 150 98613

1005 SR 1005 over Br Back Ck-DFB Bridge Improvement Second 100 100 105387

1008 SR 1008 ov Furnace Run Restoration Third 44 44 98733

1009 SR 1009 ov Poplar Run Restoration Third 180 180 98620

1013 SR 1013 over Jacobs Creek Bridge Replacement Second 2,000 2,000 79315

1027 SR 1027 ov Jacobs Crk Restoration Third 44 44 98752

1028 SR 1028 over Gist Run Bridge Improvement Third 1,100 1,100 88266

1034 SR 1034 ov Breakneck Run Restoration Third 160 160 99531

1034 SR 1034 over Whites Run- DFB Bridge Rehabilitation First 150 150 105323

1035 SR 1035 ov Mounts Crk Restoration Third 130 130 98606

1037 SR 1037 over Trump Run Bridge Rehabilitation First 350 100 100 1,500 2,050 76010

1039 SR 1039 ov Br Dickerson Run Bridge Replacement Second 1,250 1,250 81951

1041 SR 1041 ov Jacobs Crk Restoration Third 44 44 98725

1051 SR 1051 ov Br Opossum Run-DFB Bridge Replacement First 150 150 81956

1051 SR 1051 over Butler Run-DFB Bridge Replacement First 200 200 89078

1051 SR 1051 ov Br Mounts Ck Bridge Improvement Third 940 940 98325

1051 SR 1051 ov Whites Run Restoration Third 44 44 98721

1051 SR 1051 over Spruce Run-DFB Bridge Improvement First 150 150 105390

1052 SR 1052 over Irish Run-DFB Bridge Improvement First 185 185 105389

Page 228: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 204 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1053 SR 1053 over Br Dunbar Ck Bridge Improvement Third 1,280 1,280 89039

1053 SR 1053 ov Opposum Run Restoration Third 210 210 98637

1053 SR 1053 ov Gist Run Restoration Third 230 230 98820

1055 SR 1055 over Ferguson Run-DFB Bridge Replacement First 100 100 88075

1059 SR 1059 ov Jacobs Crk Restoration Third 44 44 98718

2002 SR 2002 over Mill Run Bridge Replacement Third 1,010 1,010 74182

2002 SR 2002 ov Br Mill Run-DFB Bridge Rehabilitation Second 500 500 105391

2003 SR 2003 over Chaney Run-1 Bridge Replacement First 150 150 81947

2003 SR 2003 over Chaney Run-2-DFB Bridge Replacement First 109 109 90806

2003 SR 2003 ov Big Sandy Crk Restoration Third 360 360 98563

2005 SR2005 ov Ltl Sandy Crk 2 Restoration Third 44 44 98716

2005 SR 2005 ov Ltl Sandy Ck 1 Restoration Third 44 44 98719

2008 D12 Superstructure 2018 Bridge Improvement First 13,049 13,049 105911

2011 SR 2011 ov Ltl Sandy Ck-DFB Bridge Improvement Second 500 500 91126

2011 SR 2011 ov Meadow Run Restoration Third 320 320 98651

2033 SR 2033 ov Fike Run Restoration Third 340 340 98618

2040 SR 2040 ov Coal Lick Run Bridge Replacement First 550 200 200 3,900 4,850 90993

2040 SR 2040 over Redstone Ck Bridge Replacement First 1,500 3,500 5,000 93507

2040 SR 2040 ov Coal Lick Run Restoration Third 270 270 98823

3003 SR 3003 ov Br George Ck-DFB Bridge Replacement First 100 100 81973

3009 SR 3009 ov York Run Restoration Third 44 44 98742

3011 SR 3011 ov Jacobs Crk Bridge Replacement Third 1,100 1,100 98813

3012 SR 3012 ov N Br Browns Run Restoration Third 1,190 1,190 98562

3014 SR 3014 ov Muddy Run Restoration Third 160 160 98615

3023 SR 3023 ov Saltlick Run Restoration Third 200 200 98634

3025 SR 3025 ov York Run Restoration Third 180 180 98814

3027 SR 3027 ov Georges Crk Restoration Third 130 130 98611

4001 SR 4001 over Rush Run 0050-2-DFB Bridge Replacement First 235 235 76016

4001 SR 4001 over Rush Run 0050-DFB Bridge Replacement First 235 235 88878

4003 SR 4003 over Redstone Ck Bridge Improvement Second 1,000 1,000 30010

Page 229: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 205 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4003 Cast Iron Bridge Bridge Rehabilitation First 500 500 10,000 11,000 74344

4003 SR 4003 over Cox Run-DFB Bridge Rehabilitation Second 500 500 81801

4004 SR 4004 ov Dunlap Crk Restoration Third 44 44 98715

4006 SR 4006 ov Jennings Run Restoration Third 44 44 98747

4008 SR 4008 ov Four Mile Run Restoration Third 180 180 98627

4011 SR 4011 Br Washwater Run-DFB Bridge Replacement Second 500 500 81994

4016 SR 4016 over Redstone Ck Bridge Replacement Third 1,000 1,000 76017

4017 SR 4017 ov Washington Run Restoration Third 210 210 98638

4019 SR 4019 over Mill Run-DFB Bridge Rehabilitation Second 500 500 81978

4026 SR 4026 ov Redstone Ck Restoration Third 460 460 98833

4027 SR 4027 ov LittleRedstone Restoration Third 44 44 98573

4036 SR 4036 ov LittleRedstone Restoration Third 140 140 98559

4038 SR 4038 ov Washington Run Bridge Improvement Second 810 810 29965

4038 Layton Bridge Replace/Rehab First 1,000 2,900 3,900 81192

4038 Layton Bridge Replace/Rehab Second 30,000 30,000 81192

7202 Moyer Road Bridges Bridge Rehabilitation First 700 100 100 1,700 2,600 76137

7202 Fayette County #73 Bridge Replacement First 1,000 1,000 104643

7206 Mountain Creek Br #15 Bridge Replacement Second 350 350 1,125 1,825 76138

7207 County Bridge #54 Bridge Replacement Second 350 350 1,200 1,900 29978

7218 Township Drive Br # 182 Bridge Replacement Second 350 350 1,125 1,825 76135

7220 County Bridge #92 Bridge Replacement Second 350 350 2,500 3,200 51386

Planning Partner: SPC Mode: Transit County: FayetteTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Operating Assistance First 7,773 7,773 65222

Capital Assistance First 1,222 1,222 71083

Bus Procurement First 840 840 90041

Planning Partner: SPC Mode: Highway County: GreeneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

19 US 19: Tower Rd to Moore St Resurface Second 2,690 2,690 98381

19 Blairtown Bridge to High Street Restoration Second 3,353 3,353 100495

19 PA 19/221 Ruff Creek Int Intersection Improvement Second 200 5,000 5,200 105358

Page 230: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 206 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: GreeneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2003 SR 2003: WV Line to US 19 Resurface Third 3,373 3,373 98373

2011 SR 2011: Rolling Meadows Rd to Orndoff LnRestoration Second 3,363 3,363 100419

2018 SR 2018: PA 218 to Garads Fort Rd Restoration Third 3,363 3,363 98378

3013 SR 3013: Brave to Maple Run Rd Resurface Third 1,000 1,000 98460

Planning Partner: SPC Mode: Bridge County: GreeneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

18 PA 18 ov Branch Browns Ck Bridge Replacement Third 470 470 76022

18 PA 18 over Laughman Run Bridge Improvement Third 820 820 89053

18 PA 18 ov S Fk 10 Mile Run Restoration Third 46 46 98588

18 PA 18 ov Whiteley Crk Restoration Third 920 920 98840

19 US 19 BR2 Dunkard Creek Bridge Improvement First 300 150 150 1,000 1,600 76027

19 US 19 over Laurel Run- DFB Bridge Rehabilitation Second 100 100 76030

19 US 19 ov Boyd Run Restoration Third 46 46 98763

19 US 19 ov Ruff Crk Restoration Third 46 46 98768

21 PA 21 over Grinnage Run Bridge Replacement First 300 150 150 1,000 1,600 30315

21 PA 21 ov Muddy Crk Restoration Third 490 490 98670

21 PA 21 ov S Fork 10 Mile Ck Restoration Third 46 46 98761

21 PA 21 ov Scott Run Restoration Third 46 46 98788

21 PA 21 over Toll Gate Run Bridge Replacement First 300 150 150 1,000 1,600 105306

21 PA 21 Metal Culvert Preservation Bridge Preservation Activities First 500 500 109745

79 I-79 ov PA 221/Ruff Crk Restoration Third 46 46 98587

88 PA 88 over Whiteley Creek Bridge Improvement First 300 100 100 500 90646

88 PA 88 over Whiteley Creek Bridge Improvement Second 5,000 5,000 90646

188 PA 188 over Br 10mile Ck-DFB Bridge Rehabilitation First 150 150 89073

188 PA 188 ov S Frk 10 Mile Ck Restoration Third 46 46 98781

218 PA 218 over Roberts Run-1 Bridge Replacement Third 1,970 1,970 79345

218 PA 218 ov Br Smith Ck Bridge Improvement First 300 150 150 1,000 1,600 81849

218 PA 218 ov Roberts Run Restoration Third 420 420 98664

221 PA 221 over Br Ruff Creek-DFB Bridge Replacement Second 270 270 105392

1005 SR 1005 over Grimes Run-DFB Bridge Replacement First 150 150 90652

1006 SR 1006 ov LittleWhiteley Restoration Third 1,020 1,020 98560

Page 231: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 207 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: GreeneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1008 SR 1008 over Neel Run-DFB Bridge Replacement Second 500 500 105401

1009 SR 1009 over Bacon Run-DFB Bridge Replacement First 105 105 76038

1009 SR 1009 over Castile Run-DFB Bridge Replacement First 250 250 79347

1010 SR 1010 over Pumpkin Run Bridge Improvement First 350 350 75 75 1,000 1,850 81842

1011 SR 1011 ov 10 Mile Crk Restoration Third 46 46 98789

1016 SR 1016 ov Ltl Whiteley Ck-2 Bridge Rehabilitation First 3,186 3,186 76039

1019 SR 1019 ov Coal Run Restoration Third 60 60 98556

2003 SR 2003 ov Dunkard Crk Restoration Third 46 46 98767

2008 SR 2008 ov Dunkard Crk Bridge Rehabilitation Third 1,280 1,280 98856

2011 SR 2011 ov Whiteley Ck #1 Restoration Third 450 450 98667

2011 SR 2011 ov Shannopin RR Restoration Third 46 46 98758

2011 SR 2011 ov Whiteley Ck #2 Restoration Third 650 650 98837

2013 SR 2013 Culvert Repl Bridge Replacement Third 1,050 1,050 93111

2017 SR 2017 ov S Br Muddy Ck Restoration Third 170 170 98545

2017 SR 2017 over Branch Muddy Ck Bridge Rehabilitation Third 1,200 1,200 98863

2018 SR 2018 ov Frosty Run Restoration Third 180 180 98815

2019 SR 2019 ov Whiteley Crk Restoration Third 46 46 98784

2029 SR 2029 ov Whiteley Crk Restoration Third 510 510 98834

3001 SR 3001 over Wheeling Ck Bridge Rehabilitation First 600 40 75 1,000 1,715 30134

3001 SR 3001 ov Crabapple Ck Bridge Replacement First 300 100 100 4,750 5,250 89086

3001 SR 3001 / N Fork Wheeling Ck - DFB Bridge Replacement First 150 150 90742

3008 2018 Greene Co Bridges Bridge Replacement First 1,500 1,500 106886

3009 SR 3009 ov Hoovers Run Restoration Third 46 46 98790

3010 SR 3010 ov Herod Run Restoration Third 150 150 98812

3011 SR 3011 over Br Hargus Ck-DFB Bridge Replacement Second 500 500 105402

3012 SR 3012 ov S Frk Wheeling Restoration Third 110 110 98802

3013 SR 3013 ov Br Pursley Ck-0210-DFB Bridge Replacement First 235 235 79362

3013 SR 3013 ov Br Pursley Ck- 0210 DFB Bridge Replacement First 150 150 81827

3013 SR 3013 ov Pursley Crk Restoration Third 65 65 98756

3013 SR 3013 ov Dunkard Crk Restoration Third 46 46 98791

Page 232: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 208 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: GreeneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3016 SR 3016 over Mudlick Fork-DFB Bridge Improvement Second 500 500 105329

3020 SR 3020 ov Br Webster Run-DFB Bridge Replacement Second 500 500 105395

3022 SR 3022/N Frk Wheeling Ck-DFB Bridge Replacement First 200 200 81985

4006 SR 4006 ov Br Maranda Run-DFB Bridge Replacement Second 500 500 105403

4007 SR 4007 over Owens Run-DFB Bridge Rehabilitation Second 500 500 81798

4008 SR 4008 ov Crabtree Crk Bridge Improvement Third 700 700 98862

4013 SR 4031 ov Enslow Fork Restoration Third 46 46 98754

4025 SR 4025 over Br Browns Ck-DFB Bridge Replacement Second 500 500 105330

4029 SR 4029 ov Fonner Run Restoration Third 150 150 98806

4029 SR 4029 over Pettit Run DFB Bridge Replacement First 150 150 106889

4029 SR 4029 over Dillie Run DFB Bridge Replacement First 252 252 106891

4033 SR 4033 over Garners Run-DFB Bridge Improvement First 315 315 105394

7203 Greene Co Bridge #15 Bridge Rehabilitation First 600 600 51393

7205 T-491 over Smith Creek Bridge Replacement Second 350 350 1,875 2,575 86226

7208 Greene Co Bridge #63 Bridge Improvement First 750 750 51394

7214 T-478 over Browns Creek Bridge Replacement Second 350 350 1,875 2,575 86225

9900 Greene Co Bridge # 35 Bridge Replacement Second 350 350 1,125 1,825 30207

Planning Partner: SPC Mode: Transit County: GreeneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Replacement Buses First 1,117 1,117 106607

Replace communicaion equi First 18 18 106609

Facility Upgrades First 23 23 111094

Planning Partner: SPC Mode: Highway County: IndianaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Indiana Local Br. Line #1 Bridge Replacement First 345 33 33 410 88841

Indiana DFB Line Item Bridge Replacement First 1,211 1,211 106550

22 Armagh Bypass Reconstruct Reconstruct Third 21,000 21,000 97102

22 Route 22 Safety Improve. Safety Improvement Second 4,002 4,002 98104

22 Armagh Bypass PM Resurface First 2,364 2,364 106485

56 Buena Vista Bridge Pres. Bridge Preservation Activities Third 1,850 1,850 98805

119 Wake Robin Curve Relocation/Realignment Third 25,000 25,000 69988

Page 233: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 209 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: IndianaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

210 Trade City South PM Resurface First 2,427 2,427 106484

217 Torrance Bridge Preserv. Bridge Preservation Activities Second 1,000 1,000 25769

286 PA 286 Signal Upgrades New Traffic Signal Third 620 620 98112

286 Oakland Avenue Ped Safety Safety Improvement Third 2,450 2,450 99709

286 PA 286: US 422 Interchange East New Interchange First 675 13,686 14,361 104459

286 Oakland Ave Resurfacing-Rustic Lodge Rd to PhilaStResurface First 1,648 1,648 109641

422 Cheese Rn Rd toTrim Tree Rd Reconstruct Second 2,900 2,900 100289

422 Cheese Rn Rd toTrim Tree Rd Reconstruct Third 7,473 7,473 100289

422 Shelocta West Resurfacing Resurface First 1,024 1,024 106481

4008 Chambersville Corridor Crossings RR Warning Devices First 605 605 105550

4032 SR 4032/11th St. Signal Existing Signal Improvement Third 300 300 98114

4032 SR 4032/13th St. Signal Existing Signal Improvement Third 300 300 98115

4032 SR 4032/SR 4422 Signal Existing Signal Improvement Third 300 300 98116

Planning Partner: SPC Mode: Bridge County: IndianaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 US 22 Blairsville #1 Truss Bridge Preservation Activities First 497 497 105193

110 Muller Bridge Bridge Replacement First 1,137 1,137 74300

110 PA 110 over Crooked Creek Bridge Replacement Third 2,675 2,675 83213

110 Grove Bridge Bridge Replacement First 1,133 1,133 83219

110 PA 110 over McKee Run Bridge Replacement First 1,051 1,051 83222

119 Satterlee Bridge Bridge Improvement First 345 328 56 55 784 25261

119 Satterlee Bridge Bridge Improvement Second 2,551 2,551 25261

119 US 119 over SR 8001 Bridge Rehabilitation Third 2,119 2,119 25621

119 US 119 over Pine Run Bridge Replacement Second 1,771 1,771 83227

119 Home Bridge #3 Bridge Replacement First 303 303 95848

119 US 119 over Two Lick Ck. Bridge Rehabilitation Third 2,000 2,000 95852

119 Stoney Run Bridge #1 Bridge Replacement Third 5,893 5,893 101113

210 PA 210 over Dutch Run Bridge Replacement Third 4,450 4,450 83271

217 Greys Run Bridge No. 1 Bridge Replacement Second 1,716 1,716 83275

286 PA 286 over Reeds Run Bridge Replacement Third 1,250 1,250 25590

286 PA 286 ovTrib to Cherry Rn Bridge Improvement First 360 360 25596

286 PA 286 ovTrib to Cherry Rn Bridge Improvement Second 325 58 75 1,391 1,849 25596

Page 234: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 210 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: IndianaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

286 PA 286 over Marsh Run Bridge Replacement Third 2,020 2,020 83295

286 PA 286 over Kiskiminetas Bridge Rehabilitation Third 2,950 2,950 99511

286 Philadelphia St Bridges Grp Bridge Replacement First 515 3,416 3,931 106058

403 Marion Center Bridge #1 Bridge Improvement First 383 366 68 763 1,579 109638

403 Marion Center Bridge #1 Bridge Improvement Second 58 700 758 109638

422 US 422 over Two Lick Ck. Bridge Rehabilitation Third 3,400 3,400 25548

422 SR 422 over Anthony Run Bridge Replacement Second 1,000 1,000 25694

422 SR 422 over Curry Run Bridge Replacement Third 1,000 1,000 25695

422 US 422 Cunningham Culverts Bridge Replacement First 6,259 6,259 25696

422 US 422 over Trib. to Curry Rn Bridge Replacement Third 1,000 1,000 25697

422 SR 422 EB/WB over SR 8016 Bridge Rehabilitation Third 3,300 3,300 78101

422 Bridge to Nowhere EB PM Bridge Preservation Activities Third 4,450 4,450 98811

422 Bridge to Nowhere WB PM Bridge Preservation Activities Third 4,450 4,450 98827

954 Windows Bridge Bridge Improvement First 283 265 27 37 1,097 1,711 109649

1002 Ramsey Run Bridge #1 Bridge Improvement First 318 273 44 71 613 1,319 83364

1002 Ramsey Run Bridge #1 Bridge Improvement Second 963 963 83364

1004 SR 1004 over US 119 NB/SB Bridge Replacement First 567 5 5 5,305 5,881 25781

1012 Dixonville Bridge #1 Bridge Replacement First 225 3,966 4,191 25588

1038 SR 1005 over Broadhead Run Bridge Replacement Third 1,970 1,970 83350

1053 Lockvale Bridge Bridge Replacement First 309 32 46 1,311 1,699 78113

2013 SR 2013 ov Trib to Blacklick Bridge Replacement Third 1,970 1,970 83372

2013 Grange Hall Road Bridge Bridge Replacement First 395 395 105512

3007 SR 3007 over Marshall Run #1 Bridge Replacement First 294 292 11 27 1,238 1,861 83382

3016 SR 3016 over Two Lick Creek Bridge Replacement First 309 371 27 53 1,688 2,449 25799

3024 SR 3024 over McCartney Run Bridge Replacement Third 2,019 2,019 83356

3025 Park Road Slide Safety Improvement First 292 292 109693

3031 Green Valley Bridge #1 Bridge Replacement First 26 52 10 531 618 25602

4005 SR 4005 over Trib to McKee Run Bridge Replacement First 1,030 1,030 83383

4005 SR 4005 Mack Park Bridge Bridge Replacement First 206 90 2,990 3,286 105300

4026 Smicksburg Bridge #3 Bridge Rehabilitation First 2,758 2,758 107288

4030 SR 4030 Carter Avenue Bridge Bridge Replacement First 142 90 1,948 2,180 78122

Page 235: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 211 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: IndianaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4032 SR 4032 over White Run Bridge Replacement Third 2,150 2,150 83395

4035 SR 4035 over N. Br. Plum Creek Bridge Replacement First 2,060 2,060 25523

4422 Claypoole Heights Bridge Bridge Rehabilitation First 258 292 22 32 1,069 1,673 25752

7212 T-734 over Trout Run Bridge Replacement Third 1,563 1,563 78098

7218 T-611 over Pine Run Bridge Replacement Third 1,563 1,563 78090

Planning Partner: SPC Mode: Transit County: IndianaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

OperatingAssistance-Rural First 7,717 7,717 65421

CTC Vehicle Replacement First 870 870 102337

Replace Bus Lifts First 100 100 106621

Add additional Bus Shelte First 100 100 111096

Asphalt Repair First 25 25 111097

CNG Bus Procurement First 755 755 111098

CNG Bus Replacement First 900 900 111099

Garage Equipment First 30 30 111100

Replace Vechile Wash First 150 150 111101

Vehicle Storage First 2,500 2,500 111102

Planning Partner: SPC Mode: Highway County: LawrenceTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Better. Resv Lawrence Cty Restoration First 4,000 12,300 16,300 75348

Better. Resv Lawrence Cty Restoration Third 17,810 17,810 75348

Bridge Line Item-Lawrence Bridge Rehabilitation First 3,531 3,550 7,081 76584

Bridge Line Item-Lawrence Bridge Rehabilitation Third 16,823 16,823 76584

Ninth St (CSX) RR Gates First 293 293 102760

New Castle Multimodal Regional RiverwalkTransportation Enhancement First 227 227 107053

18 PA 18 - Liberty St. to Jefferson St. Restoration Second 5,000 5,000 88284

18 PA 18 Resurfacing Resurface Third 5,675 5,675 100916

18 Wilmington Road Restoration Third 4,500 4,500 100917

19 Perry Highway 2 Resurface Second 5,070 5,070 109386

19 Perry Highway Restoration Third 9,544 9,544 109389

65 PA 65/East Washington Street Restoration Second 4,000 4,000 91768

65 PA 65 / Ellwood Road Restoration First 1,600 1,600 107535

Page 236: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 212 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: LawrenceTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

168 PA 168/Mallory to PA 18 Reconstruct Second 3,271 3,271 91764

224 US 224/State Street Reconstruct Second 3,540 3,540 91761

224 US 224/Carbon Micco - NS RR Br Reconstruct Third 3,569 3,569 91762

224 US 224/Youngstown Poland Rd Restoration First 100 5,760 5,860 100920

422 US 422/Line Ave - New Butler Reconstruct Second 2,000 2,000 79449

422 US 422 - Union Twnshp to PA 60 Restoration Third 1,200 1,200 92281

422 Benjamin Franklin Highway Resurface Second 8,500 8,500 92282

422 US 422, Benjamin Franklin Highway Reconstruct First 4,500 4,500 92804

1002 SR 1002 Reconstruct Second 4,179 4,179 91766

1005 1005/Mill St-Englewood Resurface Third 1,200 1,200 100921

1007 SR 1007 Reconstruct Third 3,135 3,135 91767

2012 Union Valley/2003 - 2001 Reconstruct Third 2,800 2,800 29507

2020 Pleasant Hill Road Resurf Resurface Third 1,600 1,600 100924

2024 Hogue Road Resurfacing Resurface Third 1,165 1,165 100925

2028 Fairview School Rd Resurface Resurface Third 2,165 2,165 100926

2030 Mountville Road Resurface Resurface Third 1,925 1,925 100927

3014 Roslyn/Larchwood - Roslyn Resurface Third 850 850 100931

4008 High Hill Road Resurfacing Resurface Third 3,130 3,130 100933

4012 Mitchell Road Restoration Restoration First 4,445 4,445 100934

7206 Wampum Rd Br #3 Bridge Removal Second 1,000 1,000 57114

7301 Boyles Ave ov Rural Ave Bridge Removal Second 500 500 78359

Planning Partner: SPC Mode: Bridge County: LawrenceTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Coffee Run Road Br T-567 Bridge Replacement First 150 25 25 850 1,050 88428

Old Route 18 Bridge Bridge Replacement Second 823 823 105602

18 PA 18 ov Abandoned Plant Access Rd Bridge Replacement Second 1,000 1,000 78396

108 Garfield Road Bridge Bridge Replacement Third 252 252 29473

108 Croton Ave Bridge Bridge Preservation Activities Second 1,500 1,500 100736

168 Eastbrook ov Hottenbaugh Bridge Rehabilitation Second 1,200 1,200 78336

168 Eastbrook Rd Bridge #2 Bridge Rehabilitation Third 1,000 1,000 78397

224 Youngstown Poland Road Br Bridge Replacement Third 1,000 1,000 100738

Page 237: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 213 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: LawrenceTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

224 Falls Street Bridge Bridge Painting First 2,200 2,200 100756

288 Wampum Ave Bridge Replace Bridge Rehabilitation First 5,000 5,000 29301

376 Beaver Valley Expressway Bridge Preservation Activities Second 1,250 1,250 100734

422 US 422 WB/PA 60 Bridge Rehabilitation Third 4,500 4,500 100936

422 US 422 EB/PA 18 Bridge Rehabilitation Third 7,500 7,500 100937

488 Portersville Road Bridge Bridge Replacement Third 5,000 5,000 100740

551 Enon Road over Sugar Creek Bridge Replacement First 450 450 78367

551 Enon Road over Sugar Creek Bridge Replacement Second 1,200 1,200 78367

956 Neshannock Falls Road Bridge Bridge Replacement Second 1,000 1,000 89091

1012 Frew Mill Road Bridge Bridge Replacement Second 500 500 81639

1015 Moores Corner Road Br/Branch Of Jamison RunBridge Replacement Second 1,500 1,500 29468

2006 East Washington Street Br Bridge Replacement First 8,500 8,500 100743

2009 Tower Road Br/Funk Run Bridge Replacement First 500 50 50 1,500 2,100 29474

2011 2011/Camp Run Bridge Bridge Replacement Third 500 500 73174

2011 Camp Run Road Bridge Bridge Replacement Second 1,458 1,458 100744

2013 Eckert Bridge Bridge Rehabilitation Second 2,500 2,500 29404

2013 Breakneck Bridge Bridge Rehabilitation Second 1,500 1,500 29405

2013 Mcconnell Mill Rd Bridge Bridge Replacement Third 500 500 29531

2016 River Rd Bridge ov Branch Conoquenessing CreekBridge Replacement Third 500 500 73175

2016 River Road Bridge Rehabilitation Third 150 150 100748

3001 S. Main Street Bridge Bridge Replacement First 450 450 29394

3001 S. Main Street Bridge Bridge Replacement Second 1,500 1,500 29394

3002 Beaver Dam Road Bridge Deck Replacement First 450 450 29541

3002 Beaver Dam Road Bridge Deck Replacement Second 1,500 1,500 29541

3002 Beaver Dam Road Bridge Preservation Activities Third 1,500 1,500 100749

3008 Darlington Rd/Wampum R Bridge Replacement Second 1,000 1,000 78381

3008 Darlington Road over Wamp Bridge Replacement Second 839 839 100751

3010 W.Washington St. Bridge Bridge Rehabilitation Third 2,800 2,800 73162

3010 West Washington Street Br Bridge Preservation Activities Third 2,500 2,500 100752

4001 Villa Maria Road Bridge Bridge Rehabilitation Third 750 750 100753

4005 Pulaski Rd Br. ov Shenango River Bridge Replacement First 600 600 78386

Page 238: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 214 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: LawrenceTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4015 Twp Rd 324 (Churchill Rd) over US 224 Bridge Rehabilitation First 1,100 1,100 78392

4015 Township Road 324 Bridge Bridge Replacement Second 750 750 100757

7203 Wallace Road Bridge T356 Bridge Rehabilitation First 350 50 50 1,000 1,450 29327

7205 Graceland Rd Br T462 Bridge Replacement Second 750 750 29528

7205 Clover Lane Bridge T710 Bridge Replacement First 850 850 88425

7206 T-341 Burkey Road Bridge Bridge Replacement First 150 25 25 1,000 1,200 57104

7206 Bartholomew Road Bridge Bridge Replacement First 200 200 10 15 800 1,225 57106

7206 Hickory View Drive Bridge Bridge Replacement First 150 150 25 25 350 88721

7206 Hickory View Drive Bridge Bridge Replacement Second 1,100 1,100 88721

7207 Barkley Rd ov Camp Rn T-353 Bridge Replacement First 425 425 78356

7207 Barkley Road Bridge #3 Bridge Replacement First 200 200 10 15 425 78357

7207 Barkley Road Bridge #3 Bridge Replacement Second 750 750 78357

7207 McCartney Hollow Road Bridge T311 Bridge Replacement First 200 200 10 15 425 105601

7207 McCartney Hollow Road Bridge T311 Bridge Replacement Second 800 800 105601

7301 Beltway Bridge Bridge Rehabilitation Second 1,260 1,260 78360

7301 Jefferson Street Bridge Bridge Replacement Second 1,575 1,575 78361

7405 Maple St ov McClures Run Bridge Replacement First 150 25 25 850 1,050 78358

Planning Partner: SPC Mode: Transit County: LawrenceTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Heavy Duty Buses First 6,210 6,210 65171

OperatingAssistance-Rural First 22,516 22,516 77860

Bus Lifts & Garage Equip. First 265 265 111113

Bus Stop Signage First 125 125 111114

Facility Maint. First 100 100 111115

Fareboxes First 300 300 111116

New Vehicle First 55 55 111117

Office Equip First 75 75 111118

Renovate Lots First 335 335 111119

Security Equip First 95 95 111120

Three Paystations First 175 175 111121

Planning Partner: SPC Mode: Highway County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Page 239: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 215 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Monongahela Corridor Crossbuck Signs First 450 450 103183

Monongahela Corridor Crossbuck Signs Second 450 450 103183

Besco St. Grade Crossing Crossbuck Signs First 328 328 103187

Elco Corridor Crossbuck Signs First 650 650 106063

Charleroi Stormwater Transportation Enhancement First 975 975 107980

18 PA 18 Signal Upgrades Existing Signal Improvement First 3,285 3,285 88829

18 PA 18: SR 3009 to SR 4020 Resurface Third 1,973 1,973 100448

18 PA 18: SR 4020 to PA 50 Resurface Third 2,841 2,841 100467

19 US 19: Greene Co Line to Seg 0100 Resurface Third 1,600 1,600 100384

19 US 19: PA 519 to SR 1025 Restoration Second 2,525 2,525 100396

19 US 19: SR 1002 to Valley Brook Rd Restoration Second 6,850 6,850 100413

19 US 19: SR 1025 to SR 1002 Resurface Third 8,338 8,338 100420

19 US 19/40: I-79 to Chestnut Street Restoration Second 2,750 2,750 105493

19 US 19 Corridor Signal Upgd Existing Signal Improvement Second 2,000 2,000 107432

22 US 22: I-576 to Allegheny Co Line Restoration Third 5,050 5,050 105425

40 US 40: I-79 to PA 519 Reconstruct Third 4,088 4,088 98351

40 US 40: Daisytown Rd to Lane Bane Brdg Restoration Third 2,850 2,850 98361

50 PA 50: PA 18 to SR 1001 Resurface Second 2,618 2,618 90979

50 PA 50: Co Line to Reissing Rd Resurface Third 500 500 98360

88 PA 88 Grade Xing Crossbuck Signs First 150 150 103184

88 PA 88 Grade Xing Crossbuck Signs Second 150 150 103184

88 PA 88 NB Charleroi CMAQ New Traffic Signal First 370 150 3,150 3,670 110399

88 PA 88 SB - Charleroi CMAQ New Traffic Signal First 400 150 2,830 3,380 110401

519 PA 519 at PA 980 and I-79 Intersection Improvement First 26,775 26,775 57201

519 PA 519: Beechview St to Main St Resurface Third 5,577 5,577 100393

837 PA 837: Main St to Elrama Resurface Third 6,000 6,000 98350

844 PA 844: PA 231 to Wellsburg Rd Resurface Third 7,500 7,500 98348

1002 McMurray/Bebout Intersect Intersection Improvement Third 1,372 1,372 97970

1002 Bebout Rd/ E McMurray Rd Intersection Intersection Improvement First 427 427 109025

1003 Cecil Reissing Rd Resurf. Resurface Third 255 255 98466

1010 Valleybrook/Bebout Rd Intersection Intersection Improvement Third 1,300 1,300 48483

Page 240: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 216 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1010 Valleybrook/Bebout Rd Intersection Intersection Improvement First 427 427 109242

1023 I-79 Ramp at McClelland Rd Intersection Improvement Second 200 5,000 5,200 105352

1041 SR 1041: US 19 to Pike Street Resurface Third 952 952 98874

1065 SR 1065: Patterson Rd to PA 837 Resurface Third 500 500 100424

1067 SR 1067: SR 2023 to Pittsburgh Rd Resurface Third 705 705 100426

2003 Chestnut Ridge Rd Resurf Resurface Second 1,000 1,000 98295

2013 SR 2013 Resurfacing Resurface Third 1,000 1,000 98474

2022 Marianna Rd to Martindale Rd Resurface Third 1,001 1,001 100431

2023 Scenic Dr to Taylor Bogdan Rd Resurface Third 1,000 1,000 98472

2029 SR 2029: SR 2027 to High St Resurface Third 733 733 100433

2051 Spring Valley Road Resurface Third 1,000 1,000 100411

2053 SR 2053: PA 917 to SR 2023 Resurface Third 1,000 1,000 100446

2079 SR 2079: SR 2048 to PA 481 Resurface Third 1,000 1,000 100440

2087 SR 2087: PA 88 to Back St Resurface Third 1,000 1,000 100374

3001 Lake Road Resurfacing Resurface Third 1,000 1,000 98464

3003 Dry Ridge Rd Resurfacing Resurface Third 1,000 1,000 98459

3006 Newman Rd Resurfacing Resurface Third 750 750 98486

3009 12-14-PB-SI4 Resurface Third 500 500 101933

3019 SR 3019: WV Line to E Finley Rd Resurface Third 1,257 1,257 100454

3020 Pikes Peak Rd Resurfacing Resurface Third 1,250 1,250 98463

3023 McGuffey Rd to Liberty Rd Resurface Third 813 813 100455

3029 SR 3029: Rocky Run Rd to PA 221 Resurface Third 2,000 2,000 98467

3037 Ackley Crk Rd Resurfacing Resurface Third 850 850 98479

3043 SR 3043: WV Line to SR 3037 Resurface Third 1,133 1,133 100516

4001 Robinson Church Rd Resurf Resurface Third 2,500 2,500 98476

4002 Frankfort Rd to Wash Rd Resurface Third 1,040 1,040 100461

4003 Burgettstown Rd to Township Rd Resurface Third 750 750 100462

4005 Hanlin Station Rd Resurf Resurface Third 1,300 1,300 98461

4006 Francis Mine Road Resurface Third 750 750 100465

4014 State Line Rd Resurfacing Resurface Third 1,000 1,000 98475

Page 241: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 217 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4018 Meadowcroft Rd Resurface Resurface Third 1,000 1,000 98480

4019 Pleasant Valley Rd Resurf Resurface Third 1,000 1,000 98471

4022 Pleasant Valley Rd Resurf 2 Resurface Third 1,250 1,250 98485

4031 SR 4031: PA 50 to SR 4029 Resurface Third 750 750 100484

4033 SR 4033: SR 4031 to Parker Rd Resurface Third 750 750 100473

4035 Henderson Ave to Atlasburg Rd Resurface Third 2,000 2,000 100474

4037 Fort Cherry Rd Resurface Resurface Third 1,000 1,000 98487

4039 SR 4039: Westland Rd to PA 50 Resurface Third 1,500 1,500 100477

4061 Taylorstown to Jefferson Resurface Third 750 750 100479

4067 North Branch Rd Resurface Resurface Third 653 653 98468

Planning Partner: SPC Mode: Bridge County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

18 PA 18 over Chartiers Ck-1 Bridge Improvement First 350 300 150 150 1,000 1,950 79365

18 PA 18 over Chartiers Ck-1 Bridge Improvement Second 1,250 1,250 79365

18 PA 18 ov Br Chartiers Ck Bridge Replacement Third 1,980 1,980 90637

18 PA 18 over Chartiers Creek-2 Bridge Replacement First 300 150 150 1,000 1,600 90685

18 PA 18 over Chartiers Creek-2 Bridge Replacement Second 1,250 1,250 90685

18 PA 18 ov Burgetts Fork Restoration Third 990 990 98550

18 PA 18 ov US 22 Restoration Third 10 10 98583

18 PA 18 ov Br Short Crk Restoration Third 110 110 98801

40 US 40 ov Chartiers Crk Restoration Third 10 10 98569

40 B'ville High Level Brdg Restoration Third 4,590 4,590 98847

40 Wash Co Bridge Preserv 2019 Bridge Preservation Activities First 1,500 1,500 110004

70 I-70 ov Buffalo Crk #2 Restoration Third 10 10 98566

70 I-70 ov Buffalo Crk #1 Restoration Third 10 10 98567

70 I-70 ov PA 231 Restoration Third 10 10 98568

70 I-70 ov PA 18/CityStreets Restoration Third 100 100 98604

79 I-79 ov SR 1045 Restoration Third 53 53 98552

79 I-79 ov PA 519 Restoration Third 53 53 98792

79 I-79 ov SR 1009 Restoration Third 53 53 98795

88 PA 88 over Trib Mon River Bridge Improvement First 350 300 150 150 2,000 2,950 76050

Page 242: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 218 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

88 PA 88 ov Br Peters Crk Restoration Third 53 53 98799

221 PA 221 over Buffalo Creek Bridge Improvement Second 1,600 1,600 76059

221 PA 221 ov N Br 10 Mile Ck Restoration Third 53 53 98793

231 PA 231 over Br Templeton Run-DFB Bridge Replacement Second 400 400 105914

331 PA 331 over Br Brush Run-DFB Bridge Replacement First 150 150 30812

519 PA 519 ov Br Chartiers Run Bridge Improvement Second 1,500 1,500 76063

519 PA 519 ov Chartiers Ck Restoration Third 53 53 98590

519 PA519 ov Ltl Chartiers Ck Restoration Third 53 53 98797

837 PA 837 ov Trib Mon River- DFB Bridge Rehabilitation Second 250 250 81777

844 PA 844 ov Br Brush Run Bridge Improvement Second 690 690 81839

844 PA 844 ov Br of Chartiers Bridge Improvement Third 2,750 2,750 88077

980 PA 980 ov Br Millers Run Restoration Third 90 90 98596

1006 SR 1006 ov Peters Crk Restoration Third 425 425 98665

1008 SR 1008 ov Peters Crk Bridge Replacement Third 1,542 1,542 98867

1009 SR 1009 over Chartiers Ck Bridge Improvement First 1,750 1,750 30687

1009 SR 1009 ov Br Chartiers Ck Bridge Improvement Second 2,340 2,340 89074

1034 SR 1034 ov I-79 Restoration Third 250 250 98640

1053 SR 1053 Ltl Chartiers Ck 2 Bridge Improvement Second 1,000 1,000 76070

1055 SR 1055 ov N Br Pigeon Ck Restoration Third 90 90 98599

1057 SR 1057 ov Mingo Crk Restoration Third 90 90 98597

1059 SR 1059 ov Br MingoCk Bridge Replacement Third 810 810 76071

1059 SR 1059 over Mingo Creek Bridge Replacement First 1,000 1,000 83445

1061 SR 1061 over Froman Run-DFB Bridge Replacement Second 500 500 90690

2001 SR 2001/PA 18 Brs ov Catfish Crk Bridge Replacement First 492 492 105888

2007 SR 2007 ov Bane Crk Restoration Third 230 230 98819

2011 SR 2011/Br Ltl 10 Mile Ck-DFB Bridge Improvement First 150 150 31091

2011 SR 2011 ov Br Ten Mile Ck Bridge Improvement Second 770 770 51510

2011 SR 2011 ov Br Ten Mile Ck Bridge Improvement Third 650 650 89047

2011 SR 2011 ov Redd Run Restoration Third 100 100 98600

2013 SR 2013/Br Ltl Daniels Run-DFB Bridge Replacement Second 500 500 105407

Page 243: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 219 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2019 SR 2019 ov Br Pigeon Ck-DFB Bridge Replacement First 150 150 90785

2020 Ten Mile Crk. BR #1 Bridge Replacement Second 2,000 2,000 30648

2020 SR 2020 ov N.Fork Cross Ck Bridge Improvement Second 1,750 1,750 89080

2022 SR 2022/Br Patterson Run-DFB Bridge Replacement Second 400 400 105410

2026 SR 2026 over Trib Mon Riv-DFB Bridge Replacement First 450 450 74230

2027 SR 2027 ov S Br Maple Ck Bridge Improvement Second 1,887 1,887 91132

2027 SR 2027 over I-70 Bridge Replacement First 100 100 5,500 5,700 98291

2027 SR 2027 ov Maple Crk Restoration Third 10 10 98570

2030 SR 2030 over Gorbys Run Bridge Replacement First 1,400 1,400 69242

2033 SR 2033 ov Toll 43 SB Restoration Third 30 30 98543

2041 SR 2041 ov West Pike Run Bridge Improvement Second 1,500 1,500 83438

2047 SR 2047 over Sowers Run-DFB Bridge Replacement First 250 250 90824

2053 SR 2053 ov Br Daniels Run Bridge Improvement First 350 75 75 500 89035

2053 SR 2053 ov Br Daniels Run Bridge Improvement Second 1,000 1,000 89035

2053 SR 2053 ov Br Daniels Run 2 Bridge Replacement Third 970 970 89081

2061 SR 2061 ov N Br Fishpot Restoration Third 10 10 98582

2065 SR 2065 over Barneys Run Bridge Replacement Second 250 250 90775

2067 Old B'ville Bridge Rehab Bridge Deck Rehabilitation Second 1,091 1,091 91135

2089 SR 2089 over Two Mile Run Bridge Replacement Third 1,710 1,710 98290

3001 SR 3001 ov Ralston Run Bridge Replacement Third 984 984 98612

3009 SR 3009 ov Buffalo Crk Restoration Third 10 10 98565

3011 SR 3011 ov I-70 Bridge Rehabilitation Third 1,000 1,000 98675

3021 SR 3021 ov Mid Wheeling Ck Bridge Improvement Third 1,150 1,150 98861

3021 SR 3021 o Br Mid Wheel Ck-DFB Bridge Replacement Second 500 500 105406

3025 SR 3025 ov Buffalo Crk Restoration Third 10 10 98575

3025 SR 3025 ov Br Robinson Fk-DFB Bridge Replacement First 150 150 105404

3027 SR 3027 over Buffalo Ck Bridge Replacement First 350 75 75 2,000 2,500 79387

3037 SR 3037 ov Enslow Fork Restoration Third 500 500 98672

3041 SR 3041 ov Short Crk Bridge Rehabilitation Third 500 500 98595

3041 2018 Washington Bridges Bridge Replacement First 2,200 2,200 106883

3043 SR 3043 ov Robinson Fork Restoration Third 270 270 98642

Page 244: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 220 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4002 SR 4002 over Bigger Run-DFB Bridge Improvement Second 300 300 90651

4004 SR 4004 ov Raccoon Crk Restoration Third 525 525 98835

4004 2019 Arch Preservation-1 Bridge Preservation Activities First 2,500 2,500 105929

4005 SR 4005 ov Harmon Crk Restoration Third 260 260 98821

4006 SR 4006 over Harmon Crk Bridge Rehabilitation Third 330 330 98654

4007 SR 4007 over US 22 Bridge Improvement First 5,150 5,150 76073

4012 SR 4012 ov Robinson Run-1-DFB Bridge Replacement First 400 400 81838

4015 SR 4015 ov Raccoon Crk Restoration Third 110 110 98558

4015 SR 4015 ov Cherry Run Restoration Third 150 150 98804

4015 SR 4015/ Br Raccoon Ck-DFB Bridge Replacement Second 500 500 103142

4017 SR 4017 ov Raccoon Crk Restoration Third 130 130 98609

4018 SR 4018 ov Cross Crk Restoration Third 320 320 98652

4022 SR 4022 ov Br Buffalo Ck Bridge Replacement First 350 75 75 500 30709

4022 SR 4022 ov Br Buffalo Ck Bridge Replacement Second 750 750 30709

4022 SR 4022 ov Br Buffalo Ck-DFB Bridge Replacement First 475 475 74240

4023 SR 4023 ov Br N Fk Cross Ck Restoration Third 120 120 98605

4025 SR 4025 ov Br Cross Crk Restoration Third 70 70 98594

4028 SR 4028 ov Br Burgetts Fork Restoration Third 270 270 98643

4029 SR 4029 ov Br North Fk Cross Bridge Improvement Second 1,000 1,000 88074

4031 SR 4031/Br S Fk Cross Ck-DFB Bridge Replacement Second 500 500 103058

4035 SR 4035 over Georges Run Bridge Improvement Third 1,279 1,279 81957

4039 SR 4039 ov Br Millers Run-DFB Bridge Rehabilitation First 110 110 103065

4045 SR 4045 ov Chartiers Run Restoration Third 180 180 98623

4051 SR 4051 ov Chartiers Crk Restoration Third 300 300 98648

4057 SR 4057 over Brush Run Bridge Improvement First 350 350 100 100 900 89052

4057 SR 4057 over Brush Run Bridge Improvement Second 1,500 1,500 89052

7220 Chartiers Creek #12 Bridge Replacement First 3,425 3,425 95829

8042 SR 8042 over US 40 Bridge Rehabilitation First 4,000 4,000 81650

9900 Raccoon Bridge #23 Bridge Rehabilitation Second 350 350 1,125 1,825 31074

Planning Partner: SPC Mode: Transit County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Page 245: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 221 of 259August 16, 2018

Planning Partner: SPC Mode: Transit County: WashingtonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

OperatingAssistance-Urban First 13,600 13,600 65428

Bus Replacement First 3,150 3,150 77647

Maint. Facility Const. First 3,200 3,200 102353

Operating Asst State First 6,006 6,006 102576

Facility Improvements First 915 915 106643

Bus Replacement First 1,750 1,750 106645

Small Transit Buses First 2,250 2,250 106646

Office Equipment First 100 100 106650

Extended Warranty First 190 190 107897

HVAC System Upgrades First 25 25 111109

P&R Facility Improvements First 250 250 111110

Vehicle Maintenance Upgr. First 440 440 111111

Surveilance/Security Syst First 10 10 111123

Planning Partner: SPC Mode: Highway County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Eureka Hill Rd Grade Xing Crossbuck Signs First 300 300 103189

Vine Street Grade Xing Crossbuck Signs First 338 338 103190

Hillis Street Grade Crossing RR Warning Devices First 131 131 110463

Hillis Street Grade Crossing RR Warning Devices Second 219 219 110463

30 US 30 Corridor Impvmts Restoration First 2,000 2,000 2,000 6,000 32040

30 US 30 Corridor Impvmts Restoration Second 40,875 40,875 32040

30 US 30 Bypass Upgrades Safety Improvement First 2,000 2,000 88436

30 Jeanette/Hempfield CMAQ Existing Signal Improvement First 1,250 1,250 101493

31 PA 31: N. Silver St- Three Mile Hill Pavement Preservation First 1,856 1,856 110064

70 I-70 Gap Reconstruction Reconstruct First 15,000 15,000 32015

119 US 119 Youngwood Recon Reconstruct First 20,000 20,000 89191

130 PA 130: SR 2039 to PA 381 Resurface Third 603 603 100597

201 PA 201 Ramp to PA 51 South Intersection Improvement Second 200 5,000 5,200 105350

259 12-14-PB-SI5 Resurface Third 750 750 101934

356 PA 356 Truck Climbing Ln Reconstruct First 12,350 12,350 70100

356 PA 356 Safety Improvement Safety Improvement First 16,750 16,750 96654

Page 246: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 222 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

381 PA 381: PA 31 to PA 130 Resurface Third 1,000 1,000 101066

381 PA 381 - SR 2043 to US 30 Resurface Third 1,000 1,000 101067

711 PA 711: SR 1017 to Che Che Rd Resurface Second 6,082 6,082 98309

711 PA 711: US 30 to Wilpen Rd Resurface Third 6,000 6,000 98337

981 PA 981 Signals - Latrobe Traffic System Management First 3,000 3,000 94952

981 PA 981: PA 130 to Kennametal Resurface Second 3,063 3,063 98315

981 Bridge Street Grade Crossing Crossbuck Signs First 300 300 106061

981 LVTIP: PA 819 to Norvelt (SR 981-Q20) Corridor Safety Improvement First 3,500 3,000 5,500 25,000 37,000 107957

981 LVTIP: PA 819 to Norvelt (SR 981-Q20) Corridor Safety Improvement Second 25,000 25,000 107957

981 LVTIP: Norvelt to Pleasant Unity Relocation/Realignment First 4,500 4,500 108010

981 LVTIP: Norvelt to Pleasant Unity Relocation/Realignment Second 5,000 3,000 3,000 16,250 27,250 108010

981 LVTIP: Norvelt to Pleasant Unity Relocation/Realignment Third 22,500 22,500 108010

981 LVTIP: Pleasant Unity to Airport Relocation/Realignment First 2,000 2,000 108140

981 LVTIP: Pleasant Unity to Airport Relocation/Realignment Second 3,000 1,000 1,000 15,000 20,000 108140

981 LVTIP: Pleasant Unity to Airport Relocation/Realignment Third 8,750 8,750 108140

993 2019 Slide Repairs Slides Correction First 2,000 2,000 110090

1025 SR 1025: PA 982 to PA 217 Resurface Third 1,105 1,105 100341

1035 SR 1035: US 22 to PA 981 Resurface Third 750 750 100344

1039 SR 1039: PA 982 to PA 217 Resurface Third 500 500 100355

1042 SR 1042: PA 66 to PA 66 Resurface Third 750 750 100357

1043 SR 1043: SR 1020 to SR 1018 Resurface Third 760 760 100522

1055 SR 1055: US 119 to US 22 Resurface Third 1,750 1,750 101068

2001 SR 2001: SR 3105 to PA 31 Resurface Third 630 630 101072

2012 SR 2012: PA 819 to County Rd Resurface Third 895 895 101078

2019 SR 2019: PA 130 to County Rd Resurface Third 750 750 101086

2025 SR 2025: PA 31 to PA 982 Resurface Third 1,269 1,269 101090

2033 SR 2033: SR 2037 to PA 982 Resurface Third 1,013 1,013 101289

2043 SR 2043: PA 711 to PA 381 Resurface Third 255 255 101299

3002 SR 3002: Loucks Rd to PA 819 Resurface Third 285 285 101303

3010 SR 3010: SR 3061 to PA 31 Resurface Third 855 855 101311

3024 SR 3024: Allegheny Co Line to US 30 Resurface Third 750 750 101376

3026 WECO Signal Upgrades-CMAQ Existing Signal Improvement First 5,000 5,000 94893

Page 247: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 223 of 259August 16, 2018

Planning Partner: SPC Mode: Highway County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3029 SR 3029: PA 981 to Fayette Co Line Resurface Third 575 575 101379

3047 SR 3047: SR 3016 to SR 3045 Resurface Third 800 800 101381

3053 SR 3053: SR 3022 to SR 3047 Resurface Third 323 323 98441

3057 SR 3057: PA 136 to SR 3016 Resurface Third 608 608 101383

3059 SR 3059: SR 3031 to PA 31 Resurface Third 750 750 101384

3083 SR 3083: SR 3002 to PA 981 Resurface Third 605 605 101329

3103 SR 3103: SR 3097 to US 30 Resurface Third 750 750 101337

3107 SR 3107: PA 819 to PA 981 Resurface Third 500 500 100529

4010 Race Street Resurfacing Resurface Third 800 800 98491

4016 SR 4016: PA 993 to TR 430 Resurface Third 330 330 98439

4017 SR 4017: Penn Ave to PA 993 Resurface Third 500 500 101345

4019 SR 4019: Allegheny Co Line to PA 993 Resurface Third 723 723 101347

4025 SR 4025: PA 993 to PA 130 Resurface Third 788 788 101350

4027 SR 4027: SR 4029 to PA 130 Resurface Third 793 793 101352

4034 SR 4034: PA 356 to PA 66 Resurface Third 750 750 98870

4034 SR 4034: SR 4048 to PA 356 Resurface Third 958 958 101354

4037 SR 4037: PA 993 to Export Rd Resurface Third 965 965 101356

4040 SR 4040: PA 56 to SR 4079 Resurface Third 750 750 101357

4050 SR 4050: PA 356 TO SR 4093 Resurface Third 750 750 101360

4052 SR 4052: PA 356 to PA 66 Resurface Third 1,000 1,000 98871

4079 SR 4079: SR 4081 to Turnback Rd Resurface Third 1,000 1,000 101363

4095 SR 4095: SR 4093 to SR 4095 Resurface Third 750 750 101366

Planning Partner: SPC Mode: Bridge County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

22 US 22 ov PA 66 Restoration Third 10 10 98692

22 US 22 ov Turtle Crk/RR Restoration Third 10 10 98693

30 US 30 ov PA Turnpike Restoration Third 10 10 98584

30 US 30 ov SW PA RR Restoration Third 300 300 98650

30 US 30 ov Loyalhanna Crk Restoration Third 400 400 98663

30 US 30 ov SR 3026 Restoration Third 10 10 98691

30 US 30 ov SR 3077 Restoration Third 10 10 98694

Page 248: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 224 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

30 US 30 ov Mill Crk Restoration Third 300 300 98824

31 PA 31 over Brush Run Psv Bridge Preservation Activities Third 1,890 1,890 76084

51 PA 51 ov PA 201 Restoration Third 2,750 2,750 98844

66 PA 66 ov Kiskiminetas River Restoration Third 15 15 98698

70 I-70 ov Local Road Trnbck Restoration Third 15 15 98714

70 I-70 over Speers Run Bridge Replacement Third 3,250 3,250 102163

119 US 119 over Crabtree Ck 2 Bridge Improvement First 350 350 75 75 1,600 2,450 76105

119 US 119 over Zellers Run Bridge Replacement First 4,000 4,000 81837

119 US 119 ov SR 3091 Restoration Second 1,157 1,157 98682

119 US 119 ov Crabtree Crk Restoration Third 15 15 98697

119 US 119 ov Jacks Run Restoration Third 15 15 98702

119 Us 119 ov Br Crabtree Ck Restoration Third 50 50 98704

130 PA 130 ov Four Mile Run Restoration Third 290 290 98646

130 PA 130 ov Br Sewickley Ck Restoration Third 15 15 98700

136 136 ov Br Ltl Sewickly Ck Bridge Replacement Third 640 640 89032

136 PA 136 ov US 30/Zellers Run Restoration Third 1,480 1,480 98680

136 PA 136 ov Little Sewickley Ck Restoration Third 15 15 98699

136 PA 136 ov SW PA RR Restoration Third 15 15 98709

136 West Newton Bridge Bridge Improvement First 1,620 500 500 2,620 98869

136 West Newton Bridge Bridge Improvement Second 11,000 11,000 98869

217 PA 217 ov McGee Run Restoration Third 520 520 98673

259 PA 259 ov Trout Run Restoration Third 170 170 98619

259 PA 259 ov Br Freeman Run Restoration Third 15 15 98712

356 PA 356 o Trib Kiski River-DFB Bridge Rehabilitation First 180 180 76114

356 PA 356 over Pine Run Bridge Improvement First 500 150 150 1,500 2,300 81751

366 PA 366 over Br Poke Run-DFB Bridge Rehabilitation First 200 200 32059

366 PA 366 Br over Pucketa Ck Bridge Rehabilitation First 350 150 150 1,500 2,150 74414

366 PA 366 over Pucketa Ck Bridge Replacement First 3,000 3,000 76115

366 PA 366 over PA 400/380 Bridge Replacement Second 2,000 2,000 88617

366 PA 366 ov Br Pucketa Ck-DFB Bridge Rehabilitation First 150 150 105315

381 PA 381 over Camp Run Bridge Improvement Second 980 980 74244

Page 249: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 225 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

381 PA 381 ov Rolling Rock Ck Restoration Third 15 15 98695

400 PA 400 Bridge Preserv Bridge Preservation Activities Third 1,190 1,190 94669

711 PA 711 ov Br of Tubmill Ck Bridge Replacement Third 670 670 76123

711 PA 711 over Tubmill Creek Bridge Replacement First 1,500 1,500 79406

711 PA 711 ov Mill Creek Restoration Third 740 740 98678

711 PA 711 ov Big Spring Run Restoration Third 15 15 98707

711 PA 711 ov Baldwin Crk Restoration Third 15 15 98708

981 PA 981 over Unity Run Bridge Rehabilitation First 1,500 1,500 88073

981 PA 981 over US 119 Bridge Replacement Third 2,000 2,000 89033

981 PA 981 over Boyer Run Bridge Rehabilitation Third 538 538 89036

981 PA 981 ov Saxman Run Restoration Third 15 15 98701

981 PA 981 ov Welty Run Restoration Third 15 15 98710

981 PA 981 over Barren Run-DFB Bridge Rehabilitation Second 500 500 105316

981 PA 981 ov Trib Loyalhanna Bridge Rehabilitation Second 500 500 105317

981 2018 - Westmoreland Bridges Bridge Replacement First 1,000 1,000 106884

982 PA 982 over Stony Run Bridge Replacement Third 720 720 76129

982 PA 982 ov Jacobs Crk Restoration Third 280 280 98644

993 PA 993 ov Brush Creek Bridge Rehabilitation Second 500 500 89147

1005 SR 1005 ov Br Shannon Run-DFB Bridge Replacement Second 500 500 105414

1012 SR 1012/Br of McGee Run Bridge Replacement First 1,000 1,000 32070

1015 SR 1015 over Hypocrite Ck-DFB Bridge Improvement First 400 400 31634

1017 SR 1017 ov Hannahs Run Restoration Third 44 44 98724

1020 SR 1020 ov Br Saxman Run Bridge Improvement First 350 350 150 150 2,000 3,000 76133

1026 SR 1026 ov Norfolk RR Restoration Third 44 44 98738

1028 SR 1028 ov Little Crabtree Ck Bridge Rehabilitation Third 1,500 1,500 98318

1028 SR 1028 ov Little Crabtree Ck 2 Restoration Third 260 260 98614

1050 SR 1050 ov Loyalhanna Crk Restoration Third 44 44 98741

1055 SR 1055 ov Br White Thorn Ck Bridge Improvement First 350 150 150 2,000 2,650 74249

1055 SR 1055 ov Crabtree Crk Restoration Third 44 44 98723

1060 Salina Bridge Bridge Improvement First 1,700 500 1,000 3,200 81747

1060 Salina Bridge Bridge Improvement Second 12,500 12,500 81747

Page 250: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 226 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1071 SR 1071 ov Hendricks Crk Restoration Third 44 44 98743

1071 SR 1071 over Br Hypocrite Ck-DFB Bridge Replacement Second 500 500 105415

1071 SR 1071 ov Br Hypocrite Ck-DFB Bridge Improvement First 150 150 106047

2007 SR 2007 over Boyer Run Bridge Replacement Third 710 710 89041

2013 SR 2013 ov Br Slate Ck Bridge Replacement Third 530 530 90635

2014 SR 2014 over Slate Creek Bridge Improvement Second 1,720 1,720 81938

2019 SR 2019 o Br Sewickley Ck-DFB Bridge Replacement First 150 150 105413

2027 SR 2027 ov Br Ninemile Run Bridge Improvement Second 2,810 2,810 31632

2027 SR 2027 over Ninemile Run-DFB Bridge Improvement Second 200 200 105319

2033 SR 2033 ov Four Mile Run Restoration Third 300 300 98647

2037 SR 2037 ov Four Mile #1 Restoration Third 180 180 98561

2037 SR 2037 ov Four Mile Run Restoration Third 480 480 98564

2037 SR2037 ov Br 4 Mile Run 2 Restoration Third 90 90 98800

3007 SR 3007 over I-70 Bridge Improvement First 1,060 85 85 1,230 75972

3007 SR 3007 over I-70 Bridge Improvement Second 4,950 4,950 75972

3008 SR 3008 ov Br Pollock Run-DFB Bridge Replacement First 150 150 90807

3009 SR 3009 ov Speers Run-DFB Bridge Replacement First 200 200 32097

3010 SR 3010 over Br Sewickley Ck-DFB Bridge Replacement Second 500 500 105416

3016 SR 3016 o Br Sewickley Ck-DFB Bridge Replacement Second 500 500 81991

3017 SR 3017 over Br Cedar Ck-DFB Bridge Replacement Second 500 500 105332

3030 SR 3030 over US 30 Bridge Improvement First 800 250 250 1,300 90834

3041 SR 3041 ov Sewickley Crk-DFB Restoration Third 680 680 98838

3041 SR 3041 ov Kelly Run-DFB Bridge Improvement First 150 150 98859

3044 SR 3044 ov Ltl Sewickley Crk Bridge Improvement First 350 150 150 1,800 2,450 98865

3093 SR 3093 over Wilson Run Bridge Improvement Second 1,700 1,700 79422

3103 SR 3103 over Jacks Run Bridge Replacement First 300 150 150 2,000 2,600 77872

3103 SR 3103 ov Zellers Run Restoration Third 1,140 1,140 98549

4012 SR 4012 over Brush Creek Bridge Replacement Third 1,415 1,415 81960

4019 SR 4019 over Brush Creek Bridge Improvement First 1,700 1,700 89066

4035 SR 4035 ov Lyons Run Restoration Third 160 160 98616

4053 SR 4053 ov Br Thorn Run-DFB Bridge Replacement First 250 250 32053

Page 251: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 227 of 259August 16, 2018

Planning Partner: SPC Mode: Bridge County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4067 SR 4067 over Br Pine Run Bridge Replacement Second 500 500 105333

4073 SR 4073 over PA 56 Bridge Rehabilitation Third 850 850 83686

4075 SR 4075 ov Pucketa Creek Bridge Improvement First 350 150 150 2,000 2,650 31979

4081 SR 4081 ov Ltl Pucketa Ck Bridge Improvement Second 1,057 1,057 90665

4089 SR 4089 o Br Chartiers Run-DFB Bridge Replacement First 200 200 74265

7204 West Co Local Br Preservation Bridge Improvement First 300 950 1,250 106406

7412 Westmoreland County #29 Bridge Improvement First 300 50 50 1,000 1,400 106405

7421 Fourth Street Bridge Bridge Replacement First 615 615 31554

9900 Fairwood Manor Br Bridge Improvement First 615 615 31669

9900 East Hillis Street Bridge Replacement First 1,055 1,055 31918

Planning Partner: SPC Mode: Transit County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

OperatingAssistance-Rural First 5,200 5,200 65572

State Operating Asst First 13,840 13,840 102359

Bus Storage Facility First 1,000 1,000 111124

Computer & Comm. Equip. First 50 50 111125

Replace Commuter Buses First 3,600 3,600 111126

Service Vehicle First 50 50 111127

Planning Partner: SVTS Mode: Highway County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Mercer STU Line Item Miscellaneous First 3,167 3,167 98276

Mercer STU Line Item Miscellaneous Second 3,200 3,200 98276

Mercer STU Line Item Miscellaneous Third 3,198 3,198 98276

Mercer TA Line Item Transportation Enhancement First 164 164 98278

Mercer TA Line Item Transportation Enhancement Second 164 164 98278

Mercer TA Line Item Transportation Enhancement Third 165 165 98278

Mercer Highway/Bridge Line Item Miscellaneous First 17,422 17,422 106423

Mercer Highway/Bridge Line Item Miscellaneous Second 31,464 31,464 106423

Mercer Highway/Bridge Line Item Miscellaneous Third 17,479 17,479 106423

Mercer 2019 AWPM Reflective Pavement Markers First 100 100 106572

Mercer 2020 AWPM Reflective Pavement Markers First 100 100 106573

Mercer 2021 AWPM Reflective Pavement Markers First 100 100 110125

Mercer 2022 AWPM Reflective Pavement Markers First 100 100 110126

Page 252: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 228 of 259August 16, 2018

Planning Partner: SVTS Mode: Highway County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

18 PA 18: Birchwood-Rutledge Restoration First 3,800 3,800 98384

18 PA 18: Main to Packard Resurface Second 100 100 98401

18 PA 18: Main to Packard Resurface Third 800 800 98401

18 PA 18: PA 358 - Mill Hill Rd. Restoration First 1,300 1,300 109773

18 PA 18/SR 4006 Intersection Safety Improvement First 800 800 110234

18 PA 18/SR 4005 Intersection Existing Signal Improvement First 750 750 110764

19 US 19 Retaining Wall Slides Correction First 50 50 97047

19 US 19 Retaining Wall Slides Correction Second 10 500 510 97047

19 US 19 Corridor Improvements Restoration First 100 1,750 1,850 97907

19 US 19: Sandy Ck- SR 1014 Resurface First 100 100 98431

19 US 19: Sandy Ck- SR 1014 Resurface Second 811 811 98431

19 US 19: Segment - Venango St. Restoration First 100 1,500 1,600 109735

58 PA 58: Ohio Line - US 322 Resurface First 100 100 98440

58 PA 58: Ohio Line - US 322 Resurface Second 1,191 1,191 98440

58 Mercer- PA 58 Safety Study Transportation Study First 150 150 110168

62 US 62: US 19 - Airport Rd Resurface Second 100 1,485 1,585 98414

62 US 62/State St Intersection Safety Improvement First 3,200 3,200 105775

62 Mercer US 62 Safety Study Transportation Study First 150 150 110218

173 PA 173: Vath Rd-SR 1004 Resurface First 1,500 1,500 98397

173 Bessemer & Lake Erie RR Corridor RR Warning Devices First 1,300 1,300 106281

173 Bessemer & Lake Erie RR Corridor RR Warning Devices Second 951 951 106281

173 PA 173: Kocher Rd - Main Street Widen First 250 10 300 2,200 2,760 109154

208 PA 208 & George Jr Road Intersection Improvement Third 1,500 1,500 97909

208 PA 173/208 Intersection Intersection Improvement Third 800 800 98387

258 PA 258: E. South - Blossom Restoration First 100 1,200 1,300 109139

358 PA 358: US 19-Carpenter Resurface Second 1,150 1,150 98405

418 Mercer Avenue Intersections Intersection Improvement First 1,000 1,000 47920

518 PA 518: PA 18 - PA 18 Restoration Second 250 250 99927

518 PA 518: PA 18 - PA 18 Restoration Third 7,300 7,300 99927

718 PA 718: Middlesex - Broadway Restoration Second 100 100 109145

718 PA 718: Middlesex - Broadway Restoration Third 2,400 2,400 109145

718 PA 718: Wayne Pl - Bridge Resurface Second 150 2,000 2,150 109750

Page 253: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 229 of 259August 16, 2018

Planning Partner: SVTS Mode: Highway County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

760 Brdway Ave: PA 18-Council Widen Second 300 300 100 100 3,200 4,000 98512

760 Brdway Ave: PA 18-Council Widen Third 5,200 5,200 98512

846 PA 846:Water Ave-Clarksville Safety Improvement Third 5,000 5,000 97914

846 PA 846: PA 718 - Segment Restoration Second 200 200 109768

846 PA 846: PA 718 - Segment Restoration Third 5,400 5,400 109768

1002 US 19: SR 4025 - US 19 Resurface Second 900 900 98511

3008 State St. Pedestrian Improvements Pedestrian Facilities First 150 50 500 1,000 1,700 109077

3011 SR 3011: PA 318-Valley View Resurface Third 1,600 1,600 97913

3020 SR 3020: Joy Cone-N. Keel Reconstruct Second 150 150 50 50 400 98388

3020 SR 3020: Joy Cone-N. Keel Reconstruct Third 1,750 1,750 98388

4011 SR 4011: PA 58 - PA 358 Restoration First 100 100 2,200 2,400 109146

7220 Shenango Park Road (T-422) Br Bridge Replacement Second 175 125 5 25 330 109744

7220 Shenango Park Road (T-422) Br Bridge Replacement Third 475 475 109744

Planning Partner: SVTS Mode: Bridge County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Kelly Rd Brs T-388 (Dual) Bridge Replacement First 2,395 2,395 1671

Mill Road Bridge T-740 Bridge Replacement Second 500 500 1692

South Foster Road Bridge Bridge Replacement Second 40 35 500 575 85410

18 PA 18 ov Hogback Run #1 Bridge Rehabilitation First 50 10 150 210 78849

18 PA 18 Br/Shenango River Trib Bridge Rehabilitation First 300 300 97272

19 US 19/Lil Shenango River Bridge Preservation Activities Second 75 150 225 84916

19 US 19/Nesh Ck Trib Bridge Replacement First 50 50 500 600 90032

19 Mercer 2019 Bridge Shotcrete Group Bridge Preservation Activities First 900 900 97300

19 US 19 Br/Otter Ck Trb #1 Bridge Rehabilitation First 50 10 60 97331

19 US 19 Br/Otter Ck Trb #1 Bridge Rehabilitation Second 150 150 97331

58 PA 58 Bridge/Mathay Run Bridge Rehabilitation Second 75 150 225 97305

58 PA 58 Bridge/Faherty Run Bridge Rehabilitation First 380 380 97307

58 PA 58 Bridge/Krem Run Bridge Rehabilitation Second 75 150 225 97315

58 PA 58 Bridge/Munnel Run Bridge Rehabilitation Second 20 190 210 97317

62 US 62 Br over Spring Ck Bridge Rehabilitation Second 75 150 225 88486

62 US 62 Bridge/Lackwnck Ck Bridge Rehabilitation Second 10 150 160 97306

62 US 62 Brdg/Sheng Riv Trib Bridge Rehabilitation Third 75 150 225 97327

Page 254: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 230 of 259August 16, 2018

Planning Partner: SVTS Mode: Bridge County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

158 PA 158 Bridge/Brandy Run Bridge Rehabilitation First 75 250 325 1687

173 PA 173 Brdg/Black Run Trb Bridge Rehabilitation Third 75 100 175 97308

208 PA 208 Bridge/Wolf Creek Bridge Preservation Activities Second 10 80 90 97330

258 PA 258 Br/Sheng Riv Trib Bridge Preservation Activities Second 10 10 97287

258 PA 258 Br/Sheng Riv Trib Bridge Preservation Activities Third 50 50 97287

258 PA 258 Bridge/Lackwnk Ck Bridge Preservation Activities Second 100 100 97318

258 PA 258 Bridge/Lackwnk Ck Bridge Preservation Activities Third 300 300 97318

318 W. Middlesex Viaduct Bridge Replacement First 2,849 2,849 1923

358 PA 358 Brdg/Sankeys Run Bridge Rehabilitation Third 75 200 275 97302

760 PA 760 Bridge over Bobby Run Bridge Rehabilitation First 150 150 73494

845 PA 845 Brdg/Sawmill Run Bridge Preservation Activities Third 50 50 97298

846 PA 846 ov Big Run Bridge Preservation Activities Third 60 60 89123

846 PA 846 Brdg/Shenango Res. Bridge Rehabilitation Second 150 10 160 97329

846 PA 846 Brdg/Shenango Res. Bridge Rehabilitation Third 1,600 1,600 97329

965 PA 965 Brdg/Yellow Creek Bridge Preservation Activities Second 50 50 97319

1001 SR 1001 Brdg/Lil Shen Riv Bridge Rehabilitation First 300 300 78923

1002 SR 1002 Brdg/Otter Creek Bridge Preservation Activities First 250 250 88484

1004 Fredonia Rd Br over I-79 Bridge Rehabilitation First 800 800 88481

1004 SR 1004/Lt Sheg Riv Trib Bridge Replacement Third 500 500 89120

1008 SR 1008 Brdg/Otter Ck Bridge Preservation Activities Second 50 150 200 1463

1009 SR 1009: Lk Wilhelm Rd Br Bridge Rehabilitation First 50 10 600 660 1820

1012 SR 1012 Brdg/Lil Sandy Ck Bridge Preservation Activities Third 10 50 60 97288

1013 SR 1013 Br/Sandy Ck Trib Bridge Preservation Activities Third 50 50 97289

1014 SR 1014 Br/Sandy Ck Trib Bridge Preservation Activities Third 50 50 97290

1014 SR 1014 Brdg/Mill Creek Bridge Preservation Activities Third 50 50 97291

1018 SR 1018 Brdg/Lake Wilhelm Bridge Rehabilitation Second 100 10 110 97299

1018 SR 1018 Brdg/Lake Wilhelm Bridge Rehabilitation Third 400 400 97299

2001 SR 2001 over Indian Run Brdg Bridge Replacement First 50 50 500 600 58080

2002 SR 2002: Neshannock Ck Br Bridge Replacement First 200 50 1,400 1,650 58081

2002 SR 2002: Neshannock Ck Br Bridge Replacement Second 600 600 58081

2006 Blacktown Rd Brdg/I-79 Bridge Rehabilitation First 50 900 950 1925

2007 SR 2007: Mill Ck Brdg Bridge Replacement First 250 250 58082

Page 255: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 231 of 259August 16, 2018

Planning Partner: SVTS Mode: Bridge County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2014 SR 2014 over Wolf Ck #2 Bridge Rehabilitation Second 10 50 60 78845

2022 SR 2022 Brdg/Wolf Creek Bridge Preservation Activities Second 50 50 78937

2025 SR 2025: Black Run Brdg Bridge Replacement Second 250 200 50 2,000 2,500 58088

2102 Clintvill Rd Br over I-79 Bridge Rehabilitation First 500 500 88482

2102 Clntville Rd Br 2 ov I-79 Bridge Rehabilitation First 500 500 88483

2103 Millbrook Rd Br ovr I-79 Bridge Rehabilitation Second 100 10 110 88480

2103 Millbrook Rd Br ovr I-79 Bridge Rehabilitation Third 600 600 88480

2104 SR 2104 Brdg over I-79 Bridge Rehabilitation Third 100 10 600 710 78943

3007 SR 3007/W. Brch Nesh Ck Bridge Preservation Activities First 50 200 250 97292

3032 SR 3032 Bridge/Pine Run Bridge Preservation Activities Third 50 50 97293

3039 SR 3039 Brdg/Lckwnk Ck Bridge Rehabilitation Second 50 50 74670

3039 SR 3039 ov Lackwnk Ck #1 Bridge Preservation Activities Second 50 50 78944

3039 SR 3039/Lil Nesh Ck Trib Bridge Preservation Activities Second 50 50 97320

3039 SR 3039/Lil Nesh Ck Tr #1 Bridge Rehabilitation Second 50 10 60 97332

3039 SR 3039/Lil Nesh Ck Tr #1 Bridge Rehabilitation Third 150 150 97332

4001 SR 4001:Sugar Run Trib 2 Bridge Replacement First 75 250 325 97268

4002 SR 4002: Coal Hill Rd Br Bridge Preservation Activities Second 50 150 200 1475

4017 SR 4017 Brdg/Lil Sheng Rv Bridge Rehabilitation First 200 200 97324

4017 SR 4017 Brdg/Lil Sheng Rv Bridge Rehabilitation Second 50 1,500 1,550 97324

4020 SR 4020 Brdg/Lil Shng Riv Bridge Preservation Activities Third 50 50 97295

4020 SR 4020 Brdg/Morrison Run Bridge Preservation Activities Third 50 50 97296

4021 SR 4021:Morrison Run Brdg Bridge Replacement First 500 500 58096

7217 Henry Rd (T-614) Br Bridge Replacement First 150 5 20 300 475 109741

7217 Henry Rd (T-614) Br Bridge Replacement Second 200 200 109741

9900 Ohl Street Bridge Bridge Replacement First 600 600 1745

9900 Wengler Ave Bridge Bridge Replacement Second 1,027 1,027 1890

9900 Heasley Rd Br (T-303) Bridge Replacement Second 350 350 1891

Planning Partner: SVTS Mode: Transit County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

ADA Related Expenses First 400 400 77148

Asset Maintenance Exp First 730 730 83653

Shop/Garage Equipment First 200 200 83656

Page 256: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 232 of 259August 16, 2018

Planning Partner: SVTS Mode: Transit County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Office Equipment First 200 200 83658

Safety & Security First 34 34 95412

Office & Garage Imprvmnts First 275 275 95413

SVSS Transit Buses First 300 300 95415

Vehicle Purchase First 1,070 1,070 102638

2019-2020 Operating Assis First 860 860 106705

2020-2021 Operating Assis First 863 863 106706

Replace Admin Vehicle First 75 75 106707

Small Transit Buses First 410 410 111059

2021 Operating Assistance First 867 867 111060

2022 Operating Assistance First 871 871 111061

Planning Partner: Wayne Mode: Highway County: WayneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Wayne County Reserve Line Miscellaneous First 3,012 3,012 98210

Wayne County Reserve Line Miscellaneous Second 9,838 9,838 98210

Wayne County Reserve Line Miscellaneous Third 25,467 25,467 98210

Wayne County Bridge Preservation Bridge Preservation Activities First 400 400 106033

6 Group 4-16-ST 5 Resurface Third 6,700 6,700 91226

6 SR 6 Safety Improvement Safety Improvement First 2,060 2,060 101991

6 Group 4-16-ST 11 Resurface Second 3,700 3,700 102010

6 Group 4-18-ST 4 Resurface First 4,900 4,900 102071

191 SR 191,196 & T367 Safety Improvement Intersection Improvement First 1,255 1,255 47625

191 SR 191,196 & T367 Safety Improvement Intersection Improvement Second 745 745 47625

370 Group 4-15-ST 5 Resurface First 1,700 1,700 101979

371 Group 4-17-ST 9 Resurface Second 5,650 5,650 102066

435 Group 4-18-ST 10 Resurface Third 7,000 7,000 102085

590 Hamlin Corners Intersection Improvement First 1,000 1,000 57868

652 SR 652 Safety Improvement II Safety Improvement First 721 721 107484

3018 Group 4-17-ST 5 Resurface Third 6,000 6,000 102054

Planning Partner: Wayne Mode: Bridge County: WayneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

170 SR 170 over Lackawaxen River Replace/Rehab First 350 300 650 101099

Page 257: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 233 of 259August 16, 2018

Planning Partner: Wayne Mode: Bridge County: WayneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

170 SR 170 over Lackawaxen River Replace/Rehab Second 1,500 1,500 101099

191 SR 191 over Branch Middle Creek Replace/Rehab First 250 250 10018

191 SR 191 over Branch Middle Creek Replace/Rehab Second 750 750 10018

191 SR 191 over Branch Wallenpaupack CreekBridge Preservation Activities First 500 500 101391

247 SR 247 over West Branch Dyberry Creek Replace/Rehab First 350 300 650 68883

247 SR 247 over West Branch Dyberry Creek Replace/Rehab Second 1,000 1,000 68883

296 SR 296 over Van Aucken Creek Replace/Rehab First 300 1,200 1,500 67578

371 SR 371 over Delaware River Bridge Rehabilitation Second 4,000 4,000 10042

371 SR 371 over Dyberry Creek Replace/Rehab First 300 1,200 1,500 56746

590 SR 590 over Jones Creek Replace/Rehab First 300 2,000 2,300 67580

590 SR 590 over Inlet to Finn Swamp Replace/Rehab First 300 750 1,050 68900

590 SR 590 over Branch of Ariel Creek Replace/Rehab First 300 300 101791

590 SR 590 over Branch of Ariel Creek Replace/Rehab Second 750 750 101791

590 SR 590 over Outlet House Pond Replace/Rehab First 750 750 109884

590 SR 590 over Inlet to Lake Moc-a-tec Replace/Rehab First 750 750 109885

670 SR 670 over Cramer Creek Replace/Rehab First 288 288 88469

670 SR 670 over Cramer Creek Replace/Rehab Third 750 750 88469

1001 SR 1001 over Carley Brook Bridge Preservation Activities First 350 300 650 101390

1001 SR 1001 over Carley Brook Bridge Preservation Activities Second 1,500 1,500 101390

1002 SR 1002 over Delaware River Replace/Rehab First 500 500 9983

1002 SR 1002 over South Branch Calkins CreekReplace/Rehab First 350 300 650 85786

1002 SR 1002 over South Branch Calkins CreekReplace/Rehab Second 1,750 1,750 85786

1004 SR 1004 over Calkins Creek Replace/Rehab First 300 300 68906

1004 SR 1004 over Calkins Creek Replace/Rehab Second 2,000 2,000 68906

1020 SR 1020 over Delaware River Bridge Rehabilitation First 10,000 10,000 10046

1023 SR 1023 over Equinunk Creek Replace/Rehab First 350 350 9877

1023 SR 1023 over Equinunk Creek Replace/Rehab Second 1,875 1,875 9877

1023 SR 1023 over South Branch Equinunk Replace/Rehab First 300 300 68921

1023 SR 1023 over South Branch Equinunk Replace/Rehab Second 1,500 1,500 68921

1023 SR 1023 over South Equinunk Creek Replace/Rehab First 1,650 1,650 92892

1031 SR 1031 over Beaver Dam Creek Bridge Replacement First 600 600 93944

2008 Carley Brook Bridge 2 Replace/Rehab First 300 1,700 2,000 9833

3002 SR 3002 over Stevens Creek Replace/Rehab First 300 300 9973

Page 258: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 234 of 259August 16, 2018

Planning Partner: Wayne Mode: Bridge County: WayneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3002 SR 3002 over Stevens Creek Replace/Rehab Third 1,000 1,000 9973

3002 SR 3002 over Butternut Creek Replace/Rehab First 350 300 650 96742

3002 SR 3002 over Butternut Creek Replace/Rehab Second 1,250 1,250 96742

3008 SR 3008 over Ariel Creek Replace/Rehab First 350 300 300 950 67585

3008 SR 3008 over Ariel Creek Replace/Rehab Second 1,575 1,575 67585

3018 SR 3018 over Branch Middle Creek Replace/Rehab First 350 350 10021

3018 SR 3018 over Branch Middle Creek Replace/Rehab Second 300 1,500 1,800 10021

3018 SR 3018 over Tributary Middle Creek Replace/Rehab First 350 300 650 67587

3018 SR 3018 over Tributary Middle Creek Replace/Rehab Second 1,500 1,500 67587

3020 SR 3020 over Tributary Quinsigamund LakeReplace/Rehab First 350 300 650 67588

3020 SR 3020 over Tributary Quinsigamund LakeReplace/Rehab Second 1,000 1,000 67588

3020 SR 3020 over Inlet Lake Quinsigamund Replace/Rehab Second 500 500 67589

3026 SR 3026 over Middle Creek Replace/Rehab First 750 750 67591

3030 SR 3030 over Van Auken Creek Replace/Rehab Third 500 500 67592

3031 SR 3031 over Middle Creek Replace/Rehab First 350 300 650 9936

3031 SR 3031 over Middle Creek Replace/Rehab Second 1,750 1,750 9936

3034 SR 3034 over Middle Creek Replace/Rehab First 300 1,000 1,300 67593

3046 SR 3046 over Spring Run Bridge Replacement First 250 250 9974

4014 SR 4014 over Balls Creek Bridge Preservation Activities First 100 100 10048

4014 SR 4014 over Balls Creek Bridge Preservation Activities Second 750 750 10048

4017 SR 4017 over Dyberry Creek Replace/Rehab First 500 500 9834

4023 SR 4023 over Tributary W. Branch Lackawaxen RiverBridge Replacement First 500 500 9976

4031 SR 4031 over Johnsons Creek Replace/Rehab First 300 300 96740

4031 SR 4031 over Johnsons Creek Replace/Rehab Second 1,000 1,000 96740

4041 SR 4041 over Riley Creek Replace/Rehab First 350 300 650 79565

4041 SR 4041 over Riley Creek Replace/Rehab Second 1,750 1,750 79565

4043 SR 4043 over Branch Sherman Creek Replace/Rehab First 250 250 9979

9900 T-603 Factory Bridge #5 over Equinunk CreekReplace/Rehab First 200 200 9849

Planning Partner: Williamsport Mode: Highway County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

FFY 19 WATS RPM Contract Reflective Pavement Markers First 30 30 106219

Pathway to Health Phase IV Transportation Enhancement First 799 799 108113

Loyalsock Township Recreational Pedestrian BridgesTransportation Enhancement First 765 765 108114

Page 259: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 235 of 259August 16, 2018

Planning Partner: Williamsport Mode: Highway County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

I-180, SR 147 , & SR 220 Ramps Wrong Way SignsSafety Improvement First 290 290 108942

Nisbet RRX Corridor RR Warning Devices First 446 446 109218

FFY 20 WATS RPM Contract Reflective Pavement Markers First 30 30 110248

FFY 21 WATS RPM Contract Reflective Pavement Markers First 30 30 110249

FFY 22 WATS RPM Contract Reflective Pavement Markers First 30 30 110250

2019 TIP HSIP Line Item Safety Improvement Second 3,160 3,160 110620

2019 TIP HSIP Line Item Safety Improvement Third 4,360 4,360 110620

WATS Local Bridge Line Item Bridge Improvement Third 3,372 3,372 110625

Interstate Delineation Project Safety Improvement First 725 725 110769

Districtwide Cable Guide Rail Upgrade Guiderail Improvement First 200 100 750 1,050 110771

15 Main St to Southern Ave Reconstruct First 250 250 98983

15 Main St to Southern Ave Reconstruct Second 1,060 750 288 500 2,598 98983

15 Main St to Southern Ave Reconstruct Third 900 11,433 12,333 98983

54 Montgomery Corridor RRX RR Warning Devices First 155 155 110890

87 Ltl Br Crk Rd to Lw Manor Resurface Second 800 800 98919

180 Muncy Creek to South Main Street Resurface First 960 960 97672

180 SR 15 to Warrensville Rd WB Resurface First 100 100 105532

180 SR 15 to Warrensville Rd WB Resurface Second 50 1,400 1,450 105532

220 US 220/4th St Interchange Interchange Improvement Third 250 250 6000

220 US220&SR 405 Intersection Intersection Improvement First 100 2,207 2,307 93016

220 PA 287 to West Fourth Street Safety Improvement First 548 100 1,175 36,972 38,795 93732

220 Muncy Crk to Main St Resurface First 420 420 98924

220 School St to Arch St Resurface Second 20 20 98990

220 School St to Arch St Resurface Third 3,022 3,022 98990

220 Bennett Lane to Muncy Cr Resurface Second 6,467 6,467 99003

220 Curves b/t Tivoli & Glen Mawr Safety Improvement Second 750 750 102641

405 SR 405 & SR 2014 Intersection Intersection Improvement First 125 25 25 400 575 6096

405 Brick Chrch Rd to Susq Rv Resurface Second 500 500 97785

405 SR 2014 to SR 2057 Resurface First 15 15 98931

405 PA 54 to Brick Church Rd Reconstruct Second 300 500 250 1,050 99008

405 PA 54 to Brick Church Rd Reconstruct Third 500 7,663 8,163 99008

442 SR 2061 to SR 2019 Resurface Third 1,500 1,500 98930

Page 260: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 236 of 259August 16, 2018

Planning Partner: Williamsport Mode: Highway County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

654 Cold Wtr Tw Rd to Vill Dr Resurface Third 1,000 1,000 98932

864 Countywide Cable Guiderail Upgrades Guiderail Improvement First 68 52 20 140 106182

864 Countywide Cable Guiderail Upgrades Guiderail Improvement Second 50 400 450 106182

1017 Beech Street to Mill Lane Resurface First 750 750 99029

2014 Campbell St to Basin St Reconstruct First 500 300 5,438 6,238 87987

2014 Campbell St to Basin St Reconstruct Second 8,169 8,169 87987

2014 US 15 to Campbell Street Reconstruct First 875 250 1,125 97508

2014 US 15 to Campbell Street Reconstruct Second 850 1,000 250 13,618 15,718 97508

2014 US 15 to Campbell Street Reconstruct Third 4,100 4,100 97508

2014 Montoursville Boro Ln to Odell Rd Resurface Third 1,400 1,400 98940

2014 Water St to I-180 Resurface First 15 850 865 99410

2014 Hillside Avenue to US 15 Phase 2 Reconstruct First 3,700 3,700 108112

2016 Lyc Cr Rd to Hepburn St Resurface First 79 79 98942

2039 3rd St to Lick Run Rd Resurface Second 15 15 99300

2039 3rd St to Lick Run Rd Resurface Third 1,400 1,400 99300

2045 Fairfield Crossing Intersection Improvement First 2,950 2,950 98166

2056 NorthwayRdtoWashingtonBlv Resurface First 150 150 97803

2060 Via Bella Dr to Third St Reconstruct First 75 600 675 81897

2060 Via Bella Dr to Third St Reconstruct Second 400 400 81897

3013 SR 3013 Slide Repair Slides Correction Third 1,300 1,300 99373

3029 SR 973 to Lyc Cr Rd Resurface First 300 300 106156

Planning Partner: Williamsport Mode: Bridge County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Jersey Shore Culvert 2 Miscellaneous Third 2,000 2,000 94681

T-369 over Queneshukney Run Bridge Replacement First 200 200 106085

T-369 over Queneshukney Run Bridge Replacement Second 100 10 20 400 530 106085

T-556 over East Mill Creek Bridge Replacement First 100 50 20 275 445 110203

14 SR 14 over Trout Run Bridge Replacement Second 71 71 6128

14 SR 14 over Trout Run Bridge Replacement Third 20 20 20 350 410 6128

14 SR 14 over Grays Run Bridge Rehabilitation First 900 900 88746

14 PA 14 over Red Run Bridge Rehabilitation Second 80 80 99233

14 PA 14 over Red Run Bridge Rehabilitation Third 20 20 20 500 560 99233

14 PA 14 over Abbots Run Bridge Rehabilitation First 60 60 99383

14 PA 14 over Abbots Run Bridge Rehabilitation Second 20 20 20 301 361 99383

Page 261: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 237 of 259August 16, 2018

Planning Partner: Williamsport Mode: Bridge County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

14 SR 14 over Lycoming Creek Bridge Rehabilitation First 1,100 1,100 102022

15 Bridge Deck Overlays Bridge Preservation Activities First 25 25 99034

15 Bridge Deck Overlays Bridge Preservation Activities Second 750 750 99034

15 Bridge Deck Overlays Bridge Preservation Activities Third 750 750 99034

15 SR 15 over Hagermans Run Bridge Improvement Third 250 1,000 1,250 110162

44 SR 44 over Susquehanna River Bridge Painting Third 50 1,235 1,285 6205

44 SR 44 over Lawshe Run Bridge Replacement First 1,000 1,000 87918

44 PA 44 over Ramsey Run Bridge Rehabilitation First 75 25 20 20 400 540 97609

44 PA 44 over Ramsey Run Bridge Rehabilitation Second 400 400 97609

44 PA 44 over Furnace Run Bridge Rehabilitation Second 60 20 17 20 200 317 99348

44 PA 44 over Furnace Run Bridge Rehabilitation Third 200 200 99348

44 PA44 ov UpperPineBottomRn Bridge Rehabilitation Second 60 20 20 20 200 320 99393

44 PA44 ov UpperPineBottomRn Bridge Rehabilitation Third 200 200 99393

54 SR 54 ov Susquehanna Riv Bridge Improvement First 141 31 172 110167

54 SR 54 ov Susquehanna Riv Bridge Improvement Second 1,332 1,332 110167

54 SR 54 ov Susquehanna Riv Bridge Improvement Third 1,868 1,868 110167

87 PA 87 over Little Bear Cr Bridge Improvement Second 500 500 97615

118 PA 118 over Greggs Creek Bridge Rehabilitation Second 60 60 97639

118 PA 118 over Greggs Creek Bridge Rehabilitation Third 20 20 20 400 460 97639

118 PA 118 over Sugar Run Bridge Rehabilitation Second 20 40 60 97654

118 PA 118 over Sugar Run Bridge Rehabilitation Third 20 20 20 500 560 97654

118 PA 118 ov Little Muncy Cr Bridge Rehabilitation Second 41 41 97658

118 PA 118 ov Little Muncy Cr Bridge Rehabilitation Third 20 300 320 97658

180 Lyc Co Bridge Prsv Grp Bridge Rehabilitation First 40 10 50 99226

180 Lyc Co Bridge Prsv Grp Bridge Rehabilitation Second 1,390 1,390 99226

220 US 220 over Wolf Run Bridge Replacement Second 80 80 79249

220 US 220 over Wolf Run Bridge Replacement Third 20 20 20 600 660 79249

220 US 220 over Ramp A (to West Fourth St.) Bridge Improvement First 155 100 10 3,820 4,085 106124

220 US 220 over Ramp A (to West Fourth St.) Bridge Improvement Second 1,560 1,560 106124

284 SR 284 over Flooks Run Bridge Replacement First 80 80 5939

284 SR 284 over Flooks Run Bridge Replacement Second 20 20 20 160 220 5939

284 SR 284 over Flooks Run Bridge Replacement Third 240 240 5939

284 PA 284 over Bonnell Run Bridge Rehabilitation Third 39 50 50 50 1,050 1,239 97617

284 PA 284 over Blacks Creek Bridge Replacement First 80 80 97623

284 PA 284 over Blacks Creek Bridge Replacement Second 20 20 20 800 860 97623

Page 262: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 238 of 259August 16, 2018

Planning Partner: Williamsport Mode: Bridge County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

287 PA 287 over Larry's Creek Bridge Improvement First 20 20 20 60 97625

287 PA 287 over Larry's Creek Bridge Improvement Second 1,300 1,300 97625

287 PA 287 ov Trb Larrys Crk Bridge Rehabilitation Second 60 60 99352

287 PA 287 ov Trb Larrys Crk Bridge Rehabilitation Third 20 20 20 300 360 99352

287 PA 287 over Lick Run Bridge Improvement First 20 20 20 60 99400

287 PA 287 over Lick Run Bridge Improvement Second 1,100 1,100 99400

405 SR 405 over Glade Run Bridge Replacement First 80 20 20 20 1,000 1,140 6261

405 PA 405 ov Trib Susq Rvr Bridge Improvement Second 120 40 20 20 600 800 97661

405 PA 405 ov Trib Susq Rvr Bridge Rehabilitation Second 40 20 20 20 100 99354

405 PA 405 ov Trib Susq Rvr Bridge Rehabilitation Third 200 200 99354

414 SR 414 over Pine Creek Bridge Rehabilitation Third 40 20 20 20 600 700 6206

414 SR 414 over Bluestone Run Bridge Rehabilitation First 20 25 20 400 465 88967

414 PA 414 over Truman Run Bridge Replacement Second 22 22 99402

414 PA 414 over Truman Run Bridge Replacement Third 200 50 50 1,240 1,540 99402

442 PA 442 over Dry Run Bridge Replacement Second 80 80 97663

442 PA 442 over Dry Run Bridge Replacement Third 20 20 20 600 660 97663

864 PA 864 over Mill Creek Bridge Rehabilitation Third 1,100 1,100 97620

973 PA 973 over Mill Creek Bridge Rehabilitation Second 80 20 20 20 300 440 99237

973 PA 973 over Mill Creek Bridge Rehabilitation Third 300 300 99237

973 PA 973 over X Bridge Improvement Third 40 500 540 110180

1003 SR 1003 over Jacoby Hollow Run Bridge Rehabilitation First 15 90 105 106125

1005 SR 1005 over Plunketts Creek Bridge Replacement First 80 80 5983

1005 SR 1005 over Plunketts Creek Bridge Replacement Second 20 20 20 532 592 5983

1005 SR 1005 over Plunketts Creek Bridge Replacement Third 252 252 5983

1006 SR 1006 over Trib to Wallis Run Bridge Improvement First 20 20 5920

1006 SR 1006 over Trib to Wallis Run Bridge Improvement Second 20 20 20 20 150 230 5920

1006 SR 1006 over Slacks Run Bridge Replacement First 20 150 170 99013

1006 SR 1006 over Slacks Run Bridge Improvement First 40 40 110182

1006 SR 1006 over Slacks Run Bridge Improvement Second 20 20 20 150 210 110182

1009 SR1009 ov TrBlockhouseCr Bridge Replacement First 40 20 20 20 100 99025

1009 SR1009 ov TrBlockhouseCr Bridge Replacement Second 150 150 99025

1010 SR 1010 over Roaring Branch Bridge Improvement First 80 80 5755

1010 SR 1010 over Roaring Branch Bridge Improvement Second 20 20 20 250 310 5755

1010 SR 1010 over Roaring Branch Bridge Improvement Third 250 250 5755

1010 SR 1010 ov Little Elk Run Bridge Improvement First 40 20 24 187 271 99027

Page 263: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 239 of 259August 16, 2018

Planning Partner: Williamsport Mode: Bridge County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1017 SR 1017 ov Trout Run Bridge Rehabilitation Second 41 41 99051

1017 SR 1017 ov Trout Run Bridge Rehabilitation Third 20 200 220 99051

2003 SR 2003 over Spring Creek Bridge Replacement First 80 80 97632

2003 SR 2003 over Spring Creek Bridge Replacement Second 20 20 20 800 860 97632

2004 SR 2004 over Trb Spring Ck Bridge Improvement First 50 20 20 20 42 152 99032

2004 SR 2004 over Trb Spring Ck Bridge Improvement Second 108 108 99032

2004 SR 2004 over Tributary to Spring Creek Bridge Improvement First 20 20 110190

2004 SR 2004 over Tributary to Spring Creek Bridge Improvement Second 20 20 20 20 150 230 110190

2013 SR 2013 over Laurel Run Bridge Replacement First 125 125 93679

2014 SR 2014 ov Bennett's Run Bridge Replacement First 20 5 200 225 99038

2014 SR 2014 ov Wolf Run Bridge Rehabilitation Second 60 60 99359

2014 SR 2014 ov Wolf Run Bridge Rehabilitation Third 20 20 20 200 260 99359

2014 Bridge Preservation Paint Group Bridge Painting First 2,352 2,352 106133

2015 SR 2015 over German Run Bridge Replacement Second 40 20 20 20 75 175 110181

2015 SR 2015 over German Run Bridge Replacement Third 75 75 110181

2018 SR 2018 over Millers Run Bridge Rehabilitation Second 60 20 20 18 350 468 99337

2018 SR 2018 over Millers Run Bridge Rehabilitation Third 350 350 99337

2053 SR 2053 over Wolf Run Bridge Rehabilitation Second 80 80 97662

2053 SR 2053 over Wolf Run Bridge Rehabilitation Third 20 20 20 400 460 97662

2055 SR 2055 overTributary to Muncy Creek Bridge Improvement Second 40 20 20 20 75 175 110204

2055 SR 2055 overTributary to Muncy Creek Bridge Improvement Third 75 75 110204

2061 SR 2061 over Beaver Run Bridge Replacement First 60 60 6030

2061 SR 2061 over Beaver Run Bridge Replacement Second 10 10 10 30 6030

2061 SR 2061 over Beaver Run Bridge Replacement Third 352 352 6030

2061 SR2061 ov Little Muncy Cr Bridge Rehabilitation Second 39 39 99058

2061 SR2061 ov Little Muncy Cr Bridge Rehabilitation Third 20 150 170 99058

2061 SR 2061 over Little Sugar Run Bridge Improvement Second 40 20 20 20 100 110205

2061 SR 2061 over Little Sugar Run Bridge Improvement Third 150 150 110205

2069 SR 2069 over Broad Run Bridge Replacement First 15 35 20 150 220 101971

2073 SR 2073 ov Greggs Run Bridge Replacement First 40 20 20 20 100 99035

2073 SR 2073 ov Greggs Run Bridge Replacement Second 176 176 99035

2083 SR 2083 over Lick Run Bridge Rehabilitation First 40 40 99408

2083 SR 2083 over Lick Run Bridge Rehabilitation Second 20 20 20 150 210 99408

3007 SR 3007 ov Pine Run Bridge Replacement First 10 25 15 151 201 99036

3010 SR 3010 ov Larrys Creek Bridge Rehabilitation First 80 80 99052

Page 264: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 240 of 259August 16, 2018

Planning Partner: Williamsport Mode: Bridge County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3010 SR 3010 ov Larrys Creek Bridge Rehabilitation Second 20 20 20 750 810 99052

3015 SR 3015 over Stoney Gap Run Bridge Improvement First 20 20 15 30 150 235 106207

3018 SR 3018 ov 1stFrkLarrysCr Bridge Improvement First 15 20 20 150 205 6106

4001 SR 4001 ov Lt Pine Creek Bridge Rehabilitation First 151 8 20 4,988 5,166 6209

4001 SR 4001 over Lt Pine Crk Bridge Rehabilitation First 10 10 88743

4001 SR 4001 over Lt Pine Crk Bridge Rehabilitation Second 1,042 1,042 88743

4001 SR 4001 over Tributary to Little Pine CreekBridge Improvement Second 40 20 20 20 100 110207

4001 SR 4001 over Tributary to Little Pine CreekBridge Improvement Third 150 150 110207

4002 SR 4002 over Hughes Run Bridge Improvement Second 45 45 110208

4002 SR 4002 over Hughes Run Bridge Improvement Third 20 20 20 150 210 110208

4010 SR 4010 over Larrys Creek Bridge Replacement First 40 40 6031

4010 SR 4010 over Larrys Creek Bridge Replacement Second 20 20 20 205 265 6031

4010 SR 4010 over Larrys Creek Bridge Replacement Third 95 95 6031

4010 SR 4010 ov Larry's Creek Bridge Rehabilitation First 80 80 99061

4010 SR 4010 ov Larry's Creek Bridge Rehabilitation Second 20 25 20 849 914 99061

9900 T-665 over Pleasant Stream Bridge Replacement First 1,000 1,000 5891

9900 T-836 over Trout Run Bridge Replacement First 200 200 6085

9900 T-836 over Trout Run Bridge Replacement Second 100 20 20 400 540 6085

Planning Partner: Williamsport Mode: Transit County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Garage/Office Improvement First 3,000 3,000 76510

Operating Assistance First 29,600 29,600 84058

Planning Assistance First 500 500 84060

Support Equipment First 350 350 89390

Spare Components First 350 350 89391

Support Vehicles First 250 250 89579

Purchase FRB and Other TV First 6,057 6,057 95534

Transit/Joint Dev CSTC First 250 250 102593

Transit Vehciles- Equip. First 100 100 106400

Transit/JD TTC II/Stcpe First 2,000 2,000 106401

Transit/JD- Reg Hubs First 250 250 106402

Transit JD/ TTC Complex First 2,000 2,000 110548

Transit/JD/ E 3rd St Revi First 4,200 4,200 110549

Page 265: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 241 of 259August 16, 2018

Planning Partner: York Mode: Highway County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

SRTP Rideshare Program Miscellaneous First 1,166 1,166 82376

Bridge Reserve Miscellaneous First 4,200 4,200 87946

Bridge Reserve Miscellaneous Second 5,159 5,159 87946

Bridge Reserve Miscellaneous Third 5,736 5,736 87946

Highway Reserve Miscellaneous First 5,682 5,682 87952

Highway Reserve Miscellaneous Second 6,637 6,637 87952

Highway Reserve Miscellaneous Third 13,451 13,451 87952

Congestion Mitigation Implementation Miscellaneous First 10,847 10,847 87957

Congestion Mitigation Implementation Miscellaneous Second 14,350 14,350 87957

Congestion Mitigation Implementation Miscellaneous Third 16,006 16,006 87957

Delivery/Consult Assist Miscellaneous First 3,200 1,600 4,800 87958

TAP Line Item Miscellaneous First 584 584 87960

TAP Line Item Miscellaneous Second 972 972 87960

TAP Line Item Miscellaneous Third 970 970 87960

York HRST Line Item Miscellaneous First 5,000 5,000 87962

HSIP Line Item Miscellaneous Second 9,604 9,604 87963

HSIP Line Item Miscellaneous Third 9,606 9,606 87963

York STU Line Item Miscellaneous First 1,372 1,372 88056

York STU Line Item Miscellaneous Second 6,544 6,544 88056

York STU Line Item Miscellaneous Third 18,799 18,799 88056

Rabbittransit Bus Replacment Transit System Improvement First 1,910 1,910 95325

Rabbittransit Bus Replacment Transit System Improvement Second 1,658 1,658 95325

CMP Signal Timing Existing Signal Improvement First 1,000 1,000 95357

Implementation of I-83 Study Reserve Miscellaneous First 9,665 9,665 102398

Implementation of I-83 Study Reserve Miscellaneous Second 6,173 6,173 102398

MA & PA Community Greenway Pedestrian Facilities First 388 388 106290

RSA Implementation Line Item Safety Improvement First 5,905 5,905 106542

York Connects Assistance Miscellaneous First 245 245 107873

15 US-15 Safety Improvements - York Safety Improvement First 3,629 3,629 92920

15 Blue-Gray Highway Reconstruction Reconstruct First 1,500 6,495 2,000 5,000 14,995 92923

15 Blue-Gray Highway Reconstruction Reconstruct Second 21,058 21,058 92923

15 Blue-Gray Highway Reconstruction Reconstruct Third 19,617 19,617 92923

15 US-15 Resurfacing - York Resurface First 4,394 4,394 94950

15 US 15 Crossing Study Transportation Study First 1,458 250 1,708 95098

15 US 15 Crossing Study Transportation Study Second 2,500 100 500 11,017 14,117 95098

Page 266: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 242 of 259August 16, 2018

Planning Partner: York Mode: Highway County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

24 Edgewood/Mount Zion Road Resurface Third 50 4,250 4,300 90946

24 Sherman Street Extended Resurface First 50 2,450 2,500 100220

24 Winterstown Road Resurfac Resurface First 50 1,950 2,000 100224

30 US 30 Pavement Grinding Restoration Second 50 3,250 3,300 83402

30 US30: PA74 to N George St Restoration Second 1,500 1,500 88951

30 Licoln Highway Rsf 2 Resurface Second 50 2,000 2,050 100227

83 I-83 Exit 4 Interchange Improvement First 26,139 26,139 89917

83 I-83 Newberrytown South Resurf Resurface Third 3,000 3,000 106531

114 Lewisbury Road Resurface Resurface Second 2,500 2,500 91070

116 Spring Grove Resurface Resurface Second 750 750 97967

194 Baltimore Pike Pavement Preservation First 2,000 2,000 108743

194 Baltimore Pike Pavement Preservation Second 2,000 2,000 108743

372 Holtwood Road Resurface Resurface Second 1,000 1,000 96233

462 Lincoln Highway Resf 3 Resurface Second 3,000 3,000 99941

462 PA462 and PA624 Intersection Intersection Improvement Second 750 750 110480

516 Jefferson Road Resf Resurface Second 1,500 1,500 99944

616 Green Valley Roundabout Safety Improvement Second 350 350 100232

616 Green Valley Roundabout Safety Improvement Third 1,200 1,200 100232

2005 Camp Betty Washington Safety Improvement First 300 50 150 5,000 5,500 20652

3008 Church Street Resurface Third 1,500 1,500 90930

3065 George St Road Diet Pedestrian Facilities First 2,600 2,600 108933

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

15 US 15 Yellow Breeches Cr Bridge Rehabilitation First 350 700 1,050 21140

24 Sherman St Br Trib of Cod Bridge Preservation Activities Second 75 300 375 73962

24 SR 24 Br PM over N.S. RR Bridge Preservation Activities Second 75 2,000 2,075 81069

30 US 30 Trib to Beaver Cr Bridge Replacement Second 75 500 575 100014

30 US 30 Trib Beaver Cr 2 Bridge Replacement Second 75 400 475 100038

74 Trib Doe Run Bridge-C Bridge Replacement First 500 500 87543

74 Carlisle Road Bridge Bridge Preservation Activities First 350 3,000 3,350 100151

74 York Road ovr Dogwood Run Bridge Replacement Second 75 1,000 1,075 100203

Page 267: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 243 of 259August 16, 2018

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

114 Lewisberry Road Bridge 1 Bridge Replacement Second 150 150 100177

114 Lewisberry Road Bridge 1 Bridge Replacement Third 700 700 100177

116 York Road Bridge Bridge Preservation Activities First 150 750 900 78844

116 York Street Bridge 2 Bridge Replacement First 200 200 100179

116 York Street Bridge 2 Bridge Replacement Second 800 800 100179

124 East Prospect Bridge-C Bridge Replacement First 500 500 87546

124 East Prospect Road Bridge Bridge Replacement Second 75 1,600 1,675 100180

177 SR 177 Over Beaver Creek Bridge Rehabilitation First 10 200 210 78846

194 Tributary Bermudian Cr Br Bridge Replacement First 75 75 87519

194 Tributary Bermudian Cr Br Bridge Replacement Second 50 20 20 450 540 87519

194 Trib Bermudian Cr Br 2 Bridge Replacement First 60 20 15 400 495 87598

194 Baltimore Pike Bridge 1 Bridge Replacement Second 150 1,200 1,350 100182

216 Pierceville Run Tributary-C Bridge Replacement First 800 800 90321

216 PA 216 Bridge Bridge Replacement First 200 200 91354

216 PA 216 Bridge Bridge Replacement Second 400 400 91354

216 PA 216 Trib Codorus Cr 1 Bridge Replacement Second 75 340 415 100040

216 PA 216 Tib Codorus Cr 3 Bridge Replacement Second 75 360 435 100043

216 Seaks Run Bridge 1 Bridge Replacement Second 75 330 405 100045

216 Blooming Grove Road Brdg Bridge Preservation Activities Second 300 4,000 4,300 100153

216 Main Street Bridge 4 Bridge Replacement Second 250 1,400 1,650 100185

234 East Berlin Road Bridge 1 Bridge Replacement Second 75 614 689 100187

234 East Berlin Road Bridge 1 Bridge Replacement Third 276 276 100187

392 Old Trail Bridge-C Bridge Replacement First 900 900 87692

392 Old Trail Road Bridge-C Bridge Replacement First 250 250 91355

392 Yocumtown Rd Bridge-C Bridge Replacement First 450 450 102404

425 Furnace Road Bridge-C Bridge Replacement First 800 800 87700

425 Woodbine Road Bridge-C Bridge Replacement First 450 450 90320

425 Woodbine Road Bridge 1 Bridge Replacement Second 75 400 475 100047

462 Market Street Bridge 2 Bridge Preservation Activities Second 75 75 78851

462 Market Street Bridge 2 Bridge Preservation Activities Third 2,400 2,400 78851

462 Lincoln Highway Bridge 2-C Bridge Replacement First 750 750 91356

462 Market Street Bridge 3 Bridge Replacement Second 75 700 775 100189

Page 268: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 244 of 259August 16, 2018

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

462 Market Street Bridge 4 Bridge Replacement Second 75 75 100192

462 Market Street Bridge 4 Bridge Replacement Third 950 950 100192

462 Market Street Bridge 5 Bridge Replacement Second 75 75 100194

462 Market Street Bridge 5 Bridge Replacement Third 1,000 1,000 100194

462 PA 462 over Kruetz Creek Bridge Replacement Second 75 75 100196

462 PA 462 over Kruetz Creek Bridge Replacement Third 1,300 1,300 100196

462 PA 462/Trib to Kreutz Cr Bridge Replacement Second 75 75 100197

462 PA 462/Trib to Kreutz Cr Bridge Replacement Third 750 750 100197

462 PA 462/Trib to Kreutz Cr4 Bridge Replacement Second 75 75 100200

462 PA 462/Trib to Kreutz Cr4 Bridge Replacement Third 850 850 100200

616 South Br Codorus Creek Bridge Replacement Second 75 75 87696

616 South Br Codorus Creek Bridge Replacement Third 375 375 87696

616 Seven Valleys Road Bridge-C Bridge Replacement First 600 600 87698

616 Main Street Bridge Bridge Preservation Activities Second 75 75 100157

616 Main Street Bridge Bridge Preservation Activities Third 250 250 100157

624 Front Street Bridge Bridge Replacement First 325 325 81040

624 Front Street Bridge Bridge Replacement Second 250 50 30 2,500 2,830 81040

624 Craley Road Bridge 1 Bridge Replacement Second 250 250 100201

624 Craley Road Bridge 1 Bridge Replacement Third 1,300 1,300 100201

851 Bryansville Road Bridge Bridge Rehabilitation First 300 300 106230

921 Canal Rd Br over Fox Run Bridge Replacement Second 150 150 73966

921 Canal Rd Br over Fox Run Bridge Replacement Third 1,200 1,200 73966

921 Canal Road Ext Bridge Bridge Rehabilitation First 4,000 4,000 91031

1003 Old York Road Bridge 1 Bridge Replacement Second 75 75 100205

1003 Old York Road Bridge 1 Bridge Replacement Third 585 585 100205

1004 Conewago Cr Rd Brdg 1 Bridge Replacement Second 150 150 100075

1004 Conewago Cr Rd Brdg 1 Bridge Replacement Third 395 395 100075

1008 Codorus Furnace Road Brdg Bridge Preservation Activities Second 150 150 100159

1008 Codorus Furnace Road Brdg Bridge Preservation Activities Third 2,777 2,777 100159

1012 Emig Road Bridge Bridge Replacement Second 150 150 78884

1012 Emig Road Bridge Bridge Replacement Third 1,200 1,200 78884

1013 SR 1013 over Conewago Crk Bridge Rehabilitation First 450 3,750 4,200 78887

1013 SR 1013 over Conewago Crk Bridge Rehabilitation Second 150 150 78887

1013 SR 1013 over Conewago Crk Bridge Rehabilitation Third 7,917 7,917 78887

1019 Wago Road Bridge Bridge Rehabilitation First 150 15 45 2,500 2,710 78888

Page 269: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 245 of 259August 16, 2018

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

1021 Locust Point Road Bridge Bridge Replacement Second 150 150 100077

1021 Locust Point Road Bridge Bridge Replacement Third 252 252 100077

1041 Horse Shoe Road Bridge Bridge Preservation Activities Second 150 150 100150

1041 Horse Shoe Road Bridge Bridge Preservation Activities Third 3,458 3,458 100150

2002 Springwood Road Bridge Bridge Replacement First 175 175 87697

2002 Springwood Road Bridge Bridge Replacement Second 400 400 87697

2002 Springwood Road Bridge Bridge Replacement First 10 575 585 91359

2011 Cool Creek Road Bridge 1 Bridge Replacement Second 150 650 800 100079

2012 Bull Run Road Bridge 1 Bridge Replacement Second 150 150 100081

2012 Bull Run Road Bridge 1 Bridge Replacement Third 411 411 100081

2014 Burkholder Rd Bridge ov Beaver Cr Bridge Replacement First 75 15 450 540 78892

2016 Pleasant Grove Rd Box Culvert 1 Bridge Replacement First 750 750 91360

2016 Pleasant Grove Rd Box Culvert 2 Bridge Replacement First 750 750 91361

2024 Paper Mill Road Bridge Bridge Preservation Activities Second 150 1,200 1,350 100161

2027 Canadochly Road Bridge Bridge Preservation Activities Second 150 150 100164

2027 Canadochly Road Bridge Bridge Preservation Activities Third 349 349 100164

2028 Line Road Bridge 1 Bridge Replacement Second 150 150 100085

2028 Line Road Bridge 1 Bridge Replacement Third 343 343 100085

2033 Snyder Corner Rd Bridge-C Bridge Replacement First 450 450 87597

2033 Cabin Creek Road Bridge Bridge Preservation Activities Second 150 150 100168

2033 Cabin Creek Road Bridge Bridge Preservation Activities Third 411 411 100168

2038 Blue Ball Road Bridge Bridge Replacement First 150 75 5 20 250 63121

2038 Blue Ball Road Bridge Bridge Replacement Second 600 600 63121

2039 Canning House Road Bridge Bridge Preservation Activities Second 150 150 100170

2039 Canning House Road Bridge Bridge Preservation Activities Third 389 389 100170

2040 Frosty Hill Road Bridge Bridge Preservation Activities Second 150 150 100172

2040 Frosty Hill Road Bridge Bridge Preservation Activities Third 356 356 100172

2043 Flintville Road Bridge 1 Bridge Replacement Second 150 150 100086

2043 Flintville Road Bridge 1 Bridge Replacement Third 390 390 100086

2044 Muddy Creek Forks Road Br Bridge Preservation Activities First 150 150 100176

2044 Muddy Creek Forks Road Br Bridge Preservation Activities Second 350 350 100176

2047 Kilgore Road Bridge 1 Bridge Replacement Second 150 150 100088

2047 Kilgore Road Bridge 1 Bridge Replacement Third 551 551 100088

2048 Old Forge Road Bridge Bridge Rehabilitation First 175 175 78901

2048 Old Forge Road Bridge Bridge Rehabilitation Second 550 550 78901

Page 270: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 246 of 259August 16, 2018

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2050 Century Farms Rd Bridge Bridge Replacement First 275 275 91190

2050 Century Farms Rd Bridge Bridge Replacement Second 1,434 1,434 91190

2051 Miller Road Bridge Bridge Replacement First 575 575 106229

2053 MT Olivet Rd Bridge Bridge Replacement First 75 75 87552

2053 MT Olivet Rd Bridge Bridge Replacement Second 50 10 15 75 87552

2053 MT Olivet Rd Bridge Bridge Replacement Third 341 341 87552

2056 Browntown Road Bridge Bridge Replacement Second 150 1,000 1,150 20976

2060 Rippling Run Road Bridge-C Bridge Rehabilitation First 600 600 91364

2067 Round Hill Bridge 1 Bridge Replacement Second 150 150 100091

2067 Round Hill Bridge 1 Bridge Replacement Third 683 683 100091

2067 Round Hill Bridge 2 Bridge Replacement First 250 250 100094

2067 Round Hill Bridge 2 Bridge Replacement Second 750 750 100094

2071 York Group K Br. Preservations Bridge Preservation Activities First 1,000 1,000 81039

2077 Stamper Road Box Culvert Bridge Replacement First 250 250 91365

2079 Red Lion Avenue Bridge Bridge Rehabilitation First 100 50 15 1,500 1,665 91036

2079 Crossroads Ave Bridge Bridge Replacement First 250 600 850 92562

2079 Crossroads Ave Bridge Bridge Replacement Third 537 537 92562

2089 Swamp Road Pipe Bridge Replacement First 175 175 106213

2103 Stewartstown Rd Bridge Bridge Replacement First 250 750 1,000 73967

3001 South George St Bridge Bridge Replacement Second 150 150 87549

3001 South George St Bridge Bridge Replacement Third 259 259 87549

3001 George St over Tyler Run Bridge Replacement Second 250 250 97195

3001 George St over Tyler Run Bridge Replacement Third 1,404 1,404 97195

3001 George St over Tylers Run Bridge Replacement First 200 800 1,000 100207

3006 Clearview Drive Bridge Bridge Replacement Second 150 150 87599

3006 Clearview Drive Bridge Bridge Replacement Third 1,737 1,737 87599

3011 Bonair Road Bridge 1 Bridge Replacement Second 150 150 20970

3011 Bonair Road Bridge 1 Bridge Replacement Third 474 474 20970

3016 SR 3016 O/Centerville Run Bridge Rehabilitation Second 150 150 78967

3016 SR 3016 O/Centerville Run Bridge Rehabilitation Third 1,589 1,589 78967

3029 Loucks Mill Road Bridge 1 Bridge Replacement Second 107 107 100128

3029 Loucks Mill Road Bridge 1 Bridge Replacement Third 654 654 100128

3029 Loucks Mill Road Bridge 2 Bridge Replacement Second 150 150 100209

3029 Loucks Mill Road Bridge 2 Bridge Replacement Third 934 934 100209

Page 271: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 247 of 259August 16, 2018

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

3035 Allison Mill Road Bridge Bridge Replacement Second 150 150 92584

3035 Allison Mill Road Bridge Bridge Replacement Third 243 243 92584

3035 Allison Mill Road Brdg 1 Bridge Replacement First 250 850 1,100 100211

3035 Allison Mill Road Brdg 1 Bridge Replacement Second 150 150 100211

3035 Allison Mill Road Brdg 1 Bridge Replacement Third 725 725 100211

3047 Porters Road Bridge 1 Bridge Preservation Activities Second 150 150 20972

3047 Porters Road Bridge 1 Bridge Preservation Activities Third 354 354 20972

3047 Kraftmill Road Bridge Bridge Preservation Activities Second 150 150 20973

3047 Kraftmill Road Bridge Bridge Preservation Activities Third 1,931 1,931 20973

3047 Iron Ridge Road Bridge Bridge Replacement Second 150 150 91368

3047 Iron Ridge Road Bridge Bridge Replacement Third 239 239 91368

3047 Pigeon Hill Road Bridge Bridge Replacement Second 150 150 91369

3047 Pigeon Hill Road Bridge Bridge Replacement Third 188 188 91369

3054 Richland Avenue Bridge Bridge Replacement Second 150 150 100131

3054 Richland Avenue Bridge Bridge Replacement Third 516 516 100131

3056 Tyler Run Road Bridge Bridge Replacement Second 150 150 91372

3056 Tyler Run Road Bridge Bridge Replacement Third 418 418 91372

3058 Blue Hill Road Bridge Bridge Replacement First 575 575 87523

3060 Glenville Road Bridge 1 Bridge Preservation Activities Second 150 150 100133

3060 Glenville Road Bridge 1 Bridge Preservation Activities Third 500 500 100133

3061 Stoverstown Road Bridge 1 Bridge Preservation Activities Second 150 150 100135

3061 Stoverstown Road Bridge 1 Bridge Preservation Activities Third 1,401 1,401 100135

3070 Black Rock Road Bridge 1 Bridge Preservation Activities First 200 520 720 100136

3073 Westminster Ave Bridge Bridge Replacement First 300 300 78816

3073 Westminister Ave Bridge 2 Bridge Replacement Second 150 150 91373

3073 Westminister Ave Bridge 2 Bridge Replacement Third 370 370 91373

4001 Bull Road Bridge 2 Bridge Replacement First 250 250 87689

4001 Bull Road Bridge 2 Bridge Replacement Second 200 25 20 245 87689

4001 Bull Road Bridge 2 Bridge Replacement Third 2,886 2,886 87689

4001 Roosevelt Avenue Bridge 1 Bridge Replacement Second 150 150 100215

4001 Roosevelt Avenue Bridge 1 Bridge Replacement Third 2,200 2,200 100215

4002 Canal Road Bridge 2 Bridge Replacement First 150 150 78986

4002 Canal Road Bridge 2 Bridge Replacement Second 125 25 20 170 78986

4002 Canal Road Bridge 2 Bridge Replacement Third 390 390 78986

4006 Bermudian Road Bridge 1 Bridge Preservation Activities Second 150 150 100137

4006 Bermudian Road Bridge 1 Bridge Preservation Activities Third 62 62 100137

Page 272: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 248 of 259August 16, 2018

Planning Partner: York Mode: Bridge County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

4008 Davidsburg Road Bridge 1 Bridge Replacement Second 150 150 100217

4008 Davidsburg Road Bridge 1 Bridge Replacement Third 668 668 100217

4011 Greenbriar Road Bridge 1 Bridge Preservation Activities Second 150 150 100139

4011 Greenbriar Road Bridge 1 Bridge Preservation Activities Third 974 974 100139

4014 Harmony Grove Rd Br PM Bridge Preservation Activities First 391 391 81070

4014 Harmony Grove Rd Br PM Bridge Preservation Activities Second 3,500 3,500 81070

4015 Colonial Road Bridge Bridge Preservation Activities First 265 1,200 1,465 78989

4043 Franklin Church Rd Brg 1 Bridge Preservation Activities Second 120 120 100145

4043 Franklin Church Rd Brg 1 Bridge Preservation Activities Third 300 300 100145

4045 Campground Road Bridge Bridge Replacement Second 150 150 100146

4045 Campground Road Bridge Bridge Replacement Third 928 928 100146

7205 Baker Road Bridge Bridge Rehabilitation First 225 20 10 800 1,055 21144

7216 Furnace Road Bridge Bridge Replacement First 175 225 15 10 425 106552

7216 Furnace Road Bridge Bridge Replacement Second 780 780 106552

7219 Granthum Bridge Replacement Bridge Replacement First 200 200 400 111023

7219 Granthum Bridge Replacement Bridge Replacement Second 3,072 3,072 111023

7229 Detters Mill Road Bridge Bridge Replacement First 125 125 106553

7229 Detters Mill Road Bridge Bridge Replacement Second 200 30 10 650 890 106553

7301 College Avenue Bridge Bridge Replacement First 6,999 6,999 110280

Planning Partner: York Mode: Transit County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Fixed Route Buses First 3,302 3,302 110665

Operating Assistance First 42,335 42,335 110666

Planning Partner: Interstate Mode: Highway County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

376 I-376/Carnegie Interchange Interchange Improvement First 2,500 2,500 97027

376 I-376/Greentree Interchange Interchange Improvement First 2,500 2,500 97029

376 Pkwy East Corridor Transp Safety Improvement First 6,000 9,000 4,000 6,000 25,000 99874

376 Pkwy East Corridor Transp Safety Improvement Second 60,000 60,000 99874

376 376/Tonidale - Boyce Road Resurface First 3,242 3,242 110593

Planning Partner: Interstate Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

79 Neville Island Bridge Bridge Preservation Activities First 2,060 103 618 56,650 59,431 87756

Page 273: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 249 of 259August 16, 2018

Planning Partner: Interstate Mode: Bridge County: AlleghenyTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

376 I-376, Commercial Street Bridge Bridge Replacement First 4,000 6,000 500 600 11,100 105438

376 I-376, Commercial Street Bridge Bridge Replacement Second 101,099 101,099 105438

376 I-376, Commercial Street Bridge Bridge Replacement Third 10,901 10,901 105438

Planning Partner: Interstate Mode: Highway County: BedfordTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

70 Breezewood-Fulton Co Line Restoration First 412 567 19,013 19,992 22816

99 Turnpike to Sproul/Claysburg Resurface First 6,000 6,000 109816

Planning Partner: Interstate Mode: Highway County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

78 Interstate 78 (12M) Reconstruct First 100,000 100,000 10466

78 I-78 Tulpehocken Crk Stream Restoration Environmental Mitigation First 250 250 110230

78 I-78 Wetland Mitigation Environmental Mitigation First 1,500 1,500 110232

Planning Partner: Interstate Mode: Bridge County: BerksTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

78 I-78-Rt 61 Bridge Replace Bridge Replacement First 273 500 76,387 77,160 93494

78 I-78-Rt 61 Bridge Replace Bridge Replacement Second 26,600 26,600 93494

78 Lenhartsville Br Rehab Bridge Rehabilitation First 2,334 481 902 9,961 13,677 97274

78 Lenhartsville Br Rehab Bridge Rehabilitation Second 14,800 14,800 97274

Planning Partner: Interstate Mode: Bridge County: ButlerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

79 I-79 Bridges over North Boundary Road Bridge Improvement First 500 567 103 1,030 10,609 12,809 106248

Planning Partner: Interstate Mode: Highway County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 Rehabilitation Resurface First 13,500 13,500 87648

Planning Partner: Interstate Mode: Bridge County: CarbonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 White Haven Bridges Bridge Improvement First 6,000 4,917 820 164 11,901 99552

80 I-80 White Haven Bridges Bridge Improvement Second 18,784 18,784 99552

80 I-80 White Haven Bridges Bridge Improvement Third 25,000 25,000 99552

Planning Partner: Interstate Mode: Highway County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Interstate Contingency Miscellaneous First 240,377 240,377 75891

Interstate Contingency Miscellaneous Second 224,437 224,437 75891

Interstate Contingency Miscellaneous Third 169,302 169,302 75891

Interstate Traffic Monitoring Miscellaneous First 3,000 3,000 105487

Page 274: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 250 of 259August 16, 2018

Planning Partner: Interstate Mode: Highway County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Interstate Traffic Monitoring Miscellaneous Second 3,000 3,000 105487

Interstate Traffic Monitoring Miscellaneous Third 3,000 3,000 105487

Interstate Preservation Line Item Miscellaneous First 56,311 56,311 106677

Interstate Preservation Line Item Miscellaneous Second 120,000 120,000 106677

Interstate Preservation Line Item Miscellaneous Third 120,000 120,000 106677

INFRA Support Miscellaneous First 10,000 10,000 110601

INFRA Support Miscellaneous Second 17,812 17,812 110601

Planning Partner: Interstate Mode: Highway County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 EXIT 161 Bellefonte Interchange New Interchange First 1,500 100 250 40,000 41,850 3142

80 EXIT 161 Bellefonte Interchange New Interchange Second 87,188 87,188 3142

80 PA 26/I-80 Interchange New Interchange First 500 100 200 43,110 43,910 51466

Planning Partner: Interstate Mode: Bridge County: CentreTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 Bridge Improvements Bridge Improvement First 2,000 2,000 74912

80 I-80 Bridge Improvements Bridge Improvement Second 9,000 9,000 74912

Planning Partner: Interstate Mode: Bridge County: ClarionTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 Canoe Creek Bridges Bridge Improvement First 2,000 2,122 265 265 4,652 90021

80 I-80 Canoe Creek Bridges Bridge Improvement Second 41,435 41,435 90021

80 I-80 Canoe Creek Bridges Bridge Improvement Third 72,000 72,000 90021

Planning Partner: Interstate Mode: Bridge County: ClearfieldTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 Clearfield Culverts Bridge Rehabilitation First 250 250 87694

80 I-80 ov SR 970 Interchange Bridge Replacement First 1,545 103 52 26,098 27,798 87729

80 I-80 Bridges over SR 1012 Bridge Replacement First 103 232 77 6,798 7,210 106657

Planning Partner: Interstate Mode: Highway County: ColumbiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 East Bound Lane from Paper Mill Rd to US 11Reconstruct First 1,545 1,545 93697

80 I-80 East Bound Lane from Paper Mill Rd to US 11Reconstruct Second 4,000 50 100 20,000 24,150 93697

80 I-80 East Bound Lane from Paper Mill Rd to US 11Reconstruct Third 21,803 21,803 93697

80 I-80 West Bound Lane from Fishing Creek to US 11Reconstruct First 1,545 1,545 97561

80 I-80 West Bound Lane from Fishing Creek to US 11Reconstruct Second 4,000 50 100 15,000 19,150 97561

80 I-80 West Bound Lane from Fishing Creek to US 11Reconstruct Third 16,803 16,803 97561

Planning Partner: Interstate Mode: Highway County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Page 275: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 251 of 259August 16, 2018

Planning Partner: Interstate Mode: Highway County: CumberlandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

81 I-81 Carlisle West Resurface First 15,450 15,450 91015

Planning Partner: Interstate Mode: Highway County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

83 I-83 East Shore Section 1 Reconstruct First 78,511 78,511 70024

83 Eisenhower Interchange Reconstruct First 10,000 18,000 9,000 35,000 20,000 92,000 92931

83 Eisenhower Interchange Reconstruct Second 3,000 160,000 163,000 92931

83 Eisenhower Interchange Reconstruct Third 69,050 69,050 92931

83 I-83 East Shore Section 3 Reconstruct First 11,000 10,000 21,000 97828

83 I-83 East Shore Section 3 Reconstruct Second 10,000 7,000 28,000 61,099 106,099 97828

83 I-83 East Shore Section 3 Reconstruct Third 138,901 138,901 97828

Planning Partner: Interstate Mode: Highway County: DelawareTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

95 I95/US322 Intrchng Imp(H) Interchange Improvement First 3,500 3,500 15477

95 I95/US322 Intrchng Imp(H) Interchange Improvement Second 500 4,000 1,000 2,000 7,500 15477

95 I95/US322 Intrchng Imp(H) Interchange Improvement Third 1,000 1,000 1,000 134,392 137,392 15477

476 I-476 Travel Management Traffic System Management First 2,500 5,500 300 250 8,550 104821

476 I-476 Travel Management Traffic System Management Second 54,000 54,000 104821

Planning Partner: Interstate Mode: Highway County: ErieTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

86 I-86 Eastbound Preservation Surface Treatment Micro-surfacing First 6,000 6,000 81441

90 I-90: MP 0 to 3.5 Reconstruct Reconstruct First 2,026 10 174 39,346 41,556 102031

90 I-90: MP 3.5 to 7 Reconstruct Reconstruct First 2,575 125 374 31,481 34,556 102039

90 I-90: MP 3.5 to 7 Reconstruct Reconstruct Second 10,000 10,000 102039

90 I-90: MP 7 to 10.5 Reconstruct Reconstruct First 31,135 31,135 102040

90 I-90: MP 7 to 10.5 Reconstruct Reconstruct Second 20,000 20,000 102040

90 I-90: MP 10.5 to 14.5 Reconstruct Reconstruct First 2,209 2,209 102041

90 I-90: MP 10.5 to 14.5 Reconstruct Reconstruct Second 1,000 4,725 63 190 45,396 51,374 102041

90 I-90: MP 14.5 - 18, Reconstruct Reconstruct Second 63 190 41,611 41,865 102044

Planning Partner: Interstate Mode: Highway County: FranklinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

81 I-81 Maryland to Mile 18 Pavement Preservation Second 250 800 1,050 92006

81 I-81 Maryland to Mile 18 Pavement Preservation Third 24,000 24,000 92006

Planning Partner: Interstate Mode: Highway County: FultonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

70 I-70 WB Amaranth to Bdfrd Resurface First 10,000 10,000 91536

70 I-70 WB Amaranth to Bdfrd Resurface Second 5,082 5,082 91536

Page 276: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 252 of 259August 16, 2018

Planning Partner: Interstate Mode: Bridge County: FultonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

70 I-70 Bridges over PA 915 Bridge Preservation Activities First 1,600 1,600 110583

Planning Partner: Interstate Mode: Highway County: JeffersonTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 Reynoldsville PM Resurface First 10,100 10,100 106254

Planning Partner: Interstate Mode: Highway County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

81 I-81 NB/SB Moosic-Scranton I-4R Lacka Reconstruct First 16,480 16,480 87736

81 I-81 NB/SB Moosic-Scranton I-4R Lacka Reconstruct Second 17,389 123 4,919 22,432 87736

81 I-81 NB/SB Moosic-Scranton I-4R Lacka Reconstruct Third 200,000 200,000 87736

81 I-81 NB/SB Preservation Pavement Replacement LackaReconstruct First 1,591 16,371 17,962 92435

81 I-81 NB/SB Preservation Pavement Replacement LackaReconstruct Second 30,000 30,000 92435

81 Scranton Beltway/Turnpike Reconstruct First 11,600 7,550 19,150 106682

81 Scranton Beltway/Turnpike Reconstruct Second 182,450 182,450 106682

81 I-81 NB/SB Mill/Fill Lacka Resurface First 14,111 14,111 109304

81 I 81 & I 84 Pavement Failure Interim Concrete Rehabilitation First 5,000 5,000 110338

Planning Partner: Interstate Mode: Bridge County: LackawannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

84 I-84 ov LackRR/Roaring & 435 Bridge Replacement First 3,554 258 60,000 63,811 69181

84 I-84 ov LackRR/Roaring & 435 Bridge Replacement Second 56,699 56,699 69181

Planning Partner: Interstate Mode: Highway County: LehighTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

78 I-78 PM 2 - Lehigh Resurface First 273 7,599 7,872 87646

Planning Partner: Interstate Mode: Highway County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 Eastbound/Westbound Restoration Restoration First 800 800 34,000 35,600 107495

80 I-80 Eastbound/Westbound Restoration Restoration Second 20,000 20,000 107495

81 I-81 NB Grinding Luz Restoration First 11,500 11,500 81910

Planning Partner: Interstate Mode: Bridge County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 EB over I-81 NB/SB Bridge Improvement First 5,750 4,712 10,462 91587

80 I-80 EB over I-81 NB/SB Bridge Improvement Second 18,302 18,302 91587

80 I-80 EB over I-81 NB/SB Bridge Improvement Third 50,000 50,000 91587

81 I-81 Dorrance Bridges Bridge Replacement First 2,340 106 8,138 10,584 67443

81 I-81 Dorrance Bridges Bridge Replacement Second 20,000 20,000 67443

81 Interstate 81 Bridge Program Bridge Improvement First 5,800 2,589 8,389 106046

Page 277: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 253 of 259August 16, 2018

Planning Partner: Interstate Mode: Bridge County: LuzerneTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

81 Interstate 81 Bridge Program Bridge Improvement Second 38,843 38,843 106046

81 Interstate 81 Bridge Program Bridge Improvement Third 20,000 20,000 106046

81 Interstate 81 over Railroad Bridge Improvement First 3,000 2,122 9,335 14,457 106049

81 Interstate 81 over Railroad Bridge Improvement Second 10,400 10,400 106049

Planning Partner: Interstate Mode: Highway County: LycomingTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

180 Market St Br to Loyalsock Cr Br Surface Treatment Micro-surfacing First 1,450 1,450 97554

Planning Partner: Interstate Mode: Highway County: MercerTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80: Hogback Run Bridges Bridge Rehabilitation First 155 10 3,090 3,255 58006

80 I-80: State Line to US 19 Reconstruct Reconstruct First 400 318 718 91569

80 I-80: State Line to US 19 Reconstruct Reconstruct Second 76,000 76,000 91569

80 I-80: State Line to US 19 Reconstruct Reconstruct Third 70,000 70,000 91569

Planning Partner: Interstate Mode: Highway County: MonroeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80/Exit 308 Realignment Interchange Improvement First 69,000 69,000 57921

80 I-80 Reconstruction-Monroe Reconstruct First 10,000 10,000 76357

80 I-80 Reconstruction-Monroe Reconstruct Second 19,504 2,319 12,000 33,822 76357

80 I-80 Reconstruction-Monroe Reconstruct Third 1,911 200,000 201,911 76357

Planning Partner: Interstate Mode: Highway County: MontgomeryTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

76 I-76 Integrated Corridor Management Miscellaneous First 7,985 5,990 10,240 12,000 36,215 106662

76 I-76 Integrated Corridor Management Miscellaneous Second 107,025 107,025 106662

Planning Partner: Interstate Mode: Highway County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

95 I-95: Bridge St DESIGN Interchange Improvement First 20,000 20,000 47811

95 I-95: Bridge St DESIGN Interchange Improvement Second 15,300 15,300 47811

95 I-95: BetsyRoss DESIGN Interchange Improvement First 24,000 24,000 47812

95 I-95: BetsyRoss DESIGN Interchange Improvement Second 21,000 21,000 47812

95 I-95: Ann St - Wheatsheaf Reconstruct First 20,000 1,400 21,400 47813

95 I-95: Ann St - Wheatsheaf Reconstruct Second 15,000 15,000 47813

95 Cttmn-Prnc Main Ln Rmp(F) Interchange Improvement First 2,700 2,700 79685

95 I-95N:Columbia-AnnSt N(C) Reconstruct First 5,000 5,000 79826

95 I-95: Race - Shackamaxon Reconstruct Second 11,600 3,678 61,099 76,377 79828

95 I-95: Race - Shackamaxon Reconstruct Third 68,901 68,901 79828

Page 278: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 254 of 259August 16, 2018

Planning Partner: Interstate Mode: Highway County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

95 I-95: Betsy Ross Ramps(C) Reconstruct First 3,000 3,000 79903

95 I-95: Betsy Ross Rmps A&B Widen First 2,884 61,099 63,983 79904

95 I-95: Betsy Ross Rmps A&B Widen Second 38,626 38,626 79904

95 I-95: Betsy RossMainln NB Widen First 800 3,090 3,890 79905

95 I-95: Betsy RossMainln NB Widen Second 293 90,000 90,293 79905

95 I-95: Betsy RossMainln NB Widen Third 120,000 120,000 79905

95 I-95: Kennedy-Levick Widen First 5,150 2,000 66,580 73,730 79908

95 I-95: Kennedy-Levick Widen Second 22,000 22,000 79908

95 I-95: Margaret-Kennedy Widen First 6,365 5,305 11,670 79910

95 I-95: Margaret-Kennedy Widen Second 60,000 60,000 79910

95 I-95: Margaret-Kennedy Widen Third 120,000 120,000 79910

95 I-95: Allegheny & Castor Ave Intr ConnectionWiden First 3,090 10,864 8,000 21,954 79912

95 I-95: Allegheny & Castor Ave Intr ConnectionWiden Second 19,225 19,225 79912

95 I-95: Cottman On-Ramp Reconstruct First 2,060 32,436 34,496 80014

95 I-95: Cottman On-Ramp Reconstruct Second 10,000 10,000 80014

95 I-95 Consultant Mgmt Miscellaneous First 8,000 8,000 92289

95 I-95 Congestion Managemnt Miscellaneous First 49,100 49,100 98207

95 I-95: Race-Shackamaxon 2 Reconstruct First 10,609 9,833 20,442 103553

95 I-95: Race-Shackamaxon 2 Reconstruct Second 90,000 90,000 103553

95 I-95: Race-Shackamaxon 2 Reconstruct Third 40,000 40,000 103553

95 I95 Corridor ITS(C) Variable Message Signs First 1,000 1,000 103554

95 I-95 Corridor ITS Traffic System Management First 5,150 20,000 25,150 103555

95 I-95 Corridor ITS Traffic System Management Second 11,827 11,827 103555

95 I-95 ATMS (GR9) Variable Message Signs Third 1,000 50,000 51,000 103556

95 I-95N Ann St-Wheatsheaf Lane Reconstruct First 800 3,500 4,300 103557

95 I-95N Ann St-Wheatsheaf Lane Reconstruct Second 1,451 6,630 30,000 38,081 103557

95 I-95N Ann St-Wheatsheaf Lane Reconstruct Third 115,000 115,000 103557

95 I-95SB: Ann St -Wheatsheaf Lane Noise Barriers Third 500 500 61,099 62,099 103558

95 I-95 Btsy Rss Mainln SB Concrete Rehabilitation Third 217,800 217,800 103559

95 I-95 Betsy Ross Conrail Brdgs Concrete Rehabilitation First 1,545 2,060 19,010 22,615 103560

95 I-95 Betsy Ross Conrail Brdgs Concrete Rehabilitation Second 16,000 16,000 103560

95 I95 Betsy Ross Int. Drainage Concrete Rehabilitation Second 8,358 8,358 103561

95 I-95 B.Ross Rmps/Adms Ave Cnn (C) Concrete Rehabilitation First 5,814 5,814 103562

Planning Partner: Interstate Mode: Bridge County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Page 279: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 255 of 259August 16, 2018

Planning Partner: Interstate Mode: Bridge County: PhiladelphiaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

95 I-95S: Columbia-Ann St N Widen First 9,504 120,000 129,504 79827

95 I-95S: Columbia-Ann St N Widen Second 120,000 120,000 79827

95 I-95S: Columbia-Ann St N Widen Third 8,000 8,000 79827

Planning Partner: Interstate Mode: Highway County: PikeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

84 I-84 E&W I-4R Wayne - E26 Reconstruct First 103,063 103,063 76861

84 I-84 E&W I-4R MP 40 - E46 Reconstruct First 51,237 51,237 85766

84 I-84 E&W I-4R MP 40 - E46 Reconstruct Second 40,000 40,000 85766

84 I-84 E&W I-4R E26 to E34 Reconstruct First 1,550 112,000 113,550 87795

Planning Partner: Interstate Mode: Highway County: SchuylkillTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

81 I-81 - Gordon to Frackville Resurface First 10,797 10,797 75834

Planning Partner: Interstate Mode: Highway County: SusquehannaTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

81 NTier Interstate 4R Bridge Replacement First 2,500 637 2,652 62,000 67,789 75917

81 NTier Interstate 4R Bridge Replacement Second 98,000 98,000 75917

81 I-81 Exit 219 Interchange Improvement First 2,606 530 1,167 27,646 31,949 75976

Planning Partner: Interstate Mode: Highway County: VenangoTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

80 I-80 MM27 to MM34 Surface Treatment Micro-surfacing First 3,500 3,500 109821

Planning Partner: Interstate Mode: Highway County: WestmorelandTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

70 Yukon & Madison Interchanges Interchange Improvement First 2,185 3,278 34,568 40,031 31895

70 Yukon & Madison Interchanges Interchange Improvement Second 45,000 45,000 31895

70 I-70 @ PA 51 Interchange Interchange Improvement First 2,000 4,244 5,305 7,426 18,974 75978

70 I-70 @ PA 51 Interchange Interchange Improvement Second 65,000 65,000 75978

70 I-70 @ PA 51 Interchange Interchange Improvement Third 60,000 60,000 75978

70 I-70 Arnold City Interch Interchange Improvement First 2,000 3,183 2,652 2,652 18,636 29,124 88508

70 I-70 Arnold City Interch Interchange Improvement Second 36,000 36,000 88508

Planning Partner: Interstate Mode: Highway County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

83 North York Widening Reconstruct First 15,000 8,600 15,000 61,099 99,699 92924

83 North York Widening Reconstruct Second 9,000 9,500 130,201 148,701 92924

83 North York Widening Reconstruct Third 141,000 141,000 92924

83 I-83 Lake Redman North Resurface First 9,500 9,500 110410

Page 280: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 256 of 259August 16, 2018

Planning Partner: Interstate Mode: Highway County: YorkTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

181 North George Street Improvement Intersection Improvement First 100 1,000 5,700 6,800 110056

2003 North Hills Road Improvement Intersection Improvement First 3,000 3,000 110054

Planning Partner: STWD Items Mode: Highway County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

DBE Supportive Services Administration First 3,380 3,380 10

DBE Supportive Services Administration Second 3,380 3,380 10

DBE Supportive Services Administration Third 3,380 3,380 10

Transit Flex Reserve Transit System Improvement First 6,979 6,979 59763

Transit Flex Reserve Transit System Improvement Second 6,979 6,979 59763

Transit Flex Reserve Transit System Improvement Third 6,979 6,979 59763

TIIF Reserve Miscellaneous First 77,765 77,765 60469

TIIF Reserve Miscellaneous Second 100,000 100,000 60469

TIIF Reserve Miscellaneous Third 100,000 100,000 60469

TAP Reserve Transportation Enhancement First 48,501 48,501 60560

TAP Reserve Transportation Enhancement Second 73,236 73,236 60560

TAP Reserve Transportation Enhancement Third 73,236 73,236 60560

Pooled Fund Studies LI Research First 2,000 2,000 74548

Pooled Fund Studies LI Research Second 2,000 2,000 74548

Pooled Fund Studies LI Research Third 2,000 2,000 74548

State Highway Reserve Restoration First 90,000 90,000 77786

State Highway Reserve Restoration Second 60,000 60,000 77786

State Highway Reserve Restoration Third 60,000 60,000 77786

State (15%) Reserve Miscellaneous First 13,637 13,637 84337

State (15%) Reserve Miscellaneous Second 323,430 323,430 84337

State (15%) Reserve Miscellaneous Third 451,185 451,185 84337

Bridg Insp Training LI Administration First 1,920 1,920 84371

Bridg Insp Training LI Administration Second 1,920 1,920 84371

Bridg Insp Training LI Administration Third 1,920 1,920 84371

Federal SRTS Reserve Miscellaneous First 2,203 2,203 84372

Env Rev US Army Corps Administration First 3,018 3,018 87583

Env Rev US Army Corps Administration Second 3,040 3,040 87583

Env Rev US Army Corps Administration Third 3,040 3,040 87583

Env Rev US F&WS Administration First 1,355 1,355 87584

Env Rev US F&WS Administration Second 1,365 1,365 87584

Env Rev US F&WS Administration Third 1,365 1,365 87584

Env Rev PHMC Administration First 1,584 1,584 87585

Env Rev PHMC Administration Second 1,596 1,596 87585

Page 281: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 257 of 259August 16, 2018

Planning Partner: STWD Items Mode: Highway County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Env Rev PHMC Administration Third 1,596 1,596 87585

Env Rev PA Fish/Boat Administration First 994 994 87586

Env Rev PA Fish/Boat Administration Second 1,001 1,001 87586

Env Rev PA Fish/Boat Administration Third 1,001 1,001 87586

Env Rev PA Game Comm Administration First 319 319 87587

Env Rev PA Game Comm Administration Second 319 319 87587

Env Rev PA Game Comm Administration Third 319 319 87587

Env Rev PA DEP Administration First 6,465 6,465 87588

Env Rev PA DEP Administration Second 6,513 6,513 87588

Env Rev PA DEP Administration Third 6,513 6,513 87588

Env Rev PA DCNR Administration First 372 372 91407

Env Rev PA DCNR Administration Second 374 374 91407

Env Rev PA DCNR Administration Third 374 374 91407

State Inventory/Inspect Administration First 9,600 9,600 94921

State Inventory/Inspect Administration Second 9,600 9,600 94921

State Inventory/Inspect Administration Third 9,600 9,600 94921

RRX Reserve Safety Improvement First 149 149 98255

RRX Reserve Safety Improvement Second 20,184 20,184 98255

RRX Reserve Safety Improvement Third 28,784 28,784 98255

P3 Bridge Initiative Bridge Replacement First 2,000 1,000 3,000 98968

Planning Reserve Planning First 313,772 313,772 101924

Planning Reserve Planning Second 327,818 327,818 101924

Planning Reserve Planning Third 327,818 327,818 101924

HSIP Set Aside Reserve Safety Improvement First 42,005 42,005 101969

HSIP Set Aside Reserve Safety Improvement Second 140,000 140,000 101969

HSIP Set Aside Reserve Safety Improvement Third 140,000 140,000 101969

NHPP Reserve Miscellaneous First 3,019 3,019 102466

NHPP Reserve Miscellaneous Second 5,321 5,321 102466

NHPP Reserve Miscellaneous Third 229,095 229,095 102466

STP Reserve Miscellaneous First 3,276 3,276 102620

STP Reserve Miscellaneous Second 5,876 5,876 102620

STP Reserve Miscellaneous Third 146,976 146,976 102620

RBR Reserve Bridge Replacement First 10,000 10,000 102623

Multimodal Reserve Miscellaneous First 318,822 318,822 102893

Multimodal Reserve Miscellaneous Second 348,196 348,196 102893

Multimodal Reserve Miscellaneous Third 391,233 391,233 102893

Passive Xing Yield Signs Miscellaneous First 50 50 102907

Page 282: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 258 of 259August 16, 2018

Planning Partner: STWD Items Mode: Highway County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

State Bridge Inspection Administration First 96,223 96,223 104409

State Bridge Inspection Administration Second 100,531 100,531 104409

State Bridge Inspection Administration Third 100,531 100,531 104409

Local Bridge Inspection Administration First 26,630 26,630 104410

Local Bridge Inspection Administration Second 27,823 27,823 104410

Local Bridge Inspection Administration Third 27,823 27,823 104410

TIIF Oversight and Mngmt Administration First 13,600 13,600 104411

TIIF Oversight and Mngmt Administration Second 13,600 13,600 104411

TIIF Oversight and Mngmt Administration Third 13,600 13,600 104411

TAP Oversight & Mngmt Administration First 8,000 8,000 104412

TAP Oversight & Mngmt Administration Second 8,000 8,000 104412

TAP Oversight & Mngmt Administration Third 8,000 8,000 104412

HNTB P3 Support Planning First 2,000 2,000 105813

Municipal Safety LTAP Administration First 320 320 106544

P3 - RBR - Rail Bridge Replacement First 1,000 1,000 106679

LaSeR Initiative Miscellaneous First 25,550 25,550 106680

LTAP Line Item Administration First 1,240 1,240 107082

LTAP Line Item Administration Second 1,240 1,240 107082

LTAP Line Item Administration Third 1,240 1,240 107082

DCNR Rec Trails Reserve Pedestrian Facilities First 3,982 3,982 107087

MIRE FDE Local Road Data Collection Administration First 4,000 4,000 110068

LSR Initiative Miscellaneous First 20,000 20,000 111142

TSMO Reserve Miscellaneous First 20,000 20,000 111145

TSMO Reserve Miscellaneous Second 20,000 20,000 111145

TSMO Reserve Miscellaneous Third 20,000 20,000 111145

STIP Balancing Reserve Miscellaneous First 23 23 111806

Planning Partner: STWD Items Mode: Bridge County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

State Bridge Reserve Miscellaneous First 70,000 70,000 82335

State Bridge Reserve Miscellaneous Second 60,000 60,000 82335

State Bridge Reserve Miscellaneous Third 60,000 60,000 82335

179 Fund Closeout Bridge Preservation Activities First 1,000 1,000 88614

P3 RBR Payments Bridge Replacement First 247,150 247,150 106136

P3 RBR Payments Bridge Replacement Second 250,040 250,040 106136

P3 RBR Payments Bridge Replacement Third 253,230 253,230 106136

Page 283: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

2019- 2030 Twelve Year Program Page 259 of 259August 16, 2018

Planning Partner: STWD Items Mode: Transit County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Transit Reserves FFY 2029 Third 1,664,995 1,664,995 84703

5311 Rural Area Grants First 185,400 185,400 95651

5311 Rural Area Grants Second 188,400 188,400 95651

5311 Rural Area Grants Third 188,400 188,400 95651

Transit Reserves FFY 2030 Third 1,628,213 1,628,213 95765

5310 Elder & Handicap First 63,000 63,000 102220

5310 Elder & Handicap Second 64,500 64,500 102220

5310 Elder & Handicap Third 64,500 64,500 102220

5329 Safety Oversight First 6,770 6,770 104267

5329 Safety Oversight Second 6,770 6,770 104267

5329 Safety Oversight Third 6,770 6,770 104267

BPT CNG P3 Project First 50,250 50,250 106739

BPT CNG P3 Project Second 19,000 19,000 106739

BPT CNG P3 Project Third 19,000 19,000 106739

Transit Reserves FFY 2028 Third 1,614,090 1,614,090 107838

Transit Reserve 2019 TYP First 3,512,223 3,512,223 110859

Transit Reserve 2019 TYP Second 5,601,115 5,601,115 110859

Transit Reserve FFY 2027 Third 1,614,090 1,614,090 111793

Planning Partner: STWD Items Mode: Aviation County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2019TYP Reserve-Aviation Second 128,000 128,000 66343

2019 Aviation Reserve-3rd Third 128,000 128,000 66344

Planning Partner: STWD Items Mode: Rail Freight County: Central OfficeTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

Rail Freight Reserves - 1 First 228,571 228,571 77735

Rail Freight Reserves - 2 Second 228,571 228,571 77736

Rail Freight Reserves - 3 Third 228,571 228,571 77737

Planning Partner: STWD Items Mode: Aviation County: DauphinTotalROWUTL PRACONFDPEStudyPeriodSRProject ImprovementTitle/Sponsor

Costs ($000)

2019 TYP Aviation Reserve First 128,000 128,000 66342

Page 284: Twelve Year Program · I commend our regional transportation Planning Partners and the State Transportation Commission for their continued dedication to this critical planning process,

State Transportation Commission2019 Twelve Year Program

2019Twelve Year Program

Tom WolfGovernor

Leslie S. RichardsSecretary, PA Department of Transportation

Chairperson, State Transportation Commission