T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Status Summary Off-Chamber Electronics Off-Chamber Electronics
Transcript
Page 1: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling

EMU MeetingCERN, September 20, 2005

Status SummaryStatus SummaryOff-Chamber ElectronicsOff-Chamber Electronics

Status SummaryStatus SummaryOff-Chamber ElectronicsOff-Chamber Electronics

Page 2: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 2

EMU Electronics System LayoutEMU Electronics System LayoutEMU Electronics System LayoutEMU Electronics System Layout

CSC

CFEBCFEBCFEB CFEB

ALCT1 of 24

CFEB

1 of 2

LVDBLV Distribution

Board

1 of 5

1 of 5

Anode Front-end Board

Cathode Front-end Board

Anode LCT Board

MPC

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

CCBC

ONTROLLER

Peripheral Crate on iron disk

Slow Control

Trigger-Timing-Control

Muon Sector ReceiverLev-1 Trigger

Trig Motherboard

DAQ Motherboard

Clock Control Board

Readout Data

FED Crate in USC55

DDU,DCC Boards

Page 3: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 3

Total Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board Count

CSC Type ME11 ME12 ME13 ME21 ME22 ME31 ME32 ME41TOTAL +10%

CSC No. 72 72 72 36 72 36 72 72CFEB 360 360 288 180 360 180 360 180 2,495AFEB 1,728 864 1,512 1,728 1,296 1,728 1,296 11,167

ALCT-288 72 72 158ALCT-384 72 72 72 238ALCT-672 36 36 36 119

LVDB 72* 72 72 36 72 36 72 36 436TMB 72 72 72 36 72 36 72 36 515DMB 72 72 72 36 72 36 72 36 515CCB 12 66MPC 12 66

Controller 75CRB 66

Backplane 66DDU 40DCC 10

Backplane 5

60

24 12 12

6024 12 12

60

836

4

Per

iph

eral

Cra

tes

FE

D

Cra

tes

On

-ch

amb

erB

oar

ds

DONE

Page 4: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 4

Boards in Peripheral CrateBoards in Peripheral CrateBoards in Peripheral CrateBoards in Peripheral Crate

MPC

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

DMB

TMB

CCB

CONTROLLER

Clock Control Board (CCB)• 89 boards produced (need 60).• 72 boards burned-in and tested.• 70 boards equipped with TTCrq (v5) & tested with TTCvi/TTCvx.

Trigger Motherboard (TMB)RPC ALCT Trans Brd (RAT)• Prototype board sets produced. Testing with full backplane prototype in progress. • 30 pre-prod sets by Aug 05.

Muon Port Card (MPC)• 75 boards produced. (need 60)• 70 boards equipped FPGA mezzanine• Burned-in and tested .

DAQ Motherboard (DMB)• 550 boards produced (need 468).• 534 passed all tests, ready to ship.• 16 have BGA problems, being fixed.

Crate Controller• 10 preproduction boards produced. • Rad test completed. No problems• Will produce 75 boards (need 60) by Oct 15, 2005.

Page 5: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 5

Custom Backplane and CRBCustom Backplane and CRBCustom Backplane and CRBCustom Backplane and CRB

9U VME boards

Custom Backplane (enlarged to include

J1 section with split

power plane)

CRB (design similar to

front-end LVDB)

Heat sink

RPC ALCT Transition

Boards

Custom Backplane• Final prototype board delivered. 6/10/05

• Full crate test planned for July/Aug 2005.• Production of 70 boards Aug-Oct 2005.

(need 60)

Crate Regulation Board (CRB)• All 80 boards produced, delivered, and tested at CERN

Page 6: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 6

Prod. Schedule: Peripheral Crate Boards Prod. Schedule: Peripheral Crate Boards Prod. Schedule: Peripheral Crate Boards Prod. Schedule: Peripheral Crate Boards

Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec

DMB 350 450 550TMB-RAT 30* 150 270 390 540CCB 10 20 40 70 89MPC 10 20 40 60 70CRB 10 30 50 80Controller 10* 10 10 75Backplane 12 24 36 48 60

2005

* preproduction boards

Page 7: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 7

Peripheral VME Crate and Mini-rackPeripheral VME Crate and Mini-rackPeripheral VME Crate and Mini-rackPeripheral VME Crate and Mini-rack

• VME Crates– Prototype crate checked at OSU.

(July 04) – Parts purchased, machined for 72

crates (need 60)– All parts delivered to CERN– All VME crates assembled (without

backplanes)

• Mini-Racks– 24 mini-racks ordered and delivered

to CERN (need 24). – Mounts and strain relief installed.

Mini-rack

Page 8: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 8

EMU FED Crate (in USC55) EMU FED Crate (in USC55) EMU FED Crate (in USC55) EMU FED Crate (in USC55)

CRATE

CONTROLLER

DDU

DCC

DDU

DDU

DDU

DDU

DDU

DDU

DCC

DDU

DDU

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

DCC DDUsDDUs DDUs DCCDDUs

optional

5 Wiener Crates ordered/2 delivered (need 4).4 CAEN Controllers ordered.

Detector Dependent Unit (DDU)• Collect data from 15 DMB (15*160MB/s) • Send data to DCC (640MB/s)• Check data, Detect error, send to FMM• Spy data to local DAQ via Gigabit Ethernet links

Status• 10 preproduction boards in August 05. • Full production: Oct, 2005• Will produce 40 boards (need 36). Detector Concentration Card (DCC)• Merge data from 10 DDU (10*640MB/s), send data to CMS DAQ SLINK64 • Receive and fan out TTC fast control Status

• 2 preproduction boards in July 05. • Full production: Sept, 05• Will produce 10 boards (need 8).

Custom Backplane• Full size prototype tested.• 5 boards produced. (need 4).

Page 9: T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

T.Y. Ling, EMU Meeting, September 2005 9

Prod. Schedule: FED Crate Boards Prod. Schedule: FED Crate Boards Prod. Schedule: FED Crate Boards Prod. Schedule: FED Crate Boards

Jun Jul Aug Sep Oct Nov Dec

DDU 10* 10 40DCC 2* 2 2 10Backplane 5

2005

preproduction boards

USC 55 scheduled for occupancy

Nov 2005.