+ All Categories
Home > Documents > Type B.3 Final Submittal Government... · traversed by piping, ducts, and other work to be...

Type B.3 Final Submittal Government... · traversed by piping, ducts, and other work to be...

Date post: 21-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
785
C-17 Type III Hydrant Refueling System and Ramp Expansion PN FJRP159073 145th Airlift Wing Charlotte, NC North Carolina Air National Guard Type B.3 Final Submittal Technical Specifications (Vol 1 of 2) Burns & McDonnell Engineering Co., Inc. Kansas City, Missouri October 2017 W9133L-15-D-0003 Delivery Order D301
Transcript
  • C-17 Type III Hydrant Refueling System and Ramp Expansion

    PN FJRP159073

    145th Airlift Wing Charlotte, NC

    North Carolina Air National Guard

    Type B.3 Final Submittal Technical Specifications (Vol 1 of 2)

    Burns & McDonnell Engineering Co., Inc. Kansas City, Missouri

    October 2017

    W9133L-15-D-0003 Delivery Order D301

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    PROJECT TABLE OF CONTENTS

    DI VI SI ON 01 - GENERAL REQUI REMENTS

    01 11 00 SUMMARY OF WORK01 14 00 WORK RESTRI CTI ONS01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES01 30 00 ADMI NI STRATI VE REQUI REMENTS01 32 16. 00 20 PROJECT CONSTRUCTI ON PROGRESS SCHEDULES01 33 00 SUBMI TTAL PROCEDURES01 33 23. 33 AVI ATI ON FUEL SYSTEM SPECI FI C SUBMI TTAL REQUI REMENTS01 33 29 SUSTAI NABI LI TY REPORTI NG01 35 13 SPECI AL PROJECT PROCEDURES01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS01 35 29. 13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

    CONTAMI NATED SI TES01 45 00. 00 20 QUALI TY CONTROL01 45 35 SPECI AL I NSPECTI ONS01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT01 78 00 CLOSEOUT SUBMI TTALS01 78 23 OPERATI ON AND MAI NTENANCE DATA01 78 23. 33 OPERATI ON AND MAI NTENANCE MANUALS FOR AVI ATI ON FUEL

    SYSTEMS

    DI VI SI ON 02 - EXI STI NG CONDI TI ONS

    02 41 00 DEMOLITION02 61 13 EXCAVATI ON AND HANDLI NG OF CONTAMI NATED MATERI AL02 81 00 TRANSPORTATI ON AND DI SPOSAL OF HAZARDOUS MATERI ALS

    DI VI SI ON 03 - CONCRETE

    03 30 00 CAST- I N- PLACE CONCRETE

    DI VI SI ON 04 - MASONRY

    04 20 00 UNI T MASONRY

    DI VI SI ON 05 - METALS

    05 12 00 STRUCTURAL STEEL05 40 00 COLD- FORMED METAL FRAMI NG05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS05 59 10 ROLLI NG COVER FOR AVI ATI ON REFUELI NG VAULTS

    DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

    06 10 00 ROUGH CARPENTRY

    DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

    07 11 13 BI TUMI NOUS DAMPPROOFI NG07 21 13 BOARD AND BLOCK I NSULATI ON07 27 26 FLUI D- APPLI ED AI R AND VAPOR BARRI ERS07 60 00 FLASHI NG AND SHEET METAL07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG07 84 00 FIRESTOPPING

    PROJECT TABLE OF CONTENTS Page 1

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    07 92 00 JOI NT SEALANTS

    DI VI SI ON 08 - OPENI NGS

    08 11 13 STEEL DOORS AND FRAMES 08 51 13 ALUMI NUM WI NDOWS08 71 00 DOOR HARDWARE08 81 00 GLAZING08 91 00 METAL WALL LOUVERS

    DI VI SI ON 09 - FI NI SHES

    09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD09 29 00 GYPSUM BOARD09 51 00 ACOUSTI CAL CEI LI NGS09 65 00 RESI LI ENT FLOORI NG09 77 20 DECORATI VE FI BERGLASS REI NFORCED WALL PANELS09 90 00 PAI NTS AND COATI NGS09 96 00 HI GH- PERFORMANCE COATI NGS09 97 13. 17 THREE COAT EPOXY I NTERI OR COATI NG OF WELDED STEEL

    PETROLEUM FUEL TANKS09 97 13. 27 EXTERI OR COATI NG OF STEEL STRUCTURES

    DI VI SI ON 10 - SPECI ALTI ES

    10 14 00. 20 I NTERI OR/ EXTERI OR SI GNAGE10 28 13 TOI LET ACCESSORI ES10 44 16 FI RE EXTI NGUI SHERS

    DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

    13 34 19 METAL BUI LDI NG SYSTEMS13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT13 73 19 JET BLAST DEFLECTOR FENCE FOR HI GH POWER RUN- UP VELOCI TI ES

    DI VI SI ON 22 - PLUMBI NG

    22 00 00 PLUMBI NG, GENERAL PURPOSE

    DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

    23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT23 82 46. 00 40 ELECTRI C UNI T HEATERS

    DI VI SI ON 26 - ELECTRI CAL

    26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT26 08 00 APPARATUS I NSPECTI ON AND TESTI NG26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM26 24 13 SWITCHBOARDS26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON26 32 15. 00 10 DI ESEL- GENERATOR SET STATI ONARY 100- 2500 KW, WI TH

    AUXILIARIES

    PROJECT TABLE OF CONTENTS Page 2

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    26 36 00. 00 10 AUTOMATI C TRANSFER SWI TCH AND BY- PASS/ I SOLATI ON SWI TCH26 41 00 LI GHTNI NG PROTECTI ON SYSTEM26 42 19. 00 10 CATHODI C PROTECTI ON BY I MPRESSED CURRENT 26 51 00 I NTERI OR LI GHTI NG26 56 00 EXTERI OR LI GHTI NG

    DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

    28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE

    DI VI SI ON 31 - EARTHWORK

    31 00 00 EARTHWORK31 11 00 CLEARI NG AND GRUBBI NG31 24 00 SETTLEMENT MONI TORI NG31 32 11 SOI L SURFACE EROSI ON CONTROL31 36 00 WI RE MESH GABI ONS31 63 26 DRI LLED SHAFTS

    DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

    32 01 16. 71 COLD MI LLI NG ASPHALT PAVI NG32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

    PAVEMENTS32 05 33 LANDSCAPE ESTABLI SHMENT32 11 23 GRADED- CRUSHED AGGREGATE BASE COURSE32 12 10 BI TUMI NOUS TACK AND PRI ME COATS32 12 15. 13 HOT- MI X ASPHALT AI RFI ELD PAVI NG32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS32 13 11 CONCRETE PAVEMENT FOR AI RFI ELDS AND OTHER HEAVY- DUTY

    PAVEMENTS32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS32 17 23 PAVEMENT MARKI NGS32 31 13 CHAI N LI NK FENCES AND GATES32 32 23 MECHANI CALLY STABI LI ZED EARTH RETAI NI NG WALL32 92 19 SEEDING

    DI VI SI ON 33 - UTI LI TI ES

    33 08 53 AVI ATI ON FUEL DI STRI BUTI ON SYSTEM START- UP33 09 53 AVI ATI ON FUEL PUMP CONTROL AND ANNUNCI ATI ON SYSTEM33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG33 30 00 SANI TARY SEWERS AND CONTAI NMENT DRAI NS33 40 00 STORM DRAI NAGE UTI LI TI ES33 52 43. 11 AVI ATI ON FUEL MECHANI CAL EQUI PMENT33 52 43. 13 AVI ATI ON FUEL PI PI NG33 52 43. 14 AVI ATI ON FUEL CONTROL VALVES33 52 43. 23 AVI ATI ON FUEL PUMPS33 52 43. 28 FI LTER SEPARATOR, AVI ATI ON FUELI NG SYSTEM33 52 80 LI QUI D FUELS PI PELI NE COATI NG SYSTEMS33 52 90. 00 20 WELDI NG FOR POL SERVI CE PI PI NG33 56 10 FACTORY- FABRI CATED FUEL STORAGE TANKS33 56 13. 13 STEEL TANKS WI TH FI XED ROOFS33 56 19 FUEL I MPERMEABLE LI NER SYSTEM33 65 00 CLEANI NG PETROLEUM STORAGE TANKS33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

    DI VI SI ON 34 - TRANSPORTATI ON

    PROJECT TABLE OF CONTENTS Page 3

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    34 73 16 JET BLAST DEFLECTOR FENCE FOR HI GH POWER RUN- UP VELOCI TI ES

    - - End of Pr oj ect Tabl e of Cont ent s - -

    PROJECT TABLE OF CONTENTS Page 4

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 11 00 Page 1

    SECTION 01 11 00

    SUMMARY OF WORK

    08/15

    PART 1 GENERAL

    1.1 SUBMITTALS

    Government approval is required for submittals with a "G" designation;

    submittals not having a "G" designation are for Contractor Quality Control

    approval. Submittals with an "S" are for inclusion in the Sustainability

    eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

    Submit the following in accordance with Section 01 33 00 SUBMITTAL

    PROCEDURES:

    SD-01 Preconstruction Submittals

    Salvage Plan; G

    1.2 WORK COVERED BY CONTRACT DOCUMENTS

    1.2.1 Project Description

    The work includes the following items and incidental related work. The new

    work is summarized, but not limited to the items listed below:

    a. Provide one API 650 vertical aboveground storage tank. Tank shall be

    40 ft in diameter with a shell height of 29 ft.

    b. Modify two existing vertical aboveground storage tanks originally

    constructed in 1984 in accordance with API 650 7th Edition. Existing

    tanks are 27 ft in diameter with a shell height of 28.25 ft.

    Modifications shall be in accordance with API 653 and API 650 latest

    edition.

    c. Provide new 350 kW standby generator with integral diesel fuel storage

    tank.

    d. Provide a Type III Hydrant System pump shelter with electrical control

    room, restroom, mechanical room, and storage closet.

    e. Provide two (2) 900 GPM receipt filter separators.

    f. Provide two (2) 900 GPM issue filter separators.

    g. Provide two (2) 900 GPM hydrant issue pumps (API 610).

    h. Provide issue and return venturis.

    i. Provide motor operated valves and valves with limit switches where

    indicated.

    j. Hydrant issue and return piping shall be piggable, however no permanent

    pig launcher or receiver will be provided as a part of this project.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 11 00 Page 2

    Upon completion, the lines will be cleaned and inspected to create a

    baseline.

    k. Provide a Hydrant Hose Truck Checkout stand with supply and return

    piping.

    l. Provide 4,000 gallon product recovery tank located within a concrete

    vault, below a canopy.

    m. Modifications at existing truck offload shelter.

    n. Provide new liner containment system for new and existing tank

    containment.

    o. Modify existing tank containment to allow for shared containment

    capacity.

    p. Provide four (4) Hydrant pits, one (1) isolation valve pit, one (1)

    isolation valve vault and various high point drain and low point drain

    pits throughout the hydrant system.

    q. Replace demolished apron concrete and expand existing apron.

    r. Re-route electrical and communications for the new site arrangement.

    s. Provide spill control pit for refueler parking area.

    t. Relocate existing refueler parking area.

    u. Provide all associated piping, support, valves, equipment, and

    appurtenances.

    v. Site work to support the new facilities.

    w. OPTIONS:

    (1) OPTION 1: Provide a new blast fence and all of the associated

    Earthwork, Paving, and Foundations.

    (2) OPTION 2: Provide a 5th hydrant pit and associated piping and

    equipment to allow for fueling at position B1.

    (3) OPTION 3: Provide a third 900 GPM issue filter separator and third

    hydrant issue pump (API 610) as a spare.

    (4) OPTION 4: Mill and overlay existing apron asphalt shoulder.

    1.2.2 Location

    The work will be located at the North Carolina Air National Guard Base,

    145th Airlift Wing in Charlotte, NC.

    1.3 EXISTING WORK

    In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures,

    Equipment, Utilities, and Improvements":

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 11 00 Page 3

    a. Remove or alter existing work in such a manner as to prevent injury or

    damage to any portions of the existing work which remain.

    b. Repair or replace portions of existing work which have been altered

    during construction operations to match existing or adjoining work, as

    approved by the Contracting Officer. At the completion of operations,

    existing work must be in a condition equal to or better than that which

    existed before new work started.

    1.4 LOCATION OF UNDERGROUND UTILITIES

    Obtain digging permits prior to start of excavation, and comply with

    Installation requirements for locating and marking underground utilities.

    Contact local utility locating service a minimum of 48 hours prior to

    excavating, to mark utilities, and within sufficient time required if work

    occurs on a Monday or after a Holiday. Verify existing utility locations

    indicated on contract drawings, within area of work.

    Identify and mark all other utilities not managed and located by the local

    utility companies. Scan the construction site with Ground Penetrating Radar

    (GPR), electromagnetic, or sonic equipment, and mark the surface of the

    ground, pier deck or paved surface where existing underground utilities are

    discovered. Verify the elevations of existing piping, utilities,and any

    type of underground or encased obstruction not indicated, or specified to be

    removed, that is indicated or discovered during scanning, in locations to be

    traversed by piping, ducts, and other work to be conducted or installed.

    Verify elevations before installing new work closer than nearest manhole or

    other structure at which an adjustment in grade can be made.

    1.4.1 Notification Prior to Excavation

    Notify the Contracting Officer at least 15 days prior to starting excavation

    work.

    1.5 SALVAGE MATERIAL AND EQUIPMENT

    Items designated by the Contracting Officer to be salvaged remain the

    property of the Government. Segregate, itemize, deliver and off-load the

    salvaged property at the Government designated storage area located within 1

    mile of the construction site.

    Provide a salvage plan, listing material and equipment to be salvaged, and

    their storage location. Maintain property control records for material or

    equipment designated as salvage. Use a system of property control that is

    approved by the Contracting Officer. Store and protect salvaged materials

    and equipment until disposition by the Contracting Officer.

    PART 2 PRODUCTS

    Not Used.

    PART 3 EXECUTION

    Not Used.

    -- End of Section --

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 14 00 Page 1

    SECTION 01 14 00

    WORK RESTRICTIONS

    11/11

    PART 1 GENERAL

    1.1 SPECIAL SCHEDULING REQUIREMENTS

    a. Two operating tanks must be operational at all times as approved by

    Contracting Officer before modifications to an existing tank takes a

    tank out of service.

    b. Have materials, equipment, and personnel required to perform the work

    at the site prior to the commencement of the work.

    c. The existing truck loading and truck offloading will remain in

    operation during the entire construction period. The Contractor must

    conduct his operations so as to cause the least possible interference

    with normal operations of the activity.

    d. Permission to interrupt any Activity roads, fuel facility operational

    capability, or utility service must be requested in writing a minimum

    of 21 calendar days prior to the desired date of interruption.

    e. The work under this contract requires special attention to the

    scheduling and conduct of the work in connection with existing

    operations. Identify on the construction schedule each factor which

    constitutes a potential interruption to operations.

    1.2 CONTRACTOR ACCESS AND USE OF PREMISES

    1.2.1 Activity Regulations

    Ensure that Contractor personnel employed on the Activity become familiar

    with and obey Activity regulations including safety, fire, traffic and

    security regulations. Keep within the limits of the work and avenues of

    ingress and egress. To minimize traffic congestion, delivery of materials

    must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00

    p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats

    in designated areas. Do not enter any restricted areas unless required to

    do so and until cleared for such entry. Mark Contractor equipment for

    identification.

    1.2.1.1 Subcontractors and Personnel Contacts

    Provide a list of contact personnel of the Contractor and subcontractors

    including addresses and telephone numbers for use in the event of an

    emergency. As changes occur and additional information becomes available,

    correct and change the information contained in previous lists.

    1.2.1.2 Identification Badges and Installation Access

    Obtain access through participation in the Defense Biometrics Identification

    System (DBIDS). Requirements for Contractor employee registration, and

    transition for employees currently under Navy Commercial Access Control

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 14 00 Page 2

    System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html.

    No fees are associated with obtaining a DBIDS credential.

    Participation in the DBIDS is not mandatory, and Contractor personnel may

    apply for One-Day Passes at the Base Visitor Control Office to access an

    installation.

    1.2.1.2.1 Registration for DBIDS

    Registration for DBIDS is available at

    https://www.cnic.navy.mil/om/dbids.html. Procedure includes:

    a. Present a letter or official award document (i.e., DD Form 1155 or SF

    1442) from the Contracting Officer, that provides the purpose for

    access, to the base Visitor Control Center representative.

    b. Present valid identification, such as a passport or Real ID Act-

    compliant state driver's license.

    c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center

    representative to obtain a background check. This form is available

    for download at https://www.cnic.navy.mil/om/dbids.html.

    d. Upon successful completion of the background check, the Government will

    complete the DBIDS enrollment process, which includes Contractor

    employee photo, finger prints, base restriction and several other

    assessments.

    e. Upon successful completion of the enrollment process, the Contractor

    employee will be issued a DBIDS credential, and will be allowed to

    proceed to worksite.

    1.2.1.2.2 DBIDS Eligibility Requirements

    Throughout the length of the Contract, the Contractor employee must continue

    to meet background screen standards. Periodic background screenings are

    conducted to verify continued DBIDS participation and installation access

    privileges. DBIDS access privileges will be immediately suspended or

    revoked if at any time a Contractor employee becomes ineligible.

    An adjudication process may be initiated when a background screen failure

    results in disqualification from participation in the DBIDS, and Contractor

    employee does not agree with the reason for disqualification. The

    Government is the final authority.

    1.2.1.2.3 DBIDS Notification Requirements

    a. Immediately report instances of lost or stolen badges to the

    Contracting Officer.

    b. Immediately collect DBIDS credentials and notify the Contracting

    Officer in writing under the following circumstances:

    (1) An employee has departed the company without having properly

    returned or surrendered their DBIDS credentials.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 14 00 Page 3

    (2) There is a reasonable basis to conclude that an employee, or former

    employee, might pose a risk, compromise, or threat to the safety

    or security of the Installation or anyone therein.

    1.2.1.2.4 One-Day Passes

    Personnel applying for One-Day passes at the Base Visitor Control Office are

    subject to daily mandatory vehicle inspection, and will have limited access

    to the installation. The Government is not responsible for any cost or lost

    time associated with obtaining daily passes or added vehicle inspections

    incurred by non-participants in the DBIDS.

    1.2.1.2.5 Rules and Regulations

    The Contractor shall be required to comply with all Federal Aviation

    Administration, Transportation Security Administration (TSA), and Charlotte-

    Douglas International Airport rules, regulations, and requirements affecting

    the Project. This includes personnel badging and access to the apron in

    addition to FAA permits and notifications to accommodate the construction of

    this Project.

    1.2.1.3 No Smoking Policy

    Smoking is prohibited within and outside of all buildings on installation,

    except in designated smoking areas. This applies to existing buildings,

    buildings under construction and buildings under renovation. Discarding

    tobacco materials other than into designated tobacco receptacles is

    considered littering and is subject to fines. The Contracting Officer will

    identify designated smoking areas.

    1.2.2 Working Hours

    Regular working hours must consist of an 9-1/2 hour period, between 7 a.m.

    and 4:30 p.m., Monday through Friday, excluding Government holidays.

    1.2.3 Work Outside Regular Hours

    Work outside regular working hours requires Contracting Officer approval.

    Make application 7 calendar days prior to such work to allow arrangements to

    be made by the Government for inspecting the work in progress, giving the

    specific dates, hours, location, type of work to be performed, contract

    number and project title. Based on the justification provided, the

    Contracting Officer may approve work outside regular hours. During periods

    of darkness, the different parts of the work must be lighted in a manner

    approved by the Contracting Officer. Make utility cutovers after normal

    working hours or on Saturdays, Sundays, and Government holidays unless

    directed otherwise.

    1.2.4 Occupied and Existing Buildings

    The Contractor shall be working in or around existing buildings which is

    occupied. Do not enter the buildings without prior approval of the

    Contracting Officer.

    The existing buildings and their contents must be kept secure at all times.

    Provide temporary closures as required to maintain security as directed by

    the Contracting Officer.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 14 00 Page 4

    1.2.5 Utility Cutovers and Interruptions

    a. Make utility cutovers and interruptions after normal working hours or

    on Saturdays, Sundays, and Government holidays. Conform to procedures

    required Paragraph "Work Outside Regular Hours".

    b. Ensure that new utility lines are complete, except for the connection,

    before interrupting existing service.

    c. Interruption to water, sanitary sewer, storm sewer, electric service,

    fire alarm, and communications are considered utility cutovers pursuant

    to the Paragraph "Work Outside Regular Hours". Such interruptions are

    further limited to 8 hours. This time limit includes time for

    deactivation and reactivation.

    d. Operation of Station Utilities: The Contractor must not operate nor

    disturb the setting of control devices in the station utilities system,

    including water, sewer, electrical, and steam services. The Government

    will operate the control devices as required for normal conduct of the

    work. The Contractor must notify the Contracting Officer giving

    reasonable advance notice when such operation is required.

    e. Site access and permits obtained through Charlotte-Douglas Air National

    Guard Base (ANGB), by going through the North Carolina Air National

    Guard (NCANG), will be required in advance of access to the base and

    the start of work. This includes permits, tapping permits or fees,

    etc., as required by ANGB and/or other Government or local utility

    authorities. The Contractor is responsible for obtaining and payment

    of all Construction Permit and tapping fees that may be required.

    1.3 SECURITY REQUIREMENTS

    Contract Clause "FAR 52.204-2, Security Requirements and Alternate II"

    1.3.1 Employment Restrictions

    1.3.1.1 Personnel List

    Submit for approval to the Base Security Officer, at least 15 days prior to

    the desired date of entry, an original alphabetical list of personnel who

    require entry into Government property to perform work on the project.

    Furnish for each person:

    a. Name;

    b. Date and place of birth;

    c. Citizenship;

    d. Home address;

    e. Social security number;

    f. Current pass expiration date;

    g. Naturalization or Alien Registration number;

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 14 00 Page 5

    h. Passport number, place of issue, and expiration date.

    i. Driver's License number.

    1.4 FOREIGN OBJECT DEBRIS (FOD) REQUIREMENTS

    The Contractor shall provide appropriate man power and FOD detection

    equipment/procedures to prevent FOD from construction activities to impair

    and harm the operation of aircraft and personnel.

    PART 2 PRODUCTS

    Not Used.

    PART 3 EXECUTION

    Not Used.

    -- End of Section --

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 20 00.00 20 Page 1

    SECTION 01 20 00.00 20

    PRICE AND PAYMENT PROCEDURES

    11/11

    PART 1 GENERAL

    1.1 REFERENCES

    The publications listed below form a part of this specification to the

    extent referenced. The publications are referred to within the text by the

    basic designation only.

    U.S. ARMY CORPS OF ENGINEERS (USACE)

    EP-1110-1-8 (2009) Construction Equipment Ownership and

    Operating Expense Schedule

    1.2 SUBMITTALS

    Government approval is required for submittals with a "G" designation;

    submittals not having a "G" designation are for Contractor Quality Control

    approval. Submit the following in accordance with Section 01 33 00

    SUBMITTAL PROCEDURES:

    SD-01 Preconstruction Submittals

    Earned Value Report; G

    1.3 EARNED VALUE REPORT

    1.3.1 Data Required

    This Contract requires the use of a cost-loaded Network Analysis Schedule

    (NAS). The information required for the Schedule of Prices will be entered

    as an integral part of the Network Analysis Schedule. Within 15 calendar

    days of notice of award, prepare and deliver to the Contracting Officer an

    Earned Value Report (Construction Contract) as directed by the Contracting

    Officer. Provide a detailed breakdown of the Contract Price, giving

    quantities for each of the various kinds of work, unit prices, and extended

    prices. Costs shall be summarized and totals provided for each construction

    category.

    1.3.2 Schedule Instructions

    Payments will not be made until the Earned Value Report from the cost-loaded

    NAS has been submitted to and accepted by the Contracting Officer.

    1.3.3 Real Property Assets

    The Government will provide the Draft DD Form 1354, Transfer and Acceptance

    of Military Real Property filled in with the appropriate Real Property

    Unique Identifiers (RPUID) and related construction Category Codes to

    summarize the designed real property assets that apply to this Contract.

    The Contractor shall meet with the Contracting Officer and the Real Property

    Accounting Officer during the Pre Construction Meeting and the Project

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 20 00.00 20 Page 2

    Closeout Meetings to modify and include any necessary changes to the DD Form

    1354. The Contractor shall provide the Interim DD Form 1354 that uses the

    appropriate division of the RPUIDs/Category Codes to represent the final

    constructed facility and include all associated cost. Coordinate the

    Contractor's Price and Payment structure with the structure of the

    RPUIDs/Category Codes.

    Divide detailed asset breakdown into the RPUIDs and related construction

    Category Codes and populate associated costs which represent all aspects of

    the work. Where assets diverge into multiple RPUID/Category Codes, divide

    the asset and provide the proportion of the assets in each RPUID/Category

    Code. Assets and related RPUID/Category Codes may be modified by the

    Contracting Officer as necessary during course of the work. Coordinate

    identification and proportion of these assets with the Government Real

    Property Accounting Officer.

    Cost data accumulated under this section are required in the preparation of

    DD Form 1354.

    1.4 CONTRACT MODIFICATIONS

    In conjunction with the Contract Clause "DFARS 252.236-7000, Modification

    Proposals-Price Breakdown," and where actual ownership and operating costs

    of construction equipment cannot be determined from Contractor accounting

    records, equipment use rates shall be based upon the applicable provisions

    of the EP-1110-1-8.

    PART 2 PRODUCTS

    Not Used.

    PART 3 EXECUTION

    Not Used.

    -- End of Section --

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    SECTI ON 01 30 00

    ADMI NI STRATI VE REQUI REMENTS08/15

    PART 1 GENERAL

    1. 1 REFERENCES

    The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

    U. S. ARMY CORPS OF ENGI NEERS ( USACE)

    EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

    1. 2 SUBMITTALS

    Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on; submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

    SD- 01 Pr econst r uct i on Submi t t al s

    Vi ew Locat i on Map; G

    Pr ogr ess and Compl et i on Pi ct ur es; G

    SD- 04 Sampl es

    Col or Boar ds; G

    1. 3 COLOR BOARDS

    Submi t f i ve set s of col or boar ds wi t hi n 90 cal endar days af t er Cont r act Awar d. Each set of boar ds must i ncl ude sampl es of col or s and f i ni shes of i nt er i or sur f aces, such as wal l s, f l oor s, and cei l i ngs. Pr esent t he sampl es on 8 by 10- 1/ 2 i nches boar ds ( modul es) wi t h a maxi mum spr ead of 24 by 31- 1/ 2 i nches f or f ol dout s. Desi gn modul es t o f i t i n a st andar d l oose- l eaf , t hr ee- r i ng bi nder . Wher e speci al f i ni shes such as ar chi t ect ur al concr et e, car pet , or pr ef i ni shed t ext ur ed met al panel s ar e r equi r ed, submi t sampl es not l ess t han 12 i nches squar e wi t h t he boar d. I f mor e space i s needed, mor e t han one boar d per set may be submi t t ed. Cer t i f y t hat t he col or sampl es have been r evi ewed i n det ai l , and t hat t he col or sampl es ar e i n st r i c t accor dance wi t h Cont r act Dr awi ngs and Speci f i cat i ons, except as may be ot her wi se expl i c i t l y st at ed. Submi t t al of col or sampl es does not r el i eve t he Cont r act or of t he r esponsi bi l i t y t o submi t sampl es r equi r ed el sewher e her ei n.

    1. 4 VI EW LOCATI ON MAP

    Submi t , pr i or t o or wi t h t he f i r s t di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.

    SECTI ON 01 30 00 Page 1

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    1. 5 PROGRESS AND COMPLETI ON PI CTURES

    Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600 by 1200 by 24 bi t t r ue col or mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e Pr oj ect f r om a mi ni mum of t en v i ews f r om poi nt s l ocat ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew l ocat i on sket ch. Al so pr ovi de t he v i ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e. I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Gover nment .

    1. 6 MI NI MUM I NSURANCE REQUI REMENTS

    Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 " Li abi l i t y" , dur i ng t he ent i r e per i od of per f or mance under t hi s Cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e law.

    1. 7 SUPERVISION

    1. 7. 1 Mi ni mum Communi cat i on Requi r ement s

    Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.

    1. 7. 2 Super i nt endent Qual i f i cat i ons

    The Pr oj ect Super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on avi at i on f uel syst em pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he Al t er nat e Super i nt endent ar e t he same as f or t he Pr oj ect Super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he Super i nt endent ' s qual i f i cat i ons at any poi nt i n t he Pr oj ect i f t he per f or mance of t he Super i nt endent i s i n quest i on.

    1. 7. 3 Non- Compl i ance Act i ons

    The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he Cont r act and f or f ai l ur e t o manage t he Pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

    SECTI ON 01 30 00 Page 2

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    1. 8 PROJECT MEETI NGS

    1. 8. 1 General

    Cont r act or shal l schedul e, at t end, and conduct meet i ngs and conf er ences at Pr oj ect 1. 0. 1 s i t e, unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer .

    1. 8. 1. 1 Attendees

    I nf or m par t i c i pant s and ot her s i nvol ved, and i ndi v i dual s whose pr esence i s r equi r ed, of dat e and t i me of each meet i ng. Not i f y Cont r act i ng Of f i cer ( CO) of schedul ed meet i ng dat es and t i mes.

    1. 8. 1. 2 Agenda

    Pr epar e t he meet i ng agenda. Di st r i but e t he agenda t o al l i nvi t ed at t endees. Coor di nat e wi t h Cont r act i ng Of f i cer t he meet i ng agenda f or t he pr ogr ess meet i ngs i n advance.

    1. 8. 1. 3 Minutes

    Recor d s i gni f i cant di scussi ons and agr eement s achi eved f or pr ogr ess meet i ngs. Di st r i but e t he meet i ng mi nut es f or al l meet i ngs t o ever yone concer ned, i ncl udi ng Cont r act i ng Of f i cer wi t hi n t hr ee days of t he meet i ng.

    1. 8. 2 Pr econst r uct i on Conf er ence

    Wi l l be schedul ed by t he Cont r act i ng Of f i cer ( CO) . Ti me and l ocat i on of meet i ng wi l l be pr ovi ded by Cont r act i ng Of f i cer t o t he Cont r act or . Al l Cont r act or per sonnel , t o i ncl ude cr i t i cal / maj or Subcont r act or per sonnel must at t end t hi s conf er ence. Al l par t i c i pant s at t he conf er ence shal l be f ami l i ar wi t h Pr oj ect and aut hor i zed t o concl ude mat t er s r el at i ng t o t he Work.

    1. 8. 2. 1 Agenda

    I t ems of s i gni f i cance t hat wi l l be di scussed, i ncl ude t he f ol l owi ng, at a minimum:

    a. Pr ot ect i on of const r uct i on and per sonnel .

    b. Tent at i ve const r uct i on schedul e.

    c. Desi gnat i on of key per sonnel and t hei r dut i es.

    d. Pr ocedur es f or pr ocessi ng f i el d deci s i ons and Change Or der s.

    e. Pr ocedur es f or RFI s.

    f . Pr ocedur es f or t est i ng and i nspect i ng.

    g. Pr ocedur es f or pr ocessi ng Appl i cat i ons f or Payment .

    h. Di st r i but i on of Document s.

    i . Submi t t al pr ocedur es.

    j . LEED r equi r ement s.

    SECTI ON 01 30 00 Page 3

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    k. Pr epar at i on of Recor d Document s.

    l . Use of t he pr emi ses.

    m. Wor k r est r i c t i ons.

    n. Gover nment ' s occupancy r equi r ement s.

    o. Responsi bi l i t y f or t empor ar y f aci l i t i es and cont r ol s.

    p. Const r uct i on wast e management and r ecycl i ng.

    q. Par ki ng avai l abi l i t y .

    �r . Of f i ce, wor k, and st or age ar eas.

    s. Equi pment del i ver i es and pr i or i t i es.

    t . Fi r st ai d.

    u. Secur i t y.

    v. Pr ogr ess c l eani ng.

    w. Wor ki ng hour s.

    1. 8. 2. 2 Minutes

    Cont r act or shal l r ecor d and di st r i but e al l meet i ng mi nut es.

    1. 8. 3 Pr e- i nst al l at i on Conf er ences

    Conduct a pr e- i nst al l at i on conf er ence at Pr oj ect Si t e bef or e each const r uct i on act i v i t y t hat r equi r es coor di nat i on wi t h ot her const r uct i on.

    1. 8. 3. 1 Attendees

    I nst al l er and r epr esent at i ves of manuf act ur er s and f abr i cat or s i nvol ved i n or af f ect ed by t he i nst al l at i on and i t s coor di nat i on or i nt egr at i on wi t h ot her mat er i al s and i nst al l at i ons t hat have pr eceded or wi l l f ol l ow, shal l at t end t he meet i ng. Advi se Cont r act i ng Of f i cer ( CO) of schedul ed meet i ng dates.

    1. 8. 3. 2 Agenda

    Revi ew pr ogr ess of ot her const r uct i on act i v i t i es and pr epar at i ons f or t he par t i cul ar act i v i t y under consi der at i on, i ncl udi ng r equi r ement s f or t he following:

    a. Pr ot ect i on of const r uct i on and per sonnel .

    b. The Cont r act Document s.

    c. Opt i ons.

    d. Rel at ed RFI s.

    e. Rel at ed Change Or der s.

    SECTI ON 01 30 00 Page 4

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    f . Pur chases.

    g. Del i ver i es.

    h. Submi t t al s.

    i . Revi ew of Mockups.

    j . Possi bl e conf l i c t s.

    k. Compat i bi l i t y pr obl ems.

    l . Ti me schedul es.

    m. Weat her l i mi t at i ons.

    n. Manuf act ur er ' s wr i t t en r ecommendat i ons.

    o. War r ant y r equi r ement s.

    p. Compat i bi l i t y of mat er i al s.

    q. Accept abi l i t y of subst r at es.

    r . Tempor ar y f aci l i t i es and cont r ol s.

    s. Space and access l i mi t at i ons.

    t . Regul at i ons appl i cabl e t o t he i ssue at hand.

    u. Test i ng and i nspect i ng r equi r ement s.

    v. I nst al l at i on pr ocedur es.

    w. Coor di nat i on wi t h ot her wor k.

    x. Requi r ed per f or mance r esul t s.

    y. Pr ot ect i on of adj acent wor k.

    Recor d s i gni f i cant conf er ence di scussi ons, agr eement s, and di sagr eement s, i ncl udi ng r equi r ed cor r ect i ve measur es and act i ons.

    1. 8. 3. 3 Reporting

    Di st r i but e mi nut es of t he meet i ng t o t he Cont r act i ng Of f i cer and each par t y pr esent and t o par t i es who shoul d have been pr esent .

    Do not pr oceed wi t h i nst al l at i on i f t he conf er ence cannot be successf ul l y concl uded. I ni t i at e what ever act i ons ar e necessar y t o r esol ve i mpedi ment s t o per f or mance of t he Wor k and r econvene t he conf er ence at ear l i est f easi bl e dat e.

    1. 8. 4 Pr ogr ess Meet i ngs

    Conduct pr ogr ess meet i ngs at bi - weekl y i nt er val s. I nt er val s may change wi t h t he appr oval of t he Cont r act i ng Of f i cer . Coor di nat e dat es of meet i ngs wi t h pr epar at i on of payment r equest s.

    SECTI ON 01 30 00 Page 5

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    1. 8. 4. 1 Attendees

    I n addi t i on t o r epr esent at i ves of t he Gover nment , Subcont r act or s, suppl i er s, and ot her ent i t i es concer ned wi t h cur r ent pr ogr ess or i nvol ved i n pl anni ng, coor di nat i on, or per f or mance of f ut ur e act i v i t i es shal l be r epr esent ed at t hese meet i ngs. Al l par t i c i pant s shal l be f ami l i ar wi t h Pr oj ect and aut hor i zed t o concl ude mat t er s r el at i ng t o t he Wor k.

    1. 8. 4. 2 Agenda

    Cont r act i ng Of f i cer or hi s r epr esent at i ve wi l l r ev i ew and comment on mi nut es of pr evi ous pr ogr ess meet i ng. Revi ew wi t h Cont r act i ng Of f i cer ( CO) ot her i t ems of s i gni f i cance t hat coul d af f ect pr ogr ess. I ncl ude t opi cs f or di scussi on as appr opr i at e t o st at us of Pr oj ect .

    a. Cont r act or ' s Const r uct i on Schedul e: Pr ovi de a wr i t t en r epor t r evi ewi ng pr ogr ess i n t he past t wo weeks, and t he next t wo weeks. Revi ew pr ogr ess s i nce t he l ast meet i ng. Det er mi ne whet her each act i v i t y i s on t i me, ahead of schedul e, or behi nd schedul e, i n r el at i on t o Cont r act or ' s Const r uct i on Schedul e. Det er mi ne how const r uct i on behi nd schedul e wi l l be expedi t ed; secur e commi t ment s f r om par t i es i nvol ved t o do so. Di scuss whet her schedul e r evi s i ons ar e r equi r ed t o ensur e t hat cur r ent and subsequent act i v i t i es wi l l be compl et ed wi t hi n t he Cont r act Per f or mance Per i od.

    ( 1) Revi ew schedul e f or next per i od.

    b. Revi ew pr esent and f ut ur e needs of each ent i t y pr esent , i ncl udi ng t he following:

    ( 1) I nt er f ace r equi r ement s.

    ( 2) Sequence of oper at i ons.

    ( 3) St at us of submi t t al s.

    ( 4) Del i ver i es.

    ( 5) Of f - s i t e f abr i cat i on.

    ( 6) Access.

    ( 7) Si t e ut i l i zat i on.

    ( 8) Tempor ar y f aci l i t i es and cont r ol s.

    ( 9) Wor k hour s.

    ( 10) Hazar ds and r i sks.

    ( 11) Pr ogr ess c l eani ng.

    ( 12) Qual i t y and wor k st andar ds.

    ( 13) St at us of cor r ect i on of def i c i ent i t ems.

    ( 14) Fi el d obser vat i ons.

    ( 15) RFI s.

    SECTI ON 01 30 00 Page 6

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    ( 16) St at us of pr oposal r equest s.

    ( 17) Pendi ng changes.

    ( 18) St at us of Change Or der s.

    ( 19) Document at i on of i nf or mat i on f or payment r equest s.

    1. 8. 5 Coor di nat i on Meet i ngs

    Conduct Pr oj ect coor di nat i on meet i ngs at weekl y i nt er val s. Pr oj ect coor di nat i on meet i ngs ar e i n addi t i on t o speci f i c meet i ngs hel d f or ot her pur poses, such as pr ogr ess meet i ngs and pr e- i nst al l at i on conf er ences.

    1. 8. 5. 1 Attendees

    I n addi t i on t o r epr esent at i ves of Gover nment , Cont r act i ng Of f i cer ( CO) , and Ar chi t ect ( as necessar y) , Subcont r act or , suppl i er , and ot her ent i t y concer ned wi t h cur r ent pr ogr ess or i nvol ved i n pl anni ng, coor di nat i on, or per f or mance of f ut ur e act i v i t i es shal l be r epr esent ed at t hese meet i ngs. Al l par t i c i pant s at t he conf er ence shal l be f ami l i ar wi t h Pr oj ect and aut hor i zed t o concl ude mat t er s r el at i ng t o t he Wor k.

    1. 8. 5. 2 Agenda

    Revi ew and cor r ect or appr ove mi nut es of t he pr evi ous coor di nat i on meet i ng. Revi ew ot her i t ems of s i gni f i cance t hat coul d af f ect pr ogr ess. I ncl ude t opi cs f or di scussi on as appr opr i at e t o st at us of Pr oj ect .

    a. Combi ned Cont r act or ' s Const r uct i on Schedul e: Revi ew pr ogr ess s i nce t he l ast coor di nat i on meet i ng. Det er mi ne whet her each Subcont r act i s on t i me, ahead of schedul e, or behi nd schedul e, i n r el at i on t o Combi ned Cont r act or ' s Const r uct i on Schedul e. Det er mi ne how const r uct i on behi nd schedul e wi l l be expedi t ed; secur e commi t ment s f r om par t i es i nvol ved t o do so. Di scuss whet her schedul e r evi s i ons ar e r equi r ed t o ensur e t hat cur r ent and subsequent act i v i t i es wi l l be compl et ed wi t hi n t he Cont r act Per f or mance Per i od.

    b. Schedul e Updat i ng: Ther e wi l l be NO r evi s i on t o t he schedul e unl ess i t i s due t o an appr oved change or der . I f t he change or der r equi r ed t o r evi se t he schedul e i s appr oved, r evi se Combi ned Cont r act or ' s Const r uct i on Schedul e af t er each coor di nat i on meet i ng wher e r evi s i ons t o t he schedul e have been made. I ssue r evi sed schedul e concur r ent l y wi t h r epor t of each meet i ng.

    c. Revi ew pr esent and f ut ur e needs of each Subcont r act or pr esent , i ncl udi ng t he f ol l owi ng:

    ( 1) I nt er f ace r equi r ement s.

    ( 2) Sequence of oper at i ons.

    ( 3) St at us of submi t t al s.

    ( 4) Del i ver i es.

    ( 5) Of f - s i t e f abr i cat i on.

    SECTI ON 01 30 00 Page 7

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    ( 6) Access.

    ( 7) Si t e ut i l i zat i on.

    ( 8) Tempor ar y f aci l i t i es and cont r ol s.

    ( 9) Wor k hour s.

    ( 10) Hazar ds and r i sks.

    ( 11) Pr ogr ess c l eani ng.

    ( 12) Qual i t y and wor k st andar ds.

    ( 13) Change Or der s.

    ( 14) Request f or I nt er pr et at i on.

    1. 8. 5. 3 Reporting

    Cont r act or shal l r ecor d meet i ng r esul t s and di st r i but e copi es t o ever yone i n at t endance and t o ot her s af f ect ed by deci s i ons or act i ons r esul t i ng f r om each meet i ng.

    1. 9 ELECTRONI C MAI L ( E- MAI L) ADDRESS

    Est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s as t ext f i l es, pdf f i l es, and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er Cont r act Awar d, pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s Cont r act i ncl udi ng, but not l i mi t ed t o Cont r act Document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s. Mul t i pl e emai l addr esses ar e not al l owed.

    I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l Cont r act i ng Of f i cer i ni t i at ed e- mai l wi t h i t s own or gani zat i on i ncl udi ng f i el d of f i ce( s) . Pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hi s emai l addr ess.

    PART 2 PRODUCTS

    Not Used.

    PART 3 EXECUTI ON

    Not Used.

    - - End of Sect i on - -

    SECTI ON 01 30 00 Page 8

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    SECTI ON 01 32 16. 00 20

    PROJECT CONSTRUCTI ON PROGRESS SCHEDULES02/15

    PART 1 GENERAL

    1. 1 SUBMITTALS

    Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on; submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

    SD- 01 Pr econst r uct i on Submi t t al s

    Const r uct i on Schedul e; G

    SD- 07 Cer t i f i cat es

    Mont hl y Updat es

    1. 2 ACCEPTANCE

    Pr i or t o t he st ar t of wor k, pr epar e and submi t t o t he Cont r act i ng Of f i cer f or accept ance a const r uct i on schedul e i n t he f or m of a Net wor k Anal ysi s Schedul e ( NAS) i n accor dance wi t h t he t er ms i n Cont r act Cl ause " FAR 52. 236- 15, Schedul es f or Const r uct i on Cont r act s, " except as modi f i ed i n t hi s Cont r act .

    The accept ance of a Basel i ne Const r uct i on Schedul e i s a condi t i on pr ecedent to:

    a. The Cont r act or st ar t i ng wor k on t he demol i t i on or const r uct i on st age( s) of t he Cont r act .

    b. Pr ocessi ng Cont r act or ' s i nvoi ce( s) f or const r uct i on act i v i t i es/ i t ems of work.

    c. Revi ew of any schedul e updat es.

    Submi t t al of t he Basel i ne Schedul e, and subsequent schedul e updat es, i s under st ood t o be t he Cont r act or ' s cer t i f i cat i on t hat t he submi t t ed schedul e meet s al l of t he r equi r ement s of t he Cont r act Document s, r epr esent s t he Cont r act or ' s pl an on how t he wor k wi l l be accompl i shed, and accur at el y r ef l ect s t he wor k t hat has been accompl i shed and how i t was sequenced ( as- bui l t l ogi c) .

    1. 3 SCHEDULE FORMAT

    1. 3. 1 Net wor k Anal ysi s Schedul e ( NAS)

    Use t he cr i t i cal pat h met hod ( CPM) t o schedul e and cont r ol Pr oj ect act i v i t i es. Pr epar e and mai nt ai n Pr oj ect Schedul es usi ng Pr i maver a P6. I mpor t i ng dat a i nt o t he schedul i ng pr ogr am usi ng dat a conver si on t echni ques or t hi r d par t y sof t war e i s cause f or r ej ect i on of t he submi t t ed schedul e. Bui l d t he schedul e as f ol l ows:

    SECTI ON 01 32 16. 00 20 Page 1

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    a. The Pr oj ect Schedul e must show submi t t al s, Gover nment r evi ew per i ods, mat er i al / equi pment del i ver y, ut i l i t y out ages, al l on- si t e const r uct i on, i nspect i on, t est i ng, and cl oseout act i v i t i es. Gover nment and Cont r act or on- si t e wor k act i v i t i es must be dr i ven by cal endar s t hat r ef l ect Sat ur days, Sundays, and al l Feder al Hol i days as non- wor k days.

    b. Wi t h t he except i on of t he Cont r act Awar d and End Cont r act mi l est one act i v i t i es, no act i v i t i es shal l be open- ended; each act i v i t y must have pr edecessor and successor t i es. No act i v i t y must have open st ar t or open f i ni sh ( dangl i ng) l ogi c. Mi ni mi ze r edundant l ogi c t i es. Once an act i v i t y exi st s on t he schedul e i t must not be del et ed or r enamed t o change t he scope of t he act i v i t y and must not be r emoved f r om t he schedul e l ogi c wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Whi l e an act i v i t y cannot be del et ed, wher e sai d act i v i t y i s no l onger appl i cabl e t o t he schedul e but must r emai n wi t hi n t he l ogi c st r eam f or hi st or i cal r ecor d, i t can be changed t o a mi l est one. Document any such change i n t he mi l est one' s " Not ebook" , i ncl udi ng a dat e and expl anat i on f or t he change. The I D number f or a del et ed act i v i t y must not be r e- used f or anot her act i v i t y .

    c. Each act i v i t y must be assi gned i t s appr opr i at e Responsi bi l i t y Code i ndi cat i ng r esponsi bi l i t y t o accompl i sh t he wor k i ndi cat ed by t he act i v i t y, Phase Code and Wor k Locat i on Code.

    d. Dat e/ t i me const r ai nt ( s) and/ or l ags, ot her t han t hose r equi r ed by t he Cont r act , ar e not al l owed unl ess accept ed by t he Cont r act i ng Of f i cer . I ncl ude as t he l ast act i v i t y i n t he Cont r act schedul e, a mi l est one act i v i t y named " Cont r act Compl et i on Dat e" .

    1. 3. 1. 1 Pr i maver a P6 Set t i ngs and Par amet er s

    Use t he f ol l owi ng Pr i maver a P6 set t i ngs and par amet er s i n pr epar i ng t he Basel i ne Schedul e. Devi at i on f r om t hese set t i ngs and par amet er s, wi t hout pr i or consent of t he Cont r act i ng Of f i cer , i s cause f or r ej ect i on of schedul e submi ssi on.

    a. Gener al : Def i ne or est abl i sh Cal endar s and Act i v i t y Codes at t he " Pr oj ect " l evel , not t he " Gl obal " l evel .

    b. Admi n Dr op- Down Menu, Admi n Pr ef er ences, Ti me Per i ods Tab:

    ( 1) Set t i me per i ods f or P6 t o 8. 0 Hour s/ Day, 40. 0 Hour s/ Week, 172. 0 Hour s/ Mont h and 2000. 0 Hour s/ Year .

    ( 2) Use assi gned cal endar t o speci f y t he number of wor k hour s f or each t i me per i od: Must be checked.

    c. Pr oj ect Level , Dat es Tab:

    ( 1) Set " Must Fi ni sh By" dat e t o " Cont r act Compl et i on Dat e" .

    d. Pr oj ect Level , Def aul t s Tab:

    ( 1) Dur at i on Type: Set t o " Fi xed Dur at i on & Uni t s" .

    ( 2) Per cent Compl et e Type: Set t o " Physi cal " .

    ( 3) Act i v i t y Type: Set t o " Task Dependent " .

    SECTI ON 01 32 16. 00 20 Page 2

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    ( 4) Cal endar : Set t o " St andar d 5 Day Wor kweek" . Cal endar must r ef l ect Sat ur day, Sunday, and al l Feder al hol i days as non- wor k days. Al t er nat i ve cal endar s may be used wi t h Cont r act i ng Of f i cer approval.

    e. Pr oj ect Level , Cal cul at i ons Tab:

    ( 1) Act i v i t y per cent compl et e based on act i v i t y st eps: Must be Checked.

    ( 2) Reset Remai ni ng Dur at i on and Uni t s t o Or i gi nal : Must be Checked.

    ( 3) Subt r act Act ual f r om At Compl et i on: Must be Checked.

    ( 4) Recal cul at e Act ual uni t s and Cost when dur at i on per cent ( %) compl et e changes: Must be Checked.

    ( 5) Li nk Act ual t o Dat e and Act ual Thi s Per i od Uni t s and Cost : Must be Checked.

    f . Pr oj ect Level , Set t i ngs Tab:

    ( 1) Def i ne Cr i t i cal Act i v i t i es: Check " Tot al Fl oat i s l ess t han or equal t o" and add " 0d" .

    g. No on- si t e const r uct i on act i v i t y may have dur at i ons i n excess of 20 wor ki ng days.

    1. 3. 2 Schedul e Submi t t al s and Pr ocedur es

    Submi t Net wor k Anal ysi s Schedul es ( NAS) and updat es i n har d copy and on el ect r oni c medi a t hat i s accept abl e t o t he Cont r act i ng Of f i cer . Submi t an el ect r oni c back- up of t he Pr oj ect Schedul e i n an i mpor t f or mat compat i bl e wi t h t he Gover nment ' s schedul i ng pr ogr am.

    1. 4 SCHEDULE MONTHLY UPDATES

    Updat e t he Const r uct i on Schedul e at mont hl y i nt er val s or when t he schedul e has been r evi sed. The updat ed schedul e must be kept cur r ent , r ef l ect i ng act ual act i v i t y pr ogr ess and pl an f or compl et i ng t he r emai ni ng wor k. Submi t copi es of pur chase or der s and conf i r mat i on of del i ver y dat es as di r ect ed by t he Cont r act i ng Of f i cer .

    a. Nar r at i ve Repor t : Pr ovi de wi t h schedul e updat es. I dent i f y and j ust i f y ;

    ( 1) Pr ogr ess made i n each ar ea of t he Pr oj ect ;

    ( 2) Cr i t i cal Pat h;

    ( 3) Dat e/ t i me const r ai nt ( s) , ot her t han t hose r equi r ed by t he Cont r act ;

    ( 4) Changes i n t he f ol l owi ng; added or del et ed act i v i t i es, or i gi nal and r emai ni ng dur at i ons f or act i v i t i es t hat have not st ar t ed, l ogi c, mi l est ones, pl anned sequence of oper at i ons, and cr i t i cal path;

    ( 5) St at us of Cont r act Compl et i on Dat e and i nt er i m mi l est ones;

    ( 6) Cur r ent and ant i c i pat ed del ays ( descr i be cause of del ay and

    SECTI ON 01 32 16. 00 20 Page 3

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    cor r ect i ve act i ons( s) and mi t i gat i on measur es t o mi ni mi ze) ;

    ( 7) Descr i pt i on of cur r ent and f ut ur e schedul e pr obl em ar eas.

    Each ent r y i n t he nar r at i ve r epor t must c i t e t he r espect i ve Act i v i t y I D and Act i v i t y Descr i pt i on, t he dat e and r eason f or t he change, and descr i pt i on of t he change.

    1. 5 CONTRACT MODI FI CATI ON

    Submi t a Ti me I mpact Anal ysi s ( TI A) wi t h each cost and t i me pr oposal f or a pr oposed change. TI A must i l l ust r at e t he i nf l uence of each change or del ay on t he Cont r act Compl et i on Dat e or mi l est ones. No t i me ext ensi ons wi l l be gr ant ed nor del ay damages pai d unl ess a del ay occur s whi ch consumes al l avai l abl e Pr oj ect Fl oat , and ext ends t he Pr oj ect ed Fi ni sh beyond t he Cont r act Compl et i on Dat e.

    a. Each TI A must be i n bot h nar r at i ve and schedul e f or m. The nar r at i ve must def i ne t he scope and condi t i ons of t he change; pr ovi de st ar t and f i ni sh dat es of i mpact , successor and pr edecessor act i v i t y t o i mpact per i od, r esponsi bl e par t y, descr i be how i t or i gi nat ed, and how i t i mpact s t he schedul e. The schedul e submi ssi on must consi st of t hr ee nat i ve f i l es:

    ( 1) Fr agnet used t o def i ne t he scope of t he changed condi t i on.

    ( 2) Most r ecent accept ed schedul e updat e as of t he t i me of t he pr oposal or c l ai m submi ssi on t hat has been updat ed t o show al l act i v i t y pr ogr ess as of t he t i me of t he i mpact st ar t dat e.

    ( 3) The i mpact ed schedul e t hat has t he f r agnet i nser t ed i n t he updat ed schedul e and t he schedul e " r un" so t hat t he new compl et i on dat e i s determined.

    b. For c l ai med as- bui l t pr oj ect del ay, t he i nser t ed f r agnet TI A met hod must be modi f i ed t o account f or as- bui l t event s known t o occur af t er t he dat a dat e of schedul e updat e used.

    c. Al l TI As must i ncl ude any mi t i gat i on, and must det er mi ne t he appor t i onment of t he over al l del ay assi gnabl e t o each i ndi v i dual del ay. The associ at ed nar r at i ve must c l ear l y descr i be t he f i ndi ngs i n a chr onol ogi cal l i s t i ng begi nni ng wi t h t he ear l i est del ay event .

    ( 1) I dent i f y t ypes of del ays as f ol l ows:

    ( a) Excusabl e Del ay: For ce- Maj eur e ( e. g. , weat her ) - Cont r act or may r ecei ve t i me ext ensi on, but t i me wi l l not be compensabl e.

    ( b) I nexcusabl e Del ay: Cont r act or Responsi bi l i t y - Cont r act or wi l l not r ecei ve t i me ext ensi on.

    ( c) Compensabl e Del ay: Gover nment Responsi bi l i t y - Cont r act or may r ecei ve compensabl e t i me ext ensi on.

    ( 2) I f a combi nat i on of any of t he del ay t ypes out l i ned above occur s, i t i s consi der ed a Concur r ent Del ay, whi ch wi l l r equi r e an anal ysi s of t he f act s t o det er mi ne compensabi l i t y and ent i t l ement t o any t i me ext ensi on under t he appl i cabl e Cont r act Cl auses.

    SECTI ON 01 32 16. 00 20 Page 4

  • C- 17 Type I I I Fuel Syst em & Ramp Expansi on FJRP159073145t h Ai r l i f t Wi ng, Nor t h Car ol i na Ai r Nat i onal Guar d

    d. Submi t Dat a di sks cont ai ni ng t he nar r at i ve and nat i ve schedul e f i l es.

    e. Unl ess t he Cont r act i ng Of f i cer r equest s ot her wi se, onl y add conf or med Cont r act modi f i cat i ons i nt o t he Pr oj ect NAS.

    1. 6 3- WEEK LOOK AHEAD SCHEDULE

    Pr epar e and i ssue a 3- Week Look Ahead schedul e t o pr ovi de a mor e det ai l ed day- t o- day pl an of upcomi ng wor k i dent i f i ed on t he Const r uct i on Schedul e. Key t he wor k pl ans t o act i v i t y number s when a NAS i s r equi r ed and updat e each week t o show t he pl anned wor k f or t he cur r ent and f ol l owi ng t wo- week per i od. Addi t i onal l y, i ncl ude upcomi ng out ages, c l osur es, pr epar at or y meet i ngs, and i ni t i al meet i ngs. I dent i f y cr i t i cal pat h act i v i t i es on t he Thr ee- Week Look Ahead Schedul e. The det ai l wor k pl ans ar e t o be bar char t t ype schedul es, mai nt ai ned separ at el y f r om t he Const r uct i on Schedul e on an el ect r oni c spr eadsheet pr ogr am and pr i nt ed on 8- 1/ 2 by 11 i nch sheet s as di r ect ed by t he Cont r act i ng Of f i cer . Act i v i t i es must not exceed 5 wor ki ng days i n dur at i on and have suf f i c i ent l evel of det ai l t o assi gn cr ews, t ool s and equi pment r equi r ed t o compl et e t he wor k. Del i ver t hr ee har d copi es and one el ect r oni c f i l e of t he 3- Week Look Ahead Schedul e t o t he Cont r act i ng Of f i cer no l at er t han 8 a. m. each Monday, and r evi ew dur i ng t he weekl y CQC Coor di nat i on or Pr oduct i on Meet i ng.

    1. 7 CORRESPONDENCE AND TEST REPORTS:

    Al l cor r espondence ( e. g. , l et t er s, Request s f or I nf or mat i on ( RFI s) , e- mai l s, meet i ng mi nut e i t ems, Pr oduct i on and QC Dai l y Repor t s, mat er i al del i ver y t i cket s, phot ogr aphs) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed. Al l t est r epor t s ( e. g. , concr et e, soi l compact i on, wel d, pr essur e) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed.

    1. 8 ADDI TI ONAL SCHEDULI NG REQUI REMENTS

    Any r ef er ences t o addi t i onal schedul i ng r equi r ement s, i ncl udi ng syst ems t o be i nspect ed, t est ed and commi ssi oned, t hat ar e l ocat ed t hr oughout t he r emai nder of t he Cont r act Document s, ar e subj ect t o al l r equi r ement s of t hi s sect i on.

    PART 2 PRODUCTS

    Not Used.

    PART 3 EXECUTI ON

    Not Used.

    - - End of Sect i on - -

    SECTI ON 01 32 16. 00 20 Page 5

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 1

    SECTION 01 33 00

    SUBMITTAL PROCEDURES

    05/11

    PART 1 GENERAL

    1.1 SUMMARY

    The Contracting Officer may request submittals in addition to those

    specified when deemed necessary to adequately describe the work covered in

    the respective sections.

    Units of weights and measures used on all submittals are to be the same as

    those used in the contract drawings.

    Each submittal is to be complete and in sufficient detail to allow ready

    determination of compliance with Contract Requirements.

    Contractor's Quality Control (CQC) System Manager to check and approve all

    items prior to submittal and stamp, sign, and date indicating action taken.

    Proposed deviations from the contract requirements are to be clearly

    identified. Include within submittals items such as: Contractor's,

    manufacturer's, or fabricator's drawings; descriptive literature including

    (but not limited to) catalog cuts, diagrams, operating charts or curves;

    test reports; test cylinders; samples; O&M manuals (including parts list);

    certifications; warranties; and other such required submittals.

    Submittals requiring Government approval are to be scheduled and made prior

    to the acquisition of the material or equipment covered thereby. Pick up

    and dispose of samples not incorporated into the work in accordance with

    manufacturer's Material Safety Data Sheets (MSDS) and in compliance with

    existing laws and regulations.

    A submittal register showing items of equipment and materials for when

    submittals are required by the specifications is provided as "Appendix A -

    Submittal Register".

    1.2 DEFINITIONS

    1.2.1 Submittal Descriptions (SD)

    Submittals requirements are specified in the technical sections. Submittals

    are identified by Submittal Description (SD) numbers and titles as follows:

    SD-01 Preconstruction Submittals

    Submittals which are required prior to start of construction (work), issuance

    of contract notice to proceed, or commencing work on site, or the start of

    the next major phase of the construction on a multi-phase contract, includes

    schedules, tabular list of data, or tabular list including location,

    features, or other pertinent information regarding products, materials,

    equipment, or components to be used in the work.

    Certificates of insurance

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 2

    Surety bonds

    List of proposed Subcontractors

    List of proposed products

    Construction progress schedule

    Network Analysis Schedule (NAS)

    Submittal register

    Schedule of prices or Earned Value Report

    Health and safety plan

    Work plan

    Quality Control(QC) plan

    Environmental protection plan

    SD-02 Shop Drawings

    Drawings, diagrams and schedules specifically prepared to illustrate some

    portion of the work.

    Diagrams and instructions from a manufacturer or fabricator for use in

    producing the product and as aids to the Contractor for integrating the

    product or system into the Project.

    Drawings prepared by or for the Contractor to show how multiple systems and

    interdisciplinary work will be coordinated.

    SD-03 Product Data

    Catalog cuts, illustrations, schedules, diagrams, performance charts,

    instructions and brochures illustrating size, physical appearance and other

    characteristics of materials, systems or equipment for some portion of the

    work.

    Samples of warranty language when the Contract requires extended product

    warranties.

    SD-04 Samples

    Fabricated or unfabricated physical examples of materials, equipment or

    workmanship that illustrate functional and aesthetic characteristics of a

    material or product and establish standards by which the work can be judged.

    Color samples from the manufacturer's standard line (or custom color samples

    if specified) to be used in selecting or approving colors for the Project.

    Field samples and mock-ups constructed on the Project Site establish

    standards by which the ensuring work can be judged. Includes assemblies or

    portions of assemblies which are to be incorporated into the Project and

    those which will be removed at conclusion of the work.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 3

    SD-05 Design Data

    Design calculations, mix designs, analyses or other data pertaining to a part

    of work.

    Design submittals, design substantiation submittals and extensions of design

    submittals.

    SD-06 Test Reports

    Report signed by authorized official of testing laboratory that a material,

    product or system identical to the material, product or system to be provided

    has been tested in accord with specified requirements. Unless specified in

    another section, testing must have been within three years of date of

    Contract Award for the Project.

    Report which includes findings of a test required to be performed by the

    Contractor on an actual portion of the work or prototype prepared for the

    Project before shipment to job site.

    Report which includes finding of a test made at the job site or on sample

    taken from the job site, on portion of work during or after installation.

    Investigation reports.

    Daily logs and checklists.

    Final acceptance test and operational test procedure.

    SD-07 Certificates

    Statements printed on the manufacturer's letterhead and signed by responsible

    officials of manufacturer of product, system or material attesting that the

    product, system, or material meets specification requirements. Must be dated

    after award of Project Contract and clearly name the Project.

    Document required of Contractor, or of a manufacturer, supplier, installer or

    Subcontractor through Contractor. The document purpose is to further promote

    the orderly progression of a portion of the work by documenting procedures,

    acceptability of methods, or personnel qualifications.

    SD-08 Manufacturer's Instructions

    Preprinted material describing installation of a product, system or material,

    including special notices and (MSDS)concerning impedances, hazards and safety

    precautions.

    SD-09 Manufacturer's Field Reports

    Documentation of the testing and verification actions taken by manufacturer's

    representative at the job site, in the vicinity of the job site, or on a

    sample taken from the job site, on a portion of the work, during or after

    installation, to confirm compliance with manufacturer's standards or

    instructions. The documentation must be signed by an authorized official of

    a testing laboratory or agency and state the test results; and indicate

    whether the material, product, or system has passed or failed the test.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 4

    Factory test reports.

    SD-10 Operation and Maintenance Data

    Data that is furnished by the manufacturer, or the system provider, to the

    equipment operating and maintenance personnel, including manufacturer's help

    and product line documentation necessary to maintain and install equipment.

    This data is needed by operating and maintenance personnel for the safe and

    efficient operation, maintenance and repair of the item.

    This data is intended to be incorporated in an operations and maintenance

    manual or control system.

    SD-11 Closeout Submittals

    Documentation to record compliance with technical or administrative

    requirements or to establish an administrative mechanism.

    Submittals required for Guiding Principle Validation (GPV) or Third Party

    Certification (TPC).

    Special requirements necessary to properly close out a Construction Contract.

    For example, Record Drawings and as-built drawings. Also, submittal

    requirements necessary to properly close out a major phase of construction on

    a multi-phase Contract.

    1.2.2 Approving Authority

    Office or designated person authorized to approve submittal.

    1.2.3 Work

    As used in this section, on- and off-site construction required by contract

    documents, including labor necessary to produce submittals, except those SD-

    01 Pre-Construction Submittals noted above, construction, materials,

    products, equipment, and systems incorporated or to be incorporated in such

    construction.

    1.3 SUBMITTALS

    Government approval is required for submittals with a "G" designation;

    submittals not having a "G" designation are for Contractor QC approval.

    Submit the following in accordance with this section.

    SD-01 Preconstruction Submittals

    Submittal Register; G

    1.4 SUBMITTAL CLASSIFICATION

    Submittals are classified as follows:

    1.4.1 Government Approved (G)

    Government approval is required for extensions of design, critical

    materials, deviations, equipment whose compatibility with the entire system

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 5

    must be checked, and other items as designated by the Contracting Officer.

    Government approval is required for any deviations from the Solicitation or

    Accepted Proposal and other items as designated by the Contracting Officer.

    Within the terms of the Contract Clause "Specifications And Drawings For

    Construction", they are considered to be "shop drawings."

    1.4.2 For Information Only

    Submittals not requiring Government approval will be for information only.

    For Design-build construction all submittals not requiring Designer of

    Record or Government approval will be for information only. They are not

    considered to be "shop drawings" within the terms of the Contract Clause

    referred to above.

    1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL

    1.5.1 Submittals Required from the Contractor

    As soon as practicable after award of Contract, and before procurement of

    fabrication, forward to the Contracting Officer submittals required in the

    technical sections of this Specification, including shop drawings, product

    data and samples. Forward one copy of the transmittal form for all

    submittals to the Resident Officer in Charge of Construction.

    1.5.1.1 O&M Data

    The Architect-Engineer for this project will review and approve for the

    Contracting Officer O&M Data to verify the submittals comply with the

    Contract Requirements; submit data specified for a given item within 30

    calendar days after the item is delivered to the Contract Site.

    In the event the Contractor fails to deliver O&M Data within the time

    limits specified, the Contracting Officer may withhold from progress

    payments 50 percent of the price of the item with which such O&M Data

    are applicable.

    1.6 PREPARATION

    1.6.1 Transmittal Form

    Transmit each submittal, except sample installations and sample panels to

    office of approving authority. Transmit submittals with transmittal form

    prescribed by Contracting Officer and standard for Project. On the

    transmittal form identify Contractor, indicate date of submittal, and

    include information prescribed by transmittal form and required in Paragraph

    "Identifying Submittals". Process transmittal forms to record actions

    regarding samples.

    Use the attached sample transmittal form in Appendix B ENG Form 4025-R for

    submitting both Government approved and information only submittals in

    accordance with the instructions on the reverse side of the form. Properly

    complete this form by filling out all the heading blank spaces and

    identifying each item submitted. Exercise special care to ensure proper

    listing of the specification paragraph and sheet number of the Contract

    Drawings pertinent to the data submitted for each item.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 6

    1.6.2 Identifying Submittals

    When submittals are provided by a Subcontractor, the Prime Contractor is to

    prepare, review and stamp with Contractor's approval all specified

    submittals prior to submitting for Government approval.

    Identify submittals, except sample installations and sample panels, with the

    following information permanently adhered to or noted on each separate

    component of each submittal and noted on transmittal form. Mark each copy

    of each submittal identically, with the following:

    a. Project title and location.

    b. Construction Contract number.

    c. Date of the Drawings and revisions.

    d. Name, address, and telephone number of Subcontractor, supplier,

    manufacturer and any other Subcontractor associated with the submittal.

    e. Section number of the Specification Section by which submittal is

    required.

    f. Submittal description (SD) number of each component of submittal.

    g. When a resubmission, add alphabetic suffix on submittal description,

    for example, submittal 18 would become 18A, to indicate resubmission.

    h. Product identification and location in Project.

    1.6.3 Format for SD-02 Shop Drawings

    Shop drawings are not to be less than 8-1/2 by 11 inches nor more than 30 by

    42 inches, except for full size patterns or templates. Prepare drawings to

    accurate size, with scale indicated, unless other form is required.

    Drawings are to be suitable for reproduction and be of a quality to produce

    clear, distinct lines and letters with dark lines on a white background.

    Present 8-1/2 by 11 inches sized shop drawings as part of the bound volume

    for submittals required by Section. Present larger drawings in sets.

    Include on each drawing the drawing title, number, date, and revision

    numbers and dates, in addition to information required in Paragraph

    "Identifying Submittals".

    Number drawings in a logical sequence. Each Drawing is to bear the number

    of the submittal in a uniform location adjacent to the title block. Place

    the Government contract number in the margin, immediately below the title

    block, for each Drawing.

    Reserve a blank space, no smaller than 4 inches on the right hand side of

    each sheet for the Government disposition stamp.

    Dimension Drawings, except diagrams and schematic drawings; prepare drawings

    demonstrating interface with other trades to scale. Use the same unit of

    measure for shop drawings as indicated on the Contract Drawings. Identify

    materials and products for work shown.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 7

    Include the nameplate data, size and capacity on Drawings. Also include

    applicable Federal, military, industry and technical society publication

    references.

    Submit drawings in PDF format.

    1.6.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions

    Present product data submittals for each section as a complete, bound

    volume. Include table of contents, listing page and catalog item numbers

    for product data.

    Indicate, by prominent notation, each product which is being submitted;

    indicate Specification Section number and paragraph number to which it

    pertains.

    Supplement product data with material prepared for Project to satisfy

    submittal requirements for which product data does not exist. Identify this

    material as developed specifically for Project, with information and format

    as required for submission of SD-07 Certificates.

    Include the manufacturer's name, trade name, place of manufacture, and

    catalog model or number on product data. Also include applicable Federal,

    military, industry and technical society publication references. Should

    manufacturer's data require supplemental information for clarification,

    submit as specified for SD-07 Certificates.

    Where equipment or materials are specified to conform to industry and

    technical society reference standards of the organizations such as American

    National Standards Institute (ANSI), ASTM International (ASTM), National

    Electrical Manufacturer's Association (NEMA), Underwriters Laboratories

    (UL), and Association of Edison Illuminating Companies (AEIC), submit proof

    of such compliance. The label or listing by the specified organization will

    be acceptable evidence of compliance. In lieu of the label or listing,

    submit a certificate from an independent testing organization, competent to

    perform testing, and approved by the Contracting Officer. State on the

    certificate that the item has been tested in accordance with the specified

    organization's test methods and that the item complies with the specified

    organization's reference standard.

    Collect required data submittals for each specific material, product, unit

    of work, or system into a single submittal and marked for choices, options,

    and portions applicable to the submittal. Mark each copy of the product

    data identically. Partial submittals will not be accepted for expedition of

    construction effort.

    Submit manufacturer's instructions prior to installation.

    1.6.5 Format of SD-04 Samples

    Furnish samples in sizes below, unless otherwise specified or unless the

    manufacturer has prepackaged samples of approximately same size as

    specified:

    a. Sample of Equipment or Device: Full size.

  • C-17 Type III Fuel System & Ramp Expansion FJRP159073

    145th Airlift Wing, North Carolina Air National Guard

    Section 01 33 00 Page 8

    b. Sample of Materials Less Than 2 by 3 inches: Built up to 8-1/2 by 11

    inches.

    c. Sample of Materials Exceeding 8-1/2 by 11 inches: Cut down to 8-1/2 by

    11 inches and adequate to indicate color, texture, and material

    variations.

    d. Sample of Linear Devices or Materials: 10 inch length or length to be

    supplied, if less than 10 inches. Examples of linear devices or

    materials are conduit and handrails.

    e. Sample of Non-Solid Materials: Pint. Examples of non-solid materials

    are sand and paint.

    f. Color Selection Samples: 2 by 4 inches. Where samples are specified

    for selection of color, finish, pattern, or texture, submit the full

    set of available choices for the material or product specified. Sizes

    and quantities of samples are to represent their respective standard

    unit.

    g. Sample Panel: 4 by 4 feet.

    h. Sample Installation: 100 square feet.

    Samples Showing Range of Variation: Where variations in color, finish,

    pattern, or texture are unavoidable due to nature of the materials, submit

    sets of samples of not less than three units showing extremes and middle of

    range. Mark each unit to describe its relation to the range of the

    variation.

    Reusable Samp


Recommended