BCIS Construction Indices Seminar
Types of Indices
Ian Pegg, Technical DirectorBCIS
BCIS Construction Indices Seminar
Taxonomy
• Price or Quantity• Laspeyres or Paasche• Monthly, Quarterly or Annual• Cost or Price (Input or Output)
Types of Indices
BCIS Construction Indices Seminar
Definitions
“A price index is a statistic designed to measure how prices vary from one period to another (or one location to another).”
Types of Indices
“An index series is a set of indices at successive periods.”
BCIS Construction Indices Seminar
Types of Indices
• An index has no units – but it does have a base
• Base number and Base period eg– 31st July 1978 = 100– 1985 mean = 100– UK mean = 1.00
• Most BCIS Indices have a base of 1985 mean = 100
• Indices are rebased from time to time
– Numbers are comparable
– Avoid illusion of accuracy
BCIS Construction Indices Seminar
Types of Indices
Percentage change between I1 and I2 = 100 * (I2 – I1) / I1
So if I1 = 120I2 = 150
100 * (150 – 120) / 120 = 25%
Calculating a Percentage
BCIS Construction Indices Seminar
Types of Indices
BCIS Construction Indices Seminar
Types of Indices
• Specific day or Average for the period
• Calendar year or Financial year
Period
BCIS Construction Indices Seminar
Types of Indices
• Annual index is mean of quarterly indices• Quarterly index is mean of monthly indices• Monthly index is weighting of Price Adjustment
Formula Indices• Price Adjustment Formula Indices comprise labour,
materials and plant– Labour – 15th day of month– Materials – average for previous month– Plant – average for the month
BCIS General Building Cost Index
BCIS Construction Indices Seminar
Types of Indices
• Months have 28-31 days (10% difference)• RPI ‘month’ may be 4 or 5 weeks• Annual comparisons not affected• More of a problem for quantity indices
How can the period affect the answer?
BCIS Construction Indices Seminar
Types of Indices
• Life cycle (typical)– Forecast– Provisional– Firm– Revised
• RPI never changed• BCIS All-in TPI
– Forecast (several)– Forecast supported by early results– Calculated based on increasing sample size– No further projects added
Publication
BCIS Construction Indices Seminar
Types of Indices
Updating price P from period 1 to period 2
P2 = P1 * I2 / I1
So if P1 = £3,000I1 = 120I2 = 150
P2 = £3,000 * 150 / 120 = £3,750
Updating a price
BCIS Construction Indices Seminar
Types of Indices
BCIS All-in TPI
• June 2008– 3Q2008 = 258 (forecast)
• June 2009– 3Q2008 = 247 (sample 48)– 3Q2009 = 229 (forecast)
• Calculation based on latest figures:– £4,000,000 * 229 / 247 = £3,708,502 (say £3,700,000)
• Calculation based on original TPI:– £4,000,000 * 229 / 258 = £3,550,388 (say £3,550,000)
Revisiting a calculation
BCIS Construction Indices Seminar
Types of Indices
Difference between First Forecast and Last Calculated
-10.0%
-5.0%
0.0%
5.0%
10.0%
15.0%
20.0%
1993 1995 1998 2001 2004 2006 2009
Quarter
Dif
fere
nce
BCIS Construction Indices Seminar
Types of Indices
• BCIS/ABI– one week
• BCIS All-in TPI– Forecast– Forecast supported by early results – 6 weeks– Calculated based on increasing sample size – 4 weeks– No further projects added - 1 year
Lag in Publication
BCIS Construction Indices Seminar
Types of Indices
• Base weighted (Laspeyres)
Calculating an Index
00
0100ctct
ctctt QP
QPP n
Pt = 100 * SUMPRODUCT( CurrentPrice, BaseQuantity ) / SUMPRODUCT( BasePrice, BaseQuantity )
BCIS Construction Indices Seminar
Types of Indices
• Base weighted (Laspeyres)• Current weighted (Paasche)
Calculating an Index
Pt = 100 * SUMPRODUCT( CurrentPrice, CurrentQuantity ) / SUMPRODUCT( BasePrice, CurrentQuantity )
n
nn
ctct
ctctt QP
QPP
0
100
BCIS Construction Indices Seminar
Types of Indices
• Base weighted (Laspeyres)• Current weighted (Paasche)• Fisher’s Ideal• Chain weighted
Calculating an Index
BCIS Construction Indices Seminar
Types of Indices
• Product discontinued• Specification changes• Specific problems in construction
– Every project unique– Each project can span many periods– Market economy
Other Issues
BCIS Construction Indices Seminar
Types of Indices
• Cost (Input) • Tender Price (Output?)• Output Price (Output)
Cost or Price Indices
BCIS Construction Indices Seminar
Types of Indices
• Materials– List price, merchant or manufacturer
• Labour– National wage awards or site rates
• Plant– Owned or rented
Cost Indices
BCIS Construction Indices Seminar
Types of Indices
• Based on Price Adjustment Formula Indices• Weights calculated from a sample of priced bills
– Percentage calculated for each building sampled– Percentages averaged
BCIS General Building Cost Indices
BCIS Construction Indices Seminar
Types of Indices
• Based on a model for an estate of 16 houses
Building Housing Cost Index
BCIS Construction Indices Seminar
Types of Indices
• Building and Element Price Indices– Based on cost index with allowance for inflation and market
• BCIS All-in Tender Price Index– Based on priced bills of quantities– Competition or negotiated
Tender Price Indices
BCIS Construction Indices Seminar
Types of Indices
• Project Indices– Value of a trade– Match largest item by value against base schedule– Repeat until 25% matched– Estimated value of trade at base date– Combine trades and add Prelims etc
• Quarterly Indices– Adjust for region, value, procurement– Geometric mean of all projects in quarter
BCIS All-in Tender Price Index
BCIS Construction Indices Seminar
Types of Indices
• Best method available• Limitations
– Not all items can be matched• Mechanical and electrical• Curtain walling• Carpets• Laminated beams
– Relies on BQs
• Based on a sample• Current weighted index
BCIS All-in Tender Price Index
BCIS Construction Indices Seminar
Types of Indices
• Cost model for social housing• Match project cost to modelled cost
Tender Price Index for Social Housing(TPISH)
BCIS Construction Indices Seminar
Types of Indices
• Index for schools did not work• £/m2 index
Other Approaches to Project Indices
BCIS Construction Indices Seminar
Types of Indices
• Work carried out in a period
Output Price Indices
BCIS Construction Indices Seminar
Types of Indices
• Non-housing and Public Housing based on Term Contracts
• Private Housing based on panel of contractors
Repair and Maintenance Price Indices
BCIS Construction Indices Seminar
Types of Indices
• Intended use• Original or accepted tender• UK or England Scotland and Wales• All sectors or Public non-housing• Base date or tender date• Weight by project• Adjust or not adjusted• Geometric mean or median• Single quarters index or smoothed index• Revised fortnightly or revised twice before firmed
Comparing two Tender Price Indices:BCIS All-in TPI and BIS PUBSEC
BCIS Construction Indices Seminar
Types of indices