Typical Drawing Index
Delaill Typical Silt Fence Banier Delail2 Typical Straw or Hay Bail Banier Delail3 Temporary/Permanent Slope Breaker Delail (Water Bars) Delail4 Erosion Control Matting Inslallation Delail5 Typical Dewatering Filter Bag Delail6 Typical Straw Bale Dewatering Structure Delail7 Typical Permanent Trench Breakers Delail8 "Dry" Wetland Crossing Method Delail9 Slandard WeUand Crossing Method Delaill0 Push/Pull Wetland Crossing Method Delailll Typical Open Cut Wet Crossing Method Non-Flowing Waterbody Delail12 Typical Open Cut Wet Crossing Method Flowing Waterbody Delail12 a Typical Open Cut Wet Crossing Method Flowing Waterbody - Construction Procedures Delail13 Typical Dry Flume Crossing Method Delail13 a Typical Dry Flume Crossing Method - Construction Procedures Delail14 Typical Dam and Pump Crossing Delail14a Typical Dam and Pump Crossing - Construction Procedures Delail15 Typical Horizonlal Drill (HDD) Site Plan & Profile Delail16 Typical Temporary Bridge Crossing Delail16 a Typical Temporary Bridge Crossing - Construction Procedures Delail17 Typical Flume Bridge Crossing Delail18 Typical Railcar Bridge Crossing Delail18a Typical Railcar Bridge Crossing - Construction Procedures Delail19 Flexible Channel Liner Installation Delail20 Typical Rock Rip-Rap Delail21 Typical Road Bore Crossing Delail22 Stream bank Reclamation - Brush Layer in Cross Cut Slope Delail23 Stream bank Reclamation - Wall Log Delail24 Stream bank Reclamation - Vegelated Geotextile Inslallation Delail25 Typical ROW LayouVSoil Handling Delail26 Header/Main Crossovers of Pipeline Delail27 Relocate/Replace Drainage Header/Main Delail28 Temporary Drain Tile Repair Delail29 Permanent Repair Method of Drain Tiles Delail30 Equipment Cleaning Slation Delail Delail31 Equipment Wash Slation Detail Delail67 Topsoil Conservation Ditch Spoil Stripping Triple Ditch & Delail67A Topsoil Conservation Ditch & Spoil Stripping Triple Ditch
NOTE: The following typical drawings are included ease for of reference. • Delails 1 through 31 can be found in the Construction Mitigation and Reclamation Plan
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
"' I!! 0 z
" z
~ "' 0 0 I!! < 0 CL ::>
~ I
0
'i 0 0 N
N
ROCK FILL, TIMBER~~'!< OR WOVEN
GEOTEXTILE SPILL PAD
GENTLE SLOPE - 1 NATURAL GRADE
/
NOTES:
I SHEET FLOW
PLAN
SECTION A-A
2" x2" STAKES OR REBAR (TYP.)
4" (TYP.) RECESS
2"x2" STAKES DR REBAR (TYP.)
STRAW BALES
I GENTLE SLOPENA TURAL GRADE
~ 1. INSTALL A STRAW BALE DEWATERING STRUCTURE WHEREVER IT IS NECESSARY AND AS DIRECTED BY THE ENll1RONMENTAL INSPECTOR TO PREVENT THE FLOW OF HEAVILY SILT LADEN WATER INTO z
" WA TERBOOIES OR WETLANDS. ! 2. DISCHARGE SITE SHOULD BE WELL VEGETATED AND LOCATED AT LEAST 50 FEET FROM ANY WATERBODY. THE TOPOGRAPHY OF THE SITE SHOULD BE SUCH THAT WATER YllLL FLOW INTO THE DEWA TERING STRUCTURE ANO AWAY FROM ANY WORK AREAS. THE AREA DOWNSLOPE FROM THE DEWATERING SITE MUST BE REASONABLY FLAT OR STABILIZED BY VEGETATION OR OTHER MEANS TO ALLOW THE FILTERED WATER TO CONTINUE AS SHEET FLOW.
~ 0
tl' 8 "' 3. <!;
DIRECT THE PUMPED WATER ONTO A STABLE SPILL PAO CONSTRUCTED OF ROCKFILL, WEIGHTED TIMBERS, OR A WOVEN GEOTEXTILE STAKED TO THE GROUND SURFACE, SUCH AS MIRAFl 600X, TERRAFIX 400W, OR A COMPANY APPROVED EQUIVALENT. BEYOND THE SPILL PAD FORCE THE DISCHARGE WATER INTO SHEET FLOW USING STRAW BALES AND THE NATURAL TOPOGRAPHY.
I
'i ~ 4 .
5. DISCHARGE RATES SHOULD BE SUCH THAT THE CAPACITY OF THE STRUCTURE YllLL NOT BE EXCEEDED. DISCHARGE WATER SHALL BE FORCED INTO SHEET FLOW IMMEDIATELY BEYOND THE SPILL PAD USING A COMBINATION OF STRAW BALES AND THE NATURAL TOPOGRAPHY. RECESS STRAW BALES. DRIVE TWO (2) STAKES OR REBAR IN TO EACH BALE TO ANCHOR THEM IN PLACE. INSTALLATION SPECIFICATIONS TD BE MODIFIED AS NECESSARY TD SUIT ACTUAL SI TE CONDITIONS.
exp Energy Services Inc. c •l.tS0.386.$'41 lf.•1 ,860.38$~
1JOOM&llO(ICfi!MflM .:"'• ~~w.-.FL :woe .,-;.exp. - .-xp.ciom ... ______ _
TC....MJ!R.OWG 8.5X11
DISCIPLINE I 03
JMP 2011H0-21 TITU: "'
1 DETAIL 6 TYPICAL STRAW BALE OEWATERING STRUCTURE
CHECKED BY: OEStGN CHECKER: 1--~~~~~~~~~~~~~~~~~~~~~--t
WSF RW ""'SCALE N.T.S. owe No 4359-03- ML-05- 706
CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
N
<!; I
------- ----/ ...-
/ ...-...-J -
A
RESPREAD TOPSOIL
12"
12" KEY r-
SECTION A-A SECTION 8-8
NOTES:
lRENCH BREAKERS TO BE INSTALLED AS SHOWN ON THE CONSlRUCTION DRAWINGS. WHERE DESCRIBED IN THE PLAN, AND AS DIRECTED. OPEN WEAVE HEMP OR JUTE SACKS SHALL BE FILLED WITH AN AVERAGE 55 LBS. MIXTURE OF:
1) ONE (1) PART CEMENT AND SIX (6) PARTS SAND OR SUBSOIL, OR 2) ONE (1) PART CEMENT. THREE (3) PARTS FLYASH. AND FIVE (5) PARTS SAND OR SUBSOIL 3) SAND WITH JUST SUFFICIENT WATER TO PERMIT MIXTURE TO EXUDE AND BOND SACKS
.!. TOGETHER. TOPSOIL IS NOT TO BE USED IN SACKS. 20 .. 3. KEY EACH TRENCH BREAKER A MINIMUM OF ONE (1) FT. INTO BOTTOMS AND SIDES OF TRENCH. _ 4. FOAM TRENCH BREAKERS MAY BE USED IN LIEU OF SAND SACK TRENCH BREAKERS. o 5. INSTALLATION SPECIFICATIONS TO BE MODIFIED AS NECESSARY TO SUI T ACTUAL SITE CONDITIONS. lQ 6. TRENCH BREAKERS SHALL BE INSTALLED SUCH THAT THE TOP OF EACH DOWNSLOPE BREAKER IS
~ 1----A_B_o_VE_TH_E_B_o_r_r_o~M_O_F_TH_E_N_E_x_r_u_P_SL_o_P_E_B_R~E_A_K_ER_. __________________ --< o: (().) OESJGNER:
T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,
~~'-·FL :wos .,. ... exp. -.-xp.com .. __ ___ ...
TC...MJ!RDWG 8.5X11
KEYSTONE XL PROJECT
FIA f 4359 CHAI NACE: OISCIPLINE I 03
JMP 2011)-10-21 mu: 1-----,m.---- &ii DETAIL 7
TYPICAL PERMANENT TRENCH BREAKER CHECKED BY: OEStCN CHECKER:i-,..,.~---=~-----------~=---l
WSF RW "'" SCALE N.T.S. owe No 4359- 03- ML- 05- 707 R(V02
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
IS ~ ;;1 "' § " w er
~ I
0 5 N
N
0
CONSTRUCTION R.0.W.
"" -< EXTRA -<I WORK SPACE
~I -<
HAYBALE GA TE TO BE OPENED ONLY DURING
VEH: CLE CROSZ
~ • TRENCH/HARD PLUG I -< RETAIN A MIN. 10' -'\ VEGETATIVE BUFFER TO ""' • THE EXTENT POSSIBLE
,,,L , I,_ , _ -,
----- -----~
WATERBOOY ~ -----
--y-y-..,., v '\
{1j ' ~ I · .(
STREAM SPOIL PILE
EXTRA WORK SPACE
~ --------------HAYBALES
BACKHOE
-' CJ :c
MIN. ~~ 10' >- Vi C>: <Jl <0 -----C>: C>: oU a. :::. w ,_
TRENCH/HARO PLUG
PROPOSED PIPELINE ALIGNMEN T
PLAN VIEW
.,
~ ---- FLOW ~ -----
~ 1-----------.-------------.------------------------< er (().) OESJGNER:
T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl8t\old • • , ,
~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...
TC...MJ!RDWG 8.5X11
KEYSTONE XL PROJECT
FIA f 4359 CHAI NACE: DISCIPLINE I 03
JMP 2011)-10-21 mu: 1---=--- &ii DETAIL 12 TYPICAL OPEN CUT v.t:T CROSSING METHOD
CHECKED BY: DESIGN CHECKER:i-,..,~---~=~FL_o_wi_N_G_w_A_TE_R_B_o_D_Y ____ ~=--1 WSF RW "'" SCALE N.T.S. owe No 4359- 03- ML- 03- 705 R(V02
CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
~ I
0 Ci N
KEY INTO BANK IF NECESSARY TO SEAL
FLOW
SPOIL CONTAINMENT
BERM
INSTREAM DITCH SPOIL
IF TRENCH SIDES BECOME UNSTABLE AND COULD
COLLAPSE, ALLOW TRENCH TO REFILL WI TH WATER AND PLACE
PIPE UNDERWATER
exp Energy Services Inc. c •l.tS0.386.$'41 lf.•1 ,860.38$~
1JOOM&llO(ICfi!MflM ~'•
WORKING R.O. W. WIDTH
INSTREAM DITCH SPOIL
CONSTRUCT STABLE APPROACH ROAD USING ROCK. CORDUROY OR CLEAN COARSE GRAVEL
1--~x
I EXTRA WORK
SPACE
o~ ENERGY DISSIPATOR-ROCK SCOUR PROTECTION -,_
~
1--RETAIN A 10' VEGETATIVE ) BUFFER TO THE EXTENT
·~ .. , .. ,:, "" r OSSIBLE
11 BACKHOE TO BE CLOSED AT NIGHT OR DURING RAINF All
PLAN VIEW
FLUME LENGTH
NEW PIPELINE
SECTION A-A
TEMPORARY VEHICLE CROSSING
ENERGY DISSIPATOR- ROCK SCOUR PROTECTION
FLUME UNDER TEMPORARY VEHICLE CROSSING
DISCIPLINE I 03
DETAIL 13 TYPICAL ORY FLUME CROSSING METHOD
~~w.-.FL :woe •4";'-exp. CHECKED BY: OEStGN CHECKER: -.-xp.ciom ... ______ _ I------~------------~----<
WSF RW ""' SCALE N.T.S. owe No 4359- 03- ML- 03- 707
TC....MJ!R.OWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITlq NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
CONSTRUCTION PROCEOURES:
I. MARK OUT AND MAINTAIN LIMITS OF AUIBORIZED WORK AREAS WIIB FENCING OR FLAGGING TAPE TO AVOlD UNNECESSARY DISTURBANCE OF VEGETATION. ENSURE EQUIPMENT OPERATORS WORKING ON IBE CROSSING HAVE BEEN BRIEFED ABOUT IBIS PLAN AND IBE MEASURE NEEDED TO PROTECT WATER QUAUTY.
2. ALL NECESSARY EQUIPMENT AND MATERIALS TO BUILD IBE FLUME MUST BE ON-SITE OR READILY AVAILABLE PRIOR TO COMMENONG IN-WATER WORK.
3. TO IBE EXTEN T POSSIBLE, MAINTAIN A MINIMUM 10 FT. VEGETATIVE BUFFER STRIP BETWEEN DISTURBED AREAS AND IBE WATERCOURSE. INSTALL AND MAINTAIN A SILT FENCE OR STRAW BALE BARRIER UPSLOPE OF IBE BUFFER STRIP ON EACH SIDE OF IBE WATERCOURSE.
-
4. CONTRACTOR SHALL SUPPLY, INSTALL AND MAINTAIN SEDIMENT CONTROL STRUCTURES, AS DEPICTED OR ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH IBAT NO HEAVILY SILT LADEN WATER ENTERS STREAM. a. NO HEAVILY SILT LADEN WATER SHALL BE DISCHARGED DIREClLY INTO IBE STREAM. b. EROSION AND SEDIMENT CONTROL STRUCTURE LOCATIONS AS DEPICTED ARE APPROXIMATE AND MAY
BE ADJUSTED AS DIRECTED BY IBE COMPANY INSPECTOR TO ACTUAL SITE CONDITIONS. c. SILT FENCE OR STRAW BALE INSTALLATIONS SHALL INCLUDE REMOVABLE SECTIONS TO FACILITATE
ACCESS DURING CONSTRUCTION. UTILIZE STRAW BALE BARRIERS ONLY IN UEU OF A SILT FENCE WHERE FREQUENT ACCESS IS REQUIRED.
d. SEDIMENT LADEN WATER FROM TRENCH DEWATERING SHALL BE DISCHARGED TO A WELL VEGETATED UPLAND AREA IN TO A STRAW BALE DEWATERING STRUCTURE OR GEOTEXTILE FILTER BAG.
e. SEDIMENT CONTROL STRUCTURES MUST BE IN PLACE AT ALL TIMES ACROSS IBE DISTURBED PORTIONS OF IBE RIGHT-OF-WAY EXCEPT DURING EXCAVATION/INSTALLATION OF IBE CROSSING PIPE.
f, SOFT DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM IBE RIVER CROSSING UNTIL IBE RIVER CROSSING IS INSTALLED AND BACKFILLED.
5. PIPE SHALL BE STRUNG AND WELDED FOR READY INSTALLATION PRIOR TO WATERCOURSE TRENCHING. 6. FlUME CAPACITY DURING DRY CROSSING SHALL BE SUFFIOENT TO ACCOMMODATE 1.5 TIMES IBE FlOW MEASURED
AT IBE TIME OF" CONSTRUCTION PROVIDED THAT THE FLUMES WILL BE IN PLACE NOT MORE IBAN 96 HOURS AND NO PRECIPITATION IS FORECAST. FLUME CAPACITY FOR VEHICLE ACCESS SHALL BE SUFFICIENT TO PASS IBE 2 YEAR DESIGN FlOW OR IBE FlOW REASONABLY EXPECTED TO OCCUR DURING IBE INSTALLATION. EXCESS FLUMES REQUIRED FOR LONGER TERM ACCESS SHALL BE CAPPED DURING DRY CROSSING PROCEDURES.
7. ENSURE THAT IBE DAMS AND VEHICLE CROSSING ARE LOCATED FAR ENOUGH APART TO ALLOW FOR A WIDE EXCAVATION.
8. FlUMES ARE TD BE SET WIIB 10 PERCENT OF" IBEIR DIAMETER BELOW STRf.'.AMBED LEVEL WHERE SOIL CONDITIONS >-- PERMIT (OTHERWISf.'. INSTALLED AT STREAM GRADE AND SLOPE.)
9. PLACE IMPERVIOUS DAMS AT EACH END OF IBE FLUME, UPSTREAM FIRST, IBEN DOWNSTREAM. ACCEPTABLE ALTERNATIVES INCLUDE GRAVEL V~IB RIP-RAP PROTECTION, SAND BAGS, STEEL PLATE AND ROCKFILL DURING INSTALLATION, INSTALL AN IMPERVIOUS MEMBRANE, It NECESSARY, TO LIMIT LEAKAGE. DAMS MAY NEED KEYING IN TO IBE BANK AND STREAMBED.
-EXCAVATE TRENCH THROUGH PLUGS AND UNDER FLUME FROM BOIB SIDES. WORK IS TO BE COMPLETED AS QUICKLY AS POSSIBLE. o. LOWER IN PIPE BY PASSING UNDER FLUME AND BACKFILL IMMEDIATELY WIIB SPOIL MATERIAL b. IT IS NOT NECESSARY TO DEWATER IBE IN-STREAM TRENCH, HOWEVER, DISPLACED WATER SHALL
BE PUMPED TO A STABLE UPLAND AREA TO AVOID OVERTOPPING OF DAMS DURING PIPE PLACEMENT. c. IF IBE SPOIL MA TERI AL IS NOT SUITABLE, USE IMPORTED CLEAN GRANULAR MATERIAL d. IF BLASTING IS REQUIRED. USE CONTROLLED BLASTING TECHNIQUES TO PREVENT DAMAGE TO THE
FlOW CONVEYANCE SYSTEM. ALTERNATIVELY, BLASTING MAY BE ACCOMPUSHED PRIOR TO THE FlUME INSTALLATION BY DRILLING THROUGH IBE OVERBURDEN.
10. EXCAVATED MATERIAL MUST NOT SE STOCKPILED WITHIN 10 FT. OF IBE WATERCOURSE. IBIS MATERIAL SHALL BE 2 CONTAINED TO PREVENT SA TUR A TED SOIL F"ROM FlOWING BACK INTO IBE WATERCOURSE. 6 11. DEWATERING OF IBE ONLAND TRENCH SHOULD OCCUR IN A STABLE VEGETATED AREA A MINIMUM OF 50 FT. FROM ANY 0 WATERBODY. IBE PUMP DISCHARGE SHOULD BE DIRECTED ONTO A STABLE SPILL PAD CONSTRUCTED OF ROCKflLL OR N TIMBERS TO PREVEN T LOCALIZED EROSION. IBE DISCHARGE WATER SHOULD ALSO BE F"ORCED IN TO SHEET FlOW
>-- IMMEDIATELY BEYOND IBE SPILL PAD BY USING STRAW BALES AND IBE NATURAL TOPOGRAPHY. W1 12. FlUMES SHOULD BE REMOVED AS SOON AS POSSIBLE, WHEN NO LONGER REQUIRED FOR PIPE LAYING OR FOR ROAD ACCESS, IN IBE F"OLLOWING MANNER: o. REMOVE IBE VEHICLE CROSSING RAMP. BANKS ARE TO BE RESTORED TO A STABLE ANGLE AND
PROTECTED WIIB EROS10N RESISTANT MATERIAL COMPATIBLE WIIB IBE FLOW CONDITIONS (E.G., EROSION CONTROL BLANKETS, CRIBBING, ROCK RIP-RAP, ETC.) TO IBE MAXIMUM EXTENT POSSIBLE BEFORE REMOVING IBE DAMS.
b. REMOVE DOWNSTREAM DAM. c. REMOVE UPSTREAM DAM. d . REMOVE FlUME. e. COMPLETE BANK TRIMMING AND EROSION PROTECTION. It SANDBAGS ARE USED FOR IBE DAMS,
PLACE AND REMOVE BY HAND TO AVOID EQUIPMENT BREAKING BAGS. :;! 13. RESTORE IBE STREAMBED AND BANKS TO APPROXIMATE PRE-CONSTRUCTION CONTOURS, BUT NOT TO EXCEED 2 " HORIZONTAL TO 1 VERTICAL.
o. INSTALL PERMANENT EROSION AND SEDIMENT CONTROL STRUCTURES AS INDICATED ON A SITE ~ SPEOFIC BASIS. IN IBE ABSENCE OF SITE SPECIFIC INFORMATION, A FlEXIBLE CHANNEL LINER SUCH ~ AS NAG C125 OR C350 WHICH IS CAPABLE OF" WIIBSTANDING ANTICIPATED FlOW SHALL BE - INSTALLED. ALTERNATIVELY, ROCK RIP-RAP SHALL BE INSTALLED.
- b. ANY MATERIALS PLACED IN IBE STREAM TO FACILITATE CONSTRUCTION SHALL BE REMOVED DURING o RESTORATION. BANKS SHALL BE STABILIZED AND TEMPORARY SEDIMENT BARRIERS INSTALLED AS
SOON AS POSS1BLE AFTER CROSSING, BUT WIIBIN 24 HOURS OF COMPLETING THE CROSS1NG. ~ c. MAINTAIN A SILT FENCE OR STRAW BALE BARRIER ALONG IBE WATER COURSE UNTIL VEGETATION IS en ESTABUSHED IN ADJACENT DISTURBED AREAS.
KEYSTONE XL PROJECT ~ (().) OESJGNER:
'-- T.r.~~~~.~da flA , 4359 I CHAINACE: I DISCIPLINE I
exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~
JMP 2011)-10-21 mu: , ___ _,_,,,,..--- &ii DETAIL 13A TYPICAL DRY FLUME CROSSING METHOD -
D3
1J00 .... l.'O(ICiilllfl8t\old • • , ,
~~'-·FL :wos .,-... exp. CHECKED BY: DESIGN CHECKER:i-,..,~---~-c~o_N_s_TR_u_c_TI_o_N_P_R_o_c_E_o_u_R_E_s ___ =~---1 Rw .,'- SCALE N.T.S. 1owc No IR£V02 -.-xp.com .. _____ ...
WSF _ 4359- 03- ML- 03- 708 I TC...MJ!IUlWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
~
~;~ I INSTREAM _ _ DI TCH SPOIL
~
~ ::::> ~ I r z ':E
I ff-0 ~ SPOIL X
CONTAINMENT BERM
A
1 =t~ow --:::_-
INTAKE HOSE
FILTER/ SCREEN
PUMP
FJ SPOIL
NMENT BERM
IN STREAM DITCH SPOIL
QAM
--
WORKING R.0.W. WIDTH
BACKHOE
PROPOSED PIPELINE ALIGNMENT
SILT FENCE (TYP.)
x
TOP BANK
----------... -
DISCHARGE LINE
\
I EXTRA ~ WORK SPACE < ,~ ~
CONSTRUCT STABLE I APPROACH ROAD USING ROCK, CORDUROY, OR I CLEAN COARSE GRAVEL
1--.--x -----TEMPORARILY PLUG FLUME DURING CONSTRUCTION OF THE CROSSING
- - :::::rL15W---:.._- 1 -- -
F-:::::::::::'.: x +'--0...J_ ,
RETAIN A 10 FT. "' I
-ENERGY OISSIPATERROCK SCOUR PROTECTION
VEGETATIVE BUFFER TO THE EXTENT POSSIBLE
L~ SILT FENCE GA TE TO BE CLOSED AT NIGHT OR DURING RAINFALL
PLAN VIEW
SUMP LINE WITH ROCK RIP- RAP IF NECESSARY
TO REDUCE TURBIDI TY
FLUME/CUL VERT UNDER TEMPORARY VEHICLE
CROSSING
TEMPORARY VEHICLE CROSSING
ENERGY QISSIPATOR-ROCK SCOUR PROTECTION
"' FLOW
WELL GRADED GRAVEL 'V
0
~ ~ I
0 Ci N
0 NOTES:
NEW PIPELINE
IF TRENCH SIDES BECOME UNSTABLE ANO COULD COLLAPSE, ALLOW TRENCH TO REFILL WI TH WATER ANO PLACE PIPE UNOERWA TER.
SECTION A-A
~ 1. PIPELINE PLACEMENT WITHIN RIGHT-OF-WAY CONCEPTUAL ONLY. en 2 SEE DETAIL 14A FOR CONSTRUCTION PROCEDURES.
~ ,; ~ OES1GNER KEYSTONE XL PROJECT
'\ !r.~~S~.~:,da F1A , 4359 CHAI NACE:
JMP 2011H0-21 TITU: 1----;m;c---- &iJt DETAIL 14
DISCIPLINE I
exp Energy Services Inc. c •l.tS0.386.$'41 lf. •1 ,860.38$~
1JOOM&llO(ICfi!M flM ~'• TYPICAL DAM ANO PUMP CROSSING CHECKED BY: OEStGN CHECKER:
OJ
~~w.-.FL :woe •4";'-exp. 1-------------------~-----< - .-xp.ciom ... _ _ ____ _
WSF RW ""'SCALE N.T.S. owe No 4359- 03- ML-OJ- 709
TC....MJ!R.OWG 8.5X11 CAPO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDmq Ns MAY VARY FROM THE SITE GRAPHICALL y REPRESENTED.
CONSTRUCTION PRQCEQURES:
1. WHERE NECESSARY. OBTAIN PRIOR APPROVAL BEFORE USlNG THE DAM AND PUMP METHOD. 2. If THERE IS ANY FLOW IN THE WATERCOURSE, INSTALL PUMPS TO MAINTAIN STREAMfLQW AROUND THE BLOCKED Off
SECTIONS Of CHANNEL. THE PUMP IS TO HAVE 1.5 TIMES THE PUMPING CAPACITY Of ANTIClPATED FLOW. A SECOND STANDBY PUMP Of EQUAL CAPAClTY IS TO BE READILY AVAILABLE AT All TIMES. AN ENERGY DISSlPATER IS TO BE BUil T TO ACCEPT PUMP DISCHARGE WITHOUT STREAMBED QR STREAMBANK EROSION. IF THE CROSSING IS PROLONGED BEYOND ONE DAY THE OPERATION NEEDS TO BE MONITORED OVERNIGHT.
3. SCHEDULE INSTREAM ACTIVITY fQR LOW FLOW PERIODS If POSSIBLE. 4. MARK OUT AND MAINTAIN LIMITS OF AUTHORIZED WORK AREAS WITH FENCING QR FLAGGING TAPE TO AVOID
UNNECESSARY DISTURBANCE Of VEGETATION. ENSURE EQUIPMENT OPERATORS WORKING ON THE CROSSING HAVE BEEN BRIEFED ABOUT THIS PLAN AND THE MEASURES NEEDED TO PROTECT WATER QUALITY. INSTALL PRE-WORK SEDIMENT CONTROL MEASURES AS SPECIFIED IN THE PLAN. ALL NECESSARY EQUIPMENT AND MATERIALS TO BUILD THE DAMS AND TO PUMP WATER MUST BE ON SITE QR READILY AVAILABLE PRIOR TO COMMENCING IN-WATER CONSTRUCTION. PIPE SHOULD BE STRUNG, WELDED AND COATED AND READY fQR INSTALLATION PRIOR TO WATERCOURSE TRENCHING •
.....__ 5. CONTRACTOR SHALL SUPPLY, INSTALL AND MAINTAIN SEDIMENT CONTROL STRUCTURES, AS DEPICTED AND ALONG DOWN GRADIENT SlDES Of WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SlLT LADEN WATER ENTERS STREAM.
o. NO HEAVILY SlLT LADEN WATER SHALL BE DISCHARGED DIRECTLY INTO THE STREAM. b. EROSION AND SEDIMENT CONTROL STRUCTURE LOCA TIQNS AS DEPICTED ARE APP ROXI MA TE AND MAY
BE ADJUSTED AS DIRECTED BY THE COMPANY INSPECTOR TO ACTUAL SITE CONDITIONS. c. SllT FENCE OR STRAW BALE INSTALLATIONS SHALL INCLUDE REMOVABLE SECTIONS TO FACILITATE
ACCESS DURING CONSTRUCTION. UTILIZE STRAW BALE BARRIERS ONLY IN LIEU OF A SILT FENCE WHERE FREQUENT ACCESS IS REQUIRED.
d. SEDIMENT LADEN WATER FROM TRENCH DEWA TERING SHALL BE DISCHARGED TO A WELL VE GE TA TED UPLAND AREA INTO A STRAW BALE DEWATERIN() STRUCTURE OR CEQTEXTILE FILTER BAG.
e. SEDIMENT CONTROL STRUCTURES MUST BE IN PLACE AT ALL TIMES ACROSS THE DISTURBED PORTIONS OF THE RIGHT-OF-WAY EXCEPT DURING EXCAVATION/INSTALLATION OF THE CROSSING PIPE.
f, SOFT DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE RIVER CROSSIN() UNTIL THE RIVER CROSSIN() IS INSTALLED AND BACKFILLED.
6. TO THE EXTENT POSSIBLE, MAINTAIN A MINIMUM 10 FEET VEGETATIVE BUFFER STRIP BETWEEN DISTURBED AREAS AND THE WATERCOURSE. INSTALL AND MAINTAIN A SILT FENCE UPSLOPE Of THE BUFFER STRIP ON EACH SIDE Of THE WATERCOURSE. THE Sll T FENCE SHOULD INCORPORATE REMOVABLE "GA TES" AS REQUIRED TO ALLOW ACCESS WHILE MAINTAINING EASE OF REPLACEMENT FOR OVERNIGHT QR DURING PERIODS Of RAINFALL
- 7. CONSTRUCT A TEMPORARY SUMP UPSTREAM OF THE DAM AND LINE WITH ROCKFILL IF A NA TUR AL POOL DOES NOT
- EXIST. INSTALL THE PUMP OR PUMP INTAKE IN THE POOL OR SUMP. DISCHARGE WATER ONTO AN ENERGY DISSIPATER DOWNSTREAM Of THE WORK AREA.
8. EXCAVATED MATERIAL MUST NOT BE STOCKPILED WITHIN 10 FT. OF THE WATERCOURSE. THIS MATERIAL MUST BE CONTAINED WITHIN BERM CONTAINMENT. WITH SECONDARY SILT FENCE PROTECTION TO PREVENT SATURATED SOIL FROM FLOWING BACK INTO THE WATERCOURSE.
9. CHEMICALS. FUELS, LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT REFUELED WITHIN 100 FT. OF THE WA TERBODY. PUMPS ARE TO BE REFUELED AS PER THE SPCC PLANS.
10. STAGING AREAS ARE TO BE LOCATED AT LEAST 10 FT. FROM THE WATER'S EDGE (WHERE TOPOGRAPHIC CONDITIONS PERMIT) AND SHALL BE THE MINIMUM SIZE NEEDED.
11. DAMS ARE TO BE MADE OF STEEL PLATE, INFLATABLE PLASTIC DAM, SAND BAGS, COBBLES, WELL GRADED COARSE GRA \/EL FILL, QR ROCK Fill. DAMS MAY NEED KEYING INTO THE BANKS AND STREAMBED. ENSURE THAT THE DAM AND VEHICLE CROSSING ARE LOCATED FAR ENOUGH APART TO ALLOW fOR A WIDE EXCAVATION. CAP FLUMES USED UNDER VEHICLE CROSSING DURING ORY CROSSING.
12. DEWATER AREA BETWEEN DAMS IF POSSIBLE. DEWATERING SHOULD OCCUR IN A STABLE VEGETATIVE AREA A MINIMUM OF 50 FT. FROM ANY WATERBODY. THE PUMP DISCHARGE Sl-lOULD BE DISCliARGED ONTO A STABLE SPILL PAD CONSTRUCTED OF ROCKFILL SANDBAGS, OR TIMBERS TO PREVENT LOCALIZED EROSION. THE DISCHARGE WATER SHOULD ALSO BE FORCED INTO SHEET FLOW IMMEDIATELY BEYOND THE SPILL PAD BY USJNG STRAW BALES AND THE NATURAL TOPOGRAPHY DISCliARGED WA lER SHALL NOT BE ALLOWED TO FLOW INTO ANY WA lERCOURSE OR WETLAND. If IT IS NOT POSSJBLE TO DEWATER THE EXCAVATION DUE TO SOILS WITH A HIGH HYDRAULIC CONDUCTIVITY, THE EXCAVATION AND PIPE PLACEMENT IS TO BE CARRIED OUT IN THE STANDING WAlER. PUMP ANY DISPLACED WAlER AS DESCRIBED ABOVE TO PREVENT OVERTOPPING Of DAMS.
13. EXCAVATE TRENCH THROUGH PLUGS AND STREAMBEO FROM BOTH SIDES. RE-POSITIONING DISCHARGE HOSE AS NECESSARY. LOWER THE PIPE IN THE TRENCH AND BACKFILL IMMEDIA lEl Y. DURING THIS OPERATION WORK IS TO BE COMPLElED AS OUICKL Y AS POSSIBLE.
14. CONTRACTOR SHALL RESTORE THE STREAM BED ANO BANKS TO APPROXIMATE PRE-CONSTRUCTION CONTOURS, BUT NOT TO EXCEED 2 HORIZONTAL TO 1 VERTICAL.
o. CONTRACTOR SHALL INSTALL PERMANENT EROSlON AND SEDIMENT CONTROL STRUCTURES AS INDICAlED ON A SllE SPECIFIC BASJS. IN THE ABSENCE OF SITE SPECIFIC INFORMATION, A FLEXIBLE CHANNEL LINER SUCH AS NAG C125 QR C350 WHICH IS CAPABLE OF WITHSTANDING ANTICIPATED FLOW SHALL BE INSTALLED. ALTERNATIVELY, ROCK RIP-RAP SHALL BE INSTALLED.
:;! b. ANY MATERIALS PLACED IN THE STREAM TO FAClLITATE CONSTRUCTION SHALL BE REMOVED DURING " RESTORATION. BANKS SHALL BE STABILIZED AND TEMPORARY SEDIMENT BARRIERS INSTALLED AS SOON AS o POSSlBLE AFTER CROSSING, BUT WITHIN 24 HOURS Of COMPLETING THE CROSSlNG. !:{ c. MAINTAIN A SILT FENCE OR STRAW BALE BARRIER ALONG THE WATER COURSE UNTIL VEGETATION IS ~ ESTABLISHED IN ADJACENT DISTURBED AREAS .
.....__ 15. WHEN THE STREAMBED HAS BEEN RESTORED, THE CREEK BANKS ARE TO BE CONTOURED TO A STABLE ANGLE AND - PROlEClED WITH EROSION RESlSTANT MAlERIAL COMPATIBLE WITH FLOW VELOCITY BETWEEN DAMS (E.G., EROSION
.,_Q.. CONTROL BLANKETS. CRIBBING. ROCK RIP-RAP. ETC.) . THE DAMS ARE TO BE REMOVED DOWNSTREAM FIRST. KEEP ~- PUMP RUNNING UNTIL NORMAL FLOW IS RESUMED. COMPLElE BANK TRIMMING AND EROSION PROTECTION. IF SANDBAGS en ARE USED fOR THE DAMS, PLACE AND REMOVE BY HAND TO AVOID EQUIPMENT BREAKING BAGS.
~ ~ ~- ~~n~ ....._ '\ !r.~~S~.~:,da F1A , 4359 1 CHAINACE: 1 DISCIPLINE , o.:i exp Energy Services Inc. c •l.tS0.386.$'41 lf.•1 ,860.38$~
1JOOM&llO(ICfi!MflM ~'• ~~w.-.FL :woe •4";'-exp. - .-xp.ciom ... ______ _
TC....MJ!R.OWG 8.5X11
JMP 2011)-10-21 TITLE 1---;mz--- "'' DETAIL 14A
- TYPICAL DAM ANO PUMP CROSSING -l;;C;;;H;;;EC~K;;;E;;;D=;BY;;;=: =;;0;;;E;;;S;;;IG;;N=;C~H;;;E;;CK;;;E;;;R~: CONSTRUCTION PROCEDURES
WSF SCALE 1owc No
RW ""' N. T.S. 4.359 - 0.3- ML-0.3- 710 l"EV02
CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
2 I
0 0 N
0
r NON- WOVEN DECK WIDTH FOR WIDEST EQUIPMENT LOCATE SO ,~-----1:.
1 GEOTEXTILE
:x: TRENCHING DOES : ,. ; .:,.:_ TEMPORARY u NOT AFFECT : . . · . ,. BRIDGE
DECK MUST BE SEALED TO PREVENT SEDIMENT OR DEBRIS PUSHING THROUGH CRACKS IN BETWEEN DECK TIMBERS OR GEOTEX TILE DIAPER
,'.5 BRIDGE ~
~ x--
FLOW J FLOW
--x--
1 >6.5'
IN TA
STRINGERS TO BE DESIGNED BY AN ENGINEER TO SUPPORT EXPECTED LOADS
ALL BRIDGES TO HA VE CURBS TO CONTAIN SEDIMENT OR DEBRIS
SECTION A- A
l..=°'j:=~='.;:1-USE ROCK CORDUROY OR COARSE GRAVEL BRIDGE APPROACH PLACED OVER A NON- WOVEN GEOTEXTILE
TO BE ADEQUATEL y SUCH AS AMOCO 4553 OR EQUIVALENT TO STABILIZED FORM STABLE APPROACH ROADS
PLAN VIEW
ROCK OR COARSE GRAVEL FILL
BRIDGE LENGTH SEE NOTE 2, DETAIL 16A
DECK
0;:--g_....li.l'.i.J....l~><=-;;;ENSURE ADEOUA TE OPENING TO ALLOW AN TICIPATED INCREASE INSTREAM DISCHARGE
BRIDGE PROFILE
LOGS TO HOLD GRAVEL
BOULDER OR ROCK FILL
~-----RIP-RAP TOE ..,.,..__,_PROTECTION
TYPICAL TEMPORARY CRIB ABUTMENT
CURB
STEEL OR LOG STRINGER
~ ~ ~,-,.).-------~0-ES-l-GN_ER_: --------.--------K-EYST_O_N_E_X_L_P_R~-EC-T--------<
"" J) T.r.~~~~.~da FIA , 4359 CHAJNACE: DISCIPLINE N 03
exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl8t\old • • , ,
~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...
TC...MJ!RDWG 8.5X11
JMP 2011)-10-21 mu: 1-----,m.---- &ii DETAIL 16
TYPICAL TEMPORARY BRIDGE CROSSING CHECKED BY: OEStCN CHECKER:...,..,_~---=~-----------~=--!
WSF RW "'"SCALE N.T.S. owe No 4359 - 03- ML- 03- 712 R(VOl
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
LOCATE SO TRENCHING DOES NOT AFFECT THE TEMPORARY CROSSING
B
l FLOW
HAYBALE GATE TO BE OPENED ONLY DURING VEHICLE CROSSING
TOP OF BANK
ROCK SCOUR B PROTECTION FLOW (AS NEEDED) J
PLAN VIEW
TOP OF BANK
FLOW
FLUMES
MIN. 12"
SECTION
:· ..
TOP OF BANK
SPACING WIDTH (APPROX. ~ DIA.
A-A
PIPE TO BE LONG ENOUGH FOR STABLE FILL SLOPES
FLOW
INSTALL PIPE ON STREAMBED
~ COOS!fflJCDON fROCFQllRES·
SECTION B- B
"-J THE FOLLOWING IS A SEQUENCE CE CONSTRUCTION ANO PROCEDURES MEASURES TO BE fOllOWEO AT All TEMPORARY FLUME VEHICLE CROSSINGS. o! <= 1. A PORTABLE FlEXl- FLOAT, OR TEMPORARY BRIDGE MAY BE SUBSTITUTED FOR TI-lE TEMPORARY FLUME CROSSING.
2 I
0 0 N
2. THE lENCTH Of nfE FLUME SHALL SE sum c1ENT TO SPAN THE ENTIRE AREA REOUIREO FOR VEHICULAR ACCESS. EXTENDING 4 FEET BEYOND TOE OF F1Ll MATERfAL. so TRENCHING Will NOT AFFECT THE ROAD CROSSING. A LONGER PIPE IS TO BE usro. IF NEEDED. TO MAJNTAIN STABLE SIDE stOPES. FLUME CAPACITY TO BE BA.SEO ON THE 2- YEAR DESIGN FLOW OR MAXIMUM FLOW ANTICIPATED TO OCCUR DURING INSTALLATION. AS SPECIFIED IN CONSTRUCTION OOCUMENTS.
J, WHERE PRACTICAL, BACKFlll AROUND THE ptPES AT ll-IE ROAD WITH ct.EAN. COARSE ROCK F1ll MATERIAL IF SCOOR IS POS'SIBlE, RIP- RAP IS TO BE PLACED ON ntE WATERBOOY BED DOWNSTREAM Of THE PIPE OOTLET EXTENDING A MINIMUM OF TWO PIPE DIAMETERS. ALTERNATIVELY, TIMBER EQUIPMENT MATS, SANO BAGS OR TIMBER CORDUROY MAY BE USEC TO FORM THE TRAVEL SURFACE..
4, TO REOUCE DEBRIS ENTERING THE WATERBOOY FROM EQUIPMENT TRACKS. THE APPROACH ROAD LEADING TO THE CULVERT CROSSING MUST BE RAISED AHO STABLE SO EQUIPMENT LOADS ARE SUPPORTEO A SUFFlCIENT DISTANCE SACK FROM THE WATER. IF CUTS ARE NEEDED TO OOTAIN A SATISFACTORY GRADE. THEY ARE TO BE DUG 'Nini SIDE DITCHES ANO STABLE SLOPES. EROSION ANO SEOtMENT CONTROL MEASURES ARE TO BE INSTALLED TO LIMIT THE POTENTIAL FOR SEDIMENT TO ENTER THE WATERBOOY (E.C •• CHECK DAMS, SILT FENCE.
0 RIP- RAP. SEED ANO MULCH, SEDIMENT TRAPS, ETC.). 5. PERIOOICAU. Y CHECK THE TEMPORARY CROSSING INSTAllATION ANO REMOVE AAY BUILD-UP OF SEDtMENT OR DEBRIS ON TliE BRIDGE.
~ DISPOSE Of THIS MATERIAL AT LEAST 100 f EET FROM THE WATERBOOY ANO ABOVE TliE HIGH WATER LEVEL ;:_- 6. FOU.O.,NG 00MPL£TION OF THE CROSSING, REMOVE ROCl<FlLL IN/OR AROUND FLUME PIPES FROM THE WA1'£RBOOY OR WETLAND. ~ 7. RESTORE STREAM SANKS AHO WATERBOOY 8 0TTOM.
exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l."O(ICiilllfl&hid • • , ,
FlA , 4359
JMP 2011)-10-21 mu: , ___ ...,,,,,....___ &ii
CHECKED BY:
KEYSTONE XL PROJECT
CHAI NACE: DISCIPLINE I
DETAIL 17 TYPICAL FLUME BRIDGE CROSSING
03
~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...
P7100
OEStCN CHECKER: ~s~c-AL-E~---~o~wc~-.-o-------------~R£V~0-1--l N.T.S. 4359- 03- ML- 03 - 714 WSF RW
TC...MJ!RDWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
~ I
0 Ci N
TEMPORARY BRIDGE
------------------- ~------------------- - - - - - - - - -- - - - - - - - - -
B FLOW l
B
J
STEEL PLATE
WATERBODY
=========- -=========
UNDISTURBED CREEK BANKS
CHECKED BY:
WSF
x
STEEL PLATE
PLAN VIEW
SECTION A-A
x
SILT FENCE
FLATBED RAIL CAR
ENSURE ADEQUATE OPENING TO ALLOW AN TICIPATED INCREASE IN STREAM DISCHARGE
" iox ____ r_•D•E•C•K-.,,&~~~ <J V7 SECTION B-B
DISCIPLINE I 03
DETAIL 18 TYPICAL RAILCAR BRIDGE CROSSING
OEStGN CHECKER: 1--~~~~~~~~~~~~~~~~~~~~~--t
SCALE N.T.S.
owe No RW 4359 - 03- ML- 03- 715 P7100
TC....MJ!R.OWG 8.5X11 CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
N
~ ~ 1.
"' z 2. ~ 3. c
~ f 4. :;
;; 5. I
RIVERBANK
HIGH WATER MARK
LOW WATER MARK
2'
EXTEND TO BOTTOM OR 10'
RIVER
FLOW
SECTION
~ ' KEY-IN 6' IN TO EXISTING BANK
5' MIN. SEE NOTE 8
RIVERBANK
GEOTEXTILE AMOCO 455.3 WHERE REQUIRED
' (OR EQUIV.) '-....___NATURAL OR
GRADED SLOPE---...,_
12" MINIMUM DEPTH OR ' 2 TIMES SPECIFIED MAXIMUM PARTICLE SJZE
REMOVE ALL STUMPS, ORGANIC MATERIAL ANO PREPARE BANKS TO A STABLE CONFIGURATION TO A MAXIMUM SLOPE OF 2 HORIZONTAL TO 1 VERTICAL. CONSTRUCT TOE TRENCH TO KEY IN BOTTOM OF RIP- RAP PROTECTION. INSTALL FILTER CLOTH (GEO TEXTILE), SUCH AS AMOCO 455.3 OR EQUIVALENT, UNDER ROCK 'M-iERE SPECIFIED OR AS DIRECTED BY THE COMPANY. ADJOINING EDGES OF CLOTH SHALL OVERLAP A MINIMUM OF 12". ROCK UTILIZED FOR RIP-RAP SHALL CONSIST OF SOUND, DURABLE ROCK, AND RESISTANT TO WEATHERING. INDIVIDUAL PIECES SHOULD BE ANGULAR, BLOCK SHAPED AND HAVE A MINIMUM SPECIFIC GRAVITY OF 2.2. INSTALL RIP-RAP TO A THICKNESS OF APPROXIMATELY 2 TIMES THE MAXIMUM EQUIVALENT DIAMETER OF THE RIP-RAP. EACH LOAD SHOULD BE WELL GRADED. A WELL GRADED MIXTURE IS COMPOSED 60% (MINIMUM) OF LARGER SIZES WITH 40% OF SMALLER SIZES TO FILL THE VOIDS. SIZE OF RIP-RAP IS DEPENDENT UPON THE PREDICTED FLOW CONDITIONS. KEY IN THE EDGES OF THE RIP- RAP AND FILTER CLOTH TO NATURAL GROUND CONTOURS SO THAT UNDERMINING DOES NOT OCCUR. RIP-RAP 1$ TO BE INSTALLED TO 2 FEET. ABOVE THE NORMAL HIGH WATER MARK OR 5 FEET ALONG THE SLOPE, 'M-ilCHEVER IS LESS. INSTALLATION SPECIFICATIONS TO BE MODIFIED TO SUIT ACTUAL SITE CONDITIONS.
KEYSTONE XL PROJECT
FIA f 4.359 CHAI NACE: DISCIPLINE I 0.3
exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~
JMP 2011)-10-21 mu: 1-----,m.---- &ii DETAIL 20
TYPICAL ROCK RIP- RAP 1J00 .... l.'O(ICiilllfl 8t\old • • , ,
~~'-·FL :wos .,. ... exp. - .-xp.com .. __ ___ ...
CHECKED BY: OEStCN CHECKER:...,_,.~---=~-----------~=--!
WSF RW ""' SCALE N. T.S. owe No 4.359- 0.3- ML- 05- 709 R(V02
TC...MJ!RDWG 8.5X11 CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
N
LINE PIPE
WIDTH OF EXISTING ROAD OR RAILROAD R.O.W.
I-
CROSSING PIPE TO EXTEND TO RIGHT-OF-WAY (MIN.)
MARKER SIGN
CLEAR FENCE LINE HORIZONTALLY BY 2" MIN.
I HEAVY WALL CROSSING PIPE (SEE NOTE 4)
BORE ANNULUS TO BE NO LARGER THAN 1 •
GREATER THAN COATED LINE PIPE
CROWN OF ROAD
·'
ROAD RIGHT-OF-WAY
MARKER SIGN
w a_ 0
ul ... 0
HEAVY WALL CROSSING PIPE (SEE NOTE 4)
CROSSINGS SHALL BE IN ACCORDANCE WITH APPLICABLE PERMIT.
I LINE PIPE
~ 1. ~ 2. :. 3. a
ROAD CROSSING PIPE SHALL EXTEND AT MINIMUM TO RIGHT-OF- WAY LINE UNLESS OTHERWISE SPECIFIED. THE TYPE ANO MINIMUM REQUIRED LENGTH OF PIPE FOR CROSSINGS OF ROADS SHALL BE AS SPECIFIED ON ALIGNMENT SHEETS.
~ 4. PIPE FOR BORED CROSSINGS TO INCLUDE ABRASION-RESISTANT (ARB) COATING. ~ 5. PIPELINE MARKER ANO TEST STATIONS TO BE INSTALLED ON RIGHT-OF-WAY LINE NEXT TO FENCE IF - POSSIBLE. 0 6. THE CROSSING PIPE SHALL BE STRAIGHT WITH NO VERTICAL OR HORIZONTAL BENDS vnTHIN ROAD
RIGHT- OF- WAY. lQ 7. MINIMUM PIPELINE COVER IN DRAINAGE DI TCHES AT PUBLIC ROADS IS 60 INCHES; 36 INCHES IN
~ 1----c_o_N_so_L_1o_A_TE_o_R_o_c~K-· __________ -.---------------------~ "' (().) OESJGNER:
T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl8t\old • • , ,
~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...
TC...MJ!RDWG 8.5X11
KEYSTONE XL PROJECT
FIA f 4359 CHAI NACE: DISCIPLINE I 03
JMP 2011)-10-21 mu: "" DETAIL 21
l;;;=.;;;;;;;;;=;;"""==r"""'""'""""""'~ TYPICAL UNCASED ROAD /RAILROAD CROSSING BORE DETAIL CHECKED BY: OEStCN CHECKER:i-,..,.~---=~-----------~=---l
WSF RW "'"SCALE N.T.S. owe No 4359 - 03- ML-03- 717 R(V02
CADO DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
N
;; I
0
WATERLINE \
WILLOWS (OPTIONAL)
WILLOWS (OPTIONAL)
UNDISTURBED BANK
WATERLINE
5/16" CABLE
5/16" CABLE
GEOTEXTILE FIL TERCLOTH
1. LOG WALLS TO BE CONSTRUCTED USING CONIFEROUS MATERIAL
CLAY BACKFILL
FINAL GRADE
FINAL GRADE
UNDISTURBED BANK
LOGS TO BE KEYED INTO BANK
2. NATURE BACKFILL OR LOOSE GRADE MATERIAL SHOULD BE USED AS fil l MATERIAL J. ANCHOR PILINGS OR DEADMAN ANCHORS TO BE USED TO SECURE CABLE IN BANK. 4. NON-WOVEN FILTER CLOTH (NYLEX C34 OR EQUIVALENT) TO BE USED TO LINE LOG WALL. 5. INSTALLATION SPECIFICATIONS TO BE MODIFIED AS NECESSARY TO SUIT ACTUAL SI TE CONDITIONS. ~ ~ ~,-,.).-------~0-ES-l-GN_ER_: --------.--------K-EYST_O_N_E_X_L_P_R~-EC-T--------<
"" J) T.r.~~~~.~da FIA , 4359 CHAJNACE: DISCIPLINE N 03
exp Energy Services Inc. t 0 1.&S0.396.$'41 It • 1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,
~~'-·FL :wos .,. ... exp. -.-xp.com .. __ ___ ...
TC...MJ!RDWG 8.5X11
JMP 2011)-10-21 mu: ·-----,,,,...--- &ii DETAIL 23
STREAMBANK RECLAMATION - LOGWALL OEStCN CHECKER:
~S~C&~E---~O~WC~N-o-----------r.R(V~0-2--l "'" N. T.S. 4359- 03- ML- 05- 711
CHECKED BY:
WSF RW
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
WATERLINE
~ 6 WATERLINE 5 N
N
0
WILLOWS (OPTIONAL)
GEO TEXTILE FABRIC (DEKOWE 700)
2- 3 FEET
WILLOWS (OPTIONAL)
3 FEET
CLAY BACKFILL
FINAL GRADE
CLAY BACKFILL AND GEOTEXTILE FABRIC
~ I. NATURE BACKFILL OR LOOSE GRADE MATERIAL SHOULD BE USED TO MINIMIZE AIR SPACES. THIS ~ ALLOWS PROPER SOIL FABRIC CON TACT, WHICH MINIMIZES STEELING AND SCOURING DURING RUNOFF
AND ENSURES SURVIVAL OF THE WILLOW CUTTINGS. ~ 2. PLYWOOD FORMS (8'x2') MAY BE REQUIRED TO HELP RECONSTRUCT STEEP OR VERTICAL BANKS. * 3. GRID LAYERS SHOULD NOT EXCEED 3 FEET IN HEIGHT WITH A MINIMUM OF 3 FEET SET IN BANK. 80
4. WILLOWS SHOULD BE HARVESTED AS CLOSE TO INSTALLATION AS POSSIBLE. PREFERABLY THE PREVIOUS DAY BUT NO MORE THAN 2 DAYS EARLY.
- 5. WILLOWS SHOULD BE 0.5 TO 1 INCH IN DIAMETER AND 2 TO 3 FEET LONG WITH NO MORE THAN 10 o INCHES LEFT EXPOSED. ~ 6. PLANTING RATE SHOULD BE APPROXIMATELY 1 STEM PER 6 INCHES.
7 INSTALLATION TO BE MODIFIED AS NECESSARY TO SUIT ACTUAL SITE CONDITIONS.
~ ,;~ O~GNER '\ !r.~~S~.~:,da F1A , 4359
exp Energy Services Inc. c •l.tS0.386.$'41 lf. •1 ,860.38$~
1JOOM&llO(ICfi!M flM .:"'•
JMP 2011H0-21 TITU: 1----;m;c---- &iJt
CHECKED BY: OEStGN CHECKER:
KEYSTONE XL PROJECT
CHAI NACE: DISCIPLINE I
DETAIL 24 STREAMBANK RECLAMATION -
VEGETATED GEOTEXTILE INSTALLATION
03
~~w.-.FL :woe .,-;.exp. !-------------------~---< - .-xp.ciom ... _ _ ____ _
WSF RW ""'SCALE N.T.S. owe No 4359 - 03- ML- 05- 712 REV02
TC....MJ!R.OWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
110' CONSTRUCTION R.O.W.
N 15'
!5 ~ %
25'
50' PERMANENT EASEMEN T
25'
-~ ::::;
:rl a: 0 w ~ n. 0 a:: n.
""
25'
PLAN VIEW
35'
I I 20·
II // >-W - ~---· // o::U I I
I < < 'X><.,x I ~ ~ f x"<<x :\G I ~ \i? ~<~ "-- xf -1 "' ' I x:xX K - I _ _ - y - · ,_ ..!.._I ..QR.Ali'!_
I »""' I TILE
I I ?' I I ~I ?' x l\G I x i_
I /r l I // --·-J I 20·
I
40' SEE NOTE 1
DRAIN
25' TEMPORARY EASEMENT
50'
-DRAIN TILE
5'
16'
60' WORKING SIDE
25' 25' 35'
50' PERMANENT EASEMENT
110 ' CONSTRUCTION R.0.W.
TEMPORARY EASEMENT
ELEVATION
~ 1. THE OFFSET FROM A FOREIGN PIPELINE, WHERE APPLICABLE, WILL BE 40' FOR MOST LOCATIONS, BUT MAY ~ BE INCREASED OR DECREASED DEPENDING ON THE SITE SPECIFIC CONSTRUCTION REQUIREMENTS.
0 2. THE MINIMUM CLEARANCE BETWEEN THE TOP OF PIPE AND THE BOTTOM OF DRAIN TILE WILL BE 12 INCHES.
~ 3. INSTALLATION SPECIFICATIONS TO BE MODIFIED AS NECESSARY TO SUIT ACTUAL SITE CONDITIONS.
~ !--------~---------~---------------------< - ~ ~- ~~n~ '\ !r.~~s~.~:,da F1A , 4359 CHAINACE: DISCIPLINE I
exp Energy Services Inc. c • l.tS0.386.$'41 lf.•1 ,860.38$~
1JOOM&llO(ICfi!MflM ~'• ~~w.-.FL :woe •4";'-exp. - .-xp.ciom ... ______ _
TC....MJ!R.OWG 8.5X11
JMP 2011H0-21 TITU: 1----;m;c---- &iJt DETAIL 25
TYPICAL R.O.W. LAYOUT/SOIL HANDLING 110' CONSlRUCTION R.O.W. 50' EASEMENT
CHECKED BY: DESIGN CHECKER: DRAIN TILE CROSSING
WSF RW ""'SCALE N.T.S. owe No 4359 - 03- ML- 03- 718
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
03
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
ITT, -t -t -t ,__,,_ I
x x
t • t t t ~·"~ I I TILE I I
I I I I I I I I I
I I I I I I I
I + I I r + I
_L -1. _J -1._J
PIPELINE
x
t I
I T + I x I I I T + I
I I I I I T I I I I cR!ssovf R
I I I I I I L L .L L .L.4
x
~ x ~ CD
:;! "' ~ s "' "' 2 I
0 0 N
• • I • • • • • • • • ~ DRAINAGEJ
N r NATURAL GROUND
PIPELINE~
1' MIN. f~r--~-CROSSOVERS~ CLEARANCE I
0
PROFILE ~ er ~,-,.).-------~0-ES-l-GN_ER_: --------.--------K-EYST_O_N_E_X_L_P_R~-EC-T--------<
"" J) TransCanada FIA , 4359 CHAJNACE: DISCIPLINE N 03 In bu•in«> to d•li><'
exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,
~~'-·FL :wos .,-... exp. - .-xp.com .. __ ___ ...
TC...MJ!RDWG 8.5X11
JMP 2011)-10-21 mu: 1------,m.---- &ii DETAIL 26 HEADER/MAIN CROSSOVERS OF PIPELINE
CHECKED BY: OEStCN CHECKER:i-,..,.~---=~-----------~=----l
WSF RW "'"SCALE N.T.S. owe No 4359- 03- ML- 03- 719 R(V02
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
N
0
~
RELOCATE /REPLACE DRAINAGE HEADER /MAIN
x- x- xl DRAIN TILE
I ~·
I -../"' -../"' -../"' -../"'
SECONDARY LATERAL I I
T T I
x x
i~~~ x I T~~
I T I I
t I I I I I
~~ I I T ~
x
I I I x i I I I r-r ~
I I I i J .~ ~ { EXISTING L - l_ - J_ ~ _l _ _ . - · _l - ~ ~ PIPELINE '-----x ------x -----::;---.---r-- -r--...-'"- -'-r
~ DRAINAGE
~ !--------~---------~---------------------< - ~~ ~- ~~n~
~ TransCanada F1A , 4359 CHAINACE: DISCIPLINE * 03 In bu•;,,.,, to d<f;,.,
exp Energy Services Inc. c •l.tS0.386.$'41 l f. •1 ,860.38$~
1JOOM&llO(ICfi!MflM ~'• ~~w.-.FL :woe •4";'-exp. -.-xp.ciom ... ______ _
TC....MJ!R.OWG 8.5X11
JMP 2011)-10-21 TITLE 1----;m;c---- &iJt DETAIL 27 HEADER/MAIN CROSSOVERS OF PIPELINE
CHECKED BY: OEStGN CHECKER: 1-------------------~-----<
WSF RW ""' SCALE N.T.S. owe No 4359- 03- ML- 03- 720
CADO DRAWING: 00 NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
' •.,_-
N
c; I
~ 0
THE PROJECT PIPELINE
TRENCH LINE
TEMPORARY SUPPORT (IF NECESSARY)
REPAIR BELL HOLE (TYP. )
SANO BAG SUPPORT (IF NECESSARY)
PROFILE
TRENCH LINE
~ .. · .. _·
RIGID PVC PIPE OR DOUBLE WALL CORRUGA TEO PLASTIC PIPE
...
SUP COUPLINGS FOR END CONNECTIONS
RIGID PVC PIPE OR DOUBLE WALL CORRUGA TEO PLASTIC PIPE WITH TEMPORARY SUPPORT & SLIP COUPLINGS FOR END CONNECTIONS
REPAIR/EXISTING PIPE 12" OVERLAP ( TYP.)
NATURAL GRADE
lQ 1. IMMEDIATELY REPAIR TILE IF WATER IS FLOWING THROUGH TILE AT TIM E OF TRENCHING.
~ 1--2_. _s_c_R_E_EN_A_L_L_E_X_P_O~S-EO_E_N_o_s_o_F_T_IL_E_Ll_N_E_s_._-.---------------------~ o: (().) OESJGNER:
T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It • 1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,
~~'-·FL :wos .,. ... exp. -.-xp.com .. __ ___ ...
TC...MJ!RDWG 8.5X11
FIA f 4359
JMP 2011)-10-21 mu: 1---=--- &ii
CHECKED BY:
KEYSTONE XL PROJECT
CHAI NACE: DISCIPLINE I
DETAIL 28 DRAINAGE AND IRRIGATION
TEMPORARY DRAIN TILE REPAIR
03
OEStCN CHECKER: ~S~C~AL~E---~O~WC~N-o-----------~R(V~0-2---t
N.T.S. 4359 - 03- ML- 03- 721 WSF RW P7100
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS
THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.
ORIGINAL POSITION OF TILE BEFORE EXCAVATION RELOCATED POSITION OF TILE LINE
AFTER EXCAVATION (SEE NOTES 1 & 2)
TILE DIMENSIONS AND QUALITY SHALL BE EQUAL TO THAT OF EXISTING TILE AND CUT TO NECESSARY LENGTH
13 ~ ~ "' § 5
USE SAND FILLED DR SAKRETE SACKS SET ON PIPE TO MAINTAIN A POSITIVE SEPARATION
IF TOTAL SPAN EXCEEDS 10 FEET PIPE SHALL
SEE NOTE J
BE USED TD PROVIDE TYPICAL CONTINUOUS SUPPORT
PLAN VIEW BUTT ENDS
(DRAIN TILE
CHANNEL (SEE TABLE BELOW)
PAD WITH SOIL
SECTION "A-A" CHANNEL (SPANS < 10 FEET)
FLAME CUT APPROX. J - 6" SLOTS,
1'-0" c/c, IN TOP THIRD OF PIPE
TILE FULL LENGTH OF INTERIOR
w "' END VIEWS
RIGID PIPE (SEE TABLE BELOW)
~ ' 0
5 N
tllUES: N
I . TIL£ REPAIR SHALL MAINTAIN ~GINAL ALICN.MENT ANO GRADIENT
TILE SIZE
J"
4" - 5"
6"-9" 10"
v.t!EN ANGLE "A", BET\\UN PIPEUNE ANO ORICtNAL TILE. 1$ MORE
O~ THAN 20 f"EET UNI.£$$ OTHER'MSE CHRECTED er THE PRO..ECT REPRESENTATIVE.
z 2. WHEN ANGLE "A .. IS t.ESS THAN 20 F'EET. UNLESS OTHERWISE \1 OIR(CTEO BY COMPANY, ANGLE •e• SliAll B( 45· FOR USUAL J" WIOTiiS OF TRENCH. FOR EXTRA WIOTHS. IT MAY SE GA(ATtR AS
O~ OIRt:CTEO 9Y THE PROJECT REPR(S(NTATl\IE. 3. 3 FOOT MtNIMUM LENGTH OE CHANNa OR R1Ct0 PIPE $HALL ee:
A SUPPORTEO SY UN01$1\JRB(O $()IL, OR IF CROSSING 1$ NOT AT
SECTION "A- A" RIGID PIPE (SPANS > 10 FEET)
MINIMUM SUPPORT TABLE
CHANNEL SIZE PIPE SIZE
4" @ 5.4 #/FT. 4" STD. WT 5"@ 6.7 #/FT. 6" STD. WT
7" @ 9.8 #/FT. 8"-10" STD. WT 10" @ 15.J #/FT. 12" STD. WT
~ RICHT ANG!.£$ TO GAS PtP(llN:E. EOUIVAU:NT U:NCTH ~ PERP(NOIOJLAR TO TR(NCH. SHIM Vi11H SAKRETE. SANO 8A¢S OR CONCRETE et.OO<S TO UN01$TVRS(O $0ll. FOR SUPPORT ANO ORAINAGE .... CRAOIENT MAINTENANCE (TYPICAL BOTH SIDES). => 4. DRAINAGE TIU SHAU. BE R£PLACE0 SO TliAT ITS FORMER GRADIENT AND AUGNMEN T ARE RESTORED. (!) 5. DIAMETER Of' RIGID PIPE SHALL SE <:E AOEOUATE SIZE TO Al.LOW FOR THE INSTAU.ATION Of' THE TIU FOR T>iE F\Jll LENGTH Of THE RtGID I PIP(,
' 6.
8 OTHER MET>iODS Of' SUPPORTING DRAIN TILE MAY BE USED If THE ALTERHATE PROPOSED IS EQUIVALENT IN STRENGTH TO THE QfANNEL/PIPE SECTIONS SHO'hff AND If APPROVED BY ntE PROJECT REPRESENTATIVE IN ADVANCE. S1TE SPECIAC ALTERNATE SUPPORT SYSTEM TO BE DEVE:t.OPED BY lHE PROJECT REPRESENTATIVE AND FURNISHED TO CONTRACTOR FOR SPANS IN EXC£SS Of' 20 FEET, TIL£ GREATER lHA.N 10 INCliES CMAMETER. AND FOR HEADER SYSTEMS.
Q 7. All MATERIAL TO BE FURNISHED BY CONTRACTOR. 8. PRIOR TO REPAIRING TILE. CONTRACTOR SHALL PROOE INTO lHE EXISTING TILE TO ntE FULL ~om <:E T>iE RIGHT- Of- WAY TO OETERM(NE If
O~ AOOtTIOHAL DAMAGE HAS OCCURRED. All DAMACEO/OIST\JR0EO TILE SHALL BE REPAIRED AS NEAR AS PRACTICABLE TO ITS ORICIHAL OR BETTER CONDITION.
~ 9. .NtCHT CAP• OPEN ENOS Of' PIPE ANO/OR DRAIN TILES If REPA.tRS ARE NOT COMPLETED SY ENO Of' WORK DAY.
- ~ ~- ~~n~ '\. !r.~~s~.~_:,da F1A , 4359 CHAINACE: OISCIPUNE * OJ
exp Energy Services Inc. c • l.tS0.386."41 lf.•1 ,860.38$~
1JOOM&llO(ICfi!MflM o!''•
~~"""'-·FL :woe .,-;.exp. -.-xp.ciom ... ______ _
TC....MJ!R.OWG 8.5X11
JMP 2011H0-21 TITU: 1~~~..,.r-~~- ~t
CHECKED BY:
WSF RW P7100
DETAIL 29 DRAIN AGE ANO IRRIGATION
PERMANENT DRAIN TIL.£ REPAIR
4359- 0J- ML- OJ- 722
CADD DRAWING: DO NOT MAKE MANUAL REVISIONS