+ All Categories
Home > Documents > Typical Drawing Index - South Dakota Public Utilities ... · Typical Drawing Index Delaill Typical...

Typical Drawing Index - South Dakota Public Utilities ... · Typical Drawing Index Delaill Typical...

Date post: 02-Apr-2018
Category:
Upload: vophuc
View: 216 times
Download: 1 times
Share this document with a friend
39
ical Drawing Index Delaill Typical Silt Fence Baer Delail2 Typical Straw or Hay Bail Banier Delail3 Temporary/Permanent Slope Breaker Delail (Water Bars) Delail4 Erosion Control Maing Insllation Delail5 Typical Dewateng Filter Bag Delail6 Typical Straw Bale Dewatering Structure Delail7 Typical Permanent Trench Breakers Delail8 "Dry" Wetland Crossing Method Delail9 Slandard WeUand Crossing Method Delaill0 Push/Pull Wetland Crossing Meth Delailll Typil Open Cut Wet Cssing Method Non-Flowing Wateody Delail12 Typical Open Cut Wet Cssing Method Flowing Way Delail12 a Typical Open Cut Wet Crossing Method Flowing Waterbody - Construction Produres Delail13 Typical Dry Flume Cssing Method Delail13 a Typil D Flume Crossing Method - Construion Predures Delail14 Typil Dam and Pump Crossing Delail14a Typil Dam and Pump Crossing - Construion Produres Delail15 Typil Hozonlal Dll (HDD) Si Plan & Prle Delail16 Typical Tempo Bridge Crossing Delail16 a Typical Temporary Bridge Crossing - Constction Pdures Delail17 Typical Flume Bdge Crossing Delail18 Typil Railcar Bridge Cssing Delail18a Typil Railcar Bridge Crossing - Constction Prous Delail19 Flexible Channel Liner Installation Delail20 Typil Rock Rip-Rap Delail21 Typil Road Bore Crossing Delail22 Stream bank Reclamation - Brush Layer in Css Cut Slope Delail23 Stream bank Reclamation - Wall L Delail24 Stream bank Reclamation - Vegeted Geotextile Inslallaon Delail25 Typical ROW LayouVSoil Handling Delail26 Header/Main Crossove Pipeline Delail27 Relocate/Repla Drainage Header/Main Delail28 Tempora Drain Tile Repair Delail29 Permanent Repair Method of Drain Tiles Delail30 Equipment Cleaning Slation Delail Delail31 Equipment Wash Slation Detail Delail67 Topsoil Conservation Ditch Spoil Stripping Tple Ditch & Delail67A Topsoil Conservation Ditch & Spoil Stripping Tple Ditch NOTE: The llowing pical drawings are included ease r n. Delails 1 thugh 31 n be found i n the Construction Mitigation and Reamation Plan
Transcript

Typical Drawing Index

Delaill Typical Silt Fence Banier Delail2 Typical Straw or Hay Bail Banier Delail3 Temporary/Permanent Slope Breaker Delail (Water Bars) Delail4 Erosion Control Matting Inslallation Delail5 Typical Dewatering Filter Bag Delail6 Typical Straw Bale Dewatering Structure Delail7 Typical Permanent Trench Breakers Delail8 "Dry" Wetland Crossing Method Delail9 Slandard WeUand Crossing Method Delaill0 Push/Pull Wetland Crossing Method Delailll Typical Open Cut Wet Crossing Method Non-Flowing Waterbody Delail12 Typical Open Cut Wet Crossing Method Flowing Waterbody Delail12 a Typical Open Cut Wet Crossing Method Flowing Waterbody - Construction Procedures Delail13 Typical Dry Flume Crossing Method Delail13 a Typical Dry Flume Crossing Method - Construction Procedures Delail14 Typical Dam and Pump Crossing Delail14a Typical Dam and Pump Crossing - Construction Procedures Delail15 Typical Horizonlal Drill (HDD) Site Plan & Profile Delail16 Typical Temporary Bridge Crossing Delail16 a Typical Temporary Bridge Crossing - Construction Procedures Delail17 Typical Flume Bridge Crossing Delail18 Typical Railcar Bridge Crossing Delail18a Typical Railcar Bridge Crossing - Construction Procedures Delail19 Flexible Channel Liner Installation Delail20 Typical Rock Rip-Rap Delail21 Typical Road Bore Crossing Delail22 Stream bank Reclamation - Brush Layer in Cross Cut Slope Delail23 Stream bank Reclamation - Wall Log Delail24 Stream bank Reclamation - Vegelated Geotextile Inslallation Delail25 Typical ROW LayouVSoil Handling Delail26 Header/Main Crossovers of Pipeline Delail27 Relocate/Replace Drainage Header/Main Delail28 Temporary Drain Tile Repair Delail29 Permanent Repair Method of Drain Tiles Delail30 Equipment Cleaning Slation Delail Delail31 Equipment Wash Slation Detail Delail67 Topsoil Conservation Ditch Spoil Stripping Triple Ditch & Delail67A Topsoil Conservation Ditch & Spoil Stripping Triple Ditch

NOTE: The following typical drawings are included ease for of reference. • Delails 1 through 31 can be found in the Construction Mitigation and Reclamation Plan

ZollerJ
Text Box
Details 12A, 16A, 18A, 22, 67 & 67A are new additions

Update

d

Update

d

Update

d

Update

d

Update

d

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

"' I!! 0 z

" z

~ "' 0 0 I!! < 0 CL ::>

~ I

0

'i 0 0 N

N

ROCK FILL, TIMBER~~'!< OR WOVEN

GEOTEXTILE SPILL PAD

GENTLE SLOPE - 1 NATURAL GRADE

/

NOTES:

I SHEET FLOW

PLAN

SECTION A-A

2" x2" STAKES OR REBAR (TYP.)

4" (TYP.) RECESS

2"x2" STAKES DR REBAR (TYP.)

STRAW BALES

I GENTLE SLOPE­NA TURAL GRADE

~ 1. INSTALL A STRAW BALE DEWATERING STRUCTURE WHEREVER IT IS NECESSARY AND AS DIRECTED BY THE ENll1RONMENTAL INSPECTOR TO PREVENT THE FLOW OF HEAVILY SILT LADEN WATER INTO z

" WA TERBOOIES OR WETLANDS. ! 2. DISCHARGE SITE SHOULD BE WELL VEGETATED AND LOCATED AT LEAST 50 FEET FROM ANY WATERBODY. THE TOPOGRAPHY OF THE SITE SHOULD BE SUCH THAT WATER YllLL FLOW INTO THE DEWA TERING STRUCTURE ANO AWAY FROM ANY WORK AREAS. THE AREA DOWNSLOPE FROM THE DEWATERING SITE MUST BE REASONABLY FLAT OR STABILIZED BY VEGETATION OR OTHER MEANS TO ALLOW THE FILTERED WATER TO CONTINUE AS SHEET FLOW.

~ 0

tl' 8 "' 3. <!;

DIRECT THE PUMPED WATER ONTO A STABLE SPILL PAO CONSTRUCTED OF ROCKFILL, WEIGHTED TIMBERS, OR A WOVEN GEOTEXTILE STAKED TO THE GROUND SURFACE, SUCH AS MIRAFl 600X, TERRAFIX 400W, OR A COMPANY APPROVED EQUIVALENT. BEYOND THE SPILL PAD FORCE THE DISCHARGE WATER INTO SHEET FLOW USING STRAW BALES AND THE NATURAL TOPOGRAPHY.

I

'i ~ 4 .

5. DISCHARGE RATES SHOULD BE SUCH THAT THE CAPACITY OF THE STRUCTURE YllLL NOT BE EXCEEDED. DISCHARGE WATER SHALL BE FORCED INTO SHEET FLOW IMMEDIATELY BEYOND THE SPILL PAD USING A COMBINATION OF STRAW BALES AND THE NATURAL TOPOGRAPHY. RECESS STRAW BALES. DRIVE TWO (2) STAKES OR REBAR IN TO EACH BALE TO ANCHOR THEM IN PLACE. INSTALLATION SPECIFICATIONS TD BE MODIFIED AS NECESSARY TD SUIT ACTUAL SI TE CONDITIONS.

exp Energy Services Inc. c •l.tS0.386.$'41 lf.•1 ,860.38$~

1JOOM&llO(ICfi!MflM .:"'• ~~w.-.FL :woe .,-;.exp. - .-xp.ciom ... ______ _

TC....MJ!R.OWG 8.5X11

DISCIPLINE I 03

JMP 2011H0-21 TITU: "'

1 DETAIL 6 TYPICAL STRAW BALE OEWATERING STRUCTURE

CHECKED BY: OEStGN CHECKER: 1--~~~~~~~~~~~~~~~~~~~~~--t

WSF RW ""'SCALE N.T.S. owe No 4359-03- ML-05- 706

CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

N

<!; I

------- ----/ ...-

/ ...-...-J -

A

RESPREAD TOPSOIL

12"

12" KEY r-

SECTION A-A SECTION 8-8

NOTES:

lRENCH BREAKERS TO BE INSTALLED AS SHOWN ON THE CONSlRUCTION DRAWINGS. WHERE DESCRIBED IN THE PLAN, AND AS DIRECTED. OPEN WEAVE HEMP OR JUTE SACKS SHALL BE FILLED WITH AN AVERAGE 55 LBS. MIXTURE OF:

1) ONE (1) PART CEMENT AND SIX (6) PARTS SAND OR SUBSOIL, OR 2) ONE (1) PART CEMENT. THREE (3) PARTS FLYASH. AND FIVE (5) PARTS SAND OR SUBSOIL 3) SAND WITH JUST SUFFICIENT WATER TO PERMIT MIXTURE TO EXUDE AND BOND SACKS

.!. TOGETHER. TOPSOIL IS NOT TO BE USED IN SACKS. 20 .. 3. KEY EACH TRENCH BREAKER A MINIMUM OF ONE (1) FT. INTO BOTTOMS AND SIDES OF TRENCH. _ 4. FOAM TRENCH BREAKERS MAY BE USED IN LIEU OF SAND SACK TRENCH BREAKERS. o 5. INSTALLATION SPECIFICATIONS TO BE MODIFIED AS NECESSARY TO SUI T ACTUAL SITE CONDITIONS. lQ 6. TRENCH BREAKERS SHALL BE INSTALLED SUCH THAT THE TOP OF EACH DOWNSLOPE BREAKER IS

~ 1----A_B_o_VE_TH_E_B_o_r_r_o~M_O_F_TH_E_N_E_x_r_u_P_SL_o_P_E_B_R~E_A_K_ER_. __________________ --< o: (().) OESJGNER:

T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,

~~'-·FL :wos .,. ... exp. -.-xp.com .. __ ___ ...

TC...MJ!RDWG 8.5X11

KEYSTONE XL PROJECT

FIA f 4359 CHAI NACE: OISCIPLINE I 03

JMP 2011)-10-21 mu: 1-----,m.---- &ii DETAIL 7

TYPICAL PERMANENT TRENCH BREAKER CHECKED BY: OEStCN CHECKER:i-,..,.~---=~-----------~=---l

WSF RW "'" SCALE N.T.S. owe No 4359- 03- ML- 05- 707 R(V02

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

Update

d

Update

d

Update

d

Update

d

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

IS ~ ;;1 "' § " w er

~ I

0 5 N

N

0

CONSTRUCTION R.0.W.

"" -< EXTRA -<I WORK SPACE

~I -<

HAYBALE GA TE TO BE OPENED ONLY DURING

VEH: CLE CROSZ

~ • TRENCH/HARD PLUG I -< RETAIN A MIN. 10' -'\ VEGETATIVE BUFFER TO ""' • THE EXTENT POSSIBLE

,,,L , I,_ , _ -,

----- -----~

WATERBOOY ~ -----

--y-y-..,., v '\

{1j ' ~ I · .(

STREAM SPOIL PILE

EXTRA WORK SPACE

~ --------------HAYBALES

BACKHOE

-' CJ :c

MIN. ~~ 10' >- Vi C>: <Jl <0 -----C>: C>: oU a. :::. w ,_

TRENCH/HARO PLUG

PROPOSED PIPELINE ALIGNMEN T

PLAN VIEW

.,

~ ---- FLOW ~ -----

~ 1-----------.-------------.------------------------< er (().) OESJGNER:

T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl8t\old • • , ,

~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...

TC...MJ!RDWG 8.5X11

KEYSTONE XL PROJECT

FIA f 4359 CHAI NACE: DISCIPLINE I 03

JMP 2011)-10-21 mu: 1---=--- &ii DETAIL 12 TYPICAL OPEN CUT v.t:T CROSSING METHOD

CHECKED BY: DESIGN CHECKER:i-,..,~---~=~FL_o_wi_N_G_w_A_TE_R_B_o_D_Y ____ ~=--1 WSF RW "'" SCALE N.T.S. owe No 4359- 03- ML- 03- 705 R(V02

CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS

New

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

~ I

0 Ci N

KEY INTO BANK IF NECESSARY TO SEAL

FLOW

SPOIL CONTAINMENT

BERM

INSTREAM DITCH SPOIL

IF TRENCH SIDES BECOME UNSTABLE AND COULD

COLLAPSE, ALLOW TRENCH TO REFILL WI TH WATER AND PLACE

PIPE UNDERWATER

exp Energy Services Inc. c •l.tS0.386.$'41 lf.•1 ,860.38$~

1JOOM&llO(ICfi!MflM ~'•

WORKING R.O. W. WIDTH

INSTREAM DITCH SPOIL

CONSTRUCT STABLE APPROACH ROAD USING ROCK. CORDUROY OR CLEAN COARSE GRAVEL

1--~x

I EXTRA WORK

SPACE

o~ ENERGY DISSIPATOR-ROCK SCOUR PROTECTION -,_

~

1--RETAIN A 10' VEGETATIVE ) BUFFER TO THE EXTENT

·~ .. , .. ,:, "" r OSSIBLE

11 BACKHOE TO BE CLOSED AT NIGHT OR DURING RAINF All

PLAN VIEW

FLUME LENGTH

NEW PIPELINE

SECTION A-A

TEMPORARY VEHICLE CROSSING

ENERGY DISSIPATOR- ROCK SCOUR PROTECTION

FLUME UNDER TEMPORARY VEHICLE CROSSING

DISCIPLINE I 03

DETAIL 13 TYPICAL ORY FLUME CROSSING METHOD

~~w.-.FL :woe •4";'-exp. CHECKED BY: OEStGN CHECKER: -.-xp.ciom ... ______ _ I------~------------~----<

WSF RW ""' SCALE N.T.S. owe No 4359- 03- ML- 03- 707

TC....MJ!R.OWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITlq NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

CONSTRUCTION PROCEOURES:

I. MARK OUT AND MAINTAIN LIMITS OF AUIBORIZED WORK AREAS WIIB FENCING OR FLAGGING TAPE TO AVOlD UNNECESSARY DISTURBANCE OF VEGETATION. ENSURE EQUIPMENT OPERATORS WORKING ON IBE CROSSING HAVE BEEN BRIEFED ABOUT IBIS PLAN AND IBE MEASURE NEEDED TO PROTECT WATER QUAUTY.

2. ALL NECESSARY EQUIPMENT AND MATERIALS TO BUILD IBE FLUME MUST BE ON-SITE OR READILY AVAILABLE PRIOR TO COMMENONG IN-WATER WORK.

3. TO IBE EXTEN T POSSIBLE, MAINTAIN A MINIMUM 10 FT. VEGETATIVE BUFFER STRIP BETWEEN DISTURBED AREAS AND IBE WATERCOURSE. INSTALL AND MAINTAIN A SILT FENCE OR STRAW BALE BARRIER UPSLOPE OF IBE BUFFER STRIP ON EACH SIDE OF IBE WATERCOURSE.

-

4. CONTRACTOR SHALL SUPPLY, INSTALL AND MAINTAIN SEDIMENT CONTROL STRUCTURES, AS DEPICTED OR ALONG DOWN GRADIENT SIDES OF WORK AREAS AND STAGING AREAS SUCH IBAT NO HEAVILY SILT LADEN WATER ENTERS STREAM. a. NO HEAVILY SILT LADEN WATER SHALL BE DISCHARGED DIREClLY INTO IBE STREAM. b. EROSION AND SEDIMENT CONTROL STRUCTURE LOCATIONS AS DEPICTED ARE APPROXIMATE AND MAY

BE ADJUSTED AS DIRECTED BY IBE COMPANY INSPECTOR TO ACTUAL SITE CONDITIONS. c. SILT FENCE OR STRAW BALE INSTALLATIONS SHALL INCLUDE REMOVABLE SECTIONS TO FACILITATE

ACCESS DURING CONSTRUCTION. UTILIZE STRAW BALE BARRIERS ONLY IN UEU OF A SILT FENCE WHERE FREQUENT ACCESS IS REQUIRED.

d. SEDIMENT LADEN WATER FROM TRENCH DEWATERING SHALL BE DISCHARGED TO A WELL VEGETATED UPLAND AREA IN TO A STRAW BALE DEWATERING STRUCTURE OR GEOTEXTILE FILTER BAG.

e. SEDIMENT CONTROL STRUCTURES MUST BE IN PLACE AT ALL TIMES ACROSS IBE DISTURBED PORTIONS OF IBE RIGHT-OF-WAY EXCEPT DURING EXCAVATION/INSTALLATION OF IBE CROSSING PIPE.

f, SOFT DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM IBE RIVER CROSSING UNTIL IBE RIVER CROSSING IS INSTALLED AND BACKFILLED.

5. PIPE SHALL BE STRUNG AND WELDED FOR READY INSTALLATION PRIOR TO WATERCOURSE TRENCHING. 6. FlUME CAPACITY DURING DRY CROSSING SHALL BE SUFFIOENT TO ACCOMMODATE 1.5 TIMES IBE FlOW MEASURED

AT IBE TIME OF" CONSTRUCTION PROVIDED THAT THE FLUMES WILL BE IN PLACE NOT MORE IBAN 96 HOURS AND NO PRECIPITATION IS FORECAST. FLUME CAPACITY FOR VEHICLE ACCESS SHALL BE SUFFICIENT TO PASS IBE 2 YEAR DESIGN FlOW OR IBE FlOW REASONABLY EXPECTED TO OCCUR DURING IBE INSTALLATION. EXCESS FLUMES REQUIRED FOR LONGER TERM ACCESS SHALL BE CAPPED DURING DRY CROSSING PROCEDURES.

7. ENSURE THAT IBE DAMS AND VEHICLE CROSSING ARE LOCATED FAR ENOUGH APART TO ALLOW FOR A WIDE EXCAVATION.

8. FlUMES ARE TD BE SET WIIB 10 PERCENT OF" IBEIR DIAMETER BELOW STRf.'.AMBED LEVEL WHERE SOIL CONDITIONS >-- PERMIT (OTHERWISf.'. INSTALLED AT STREAM GRADE AND SLOPE.)

9. PLACE IMPERVIOUS DAMS AT EACH END OF IBE FLUME, UPSTREAM FIRST, IBEN DOWNSTREAM. ACCEPTABLE ALTERNATIVES INCLUDE GRAVEL V~IB RIP-RAP PROTECTION, SAND BAGS, STEEL PLATE AND ROCKFILL DURING INSTALLATION, INSTALL AN IMPERVIOUS MEMBRANE, It NECESSARY, TO LIMIT LEAKAGE. DAMS MAY NEED KEYING IN TO IBE BANK AND STREAMBED.

-EXCAVATE TRENCH THROUGH PLUGS AND UNDER FLUME FROM BOIB SIDES. WORK IS TO BE COMPLETED AS QUICKLY AS POSSIBLE. o. LOWER IN PIPE BY PASSING UNDER FLUME AND BACKFILL IMMEDIATELY WIIB SPOIL MATERIAL b. IT IS NOT NECESSARY TO DEWATER IBE IN-STREAM TRENCH, HOWEVER, DISPLACED WATER SHALL

BE PUMPED TO A STABLE UPLAND AREA TO AVOID OVERTOPPING OF DAMS DURING PIPE PLACEMENT. c. IF IBE SPOIL MA TERI AL IS NOT SUITABLE, USE IMPORTED CLEAN GRANULAR MATERIAL d. IF BLASTING IS REQUIRED. USE CONTROLLED BLASTING TECHNIQUES TO PREVENT DAMAGE TO THE

FlOW CONVEYANCE SYSTEM. ALTERNATIVELY, BLASTING MAY BE ACCOMPUSHED PRIOR TO THE FlUME INSTALLATION BY DRILLING THROUGH IBE OVERBURDEN.

10. EXCAVATED MATERIAL MUST NOT SE STOCKPILED WITHIN 10 FT. OF IBE WATERCOURSE. IBIS MATERIAL SHALL BE 2 CONTAINED TO PREVENT SA TUR A TED SOIL F"ROM FlOWING BACK INTO IBE WATERCOURSE. 6 11. DEWATERING OF IBE ONLAND TRENCH SHOULD OCCUR IN A STABLE VEGETATED AREA A MINIMUM OF 50 FT. FROM ANY 0 WATERBODY. IBE PUMP DISCHARGE SHOULD BE DIRECTED ONTO A STABLE SPILL PAD CONSTRUCTED OF ROCKflLL OR N TIMBERS TO PREVEN T LOCALIZED EROSION. IBE DISCHARGE WATER SHOULD ALSO BE F"ORCED IN TO SHEET FlOW

>-- IMMEDIATELY BEYOND IBE SPILL PAD BY USING STRAW BALES AND IBE NATURAL TOPOGRAPHY. W1 12. FlUMES SHOULD BE REMOVED AS SOON AS POSSIBLE, WHEN NO LONGER REQUIRED FOR PIPE LAYING OR FOR ROAD ACCESS, IN IBE F"OLLOWING MANNER: o. REMOVE IBE VEHICLE CROSSING RAMP. BANKS ARE TO BE RESTORED TO A STABLE ANGLE AND

PROTECTED WIIB EROS10N RESISTANT MATERIAL COMPATIBLE WIIB IBE FLOW CONDITIONS (E.G., EROSION CONTROL BLANKETS, CRIBBING, ROCK RIP-RAP, ETC.) TO IBE MAXIMUM EXTENT POSSIBLE BEFORE REMOVING IBE DAMS.

b. REMOVE DOWNSTREAM DAM. c. REMOVE UPSTREAM DAM. d . REMOVE FlUME. e. COMPLETE BANK TRIMMING AND EROSION PROTECTION. It SANDBAGS ARE USED FOR IBE DAMS,

PLACE AND REMOVE BY HAND TO AVOID EQUIPMENT BREAKING BAGS. :;! 13. RESTORE IBE STREAMBED AND BANKS TO APPROXIMATE PRE-CONSTRUCTION CONTOURS, BUT NOT TO EXCEED 2 " HORIZONTAL TO 1 VERTICAL.

o. INSTALL PERMANENT EROSION AND SEDIMENT CONTROL STRUCTURES AS INDICATED ON A SITE ~ SPEOFIC BASIS. IN IBE ABSENCE OF SITE SPECIFIC INFORMATION, A FlEXIBLE CHANNEL LINER SUCH ~ AS NAG C125 OR C350 WHICH IS CAPABLE OF" WIIBSTANDING ANTICIPATED FlOW SHALL BE - INSTALLED. ALTERNATIVELY, ROCK RIP-RAP SHALL BE INSTALLED.

- b. ANY MATERIALS PLACED IN IBE STREAM TO FACILITATE CONSTRUCTION SHALL BE REMOVED DURING o RESTORATION. BANKS SHALL BE STABILIZED AND TEMPORARY SEDIMENT BARRIERS INSTALLED AS

SOON AS POSS1BLE AFTER CROSSING, BUT WIIBIN 24 HOURS OF COMPLETING THE CROSS1NG. ~ c. MAINTAIN A SILT FENCE OR STRAW BALE BARRIER ALONG IBE WATER COURSE UNTIL VEGETATION IS en ESTABUSHED IN ADJACENT DISTURBED AREAS.

KEYSTONE XL PROJECT ~ (().) OESJGNER:

'-- T.r.~~~~.~da flA , 4359 I CHAINACE: I DISCIPLINE I

exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~

JMP 2011)-10-21 mu: , ___ _,_,,,,..--- &ii DETAIL 13A TYPICAL DRY FLUME CROSSING METHOD -

D3

1J00 .... l.'O(ICiilllfl8t\old • • , ,

~~'-·FL :wos .,-... exp. CHECKED BY: DESIGN CHECKER:i-,..,~---~-c~o_N_s_TR_u_c_TI_o_N_P_R_o_c_E_o_u_R_E_s ___ =~---1 Rw .,'- SCALE N.T.S. 1owc No IR£V02 -.-xp.com .. _____ ...

WSF _ 4359- 03- ML- 03- 708 I TC...MJ!IUlWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

~

~;~ I INSTREAM _ _ DI TCH SPOIL

~

~ ::::> ~ I r z ':E

I ff-0 ~ SPOIL X

CONTAINMENT BERM

A

1 =t~ow --:::_-

INTAKE HOSE

FILTER/ SCREEN

PUMP

FJ SPOIL

NMENT BERM

IN STREAM DITCH SPOIL

QAM

--

WORKING R.0.W. WIDTH

BACKHOE

PROPOSED PIPELINE ALIGNMENT

SILT FENCE (TYP.)

x

TOP BANK

----------... -

DISCHARGE LINE

\

I EXTRA ~ WORK SPACE < ,~ ~

CONSTRUCT STABLE I APPROACH ROAD USING ROCK, CORDUROY, OR I CLEAN COARSE GRAVEL

1--.--x -----TEMPORARILY PLUG FLUME DURING CONSTRUCTION OF THE CROSSING

- - :::::rL15W---:.._- 1 -- -

F-:::::::::::'.: x +'--0...J_ ,

RETAIN A 10 FT. "' I

-ENERGY OISSIPATER­ROCK SCOUR PROTECTION

VEGETATIVE BUFFER TO THE EXTENT POSSIBLE

L~ SILT FENCE GA TE TO BE CLOSED AT NIGHT OR DURING RAINFALL

PLAN VIEW

SUMP LINE WITH ROCK RIP- RAP IF NECESSARY

TO REDUCE TURBIDI TY

FLUME/CUL VERT UNDER TEMPORARY VEHICLE

CROSSING

TEMPORARY VEHICLE CROSSING

ENERGY QISSIPATOR-ROCK SCOUR PROTECTION

"' FLOW

WELL GRADED GRAVEL 'V

0

~ ~ I

0 Ci N

0 NOTES:

NEW PIPELINE

IF TRENCH SIDES BECOME UNSTABLE ANO COULD COLLAPSE, ALLOW TRENCH TO REFILL WI TH WATER ANO PLACE PIPE UNOERWA TER.

SECTION A-A

~ 1. PIPELINE PLACEMENT WITHIN RIGHT-OF-WAY CONCEPTUAL ONLY. en 2 SEE DETAIL 14A FOR CONSTRUCTION PROCEDURES.

~ ,; ~ OES1GNER KEYSTONE XL PROJECT

'\ !r.~~S~.~:,da F1A , 4359 CHAI NACE:

JMP 2011H0-21 TITU: 1----;m;c---- &iJt DETAIL 14

DISCIPLINE I

exp Energy Services Inc. c •l.tS0.386.$'41 lf. •1 ,860.38$~

1JOOM&llO(ICfi!M flM ~'• TYPICAL DAM ANO PUMP CROSSING CHECKED BY: OEStGN CHECKER:

OJ

~~w.-.FL :woe •4";'-exp. 1-------------------~-----< - .-xp.ciom ... _ _ ____ _

WSF RW ""'SCALE N.T.S. owe No 4359- 03- ML-OJ- 709

TC....MJ!R.OWG 8.5X11 CAPO DRAWING: 00 NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDmq Ns MAY VARY FROM THE SITE GRAPHICALL y REPRESENTED.

CONSTRUCTION PRQCEQURES:

1. WHERE NECESSARY. OBTAIN PRIOR APPROVAL BEFORE USlNG THE DAM AND PUMP METHOD. 2. If THERE IS ANY FLOW IN THE WATERCOURSE, INSTALL PUMPS TO MAINTAIN STREAMfLQW AROUND THE BLOCKED Off

SECTIONS Of CHANNEL. THE PUMP IS TO HAVE 1.5 TIMES THE PUMPING CAPACITY Of ANTIClPATED FLOW. A SECOND STANDBY PUMP Of EQUAL CAPAClTY IS TO BE READILY AVAILABLE AT All TIMES. AN ENERGY DISSlPATER IS TO BE BUil T TO ACCEPT PUMP DISCHARGE WITHOUT STREAMBED QR STREAMBANK EROSION. IF THE CROSSING IS PROLONGED BEYOND ONE DAY THE OPERATION NEEDS TO BE MONITORED OVERNIGHT.

3. SCHEDULE INSTREAM ACTIVITY fQR LOW FLOW PERIODS If POSSIBLE. 4. MARK OUT AND MAINTAIN LIMITS OF AUTHORIZED WORK AREAS WITH FENCING QR FLAGGING TAPE TO AVOID

UNNECESSARY DISTURBANCE Of VEGETATION. ENSURE EQUIPMENT OPERATORS WORKING ON THE CROSSING HAVE BEEN BRIEFED ABOUT THIS PLAN AND THE MEASURES NEEDED TO PROTECT WATER QUALITY. INSTALL PRE-WORK SEDIMENT CONTROL MEASURES AS SPECIFIED IN THE PLAN. ALL NECESSARY EQUIPMENT AND MATERIALS TO BUILD THE DAMS AND TO PUMP WATER MUST BE ON SITE QR READILY AVAILABLE PRIOR TO COMMENCING IN-WATER CONSTRUCTION. PIPE SHOULD BE STRUNG, WELDED AND COATED AND READY fQR INSTALLATION PRIOR TO WATERCOURSE TRENCHING •

.....__ 5. CONTRACTOR SHALL SUPPLY, INSTALL AND MAINTAIN SEDIMENT CONTROL STRUCTURES, AS DEPICTED AND ALONG DOWN GRADIENT SlDES Of WORK AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SlLT LADEN WATER ENTERS STREAM.

o. NO HEAVILY SlLT LADEN WATER SHALL BE DISCHARGED DIRECTLY INTO THE STREAM. b. EROSION AND SEDIMENT CONTROL STRUCTURE LOCA TIQNS AS DEPICTED ARE APP ROXI MA TE AND MAY

BE ADJUSTED AS DIRECTED BY THE COMPANY INSPECTOR TO ACTUAL SITE CONDITIONS. c. SllT FENCE OR STRAW BALE INSTALLATIONS SHALL INCLUDE REMOVABLE SECTIONS TO FACILITATE

ACCESS DURING CONSTRUCTION. UTILIZE STRAW BALE BARRIERS ONLY IN LIEU OF A SILT FENCE WHERE FREQUENT ACCESS IS REQUIRED.

d. SEDIMENT LADEN WATER FROM TRENCH DEWA TERING SHALL BE DISCHARGED TO A WELL VE GE TA TED UPLAND AREA INTO A STRAW BALE DEWATERIN() STRUCTURE OR CEQTEXTILE FILTER BAG.

e. SEDIMENT CONTROL STRUCTURES MUST BE IN PLACE AT ALL TIMES ACROSS THE DISTURBED PORTIONS OF THE RIGHT-OF-WAY EXCEPT DURING EXCAVATION/INSTALLATION OF THE CROSSING PIPE.

f, SOFT DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE RIVER CROSSIN() UNTIL THE RIVER CROSSIN() IS INSTALLED AND BACKFILLED.

6. TO THE EXTENT POSSIBLE, MAINTAIN A MINIMUM 10 FEET VEGETATIVE BUFFER STRIP BETWEEN DISTURBED AREAS AND THE WATERCOURSE. INSTALL AND MAINTAIN A SILT FENCE UPSLOPE Of THE BUFFER STRIP ON EACH SIDE Of THE WATERCOURSE. THE Sll T FENCE SHOULD INCORPORATE REMOVABLE "GA TES" AS REQUIRED TO ALLOW ACCESS WHILE MAINTAINING EASE OF REPLACEMENT FOR OVERNIGHT QR DURING PERIODS Of RAINFALL

- 7. CONSTRUCT A TEMPORARY SUMP UPSTREAM OF THE DAM AND LINE WITH ROCKFILL IF A NA TUR AL POOL DOES NOT

- EXIST. INSTALL THE PUMP OR PUMP INTAKE IN THE POOL OR SUMP. DISCHARGE WATER ONTO AN ENERGY DISSIPATER DOWNSTREAM Of THE WORK AREA.

8. EXCAVATED MATERIAL MUST NOT BE STOCKPILED WITHIN 10 FT. OF THE WATERCOURSE. THIS MATERIAL MUST BE CONTAINED WITHIN BERM CONTAINMENT. WITH SECONDARY SILT FENCE PROTECTION TO PREVENT SATURATED SOIL FROM FLOWING BACK INTO THE WATERCOURSE.

9. CHEMICALS. FUELS, LUBRICATING OILS SHALL NOT BE STORED AND EQUIPMENT REFUELED WITHIN 100 FT. OF THE WA TERBODY. PUMPS ARE TO BE REFUELED AS PER THE SPCC PLANS.

10. STAGING AREAS ARE TO BE LOCATED AT LEAST 10 FT. FROM THE WATER'S EDGE (WHERE TOPOGRAPHIC CONDITIONS PERMIT) AND SHALL BE THE MINIMUM SIZE NEEDED.

11. DAMS ARE TO BE MADE OF STEEL PLATE, INFLATABLE PLASTIC DAM, SAND BAGS, COBBLES, WELL GRADED COARSE GRA \/EL FILL, QR ROCK Fill. DAMS MAY NEED KEYING INTO THE BANKS AND STREAMBED. ENSURE THAT THE DAM AND VEHICLE CROSSING ARE LOCATED FAR ENOUGH APART TO ALLOW fOR A WIDE EXCAVATION. CAP FLUMES USED UNDER VEHICLE CROSSING DURING ORY CROSSING.

12. DEWATER AREA BETWEEN DAMS IF POSSIBLE. DEWATERING SHOULD OCCUR IN A STABLE VEGETATIVE AREA A MINIMUM OF 50 FT. FROM ANY WATERBODY. THE PUMP DISCHARGE Sl-lOULD BE DISCliARGED ONTO A STABLE SPILL PAD CONSTRUCTED OF ROCKFILL SANDBAGS, OR TIMBERS TO PREVENT LOCALIZED EROSION. THE DISCHARGE WATER SHOULD ALSO BE FORCED INTO SHEET FLOW IMMEDIATELY BEYOND THE SPILL PAD BY USJNG STRAW BALES AND THE NATURAL TOPOGRAPHY DISCliARGED WA lER SHALL NOT BE ALLOWED TO FLOW INTO ANY WA lERCOURSE OR WETLAND. If IT IS NOT POSSJBLE TO DEWATER THE EXCAVATION DUE TO SOILS WITH A HIGH HYDRAULIC CONDUCTIVITY, THE EXCAVATION AND PIPE PLACEMENT IS TO BE CARRIED OUT IN THE STANDING WAlER. PUMP ANY DISPLACED WAlER AS DESCRIBED ABOVE TO PREVENT OVERTOPPING Of DAMS.

13. EXCAVATE TRENCH THROUGH PLUGS AND STREAMBEO FROM BOTH SIDES. RE-POSITIONING DISCHARGE HOSE AS NECESSARY. LOWER THE PIPE IN THE TRENCH AND BACKFILL IMMEDIA lEl Y. DURING THIS OPERATION WORK IS TO BE COMPLElED AS OUICKL Y AS POSSIBLE.

14. CONTRACTOR SHALL RESTORE THE STREAM BED ANO BANKS TO APPROXIMATE PRE-CONSTRUCTION CONTOURS, BUT NOT TO EXCEED 2 HORIZONTAL TO 1 VERTICAL.

o. CONTRACTOR SHALL INSTALL PERMANENT EROSlON AND SEDIMENT CONTROL STRUCTURES AS INDICAlED ON A SllE SPECIFIC BASJS. IN THE ABSENCE OF SITE SPECIFIC INFORMATION, A FLEXIBLE CHANNEL LINER SUCH AS NAG C125 QR C350 WHICH IS CAPABLE OF WITHSTANDING ANTICIPATED FLOW SHALL BE INSTALLED. ALTERNATIVELY, ROCK RIP-RAP SHALL BE INSTALLED.

:;! b. ANY MATERIALS PLACED IN THE STREAM TO FAClLITATE CONSTRUCTION SHALL BE REMOVED DURING " RESTORATION. BANKS SHALL BE STABILIZED AND TEMPORARY SEDIMENT BARRIERS INSTALLED AS SOON AS o POSSlBLE AFTER CROSSING, BUT WITHIN 24 HOURS Of COMPLETING THE CROSSlNG. !:{ c. MAINTAIN A SILT FENCE OR STRAW BALE BARRIER ALONG THE WATER COURSE UNTIL VEGETATION IS ~ ESTABLISHED IN ADJACENT DISTURBED AREAS .

.....__ 15. WHEN THE STREAMBED HAS BEEN RESTORED, THE CREEK BANKS ARE TO BE CONTOURED TO A STABLE ANGLE AND - PROlEClED WITH EROSION RESlSTANT MAlERIAL COMPATIBLE WITH FLOW VELOCITY BETWEEN DAMS (E.G., EROSION

.,_Q.. CONTROL BLANKETS. CRIBBING. ROCK RIP-RAP. ETC.) . THE DAMS ARE TO BE REMOVED DOWNSTREAM FIRST. KEEP ~- PUMP RUNNING UNTIL NORMAL FLOW IS RESUMED. COMPLElE BANK TRIMMING AND EROSION PROTECTION. IF SANDBAGS en ARE USED fOR THE DAMS, PLACE AND REMOVE BY HAND TO AVOID EQUIPMENT BREAKING BAGS.

~ ~ ~- ~~n~ ....._ '\ !r.~~S~.~:,da F1A , 4359 1 CHAINACE: 1 DISCIPLINE , o.:i exp Energy Services Inc. c •l.tS0.386.$'41 lf.•1 ,860.38$~

1JOOM&llO(ICfi!MflM ~'• ~~w.-.FL :woe •4";'-exp. - .-xp.ciom ... ______ _

TC....MJ!R.OWG 8.5X11

JMP 2011)-10-21 TITLE 1---;mz--- "'' DETAIL 14A

- TYPICAL DAM ANO PUMP CROSSING -l;;C;;;H;;;EC~K;;;E;;;D=;BY;;;=: =;;0;;;E;;;S;;;IG;;N=;C~H;;;E;;CK;;;E;;;R~: CONSTRUCTION PROCEDURES

WSF SCALE 1owc No

RW ""' N. T.S. 4.359 - 0.3- ML-0.3- 710 l"EV02

CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS

Update

d

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

2 I

0 0 N

0

r NON- WOVEN DECK WIDTH FOR WIDEST EQUIPMENT LOCATE SO ,~-----1:.

1 GEOTEXTILE

:x: TRENCHING DOES : ,. ; .:,.:_ TEMPORARY u NOT AFFECT : . . · . ,. BRIDGE

DECK MUST BE SEALED TO PREVENT SEDIMENT OR DEBRIS PUSHING THROUGH CRACKS IN BETWEEN DECK TIMBERS OR GEOTEX TILE DIAPER

,'.5 BRIDGE ~

~ x--

FLOW J FLOW

--x--

1 >6.5'

IN TA

STRINGERS TO BE DESIGNED BY AN ENGINEER TO SUPPORT EXPECTED LOADS

ALL BRIDGES TO HA VE CURBS TO CONTAIN SEDIMENT OR DEBRIS

SECTION A- A

l..=°'j:=~='.;:1-USE ROCK CORDUROY OR COARSE GRAVEL BRIDGE APPROACH PLACED OVER A NON- WOVEN GEOTEXTILE

TO BE ADEQUATEL y SUCH AS AMOCO 4553 OR EQUIVALENT TO STABILIZED FORM STABLE APPROACH ROADS

PLAN VIEW

ROCK OR COARSE GRAVEL FILL

BRIDGE LENGTH SEE NOTE 2, DETAIL 16A

DECK

0;:--g_....li.l'.i.J....l~><=-;;;ENSURE ADEOUA TE OPENING TO ALLOW AN TICIPATED INCREASE INSTREAM DISCHARGE

BRIDGE PROFILE

LOGS TO HOLD GRAVEL

BOULDER OR ROCK FILL

~-----RIP-RAP TOE ..,.,..__,_PROTECTION

TYPICAL TEMPORARY CRIB ABUTMENT

CURB

STEEL OR LOG STRINGER

~ ~ ~,-,.).-------~0-ES-l-GN_ER_: --------.--------K-EYST_O_N_E_X_L_P_R~-EC-T--------<

"" J) T.r.~~~~.~da FIA , 4359 CHAJNACE: DISCIPLINE N 03

exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl8t\old • • , ,

~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...

TC...MJ!RDWG 8.5X11

JMP 2011)-10-21 mu: 1-----,m.---- &ii DETAIL 16

TYPICAL TEMPORARY BRIDGE CROSSING CHECKED BY: OEStCN CHECKER:...,..,_~---=~-----------~=--!

WSF RW "'"SCALE N.T.S. owe No 4359 - 03- ML- 03- 712 R(VOl

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

New

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

LOCATE SO TRENCHING DOES NOT AFFECT THE TEMPORARY CROSSING

B

l FLOW

HAYBALE GATE TO BE OPENED ONLY DURING VEHICLE CROSSING

TOP OF BANK

ROCK SCOUR B PROTECTION FLOW (AS NEEDED) J

PLAN VIEW

TOP OF BANK

FLOW

FLUMES

MIN. 12"

SECTION

:· ..

TOP OF BANK

SPACING WIDTH (APPROX. ~ DIA.

A-A

PIPE TO BE LONG ENOUGH FOR STABLE FILL SLOPES

FLOW

INSTALL PIPE ON STREAMBED

~ COOS!fflJCDON fROCFQllRES·

SECTION B- B

"-J THE FOLLOWING IS A SEQUENCE CE CONSTRUCTION ANO PROCEDURES MEASURES TO BE fOllOWEO AT All TEMPORARY FLUME VEHICLE CROSSINGS. o! <= 1. A PORTABLE FlEXl- FLOAT, OR TEMPORARY BRIDGE MAY BE SUBSTITUTED FOR TI-lE TEMPORARY FLUME CROSSING.

2 I

0 0 N

2. THE lENCTH Of nfE FLUME SHALL SE sum c1ENT TO SPAN THE ENTIRE AREA REOUIREO FOR VEHICULAR ACCESS. EXTENDING 4 FEET BEYOND TOE OF F1Ll MATERfAL. so TRENCHING Will NOT AFFECT THE ROAD CROSSING. A LONGER PIPE IS TO BE usro. IF NEEDED. TO MAJNTAIN STABLE SIDE stOPES. FLUME CAPACITY TO BE BA.SEO ON THE 2- YEAR DESIGN FLOW OR MAXIMUM FLOW ANTICIPATED TO OCCUR DURING INSTALLATION. AS SPECIFIED IN CONSTRUCTION OOCUMENTS.

J, WHERE PRACTICAL, BACKFlll AROUND THE ptPES AT ll-IE ROAD WITH ct.EAN. COARSE ROCK F1ll MATERIAL IF SCOOR IS POS'SIBlE, RIP- RAP IS TO BE PLACED ON ntE WATERBOOY BED DOWNSTREAM Of THE PIPE OOTLET EXTENDING A MINIMUM OF TWO PIPE DIAMETERS. ALTERNATIVELY, TIMBER EQUIPMENT MATS, SANO BAGS OR TIMBER CORDUROY MAY BE USEC TO FORM THE TRAVEL SURFACE..

4, TO REOUCE DEBRIS ENTERING THE WATERBOOY FROM EQUIPMENT TRACKS. THE APPROACH ROAD LEADING TO THE CULVERT CROSSING MUST BE RAISED AHO STABLE SO EQUIPMENT LOADS ARE SUPPORTEO A SUFFlCIENT DISTANCE SACK FROM THE WATER. IF CUTS ARE NEEDED TO OOTAIN A SATISFACTORY GRADE. THEY ARE TO BE DUG 'Nini SIDE DITCHES ANO STABLE SLOPES. EROSION ANO SEOtMENT CONTROL MEASURES ARE TO BE INSTALLED TO LIMIT THE POTENTIAL FOR SEDIMENT TO ENTER THE WATERBOOY (E.C •• CHECK DAMS, SILT FENCE.

0 RIP- RAP. SEED ANO MULCH, SEDIMENT TRAPS, ETC.). 5. PERIOOICAU. Y CHECK THE TEMPORARY CROSSING INSTAllATION ANO REMOVE AAY BUILD-UP OF SEDtMENT OR DEBRIS ON TliE BRIDGE.

~ DISPOSE Of THIS MATERIAL AT LEAST 100 f EET FROM THE WATERBOOY ANO ABOVE TliE HIGH WATER LEVEL ;:_- 6. FOU.O.,NG 00MPL£TION OF THE CROSSING, REMOVE ROCl<FlLL IN/OR AROUND FLUME PIPES FROM THE WA1'£RBOOY OR WETLAND. ~ 7. RESTORE STREAM SANKS AHO WATERBOOY 8 0TTOM.

exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l."O(ICiilllfl&hid • • , ,

FlA , 4359

JMP 2011)-10-21 mu: , ___ ...,,,,,....___ &ii

CHECKED BY:

KEYSTONE XL PROJECT

CHAI NACE: DISCIPLINE I

DETAIL 17 TYPICAL FLUME BRIDGE CROSSING

03

~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...

P7100

OEStCN CHECKER: ~s~c-AL-E~---~o~wc~-.-o-------------~R£V~0-1--l N.T.S. 4359- 03- ML- 03 - 714 WSF RW

TC...MJ!RDWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

~ I

0 Ci N

TEMPORARY BRIDGE

------------------- ~------------------­- - - - - - - - - -- - - - - - - - - -

B FLOW l

B

J

STEEL PLATE

WATERBODY

=========- -=========

UNDISTURBED CREEK BANKS

CHECKED BY:

WSF

x

STEEL PLATE

PLAN VIEW

SECTION A-A

x

SILT FENCE

FLATBED RAIL CAR

ENSURE ADEQUATE OPENING TO ALLOW AN TICIPATED INCREASE IN STREAM DISCHARGE

" iox ____ r_•D•E•C•K-.,,&~~~ <J V7 SECTION B-B

DISCIPLINE I 03

DETAIL 18 TYPICAL RAILCAR BRIDGE CROSSING

OEStGN CHECKER: 1--~~~~~~~~~~~~~~~~~~~~~--t

SCALE N.T.S.

owe No RW 4359 - 03- ML- 03- 715 P7100

TC....MJ!R.OWG 8.5X11 CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS

New

Update

d

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

N

~ ~ 1.

"' z 2. ~ 3. c

~ f 4. :;

;; 5. I

RIVERBANK

HIGH WATER MARK

LOW WATER MARK

2'

EXTEND TO BOTTOM OR 10'

RIVER

FLOW

SECTION

~ ' KEY-IN 6' IN TO EXISTING BANK

5' MIN. SEE NOTE 8

RIVERBANK

GEOTEXTILE AMOCO 455.3 WHERE REQUIRED

' (OR EQUIV.) '-....___NATURAL OR

GRADED SLOPE---...,_

12" MINIMUM DEPTH OR ' 2 TIMES SPECIFIED MAXIMUM PARTICLE SJZE

REMOVE ALL STUMPS, ORGANIC MATERIAL ANO PREPARE BANKS TO A STABLE CONFIGURATION TO A MAXIMUM SLOPE OF 2 HORIZONTAL TO 1 VERTICAL. CONSTRUCT TOE TRENCH TO KEY IN BOTTOM OF RIP- RAP PROTECTION. INSTALL FILTER CLOTH (GEO TEXTILE), SUCH AS AMOCO 455.3 OR EQUIVALENT, UNDER ROCK 'M-iERE SPECIFIED OR AS DIRECTED BY THE COMPANY. ADJOINING EDGES OF CLOTH SHALL OVERLAP A MINIMUM OF 12". ROCK UTILIZED FOR RIP-RAP SHALL CONSIST OF SOUND, DURABLE ROCK, AND RESISTANT TO WEATHERING. INDIVIDUAL PIECES SHOULD BE ANGULAR, BLOCK SHAPED AND HAVE A MINIMUM SPECIFIC GRAVITY OF 2.2. INSTALL RIP-RAP TO A THICKNESS OF APPROXIMATELY 2 TIMES THE MAXIMUM EQUIVALENT DIAMETER OF THE RIP-RAP. EACH LOAD SHOULD BE WELL GRADED. A WELL GRADED MIXTURE IS COMPOSED 60% (MINIMUM) OF LARGER SIZES WITH 40% OF SMALLER SIZES TO FILL THE VOIDS. SIZE OF RIP-RAP IS DEPENDENT UPON THE PREDICTED FLOW CONDITIONS. KEY IN THE EDGES OF THE RIP- RAP AND FILTER CLOTH TO NATURAL GROUND CONTOURS SO THAT UNDERMINING DOES NOT OCCUR. RIP-RAP 1$ TO BE INSTALLED TO 2 FEET. ABOVE THE NORMAL HIGH WATER MARK OR 5 FEET ALONG THE SLOPE, 'M-ilCHEVER IS LESS. INSTALLATION SPECIFICATIONS TO BE MODIFIED TO SUIT ACTUAL SITE CONDITIONS.

KEYSTONE XL PROJECT

FIA f 4.359 CHAI NACE: DISCIPLINE I 0.3

exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~

JMP 2011)-10-21 mu: 1-----,m.---- &ii DETAIL 20

TYPICAL ROCK RIP- RAP 1J00 .... l.'O(ICiilllfl 8t\old • • , ,

~~'-·FL :wos .,. ... exp. - .-xp.com .. __ ___ ...

CHECKED BY: OEStCN CHECKER:...,_,.~---=~-----------~=--!

WSF RW ""' SCALE N. T.S. owe No 4.359- 0.3- ML- 05- 709 R(V02

TC...MJ!RDWG 8.5X11 CAOO DRAWING: 00 NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

N

LINE PIPE

WIDTH OF EXISTING ROAD OR RAILROAD R.O.W.

I-

CROSSING PIPE TO EXTEND TO RIGHT-OF-WAY (MIN.)

MARKER SIGN

CLEAR FENCE LINE HORIZONTALLY BY 2" MIN.

I HEAVY WALL CROSSING PIPE (SEE NOTE 4)

BORE ANNULUS TO BE NO LARGER THAN 1 •

GREATER THAN COATED LINE PIPE

CROWN OF ROAD

·'

ROAD RIGHT-OF-WAY

MARKER SIGN

w a_ 0

ul ... 0

HEAVY WALL CROSSING PIPE (SEE NOTE 4)

CROSSINGS SHALL BE IN ACCORDANCE WITH APPLICABLE PERMIT.

I LINE PIPE

~ 1. ~ 2. :. 3. a

ROAD CROSSING PIPE SHALL EXTEND AT MINIMUM TO RIGHT-OF- WAY LINE UNLESS OTHERWISE SPECIFIED. THE TYPE ANO MINIMUM REQUIRED LENGTH OF PIPE FOR CROSSINGS OF ROADS SHALL BE AS SPECIFIED ON ALIGNMENT SHEETS.

~ 4. PIPE FOR BORED CROSSINGS TO INCLUDE ABRASION-RESISTANT (ARB) COATING. ~ 5. PIPELINE MARKER ANO TEST STATIONS TO BE INSTALLED ON RIGHT-OF-WAY LINE NEXT TO FENCE IF - POSSIBLE. 0 6. THE CROSSING PIPE SHALL BE STRAIGHT WITH NO VERTICAL OR HORIZONTAL BENDS vnTHIN ROAD

RIGHT- OF- WAY. lQ 7. MINIMUM PIPELINE COVER IN DRAINAGE DI TCHES AT PUBLIC ROADS IS 60 INCHES; 36 INCHES IN

~ 1----c_o_N_so_L_1o_A_TE_o_R_o_c~K-· __________ -.---------------------~ "' (().) OESJGNER:

T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl8t\old • • , ,

~~'-·FL :wos .,-... exp. - .-xp.com .. _____ ...

TC...MJ!RDWG 8.5X11

KEYSTONE XL PROJECT

FIA f 4359 CHAI NACE: DISCIPLINE I 03

JMP 2011)-10-21 mu: "" DETAIL 21

l;;;=.;;;;;;;;;=;;"""==r"""'""'""""""'~ TYPICAL UNCASED ROAD /RAILROAD CROSSING BORE DETAIL CHECKED BY: OEStCN CHECKER:i-,..,.~---=~-----------~=---l

WSF RW "'"SCALE N.T.S. owe No 4359 - 03- ML-03- 717 R(V02

CADO DRAWING: DO NOT MAKE MANUAL REVISIONS

New

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

N

;; I

0

WATERLINE \

WILLOWS (OPTIONAL)

WILLOWS (OPTIONAL)

UNDISTURBED BANK

WATERLINE

5/16" CABLE

5/16" CABLE

GEOTEXTILE FIL TERCLOTH

1. LOG WALLS TO BE CONSTRUCTED USING CONIFEROUS MATERIAL

CLAY BACKFILL

FINAL GRADE

FINAL GRADE

UNDISTURBED BANK

LOGS TO BE KEYED INTO BANK

2. NATURE BACKFILL OR LOOSE GRADE MATERIAL SHOULD BE USED AS fil l MATERIAL J. ANCHOR PILINGS OR DEADMAN ANCHORS TO BE USED TO SECURE CABLE IN BANK. 4. NON-WOVEN FILTER CLOTH (NYLEX C34 OR EQUIVALENT) TO BE USED TO LINE LOG WALL. 5. INSTALLATION SPECIFICATIONS TO BE MODIFIED AS NECESSARY TO SUIT ACTUAL SI TE CONDITIONS. ~ ~ ~,-,.).-------~0-ES-l-GN_ER_: --------.--------K-EYST_O_N_E_X_L_P_R~-EC-T--------<

"" J) T.r.~~~~.~da FIA , 4359 CHAJNACE: DISCIPLINE N 03

exp Energy Services Inc. t 0 1.&S0.396.$'41 It • 1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,

~~'-·FL :wos .,. ... exp. -.-xp.com .. __ ___ ...

TC...MJ!RDWG 8.5X11

JMP 2011)-10-21 mu: ·-----,,,,...--- &ii DETAIL 23

STREAMBANK RECLAMATION - LOGWALL OEStCN CHECKER:

~S~C&~E---~O~WC~N-o-----------r.R(V~0-2--l "'" N. T.S. 4359- 03- ML- 05- 711

CHECKED BY:

WSF RW

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

WATERLINE

~ 6 WATERLINE 5 N

N

0

WILLOWS (OPTIONAL)

GEO TEXTILE FABRIC (DEKOWE 700)

2- 3 FEET

WILLOWS (OPTIONAL)

3 FEET

CLAY BACKFILL

FINAL GRADE

CLAY BACKFILL AND GEOTEXTILE FABRIC

~ I. NATURE BACKFILL OR LOOSE GRADE MATERIAL SHOULD BE USED TO MINIMIZE AIR SPACES. THIS ~ ALLOWS PROPER SOIL FABRIC CON TACT, WHICH MINIMIZES STEELING AND SCOURING DURING RUNOFF

AND ENSURES SURVIVAL OF THE WILLOW CUTTINGS. ~ 2. PLYWOOD FORMS (8'x2') MAY BE REQUIRED TO HELP RECONSTRUCT STEEP OR VERTICAL BANKS. * 3. GRID LAYERS SHOULD NOT EXCEED 3 FEET IN HEIGHT WITH A MINIMUM OF 3 FEET SET IN BANK. 80

4. WILLOWS SHOULD BE HARVESTED AS CLOSE TO INSTALLATION AS POSSIBLE. PREFERABLY THE PREVIOUS DAY BUT NO MORE THAN 2 DAYS EARLY.

- 5. WILLOWS SHOULD BE 0.5 TO 1 INCH IN DIAMETER AND 2 TO 3 FEET LONG WITH NO MORE THAN 10 o INCHES LEFT EXPOSED. ~ 6. PLANTING RATE SHOULD BE APPROXIMATELY 1 STEM PER 6 INCHES.

7 INSTALLATION TO BE MODIFIED AS NECESSARY TO SUIT ACTUAL SITE CONDITIONS.

~ ,;~ O~GNER '\ !r.~~S~.~:,da F1A , 4359

exp Energy Services Inc. c •l.tS0.386.$'41 lf. •1 ,860.38$~

1JOOM&llO(ICfi!M flM .:"'•

JMP 2011H0-21 TITU: 1----;m;c---- &iJt

CHECKED BY: OEStGN CHECKER:

KEYSTONE XL PROJECT

CHAI NACE: DISCIPLINE I

DETAIL 24 STREAMBANK RECLAMATION -

VEGETATED GEOTEXTILE INSTALLATION

03

~~w.-.FL :woe .,-;.exp. !-------------------~---< - .-xp.ciom ... _ _ ____ _

WSF RW ""'SCALE N.T.S. owe No 4359 - 03- ML- 05- 712 REV02

TC....MJ!R.OWG 8.5X11 CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

110' CONSTRUCTION R.O.W.

N 15'

!5 ~ %

25'

50' PERMANENT EASEMEN T

25'

-~ ::::;

:rl a: 0 w ~ n. 0 a:: n.

""

25'

PLAN VIEW

35'

I I 20·

II // >-W - ~---· // o::U I I

I < < 'X><.,x I ~ ~ f x"<<x :\G I ~ \i? ~<~ "-- xf -1 "' ' I x:xX K - I _ _ - y - · ,_ ..!.._I ..QR.Ali'!_

I »""' I TILE

I I ?' I I ~I ?' x l\G I x i_

I /r l I // --·-J I 20·

I

40' SEE NOTE 1

DRAIN

25' TEMPORARY EASEMENT

50'

-DRAIN TILE

5'

16'

60' WORKING SIDE

25' 25' 35'

50' PERMANENT EASEMENT

110 ' CONSTRUCTION R.0.W.

TEMPORARY EASEMENT

ELEVATION

~ 1. THE OFFSET FROM A FOREIGN PIPELINE, WHERE APPLICABLE, WILL BE 40' FOR MOST LOCATIONS, BUT MAY ~ BE INCREASED OR DECREASED DEPENDING ON THE SITE SPECIFIC CONSTRUCTION REQUIREMENTS.

0 2. THE MINIMUM CLEARANCE BETWEEN THE TOP OF PIPE AND THE BOTTOM OF DRAIN TILE WILL BE 12 INCHES.

~ 3. INSTALLATION SPECIFICATIONS TO BE MODIFIED AS NECESSARY TO SUIT ACTUAL SITE CONDITIONS.

~ !--------~---------~---------------------< - ~ ~- ~~n~ '\ !r.~~s~.~:,da F1A , 4359 CHAINACE: DISCIPLINE I

exp Energy Services Inc. c • l.tS0.386.$'41 lf.•1 ,860.38$~

1JOOM&llO(ICfi!MflM ~'• ~~w.-.FL :woe •4";'-exp. - .-xp.ciom ... ______ _

TC....MJ!R.OWG 8.5X11

JMP 2011H0-21 TITU: 1----;m;c---- &iJt DETAIL 25

TYPICAL R.O.W. LAYOUT/SOIL HANDLING 110' CONSlRUCTION R.O.W. 50' EASEMENT

CHECKED BY: DESIGN CHECKER: DRAIN TILE CROSSING

WSF RW ""'SCALE N.T.S. owe No 4359 - 03- ML- 03- 718

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

03

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

ITT, -t -t -t ,__,,_ I

x x

t • t t t ~·"~ I I TILE I I

I I I I I I I I I

I I I I I I I

I + I I r + I

_L -1. _J -1._J

PIPELINE

x

t I

I T + I x I I I T + I

I I I I I T I I I I cR!ssovf R

I I I I I I L L .L L .L.4

x

~ x ~ CD

:;! "' ~ s "' "' 2 I

0 0 N

• • I • • • • • • • • ~ DRAINAGEJ

N r NATURAL GROUND

PIPELINE~

1' MIN. f~r--~-CROSSOVERS~ CLEARANCE I

0

PROFILE ~ er ~,-,.).-------~0-ES-l-GN_ER_: --------.--------K-EYST_O_N_E_X_L_P_R~-EC-T--------<

"" J) TransCanada FIA , 4359 CHAJNACE: DISCIPLINE N 03 In bu•in«> to d•li><'

exp Energy Services Inc. t 0 1.&S0.396.$'41 It •1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,

~~'-·FL :wos .,-... exp. - .-xp.com .. __ ___ ...

TC...MJ!RDWG 8.5X11

JMP 2011)-10-21 mu: 1------,m.---- &ii DETAIL 26 HEADER/MAIN CROSSOVERS OF PIPELINE

CHECKED BY: OEStCN CHECKER:i-,..,.~---=~-----------~=----l

WSF RW "'"SCALE N.T.S. owe No 4359- 03- ML- 03- 719 R(V02

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

N

0

~

RELOCATE /REPLACE DRAINAGE HEADER /MAIN

x- x- xl DRAIN TILE

I ~·

I -../"' -../"' -../"' -../"'

SECONDARY LATERAL I I

T T I

x x

i~~~ x I T~~

I T I I

t I I I I I

~~ I I T ~

x

I I I x i I I I r-r ~

I I I i J .~ ~ { EXISTING L - l_ - J_ ~ _l _ _ . - · _l - ~ ~ PIPELINE '-----x ------x -----::;---.---r-- -r--...-'"- -'-r

~ DRAINAGE

~ !--------~---------~---------------------< - ~~ ~- ~~n~

~ TransCanada F1A , 4359 CHAINACE: DISCIPLINE * 03 In bu•;,,.,, to d<f;,.,

exp Energy Services Inc. c •l.tS0.386.$'41 l f. •1 ,860.38$~

1JOOM&llO(ICfi!MflM ~'• ~~w.-.FL :woe •4";'-exp. -.-xp.ciom ... ______ _

TC....MJ!R.OWG 8.5X11

JMP 2011)-10-21 TITLE 1----;m;c---- &iJt DETAIL 27 HEADER/MAIN CROSSOVERS OF PIPELINE

CHECKED BY: OEStGN CHECKER: 1-------------------~-----<

WSF RW ""' SCALE N.T.S. owe No 4359- 03- ML- 03- 720

CADO DRAWING: 00 NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

' •.,_-

N

c; I

~ 0

THE PROJECT PIPELINE

TRENCH LINE

TEMPORARY SUPPORT (IF NECESSARY)

REPAIR BELL HOLE (TYP. )

SANO BAG SUPPORT (IF NECESSARY)

PROFILE

TRENCH LINE

~ .. · .. _·

RIGID PVC PIPE OR DOUBLE WALL CORRUGA TEO PLASTIC PIPE

...

SUP COUPLINGS FOR END CONNECTIONS

RIGID PVC PIPE OR DOUBLE WALL CORRUGA TEO PLASTIC PIPE WITH TEMPORARY SUPPORT & SLIP COUPLINGS FOR END CONNECTIONS

REPAIR/EXISTING PIPE 12" OVERLAP ( TYP.)

NATURAL GRADE

lQ 1. IMMEDIATELY REPAIR TILE IF WATER IS FLOWING THROUGH TILE AT TIM E OF TRENCHING.

~ 1--2_. _s_c_R_E_EN_A_L_L_E_X_P_O~S-EO_E_N_o_s_o_F_T_IL_E_Ll_N_E_s_._-.---------------------~ o: (().) OESJGNER:

T.r.~~~~.~da exp Energy Services Inc. t 0 1.&S0.396.$'41 It • 1 ,8$0~~ 1J00 .... l.'O(ICiilllfl 8t\old • • , ,

~~'-·FL :wos .,. ... exp. -.-xp.com .. __ ___ ...

TC...MJ!RDWG 8.5X11

FIA f 4359

JMP 2011)-10-21 mu: 1---=--- &ii

CHECKED BY:

KEYSTONE XL PROJECT

CHAI NACE: DISCIPLINE I

DETAIL 28 DRAINAGE AND IRRIGATION

TEMPORARY DRAIN TILE REPAIR

03

OEStCN CHECKER: ~S~C~AL~E---~O~WC~N-o-----------~R(V~0-2---t

N.T.S. 4359 - 03- ML- 03- 721 WSF RW P7100

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

THESE ARE TYPICAL DRAWINGS; ACTUAL SITE CONDITI NS MAY VARY FROM THE SITE GRAPHICALLY REPRESENTED.

ORIGINAL POSITION OF TILE BEFORE EXCAVATION RELOCATED POSITION OF TILE LINE

AFTER EXCAVATION (SEE NOTES 1 & 2)

TILE DIMENSIONS AND QUALITY SHALL BE EQUAL TO THAT OF EXISTING TILE AND CUT TO NECESSARY LENGTH

13 ~ ~ "' § 5

USE SAND FILLED DR SAKRETE SACKS SET ON PIPE TO MAINTAIN A POSITIVE SEPARATION

IF TOTAL SPAN EXCEEDS 10 FEET PIPE SHALL

SEE NOTE J

BE USED TD PROVIDE TYPICAL CONTINUOUS SUPPORT

PLAN VIEW BUTT ENDS

(DRAIN TILE

CHANNEL (SEE TABLE BELOW)

PAD WITH SOIL

SECTION "A-A" CHANNEL (SPANS < 10 FEET)

FLAME CUT APPROX. J - 6" SLOTS,

1'-0" c/c, IN TOP THIRD OF PIPE

TILE FULL LENGTH OF INTERIOR

w "' END VIEWS

RIGID PIPE (SEE TABLE BELOW)

~ ' 0

5 N

tllUES: N

I . TIL£ REPAIR SHALL MAINTAIN ~GINAL ALICN.MENT ANO GRADIENT

TILE SIZE

J"

4" - 5"

6"-9" 10"

v.t!EN ANGLE "A", BET\\UN PIPEUNE ANO ORICtNAL TILE. 1$ MORE

O~ THAN 20 f"EET UNI.£$$ OTHER'MSE CHRECTED er THE PRO..ECT REPRESENTATIVE.

z 2. WHEN ANGLE "A .. IS t.ESS THAN 20 F'EET. UNLESS OTHERWISE \1 OIR(CTEO BY COMPANY, ANGLE •e• SliAll B( 45· FOR USUAL J" WIOTiiS OF TRENCH. FOR EXTRA WIOTHS. IT MAY SE GA(ATtR AS

O~ OIRt:CTEO 9Y THE PROJECT REPR(S(NTATl\IE. 3. 3 FOOT MtNIMUM LENGTH OE CHANNa OR R1Ct0 PIPE $HALL ee:

A SUPPORTEO SY UN01$1\JRB(O $()IL, OR IF CROSSING 1$ NOT AT

SECTION "A- A" RIGID PIPE (SPANS > 10 FEET)

MINIMUM SUPPORT TABLE

CHANNEL SIZE PIPE SIZE

4" @ 5.4 #/FT. 4" STD. WT 5"@ 6.7 #/FT. 6" STD. WT

7" @ 9.8 #/FT. 8"-10" STD. WT 10" @ 15.J #/FT. 12" STD. WT

~ RICHT ANG!.£$ TO GAS PtP(llN:E. EOUIVAU:NT U:NCTH ~ PERP(NOIOJLAR TO TR(NCH. SHIM Vi11H SAKRETE. SANO 8A¢S OR CONCRETE et.OO<S TO UN01$TVRS(O $0ll. FOR SUPPORT ANO ORAINAGE .... CRAOIENT MAINTENANCE (TYPICAL BOTH SIDES). => 4. DRAINAGE TIU SHAU. BE R£PLACE0 SO TliAT ITS FORMER GRADIENT AND AUGNMEN T ARE RESTORED. (!) 5. DIAMETER Of' RIGID PIPE SHALL SE <:E AOEOUATE SIZE TO Al.LOW FOR THE INSTAU.ATION Of' THE TIU FOR T>iE F\Jll LENGTH Of THE RtGID I PIP(,

' 6.

8 OTHER MET>iODS Of' SUPPORTING DRAIN TILE MAY BE USED If THE ALTERHATE PROPOSED IS EQUIVALENT IN STRENGTH TO THE QfANNEL/PIPE SECTIONS SHO'hff AND If APPROVED BY ntE PROJECT REPRESENTATIVE IN ADVANCE. S1TE SPECIAC ALTERNATE SUPPORT SYSTEM TO BE DEVE:t.OPED BY lHE PROJECT REPRESENTATIVE AND FURNISHED TO CONTRACTOR FOR SPANS IN EXC£SS Of' 20 FEET, TIL£ GREATER lHA.N 10 INCliES CMAMETER. AND FOR HEADER SYSTEMS.

Q 7. All MATERIAL TO BE FURNISHED BY CONTRACTOR. 8. PRIOR TO REPAIRING TILE. CONTRACTOR SHALL PROOE INTO lHE EXISTING TILE TO ntE FULL ~om <:E T>iE RIGHT- Of- WAY TO OETERM(NE If

O~ AOOtTIOHAL DAMAGE HAS OCCURRED. All DAMACEO/OIST\JR0EO TILE SHALL BE REPAIRED AS NEAR AS PRACTICABLE TO ITS ORICIHAL OR BETTER CONDITION.

~ 9. .NtCHT CAP• OPEN ENOS Of' PIPE ANO/OR DRAIN TILES If REPA.tRS ARE NOT COMPLETED SY ENO Of' WORK DAY.

- ~ ~- ~~n~ '\. !r.~~s~.~_:,da F1A , 4359 CHAINACE: OISCIPUNE * OJ

exp Energy Services Inc. c • l.tS0.386."41 lf.•1 ,860.38$~

1JOOM&llO(ICfi!MflM o!''•

~~"""'-·FL :woe .,-;.exp. -.-xp.ciom ... ______ _

TC....MJ!R.OWG 8.5X11

JMP 2011H0-21 TITU: 1~~~..,.r-~~- ~t

CHECKED BY:

WSF RW P7100

DETAIL 29 DRAIN AGE ANO IRRIGATION

PERMANENT DRAIN TIL.£ REPAIR

4359- 0J- ML- OJ- 722

CADD DRAWING: DO NOT MAKE MANUAL REVISIONS

Update

d

Update

d

New

New


Recommended