12
GSPublisherEngine 0.22.100.100 PROJECT SCALE DATE CHECKED DRAWN REVISIONS, ADDITIONS & ALTERATIONS NO. BY DATE DESCRIPTION NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical DRAWING TITLE MM architects & project managers P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively copyrighted by the architect Dwg. No. Job No. [email protected] Presentation Drawings AKT tel: 020-2063507 mobile: 0722-720907 150202 JUNE 2015 TYPICAL CLASSROOM 42 pax TYPICAL CLASSROOM 42 pax lockers covered walkway lockers covered walkway covered walkway TYPICAL CLASSROOM 42 pax TYPICAL CLASSROOM 42 pax lockers covered walkway lockers covered walkway covered walkway TYPICAL CLASSROOM 42 pax TYPICAL CLASSROOM 42 pax lockers covered walkway lockers covered walkway covered walkway TYPICAL CLASSROOM 42 pax TYPICAL CLASSROOM 42 pax lockers covered walkway lockers covered walkway covered walkway COURTYARD ADMIN BLOCK RECEPTION ACCOUNTS (BURSAR) STAFF LOUNGE WASHROOMS GIRLS' WASHROOMS BOYS' HOME SCIENCE LAB COMPUTER LAB SCIENCE LAB LIBRARY READING AREA LIBRARIAN OFFICE PREP. RM STORE covered walkway lockers covered walkway lockers BOOK SHELVES INFIRMARY SUPPLIES STORE GENTS LADIES NURSE'S STATION WAITING AREA HEAD TEACHER'S STATION DEPUTY HEAD TEACHER'S STATION C C D D E E 3 3 2 2 1 1 G G F F 1 1 2 2 3 3 E E D D C C G G F F H H H H I I I I J J J J B B A A B B A A E - 04 E - 01 E - 02 E - 03 TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = 1,213 SQM - ADMINISTRATION BLOCK - BURSAR/ ACCOUNTS OFFICE - STAFF ROOM / LOUNGE - RECEPTION - 8 TYPICAL CLASS ROOMS - HOME SCIENCE LABORATORY - SCIENCE LABORATORY - LIBRARY - ABLUTION BLOCK - COMPUTER LABORATORY (FOOT PRINT FITS ON 1 ACRE) - 8 TYPICAL CLASS ROOMS - HOME SCIENCE LABORATORY - HEAD TEACHER + DEPUTY HEAD TEACHER'S OFFICES - STAFF ABLUTION - INFIRMARY (SCHOOL NURSE)
Transcript
Page 1: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL CLASSROOM42 pax

TYPICAL CLASSROOM42 pax

lockers

covered walkway

lockers

covered walkwaycovered walkway

TYPICAL CLASSROOM42 pax

TYPICAL CLASSROOM42 pax

lockers

covered walkway

lockers

covered walkwaycovered walkway

TYPICAL CLASSROOM42 pax

TYPICAL CLASSROOM42 pax

lockers

covered walkway

lockers

covered walkwaycovered walkway

TYPICAL CLASSROOM42 pax

TYPICAL CLASSROOM42 pax

lockers

covered walkway

lockers

covered walkwaycovered walkway

COURTYARDADMIN BLOCK

RECEPTION

ACCOUNTS(BURSAR)

STAFF LOUNGE

WASHROOMSGIRLS'

WASHROOMSBOYS'

HOME SCIENCE LAB

COMPUTER LAB

SCIENCE LAB

LIBRARY

READING AREA

LIBRARIANOFFICE

PREP.RM

STORE

covered walkway

lockers

covered walkway

lockers

BOOK SHELVES

INFIRMARY

SUPPLIESSTORE

GENTS

LADIES

NU

RSE

'S S

TATI

ON

WA

ITIN

G A

REA

HEAD TEACHER'SSTATION

DEP

UTY

HEA

DTE

AC

HER

'S S

TATI

ON

C

C

D

D

E

E

3 3

2 2

1 1

G

G

F

F

1 1

2 2

3 3

E

E

D

D

C

C

G

G

F

F

H

H

H

H

I

I

I

I

J

J

J

J

B

B

A

A

B

B

A

A

E -

04

E - 01

E - 02

E -

03

TYPICAL PRIMARY SCHOOL SITE PLANTOTAL FLOOR AREA = 1,213 SQM

- ADMINISTRATION BLOCK- BURSAR/ ACCOUNTS OFFICE- STAFF ROOM / LOUNGE- RECEPTION

- 8 TYPICAL CLASS ROOMS - HOME SCIENCE LABORATORY - SCIENCE LABORATORY

- LIBRARY - ABLUTION BLOCK

- COMPUTER LABORATORY

(FOOT PRINT FITS ON 1 ACRE)

- 8 TYPICAL CLASS ROOMS - HOME SCIENCE LABORATORY

- HEAD TEACHER + DEPUTY HEAD TEACHER'S OFFICES - STAFF ABLUTION - INFIRMARY (SCHOOL NURSE)

Page 2: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

AD

MIN

BLOC

K

REC

EPTION

AC

CO

UN

TS(BU

RSA

R)

STAFF LO

UN

GE

TYPICAL CLASSROOM42 pax

lockers

covered walkwaycovered walkway

INFIRMARY

NU

RSE

'S S

TATI

ON

C

C

D

D

SCIENCE LAB

PREP.RM

STORE

3

2

1

H

H

I

I

J

J

HOME SCIENCE LAB

covered walkway

lockers

G

G

H

H

Total Area = 124 SQMTYPICAL ADMINISTRATION BLOCK

Total Area =TYPICAL CLASSROOMTotal Area = 60 SQMTYPICAL CLASSROOM

Total Area = 90 SQMTYPICAL SCIENCE LAB

Total Area = 60 SQMTYPICAL HOME SCIENCE LAB

Page 3: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

SUPPLIES

STOR

E

HEA

D TEA

CH

ER'S

STATIO

N

DEPUTY HEADTEACHER'S STATION

123

C C

B B

A A

INFIR

MA

RY

GEN

TS

LAD

IES

NURSE'S STATION

WAITING AREA

CC

321

BB

AA

TYPICAL HEAD TEACHERS' OFFICES & SUPPLIES STOREINFIRMARY = 30 SQM

TYPICAL INFIRMARY & STAFF ABLUTION BLOCK

STAFF ABLUTION BLOCK = 30 SQMTotal Area = 60 SQM

HEAD TEACHERS' OFFICES = 30 SQMSUPPLIES STORE = 30 SQM

Total Area = 60 SQM

Page 4: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

WASHROOMSGIRLS'

WASHROOMSBOYS'

H

H

I

I

LIBRARY

READING AREA

LIBRARIANOFFICE

BOOK SHELVES

H

H

I

I

J

J

COMPUTER LAB

covered walkway

lockers

G

G

H

H

Total Area = 110 SQMTYPICAL ABLUTION BLOCK

Total Area =TYPICAL COMPUTER LABTotal Area = 60 SQM

Total Area = 90 SQMTYPICAL LIBRARY

Page 5: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

CC DD EE FF GG HH II JJAA BB

J

J

J

J

I

I

I

I

H

H

H

H

G

G

G

G

F

F

F

F

E

E

E

E

D

D

D

D

C

C

C

C

B

B

B

B

A

A

A

A

3

3

2

2

1

1

1

1

2

2

3

3

3

3

2

2

1

1

1

1

2

2

3

3

ELEVATION 01

ELEVATION 02

ELEVATION 03

ELEVATION 04

PRIMARY SCHOOL

PRIMARY SCHOOL

PRIMARY SCHOOL

PRIMARY SCHOOL

PRIMARY SCHOOL

PRIMARY SCHOOL

Page 6: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLSITE PLAN

Page 7: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLADMINISTRATION BLOCK

Page 8: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLADMINISTRATION BLOCK

Page 9: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLLIBRARY AND SCIENCE LAB REAR VIEW

Page 10: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLVIEW FROM COURTYARD

Page 11: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLVIEW FROM COURTYARD

Page 12: TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = … TYPICAL … · P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA CONSULTANTS Innovation 360 ARCHITECT *All Drawings are exclusively

GSPublisherEngine 0.22.100.100

PROJECT

SCALE DATECHECKEDDRAWN

REVISIONS, ADDITIONS & ALTERATIONSNO. BYDATE DESCRIPTION

NOTES:GENERAL1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured

dimensions to be used.2. The contractor must check and verify all dimensions on site before commencement of work.Any discrepancies must be notified immediately to the architect.3. All sections are to be read as per floor plan and all drawings must be read in concert with

each other. Any discrepancies must be notified immediately to the architect and clarifiedconsulting the architectural or consultants drawing.

CONSTRUCTION4. Damp proof course must be provided under all external walls at grade. DPC to be minimum150 mm above ground level.5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on

hardcore.6. All soil under slab and around external foundations to be poisoned for termite control.7. Window sills must be finished before internal plastering.

CIVIL8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural anglerepose of the soil.

STRUCTURAL9. All RC work to structural engineer's details.10. Depth of foundation to be determined on site to S.E's approval.

11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternatecourse.

MECHANICAL12. All plumbing and drainage to comply with city councils specifications.13. All service ducts to be accessible from all floors.14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and

junctions to have inspection plates.15. SVP (soil vent pipes) to be provided at the head of the drainage.16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concretesurround.

17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255.18. The storm water drain to comply to BSS 556.19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6

grade C.20. Minimum slopes in drainpipes shall be 1%.21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E.22. All testing of pipes must be completed before plastering.

23. All mechanical work must be coordinated with electrical work. Any conflicts must beclarified before work begins.

ELECTRICAL24. All conduits must be laid before plastering.25. All electrical work must be coordinated with mechanical

DRAWING TITLE

MM

architects & project managers

P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA

CONSULTANTS

Innovation 360

ARCHITECT

*All Drawings are exclusively copyrighted by the architect

Dwg. No.

Job No.

[email protected]

Presentation Drawings

AKT

tel: 020-2063507 mobile: 0722-720907

150202JUNE 2015

TYPICAL PRIMARY SCHOOLMAIN ENTRANCE VISTA


Recommended