Date post: | 27-Mar-2015 |
Category: |
Documents |
Upload: | emma-mcdaniel |
View: | 216 times |
Download: | 1 times |
TZW Karlsruhe Prüfstelle Wasser
The Influence of Water Treatment
on Corrosion of Materials in Service
Lines
and Drinking Water Installations
Josef Klinger
TZW Karlsruhe
TZW Karlsruhe Prüfstelle Wasser
TZW Karlsruhe Prüfstelle Wasser
Why to change the Water Treatment?
Water quality problems
New raw water resources
Merger of small water utilities
Corrosion problems – desalination
Consumer complaints – central softening
TZW Karlsruhe Prüfstelle Wasser
Central Softening
Precipitation (NaOH, Ca(OH)2)
Addition of acids (cooling water)
Ion exchange
Membrane filtration (nanofiltration, reverse osmosis)
TZW Karlsruhe Prüfstelle Wasser
Membrane Filtration
TZW Karlsruhe Prüfstelle Wasser
Reverse Osmosis
1 Feed 3 Feed spacer 5 Membrane 7 Permeate header2 Permeate 4 Concentrate 6 Permeate spacer 8 Sealing to pressure pipe
TZW Karlsruhe Prüfstelle Wasser
Example out of the Practice
Raw water quality
Groundwater
Winter m³/d 500
Summer m³/d 4.000
Conductivity mS/m 165
pH - 7,3
KS4,3 mmol/L 5,1
Hardness °dH 26
Chloride mg/L 325
Sulfate mg/L 70
Arsenic mg/L 0,010
Selenium mg/L 0,030
Hardness
Corrosion
Limit value
TZW Karlsruhe Prüfstelle Wasser
Pilot Study for Water Treatment
Version A
Mixture of desalinated water and aeration
Version B
100 % RO and stabilisation of desalinated water with CaCO3
TZW Karlsruhe Prüfstelle Wasser
Parameters of the Test Waters in the Pilot Plant
El. ConductivitypH
Alkalinity (pH: 4.3)Acidity (pH: 8.2)
Ca2+ 2++ MgNa+
Cl-
SO42-
NO3-
PO43- (total)
SiDOC
S1
mS/m
mmol/Lmmol/Lmmol/L
mg/Lmg/Lmg/Lmg/Lmg/L
mg/L Simg/L C
Tap Waterwith Inhibitor
148 -1647.3 - 7.4
5.10.64.713031070301.2
50.6 - 1,8
2
SoftenedTap Water
55 - 597.6 - 7.9
1.60.051.645
1002010
0.012
0.42
RO Filtrate afterCaCO3 Filtration
13 - 188.2 - 8.5
1.20.020.6
63
< 12
0.010.1
0.2 - 0,4<< 1
Parameter Unit Test Water 1 Test Water 2 Test Water 3
Tap:30%, RO:70%
TZW Karlsruhe Prüfstelle Wasser
Closed Loop Device
for Corrosion Tests with Iron Pipes
Pump
Test PipeFlowMeter
CoolingSystem
Effluent Stopcock
Cooler
Valve
Fresh Water Effluent
T O2
pH
SamplingPoint, V2
V
TZW Karlsruhe Prüfstelle Wasser
Corrosion and Iron Migration Rates
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
Cor
rosi
on
Ra
te[g
/md
]Fe
2
0 50 100 150 200 250
Running Time [d]
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Mig
ratio
nR
ate
[g/m
d]F
e2
0 50 100 150 200 250
Running Time [d]
a) b)
Testwater 1Testwater 2Testwater 3
TZW Karlsruhe Prüfstelle Wasser
Mechanical Stability and Iron Migration Rates
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Mig
ratio
nR
ate
[g/m
d]F
e2
0 50 100 150 200 250
Running Time [d]
b)
Testwater 1Testwater 2Testwater 3
0
20
40
60
80
100
120
Sta
bilit
yP
aram
eter
[g/m
²d]
Fe
0 50 100 150 200 250
Running Time [d]
c)
TZW Karlsruhe Prüfstelle Wasser
Corrosion Rates with changed Water Quality
TZW Karlsruhe Prüfstelle Wasser
Example of a „Turner Diagram“
0
50
100
150
200
Chl
orid
eC
once
ntra
tion
[mg/
L]
300
0 1 2 3 4 5 6
Carbonate Hardness [mol/m ]3
No Dezincification
Borderlinefor MS 58
Borderline for CR Brass
Testwater 1: 310 m/L Cl
Testwater 3 Source: Seppelfricke
Testwater 2
TZW Karlsruhe Prüfstelle Wasser
Metallurgical Structure of Duplex Brass
CuZn39Pb3 (Wieland Z33)Source: Wieland-Werke AG
TZW Karlsruhe Prüfstelle Wasser
Metallographical Grindings of the test pieces
Running Time: 220 Days
200 µmCuZn40Pb2 Testwater 1
200 µmCuZn40Pb2 Testwater 2
200 µmCuZn40Pb2 Testwater 3
TZW Karlsruhe Prüfstelle Wasser
Tempered Brass Material: CuZn40Pb2Running Time: 220 DaysTest Water 3(100 % RO + stabilisation) 200 µmb) CuZn40Pb2(t) Testwater 3
111 µm
Tempered Brass Material: CuZn40Pb2Running Time: 220 DaysTest Water 1Tap Water with Inhibitor
200 µma) CuZn40Pb2(t) Testwater 1
422 µm
Metallographic Sections of the test pieces
TZW Karlsruhe Prüfstelle Wasser
The new Treatment Plant
TZW Karlsruhe Prüfstelle Wasser
Summary
The influence of a changed water quality on corrosion processes was assessed in a pilot plant
Corrosion assessment tools are available
Treatment plant is in service since two years
Corrosion processes are controlled as predicted
Prediction based on pilot plant tests were successful