+ All Categories
Home > Documents > U-5307 WAKE COUNTY BREAKDOWN US 1 MAP - NCDOT Breakdown Maps/U-5307.pdfDec 15, 2020  · 2213 1922...

U-5307 WAKE COUNTY BREAKDOWN US 1 MAP - NCDOT Breakdown Maps/U-5307.pdfDec 15, 2020  · 2213 1922...

Date post: 06-Mar-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
1
Wake Franklin 3571 5103 1926 3530 4520 1171 4555 1933 4598 2014 4590 1982 2137 3600 4592 1956 5748 4524 3532 5720 1987 2000 4516 4429 4569 2197 2135 3547 3507 5150 2046 4408 3543 3542 4577 1928 4490 4554 1979 3568 4409 4525 2115 4424 1794 4527 1990 5704 5777 4523 5700 4597 2132 5107 2108 4517 1734 5780 1986 4510 1717 1923 4413 1962 2134 1135 4519 2030 2179 4578 1946 1976 5762 1978 2042 2183 5151 5104 4521 4423 1974 2012 4513 2006 4514 5175 5756 2041 1972 1968 4588 1945 2002 2015 4526 4576 2052 5167 1994 2044 4518 1923 2001 4583 1924 1971 2136 2013 4568 5173 4428 4580 2006 3577 2000 4560 1969 1932 2041 2006 2044 5703 1930 1925 2133 5172 2011 2162 2012 4599 3555 4581 1967 1926 1927 2213 1922 1137 4462 2045 4463 1929 1923 1909 1912 4509 3514 2152 2181 2000 1991 1909 4529 1931 2043 2000 1156 1922 U-5307A U-5307 B U-5307C U-5307D § ¨ ¦ 540 § ¨ ¦ 540 § ¨ ¦ 540 U V 98 U V 98 U V 98 £ ¤ 1 £ ¤ 1 £ ¤ 401 £ ¤ 1 £ ¤ 1 £ ¤ 401 £ ¤ 1 £ ¤ 1 £ ¤ 1 £ ¤ 1 Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community PROJECT BREAKDOWN MAP PROJECTS SCHEDULES AND COSTS ARE ACCURATE AS OF DATE SHOWN μ U-5307 WAKE COUNTY US 1 UPDATED - 12/15/2020 STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST U5307A I540 TO NORTH OF SR 2006 (DURANT ROAD) IN RALEIGH. 5 1.6 DESIGNBUILD PROJECT FY 2025 FY 2025 $37,600,000 $4,500,000 $82,600,000 U5307B NORTH OF SR 2006 (DURANT ROAD) IN RALEIGH TO NORTH OF SR 2045 (BURLINGTON MILLS ROAD) IN WAKE FOREST. 5 2.1 FY 2025 FY 2027 $25,000,000 $2,700,000 $92,400,000 U5307C NORTH OF SR 2045 (BURLINGTON MILLS ROAD) TO SOUTH OF NC 98 BUSINESS IN WAKE FOREST. 5 3.1 FY 2025 FY 2027 $30,000,000 $3,000,000 $95,100,000 U5307D SOUTH OF NC 98 BUSINESS TO SR1909 (PURNELL ROAD) / SR 1931 (HARRIS ROAD) IN WAKE FOREST. 5 2.1 FY 2029 UNFUNDED $40,100,000 $3,700,000 $56,400,000
Transcript
Page 1: U-5307 WAKE COUNTY BREAKDOWN US 1 MAP - NCDOT Breakdown Maps/U-5307.pdfDec 15, 2020  · 2213 1922 1137 4462 2045 4463 1929 1923 1909 1912 4509 3514 2152 2181 2000 1991 1909 4529 1931

Wake

Franklin

3571

5103

1926

3530

4520

1171

4555

1933

4598

20144590

1982

2137

3600

4592

1956

5748

4524

3532

5720

1987

2000

4516

4429

4569

2197

2135

3547

35075150

2046

4408

35433542

4577

1928

4490

4554

1979

3568

44094525

2115

4424

1794

4527

1990

5704

5777

4523

5700

4597

2132

5107

2108

45171734

5780

1986

45101717

1923

4413

1962

2134

1135

4519

2030

2179

4578

1946

1976

5762

1978

2042

2183

5151

51044521

4423

1974

2012

4513

2006

4514

5175

5756

20411972

1968

4588

1945

2002

2015

4526

4576

2052

5167

1994

2044

45181923

2001

4583

1924

1971

2136

2013

4568

5173

4428

4580

2006

3577

2000

4560

1969

1932

2041

2006

2044

5703

1930

1925

2133

5172

2011

2162

2012

4599

3555

4581

1967

1926

1927

2213

1922

1137

4462

2045

4463

1929

1923

1909

1912

4509

3514

2152

2181

2000

1991

1909 4529

19312043

2000

1156

1922

U-5307A

U-5307BU-5307CU-5307D

§̈¦540

§̈¦540

§̈¦540

UV98

UV98

UV98

£¤1

£¤1

£¤401

£¤1

£¤1

£¤401

£¤1

£¤1

£¤1

£¤1

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c)OpenStreetMap contributors, and the GIS User Community

PROJECTBREAKDOWN

MAP

PRO

JEC

TS S

CH

EDU

LES

AND

CO

STS

ARE

ACC

UR

ATE

AS O

F D

ATE

SHO

WN

μ U-5307 WAKE COUNTYUS 1

UPDATED - 12/15/2020

STIP DESCRIPTION DIVISION LENGTH (MI) COMMENT ROW/UTILITY LET ROW COST UTILITY COST CON COST

U‐5307AI‐540 TO NORTH OF SR 2006 (DURANT ROAD) IN 

RALEIGH.5 1.6

DESIGN‐BUILD PROJECT

FY 2025 FY 2025 $37,600,000 $4,500,000 $82,600,000

U‐5307BNORTH OF SR 2006 (DURANT ROAD) IN RALEIGH TO NORTH OF SR 2045 (BURLINGTON MILLS ROAD) IN 

WAKE FOREST.5 2.1 FY 2025 FY 2027 $25,000,000 $2,700,000 $92,400,000

U‐5307CNORTH OF SR 2045 (BURLINGTON MILLS ROAD) TO 

SOUTH OF NC 98 BUSINESS IN WAKE FOREST.5 3.1 FY 2025 FY 2027 $30,000,000 $3,000,000 $95,100,000

U‐5307DSOUTH OF NC 98 BUSINESS TO SR1909 (PURNELL 

ROAD) / SR 1931 (HARRIS ROAD) IN WAKE FOREST.5 2.1 FY 2029 UNFUNDED $40,100,000 $3,700,000 $56,400,000

Recommended