seekda Web Services portal
SeekdaUniversity of Trento, University of Siegen
Overview
• Web Services Portal– Crawls for and indexes Web Services on the Web– Currently more than 28,500 indexed and monitored
• Problems– Found services are not annotated– For many, descriptions are not available– Limited search results and possibilities– Web APIs need to be confirmed by users
• Target– Obtain more annotations by involving users in the annotation process– Validate existing annotations, if any– „Catch Them & Keep Them“
4/14/11 www.insemtives.eu 2
Design Decisions
• Different annotation methods exist– Keywords/tags– Categories– Natural language descriptions– Lightweight/fully-fledged semantic web service descriptions (e.g.
WSMO/Light, OWL-S, etc.)
• Annotate the K.I.S. way– Avoid complicated and demanding annotations (limit to tags,
categories and NL descriptions)
• Use lightweight RDF ontologies in the background (e.g. to ease the search)
• SWS annotations might be integrated in the future– Most users are not familiar with SWS– Difficult to integrate within the search (diverse
frameworks and variants)– May hamper performance & usability
4/14/11 www.insemtives.eu 3
Component Dependancy
4/14/11 www.insemtives.eu 4
Phase 1 and 2: Field and domain analysis
• Domain analysis– Site visit, semi-structured, qualitative interviews
• Communication processes• Existing usage practices and problems• Semantic annotation solutions
– Tape recording, transcription– Data analysis per ex-post categorization
• Focus group discussion• Usability lab tests• Expert walkthroughs
4/14/11 www.insemtives.eu 5
Phase 3: Prototype Creation
4/14/11 www.insemtives.eu 6
Phase 4: Prototyping and design analysis
• Design recommendations– Usability Design– Sociability Design– Emotional Design– Value Sensitive Design
• OPD Workshop
• Challenges
4/14/11 www.insemtives.eu 7
Phase 4: Design Recommendations
4/14/11 www.insemtives.eu 8
OPD Workshop - Objectives
4/14/11 www.insemtives.eu
Classical PD: • User centric, cyclic development approach - users provide tips and feedback for/on the prototype itself.• Problem in the seekda case:
•Workshops can not be conducted because users are potentially distributed all over world.
OPD as solution for distributed target groups:
9
OPD Workshop - Procedure
• In General:1. Technical committee chooses number of features out of forum
discussions2. Features open for user voting3. Feature selection, implementation4. Collect user feedback
• Duration per cycle: 4-6 weeks
4/14/11 www.insemtives.eu 10
OPD Workshop – Cycles•1st Cycle
• Beginning November: Start of workshop (dashboard, technical committee, introduction)
• 2 weeks later: Identification of 5 most important features/wishes
• 1 week later: Selection of 2 most popular features
• Beginning of Dec: Short tasks for users
• Mid December: End of cycle, feedback analysis
•2nd Cycle• Execution dates: January – March• Goals for this cycle
• Increase motivation• Increase activity of participants• Focus more on usability/design and incentives
• Changes• Tasks first• Split into smaller parts, sequentially • Explained through screencasts • Example: go to the portal, search for xyz, identify redundant elements, most important, …
• OPD Dashboard Improvements
4/14/11 www.insemtives.eu 11
OPD Workshop - Results• Numbers
~ 250 votes ~ 160 forum posts 15-20 active users
• User Background• Web Services experts• Developers• Random visitors
• Feedback/Implementation• 18 suggested features• 6 concrete features implemented (ongoing)• Several implemented usability/design improvements
• Conclusions & Next Steps (ongoing)• Introduce challenge procedures• Ask specifically about guided processes (wizards)• Integrate OPD workshop directly from the platform
4/14/11 www.insemtives.eu 12
Challenge 1: Amazon Mechanical Turk
Goal: Initial annotations for new and undescribed APIs
Tasks available• Confirm document is related to a Web API (yes/no)• Provide/improve description• Provide and confirm (bootstrapped) tags/concepts• Provide and confirm (bootstrapped) service categories• Rate document quality
Parameters• Qualification test• Min. approval rate per worker• Approx Time needed per task• Reward
4/14/11 www.insemtives.eu 13
Challenge 1: Amazon Mechanical Turk
Simple Annotation Wizard
Phase 11. Setup
• Initial set of 70 Web APIs• No qualification needed• Approx. Time needed: 15 minutes• Reward: 0,10$• Description + Screencast (Walkthrough)
2. Manual evaluation (seekda)• Main focus on description and Yes/No question• Determine whether qualification is needed for workers• Determine whether wizard is understandable (usability)• Determine whether review tasks are needed
4/14/11 www.insemtives.eu 14
Challenge 1: Amazon Mechanical Turk
Phase 1, Results
Total: 70 API documents, 23 distinct workers
Initial Question (Document about Web API, Yes/No)• 49 documents correctly annotated (70%)• 21 as Yes, this document is about a Web API• 28 as No, this document is not related to a Web API
Description, Category, Tags• ~ 15 submissions including all answers (description, category, tags)• 4 very good and extensive submissions• 8 complete and usable submissions
4/14/11 www.insemtives.eu 15
Challenge 1: Amazon Mechanical Turk
Phase 1, Results
Top Workers
• 15 Tasks finished (2 very good/complete, 2 complete)• 10 Tasks finished (1 very good, 2 complete)• 5 Tasks finished (2 complete)
Average time needed: 2,5 minutes (min: 9 seconds, max: 13 minutes)
Phase 1, Problems
• Spam (10% - 15%)• Only few added category and descriptions• Most workers did not add tags
4/14/11 www.insemtives.eu 16
Challenge 1: Amazon Mechanical Turk
Conclusions
• Answers have to be mandatoryE.g. You have to specify/select at least ...
• Estimated time for completion can be decreased
• → Increase reward
• Clearly point out in the description what exactly needs to be achieved“In order to be approved, your submission needs to contain at least... “2-3 appropriate tags, A short but meaningful description, etc
4/14/11 www.insemtives.eu 17
Challenge 1: Amazon Mechanical Turk
Phase 2
• New set of 100 Web APIs• No qualification needed• Approx. Time needed: 10 minutes (5 minutes less)• Reward: 0,20$ (+ 0,10$)
• Improved description and explicit goals• All questions are mandatory• Multiple workers per Task (majority vote)
Evaluation: Automatic
4/14/11 www.insemtives.eu 18
Challenge 1: Amazon Mechanical Turk
Extensions
• Additionally split Wizard into atomic tasks (e.g. Description)
• Iterative Tasks• Using an existing description as seed• Read descriptions, if you think a description is appropriate, click “Vote”• If not appropriate submit a better description and get a chance to win a
$xx bonus
• Pre-selection of documents that need manual (seekda) approval
• Spam prevention
4/14/11 www.insemtives.eu 19
Challenge 1: Amazon Mechanical Turk - Benefits
• Evaluation of usability/design
• Large number of confirmed Web APIs–Feed back to crawler/analysis framework–Improving the initial index quality
• Large number of categorised/tagged Services/APIs–Feed back to bootstrapping Service–Improved search/navigation
• Detailed service descriptions for many Services at once–Improved user experience–Improved user experience/satisfaction–Attract/motivate new visitors to participate
4/14/11 www.insemtives.eu 20
Challenge 2: Mashups• Overall Goal
– Create and add mashup(s) using services / Web APIs listed on the seekda portal. – Annotate used Services and APIs.
• Timeline– Duration: 4 weeks
• Introduction of Task through:– Step by step guidelines– Set of rules– Example walkthrough
• Reward– Gadget (Samsung Galaxy S)
4/14/11 www.insemtives.eu 21
Challenge 2: Mashups - Procedure
• Step 1: Registration
• Step 2: Brainstorming
• Step 3: Implementation
• Step 4: Finalizing
• Step 5: Add Services and APIs (optional)
• Step 6: Annotate Services and APIs
4/14/11 www.insemtives.eu 22
Challenge 2: Mashups – Winner Selection
• Challenge lasts 4 weeks• Portal users vote for Mashups (1 week)• Selection of winner is done by seekda engineers and a group of external
experts
• Criteria for evaluation:• User voting• Overall quality• Originality and usefulness• Technical details/implementation• Annotations of used Services/APIs
• Presentation of top 3 submissions
4/14/11 www.insemtives.eu 23
Challenge 3: Long-Term Competition
• Provide annotations – become a top contributor
• Collect Points• Changes and/or improvements to annotations• New annotations• Weighting according to annotation type
• Rank contributors
• Reputation is main award
• Annotation quality will evolve
4/14/11 www.insemtives.eu 24
Challenge 3: Annotations
• Allow users to donate money for good annotations Donated money will be awarded to the top annotators
• The more and better annotations provided, The higher the reputation The higher the financial incentive
4/14/11 www.insemtives.eu 25
Conclusion
• Devising motivation methods for annotating Web services is challenging
• Different possibilities were/are being explored through challenges– Mechanical Turk– Mashups Challenge– Long-Term Competition
• Users were closely kept in the development loop through OPD– Ensures that implemented features are usable– Keeps users engaged in a “community”-like way
4/14/11 www.insemtives.eu 26