Date post: | 05-Apr-2017 |
Category: |
Services |
Upload: | continuity-and-resilience |
View: | 408 times |
Download: | 2 times |
Continuity and Resilience (CORE)ISO 22301 BCM Consulting Firm
Presentations by our partners and extended team of industry experts
Our Contact Details:INDIA UAE
Continuity and ResilienceLevel 15,Eros Corporate Tower
Nehru Place ,New Delhi-110019Tel: +91 11 41055534/ +91 11 41613033
Fax: ++91 11 41055535Email: [email protected]
Continuity and ResilienceP. O. Box 127557
Abu Dhabi, United Arab EmiratesMobile:+971 50 8460530
Tel: +971 2 8152831 Fax: +971 2 8152888
Email: [email protected]
UAE BCM StandardAE/HSC/NCEMA 7000:2012
Mohammed Al JenaibiBCM SpecialistCBCP – MBCI (Hon)
Contents UAE Government Strategy. UAE BCM Standard and Guideline AE/HNSC 7000:2012. AE/7000 related standard. BCM roll-out example. Current status. Future steps.
Features of the UAE Government Strategy
Government Strategy of the UAE
2021 vision
''seeking to be responsible and effective government, characterized by flexibility
and creativity, and looking forward to the future''
UAE BCM Standard AE/HNSC 7000:2012
The aim is to explain what is the requirements and program elements required in order to build the organization's ability to
business continuity.
Part one: Specifications
The aim is to clarify how to do those steps in the first part and general guidance about the
program and method of implementation.
Part Two:Guidelines
has a business continuity plan template and explain its elements and how to build it.
Part three:BC Plan Templates
Related Standards to UAE BCM Standard
ISO/ 31000:2009 Risk management -- Principles and guidelines.
BS 25999 BSI’s BCM system.New version soon will meet all requirements of:
ISO/ 22301 Requirements .. 2012 ISO/ 22313 Guidance .. 2013 Societal security -- Business
continuity management system
BCM Roll out example
Infra Structure. Government entities. Contractors. Critical private sector. Supply chain. Public.
BCM vs Resiliency and Emergency management
Risk management – eliminate mitigate. Planning – Plan for the residual risks. ERP Emergency response plans – Save life and
properties. BCM – continuation of critical functions for the
community. Resiliency – Achieve full cycle of Total emergency
management solutions.
Current status Strong support from leadership to embrace
EM up to resiliency stage. Basic awareness in BCM throughout the
Government of UAE. A very well ERP maturity level throughout
the government nevertheless critical. Qualification of a good number of Gov.
staff in Certified BCM training providers. A complete BCM programme have been
implemented in a number of entities.
Future steps
An awareness program to be launched based on UAE BCM standard in both languages .
A centralized (UAE and Emirate level) body such as COE/or any proper authority to manage, coordinate, follow-up and provide assistance to entities.
A similar program to run in the private sector for selected entities by the BCM authority.
Build an auditing and certification body based on AE 7000:2012.
Build actual BC capabilities and resiliency throughout UAE.
Thank you