DOCUMENT STATUS: FOR APPROVAL C 2.03.05 General rev B General rev. A 8.06.04 DRCS - M1&2 - I – 0235 Rev. Date Description Drwn. Chkd. Appd. UONG BI 300 MW EXTENSION POWER PLANT Owner: EPC Contractor: Subcontractor: Document Title: Turbine Plant Main Steam System System Description Взам. инв. № Project No. Format: А4 Total Pages: Designed by: Function Name Sign Date Approved Kuyumchan 8.06.04 Checked Novikov 8.06.04 Drawn Bragin 8.06.04 Подп. и дата Document No.: UBEX1-M1&2-M-08-LBA-1352 Date: 2.03.0 Rev: C This drawing may not be reproduced or transmitted to other organization or persons without permission of JSC CENTRE OF ENGINEERING UESR branch “Institute 175N9-10UHJ-1352- TD.M.1 STAGE WD SHEET 1 SHEETS 10 UONG BI 300 MW EXTENSION POWER PLANT Turbine Plant Main Steam System System Description Турбинное отделение Система трубопроводов свежего пара. Описание. Инв. № подл. Format: А4 RUSSIA MOSCOW
Transcript

DOCUMENT STATUS: FOR APPROVAL

C 2.03.05 General revB 4.08.04 General rev.A 8.06.04 DRCS - M1&2 - I – 0235

Rev. Date Description Drwn. Chkd. Appd.

UONG BI 300 MW EXTENSION POWER PLANTOwner:

EPC Contractor:

Subcontractor:

Document Title:Turbine Plant

Main Steam SystemSystem Description

Вза

м. и

нв. №

Project No. Format: А4 (297х210) Total Pages: 10Designed by:

Function Name Sign Date

Approved Kuyumchan 8.06.04

Checked Novikov 8.06.04

Drawn Bragin 8.06.04

Под

п. и

дат

а

Document No.: UBEX1-M1&2-M-08-LBA-1352 Date:2.03.05

Rev:C

This drawing may not bereproduced or transmitted toother organization or persons

without permission of JSCCENTRE OF ENGINEERING UESRbranch “Institute Teploelektroproject”

175N9-10UHJ-1352-TD.M.1 STAGEWD

SHEET1

SHEETS10

UONG BI 300 MW EXTENSION POWER PLANT

Turbine PlantMain Steam System System Description

Турбинное отделениеСистема трубопроводов свежего пара. Описание.

Инв

. № п

одл.

Format: А4

RUSSIA MOSCOW

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

CONTENTS:

I. P&I DIAGRAM PROCESS DESCRIPTION.................................................................3

1.1. Function. 3

1.2. Description. 3

1.3. Process monitoring. 5

II. CONTROL CONDITIONS..........................................................................................7

2.1. Main steam isolating valves (MSIV) LBA10AA201, LBA20AA201. 7

2.2. Gate valve LBA30AA201 on MSIV bypass. 7

2.3. Control valve LBA30AA001 on MSIV bypass. 7

2.4. Valves LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 on main steam pipeline drains. 8

2.5. Safety valves LBA11AA601, LBA12AA601, LBA13AA601, LBA21AA601, LBA22AA601, LBA23AA601. 8

2.6.Valves LBA10AA231, LBA20AA231 on HPC SV heating lines. 9

2.7.Valves LBA10AA250, LBA20AA250, LBA50AA250 on main steam pipeline vents downstream of the boiler. 9

III. INTERRELATION WITH OTHER SYSTEMS...................................................10

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet2

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

I. P&I DIAGRAM PROCESS DESCRIPTION.

I.1. Function.

The main steam piping system (system LBA) supplies steam from boiler to the turbine HP

cylinder (HPC).

I.2. Description.

Steam is supplied from boiler to the turbine HPC stop valves via two lines LBA10 and

LBA20 260 mm nb. A motorized main steam isolating valve (MSIV) LBA10AA201,

LBA20AA201 is installed on each steam line.

For steam pressure equalization upon operation of safety valves, an interconnecting line

200 mm nb between the main steam lines downstream of the boiler is provided. To remove air

from the system during its filling, a vent line 20 mm nb with two isolating valves – manual valve

LBA50AA570 and motorized valve LBA50AA250 – is provided on the interconnecting line.

For steam pressure equalization, two interconnecting lines 100/150 mm and 200 mm nb

between the main steam lines upstream of MSIV and HP stop valve (SV) are provided.

To remove air from the system, vent lines 20 mm nb with two valves LBA10AA570

(manual), LBA10AA250 (motorized) and LBA20AA570 (manual), LBA20AA250 (motorized) are

provided on each main steam line.

To prevent pressure rising in the boiler, and for superheaters safeguarding, CCI electro-hy-

draulic safety valves LBA11AA601, LBA12AA601, LBA13AA601, LBA21AA601,

LBA22AA601, LBA23AA601 are installed on each main steam line. Each safety valve is con-

trolled via a hydropanel supplied complete with the valve, on which solenoids-servovalves dis-

tributing governing oil flow in accordance with electric signals from protection system are located.

Under normal operating conditions these valves are closed, voltage of 220 VDC is applied to their

electric solenoids, and pressurized oil is supplied to the valve closing cylinder. Solenoids power

supply is provided from a reliable source – DC board. When steam pressure rises, a valve open

command is generated. Electric solenoid is deenergized, pressurized oil is supplied to the valve

opening cylinder, and discharged from the valve closing cylinder. Valve full opening time is 2 sec.

Valve hydraulic system is connected to discharge and drain headers of HP Bypass oil sta-

tion. To ensure constant oil pressure in the system, each hydropanel is equipped with accumulator.

The accumulator storage capacity is enough for three valve operations.

Hydropanel hydraulic scheme and description are given in the documents transferred by

CCI together with the safety valves.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet3

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

Electric signals to hydropanel solenoids are wired directly to pressure switches installed in

the main steam pipelines interconnecting line LBA50BR001 downstream of the boiler and on the

boiler drum.

Two valves LBA11AA601, LBA21AA601 operate when pressure in the boiler drum rises

above 210.6 kgf/cm2, and group of four valves LBA12AA601, LBA13AA601, LBA22AA601,

LBA23AA601 operates upon pressure rise in main steam lines downstream of the boiler above

196.7 kgf/cm2.

The superheater safety valves have an inlet connection 150 mm nb and discharge to at-

mosphere via pipelines 250/400 mm nb through silencers.

The safety valve vents are drained through hydraulic seals 5 m high via pipelines 25 mm

nb with collection in a common header 50 mm nb and discharge into boiler blowdown tank.

For steam lines before stop valves of the turbine HP cylinders (HPC SV) preheating and

pressure equalization when MSIV is opened during start-up, a MSIV bypass 150 mm nb is pro-

vided, with motorized isolating valve LBA30AA201 and motorized control valve LBA30AA001

installed on it.

On interconnecting line LBF10 200 mm nb, upstream of MSIV, a HP turbine bypass, i.e. a

quick-acting pressure reducing/desuperheating station (QAPRDS-I) is installed. On the same inter-

connection, in parallel to QAPRDS-I, there is a connecting line LBG30 to the start-up pressure re-

ducing/desuperheating station (PRDS). (See HP/LP Bypass System P&I Diagram UBEX1-M1&2-

M-52-LBF-1353).

During start-up the main steam lines 65 mm nb are warmed by opening drain valves

LBА10AA230 (motorized), LBА10AA501 (manual) and LBА20AA230 (motorized),

LBА20AA501 (manual). The drains are connected to the turbine HP flash tank drains header.

The pipeline sections downstream of MSIV are drained by lines 25 mm nb, with motor-

ized isolating valves LBА10AA232 and LBА20AA232 installed on them

On MSIV bypass upstream of gate valve LBА30AA201 a drain line 25 mm nb without

any stop valves is provided, which is connected to the drain line upstream of MSIV before isolating

valve LBА20AA230.

On MSIV bypass downstream of control valve LBА30AA001 a drain line 25 mm nb with-

out any stop valves is provided, which is connected to the drain line downstream of MSIV before

isolating valve LBА10AA232.

On main steam pipelines in the immediate vicinity of the stop valves, pipelines 65 mm nb

with motorized valves LBA10AA231 (LBA20AA231) installed on each pipeline are provided for

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet4

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

heating the HPC stop valves. HPC SV heating steam is discharged to the unit HP flash tank drains

header.

For heating the pipeline dead ends upstream of the safety valves, crossover pipelines 25

mm nb without any stop valves are provided with collection in the common header 65 mm nb.

Heating is ensured by pressure differential between these pipelines terminal points.

I.3. Process monitoring.

In the main steam pipelines interconnecting line downstream of the boiler there is pressure

measurement by pressure switches LBA50CP191, LBA50CP192, LBA50CP193. Signals from

these pressure switches serve for safety valve hydraulic drive solenoids control in the event of

steam pressure rise / drop, and are wired directly to the electric circuits of the safety valve sole-

noids. For safety valves control “two out of three voting” logic is used. Safety valves open on oper-

ation of any two pressure switches. They close on release of any two pressure switches.

On each main steam pipeline downstream of the boiler there is temperature measurement

LBA10CT001 and LBA20CT001 with information input to the ICMS (Integrated Control & Moni-

toring System).

On each main steam pipeline LBA10 and LBA20 upstream of MSIV there is steam tem-

perature measurement LBA10CT007 and LBA20CT007, steam pressure measurement

LBA10CP007 and LBA20CP007 and metal temperature measurement LBA10CT011,

LBA20CT011 with information input to the ICMS.

On each main steam pipeline downstream of MSIV (before stop valves) there is steam

temperature measurement LBA10CT008 and LBA20CT008, steam pressure measurement

LBA10CP008 and LBA20CP008 with information input to the turbine protection system.

In addition, on each steam line downstream of MSIV (before stop valves) there is pipe

metal temperature measurement LBA10CT012 and LBA20CT012 with information input into

ICMS and main steam pressure measurement LBA10CP508 and LBA20CP508 with local indica-

tion.

To measure the main steam flow to the turbine, orifice plates LBA10CF005QB01 and

LBA20CF005QB01, double differential pressure transmitters LBA10CF005, LBA10CF006 and

LBA20CF005, LBA20CF006, pressure transmitters LBA10CP005, LBA20CP005 and thermocou-

ples LBA10CT005, LBA20CT005 on each steam line LBA10 and LBA20 are provided, with infor-

mation input to ICMS. Flow signals are used for boiler feeding closed loop control. Signals from

the pressure transmitters and thermocouples are used in the ICMS for main steam flow measure-

ment correction. The pressure signal is taken from orifice plate «+» chamber, steam thermocouples

are installed downstream of orifice plate.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet5

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

On interconnection between main steam pipelines upstream of MSIV there is triple pres-

sure measurement LBF10CP001, LBF10CP002 and LBF10CP003 with information input to ICMS

for protection, signaling and main steam pressure measurement before turbine control algorithms.

In addition, on the interconnection between the main steam pipelines upstream of MSIV there is

pressure measurement LBF10CP501 with local indication.

On the steam supply pipelines to each safety valve there is pressure measurements

LBA11CP501, LBA12CP501, LBA13CP501 and LBA21CP501, LBA22CP501, LBA23CP501

with local indication designed for safety valves adjusting and testing.

On each main steam pipeline downstream of the boiler a sampling line is provided for

chemical quality control of steam supplied to turbine, with information input to ICMS.

To carry out the warranty tests the following measurements are provided in each main

steam pipeline:

steam temperature downstream of boiler LBA10CT401, LBA20CT401;

steam flow LBA10CF405, LBA20CF405;

steam pressure upstream of orifice plate LBA10CP405, LBA20CP405;

steam temperature downstream of orifice plate LBA10CT405, LBA20CT405;

steam temperature upstream of the turbine stop valve LBA10CT408, LBA20CT408;

steam pressure upstream of the turbine stop valve LBA10CP408, LBA20CP408.

On pulse lines to each pressure transmitter, flow transmitter and chemical control device,

manual valves (two per line) are installed.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet6

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

II. CONTROL CONDITIONS.

Main steam piping system operates continuously when the boiler is in operation.

II.1. Main steam isolating valves (MSIV) LBA10AA201, LBA20AA201.

II.1.1. The main steam isolating valves (MSIV) on main steam pipelines, LBA10AA201,

LBA20AA201 are controlled by ICMS and are part of the protection and functional-group

control process algorithms.

II.1.2. Isolating valves LBA10AA201, LBA20AA201 are automatically closed on command from

the turbine protection circuit when more than one stop valve is closed, as well as, irrespec-

tive of valves closing, upon operation of protections acting on the turbine shutdown (closing

command is pulse-type).

II.1.3. Isolating valves LBA10AA201, LBA20AA201 can be remotely closed at all times, and can

be opened if this is not prohibited by protection signals.

II.2. Gate valve LBA30AA201 on MSIV bypass.

The gate valve on MSIV bypass is opened during unit start-up for HP stop valve (SV)

heating. HP SV bodies heating enabling condition is allowable main steam temperature upstream

of MSIV: during cold starts, this temperature should not be less than 170 0С, during hot starts, it

should exceed the HP SV bodies metal surface temperature by 50 0С. After this condition is ful-

filled, the gate valve on the MSIV bypass is opened.

II.2.1. Gate valve LBA30AA201 on MSIV bypass is controlled by the ICMS and is part of the

protection, interlocking and functional-group control process algorithms.

II.2.2. Gate valve LBA30AA201 is automatically closed upon operation of protections acting on

the turbine shutdown, as well as when more than one turbine stop valve is closed.

II.2.3. Gate valve LBA30AA201 is automatically closed upon any of the MSIVs LBA10AA201,

LBA20AA201 opening.

II.2.4. Gate valve LBA30AA201 can be remotely closed at all times, and can be opened if this is

not prohibited by protection and interlocking signals.

II.3. Control valve LBA30AA001 on MSIV bypass.

Control valve on MSIV bypass is opened during unit start-up for HP SV heating. After the

gate valve on the MSIV bypass opening, incremental opening of control valve on MSIV bypass

takes place. The control valve on the MSIV bypass opening stops when metal temperature differ-

ence along the HP SV body wall thickness (depending on the temperature level) exceeds the allow-

able value.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet7

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

II.3.1. Control valve LBA30AA001 on the MSIV bypass is controlled by the ICMS and is part of

the interlocking and functional-group control process algorithms.

II.3.2. Valve LBA30AA001 is automatically closed upon any of the MSIVs LBA10AA201,

LBA20AA201 opening.

II.3.3. Control valve LBA30AA001 can be remotely opened, closed or stopped in an intermediate

position at all times, if this is not prohibited by interlocking signals.

II.4. Valves LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 on main steam pipeline drains.

Drains are opened during unit pre-starting procedures. Drains are closed after initial load

is picked up.

Valves on the drains are also opened when the unit is shut down with boiler and main

steam pipelines cooling.

II.4.1. Each valve LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 on main steam

pipeline drains is controlled by the ICMS and is part of the protection, interlocking and

functional-group control process algorithms.

II.4.2. Valves LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 are automatically

closed if the pressure in condenser rises to the II limit - 30 kPa (0.30 kgf/cm2)(abs.).

II.4.3. Valves LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 are automatically

closed with the inhibit of their opening when the pressure in condenser rises to the III limit -

50 kPa (0.50 kgf/cm2) (abs.).

II.4.4. Each valve LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 can be remotely

closed at all times, and can be opened if this is not prohibited by signals from protection cir-

cuits.

II.5. Safety valves LBA11AA601, LBA12AA601, LBA13AA601, LBA21AA601, LBA22AA601, LBA23AA601.

2.5.1 Safety valves LBA11AA601, LBA12AA601, LBA13AA601, LBA21AA601,

LBA22AA601, LBA23AA601 are part of the protection process algorithms. Solenoids of their

hydraulic drives are controlled by either a tripled pressure switch or by the operator remotely.

Control circuits of the safety valve hydraulic drive solenoids are independent of ICMS.

2.5.2. Safety valves are divided into two groups:

valves LBA11AA601, LBA21AA601 controlled by signals from pressure switches

HAD01CP191, HAD10CP192, HAD10CP193 monitoring pressure in the boiler drum;

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet8

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

valves LBA12AA601, LBA13AA601, LBA22AA601 LBA23AA601, controlled by signals from

pressure switches LBA50CP191, LBA50CP192, LBA50CP193 monitoring pressure in the

interconnecting line between the main steam lines downstream of the boiler;

2.5.3. The first group of valves automatic opening command is generated when the pressure in the

boiler drum rises to 10% above the nominal value.

2.5.4 The second group of valves automatic opening command is generated when the pressure in

main steam pipelines rises to 10% above the nominal value.

2.5.5. Valves automatic closing command is generated when the pressure falls to the nominal

value.

2.6.Valves LBA10AA231, LBA20AA231 on HPC SV heating lines.

2.6.1 Each valve LBA10AA231, LBA20AA231 on HPC SV heating lines is controlled by

the ICMS and is part of the protection, interlocking and functional-group control process algo-

rithms.

2.6.2. Valves LBA10AA231, LBA20AA231 are automatically closed if the pressure in con-

denser rises to the II limit - 30 kPa (0.30 kgf/cm2) abs.

2.6.3. Valves LBA10AA231, LBA20AA231 are automatically closed with the inhibit of

their opening when the pressure in condenser rises to the III limit - 50 kPa (0.50 kgf/cm2) abs.

2.6.4.Each valve LBA10AA231, LBA20AA231 can be remotely (manually) closed at all

times, and can be opened if this is not prohibited by signals from protection circuits.

2.7.Valves LBA10AA250, LBA20AA250, LBA50AA250 on main steam pipeline vents downstream of the boiler.

2.7.1 Valves LBA10AA250, LBA20AA250, LBA50AA250 on main steam pipeline vents

are controlled by ICMS and are part of the functional-group control process algorithms.

2.7.2 Valves LBA10AA250, LBA20AA250, LBA50AA250 can be remotely closed at all

times, and can be opened.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet9

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

III. INTERRELATION WITH OTHER SYSTEMS.

1) P&I Diagram of HP/LP bypass station pipelines

UBEX1-M1&2-M-52-LBF-1353

2) P&I Diagram of deaerator plant pipelines

UBEX1-M1&2-M-52-L-1355

3) P&I Diagram of turbine hall steam line and pipe line

drains UBEX1-M1&2-M-52-LFC-1360

4) P&I Diagram of boiler drains, vents and auxiliary

pipelines UBEX1-M1&2-M-52-LC-1359

5) P&I Diagram of boiler superheater circuit

UBEX1-M1&2-M-52-HAH-0001

6) P&I Diagram of water path pipelines UBEX1-

M1&2-M-52-HAD-0001

7) P&I Diagram of steam and water sampling pipelines

UBEX1-M1&2-M-52-QU-1365

8) P&I Diagram of turbine steam system UBEX1-

M1&2-M-52-MAA-0020

9) P&I Diagram of main steam system UBEX1-

M1&2-M-52-LBA-1352-1

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet10

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

СОДЕРЖАНИЕ:

I ТЕХНОЛОГИЧЕСКОЕ ОПИСАНИЕ PI-ДИАГРАММЫ.......................................12

1.1 Назначение.12

1.2 Описание. 12

1.3 Технологический контроль. 14

II УСЛОВИЯ УПРАВЛЕНИЯ........................................................................................17

2.1 Главные паровые задвижки (ГПЗ) LBA10AA201, LBA20AA201. 17

2.2 Задвижка LBA30AA201 на байпасе ГПЗ. 17

2.3 Регулирующий клапан LBA30AA001 на байпасе ГПЗ. 17

2.4 Вентили LBA10AA230, LBA10AA232 , LBA20AA230, LBA20AA232 на дренажах паропроводов острого пара. 18

2.5 Предохранительные клапаны LBA11AA601, LBA12AA601, LBA13AA601, LBA21AA601, LBA22AA601, LBA23AA601. 18

2.6 Вентили LBA10AA231, LBA20AA231 на линиях прогрева СК ЦВД. 19

2.7 Вентили LBA10AA250, LBA20AA250, LBA50AA250 на воздушниках трубопроводов острого пара за котлом. 20

III ВЗАИМОСВЯЗЬ С ДРУГИМИ СИСТЕМАМИ........................................................21

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet11

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

I ТЕХНОЛОГИЧЕСКОЕ ОПИСАНИЕ PI-ДИАГРАММЫ.

1.1 Назначение.

Система паропроводов острого пара (система LBA) предназначена для подачи пара

от котла в цилиндр высокого давления (ЦВД) турбины.

1.2 Описание.

Острый пар от котла к стопорным клапанам ЦВД турбины подается по двум ниткам

диаметром 260 мм. На каждой нитке паропровода предусматривается установка главной

паровой задвижки (ГПЗ) LBA10AA201, LBA20AA201 с электроприводом.

Для выравнивания давления пара между паропроводами острого пара при

срабатывании предохранительных клапанов за котлом предусматривается перемычка

диаметром 200 мм. Для удаления воздуха из системы при ее заполнении на перемычке

предусмотрена линия-воздушник диаметром 20 мм с двумя запорными вентилями

LBA50AA570 с ручным приводом, LBA50AA250 с электроприводом.

Для выравнивания давления пара между паропроводами острого пара перед ГПЗ и

СК ВД предусматриваются перемычки диаметром 100/150 мм и 200 мм.

Для удаления воздуха из системы на каждом паропроводе острого пара

предусмотрены линии воздушников диаметром 20 мм с двумя вентилями LBA10AA570 с

ручным приводом, LBA10AA250 с электроприводом и LBA20AA570 с ручным приводом,

LBA20AA250 с электроприводом.

Для предотвращения повышения давления в пароперегревателях высокого давления

на котле и их защиты на каждой нитке паропровода острого пара предусматривается

установка предохранительных клапанов LBA11AA601, LBA12AA601, LBA13AA601,

LBA21AA601, LBA22AA601, LBA23AA601 фирмы CCI, оснащеных электро-

гидравлическими приводами. Управление каждым предохранительным клапаном

производится через гидропанель, поставляемую комплектно с клапаном, на которой

размещены соленоиды-распределители движения напорного масла в зависимости от

поступающих из системы защит электрических сигналов. В нормальном режиме работы

клапаны закрыты, их электрические соленоиды находятся под напряжением 220 VDC, масло

под давлением поступает в цилиндр закрытия клапана. Электрическое питание соленоидов

организовано от надежного источника - щита постоянного тока. При повышении давления

пара формируется команда на открытие клапана. Напряжение с электрического соленоида

снимается, масло под давлением поступает в цилиндр открытия клапана, а из цилиндра

закрытия оно сливается. Время полного открытия клапана составляет 2 сек.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet12

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

Гидравлическая система клапанов связана с напорным и сливным коллекторами

маслостанции БРОУ-1. Для бесперебойного обеспечения давления масла в системе каждая

гидропанель укомплектована аккумулятором, емкость которого рассчитана на три

срабатывания клапана.

Гидравлическая схема гидропанели и ее описание представлены в документации,

передаваемой фирмой CCI комплектно с предохранительными клапанами.

Электрические сигналы на соленоиды гидропанели поступают непосредственно от

электроконтактных манометров, установленных на перемычке паропроводов LBA50BR001

за котлом и на барабане котла.

Группа из двух клапанов LBA11AA601, LBA21AA601 срабатывает при повышении

выше заданного (210.6 кгс/см2) давления в барабане котла и группа из четырех клапанов

LBA12AA601, LBA13AA601, LBA22AA601, LBA23AA601 – при повышении давления в

паропроводах острого пара за котлом выше 196.7 кгс/см2.

Подвод пара к предохранительным клапанам от паропроводов острого пара и отвод

сбрасываемого пара от предохранительных клапанов в атмосферу осуществляется по

трубопроводам диаметром 150/250/400 мм через шумоглушители.

Из выхлопных трубопроводов за предохранительными клапанами

предусматривается отвод дренажа через гидрозатворы высотой 5 м трубопроводами

диаметром 25 мм со сбором в общий коллектор диаметром 50 мм и отводом в коллектор

продувочного бака котла.

Для предварительного прогрева паропроводов перед СК ЦВД и выравнивания

давления при открытии ГПЗ при пуске предусмотрен байпас ГПЗ диаметром 150 мм с

установкой на нем запорной арматуры LBA30AA201 с электроприводом и регулирующего

клапана LBA30AA001 с электроприводом.

На перемычке перед ГПЗ диаметром 200 мм установлена быстродействующая

редукционно-охладительная установка (БРОУ-I). На той же перемычке, параллельно БРОУ-

I, предусматривается установка резервной редукционно-охладительной установки (РОУ).

(Смотрите PI диаграмму трубопроводов БРОУ UBEX1-M1&2-M-52-LBF-1353).

Прогрев паропроводов острого пара при пусках осуществляется по дренажным

трубопроводам перед ГПЗ диаметром 65 мм, на которых предусматривается установка

запорной арматуры LBА10AA230 с электроприводом, LBА10AA501 с ручным приводом и

LBА20AA230 с электроприводом, LBА20AA501 с ручным приводом. Дренажи направлены

в коллектор расширителя дренажей высокого давления блока.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet13

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

Предусматриваются дренажи участков за ГПЗ диаметром 25 мм с установкой

запорной арматуры LBА10AA232 и LBА20AA232 с электроприводом.

На байпасе ГПЗ перед задвижкой LBА30AA201 предусмотрен дренажный

трубопровод диаметром 25 мм без запорной арматуры, который заводится в линию дренажа

перед ГПЗ до запорной арматуры LBА20AA230.

На байпасе ГПЗ после регулирующего клапана LBА30AA001 предусмотрен

дренажный трубопровод диаметром 25 мм без запорной арматуры, который заводится в

линию дренажа за ГПЗ до запорной арматуры LBА10AA232.

На паропроводах острого пара в непосредственной близости от стопорных клапанов

предусмотрены трубопроводы диаметром 65 мм прогрева СК ЦВД, на каждом из которых

устанавливается запорный клапан LBA10AA231 (LBA20AA231) с электроприводом. Сброс

пара при прогреве СК ЦВД направляется в коллектор расширителя дренажей высокого

давления блока.

Для прогрева тупиковых участков перед предохранительными клапанами

предусмотрены перепускные трубопроводы диаметром 25 мм со сбором в общий коллектор

диаметром 65 мм без установки на них запорной арматуры. Прогрев осуществляется за счет

перепада давлений между точками присоединений данных трубопроводов.

1.3 Технологический контроль.

В перемычке трубопроводов острого пара за котлом измеряется давление тремя

электроконтактными манометрами LBA50CP191, LBA50CP192, LBA50CP193. Сигналы этих

манометров служат для управления соленоидами гидроприводов предохранительных

клапанов при повышении / понижении давления пара и поступают непосредственно в

электрические цепи гидропанели предохранительных клапанов. Открытие

предохранительных клапанов происходит при замыкании контактов «больше» хотя бы двух

электроконтактных манометров, закрытие клапанов также происходит при замыкании

контактов «меньше» хотя бы двух электроконтактных манометров.

На паропроводах острого пара за котлом предусматривается измерение

температуры на каждой нитке паропровода LBA10CT001 и LBA20CT001 с вводом

информации в ПТК.

На паропроводах острого пара перед ГПЗ предусматривается измерение

температуры пара на каждой нитке паропровода LBA10CT007 и LBA20CT007, измерение

температуры металла на каждой нитке паропровода LBA10CT011, LBA20CT011 и

измерение давления пара на каждой нитке паропровода LBA10CP007 и LBA20CP007с

вводом информации в ПТК.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet14

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

На паропроводах острого пара за ГПЗ (перед стопорными клапанами)

предусматривается измерение температуры пара на каждой нитке паропровода LBA10CT008

и LBA20CT008 и измерение давления пара на каждой нитке паропровода LBA10CP008 и

LBA20CP008 с вводом информации в систему защит турбины.

На паропроводах острого пара за ГПЗ (перед стопорными клапанами)

предусматривается измерение температуры металла на каждой нитке паропровода

LBA10CT012 и LBA20CT012 с вводом информации в ПТК. Кроме того, предусматривается

измерение давления острого пара за ГПЗ (перед стопорными клапанами) LBA10CP508 и

LBA20CP508 с контролем по месту.

Для измерения расхода острого пара на турбину на каждом паропроводе

предусматривается установка измерительных диафрагм LBA10CF005QB01 и

LBA20CF005QB01, дублированных преобразователей перепада давления LBA10CF005,

LBA10CF006 и LBA20CF005, LBA20CF006 преобразователей давления LBA10CP005,

LBA20CP005 и термопар LBA10CT005, LBA20CT005. Сигналы расхода острого пара

используются в алгоритме автоматического регулирования питания котла. Сигналы

преобразователей давления и термопар используются для коррекции измерения расхода

острого пара. Отбор импульса давления берется из «+» камеры измерительной диафрагмы.

Измерение температуры устанавливается за измерительной диафрагмой.

На перемычке между паропроводами острого пара перед ГПЗ предусматривается

троированное измерение давления LBF10CP001, LBF10CP002 и LBF10CP003 с вводом

информации в ПТК для реализации алгоритмов защит, сигнализации и регуляторов по

давлению острого пара перед турбиной. Кроме того, на перемычке между паропроводами

острого пара перед ГПЗ предусматривается измерение давления LBF10CP501 с контролем

по месту.

На трубопроводах подвода пара к каждому предохранительному клапану

предусматриваются измерения давления LBA11CP501, LBA12CP501, LBA13CP501 и

LBA21CP501, LBA22CP501, LBA23CP501 с контролем по месту, которые используется при

наладке и проверке предохранительных клапанов.

На паропроводах острого пара за котлом предусматривается отбор проб для

химконтроля качества пара подаваемого в турбину с вводом информации в ПТК.

Для проведения гарантийных испытаний в каждом паропроводе острого пара

предусматриваются следующие измерения:

- температура пара после котла LBA10CT401, LBA20CT401;

- расход пара LBA10CF405, LBA20CF405;

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet15

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

- давление пара перед измерительной диафрагмой LBA10CP405, LBA20CP405;

- температура пара после измерительной диафрагмы LBA10CT405, LBA20CT405;

- температура пара перед стопорным клапаном турбины LBA10CT408,

LBA20CT408;

- давление пара перед стопорным клапаном турбины LBA10CP408, LBA20CP408.

На импульсных линиях к каждому датчику измерения давления, расхода и

химконтроля устанавливаются по два запорных вентиля с ручным приводом.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet16

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

II УСЛОВИЯ УПРАВЛЕНИЯ.

Система паропроводов острого пара находится в постоянной работе при работе

основного оборудования энергоблока.

2.1 Главные паровые задвижки (ГПЗ) LBA10AA201, LBA20AA201.

2.1.1 Главные паровые задвижки (ГПЗ) на паропроводах острого пара LBA10AA201,

LBA20AA201 управляются с помощью средств ПТК АСУ ТП и участвуют в

реализации технологических алгоритмов защит и функционально-группового

управления.

2.1.2 Задвижки LBA10AA201, LBA20AA201 закрываются автоматически по команде из

схемы защит турбины при закрытии более чем одного стопорного клапана, а также,

независимо от закрытия клапанов, при срабатывании защит, действующих на останов

турбины (команда закрытия – импульсная).

2.1.3 Дистанционно (вручную) задвижки LBA10AA201, LBA20AA201 всегда могут быть

закрыты и могут быть открыты, если этому не препятствуют сигналы защит.

2.2 Задвижка LBA30AA201 на байпасе ГПЗ.

Задвижка на байпасе ГПЗ открывается в период пуска блока для прогрева СК ВД.

Разрешающими условиями для начала прогрева корпусов СК ВД является допустимая

температура острого пара перед ГПЗ: при пусках из холодного состояния значение этой

температуры должно быть не менее 170 0С, при пусках из горячего состояния – превышать

температуру металла поверхности корпусов СК ВД на 50 0С. После выполнения этих

условий открывается задвижка на байпасе ГПЗ.

2.1.4 Задвижка LBA30AA201 на байпасе ГПЗ управляется с помощью средств ПТК

АСУ ТП и участвует в реализации технологических алгоритмов защит, блокировок и

функционально-группового управления.

2.1.5 Задвижка LBA30AA201 закрывается автоматически при срабатывании защит,

действующих на останов турбины, а также при закрытии более чем одного

стопорного клапана турбины.

2.1.6 Задвижка LBA30AA201 закрывается автоматически при открытии какой-либо из

ГПЗ LBA10AA201, LBA20AA201.

2.1.7 Дистанционно (вручную) задвижка LBA30AA201 всегда может быть закрыта и

может быть открыта, если этому не препятствуют сигналы защит и блокировок.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet17

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

2.3 Регулирующий клапан LBA30AA001 на байпасе ГПЗ.

Регулирующий клапан на байпасе ГПЗ открывается в период пуска блока для

прогрева СК ВД. После открытия задвижки на байпасе ГПЗ производится импульсное

открытие регулирующего клапана на байпасе ГПЗ. Увеличение степени открытия

регулирующего клапана на байпасе ГПЗ прекращается при превышении выше допустимой

разности температур металла по толщине стенки корпуса СК ВД (в зависимости от уровня

температур);

2.1.8 Регулирующий клапан LBA30AA001 на байпасе ГПЗ управляется с помощью

средств ПТК АСУ ТП и участвуют в реализации технологических алгоритмов

блокировок и функционально-группового управления.

2.1.9 Клапан LBA30AA001 закрывается автоматически при открытии любой из задвижек

ГПЗ LBA10AA201, LBA20AA201.

2.1.10 Дистанционно (вручную) регулирующий клапан LBA30AA001 всегда может быть

открыт, закрыт или остановлен в промежуточном положении, если этому не

препятствуют сигналы блокировок.

2.4 Вентили LBA10AA230, LBA10AA232 , LBA20AA230, LBA20AA232 на дренажах паропроводов острого пара.

Дренажи открываются в период подготовки к пуску блока. Закрытие дренажей

производится после взятия начальной нагрузки.

Арматура на дренажах открывается также в режиме останова блока с

расхолаживанием котла и паропроводов острого пара.

2.1.11 Каждый вентиль LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 на

дренажах паропроводов острого пара управляется с помощью средств ПТК АСУ ТП

и участвует в реализации технологических алгоритмов защит, блокировок и

функционально-группового управления.

2.1.12 Вентили LBA10AA230, LBA10AA232, LBA20AA230, LBA20AA232 закрываются

автоматически, если давление в конденсаторе повышается до II предела 30кПа (0.30

кгс/cм2) абсол.

2.1.13 Вентили LBA10AA230, LBA10AA232, LBA20AA230 LBA20AA232 закрываются

автоматически с наложением запрета на открытие при повышении давления в

конденсаторе до III предела 50 кПа (0.50 кгс/cм2) абсол.

2.1.14 Дистанционно (вручную) каждый вентиль LBA10AA230, LBA10AA232,

LBA20AA230, LBA20AA232 всегда может быть закрыт и может быть открыт, если

этому не препятствуют сигналы из схем защит.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet18

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

2.5 Предохранительные клапаны LBA11AA601, LBA12AA601, LBA13AA601, LBA21AA601, LBA22AA601, LBA23AA601.

2.1.15 Предохранительные клапаны LBA11AA601, LBA12AA601, LBA13AA601,

LBA21AA601, LBA22AA601, LBA23AA601 участвуют в реализации технологических

алгоритмов защит. Соленоиды их гидроприводов управляются электроконтактными

манометрами или индивидуальным ключом оператором. Цепи управления

соленоидами гидроприводов предохранительных клапанов независимы от ПТК.

2.1.16 Предохранительные клапаны разделяются на две группы:

клапаны LBA11AA601, LBA21AA601, управляемые сигналами от датчиков,

контролирующих давление в барабане котла HAD01CP191, HAD10CP192,

HAD10CP193;

клапаны LBA12AA601, LBA13AA601, LBA22AA601 LBA23AA601, управляемые

сигналами от датчиков LBA50CP191, LBA50CP192, LBA50CP193 контролирующими

давление в перемычке паропроводов острого пара за котлом;

2.1.17 Команда на автоматическое открытие первой группы клапанов формируется при

повышении давления в барабане котла до 1,1 номинального.

2.1.18 Команда на автоматическое открытие второй группы клапанов формируется при

повышении давления в паропроводах острого пара до 1,1 номинального.

2.1.19 Команда на автоматическое закрытие клапанов формируется после снижения

давления до номинального.

2.6 Вентили LBA10AA231, LBA20AA231 на линиях прогрева СК ЦВД.

2.1.20 Каждый вентиль LBA10AA231, LBA20AA231 на линиях прогрева СК ЦВД

управляется с помощью средств ПТК АСУ ТП и участвует в реализации

технологических алгоритмов защит, блокировок и функционально-группового

управления.

2.1.21 Вентили LBA10AA231, LBA20AA231 закрываются автоматически, если давление в

конденсаторе повышается до II предела 30кПа (0.30 кгс/cм2) абсол.

2.1.22 Вентили LBA10AA231, LBA20AA231 закрываются автоматически с наложением

запрета на открытие при повышении давления в конденсаторе до III предела 50 кПа

(0.50 кгс/cм2) абсол.

2.1.23 Дистанционно (вручную) каждый вентиль LBA10AA231, LBA20AA231, всегда может

быть закрыт и может быть открыт, если этому не препятствуют сигналы из схем

защит.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet19

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

2.7 Вентили LBA10AA250, LBA20AA250, LBA50AA250 на воздушниках трубопроводов острого пара за котлом.

2.7.1 Вентили LBA10AA250, LBA20AA250, LBA50AA250 на воздушниках

паропроводов острого пара управляются с помощью средств ПТК АСУ ТП и участвуют в

реализации технологических алгоритмов функционально-группового управления.

2.7.2 Дистанционно (вручную) вентили LBA10AA250, LBA20AA250, LBA50AA250

всегда могут быть закрыты и могут быть открыты.

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet20

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4

Вза

м. и

нв. №

Под

пись

и д

ата

Инв

. № п

одл.

III ВЗАИМОСВЯЗЬ С ДРУГИМИ СИСТЕМАМИ.

1) PI-диаграмма трубопроводов БРОУUBEX1-M1&2-M-52-LBF-1353

2) PI-диаграмма трубопроводов деаэрационной

установки UBEX1-M1&2-M-52-L-1355

3) PI-диаграмма дренажей паропроводов и

трубопроводов машзалаUBEX1-M1&2-M-52-LFC-1360

4) PI-диаграмма дренажей, воздушников,

вспомогательных трубопроводов котлаUBEX1-M1&2-M-52-LC-1359

5) PI-диаграмма трубопроводов первичного трактаUBEX1-M1&2-M-52-HAH-0001

6) PI-диаграмма трубопроводов водяного трактаUBEX1-M1&2-M-52-HAD-0001

7) PI-диаграмма трубопроводов отборов пара и водыUBEX1-M1&2-M-52-QU-1365

8) PI-диаграмма собственно турбинаUBEX1-M1&2-M-52-MAA-0020

9) PI-диаграмма трубопроводов острого параUBEX1-M1&2-M-52-LBA-1352-1

Document No: UBEX1-M1&2-M-08-LBA-1352

175N9-10UHJ-1352-TD.M.1 Sheet21

UONG BI 300 MW EXTENSION POWER PLANTREV. CHANGES SHEET DOCUM. № DATE

Format: А4