UCSD Boards - master plan · cala cresta artesa arena marea miramar street garage garage brisa...

Date post: 03-Nov-2018
Category:
Upload: trinhcong
View: 213 times
Download: 0 times
Share this document with a friend
1
CALA CRESTA ARTESA ARENA MAREA Miramar Street GARAGE GARAGE BRISA VIENTO PIEDRA TIERRA CALA ASTILLA PORTON EXCHANGE Miramar Street EARLY CHILDHOOD EDUCATION CENTER (ECEC) ONE MIRAMAR STREET (OMS) Regent’s Road Park View Lane SITE PLAN KEY 1 Shuttel Stop 2 Café 3 Canyon Walk 4 Pub 5 Reception/Welcome 6 La Jolla Family House 7 Enhanced Pedestrian Crossing 0 60’ 120’ N One Mesa Fire Lane SITE AMENITIES KEY 8 Surface Parking 9 Bouldering Garden 10 Climbing Boulder 11 Play Lawn 12 Outdoor Gathering Space 13 Healing Garden 14 Outdoor Cooking 15 Splash Play KEY SUSTAINABLE STRATEGIES LEED Gold Target Design Solar chimney stack effect ventilation Tailored building geometry and siting for natural cooling Indoor and outdoor bicycle storage and repair facilities High performance building envelope Enhanced daylight harvesting/natural cooling On-site renewable energy (Solar Thermal) Low/Zero VOC interior finishes Additional stairs and enhanced occupant health strategies Energy efficient LED building and site lighting Energy star high efficiency appliances Low flow plumbing fixtures Drought tolerant and native planting Exceeds Title 24 standards by more than 20% On site EV charging stations Storm water quality program to capture and treat storm water runoff 15 ACRES OF OPEN SPACE including, pathways, trails, gardens, lawns and outdoor gathering zones OVER 1 ACRE OF USABLE LAWN set-up for games, farmer’s markets, food trucks, festivities 586 NEW TREES PLANTED creating a diverse, mixed canopy of California natives and adapted species 16 Pool and Spa 17 Playground/Children’s Garden 18 Community Garden 19 Bocce Court 20 1/2 Basketball Court 21 Labryinth Garden
Transcript

CALA

CRESTA

ARTESA

ARENA

MAREA

Miramar Street

GARAGE

GARAGE

BRISA

VIENTO

PIEDRA

TIERRA

CALA

ASTILLA

PORTON

EXCHANGE

Miramar Street

EARLY CHILDHOOD EDUCATION CENTER

(ECEC)

ONE MIRAMAR STREET (OMS)

Rege

nt’s

Road

Park

Vie

w L

ane

SITE PLAN KEY1 Shuttel Stop2 Café3 Canyon Walk4 Pub5 Reception/Welcome6 La Jolla Family House7 Enhanced Pedestrian Crossing

0 60’ 120’N

One Mesa—

Fire Lane

SITE AMENITIES KEY8 Surface Parking9 Bouldering Garden10 Climbing Boulder11 Play Lawn12 Outdoor Gathering Space13 Healing Garden14 Outdoor Cooking15 Splash Play

KEY SUSTAINABLE STRATEGIESLEED Gold Target Design

Solar chimney stack effect ventilation Tailored building geometry and siting for natural coolingIndoor and outdoor bicycle storage and repair facilities

High performance building envelope Enhanced daylight harvesting/natural cooling

On-site renewable energy (Solar Thermal)Low/Zero VOC interior fi nishes

Additional stairs and enhanced occupant health strategiesEnergy effi cient LED building and site lighting

Energy star high effi ciency appliancesLow fl ow plumbing fi xtures

Drought tolerant and native plantingExceeds Title 24 standards by more than 20%

On site EV charging stationsStorm water quality program to capture and treat storm water runoff

15 ACRES OF OPEN SPACEincluding, pathways, trails, gardens, lawns and outdoor gathering zones

OVER 1 ACRE OF USABLE LAWNset-up for games, farmer’s markets, food trucks, festivities

586 NEW TREES PLANTEDcreating a diverse, mixed canopy of California natives and adapted species

16 Pool and Spa17 Playground/Children’s Garden18 Community Garden19 Bocce Court20 1/2 Basketball Court21 Labryinth Garden