UniFormatA Uniform Classification of Construction Systems and Assemblies Introduction Application Guide UniFormat ™ Levels One thru Three: Numbers and Titles Master List of Numbers, Titles, Explanations, and Related MasterFormat ™ Numbers
Transcript
Page 1: UF98

UniFormat™A Uniform Classification of Construction Systems and Assemblies

Introduction

Application Guide

UniFormat™ Levels One thru Three: Numbers and Titles

Master List of Numbers, Titles, Explanations, and Related MasterFormat™ Numbers

DAR BEIRUT
Page 1
DAR BEIRUT
Page 2: UF98

UniFormat™ Introduction

UniFormat™ is an arrangement of construction information based on physical parts of a facility called systems and assemblies. These systems and assemblies are characterized by their function without identifying the products that compose them. Systems and assemblies render a view of a constructed facility different from the view rendered by a breakdown of building materials, products, and activities. UniFormat is intended to complement MasterFormat™.

The purpose of UniFormat is to achieve consistency in economic evaluation of projects; enhance reporting of design program information; and promote consistency in filing information for facility management, drawing details, and construction market data.

Scope

Background

History

This Edition

Basic Organization

Relationship with MasterFormat™

Differences from MasterFormat™

DAR BEIRUT
Page 2
DAR BEIRUT
Page 3: UF98

UniFormat™ Introduction

Scope

UniFormat™ covers systems and assemblies for a range of building types and construction related to buildings. Besides systems and assemblies, detailed titles are presented that suggest some designed systems and assemblies. Designed systems and assemblies titles are crossreferenced to MasterFormat™. The term designed systems and assemblies refers to physical parts of buildings with a particular design solution.

DAR BEIRUT
Page 3
DAR BEIRUT
Page 4: UF98

UniFormat™ Introduction

Background

Construction information specialists have focused on organizing bidding and contracting information for many years. The project manual concept , 16 Division format , and MasterFormat™ were introduced in the 1960s and have evolved through several revisions. These organizational principles enhance communication within the construction industry, improve the retrieval of construction information, and help coordinate construction documents.

The construction industry needed a consistent, expandable organizing concept to standardize information developed other than for construction documents. This included information used to evaluate and compare alternative construction concepts in terms of a facility's functional parts, particularly during early design stages. There was a need for organizing documents for use in reporting the owner's program information and the architect/engineer's (A/E) parameters and criteria for early design stages. The facility's fiscal model, owner's program, and A/E's parameters and criteria continue to evolve through all production phases and can be introduced into and compared with construction documents at any phase.

DAR BEIRUT
Page 4
DAR BEIRUT
Page 5: UF98

UniFormat™ Introduction

History

Construction information arranged according to functional building elements was first introduced outside of the United States. Elements were included in one of five tables in a comprehensive Swedish classification system known as "SfB." In 1947, Sweden formed a committee of 32 major building industry organizations called Samarbetskommittén för Byggnadsfr Çgor, thus the initials for the classification. Its first work was published in 1950 in the form of general material and work specifications for buildings. This was a collection of codes and practices arranged according to SfB.

The Royal Institute of Chartered Surveyors published a standard list of elements in 1969, Standard Form of Cost Analysis, which was reprinted in December 1995. The Canadian Institute of Quantity Surveyors published Elemental Cost Analysis Method of Measurement and Pricing

In the early 1970s, the first element-based classification in the United States was developed by the American Institute of Architects (AIA) for the General Services Administration (GSA). UniFormat™ has since been used by U.S. Federal agencies, R. S. Means (in its Means Assemblies Cost Data), and others. In 1993, the American Society for Testing and Materials (ASTM) published ASTM E 1577, Standard Classification for Building Elements and Related Sitework UniFormat II.

In 1990, CSI became active on the working group of this ASTM subcommittee. Other participating organizations include the American Association of Cost Engineers, American Society of Professional Estimators, GSA, Naval Facilities Engineering Command, U.S. Air Force, and U.S. Army Corps of Engineers.

The ASTM Working Group came to the following conclusions:

# A need exists for a formally established classification system based on building systems and assemblies.

# The classification system should be based on UniFormat developed in the early 1970s.

# The classification system should be expanded to encompass all types of construction, not just buildings.

# The classification system should be coordinated with MasterFormat to ease transition from one to the other.

# Because CSI and Construction Specifications Canada (CSC) have a successful history in publishing and maintaining MasterFormat, the systems-and-assemblies-based classification should be further developed, published, and maintained by CSI and CSC after approval by the ASTM Working Group of the basic standard.

Working in cooperation with the ASTM Working Group, a Department of Defense (DoD) Tri Service Committee on Work Breakdown Structure established a similar building-element-based arrangement to classify DoD building project cost information.

The ASTM Working Group and DoD Tri Service Committee each prepared versions of an element-based format in the first half of 1992. The two formats were similar but not identical. In August 1992, the National Institute of Standards and Technology (NIST) published UNIFORMAT II: A Recommended Classification for Building Elements and Related Sitework. UNIFORMAT II was influenced greatly by discussions held at ASTM

DAR BEIRUT
Page 5
DAR BEIRUT
Page 6: UF98

Working Group meetings.

The first edition of UniFormat was published as an interim edition, based on the work of the ASTM Working Group and the DoD Tri Service Committee. The UniFormat Interim Edition was published with the 1992 edition of CSI Manual of Practice and included coordination with the 1988 edition of MasterFormat. This interim edition was published for trial use and comment.

After the publication of NIST and CSI versions, ASTM balloted and accepted UNIFORMAT II in 1993 as ASTM E 1557. The ASTM standard was based on NIST and DoD documents but did not include a numbering system or the low-level detail of other systems and assemblies classifications. In 1996, ASTM adopted the numbering scheme used in CSI's UniFormat for the 1996 edition of ASTM E 1557.

DAR BEIRUT
Page 6
Page 7: UF98

UniFormat™ Introduction

This Edition

In 1995, CSI and CSC began revising UniFormat™. Revisions were intended to align ASTM and CSI documents and to coordinate UniFormat with MasterFormat™, 1995 edition. CSI and CSC actively solicited public comments on the UniFormat Interim Edition and continued ongoing discussions with ASTM Subcommittee E06.81 to determine the direction for the next edition.

Both UniFormat and ASTM E 1557 now have the same numbering scheme, and the titles from Levels 1 through 3 are identical. ASTM E 1557 does not include the levels of detail, Project Description, and Category Z —General.

The CSI/CSC Task Team made the following changes to this edition:

# Collected titles that are not physical building parts and placed them near the beginning of the document with an appropriate title, such as "Project Description."

# Revised the format to allow its use for classifying information necessary to solicit proposals and to contract for design-build projects.

# Reorganized Category D Services and Category E Equipment and Furnishings to reflect more of a systems approach with generic functional categories.

# Revised the title of Category F from "Other Building Construction" to "Special Construction and Demolition."

DAR BEIRUT
Page 7
DAR BEIRUT
Page 8: UF98

UniFormat™ Introduction

Basic Organization

UniFormat™ classifies information into the following nine Level 1 categories:

PROJECT DESCRIPTION

A SUBSTRUCTURE E EQUIPMENT AND FURNISHINGS

B SHELL F SPECIAL CONSTRUCTION AND DEMOLITION

C INTERIORS G BUILDING SITEWORK

D SERVICES Z GENERAL

The nine categories above can be used to arrange brief project descriptions and preliminary cost information. Category Z General is designated by the last letter of the alphabet so the system can expand beyond building construction. When so expanded, this category will remain last. The general information is also placed immediately before Project Description when UniFormat numbers and titles are used in Project Manuals organized according to MasterFormat™.

Titles in Levels 1 through 3 can be applied to most project descriptions and preliminary cost estimates. Levels 4 and 5 are available for use on detailed, complex projects. Level 4 and 5 titles and detailed listings provide a checklist to ensure comprehensive and complete application of UniFormat.

DAR BEIRUT
Page 8
DAR BEIRUT
Page 9: UF98

UniFormat™ Introduction

Relationship with MasterFormat™

MasterFormat™ establishes a location for Systems and Assemblies within Project Manuals. This location is immediately before the listing of construction products and activities (Divisions 1 through 16).

MasterFormat refers to UniFormat™ for organizing and titling systems and assemblies. The two documents are complementary in applications, such as Project Manuals and cost estimating, where reference to both products and functional systems and assemblies may be useful.

DAR BEIRUT
Page 9
DAR BEIRUT
Page 10: UF98

UniFormat™ Introduction

Differences from MasterFormat™

The primary difference between UniFormat™ and MasterFormat™ lies in how each divides construction information for its intended application. Generally, the structure underlying each publication evolved according to its intended application. UniFormat and MasterFormat became two separate systems when the specialization of one made it impractical to be adapted to applications of the other. However, both view the same construction information or base of data. Similar to computer database programs that define various query routines to report information from a single base of information into a particular arrangement to serve a special need, UniFormat and MasterFormat do the same with construction information. Each is a uniquely defined query to report construction information.

UniFormat identifies systems and assemblies, each with one or more characteristic function. For example, foundations provide the function to stabilize and support. UniFormat serves the following needs:

# Performing economic analysis of construction alternatives, particularly in early design stages

# Building and evolving a construction cost model arranged by functional parts of a facility

# Arranging descriptions of a project's functional parts to communicate design intent for accomplishing an owner's construction program

# Arranging Project Manuals for applications when design-build project delivery is employed

# Filing drawing details# Filing facility management and construction market information In comparison, MasterFormat serves the following needs:

# Arranging information within Project Manuals# Cataloging product information with the same numbers and titles in which

those products and activities are specified in construction documents# Arranging cost information and building a cost model according to the way

construction activities and associated products are specified in construction documents

# Keynoting for drawings to associate items with specifications for coordination within construction documents

# Arranging facility management and construction market information according to the way products and activities are specified in construction documents

Underlying structures of UniFormat and MasterFormat distinguish them from each other for the benefit of their differing applications. In UniFormat, the nine categories and their associated classes and subclasses define the basic parts of a constructed facility, each characterized by its function.

In comparison, MasterFormat arranges information for Project Manuals into six major groups (i.e., Introductory Information, Bidding Requirements, Contracting Requirements, Facilities and Spaces, Systems and Assemblies, and Construction Products and Activities). MasterFormat arranges the construction products and activities group into 16 Divisions. Although not a strict classification, the 16 Divisions are based on an underlying

DAR BEIRUT
Page 10
DAR BEIRUT
Page 11: UF98

set of classification tables not fully exposed to view. These underlying classification tables include the following:

# Material (e.g., Concrete)# Location (e.g., Site)# Function (e.g., Thermal Protection)# Application (e.g., Finishes)# Attribute (e.g., Electrical)

The organization of information within MasterFormat is the result of filtering underlying classification tables into a series of interrelated but independent lists. By doing so, the same product or activity could be titled in more than one division. In some cases, various applications of a product may require multiple locations within MasterFormat.

The usefulness of MasterFormat for many applications rests on the flexibility stemming from its filtering of various classification tables. The basic challenge to the user is to develop an instinctive feel for the different classifications while relying on the keyword index to locate the title in a specific application. To further understand the different uses in the two organizing principles, consider that MasterFormat, with its list of products and activities, looks at construction in the way the parts are specified, purchased, and installed. The term products here means materials, components, and equipment that a contractor incorporates into the work of a project.

Products can be new or existing, may be commodities or manufactured units, can be materials, and are components and finished assemblies or mixes. Products are the basic components of construction. MasterFormat's view of construction emphasizes the perspective of the product manufacturer, supplier, specifier, and contractor.

UniFormat, on the other hand, looks at construction the way elements are used. This perspective coincides with the way the user, owner, and designer look at construction.

This suggests using UniFormat for organizing design descriptions, cost summaries, and performance specifications of entire systems and assemblies, such as HVAC systems and exterior wall assemblies.

UniFormat and MasterFormat titles suggest complementary views of construction products and performance requirements: UniFormat names systems and assemblies that have a determinable function; MasterFormat names components that have specifiable characteristics.

Because construction information is viewed, used, and manipulated by people with varying interests, complementing organizational concepts are helpful.

DAR BEIRUT
Page 11
Page 12: UF98

Application Guide

This application guide reflects current practices in the construction industry, supplementing those found in CSI Manual of Practice and CSC Construction Specifications Handbook. It suggests basic strategies for numbering and titling systems and assemblies for information used other than for construction documents. It is not intended to describe rigid methods for applying UniFormat™ but to develop the user's intuition for using this system consistently.

This application guide also includes important considerations for applying UniFormat for organizing cost information, preliminary project descriptions, arranging project manuals, and organizing facility management and construction market information. Discussions are provided for understanding the underlying structure and presentation conventions used and for selecting UniFormat numbers and titles.

Selecting UniFormat™ Numbers and Titles The Structure Underlying UniFormat™ Extending UniFormat™ by Using MasterFormat™ Presentation Conventions Using UniFormat™ UniFormat™ and MasterFormat™ Used Together

DAR BEIRUT
Page 12
DAR BEIRUT
Page 13: UF98

Application Guide

Selecting UniFormat™ Numbers and Titles

Not all UniFormat™ titles will be used for a given project. UniFormat is an expandable structure that can accommodate additional titles to meet specific requirements. However, designated numbers and titles listed should not be changed. This helps set a consistent arrangement.

UniFormat titles are generic, descriptive titles independent of the design solution. UniFormat titles are the starting point for systems and assemblies. When creating a user-defined Level 3, 4, or 5 title, incorporate the parent title so systems and assemblies titles are complete, clear, and descriptive.

Additional systems and assemblies numbers and titles can be added by users for projects that include items that go beyond building construction. These projects include heavy civil engineering construction and process facilities.

DAR BEIRUT
Page 13
DAR BEIRUT
Page 14: UF98

Application Guide

The Structure Underlying UniFormat™

UniFormat™ exhibits a hierarchical organization of titles for systems and assemblies by employing two separate rules for classifying. These two classifying rules are specialization and decomposition. At Level 1, the hierarchy comprises the major categories of construction information separated by their special function. These special functions include the following nine categories:

PROJECT DESCRIPTION

A SUBSTRUCTURE E EQUIPMENT AND FURNISHINGS

B SHELL F SPECIAL CONSTRUCTION AND DEMOLITION

C INTERIORS G BUILDING SITEWORK

D SERVICES Z GENERAL

The letters and titles of Level 1 categories are fixed and should not be changed in application. The first category, Project Description, does not have a letter designation. This allows it to appear first in the list of titles and distinguishes its contents from the other titles. Project Description is not a building system or assembly. Instead, it is a collection of basic information that allows users to give readers an introduction to the project before reading details of building systems and assemblies. Project Description contains Bidding, Proposal, and Contract Requirements and allows UniFormat to be used as a stand-alone contracting structure for construction projects, especially design-build applications.

Category Z General, also not a building system or assembly, is designated by the last letter of the alphabet so that the system can expand beyond building construction. When so expanded, this category will remain last. The general information is also placed immediately before Division 1 General Requirements when UniFormat numbers and titles are used in project manuals organized according to MasterFormat.

UniFormat divides Level 1 categories into classes of information by separating the categories into the constituent parts that compose them. This method of classifying is known to information specialists as "decomposition." Level 2 classes carry the letter of their parent category, plus a two-digit number. Alphanumeric designations and titles of Level 2 classes are also fixed and should not be changed in application.

Levels 3 and 4 are developed by further subdividing Level 2 classes. These subclasses carry the alphanumeric designation of their parent category and class, plus a two-digit number. Alphanumeric designations and titles of Level 3 subclasses are also fixed and should not be changed in application. Alphanumeric designations for Level 4 are unassigned within a group of Level 3 subclasses, and number extensions are assigned by the user. The user-assigned number should carry the alphanumeric designation of the parent Level 3 subclass, plus a two-digit number (as illustrated below by the XX), or the corresponding MasterFormat number.

Titles presented below Level 4 are Level 5 subclasses, developed by presenting specialized design solutions of their parent Level 4 subclasses. Particular materials may be identified (e.g., concrete and steel) to differentiate one specialized solution from another. Titles at Level 5 are examples of information included in their Level 4 subclass.

No alphanumeric designation is assigned. Extensions may be assigned by the user.

The user-assigned number should carry the alphanumeric designation of the parent Level 4 subclass, plus a two-digit number, or the corresponding MasterFormat number.

DAR BEIRUT
Page 14
DAR BEIRUT
Page 15: UF98

Level 5 and, sometimes, Level 4 titles correspond to MasterFormat numbers and titles.

The numbering system is as follows:

A SUBSTRUCTURE Level 1

A10 FOUNDATIONS Level 2

A1010 Standard Foundations Level 3

A1010.XX Wall Foundations Level 4

A1010.XX Column Foundations Level 5

The numbering system can expand to allow for additional numbers and titles at any level. This allows UniFormat to expand in the future and allows users to add titles and numbers for subjects not in the current edition. User-defined numbers and titles that fit within the established framework of UniFormat can be added.

DAR BEIRUT
Page 15
Page 16: UF98

Application Guide

Extending UniFormat™ by Using MasterFormat™

Some users may want to add MasterFormat™ materials and methods information to a document organized according to UniFormat™. MasterFormat numbers may be included if some materials and methods have been determined. For example, if the building structural frame will be steel but the design solutions for exterior walls have not been determined, MasterFormat numbers could be included for B10 Superstructure but not for B20 Exterior Enclosure. Users may refine documents organized according to UniFormat during subsequent design phases as materials and construction activities are determined.

Following are example applications for adding MasterFormat five-digit numbers to the UniFormat alphanumeric designations.

D1010 Vertical Transportation Systems is an example where the direct relationship with MasterFormat is referenced at Level 4.

D10 CONVEYING

D1010 Elevators and Lifts

D1010.XX Elevators 14200 Elevators

D1010.XX` Lifts 14400 Lifts

In the example above, Level 4 classes could be designated by two digits chosen by the user as illustrated by either the XX extensions above or MasterFormat five-digit number below:

D10 CONVEYING

D1010 Elevators and Lifts

D1010.14200 Elevators

D1010.14400 Lifts

A2020 Basement Walls is an example where the direct relationship with MasterFormat is not referenced until the detailed listings of Level 5.

A20 BASEMENT CONSTRUCTION

A2020 Basement Walls

A2020.XX Basement Wall Construction

Cast-in-Place Concrete 03300 Cast-in-Place Concrete

Masonry Units 04800 Masonry Assemblies

In the example above, a related MasterFormat number is not available until the material designations of cast-in-place concrete and masonry assemblies are included. If the Level 4 subclass of Basement Wall Construction is used before a material is determined, it should be designated by two digits after the decimal such as below:

A2020.10 Basement Wall Construction

If the material to be used for Basement Wall Construction is subsequently determined, a MasterFormat five-digit number can then be added after another decimal point to

DAR BEIRUT
DAR BEIRUT
Page 16
Page 17: UF98

designate the material to be used for Basement Wall Construction.

A2020.10.03300 Cast-in-Place Concrete Basement Wall Construction

A2020.10.04800 Masonry Units Basement Wall Construction

Or as follows:

A2020.10.04820 Reinforced Unit Masonry Assembly Basement Wall Construction

This use of MasterFormat numbers as an extension for UniFormat is available for users who want to indicate direct relationships between the two organizational principles in the designation system.

The transition from a document organized according to UniFormat to one organized according to MasterFormat may be easier by using MasterFormat extensions. If MasterFormat five-digit number extensions have been added, the document organized according to UniFormat may be searched or sorted according to a MasterFormat five-digit extension to regroup information according to MasterFormat. Such computer searches may help discover, for example, a list of all elements of cast-in-place concrete construction in the project.

DAR BEIRUT
Page 17
Page 18: UF98

Application Guide

Presentation Conventions

The detailed listing of numbers and titles for Levels 1 through 5 is arranged in columns. In the left column, numbers and titles are presented with Level 1 in large, boldface uppercase letters. Level 2 is intermediate-size, boldface, uppercase numbers and letters. Level 3 is boldface, upper and lower case numbers and letters. Level 4 is normal typeface numbers and initial capital letters in titles. Level 5 has no numbers and is presented in normal typeface initial capital letters.

The center column cross-references MasterFormat™ numbers. No MasterFormat titles are presented. The right column clarifies the scope and range of Level 4 titles. There may also be a reference to another UniFormat™ Level 2 or 3 number and title. In some cases, cross-referencing to MasterFormat is further clarified.

Titles in parentheses under Category D Services are ASTM preferred terminology. Titles presented above them are the current industry terms used throughout UniFormat.

DAR BEIRUT
DAR BEIRUT
Page 18
Page 19: UF98

Application Guide

Using UniFormat™

Arranging Cost Information

The list of elements or systems serves as a basis for a system to organize cost information. Cost information may be reported in varying degrees of detail. As design decisions are made, the information can be refined. This arrangement of cost information allows for the comparison of various building elements, particularly during early design phases. The UniFormat™ cost model can evolve along with a cost model organized according to MasterFormat™.

These two models render a different view of the same project and provide details appropriate for different requirements. For example, a cost model organized by UniFormat can provide information about the cost of a concrete structure compared with a steel structure, even though there will be more concrete and steel on the project. However, a cost model organized according to MasterFormat can provide information about the cost of all the concrete and steel on a project regardless of the structural system chosen.

Value analysis requires a consistent naming scheme carried throughtout the project. UniFormat is particularly useful for value analysis, which requires attaching a cost to a particular use or facility function rather than to particular products and activities. Using MasterFormat numbers as suffixes to element designations helps the value analyst evaluate value-analysis change proposals.

Arranging Preliminary Project Descriptions

Preliminary project descriptions are described in CSI Manual of Practice, ChapterFF/180, "Preliminary Project Descriptions and Outline Specifications." A preliminary project description helps the owner understand the various components and systems proposed by the A/E for the project. It also serves a requirement normally included in a design services agreement in which the A/E must submit a report after completing the schematic design before proceeding to design-development. These descriptions may be supported by, and serve as a basis of, an estimate of probable construction costs.

UniFormat provides a logical sequence of systems and assemblies to describe a construction project before all materials and methods have been determined. UniFormat is used to organize, and serves as a checklist for preparing, preliminary project descriptions at various levels of detail.

As the design progresses, both descriptions and the estimate of probable construction cost can be refined.

Arranging Project Manuals

Arranging Project Manuals, or portions of them, according to UniFormat is appropriate when performance specifying is the method employed for all or some of the project. Performance specifying can be used at many levels, from a single product to major subsystems or entire projects. It allows the owner to access a range of options, from existing technology to innovative systems and developing technologies. Performance specifying encourages full bidding competition based on nonrestrictive requirements and, in its broadest application, is used for design-build projects.

Whether the entire building or only a portion of it is specified using performance specifications, UniFormat can be used to organize performance specifications for

DAR BEIRUT
DAR BEIRUT
Page 19
Page 20: UF98

elements crossing MasterFormat section and division boundaries. For conventional projects with Project Manuals organized according to MasterFormat, specifiers can include systems and assemblies before Division 1 General Requirements. According to UniFormat, systems and assemblies can be numbered and sequenced in this part of the Project Manual with the appropriate assignment of UniFormat numbers and titles. CSI Manual of Practice, Chapter FF/ 120, "Methods of Specifying," and Chapter SP/090, "Performance Specifying," provide detailed discussions about this application.

Organizing Drawings

UniFormat numbers and titles can be used as a file-naming convention for library files of standard details and schedules. The Uniform Drawing System (UDS) provides a detailed description for this application.

Library files are named differently from project files because the classification and indexing requirements are different. Library file naming should be grouped by building systems, assemblies, or use because that is the most natural way to search for them. Project detail files must also be organized to make it easy to produce project contract documents, record documents, and facility management documents from several files. Naming a detail file for a project requires the sheet identification, coordinates on the sheet, and a detail identifier.

UDS recommends an eight-character designator for naming library schedule files. A numbering system based on UniFormat can be used for preliminary phases of a project. UniFormat numbers can be used during the construction documents phase for schedules made up of assemblies of materials that might otherwise have separate MasterFormat numbers.

Arranging Facilities Management Information

As UniFormat is used for preliminary project descriptions to communicate systems and assemblies concepts to a building owner, preliminary project descriptions can be refined and used to communicate the building's functional systems and assemblies for real estate due-diligence reports and organizing maintenance and operation programs and data.

UniFormat is an ideal organization concept to describe systems design intent for facility commissioning purposes. UniFormat can be used to document how systems and assemblies function. Preliminary project descriptions can be refined and can evolve through all design phases, with the commissioning authority's making system performance testing and acceptance easier. Descriptions can then be used by the facility operators and maintenance personnel to store information about systems maintenance and operations.

Arranging Construction Market Information

Market information reporting agencies can use UniFormat to describe the facility being reported. UniFormat can also be used to assemble, store, and report information about elements separate from and in addition to reports on products and activities. This helps show trends for major elements containing products and activities crossing MasterFormat section and division boundaries.

Arranging Information for Design-Build Applications

The design-build project delivery has created a need for an organizational structure for

DAR BEIRUT
Page 20
Page 21: UF98

communicating functional performance requirements, including organizing design-build requests for proposals. To communicate project performance requirements to design-build entities in requests for proposals, owners must describe those requirements. In turn, design-build contractors must use performance requirements to communicate their proposals. UniFormat provides this organizational structure.

DAR BEIRUT
Page 21
Page 22: UF98

Application Guide

UniFormat™ and MasterFormat™ used Together

Application Type UniFormat MasterFormat Comments

UniFormat™ and MasterFormat™ can be used in all applications that have traditionally been the domain of MasterFormat. This edition of UniFormat includes cross-references to MasterFormat to guide users in applying both organizational principles. These applications include organizing Project Manuals; assigning specification numbers and titles; and organizing and filing cost information, drawing details, and facility management and construction market information.

Both systems can be characterized as "single," "serial," or "parallel."

§ Single applications use only UniFormat or MasterFormat exclusively throughout the application.

§ In serial applications, such as a Project Manual, a number and title are applied to each item based on either UniFormat or MasterFormat. Both organizational principles can be used in the same application.

§ Parallel applications are those in which each item is named with numbers and titles from UniFormat and MasterFormat. This is a powerful method in many applications, such as organizing cost information, in which information about a cost-estimate line item can be tracked to a product and to a system or assembly.

The following table compares several applications, showing how UniFormat and MasterFormat can be applied to each:

____________________________________________________________Application Type UniFormat MasterFormat Comments

_____________________________________________________________________________________________________________________________________________________________________________________

Project Manual and Specifications

Single Not used Arrange Project Manual; number and title specifications

Traditional Project Manual applications

Serial Number and title project descriptions (preliminary specifications)

Arrange Project Manual product and activity; number and title specifications

Project Manuals that include project descriptions at one or more stages of development

Serial Number and title system and assembly specifications

Arrange Project Manual product and activity; number and title specifications

Typical design-build project in which some design is complete with products selected but other requirements are at functional system and assembly level

Serial Number and title specifications

Arrange Project Manuals

Typical design-build project in which design-builder is responsible for meeting performance specifications

_____________________________________________________________________________________________________________________________________________________________________________________

DAR BEIRUT
DAR BEIRUT
Page 22
Page 23: UF98

Data Filing Single Not used Number and title files Manufacturer's product data

Single Number and title files Not used General data related to systems and assemblies

Parallel Number and title design and calculation files, value analysis, and other files related to systems and assemblies

Arrange files; number and title product-related files such as shop drawings

Project technical data filing

Parallel Subject codes related to systems and assemblies

Subject codes related to construction projects and activities

Library shelf codes and subject headings

_____________________________________________________________________________________________________________________________________________________________________________________

Cost Estimating Serial Number and title unit prices for systems and assemblies

Number and title unit prices for construction products and activities

Cost-estimating database

Parallel Number each line item as to systems and assemblies

Number each line item as to product or activity

Typical project cost database to allow reporting by product or system

Parallel Number each line item as to systems and assemblies, choosing titles that group functional systems and assemblies

Optionally number each line item as to product and activity

Cost reports for use in value analysis procedures

_____________________________________________________________________________________________________________________________________________________________________________________

Drawings Serial Number keynotes related to specifications sections for systems and assemblies

Number keynotes related to specification sections for products and activities

Typical drawing keynotes

Serial Identify standard details and computer files containing detail drawings and schedules related to systems and assemblies

Identify standard details and computer files containing detail drawings and schedules relating to products

Detail and drawing component identification system. UniFormat is more useful for this application to the extent that most details consist of numbers of individual products

Parallel Name layers Name layers CAD layering convention

Serial Name assemblies shown on drawings to match terminology and coding in specifications

Name products shown on drawings to match terminology and coding in specifications

Linking between drawings and specifications

_____________________________________________________________________________________________________________________________________________________________________________________

Construction Market Information

Single Not used. See "Arranging Information for Construction Market Data Applications" in this Application

Name products specified on a project

Reporting

DAR BEIRUT
Page 23
Page 24: UF98

Guide.

Facility Management

Parallel Identify building systems for operating and maintenance applications

Identify construction products for operating and maintenance applications

Facility document management and maintenance control

Note:Neither UniFormat nor MasterFormat may be acceptable when used as the sole scheme for identifying layers, but their numbers and titles can be used as suffixes to layer names based on other schemes when a detailed naming system is appropriate.

DAR BEIRUT
Page 24
Page 25: UF98

UniFormat™ LEVELS ONE THRU THREE NUMBERS AND TITLES

Project Description

Construction Systems and Assemblies

PROJECT DESCRIPTION

10 PROJECT DESCRIPTION

1010 PROJECT SUMMARY

1020 PROJECT PROGRAM

1030 EXISTING CONDITIONS

1040 OWNER'S WORK

1050 FUNDING

20 PROPOSAL, BIDDING, AND CONTRACTING

2010 DELIVERY METHOD

2020 QUALIFICATIONS REQUIREMENTS

2030 PROPOSAL REQUIREMENTS

2040 BID REQUIREMENTS

2050 CONTRACTING REQUIREMENTS

30 COST SUMMARY

3010 ELEMENTAL COST ESTIMATE

3020 ASSUMPTIONS AND QUALIFICATIONS

3030 ALLOWANCES

3040 ALTERNATES

3050 UNIT PRICES

CONSTRUCTION SYSTEMS AND ASSEMBLIES

ELEMENT A SUBSTRUCTURE

A10 FOUNDATIONS

A1010 STANDARD FOUNDATIONS

A1020 SPECIAL OTHER FOUNDATIONS

A1030 SLAB ON GRADE

A20 BASEMENT CONSTRUCTION

A2010 BASEMENT EXCAVATION

A2020 BASEMENT WALLS

DAR BEIRUT
DAR BEIRUT
Page 25
DAR BEIRUT
Page 26: UF98

ELEMENT B SHELL

B10 SUPERSTRUCTURE

B1010 FLOOR CONSTRUCTION

B1020 ROOF CONSTRUCTION

B20 EXTERIOR ENCLOSURE

B2010 EXTERIOR WALLS

B2020 EXTERIOR WINDOWS

B2030 EXTERIOR DOORS

B30 ROOFING

B3010 ROOF COVERINGS

B3020 ROOF OPENINGS

ELEMENT C INTERIORS

C10 INTERIOR CONSTRUCTION

C1010 PARTITIONS

C1020 INTERIOR DOORS

C1030 FITTINGS SPECIALTIES

C20 STAIRS

C2010 STAIR CONSTRUCTION

C2020 STAIR FINISHES

C30 INTERIOR FINISHES

C3010 WALL FINISHES

C3020 FLOOR FINISHES

C3030 CEILING FINISHES

ELEMENT D SERVICES

D10 CONVEYING

D1010 ELEVATORS AND LIFTS

D1020 ESCALATORS AND MOVING WALKS

D1090 OTHER CONVEYING SYSTEMS

D20 PLUMBING

D2010 PLUMBING FIXTURES

DAR BEIRUT
Page 26
Page 27: UF98

D2020 DOMESTIC WATER DISTRIBUTION

D2030 SANITARY WASTE

D2040 RAIN WATER DRAINAGE

D2090 OTHER PLUMBING SYSTEMS

D30 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)D3010 ENERGY SUPPLY

D3020 HEAT GENERATION

D3030 REFRIGERATION

D3040 HVAC DISTRIBUTION

D3050 TERMINAL AND PACKAGED UNITS

D3060 HVAC INSTRUMENTATION AND CONTROLS

D3070 TESTING, ADJUSTING, AND BALANCING

D3090 OTHER SPECIAL HVAC SYSTEMS AND EQUIPMENT

D40 FIRE PROTECTION

D4010 SPRINKLERS

D4020 STANDPIPES

D4030 FIRE PROTECTION SPECIALTIES

D4090 OTHER FIRE PROTECTION SYSTEMS

D50 ELECTRICAL

D5010 ELECTRICAL SERVICE AND DISTRIBUTION

D5020 LIGHTING AND BRANCH WIRING

D5030 COMMUNICATIONS AND SECURITY D5090 OTHER ELECTRICAL SYSTEMS

ELEMENT E EQUIPMENT AND FURNISHINGS

E10 EQUIPMENT

E1010 COMMERCIAL EQUIPMENT

E1020 INSTITUTIONAL EQUIPMENT

E1030 VEHICULAR EQUIPMENT

E1090 OTHER EQUIPMENT

E20 FURNISHINGS

E2010 FIXED FURNISHINGS

E2020 MOVEABLE FURNISHINGS

DAR BEIRUT
Page 27
Page 28: UF98

ELEMENT F SPECIAL CONSTRUCTION AND DEMOLITION

F10 SPECIAL CONSTRUCTION

F1010 SPECIAL STRUCTURES

F1020 INTEGRATED CONSTRUCTION

F1030 SPECIAL CONSTRUCTION SYSTEMS

F1040 SPECIAL FACILITIES

F1050 SPECIAL CONTROLS AND INSTRUMENTATION

F20 SELECTIVE DEMOLITION

F2010 BUILDING ELEMENTS DEMOLITION

F2020 HAZARDOUS COMPONENTS ABATEMENT

ELEMENT G BUILDING SITEWORK

G10 SITE PREPARATION

G1010 SITE CLEARING

G1020 SITE DEMOLITION AND RELOCATIONS

G1030 SITE EARTHWORK

G1040 HAZARDOUS WASTE REMEDIATION

G20 SITE IMPROVEMENTS

G2010 ROADWAYS

G2020 PARKING LOTS

G2030 PEDESTRIAN PAVING

G2040 SITE DEVELOPMENT

G2050 LANDSCAPING

G30 SITE CIVIL/MECHANICAL UTILITIES

G3010 WATER SUPPLY

G3020 SANITARY SEWER

G3030 STORM SEWER

G3040 HEATING DISTRIBUTION

G3050 COOLING DISTRIBUTION

G3060 FUEL DISTRIBUTION

G3090 OTHER SITE MECHANICAL UTILITIES

G40 SITE ELECTRICAL UTILITIES

DAR BEIRUT
Page 28
Page 29: UF98

G4010 ELECTRICAL DISTRIBUTION

G4020 SITE LIGHTING

G4030 SITE COMMUNICATIONS AND SECURITY

G4090 OTHER SITE ELECTRICAL UTILITIES

G90 OTHER SITE CONSTRUCTION

G9010 SERVICE TUNNELS

G9090 OTHER SITE SYSTEMS

ELEMENT Z GENERAL

Z10 GENERAL REQUIREMENTS

Z1010 ADMINISTRATION

Z1020 QUALITY REQUIREMENTS

Z1030 TEMPORARY FACILITIES

Z1040 PROJECT CLOSEOUT

Z1050 PERMITS, INSURANCE, AND BONDS

Z1060 FEE

Z20 CONTINGENCIES

Z2010 DESIGN CONTINGENCY

Z2020 ESCALATION CONTINGENCY

Z2030 CONSTRUCTION CONTINGENCY

DAR BEIRUT
Page 29
Page 30: UF98

UniFormat™ Master List of Numbers, Titles, Explanations, and Related MasterFormat™ Numbers

Explanation with Example

PROJECT DESCRIPTION

ELEMENT A SUBSTRUCTURE

ELEMENT B SHELL

ELEMENT C INTERIORS

ELEMENT D SERVICES

ELEMENT E EQUIPMENT and FURNISHING

ELEMENT F SPECIAL CONSTRUCTION and DEMOLITION

ELEMENT G BUILDING SITEWORK

ELEMENT Z GENERAL

DAR BEIRUT
DAR BEIRUT
Page 30
Page 31: UF98

Explanation and Example

* The left column includes the master list of UniFormat numbers and titles in Levels 1-4and Level 5 titles.

* The middle column includes related 5-digit classification numbers of MasterFormat. Notall of the items have related MasterFormat numbers.

* The right column includes general descriptions of Level 4 categories. The explanationtogether with the detailed listings in the left column under each Level 4 category providean understanding of the scope of the Level 4 Category. Under the headings "See' are listsof other categories in UniFormat which contain elements of work related to the Level 4Category.

* For example:

NUMBER TITLE MF NUMBER EXPLANATION

A1020. _ Underpinning 02250 includesNeedle Beams 02250 Underpinning materials, excavation, backfill

and compaction.Grillage 02250 SeeUnderpinning 02250 Excavation Support Systems: A2010

DAR BEIRUT
DAR BEIRUT
Page 31
Page 32: UF98

UniFormat™- PROJECT DESCRIPTION10 PROJECT DESCRIPTION

1010 Project Summary1020 Project Program1030 Existing Conditions1040 Owner's Work 1050 Funding

20 PROPOSAL, BIDDING, and CONTRACTING

30 COST SUMMARY

NUMBER TITLE MF NUMBER EXPLANATION

10 PROJECT DESCRIPTION

1010 Project Summary 01110 Brief summary of overall project and each facility that comprises the project.

1020 Project Program Facilities and Spaces

Statements to define the scope, size, scale, and quality of the project. Includes regulatory requirements such as applicable codes and other standards that are to govern the design and construction.

1020._ Site Program Facilities and Spaces

Detailed statements defining site development and design requirements, and desired quality. Includes related data sheets used to identify specific program requirements for each site improvement.

1020._ Facility Program Facilities and Spaces

Detailed statements for each facility defining required spaces, sizes, quality, materials, relationships,and design requirements.Includes related data sheets used to identify specific program requirements for each space.

1030 Existing Conditions 01110 Summary of existing conditions that affect development of a project or facilities comprising a project.

1040 Owner's Work 01110 Summary of work to be completed separately by the owner or separate contractors. Includes work that is performed before, during, or after the work of the project.

1050 Funding 00300 Summary of owner's project funding

1050._ Budget 00300 Summary of the owner's project budget.

1050._ Sources 00300 Summary of the owner's project funding

1050._ Financing 00300 Summary of the owner's project financing.

1050._ Cash Flow 00300 Summary of the owner's project cashflowrequirements or projections.

DAR BEIRUT
DAR BEIRUT
information.
DAR BEIRUT
sources.
DAR BEIRUT
Page 32
Page 33: UF98

20 PROPOSAL, BIDDING, AND CONTRACTING

20102020203020402050

Delivery Method Qualifications Requirements Proposal Requirements Bid Requirements Contracting Requirements

NUMBER TITLE MF NUMBER EXPLANATION

20 PROPOSAL, BIDDING, AND

CONTRACTING

2010 Delivery Method Description of project delivery method such as general contract, multiple prime contracts, construction management, or design-build. Includes qualifications solicitation, qualifications statements, project approach, and project team.

2020 Qualifications Requirements 00100

Qualification requirements for project participants otherthan the owner to successfully participate in theproject.

2030 Proposal Requirements Bidding Requirements

2030._ Proposal Solicitation 00100 Information to attract qualified proposers. Includes advertisements and invitations for proposals.

2030._ Proposal Instructions 00200 Conditions affecting evaluation of proposals and awardof contract. Includes procedures with which proposersmust comply.

2030._ Proposal Information Available 00300

Information that the owner makes available toproposers that is not intended to be included in thecontract. Includes geotechnical reports, environmentalassessment information, and hazardous materialinvestigations.

2030._ Proposal Forms and Supplements 00400

Forms and supplements for submitting a proposal.

2030._ Proposal Addenda 00900 Changes to the proposal documents issued during the proposal period.

2040 Bid Requirements

2040._ Bid Solicitation 00100 Information to attract qualified bidders.

2040._ Instruction to Bidders 00200 Conditions affecting evaluation of bids and award of contract. Includes procedures with which bidders must comply.

DAR BEIRUT
Page 33
Page 34: UF98

2040._ Information Available to Bidders 00300

Information that the owner makes available to bidders that is not intended to be included in the contract. Includes geotechnical reports, environmental assessment information, and hazardous material investigations.

2040._ Bid Forms and Supplements 00400 Forms and supplements for submitting a bid.

2040._ Bidding Addenda 00490 Changes to the bidding documents issued during the bidding period.

2050 Contracting Requirements

2050._ Agreement 00500 Contract forms and attachments. Includes notice of award, agreement form, and notice to proceed.

2050._ Contractor Exhibits 00600 Documents prepared by the contractor that are made part of the agreement. Includes subcontractor list, supplier list, unit price schedule, allowance schedule, and other items required to supplement the agreement.

2050._ General Conditions 00700 Includes rights, responsibilities, and relationships of the parties to a construction contract.

2050._ Supplementary Conditions 00800 Includes modifications to general conditions for requirements unique to a specific project.

2050._ Contract Modifications 00900 Includes written or graphic instructions issued to clarify, revise, add, or delete contracting requirements after execution of the agreement.

DAR BEIRUT
Page 34
Page 35: UF98

30 COST SUMMARY

30103020303030403050

Elemental Cost Estimate Assumptions and Qualifications Allowances Alternates Unit Prices

NUMBER TITLE MF NUMBER EXPLANATION

30 COST SUMMARY

3010 Elemental Cost Estimate Cost summary of the elemental estimate at a level appropriate to available information.

3020 Assumptions and Qualifications

Assumptions and qualifications affecting the elemental cost estimate.

3030 Allowances 01210 Allowances included in the elemental estimate or the contract for systems or assemblies that are not defined at the time the estimate or contract is prepared.

3040 Alternates 01230 Alternates included in the elemental estimate or the contract to add or delete work from the base project.

3050 Unit Prices 01270 Unit prices included in the elemental estimate or the contract for portions of work with quantities that are not defined at the time the estimate or contract is prepared.

DAR BEIRUT
Page 35
Page 36: UF98

UniFormat™ - ELEMENT A SUBSTRUCTURE

A10 FOUNDATIONSA1010 Standard FoundationsA1020 Special Other FoundationsA1030 Slab on Grade

A20 BASEMENT CONSTRUCTION

NUMBER TITLE MF NUMBER EXPLANATION

A10 FOUNDATIONS

A1010 Standard Foundations

A1010._ Wall FoundationsContinuous Footings

Cast-in-placeConcrete Footings

Foundation WallsCast-in-place Concrete WallsUnit Masonry WallsTreated Wood Foundations

03300

033000420006140

IncludesExcavation, dewatering, formwork, concrete, concrete masonry, reinforcement, backfill and compaction, dampproofing, wall finish.

SeeSubdrainage Systems : A1030.Perimeter Insulation : A1030.Basement Excavation : A2010.Basement Walls : A2020.Excavating, Backfilling, and Compacting : G1030.

A1010._ Column FoundationsSpread Footings

Cast-in-place Concrete FootingsPile Caps

Cast-in-place Concrete Pile CapsColumn Piers

Cast-in-place Concrete Piers

03300

03300

03300

IncludesExcavation, dewatering, formwork, concrete, concrete masonry, reinforcement, anchor bolts, backfill and compaction.

SeeFloor Structural Frame : B1010.

A1020 Special Foundations

A1020._ Driven Piles Composite PilesConcrete Displacement PilesConcrete Filled Steel PilesPrecast Concrete PilesPrestressed Concrete PilesRolled Steel Section PilesSheet PilesWood PilesPressure Injected FootingsRepair of Piles

02455

02455

IncludesMaterial for piles, pile driving, pile cut off, pile testing.

SeeExcavation Support Systems : A2010.

A1020._ Bored/Augured PilesAuger Cast Grout PilesBored and Belled Concrete PilesBored Friction Concrete PilesCast-in-Place Piles - UncasedDrilled Concrete Piers

02465 IncludesDrilling, casing, bell bottom excavation, dewatering, removal of excavated materials, reinforcing, concrete.

SeeExcavation Support Systems : A2010.

A1020._ UnderpinningNeedle BeamsGrillageUnderpinningSlabjacking

0225002250022500225002250

IncludesUnderpinning materials, excavation, backfill and compaction.

SeeExcavation Support Systems : A2010.

DAR BEIRUT
DAR BEIRUT
DAR BEIRUT
DAR BEIRUT
Page 36
Page 37: UF98

A1020._ DewateringSand DrainsWell PointsFrench DrainsRelief Wells

0224002240022400224002240

IncludesDrains, well points, pumps, other equipment, associated materials.

SeeSubdrainage Systems : A1030.

A1020._ Raft FoundationsExcavationSoil TreatmentEarthworkVapor RetarderConcrete Forms and AccessoriesConcrete AccessoriesConcrete ReinforcementCast-in-place Concrete

0231502360023000726003100031500320003300

IncludesExcavation, formwork, reinforcement, concrete, slab finish.

A1020._ CofferdamsDouble Wall CofferdamsCellular CofferdamsAnchor TiebacksSheet Piling Cofferdams

0226002260022600226002260

IncludesWatertight enclosures excavated for construction below water.

A1020._ Grade Beams IncludesExcavation, formwork, reinforcement, concrete, backfill

A1030 Slab on Grade

A1030._ Standard Slabs on GradeGradingSoil TreatmentEarthworkVapor RetarderDampproofing and WaterproofingConcrete Forms and AccessoriesConcrete AccessoriesConcrete ReinforcementCast-in-place Concrete

023100236002300072600710003100031500320003300

IncludesSlab construction supported continuously by earth or compacted fill. Fine grading, soil treatment, gravel fill, vapor retarder, horizontal waterproofing, formwork, expansion joints, control joints, reinforcement, concrete, finish, curing.

SeeBasement_Wall_Vertical_Waterproofing : A2020.

A1030._ Structural Slabs on GradeConcrete Forms and AccessoriesConcrete AccessoriesConcrete ReinforcementCast-in-place Concrete

03100031500320003300

IncludesSelf-supporting slab construction not supported continuously by earth or compacted fill. Formwork, accessories, reinforcement, concrete, finish, curing.

SeeFloor Structural Frame : B1010.

A1030._ Inclined Slabs on GradeGradingSoil TreatmentEarthworkVapor RetarderConcrete Forms and AccessoriesConcrete AccessoriesConcrete ReinforcementCast-in-place Concrete

0231002360023000726003100031500320003300

IncludesStandard slab construction built on a slope. Fine grading, soil treatment, gravel fill, vapor retarder, horizontal waterproofing, formwork, expansion joints, control joints, reinforcement, concrete, finish, curing.

SeeBasement Wall Vertical Waterproofing : A2020.

A1030._ TrenchesExcavation and FillConcrete Forms and AccessoriesConcrete AccessoriesConcrete ReinforcementCast-in-place Concrete

0231503100031500320003300

IncludesLinear depressions in slabs on grade to collect and transmit liquids. Excavation, formwork, accessories, reinforcement, concrete, finish, curing, trench cover.

SeeRain Water Drainage : D2040.

DAR BEIRUT
Page 37
Page 38: UF98

Metal Fabrications0330005500 Rain Water Drainage : D2040.

A1030._ Pits and BasesExcavation and FillConcrete Forms and AccessoriesConcrete AccessoriesConcrete ReinforcementCast-in-place ConcreteMetal Fabrications

023150310003150032000330005500

IncludesDepressions in slabs on grade or protrusions above slabs on grade. Excavation, formwork, accessories, reinforcement, concrete, finish, curing, pit covers, anchor bolts.

SeeStorm Sewer : G3030.

A1030._ Subdrainage Systems Excavation and FillDisposal WellsFoundation Drainage SystemsRetaining Wall UnderdrainsTunnel Drainage SystemsUnderslab Drainage Systems

0262002315

IncludesSystems to collect moisture and water below grade usually located at perimeter of structure or below slabs. Excavation, perforated pipe, drainage boards, granular fill, filter fabrics, connection to storm sewerage systems or to daylight.

SeeStorm Sewer : G3030.

A1030._ Perimeter InsulationFoundation Wall InsulationUnderslab Insulation

07210 IncludesThermal board insulation located at perimeter of foundations or under slabs on grade.

SeeBasement Wall Vapor Retarders and Insulation : A2020.

A1030._ Other Slabs on Grade IncludesSlabs on grades in addition to those listed above.

DAR BEIRUT
Page 38
Page 39: UF98

A20 BASEMENT CONSTRUCTION

A2010A2020

Basement Excavation Basement Walls

NUMBER TITLE MF NUMBER EXPLANATION

A20 BASEMENT CONSTRUCTION

A2010 Basement Excavation

A2010._ Excavation for Basement 02315 IncludesExcavation for building spaces below grade.

SeeFoundation Excavation : A1010.

A2010._ Backfill and CompactionEarth BackfillGranular Backfill

02315 IncludesPlacing backfill and compacting fill in excess excavation for building spaces below grade.

SeeFoundation Backfill and Compaction : A1010.Granular Fill for Subdrainage Systems : A1030.

A2010._ Excavation Support SystemsCribbing and WalersSoil and Rock AnchorsGround FreezingReinforced EarthSlurry Wall ConstructionShoring

02260022600226002260022600226002250

IncludesCribbing, anchors, and other means of permanent and temporary support of excavations.

SeeUnderpinning : A1020.Driven Piles : A1020.Bored/Augured Piles : A1020.Cofferdams : A1020.Subdrainage Systems : A1030.

A2010._ Other Basement Excavation IncludesBasement excavation in addition to those listed above.

A2020 Basement Walls

A2020._ Basement Wall ConstructionCast-in-place ConcreteMasonry Units

0330004200

IncludesPerimeter walls for building spaces below grade. Formwork, reinforcing, concrete, concrete masonry, concrete finish, curing. Framed and sleeved penetrations for services.

SeeSubdrainage Systems : A1030.Excavation for Basement : A2010.Backfill and Compaction : A2010.

A2020._ Basement Wall Vertical WaterproofingSheet WaterproofingFluid - Applied WaterproofingSheet Metal WaterproofingBentonite WaterproofingMetal Oxide WaterproofingCementitious and Reactive Waterproofing

071000713007140071500717007160

07160

IncludesImpervious membranes, coatings, and other materials applied to basement walls subject to continuous and intermittent hydrostatic pressure and water immersion including boards and coatings required for protection of waterproofing.

SeeHorizontal Waterproofing below Slabs on Grade : A1030.Subdrainage Systems : A1030.

DAR BEIRUT
Page 39
Page 40: UF98

A2020._ Basement Wall DampproofingBituminous DampproofingCementitious Dampproofing

071100711007110

IncludesMaterials installed to provide resistance to moisture penetration through basement walls subject to dampness and direct water contact, but not subject to hydrostatic pressures.

SeeSubdrainage Systems : A1030.

A2020._ Basement Wall Vapor Retarders and InsulationVapor RetardersBuilding InsulationBatt InsulationBuilding Board InsulationFoamed-in-Place InsulationLoose Fill InsulationSprayed Insulation

0726007210

IncludesSheet or continuous film materials installed separately in floor assemblies to provide resistance to vapor penetration. Thermal insulation on outside, within, and on inside of basement walls.

SeeBasement Slab Insulation : A1030.Perimeter Insulation : A1030.

A2020._ Basement Wall Interior SkinLath and PlasterGypsum BoardSpecial Wall Surfaces

092000925009770

IncludesMaterials to provide finish or protective covering on inside face of basement walls. Plaster, gypsum board, special wall surfaces.

SeeInterior Wall Finishes : C3010.

A2020._ Other Basement Walls IncludesBasement walls in addition to those listed above.

DAR BEIRUT
Page 40
Page 41: UF98

UniFormat™- ELEMENT B SHELL

B10 SUPERSTRUCTUREB1010 Floor ConstructionB1020 Roof Construction

B20 EXTERIOR ENCLOSURES

B30 ROOFING

NUMBER TITLE MF NUMBER EXPLANATION

B10 SUPERSTRUCTURE

B1010 Floor Construction

B1010._ Floor Structural Frame Columns Supporting Floors

Castinplace ConcretePrecast ConcreteMasonry UnitsStructural Metal FramingStructural SteelStructural AluminumWood FramingHeavy Timber Construction

Floor Girders and BeamsCastinplace ConcretePrecast ConcreteStructural MetalStructural SteelStructural AluminumWood FramingHeavy Timber ConstructionWood TrussesGlueLaminated Construction

Floor TrussesStructural Metal FramingStructural SteelStructural AluminumTimber TrussesPrefabricated Wood Floor Trusses

Floor JoistsMetal JoistsSteel JoistsAluminum JoistsComposite Joists AssembliesCold Formed Metal JoistsWood FramingMetalWeb Wood JoistsWood Trusses

Expansion Control

0330003400042000510005120051400611006130

033000340005100051200514006110061300617006180

0510005120051400613006170

052000521005250052600542006110061700617005800

IncludesStructural elements required for support of floor construction within basements and above grade. Columns, girders, beams, trusses, joists. Castinplace concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Expansion control. Framed openings for services.

SeeBasement Walls : A2020.Stair Construction : C2010.Exterior Walls : B2010.

B1010._ Structural Interior Walls Supporting Floors Castinplace ConcretePrecast ConcreteMasonry UnitsClay Masonry UnitsConcrete Masonry UnitsReinforced Unit Masonry AssembliesLoad Bearing Metal StudsWood FramingFirestopping

033000340004200042100422004820054100611007840

IncludesInterior walls which provide structural support for floors. Castinplace concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Firestopping.

SeeBasement Walls : A2020.Structural Interior Walls Supporting Roofs : B1020.

B1010._ Floor Decks, Slabs, and Includes

DAR BEIRUT
DAR BEIRUT
Page 41
Page 42: UF98

B1010._ Floor Decks, Slabs, and ToppingsCastinplace ConcretePrecast ConcreteCementitious Decks and Underlayment

Gypsum UnderlaymentCementitious Wood Fiber PlankComposite Concrete and Insulation

Concrete ToppingMetal Deck

Steel Floor DeckRaceway Deck SystemsAluminum Floor Deck

Wood SubflooringWood DeckingExpansion Control

0330003400035000354003510035200353005300053100532005330061600616005800

Structural slab, deck, and sheathing floor construction at intermediate floors of basement construction and above grade. Castinplace concrete, precast concrete, cementitious decks and toppings, metal decking, wood sheathing, wood decking, timber decking. Expansion control, Framed and sleeved penetrations for services and housekeeping pads for equipment.

SeeTraffic Coatings : B3010.Floor Finishes : C3020.

B1010._ Balcony Floor ConstructionCastinplace ConcretePrecast ConcreteStructural Metal Framing

Structural SteelStructural Aluminum

Rough CarpentryHeavy Timber ConstructionPrefabricated Structural WoodGluedLaminated ConstructionIndoor and Outdoor Carpet

03300034000510005120051400610006130061700618009680

IncludesStructural frame and decks, slabs, and sheathing for balcony construction. Framed and sleeved penetrations for services and housekeeping pads for equipment.

SeeExterior Balcony Walls and Railings : B2010.Traffic Coatings : B3010.

B1010._ Mezzanine Construction Castinplace ConcretePrecast ConcreteStructural Metal Framing

Structural SteelStructural Aluminum

Rough CarpentryHeavy Timber ConstructionPrefabricated Structural WoodGluedLaminated ConstructionModular Mezzanines

03300034000510005120051400610006130061700618013120

IncludesStructural frame and decks, slabs, and sheathing for mezzanine construction. Framed and sleeved penetrations for services and housekeeping pads for equipment.

SeeFloor Finishes : C3020.

B1010._ RampsCastinplace ConcretePrecast ConcreteStructural Metal Framing

Structural SteelStructural Aluminum

Rough CarpentryHeavy Timber ConstructionPrefabricated Structural WoodGlued Laminated Construction

033000340005100051200514006100061300617006180

IncludesStructural frame and decks, slabs, and sheathing for ramp construction. Weather protections and railings.

SeeFloor Finishes : C3020.Exterior Steps and Ramps : G2030.

B1010._ Exterior StairsCastinplace ConcretePrecast ConcreteStructural Metal Framing

Structural SteelStructural Aluminum

0330003400051000512005140

IncludesExterior exitway stairs above grade, fire escapes, and ladders. Protections and railings.

B1010._ Floor Construction Vapor Retarders, Air Barriers, and InsulationVapor RetardersAir BarriersBuilding Insulation

Batt Insulation

072600727007210

IncludesSheet or continuous film materials installed separately in floor assemblies to provide resistance to vapor penetration. Sheet or continuous film materials installed in floor assemblies to provide a continuous impermeable barrier to air infiltration or exfiltration. Thermal insulation installed in floor

DAR BEIRUT
Page 42
Page 43: UF98

Building Board InsulationFoamedinPlace InsulationLoose Fill InsulationSprayed Insulation

exfiltration. Thermal insulation installed in floor assemblies.

SeeVapor Retarders for Slabs on Grade : A1030Perimeter Insulation : A1030Deck Vapor Retarder and Insulation : B3010

B1010._ Floor Construction FireproofingCementitious FireproofingIntumescent Mastic FireproofingFoamed Magnesium OxychlorideFireproofingMineral Fiber Floor Fireproofing

0781007810078100781007810

IncludesSpecial coatings, mineral fiber, and cementitious coverings to provide fire resistance to floor construction.

SeeRoof Construction Fireproofing : B1020.Fireproofing for Stair Construction : C2010.Plaster Fireproofing : C3010 and Plaster Fireproofing C3030.Gypsum Board Fireproofing : C3010 and Gypsum Board Fireproofing C3030.

B1010._ Floor Construction FirestoppingFibrous Fire SafingFire Penetration SealantsFirestopping MortarsFirestopping PillowsIntumescent Firestopping FoamsSilicone Firestopping FoamsMechancial Firestopping Devices for Plastic Pipe

07840

IncludesMaterial installed in cavities, around pipe penetrations, and in other openings in floors to prevent spread of fire and smoke.

SeeRoof Construction Firestopping : B1020.

B1010._ Other Floor ConstructionCatwalksSpace Frames

Structural Metal Space Frames 05160

IncludesFloor construction in addition to those listed above including catwalks and space frames.

B1020 Roof Construction

B1020._ Roof Structural FrameColumns Supporting Roofs

Castinplace ConcretePrecast ConcreteMasonry UnitsStructural Metal FramingStructural SteelStructural AluminumWood FramingHeavy Timber Construction

Roof Girders and BeamsCastinplace ConcretePrecast ConcreteStructural Metal FramingStructural SteelStructural AluminumWood FramingHeavy Timber ConstructionWood TrussesGlueLaminated Construction

Roof TrussesStructural Metal FramingStructural SteelStructural AluminumTimber Trusses Wood Trusses

Roof JoistsMetal Joists

0330003400042000510005120051400611006130

033000340005100051200514006110061300617006180

0510005120051400613006170

05200

IncludesStructural elements required for support of roof construction. Columns, girders, beams, trusses, joists. Castinplace concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Expansion control. Framed openings for services.

SeeExterior Walls : B2010.

DAR BEIRUT
Page 43
Page 44: UF98

Steel JoistsAluminum JoistsComposite Joists AssembliesCold Formed Metal JoistsWood FramingMetalWeb Wood JoistsWood Trusses

Expansion Control

052000521005250052600542006110061700617005800

B1020._ Structural Interior Walls Supporting Roofs Castinplace ConcretePrecast ConcreteMasonry Units

Clay Masonry UnitsConcrete Masonry UnitsReinforced Unit Masonry Assemblies

Load Bearing Metal StudsWood FramingFirestopping

0330003400042000421004220

04820054100611007840

IncludesInterior walls which provide structural support for roofs. Castinplace concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Firestopping.

SeeStructural Interior Walls Supporting Floors : B1010.Exterior Walls : B2010.

B1020._ Roof Decks, Slabs, and SheathingCastinplace ConcretePrecast ConcreteCementitious Decks and Underlayment

Gypsum Underlayment Roof DeckLightweight Insulating ConcreteCementitious Wood Fiber PlankComposite Concrete and Insulation

Concrete ToppingMetal Deck

Steel Roof DeckRaceway Deck SystemAluminum Floor Deck

SheathingWood DeckingExpansion Control

033000340003500035100352003510035200353005300053100532005330061600615005800

IncludesStructural roof deck, slab, and sheathing construction. Castinplace concrete, precast concrete, cementitious decks and toppings, metal decking, wood sheathing, wood decking, timber decking. Expansion control. Framed and sleeved penetrations for services and housekeeping pads for equipment.

SeeFloor Decks, Slabs, and Toppings : B1010.Exterior Walls : B2010.Roof Coverings : B3010.

B1020._ CanopiesCastinplace ConcretePrecast ConcreteStructural Metal Framing

Structural SteelStructural Aluminum

Rough CarpentryHeavy Timber ConstructionPrefabricated Structural WoodGluedLaminated ConstructionCanopies

03300034000510005120051400610006130061700618010530

IncludesStructural frame and decks, slabs, and sheathing for canopy construction. Manufactured canopies.

SeeExterior Soffits : B2010.Roof Coverings : B3010.

B1020._ Roof Construction Vapor Retarders, Air Barriers, and InsulationVapor RetardersAir BarriersBuilding Insulation

Batt InsulationBuilding Board InsulationFoamedinPlace InsulationLoose Fill InsulationSprayed Insulation

072600727007210

IncludesSheet or continuous film materials installed separately in roof assemblies to provide resistance to vapor penetration. Sheet or continuous firm materials installed in roof assemblies to provide a continuous impermeable barrier to air infiltration or exfiltration. Thermal insulation installed in roof assemblies.

SeeRoof Deck Vapor Retarder and Insulation : B3010.

B1020._ Roof Construction IncludesSpecial coatings, mineral fiber, and cementitious

DAR BEIRUT
Page 44
Page 45: UF98

FireproofingCementitious FireproofingIntumescent Mastic FireproofingFoamed Magnesium OxychlorideFireproofingMineral Fiber Fireproofing

0781007810078100781007810

Special coatings, mineral fiber, and cementitious coverings to provide fire resistance to roof construction.

SeeFloor Construction Fireproofing : B1010.Plaster Fireproofing : C3010 and Plaster Fireproofing C3030.Gypsum Board Fireproofing : C3010 and Gypsum Board Fireproofing C3030.

B1020._ Roof Construction FirestoppingFibrous Fire SafingFire Penetration SealantsFirestopping MortarsFirestopping PillowsIntumescent Firestopping FoamsSilicone Firestopping FoamsMechanical Firestopping Devices for Plastic Pipe

07840

IncludesMaterial installed in cavities, around pipe penetrations, and in other openings in roof construction to prevent sread of fire and smoke.

SeeFloor Construction Firestopping : B1010.

B1020._ Other Roof ConstructionCatwalksSpace Frames

Structural Metal Space Frames 05160

IncludesRoof construction in addition to those listed above including catwalks and space frames.

DAR BEIRUT
Page 45
Page 46: UF98

B20 EXTERIOR ENCLOSURE

B2010B2020B2030

Exterior Walls Exterior Windows Exterior Doors

NUMBER TITLE MF NUMBER EXPLANATION

B20 EXTERIOR ENCLOSURE

B2010 Exterior Walls

B2010 Exterior Wall Exterior SkinPrecast ConcreteMasonry Units

Clay Masonry UnitsConcrete Masonry UnitsAdobe Masonry Units

Stone AssembliesCollected StoneQuarried StoneStoneMarbleLimestoneGraniteSandstoneSlate

Simulated MasonrySimulated StoneCast Stone

Exterior Insulation and Finish Systems (EIFS)Siding Panels

Siding PanelsComposite Panels

Faced PanelsGlass-Fiber-Reinforced Cementitious PanelsSiding

Portland Cement PlasterExpansion ControlWater RepellentsJoint SealersHigh Performance CoatingsPaints

0340004200042100422004290048500442004430044000441004410044100441004410047000473004720

0724007400074000742007440

0745007460092200580007190079000996009910

IncludesNonstructural outside face elements of exterior walls. Precast concrete veneer, unit masonry veneer, exterior insulation and finish systems, manufactured siding, stucco. Expansion control, water repellents, joint sealers, special coatings, painting.

SeeExterior Windows : B2020.Exterior Storefronts : B2020.Glazed Curtain Wall : B2020.Exterior Doors : B2030.

B2010._ Exterior Wall ConstructionCastinplace ConcretePrecast ConcreteMasonry Units

Clay Masonry UnitsConcrete Masonry UnitsReinforced Unit MasonryGlass Masonry UnitsAdobe Masonry Units

LoadBearingMetal StudsWood FramingExpansion Control

0330003400042000421004220048200427004290054100611005800

IncludesExterior wall construction including backup systems for wall veneer. Castinplace concrete walls, precast concrete walls, unit masonry walls, metal framed wall systems, wood framed wall systems. Insulation when integral with shop fabricated wall assemblies. Expansion control.

SeeExterior Windows : B2020.Exterior Storefronts : B2020.Glazed Curtain Wall : B2020.Exterior Doors : B2030.

B2010._ Exterior Wall Vapor Retarders, Air Barriers, and InsulationVapor RetardersAir Barriers

072600727007210

IncludesSheet or continuous film materials installed separately in wall assemblies to provide resistance to vapor penetration. Sheet or continuous film materials installed in wall assemblies to provide a continuous

DAR BEIRUT
Page 46
Page 47: UF98

Building InsulationBatt InsulationBuilding Board InsulationFoamedinPlace InsulationLoose Fill InsulationSprayed Insulation

assemblies to provide a continuous impermeable barrier to air infiltration or exfiltration. Thermal insulation installed in wall assemblies.

SeeFloor Construction Vapor Retarders, Air Barriers, and Insulation : B1010.Roof Construction Vapor Retarders, Air Barriers, and Insulation : B1020.Deck Vapor Retarder and Insulation B3010.

B2010._ Exterior Wall Interior SkinPlaster and Gypsum BoardGypsum BoardSpecial Wall Surfaces

092000925009770

IncludesMaterials to provide finish or protective covering on inside face of exterior walls. Plaster, gypsum board, special wall surfaces.

SeeInterior Wall Finishes : C3010.

B2010._ ParapetsCastinplace ConcretePrecast ConcreteMasonry Units

Clay Masonry UnitsConcrete Masonry Units

ColdFormed Metal FramingRough Carpentry

03300034000420004210042200540006100

IncludesExterior wall construction above the plane of the roof.

SeeRoof Flashing and Sheet Metal : B3010.

B2010._ Exterior Louvers, Grilles, and ScreensWall LouversLouvered Equipment EnclosuresWall VentsGrilles and Screens

1020010210102201023010240

IncludesLouvers which are not an integral part of mechanical equipment, including louvers connected to ducts. Exterior enclosures, grilles and screens of wood, metal, plastic, and other materials for a variety of purposes including screening of equipment.

SeeInterior Balustrades and Screens : C1010.Interior Louvers and Vents : C1030.

B2010._ Exterior Protection Devices for OpeningsExterior Sun Control DevicesExterior ShuttersStorm PanelsAwningsMarquees

1070010705107101071510530

IncludesManufactured items such as louvers, fins, shutters, demountable panels, awnings, and sun screens to provide sun control, privacy, security, insulation, and storm protection on exterior of windows, skylights, and entrances. Fixed and moveable, manually and electrically operated, and automatically controlled devices.

SeeInterior Window Treatment : E2010.Exterior Wall Security Fencing : F1030.

B2010._ Exterior Balcony Walls and RailingsCastinplace ConcretePrecast ConcreteMasonry Units

Clay Masonry UnitsConcrete Masonry Units

LoadBearing Metal StudsMetal Railings

Handrails and RailingsOrnamental Handrails and Railings

033000340004200042100422005410Division 50552005720

IncludesComplete balcony wall and railing assemblies. Castinplace concrete, precast concrete, unit masonry, metal framed wall assemblies, metal railings, wood framed wall assemblies, wood railings, glass railings.

SeeBalcony Floor Construction : B1010.Interior Corridor Handrails : C1030.Interior Stair Railings : C2020.

B2010._ Exterior SoffitsFinish Carpentry

Finish CarpentryExterior Insulation and Finish Systems (EIFS)

062000620007240

IncludesFinish assemblies for exterior soffits at canopies, balconies, and other exposed exterior ceilings. Wood, exterior insulation and finish systems, manufactured siding, stucco, gypsum

DAR BEIRUT
Page 47
Page 48: UF98

(EIFS)Siding Panels

Siding PanelsComposite PanelsFaced Panels

Portland Cement PlasterGypsum BoardSpecialty Ceilings

Linear Metal CeilingsHigh Performance Coatings

07400074000743007440092200925009545

09960

board, special ceiling surfaces. Soffit vents, special coatings, painting.

SeeBalcony Floor Construction : B1010.Canopies : B1020.Stair Soffits : C2020.

B2010._ Other Exterior Walls IncludesOther exterior walls in addition to those listed above.

B2020 Exterior Windows

B2020._ Exterior Standard WindowsWindows

Steel WindowsAluminum WindowsStainless Steel WindowsBronze WindowsWood WindowsPlastic Windows

08500085100852008530085400855008560

IncludesFixed or operable windows used singly and in multiples. Glazing, operating hardware, screens, and other accessories. Windows units with louver blinds integrally set between glass panels. Metal, wood, and plastic window units. Wall opening elements such as lintels, slls, flashings and joint sealers.

SeeExterior Protection Devices for Openings : B2010.Interior Windows : C1010.Interior Window Treatment : E2010.

B2020._ StorefrontsAluminumFramed StorefrontsSteelFramed StorefrontsStainless SteelFramed StorefrontsBronzeFramed Storefronts

0840008410084100841008410

IncludesTypically onestory storefront systems fabricated from formed and extruded metal and glass components for exterior use. Glazing, framing, and other associated items. Wall opening elements such as lintels, sills, flashings, and joint sealers.

SeeExterior Entrance Doors : B2030.Sliding Storefronts : B2030.Interior Glazed Partitions and Storefronts : C1010.

B2020._ Glazed Curtain WallMetal Framed Curtain WallGlazed Aluminum Curtain WallGlazed Stainless Steel Curtain WallGlazed Bronze Curtain WallTranslucent Wall and Roof AssembliesSloped Glazing AssembliesStructural Glass Curtain Walls

0890008910089100891008910

089500896008970

IncludesStandard and custom fabricated curtain wall systems consisting of framing members, sash, glazing, spandrel and infill panels, fasteners, and sealants installed as an integrated system to enclose a vertical or sloped surface. Systems are typically designed for multistory construction but may be applied to single story structures. Systems may be totally glazed or a combination of glass and opaque panels. Translucent panel systems and structural glass walls are also included. Vapor retarders, air barriers, and insulation to system.

B2020._ Other Exterior WindowsDetention WindowsPass WindowsStorm Windows

085800858008580

IncludesExterior windows including glazing, operating hardware, screens, and other accessories used for a variety of special functions and applications and employing various operating methods. Wall opening elements such as lintels, sills, flashings, and joint sealers.

See

DAR BEIRUT
Page 48
Page 49: UF98

Exterior Protection Devices for Openings : B2010.Skylights : B3020.Interior Windows : C1010Stained and Other Art Glass : E2010Roof Windows : B3020.

B2030 Exterior Doors

B2030._ Exterior Entrance DoorsAluminumFramed StorefrontsSteelFramed StorefrontsStainless SteelFramed StorefrontsBronze EntranceFramed StorefrontsAll Glass Entrances and StorefrontsAutomatic Entrance DoorsRevolving Entrance DoorsBalanced Entrance DoorsSliding Storefronts

08400084100841008410084100845008460084700848008490

IncludesExterior personnel door assemblies at main entrances, usually of metal framed glass or all glass. Automatic, revolving, balanced, and other special operating entrance doors, and sliding storefront wall systems. Glazing, frames when not part of storefront or curtain wall system, hardware, and accessories. Wall opening elements such as lintels, sills, flashings, and joint sealers.

SeeStorefronts : B2020.Glazed Curtain Wall : B2020.Other Exterior Windows : B2020.Interior Entrance Doors : C1020.

B2030._ Exterior Utility DoorsMetal Doors and Frames

Steel Doors and FramesWood and Plastic Doors

Wood DoorsPlastic DoorsPreassembled Metal Door and Frame UnitsPreassembled Wood Door and Frame UnitsPreassembled Plastic Door and Frame Units

0810008110082000821008220

08150

08250

08250

IncludesExterior personnel doors assemblies other than at main entrances. Metal doors, wood doors and frames, and plastic doors. Glazing, frames, hardware, door louvers, and accessories. Wall opening elements such as lintels, sills, flashings, and joint sealers.

SeeStorefronts : B2020.Glazed Curtain Wall : B2020.

B2030._ Large Exterior Special DoorsCoiling Doors and GrillesSectional Overhead DoorsTelescoping Vertical Lift DoorsIndustrial DoorsHangar Doors

0830008330083600837008340

IncludesLarge exterior doors and door assemblies to allow for passage of large objects involving a variety of operating methods, Hardware, glazing, controls, operators, and drive mechanisms are included. Wall opening elements such as lintels, sills, flashings, and joint sealers.

SeeInterior Large Doors : C1020.

B2030._ Exterior Gates IncludesExterior devices of solid or open construction, usually hinged, to provide moveable barrier to provide access through wall or other divider.

SeeInterior Gates : C1020.Fences and Gates : G2040.

B2030._ Other Exterior DoorsPressureResistant DoorsDetention Doors and FramesCold Storage DoorsTraffic DoorsSound Control DoorsStorm DoorsScreen Doors

08390083200834008380083400818008180

IncludesExterior doors in addition to those listed above, including special function exterior doors and door assemblies for a variety of special functions and applications involving a variety of operating methods. Hardware, controls, operators, joint sealers, and drive mechanisms are included. Storm and screen doors are included. Wall opening elements such as lintels, sills, flshings, and joint sealers.

DAR BEIRUT
Page 49
Page 50: UF98

B30 ROOFING

B3010B3020

Roof Coverings Roof Openings

NUMBER TITLE MF NUMBER EXPLANATION

B30 ROOFING

B3010 Roof Coverings

B3010._ Deck Vapor Retarder and InsulationLightweight Insulating ConcreteVapor RetardersRoof and Deck Insulation

Asphaltic Perlite Concrete DeckRoof Board Insulation

035200726007220

IncludesSheet or continuous film materials installed on top of roof, terrace, or plaza decks to provide resistance to vapor penetration. Thermal insulation installed on top of roof, terrace, or plaza decks.

SeeRoof Construction Vapor Retarders, Air Barriers, and Insulation : B1020.

B3010._ Shingles and Roofing TilesShingles

Asphalt SinglesFiberglass ShinglesMetal ShinglesMineral Fiber Cement ShinglesPorcelain Enamel ShinglesSlate ShinglesWood ShinglesWood Shakes

Roofing TilesClay Roofing TilesConcrete Roofing TilesMetal Roofing TilesMineral Fiber Cement Roofing TilesPlastic Roofing Tiles

0730007310

07320

IncludesLapped roofing shingles, shakes and roofing tiles, including underlayment and fastening products and methods.

B3010._ Manufactured RoofingRoofing and siding panels

0740007400

IncludesManufactured components of metal, wood, plywood, plastic, mineral fibercement, and composite materials forming roof surfaces. Both structural and insulated panels.

B3010._ Membrane RoofingBuiltup Bituminous RoofingColdApplied Bituminous RoofingRoll RoofingModified Bituminous Membrane RoofingMembrane RoofingFluidApplied RoofingCoated Foamed RoofingMembrane RoofingRoof Maintenance and RepairsFlexible Flashing

0750007510075200758007550

075000756007570075000759007650

IncludesRoofing systems such as builtup bituminous, modified bituminous, elastomeric singleply, thermoplastic singleply, roll, fluidapplied, and foamed membranes including surfacing materials and coatings. Composition and elastomeric flashing, walk boards, and other items integral with the roofing membrane are included.

B3010._ Traffic CoatingsPedestrian Traffic CoatingVehicular Traffic Coating

071800718007180

IncludesSurface applied waterproofing and elastomeric and composition type membranes exposed to weather and suitable for light pedestrian and vehicular traffic, but not intended for heavy industrial use.

SeeFloor Finishes : C3020.

DAR BEIRUT
Page 50
Page 51: UF98

Rain Water Drainage Specialties : D2040.

B3010._ Horizontal WaterproofingSheet WaterproofingFluidApplied WaterproofingSheet Metal WaterproofingBentonite WaterproofingMetal Oxide WaterproofingCementitious and Reactive WaterproofingFlexible Flashing

071000713007140071500717007160

0716007650

IncludesImpervious membranes, coatings, and other materials applied to horizontal decks subject to water penetration, including provisions for drainage and boards and coatings required for protection of waterproofing.

SeeHorizontal Waterproofing for Slabs on Grade : A1030.Rain Water Drainage Specialties : D2040.

B3010._ Sheet Metal Roofing 07610 IncludesShop and field formed sheet metal roofing with waterproof joints such as flat and standing seams and battens. Sheet metal flashing and accessories are included.

B3010._ Flashing and Sheet MetalSheet Metal Flashing and TrimMetal Gutters and Downspouts

SplashblocksJoint Sealers

0760007620

07900

IncludesShop and field formed sheet metal flashing, accessories, and trim for roof and waterproofed deck construction such as gutters, downspouts, scuppers, gravel stops, copings, expansion joint covers, pitch pans, and diverters. Other related protective and ornamental sheet metal items and accessories for roofing construction.

B3010._ Roof Specialties and AccessoriesManufactured Roof Specialties

CopingsCounterflashing SystemsGravel Stops and FasciasRelief VentsRegletsExpansion Joint Assemblies

Roof AccessoriesManufactured CurbsGravity VentilatorsPenthouse VentilatorsRidge Vents

0770007710

07720

IncludesRoof specialties and accessories of standard manufactured components, both formed and extruded. Accessories installed on and in roofing other than mechanical and structural items.

SeeRoof Openings : B3020.Rain Water Drainage Specialties : D2040.

B3010._ Manufactured Exterior SpecialtiesSteeplesSpiresCupolasWeathervanes

1034010340103401034010340

IncludesStock and custom designed steeples, spires, cupolas, weathervanes, and other similar exterior specialties.

B3020 Roof Openings

B3020._ SkylightsUnit Skylights

Domed Unit SkylightsPyramidal Unit SkylightsVaulted Unit Skylights

MetalFramed SkylightsDomed MetalFramed SkylightsMotorized MetalFramed SkylightsRidge MetalFramed SkylightsSloped MetalFramed SkylightsVaulted MetalFramed Skylights

0860008620

07820

IncludesPlastic skylights and metalframed skylight assemblies with plastic and glass glazing. Accessories and joint sealants.

SeeSloped Glazing Assemblies : B2020.

DAR BEIRUT
Page 51
Page 52: UF98

B3020._ Other Roofing OpeningsRoof HatchesSmoke VentsRoof Windows

077200772008610

IncludesOther roof openings such as roof hatches, smoke vents, gravity roof ventilators, and roof windows. Hardware, accessories, and joint sealants.

DAR BEIRUT
Page 52
Page 53: UF98

UniFormat™ - ELEMENT C INTERIORS

C10 INTERIOR CONSTRUCTIONC1010 PartitionsC1020 Interior Doors C1030 Fittings

C20 STAIRS

C30 INTERIOR FINISHES

NUMBER TITLE MF NUMBER EXPLANATION

C10 INTERIOR CONSTRUCTION

C1010 Partitions

C1010._ Interior Fixed PartitionsCast-in-place ConcretePrecast ConcreteUnit Masonry AssembliesReinforced Masonry AssembliesNon-Reinforced Masonry AssembliesStone AssembliesFramed Partitions

Wood FramingNon-Load Bearing Wall Framing

Wire Mesh Partitions

03300034000481004820048300485004850061100911010605

IncludesEnclosures and partitions which are fixed and secured in place. Non-structural walls of concrete; clay, concrete, glass, and stone masonry; and wood and metal stud partitions with associated wall surfaces. Partitions of an open nature, such as wire mesh partitions. Expansion control.

SeeStructural Interior Walls Supporting Floors : B1010.Structural Interior Walls Supporting Roofs : B1020.Fabricated Compartments and Cubicles : C1030.

C1010._ Interior Demountable PartitionsDemountable Gypsum Board PartitionsDemountable Metal PartitionsDemountable Wood Partitions

106151061510615

IncludesPartitions which can be demounted and relocated with minimum of labor.

SeeSystems Furniture Partitions : E2020.

C1010._ Interior Operable Folding Panel PartitionsAccordion Folding PartitionsSliding PartitionsCoiling Partitions

10650106501065010650

IncludesTrack-supported, operable panels and partitions, top hung and floor supported, manually and power operated. Auditorium partitions and dividers. Overhead supports.

SeeInterior Sliding and Folding Doors : C1020.Gymnasium Dividers : E1090.

C1010._ Interior Balustrades and Screens, Interior RailingsMetal Railings

Standard Metal RailingsOrnamental Metal Railings

Wood Handrails and Guard RailsTempered Glass Railing AssembliesGrilles and Screens

0552005720064300552010240

IncludesRailings and similar open type divider assemblies used for a variety of functions and not limited to ventilation purposes. Interior grilles and screens of wood, metal, plastic, and other materials. Associated tracks and anchorages.

SeeExterior Grilles and Screens : B2010.Exterior Balcony Walls and Railings : B2010.Pedestrian Control Devices : C1030.Stair Railings and Balustrades : C2020.

C1010._ Interior WindowsWindowsSteel WindowsAluminum WindowsStainless Steel Windows

08500085100852008530

IncludesFixed or operable windows used singly and in multiples. Glazing, operating hardware and other accessories. Metal, wood, and plastic window units. Lintels and sills.

DAR BEIRUT
DAR BEIRUT
Page 53
Page 54: UF98

Stainless Steel WindowsBronze WindowsWood WindowsPlastic WindowsComposite WindowsSpecial Function WindowsDetention WindowsPass WindowsSound Control WindowsRadiation Protection WindowsRadio-Frequency-Interference (RFI)Shielding Windows

0853008540085500856008570085800858008580085800858008580

SeeExterior Windows : B2020.

C1010._ Interior Glazed Partitions and StorefrontsEntrances and StorefrontsAluminum-Framed StorefrontsSteel-Framed StorefrontsStainless Steel-Framed StorefrontsBronze-Framed Storefronts

0840008410084100841008410

IncludesFixed interior glazed partitions including interior storefronts. Frames, glazing, sealants, and associated items.

SeeExterior Storefronts : B2020.Glazed Curtain Wall : B2020.Interior Entrance Doors : C1020.

C1010._ Interior Partition FirestoppingFibrous Fire SafingFire-Resistant Joint SealantsThrough Penetration Firestopping MortarsThrough Penetration Firestopping PillowsIntumescent Firestopping FoamsSilicone Firestopping FoamsThermal Barriers for Plastics

07840 IncludesMaterial installed in cavities, around pipe penetrations, and in other openings in partitions to prevent spread of fire and smoke.

SeeFirestopping for Structural Interior Walls Supporting Floors : B1010.Floor Construction Firestopping : B1010.Firestopping for Structural Interior Walls Supporting Roofs : B1020.Roof Construction Firestopping : B1020.

C1010._ Other Partitions IncludesInterior partitions in addition to those listed above.

C1020 Interior Doors

C1020._ Interior Swinging DoorsMetal Doors and FramesSteel Doors and FramesAluminum Doors and FramesStainless Steel Doors and FramesBronze Doors and FramesWood and Plastic DoorsWood DoorsPlastic DoorsPreassembled Metal Door and Frame UnitsPreassembled Wood Door and Frame UnitsPreassembled Plastic Door and Frame Units

0810008110081200813008140082000821008220

08150

08250

08250

IncludesInterior personnel door assemblies other than at main entrances. Metal doors, wood doors and frames, and plastic doors. Glazing, frames, hardware, door louvers, lintels, accessories, and finishing.

SeeInterior Glazed Partitions and Storefronts : C1010.Exterior Doors : B2030.

C1020._ Interior Entrance DoorsAluminum-Framed StorefrontsSteel-Framed StorefrontsStainless Steel-Framed StorefrontsBronze-Framed StorefrontsAll-Glass Entrances and StorefrontsAutomatic Entrance DoorsRevolving Entrance DoorsBalanced Entrance DoorsSliding Storefronts

08400084100841008410084100845008460084700848008490

IncludesInterior personnel door assemblies at main entrances, usually of metal framed glass or all glass. Automatic, revolving, balanced, and other operating entrance doors; and sliding storefront wall systems. Frames when not part of storefront or curtain wall system, hardware, lintels, accessories, and finishing.

SeeExterior Entrance Doors : B2030.

DAR BEIRUT
Page 54
Page 55: UF98

Sliding Storefronts 08490Interior Glazed Partitions and Storefront : C1010.

C1020._ Interior Fire Doors 08340 IncludesDoors constructed to resist the passage of fire and smoke. Glazing, frames, hardware, lintels, accessories, and finishing.

C1020._ Interior Sliding and Folding DoorsSliding Metal Doors and GrillesSliding Wood and Plastic DoorsFolding Doors and Grilles

081600826008350

IncludesInterior personnel doors which slide or fold to open. Frames, hardware, lintels, accessories, and finishing.

SeeInterior Operable Partitions : C1010.

C1020._ Interior Large DoorsCoiling Doors and GrillesSectional Overhead DoorsSingle-Panel Overhead DoorsVertical Lift DoorsIndustrial DoorsHanger Doors

083300836008360083700834008340

IncludesLarge interior doors and door assemblies to allow for passage of large objects involving a variety of operating methods. Frames, hardware, controls, operators, and drive mechanisms lintels, accessories, and finishing.

SeeLarge Exterior Special Doors : B2030.

C1020._ Interior Gates IncludesInterior devices of solid or open construction, usually hinged, to provide moveable barrier to provide access through partition or other divider. Hardware, accessories, and finishing.

SeeExterior Gates : B2030.Fences and Gates : G2040.

C1020._ Other Interior DoorsAccess Doors and PanelsPressure-Resistant DoorsDetention Doors and FramesCold Storage DoorsTraffic DoorsSound Control DoorsLightproof DoorsRadiation Protection DoorsRadio-Frequency-Interference (RFI)Shielding Doors

083100839008320083400838008340083400834008340

IncludesSpecial function interior doors and door assemblies for a variety of special functions and applications involving a variety of operating methods. Frames, hardware, controls, operators, and drive mechanisms lintels, accessories, and finishing.

SeeOther Exterior Doors : B2030.Exterior Detention Doors : B2030.Revolving Darkroom Doors : E1090.Special Purpose Rooms : F1020.

C1030 Fittings Division 10 SeeCanopies : B1020.Exterior Louvers, Grilles, and Screens : B2010.Awnings : B2010.Exterior Protection Devices for Openings : B2010.Manufactured Exterior Specialties : B3010.Interior Grilles and Screens : C1010.Interior Demountable Partitions : C1010.Interior Operable Partitions : C1010.Access Flooring : C3020.Fire Protection Specialties : D4030.Walkway Covers : G2040.Car Shelters : G2040.Flagpoles : G2040.

C1030._ Visual Display BoardsChalkboardsMarkerboardsTackboard and Visual Aid Boards

10100101101011510120

IncludesChalk and marker writing surfaces manufactured of slate, painted composition board, porcelain-enameled steel, and aluminum.

DAR BEIRUT
Page 55
Page 56: UF98

Tackboard and Visual Aid BoardsOperable Board UnitsDisplay Track AssembliesVisual Aid Board Units

10120101301014010145

Mounting surfaces of cork composition board, and fabric covered material. Framing systems and accessories, and manual and motor operated units with integral projection screens.

C1030._ Fabricated Compartments and CubiclesMetal Toilet CompartmentsPlastic Laminate Toilet CompartmentsPlastic Toilet CompartmentsParticleboard Toilet CompartmentsStone Toilet CompartmentsShower and Dressing CompartmentsCubicle Curtains

1015010160

101651017010175101801018510190

IncludesEnclosures, dividers, screens, and curtains for toilets, urinals, showers, dressing compartments, and hospital cubicles including hardware and accessories. Ceiling hung, floor supported, and wall supported types. Overhead supports.

C1030._ Interior Louvers and VentsWall LouversVents

102001021010230

IncludesInterior louvers, vents, and other items for ventilation which are not an integral part of the mechanical system. Operable and stationary louvers.

SeeExterior Wall Louvers : B2010.Exterior Wall Vents : B2010.

C1030._ Service Walls 10250 IncludesWall systems and wall mounted units incorporating services such as drinking fountains, clocks, fire hoses, extinguisher cabinets, telephones, and waste receptacles. Patient headwalls.

C1030._ Wall and Corner GuardsCorner GuardsBumper GuardsImpact-Resistant Wall Protection

10260102601026010260

IncludesProtective devices such as corner guards and bumper rails of metal, plastic, rubber, and other finish materials.

C1030._ HandrailsMetal HandrailsOrnamental HandrailsWood Handrails

055200572006450

IncludesWall mounted handrails not associated with stairs or other construction. Corridor handrails.

SeeExterior Stairs : B1010.Exterior Balcony Railings : B2010.Interior Stair Railings : C2020.

C1030._ Fireplaces and StovesMasonry FireplacesFlue LinersRefractory BrickManufactured FireplacesFireplace Specialties and AccessoriesStoves

10300048800455004580103051031010320

IncludesMasonry fireplaces and manufactured and fabricated fireplaces, stoves, chimneys, dampers, and specialties for use in construction of fireplaces and stove units.

C1030._ Interior Identifying DevicesDirectoriesTackboard and Visual Aid BoardsPlaquesInterior Signage

1040010410101201042010440

IncludesInterior directories, bulletin boards, directional items, letters, signs, and plaques of various materials used in establishing identity and communication. Integrally lighted units, neon signs, computerized directories, electronic message boards, and other types of electronic signs.

SeeTraffic Signs and Signals : G2010.Parking Lot Signs : G2020.Exterior Signs : G2040.

DAR BEIRUT
Page 56
Page 57: UF98

C1030._ Pedestrian Control DevicesPortable Posts and RailingsRotary GatesTurnstilesDetection and CountingDevices

1045010450104501045010450

IncludesPortable posts and railings, rotary gates, turnstiles, electronic detection and counting systems, restrictive guides used to limit access, and temporary enclosures for pedestrian traffic.

SeeInterior Balustrades and Screens : C1010.

C1030._ LockersMetal LockersWood LockersCoin-operated LockersGlass Lockers

1050010500105001050010500

IncludesStorage facilities providing temporary security of contents. Tenant storage lockers, benches, and related hardware.

C1030._ Postal Boxes and ChutesMail ChutesMail BoxesCollection BoxesCentral Mail Delivery Boxes

1055010550105501055010550

IncludesMail chutes, collection boxes, letter boxes, letter slots, view windows, and other postal service facilities and devices.

C1030._ Storage ShelvingMetal Storage ShelvingMobile Storage SystemsWire Storage ShelvingPrefabricated Wood Storage ShelvingRecycled Plastic Storage Shelving

106701067010670106701067010670

IncludesOpen, manufactured shelving for general storage, as opposed to specific items. Manual and motorized mobile and compact storage systems.

SeeLibrary Stack Systems : E1020.Library Casework : E2010.

C1030._ Telephone SpecialtiesTelephone EnclosuresTelephone Directory UnitsTelephone Shelving

10750107501075010750

IncludesManufactured enclosures, stalls, booths, and alcoves for installation of telephones. Accessories.

C1030._ Toilet, Bath, and Laundry AccessoriesToilet AccessoriesBath AccessoriesLaundry Accessories

10800108101082010830

IncludesManufactured items for use in conjunction with toilets, baths, and laundries.

C1030._ Scales 10880 IncludesWeighing devices, usually of a fixed nature.

C1030._ Wardrobe and Closet Specialties 10900

IncludesManufactured hat and coat racks, and other specialties for storage of clothing.

SeeCheckroom Equipment : E1010.

C1030._ Other FittingsMetal FabricationsFormed Metal FabricationsExpansion Joint Cover Assemblies

055000558005810

IncludesInterior specialties in addition to those listed above. Ornamental metals.

DAR BEIRUT
Page 57
Page 58: UF98

C20 STAIRS

C2010C2020

Stair Construction Stair Finishes

NUMBER TITLE MF NUMBER EXPLANATION

C20 STAIRS

C2010 Stair Construction IncludesStructural framing for interior stairs including treads, risers, and landings. Fireproofing.

SeeTraffic Bearing Membranes : B3010.Exterior Steps and Ramps : G2030.Exterior Stairs : B1010.Fire Escapes : B1010.

C2010._ Cast-In-Place Concrete Stair Construction 03300

C2010._ Precast Concrete Stair Construction 03400

C2010._ Metal Stair ConstructionMetal Stairs and LaddersOrnamental StairsFabricated Spiral StairsStair Treads and Nosings

0550005510057100571505550

C2010._ Wood Stair Construction 06430

C2010._ Other Stair Construction

C2020 Stair Finishes

C2020._ Tile Stair FinishesCeramic TileQuarry TilePaver TileCut Natural Stone TileGlass MosaicsPlastic TileMetal Tile

0930009310093300934009380093500936009370

IncludesStair tread, riser, and landing finish of manufactured surfacing units of impervious, vitreous, semi-vitreous, and non-vitreous materials; glazed, unglazed, conductive, abrasive, and textured surfaces.

SeeInterior Tile Wall Finishes : C3010.Interior Tile Floor Finishes : C3020.

C2020._ Terrazzo Stair FinishesPortland Cement TerrazzoPrecast TerrazzoConductive TerrazzoPlastic Matrix Terrazzo

0940009410094200943009440

IncludesStair tread, riser, and landing finish of cast-in-place, monolithic, bonded and adhesively-bonded portland cement terrazzo; poured-in-place epoxy, polyester, and conductive plastic matrix terrazzo; and precast terrazzo. Accessories and finish sealers.

SeeInterior Terrazzo Wall Finishes : C3010.Interior Terrazzo Floor Finishes : C3020.

C2020._ Stone Stair FinishesFlagstone FlooringMarble FlooringGranite FlooringSlate Flooring

0963009630096300963009630

IncludesStair tread, riser, and landing finish of natural, simulated, and cast stone.

SeeInterior Stone Facing Wall Finishes : C3010.

DAR BEIRUT
Page 58
Page 59: UF98

Slate Flooring 09630Interior Stone Flooring : C3020.

C2020._ Unit Masonry Stair FinishesBrick FlooringChemical Resistant Brick Flooring

096300963009630

IncludesStair tread, riser, and landing finish of fired clay unit masonry and pressed concrete unit masonry stair covering.

SeeInterior Unit Masonry Flooring : C3020.

C2020._ Resilient Stair FinishesResilient Stair Treads and RisersResilient Stair NosingsResilient Stair LandingsResilient Stair Skirting

0965009650096500965009650

IncludesResilient tile and sheet material for stair treads, nosings, risers, skirts, and landings.

SeeInterior Resilient Flooring : C3020.

C2020._ Carpet Stair FinishesCarpet Stair Treads and RisersCarpet Stair LandingsCarpet Stair Skirting

09680096800968009680

IncludesCarpet materials and accessories for stair treads, risers, skirts, and landings.

SeeInterior Wall Carpet : C3010.Interior Carpet Flooring : C3020.

C2020._ Stair TreatmentStatic Control FlooringSlip-Resistant Floor Treatment

096100961009610

IncludesStatic dissipating and spark resistant finishes for stair treads, risers, and landings.

SeeInterior Floor Treatment Finishes : C3020.

C2020._ Stair Railings and BalustradesCast-in-place ConcretePrecast ConcreteUnit Masonry AssembliesWood Framed Railings and BalustradesMetal Framed Railings and BalustradesMetal Railings and Balustrades

Handrails and RailingsOrnamental Handrails and Railings

Wood RailingsTempered Glass Railing Assemblies

033000340004200

06110

054000541005520057200643005520

IncludesComplete stair railing and balustrade assemblies including handrails. Cast-in-place concrete, precast concrete, unit masonry, metal framed wall assemblies, metal railings, wood framed wall assemblies, wood railings, glass railings. Railings that are integral to the stair and wall mounted to serve the stair.

SeeExterior Stair Railings : B1010.Exterior Balcony Railings : B2010.Other Exterior Railings : B2010.Other Interior Railings : C1010.Interior Stair Railings : C2020.

C2020._ Stair SoffitsWood PanelingGypsum PlasterPortland Cement PlasterGypsum Board

06200092100922009250

IncludesMaterials to provide finish or protective coating to underside of interior stair and landing construction.

SeeInterior Stairway Wall Finishes : C3010.Interior Stairway Ceiling Finishes : C3030.

C2020._ Stair PaintingPaintsStains and Transparent Finishes

099100991009930

IncludesPainting and staining of interior stair construction and soffits.

SeeInterior Stairway Wall Painting : C3010.Floor Painting and Staining : C3020.Interior Stairway Ceiling Painting : C3030.

C2020._ Other Stair FinishesResinous FlooringMagnesium Oxychloride FlooringEpoxy-Marble Chip FlooringSeamless Quartz FlooringElastomeric Liquid FlooringMastic FillsPlastic-Laminate Flooring

0960009670096700967009670096700967009620

IncludesHeavy duty, high performance, and other special finishes for stair treads, risers, landings, soffits, and other related items.

SeeOther Interior Flooring Finishes : C3020.Other Interior Wall Finishes : C3010.Other Interior Ceiling Finishes : C3030.

DAR BEIRUT
Page 59
Page 60: UF98

Plastic-Laminate FlooringAsphalt Plank FlooringAbrasion-Resistant CoatingsHigh-Build Glazed CoatingsCoatings for Concrete and MasonryElastomeric CoatingsTextured Plastic CoatingsFire-Resistant Paint CoatingsIntumescent Paints CoatingsChemical-Resistant CoatingsGraffiti-Resistant Coatings

09620099600996009980099600996009960099600996009960

DAR BEIRUT
Page 60
Page 61: UF98

C30 INTERIOR FINISHES

C3010C3020C3030

Wall Finishes Floor Finishes Ceiling Finishes

NUMBER TITLE MF NUMBER EXPLANATION

C30 INTERIOR FINISHES

C3010 Wall Finishes

C3010._ Concrete Wall FinishesBlasted Concrete FinishesColored Concrete FinishesExposed Aggregate Concrete FinishesGrooved Surface Concrete FinishesTooled Concrete Finishes

033600336003360

033600336003360

IncludesSpecial or architectural finishes on exposed interior concrete walls.

SeeInterior Concrete Ceiling Finishes : C3030.

C3010._ Wall PanelingPrefinished PanelingBoard PanelingArchitectural Paneling

06420062500626006420

IncludesCovering or cladding of interior walls with wood paneling. Associated furring, fastening, and trim.

C3010._ Plaster Wall FinishesFurring and LathingGypsum PlasterPortland Cement PlasterAdobe Finish

0920009205092100922009220

IncludesLathing including accessories and trim. Interior plaster, and acoustical plaster. Plaster fireproofing. Acoustical sound barrier boards and blankets.

SeeBasement Wall Lath and Plaster Interior Skin : A2020.Portland Cement Plaster Exterior Wall Skin : B2010.Exterior Wall Plaster Interior Skin : B2010.Plaster Stair Soffits : C2020.Stucco Stair Soffits : C2020.Interior Plaster Ceiling Finishes : C3030.

C3010._ Gypsum Board Wall FinishesGypsum BoardGypsum Board AssembliesGypsum Board Accessories

09200092500926009270

IncludesUnfinished and prefinished gypsum board, gypsum backing board for other finishes, accessories and trim, and joint taping and finishing. Gypsum board fireproofing. Acoustical sound barrier boards and blankets.

SeeBasement Wall Gypsum Board Interior Skin : A2020.Exterior Wall Gypsum Board Interior Skin : B2010.Gypsum Board Stair Soffits : C2020.Gypsum Board Interior Ceiling Finishes : C3030.

C3010._ Veneer Plaster FinishesGypsum Plaster VeneerCement Plaster Veneer

092000921009220

IncludesPlaster applied as a veneer finish to various substrates such as concrete, masonry, and board finishes.

C3010._ Tile Wall FinishesCeramic TileQuarry TileGlass MosaicPlastic Tile

0930009310093300935009360

IncludesManufactured surfacing units of impervious, vitreous, semi-vitreous, and non-vitreous materials; glazed, unglazed, conductive, and textured surfaces.

DAR BEIRUT
Page 61
Page 62: UF98

Plastic TileMetal TileCut Natural Stone Tile

093600937009380

SeeTile Stair Finishes : C2020.Interior Tile Floor Finishes : C3020.

C3010._ Terrazzo Wall FinishesPortland Cement TerrazzoPrecast TerrazzoConductive TerrazzoPlastic Matrix Terrazzo

0940009410094200943009440

IncludesCast-in-place, monolithic, bonded and adhesively-bonded portland cement terrazzo; poured-in-place epoxy, polyester, and conductive plastic matrix terrazzo; and precast terrazzo. Accessories and finish sealers.

SeeTerrazzo Stair Finishes : C2020.Interior Terrazzo Floor Finishes : C3020.

C3010._ Stone Facing Wall Finishes 09380 IncludesNatural stone two inches or less in thickness, with polished or matte finish applied as an interior veneer surface.

SeeStone Stair Finishes : C2020.Interior Stone Flooring : C3020.

C3010._ Acoustical Wall Treatment 09840 IncludesAcoustical tiles and panels, sound absorbing wall units, acoustical wall systems.

SeeAcoustical Ceiling Treatment : C3030.

C3010._ Wall Carpet 09730 IncludesWall carpet materials and accessories.

SeeCarpet Stair Finishes : C2020.Interior Carpet Flooring : C3020.

C3010._ Interior Wall PaintingInterior PaintsStains and Transparent FinishesDecorative Finishes

09910099100993009940

IncludesInterior painting with transparent and opaque finishes. Stains, varnishes, lacquers, primers, fillers, paint removers, and waxes, and preparation of surfaces.

SeeExterior Painting : B2010.Stair Painting : C2020.Interior Ceiling Painting : C3030.

C3010._ Wall CoveringsVinyl-Coated Fabric Wall CoveringsVinyl Wall CoveringCork Wall CoveringWallpaperWall FabricsFlexible Wood Sheets

09720097200972009720097200972009740

IncludesWall coverings applied over solid substrates. Vinyl-coated fabric backed for light, medium, and heavy usage; unsupported vinyl and cork wall coverings; wall papers; and flexible wood sheets.

C3010._ Wall Trim and DecorationStanding and Running TrimDecorative PanelsGypsum FabricationsPlaster Fabrications

06450064200920009230

IncludesTrim and decoration applied to finished wall surfaces. Metal, wood, plastic, fabric and panels used for decoration.

C3010._ Other Wall FinishesFiber Reinforced Plastic Coated PanelsAggregate CoatingAbrasion Resistant CoatingsHigh-Build Glazed CoatingsCoatings for Concrete and MasonryElastomeric CoatingsTextured Plastic Coatings

09770

09770099600996009980099800996009960

IncludesHeavy duty, high performance, and other special wall finishes.

SeeBasement Wall Interior Skin : A2020.Exterior Wall Interior Skin : B2010.

DAR BEIRUT
Page 62
Page 63: UF98

Textured Plastic CoatingsFire-Resistant PaintsIntumescent PaintsChemical-Resistant CoatingsGraffiti-Resistant Coatings

09960099600996009960

C3020 Floor Finishes

C3020._ Concrete Floor FinishesHardeners and Sealers

03360 IncludesConcrete floor hardeners and sealers.

C3020._ Tile Floor Finishes Ceramic TileQuarry TilePaver TileGlass MosaicsPlastic TileMetal TileCut Natural Stone Tile

0930009310093300934009350093700933009380

IncludesManufactured surfacing units of impervious, vitreous, semi-vitreous, and non-vitreous materials; glazed, unglazed, conductive, abrasive, and textured surfaces. Wall base units.

SeeTile Stair Finishes : C2020.Interior Tile Wall Finishes : C3010.

C3020._ Terrazzo Floor FinishesPortland Cement TerrazzoPrecast TerrazzoConductive TerrazzoPlastic Matrix Terrazzo

0940009410094200943009440

IncludesCast-in-place, sand-cushion, monolithic, bonded and adhesively- bonded portland cement terrazzo; poured-in-place epoxy, polyester, and conductive plastic matrix terrazzo; and precast terrazzo. Integral or precast wall bases, accessories and finish sealers.

SeeTerrazzo Stair Finishes : C2020.Interior Terrazzo Wall Finishes : C3010.

C3020._ Wood FlooringWood Strip FlooringWood Block FlooringWood Parquet FlooringWood Composition FlooringResilient Wood Flooring AssembliesCushioned Wood Flooring AssembliesMastic Set Wood Flooring Assemblies

096400964009640096400964009640

09640

09640

IncludesStrip, parquet, block, and composition wood flooring. Resilient wood flooring systems, stage flooring, and gymnasium flooring. Transparent flooring finishes and associated wall base.

C3020._ Stone FlooringFlagstone FlooringMarble FlooringGranite FlooringSlate Flooring

0963009630096300963009630

IncludesFlooring of natural, simulated, and cast stone. Wall base.

SeeStone Stair Finishes : C2020.Interior Stone Facing Wall Finishes : C3010.

C3020._ Unit Masonry FlooringBrick FlooringChemical Resistant Brick Flooring

096300963009630

IncludesFired clay unit masonry flooring. Wall base.

SeeUnit Masonry Stair Finishes: C2020.

C3020._ Resilient FlooringResilient Tile FlooringResilient Sheet FlooringStatic Control Flooring

09650096500965009660

IncludesResilient tile and sheet flooring, and conductive resilient flooring. Integral and applied wall bases.

SeeResilient Stair Finishes : C2020.

C3020._ Carpet FlooringCarpet CushionSheet CarpetCarpet Tile

09680096800968009680

IncludesFloor carpet materials including cushions accessories, and wall base.

SeeCarpet Stair Finishes: C2020.Interior Wall Carpet : C3010.

DAR BEIRUT
DAR BEIRUT
Page 63
Page 64: UF98

Fixed Floor Mats : E2010.Moveable Rugs : E2020.

C3020._ Access FlooringRigid Grid Access FlooringSnap-on Stringer Access FlooringStringerless Access Flooring

10270102701027010270

IncludesFree-standing, accessible floor assembly of modular panels and elevated support systems forming an underfloor cavity for mechanical and electrical services distribution.

C3020._ Floor TreatmentStatic Control FlooringSlip-Resistant Floor Treatment

096100966009610

IncludesStatic disseminating and spark resistant finishes.

SeeStair Treatment Finishes : C2020.

C3020._ Floor PaintingInterior PaintsStains and Transparent Finishes

099100991009930

IncludesPainting and staining of concrete and wood floors.

SeeStair Painting : C2020.

C3020._ Floor ToppingsCementitious UnderlaymentHeavy Duty Concrete Floor Finish

0354003360

IncludesTopping used to prepare structural subflooring for applied finishes and structural toppings acting as finished floor surface.

C3020._ Traffic CoatingPedestrian Traffic CoatingVehicular Traffic Coating

071800718007180

IncludesSurface applied waterproofing and elastomeric and composition membranes exposed to weather and suitable for light duty pedestrian and vehicular traffic, but not intended for heavy industrial use.

C3020._ Other Floor FinishesResinous FlooringMagnesium Oxychloride FlooringEpoxy-Marble Chip FlooringSeamless Quartz FlooringElastomeric Liquid FlooringMastic FillsPlastic Laminate FlooringAsphalt Plank Flooring

0967009670096700967009670096700962009620

IncludesHeavy duty, high performance, and other special floor finishes. Integral and applied base.

C3030 Ceiling Finishes

C3030._ Concrete Ceiling FinishesBlasted Concrete FinishesColored Concrete FinishesExposed Aggregate Concrete FinishesGrooved Surface Concrete FinishesTooled Concrete Finishes

033600336003360

033600336003360

IncludesArchitectural finishes on exposed interior concrete ceilings.

SeeConcrete Wall Finishes : C3010.

C3030._ Ceiling PanelingPrefinished PanelingBoard PanelingArchitectural Paneling

06420062500626006420

IncludesCovering or cladding of interior ceilings with wood paneling. Associated furring, fastening, and trim.

SeeWall Paneling : C3010.

C3030._ Plaster Ceiling FinishesGypsum PlasterPortland Cement PlasterAdobe FinishAcoustical Plaster

0920009210092200922009210

IncludesLathing including accessories and trim. Interior plaster including veneer plaster, and acoustical plaster. Plaster fireproofing. Sound barrier boards and blankets and ceiling suspension system.

DAR BEIRUT
Page 64
Page 65: UF98

SeePortland Cement Plaster Exterior Soffits : B2010.Plaster Stair Soffits : C2020.Interior Plaster Wall Finishes : C3010.

C3030._ Gypsum Board Ceiling FinishesGypsum BoardGypsum Board AssembliesGypsum Board Accessories

09200092500926009270

IncludesUnfinished and prefinished gypsum board, gypsum backing board for other finishes, accessories and trim, and joint taping and finishing. Gypsum board fireproofing. Sound barrier boards and blankets and ceiling suspension system.

SeeExterior Gypsum Board Soffits : B2010.Gypsum Board Stair Soffits : C2020.Interior Gypsum Board Wall Finishes : C3010.

C3030._ Veneer Plaster FinishesGypsum Plaster VeneerCement Plaster Veneer

092000921009220

IncludesPlaster applied as a veneer finish to various substrates such as concrete, masonry, and board finishes.

C3030._ Acoustical Ceiling TreatmentAcoustical CeilingsAcoustical Finish

098000951009500

IncludesAcoustical tiles and panels, perforated metal pan ceiling systems, sound absorbing ceiling units, sound barrier boards and blankets, and spray applied acoustical insulation. Suspended ceiling and direct applied acoustical finishes.

SeeInterior Acoustical Wall Treatment : C3010.Integrated Ceilings : F1020.

C3030._ Interior Ceiling PaintingInterior PaintsStains and Transparent FinishesDecorative Finishes

09900099100993009940

IncludesInterior painting with transparent and opaque finishes. Stains, varnishes, lacquers, primers, fillers, paint removers, and waxes, and preparation of surfaces.

SeeExterior Painting : B2010.Stair Painting : C2020.Interior Wall Painting : C3010.Interior Ceiling Coatings : C3030.

C3030._ Ceiling Trim and DecorationStanding and Running TrimDecorative PanelsGypsum FabricationsPlaster Fabrications

06450

0920009230

IncludesTrim and decoration applied to finished ceiling surfaces. Metal, wood, plastic, fabric and panels used for decoration.

C3030._ Other Ceiling FinishesLinear Metal CeilingsMirror Panel CeilingsTextured Gypsum Ceiling PanelsLinear Wood CeilingsSuspended Decorative GridsAbrasion-Resistant CoatingsHigh-Build Glazed CoatingsCoatings for Concrete and MasonryElastomeric CoatingsTextured Plastic CoatingsFire-Resistant PaintsIntumescent PaintsChemical-Resistant CoatingsGraffiti-Resistant Coatings

0954509550095600957009580099600996009980099600996009960099600996009960

IncludesSpecial ceiling panels, units, and materials manufactured as finished ceiling surfaces. Acoustical provisions, if any, are of secondary consideration. Ceiling suspension system. Heavy duty, high performance, and other special ceiling finishes.

DAR BEIRUT
Page 65
Page 66: UF98

UniFormat™ - ELEMENT D SERVICES

D10 CONVEYINGD1010 Elevators and LiftsD1020 Escalators and Moving WalksD1090 Other Conveying Systems

D20 PLUMBING

D30 HEATING VENTILATING,and AIR CONDITIONING (HVAC)

D40 FIRE PROTECTION SYSTEMS

D50 ELECTRICAL SYSTEMS

NUMBER TITLE MF NUMBER EXPLANATION

D10 CONVEYING Division 14

D1010 Elevators and Lifts

D1010._ ElevatorsElectric Traction Passenger ElevatorsHydraulic Passenger ElevatorsElectric Traction Freight ElevatorsHydraulic Freight Elevators

1420014210142401421014240

IncludesPassenger and freight elevators of all types, including cars, enclosures, controls, safety equipment, hoistway equipment, and elevator machinery. Associated metal fabrications.

D1010._ Lifts People LiftsWheelchair LiftsPlatform LiftsSidewalk LiftsVehicle Lifts

144001441014420144301444014450

IncludesWheelchair lifts include enclosures included with the equipment. Sidewalk lifts include doors.

SeeCadaver Lifts : E1020.Dock Lifts : E1030.Ski Lifts : D1090.

D1020 Escalators and Moving Walks 14300

IncludesPassenger conveying systems composed of moving belts or treads installed in inclined position including associated components, hardware, controls, safety equipment, and related items.

D1020._ Escalators 14300

D1020._ Moving Walks 14300

D1090 Other Conveying Systems

D1090._ DumbwaitersManual DumbwaitersElectric DumbwaitersHydraulic Dumbwaiters

14100141101412014140

IncludesPackaged and field assembled, motorized and hand- operated dumbwaiters including associated components for book lifts, cart lifts, and other applications. Systems include associated components, hardware, controls, and safety equipment.

D1090._ CranesCrane RailsBridge CranesGantry CranesJib Cranes

1460014605146301464014650

IncludesHoisting towers, cranes, crane rails, and related accessories.

DAR BEIRUT
DAR BEIRUT
Page 66
Page 67: UF98

Jib CranesTower CranesMobile CranesDerricks

146701468014690

D1090._ HoistsFixed HoistsTrolley Hoists

146001461014620

IncludesManual and motor operated hoists and related accessories.

D1090._ Conveyors 14550 IncludesManual and motor operated hoists and related accessories.

SeeBuilding Conveyors for Coal : D3010.

D1090._ Turntables 14700 IncludesStructural turntables for various applications, such as moveable areas for restaurants, stages, exhibits, displays, and vehicular and industrial uses.

D1090._ Baggage Conveying and Dispensing 14540

IncludesMaterial handling equipment for baggage handling operations.

D1090._ Operable ScaffoldingSuspended ScaffoldingRope ClimbersTelescoping PlatformsPowered Scaffolding

1480014810148201483014840

IncludesOperable scaffolding that is part of completed project.

SeeWindow Washing Equipment : E1090.

D1090._ Transportation SystemsPeople MoversMonorailsFunicularsAerial TramwaysAircraft Passenger Loading

149001491014920149301494014950

IncludesCars and motorized vehicles and equipment for transporting people. Ski tows and lifts.

SeeElevators and Lifts : D1010.

DAR BEIRUT
Page 67
Page 68: UF98

D20 PLUMBING

D2010D2020D2030D2040D2090

Plumbing Fixtures Domestic Water Distribution Sanitary Waste Rain Water Drainage Other Plumbing Systems

NUMBER TITLE MF NUMBER EXPLANATION

D20 PLUMBING 15400

D2010 Plumbing Fixtures 15410 IncludesTerminal devices on the domestic water plumbing system which have water supplied to them. Rough-in piping, trim, fittings, and connection to vent piping.

D2010._ Water Closets

D2010._ Urinals

D2010._ Lavatories

D2010._ Sinks

D2010._ Showers

D2010._ Bathtubs

D2010._ Basins

D2010._ Drinking Fountains/Coolers

D2010._ Other Plumbing Fixtures

D2020 Domestic Water Distribution

D2020._ Water Supply Piping SystemsPipes and TubesValvesPiping SpecialtiesHangers and SupportsMechanical Sound, Vibration, and Seismic ControlMechanical Identification HydrantsHose Bibbs

1514015105151101512015060

15070150751514015140

IncludesPiping system for distribution of domestic water inside a building. Piping materials, basic mechanical materials and methods.

SeeIrrigation Systems : G2050.Site Domestic Water Distribution : G3010.

D2020._ Water Supply EquipmentDrinking Water Cooling SystemsPlumbing PumpsPotable Water Storage TanksDomestic Water Conditioning EquipmentDomestic Water Filtrating Equipment

154001544015450

1546015470

IncludesEquipment for domestic water distribution system. Heat exchangers, pumps, tanks, conditioners, filtration devices, water heaters, and other basic mechanical materials and methods.

See

DAR BEIRUT
Page 68
Page 69: UF98

Domestic Water Filtrating EquipmentDomestic Water HeatersPiping SpecialtiesMechanical IdentificationMechanical Sound, Vibration, and Seismic Control

15470154801512015075

15070

Fountain Equipment : D2090.Swimming Pool Equipment : D2090

D2020._ Water Supply InsulationPiping InsulationEquipment Insulation

150801508015080

IncludesInsulation of water supply piping and equipment.

D2030 Sanitary Waste

D2030._ Waste and Vent PipingPipes and TubesHangers and SupportsMechanical Sound, Vibration, and Seismic ControlMechanical Identification

154001510515060

1507015075

IncludesPiping system for transmission of sanitary waste and for venting of waste system. Piping materials and other basic mechanical materials and methods.

SeeSite Sanitary Sewers : G3020.

D2030._ Waste Piping SpecialtiesPiping SpecialtiesMechanical IdentificationMechanical Sound, Vibration, and Seismic ControlFloor Drains

154001512015075

1507015150

IncludesSpecialties for sanitary waste and vent system. Floor drains, and other basic mechanical materials and methods.

D2030._ Waste Piping EquipmentInterceptorsSeparatorsPumpsPiping SpecialtiesMechanical Sound, Vibration, and Seismic ControlMechanical Identification

1515015150151501544015120

1507015075

IncludesEquipment for sanitary waste and vent system. Pumps, tanks, and other basic mechanical materials and methods.

D2030._ Waste Piping InsulationPiping InsulationEquipment Insulation

150801508015080

IncludesInsulation of waste plumbing piping.

D2040 Rain Water Drainage

D2040._ Rain Water Drainage Piping SystemsHangers and SupportsPipes and TubesMechanical Sound, Vibration, and Seismic ControlMechanical Identification

154001506015105

1507015075

IncludesPiping system for transmission of rain water. Piping materials and other basic mechanical materials and methods.

SeeSite Storm Sewers : G3030.

D2040._ Rain Water Drainage SpecialtiesPiping SpecialtiesMechanical Sound, Vibration, and Seismic ControlMechanical IdentificationRoof DrainsPlaza DrainsArea Drains

1516015120

150701507515160

IncludesSpecialties for rain water drainage system. Basic mechanical materials and methods.

SeeSite Storm Sewers : G3030.

D2040._ Rain Water Drainage Includes

DAR BEIRUT
Page 69
Page 70: UF98

D2040._ Rain Water Drainage InsulationPiping Insulation

1508015080

Insulation of rain water drainage piping.

D2090 Other Plumbing Systems IncludesMaterial and equipment for plumbing systems handling special liquids and gases. Pool and fountain equipment. Basic mechanical materials and methods and associated items. Fuel oil, LPG, and natural gas systems for HVAC are not included.

SeeEnergy Supply Systems : D3010.Swimming Pools : F1040.Site Fuel Distribution Systems : G3060.Site Mechanical Utilities : G3090Fountains : G2040.

D2090._ Compressed Air Systems 15210

D2090._ Deionized Water Systems 15220

D2090._ Distilled Water Systems 15220

D2090._ Fuel Oil Systems 15190

D2090._ Gasoline Dispensing Systems 15190

D2090._ Helium Gas Systems 15210

D2090._ Liquified Petroleum Gas Systems 15190

D2090._ Lubricating Oil Systems 15230

D2090._ Natural Gas Systems 15190

D2090._ Nitrous Oxide Gas Systems 15210

D2090._ Oxygen Gas Systems 15210

D2090._ Reverse Osmosis Systems 15220

D2090._ Vacuum Systems 15210

D2090._ Acid Waste Systems 15220

D2090._ Pool and Fountain Equipment 15490

DAR BEIRUT
Page 70
Page 71: UF98

D30 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)D3010D3020D3030D3040D3050D3060D3070D3090

Energy Supply Heat Generation Refrigeration HVAC Distribution Terminal and Packaged Units HVAC Instrumentation and Controls Testing, Adjusting, and Balancing Other Special HVAC Systems and Equipment

NUMBER TITLE MF NUMBER EXPLANATION

D30 HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

D3010 Energy Supply

D3010._ Oil Supply SystemsStorage EquipmentTransfer EquipmentDistribution Piping

132001513015190

IncludesEquipment and piping systems for storage and transfer of fuel oil within the building and serving heat, power, and electricity generating equipment. Basic mechanical materials and methods.

SeeSite Oil Distribution Systems : G3060.

D3010._ Gas Supply SystemsNatural Gas Supply Systems

Metering and Regulating EquipmentStorage EquipmentTransfer EquipmentDistribution Piping

Liquid Petroleum Gas Supply Systems

Metering and Regulating EquipmentStorage EquipmentTransfer EquipmentDistribution Piping

15190

15190

IncludesEquipment and piping systems for storage and transfer of natural and liquid petroleum gas within the building and serving heat, power, and electricity generating equipment. Basic mechanical materials and methods.

SeeSite Gas Distribution Systems : G3060.

D3010._ Coal Supply SystemsStorage EquipmentTransfer EquipmentProcessing EquipmentDistribution Systems

IncludesEquipment and conveying systems for storage and transfer of coal and solid fuel within the building and serving heat and power generating equipment.

SeeConveyors Outside the Building : D1090.

D3010._ Steam, Hot and Chilled Water Supply Systems Pipes and TubesHangers and SupportsPumpsPiping SpecialtiesMechanical Sound, Vibration, and Seismic ControlMechanical IdentificationPiping InsulationEquipment Insulation

15105150601513015120

15070150751508015080

IncludesPiping systems for transmission of steam, hot water, and chilled water within the building where used as an energy supply system instead of boilers and chillers. Piping materials and other basic mechanical materials and methods.

SeeSite Steam Distribution Systems : G3040.Site Hot Water Distribution Systems : G3040.Site Chilled Water Distribution Systems : G3050.Building Steam Distribution Systems : D3040.

DAR BEIRUT
Page 71
Page 72: UF98

Building Hydronic Distribution Systems : D3040.

D3010._ Solar and Wind Energy EquipmentSolar Flat Plate Collectors

Air CollectorsLiquid Collectors

Solar Concentrating CollectorsSolar Vacuum Tube CollectorsSolar Collector ComponentsPackaged Solar EquipmentPhotovoltaic CollectorsWind Energy Equipment

1360013610

136201362513630136401365013660

IncludesEngineered systems of prefabricated components utilizing solar energy for conversion to thermal energy and electrical power. Basic mechanical materials and methods.

SeeHydronic Distribution Systems : D3040.HVAC Controls and Instrumentation : D3060.Testing, Adjusting, and Balancing : D3080.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3010._ Other Energy Supply Systems IncludesFuel supply systems in addition to those listed above.

D3020 Heat Generation("Heat Generating Systems ")*

15500

D3020._ Steam BoilersHeating Boilers and AccessoriesFeedwater EquipmentBreechings, Chimneys, and StacksWater Treatment Equipment

15510155201555015180

IncludesEquipment, piping, and appurtenances not associated with fuel supply and heat distribution systems. Electric-, oil-, gas-, and solid-fuel-fired boilers. Boilers; feedwater equipment and piping; chemical treatment; safety relief valves and piping; blowdown piping, valves, and specialties; integral controls; breechings and prefabricated chimneys and stacks; supports and anchors; identification; insulation; and vibration and seismic controls. Basic mechanical materials and methods.

SeeOil Supply Systems : D3010.Gas Supply Systems : D3010.Coal Supply Systems : D3010.Building Steam Distribution Systems : D3040.Site Steam Distribution Systems : G3040.Demonstration and Training : Z1040Startup and Adjusting : Z1040.

D3020._ Hot Water BoilersHeating Boilers and AccessoriesBreechings, Chimneys, and StacksWater Treatment Equipment

155101555015180

IncludesEquipment, piping, and appurtenances not associated with fuel supply and heat distribution systems. Electric-, oil-, gas-, and solid-fuel-fired boilers. Boilers; feedwater equipment and piping; chemical water treatment; safety relief valves and piping; blowdown piping, valves, and specialties; integral controls; breechings and prefabricated chimneys and stacks; supports and anchors; identification; insulation; and vibration and seismic controls. Basic mechanical materials and methods.

SeeOil Supply Systems : D3010.Gas Supply Systems : D3010.Coal Supply Systems : D3010.Building Hydronic Distribution Systems : D3040.Site Hydronic Distribution Systems : G3040.Demonstration and Training : Z1040Startup and Adjusting : Z1040.

D3020._ Furnaces Includes

DAR BEIRUT
Page 72
Page 73: UF98

D3020._ FurnacesFurnacesBreechings, Chimneys, and StacksHangers and Supports

155301555015060

Equipment and appurtenances not associated with fuel supply and heat distribution systems. Electric-, oil-, and gas-fired furnaces. Supports, flues and vents, vibration and seismic controls, and integral controls. Basic mechanical materials and methods.

SeeOil Supply Systems : D3010.Gas Supply Systems : D3010.Coal Supply Systems : D3010.Air Distribution Systems : D3040.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3020._ Fuel-Fired HeatersFuel-Fired Duct HeatersFuel-Fired Radiant HeatersFuel-Fired Unit HeatersBreechings, Chimneys, and Stacks

15540155401554015550

IncludesEquipment and appurtenances not associated with fuel supply and heat distribution systems. Electric-, oil-, and gas-fired unit heaters and duct- mounted heaters. Supports, flues and vents, vibration and seismic controls, and integral controls. Heater types include infrared, directed fired, and indirect fired. Basic mechanical materials and methods.

SeeOil Supply Systems : D3010.Gas Supply Systems : D3010.Air Distribution Systems : D3040.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3020._ Auxiliary Equipment IncludesOther equipment associated with heat generation equipment and systems, not described above.

D3020._ Other Heat Generation Systems

IncludesHeat generation systems in addition to those listed above.

D3030 Refrigeration("Cooling Generation ")*

D3030._ Absorption Water ChillersWater Treatment Equipment

1562015180

IncludesChillers and safety devices; chemical water treatment; insulation; vibration and seismic controls; integral controls not a part of chilled water and condenser water distribution systems. Basic mechanical materials and methods.

SeeBuilding Hydronic Distribution Systems : D3040.Site Chilled Water Distribution Systems : G3050.Demonstration and Training : Z1040Startup and Adjusting : Z1040.

D3030._ Centrifugal Water ChillersWater Treatment Equipment

1562015180

IncludesChillers and safety devices; chemical water treatment; insulation; vibration and seismic controls; integral controls not a part of chilled water and condenser water distribution systems. Basic mechanical materials and methods.

SeeBuilding Hydronic Distribution Systems : D3040.

DAR BEIRUT
Page 73
Page 74: UF98

Site Chilled Water Distribution Systems : G3050.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3030._ Reciprocating Water ChillersWater Treatment Equipment

1562015180

IncludesChillers and safety devices; chemical water treatment; insulation; vibration and seismic controls; integral controls not a part of chilled water and condenser water distribution systems. Basic mechanical materials and methods.

SeeBuilding Hydronic Distribution Systems : D3040.Site Chilled Water Distribution Systems : G3050.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3030._ Rotary-Screw Water ChillersWater Treatment Equipment

1562015180

IncludesChillers and safety devices; chemical water treatment; insulation; vibration and seismic controls; integral controls not a part of chilled water and condenser water distribution systems. Basic mechanical materials and methods.

SeeBuilding Hydronic Distribution Systems : D3040.Site Chilled Water Distribution Systems : G3050.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3030._ Cooling TowersPackaged Cooling TowersMechanical-Draft Cooling TowersNatural-Draft Cooling TowersLiquid Coolers and Evaporative CondensersWater Treatment Equipment

156401564015640

1566015180

IncludesFactory- and field-fabricated cooling towers and liquid coolers. Piping and specialties; chemical water treatment; vibration and seismic controls; integral controls not a part of the condenser water distribution systems.

SeeBuilding Hydronic Distribution Systems : D3040.Site Condenser Water Distribution Systems : G3050.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3030._ Refrigerant Compressors and CondensersRefrigeration CompressorsRefrigerant Condensing Units

1561015670

IncludesRefrigerant compressors, condensers, and refrigerant piping and specialties components of split air conditioning systems; including vibration and seismic controls and integral controls not a part of heat transfer systems and not a part of heat distribution systems. Basic mechanical materials and methods.

SeeDemonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3030._ Heat PumpsAir Source Heat PumpsRooftop Heat PumpsWater Source Heat Pumps

157401574015740

IncludesPackaged air-to-air and water-to-air heat pumps; refrigerant piping and specialties; vibration and seismic controls; integral controls not a part of heat transfer systems. Basic mechanical materials and methods.

SeeAir Distribution Systems : D3040.

DAR BEIRUT
Page 74
Page 75: UF98

Building Hydronic Distribution Systems : D3040.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3030._ Other Refrigeration Systems IncludesRefrigeration systems in addition to those listed above.

D3040 HVAC Distribution(Distribution Systems*

D3040._ Air Distribution SystemsAir Handling UnitsFans

Centrifugal FansAxial Fans

Air Cleaning DevicesDuctsDuct AccessoriesAir Terminal UnitsAir Outlets and Inlets

1572015830

1586015810158201584015850

IncludesSystems for distribution of air including supply systems, return systems, and general exhaust systems. Does not include special exhaust systems such as kitchen hood, paint booth, and fume hood exhaust systems. Basic mechanical materials and methods.

SeeExterior Louvers : B2010.Interior Louvers and Vents : C1030.Furnaces : D3020.Integrated Ceilings : F1020.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3040._ Steam Distribution SystemsSteam and Condensate PipingSteam Condensate Pumps

025501518015180

IncludesPiping systems and equipment for distribution of steam and condensate return. Piping systems, pumps, tanks, supports and anchors, vibration and seismic controls, identification, and piping and equipment insulation. Basic mechanical materials and methods.

SeeSteam Boilers : D3020.Site Heating Distribution Systems : G3040Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3040._ Hydronic Distribution SystemsHot Water Distribution SystemsChilled Water Distribution SystemsCondenser Water Distribution Systems Pumps

151801518015180

15130

IncludesPiping systems and equipment for distribution of heating hot water and cooling chilled water. Piping systems, pumps, tanks, supports and anchors, vibration and seismic controls, identification, and piping and equipment insulation. Basic mechanical materials and methods.

SeeHot Water Boilers : D3020.Chillers : D3030.Cooling Towers and Liquid Coolers : D3030.Solar and Wind Energy Collection, Conversion, and Storage : D3010.Site Heating Distribution Systems : G3040.Site Cooling Distribution Systems : G3050.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3040._ Special Exhaust SystemsFans

Centrifugal FansAxial FansPower Ventilators

Air Cleaning Devices

15830

15860

IncludesSpecial systems for exhausting air such as kitchen hood, paint booth, and fume hood exhaust systems. Basic mechanical materials and methods.

See

DAR BEIRUT
Page 75
Page 76: UF98

Air Cleaning DevicesDuctsDucts AccessoriesAir Outlets and Inlets

15860158101582015850

Exterior Louvers : B2010.Interior Louvers and Vents : C1030.Laboratory Equipment : E1020.Food Service Equipment : E1090.Paint Booths : F1020.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3040._ Other HVAC Distribution Systems

IncludesHeat distribution systems in addition to those listed above.

D3050 Terminal and Packaged Units("Terminal and Package Units ")*

15730

IncludesHeat transfer equipment and terminal heat transfer units not a part of air distribution systems. Supports and anchors, vibration and seismic controls, integral controls, identification, and insulation. Basic mechanical materials and methods.

SeeHeat Generation : D3020.Refrigeration : D3030.Air Distribution Systems : D3040.HVAC Instrumentation and Controls : D3060.Solar and Wind Energy Collection, Conversion, and Storage : D3010.Testing, Adjusting, and Balancing : D3080.Demonstration and Training : Z1040Startup and Adjusting : Z1040.

D3050._ Unitary Air Conditioning EquipmentComputer Room Air Conditioning UnitsPackaged Rooftop Air Conditioning UnitsPackaged Terminal Air Conditioning UnitsUnit Air Conditioners

15760

D3050._ Air Coils 15750

D3050._ Humidifiers 15750

D3050._ Dehumidifiers 15760

D3050._ Terminal Heat Transfer UnitsConvectorsFan Coil UnitsFinned Tube RadiationInduction UnitsInfrared HeatersUnit HeatersUnit Ventilators

15780

D3050._ Energy Recovery Units

D3050._ Other Terminal and Packaged Units

D3060 HVAC Instrumentation and Controls

DAR BEIRUT
Page 76
Page 77: UF98

D3060._ Energy Management and Conservation Systems 13800

IncludesItems for operating and controlling heating, ventilating, and air conditioning systems and equipment for energy management and conservation. Piping, tubing, wiring, control panels, thermostats, aquastats, timers, and recording and alarm devices.

SeeBuilding Automation Systems : F1050Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3060._ HVAC Instrumentation and ControlsElectric and Electronic ControlsPneumatic ControlsPneumatic and Electric ControlsSelf-Powered ControlsBuilding Systems Controls

15900

IncludesComponents for operating and controlling heating, ventilating, and air conditioning systems and equipment. Piping, tubing, wiring, control panels, thermostats, aquastats, timers, instrumentation, and recording and alarm devices.

SeeBuilding Automation Systems : F1050.Recording Instrumentation : F1050.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3060._ HVAC Sequence of Operation 15940 IncludesDescription of how HVAC equipment is intended to operate. Does not include requirements for component products.

D3060._ Gas Purging Systems IncludesSystems to remove contaminated or unwanted gases from structure or piping system.

D3060._ Other HVAC Instrumentation and Controls

IncludesControls and instrumentation in addition to those listed above.

D3070 Testing, Adjusting, and Balancing

D3070._ Piping Systems Testing, Adjusting and Balancing 15950

IncludesTechnical procedures for testing, adjusting and balancing mechanical piping systems.

SeeDemonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3070._ Air Systems Testing, Adjusting and Balancing 15950

IncludesTechnical procedures for testing, adjusting and balancing mechanical air systems.

SeeDemonstration and Training : Z1040.Startup and Adjusting : Z1040.

D3090 Other Special HVAC Systems and Equipment

DAR BEIRUT
Page 77
Page 78: UF98

D40 FIRE PROTECTION

D4010D4020D4030D4090

Sprinklers Standpipes Fire Protection Specialties Other Fire Protection Systems

NUMBER TITLE MF NUMBER EXPLANATION

D40 FIRE PROTECTION

D4010 Sprinklers

D4010._ Wet-Pipe Fire Sprinkler SystemsFire Protection Basic Materials and Methods

13930

13910

IncludesPiping, fittings, valves, hangers, supports, other specialties, and sprinklers for fire protection systems. Limited area sprinkler systems, fire pumps, accessories, and controls.

SeeDetection and Alarm Systems : D5030.Building Automation Systems : F1050.Site Fire Protection Water Distribution : G3010.

D4010._ Dry-Pipe Fire Sprinkler SystemsFire Protection Basic Materials and Methods

13935

13910

IncludesPiping, fittings, and specialties; and sprinklers for fire protection systems. Air compressor, accessories, and controls.

SeeDetection and Alarm Systems : D5030.Building Automation Systems : F1050.Site Fire Protection Water Distribution : G3010.

D4010._ Combination Dry- Pipe and Pre- Action Fire Sprinkler SystemsFire Protection Basic Materials and Methods

13945

IncludesPiping, fittings, and specialties; and sprinklers for fire protection systems. Accessories, and controls.

SeeDetection and Alarm Systems : D5030.Building Automation Systems : F1050.Site Fire Protection Water Distribution : G3010.

D4010._ Deluge Fire Sprinkler SystemsFire Protection Basic Materials and Methods

13950

IncludesPiping, fittings, and specialties; and sprinklers for fire protection systems. Accessories, and controls.

SeeDetection and Alarm Systems : D5030.Building Automation Systems : F1050.Site Fire Protection Water Distribution : G3010.

D4020 Standpipes

D4020._ Fire Protection Standpipe System 13975

IncludesPiping, fittings, and specialties; hoses, valves, and cabinets; fire pumps, accessories, and controls.

SeeFire Protection Specialties : D4030.Detection and Alarm Systems : D5030.

DAR BEIRUT
Page 78
Page 79: UF98

Building Automation Systems : F1050.Site Fire Protection Water Distribution : G3010.

D4030 Fire Protection Specialties 10520 IncludesFire fighting devices and storage cabinets, not including items or devices physically connected to a fire protection system.

SeeService Wall Systems : C1030.

D4030._ Fire Extinguisher, Cabinets and Accessories 10520

D4030._ Fire Blankets and Cabinets 10520

D4030._ Wheeled Fire Extinguisher Units 10520

D4090 Other Fire Protection Systems

IncludesFire protection systems which use other than water. Equipment and controls. Basic mechanical materials and methods. Systems installed in exhaust hoods.

SeeDetection and Alarm Systems : D5030.Building Automation Systems : F1050.

D4090._ Foam Extinguishing Systems 13955

D4090._ Carbon Dioxide Fire Extinguishing Systems 13960

D4090._ Clean Agent Extinguishing Systems 13965

D4090._ Dry Chemical Fire Extinguishing Systems 13970

DAR BEIRUT
Page 79
Page 80: UF98

D50 ELECTRICAL

D5010D5020D5030D5090

Electrical Service and Distribution Lighting and Branch Wiring Communications and Security Other Electrical Systems

NUMBER TITLE MF NUMBER EXPLANATION

D50 ELECTRICAL

D5010 Electrical Service and Distribution

D5010._ Main Electrical TransformersTransformers 16270

IncludesOverhead and underground transformers used for primary electrical service. Assemblies include transformers, pads, trenching, and backfill.

SeeSite Electric Power Distribution : G4010.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5010._ Secondary Electrical TransformersLow-Voltage Transformers 16460

IncludesTransformers fed from protection equipment on the building side of primary transformer. Assemblies include transformers, conduit, conduit support, and wire.

SeeDemonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5010._ Main Electrical SwitchboardsLow-Voltage DistributionPower Factor ControllersVoltage RegulatorsElectrical Utility ServicesSwitchboards, Panelboards and Control CentersStatic Power ConvertersEnclosed Switches and Circuit BreakersGrounding and BondingEnclosed Bus Assemblies

16400162801628016210

1644016260

164101606016450

IncludesProtection equipment and metering devices for main distribution. Main distribution panel, breakers, fuses, and meters.

SeeSite Electric Power Distribution : G4010.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5010._ Interior Electrical Distribution TransformersLow-Voltage Transformers 16460

IncludesInterior step-down or buck boost transformers. Basic electrical materials and methods for distribution system.

D5010._ Electrical Branch Circuit PanelboardsSwitchboards, Panelboards and Control CentersEnclosed Switches and Circuit Breakers

16440

16410

IncludesBranch circuit panelboards, breakers, and fuses. Basic electrical materials and methods for distribution system.

D5010._ Enclosed Electrical CircuitEnclosed Switches and Circuit Breakers 16410

IncludesOvercurrent protection devices enclosed in its own housing. Basic electrical materials and methods for distribution system.

D5010._ Motor Control Centers Includes

DAR BEIRUT
Page 80
Page 81: UF98

D5010._ Motor Control CentersSwitchboards, Panelboards, and Control Centers 16440

Motor control center cabinets containing motor starters and operation devices. Cabinets, motor starters, contacts, switches, and other accessories. Basic electrical materials and methods for distribution system.

SeeDemonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5020 Lighting and Branch Wiring

D5020._ Electrical Branch WiringRaceway and BoxesConductors and CablesWiring DevicesWiring Connections Hangers and SupportsElectrical Identification

161301612016140161501607016075

IncludesElectrical distribution system beyond branch circuit panelboards.

D5020._ Interior LightingLighting AccessoriesInterior LuminairesEmergency LightingClassified Location LightingSpecial Purpose LightingSignal LightingDimming ControlLighting Restoration and RepairUnderwater LightingTheatrical LightingOperating Room LightingDarkroom LightingHangers and Supports

1650016580165101653016540165501656016570165901655016550165501655016070

IncludesEquipment and installation related to interior and special lighting applications.

SeeIntegrated Ceilings : F1020.Site Lighting : G4020.

D5020._ Exterior Building LightingExterior LuminairesLighting AccessoriesEmergency LightingSpecial Purpose LightingSignal LightingLighting Restoration and RepairHangers and Supports

16520165801653016550165601659016070

IncludesExterior soffit lighting and other luminaires mounted on or in the building exterior enclosure.

SeeSite Lighting : G4020.

D5030 Communication and Security

D5030._ Detection and Alarm Fire AlarmGas DetectionLeak DetectionSmoke Alarm

13850IncludesEquipment for detecting hazardous conditions in a building and communicating an alarm signal. Alarm devices, detection devices, safety switches, and associated items. Basic electrical materials and methods.

SeeFire Protection Systems : D40.Building Automation Systems : F1050.Site Detection and Alarm Systems : G4030.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5030._ Security Access and Surveillance 13700

IncludesEquipment for detecting and controlling access

DAR BEIRUT
Page 81
Page 82: UF98

SurveillanceDoor AnsweringIntrusion DetectionSecurity AccessVideo Surveillance

13700by persons to a building or within a building. Basic electrical materials and methods.

SeeSite Security Systems : G4030.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5030._ Clock and Program Systems 13800 IncludesEquipment for automatic control of building systems and equipment and master clock systems. Clock and programmable computer controls and monitors. Basic electrical materials and methods.

SeeIndividual Wall Clocks : E2020.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5030._ Voice and Data SystemsTelephone SystemsPaging SystemsCall SystemsData SystemsLocal Area Network SystemsDoor Answering SystemsMicrowave and Radio SystemsCentral Dictation SystemsIntercommunication Systems

16700 IncludesEquipment for voice and data communication systems. Central switchboards, telephone sets, backboards, cabinets, amplifiers, speakers, monitoring devices, and associated items. Basic electrical materials and methods.

SeeSite Voice and Data Systems : G4030.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5030._ Public Address and Music Systems 16820

IncludesEquipment for public address and music systems. Backboards, cabinets, amplifiers, speakers, monitoring devices, and associated items. Basic electrical materials and methods.

SeeDemonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5030._ Television SystemsMaster Antenna SystemsVideo Telecommunication SystemsBroadcast Video Systems

16850 IncludesEquipment for television antenna and television systems. Grounding, amplifiers, receivers, video equipment, and associated items. Basic electrical materials and methods.

SeeVideo Surveillance : D5030.Site Television Systems : G4030.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5030._ Other Communications and Security SystemsMicrowave Transmission and Reception

Equipment16790

IncludesCommunication systems in addition to those listed above.

SeeSite Communications and Security : G4030.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

D5090 Other Electrical Systems IncludesEquipment including installation for other than normal electrical systems. Basic electrical materials and methods.

SeeSite Cathodic Protection : G4090.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.Building Automation Systems : F1050.

DAR BEIRUT
Page 82
Page 83: UF98

D5090._ Uninterruptible Power Supply Systems 16600

D5090._ Packaged Engine Generator Systems 16260

D5090._ Battery Power Systems 16230

D5090._ Cathodic Protection 16240

D5090._ Electromagnetic Shielding Systems 13110

D5090._ Lightning Protection Systems 16280

D5090._ Unit Power Conditioners 13100

D5090._ Power Generation Systems 16280

DAR BEIRUT
Page 83
Page 84: UF98

UniFormat™ - ELEMENT E EQUIPMENT and FURNISHINGS

E10 EQUIPMENTE1010 Commercial EquipmentE1020 Institutional EquipmentE1030 Vehicular EquipmentE1090 Other Equipment

E20 FURNISHINGS

NUMBER TITLE MF NUMBER EXPLANATION

E10 EQUIPMENT Division 11

E1010 Commercial Equipment

E1010._ Security and Vault EquipmentVault Doors and Day GatesSafesSafe Deposit Boxes

11020110201102011020

IncludesBuilt-in and free-standing equipment specifically designed for money or valuable material storage, including vault ventilators and specialized security equipment.

SeeVaults : F1020.

E1010._ Teller and Service EquipmentService and Teller Window UnitsPackage Transfer UnitsAutomatic Banking SystemsTeller Equipment SystemsMoney Cart Pass-Through

110301103011030110301103011030

IncludesBuilt-in and free-standing equipment specifically designed for handling and transfer of money and other high security items.

E1010._ Registration Equipment 11080 IncludesSpecialized equipment for the purpose of registering, admitting, and controlling rooms at hotels, motels, hospitals, and other similar installations.

E1010._ Checkroom Equipment 11090 IncludesManual or automated equipment used where wearing apparel and luggage are checked and stored on a temporary basis.

SeeWardrobe and Closet Specialties : C1030.

E1010._ Mercantile EquipmentBarber and Beauty Shop EquipmentCash Registers and Checking EquipmentDisplay CasesFood Processing EquipmentFood Weighing and Wrapping Equipment

1110011100

111001110011100

11100

IncludesBuilt-in and free-standing equipment used in retail and service stores.

E1010._ Commercial Laundry and Dry Cleaning EquipmentWashers and ExtractorsDry Cleaning EquipmentDrying and Conditioning EquipmentFinishing EquipmentIroning Equipment

111101111011110111101111011110

IncludesManufactured equipment for commercial laundry and dry cleaning operations including coin-operated equipment.

SeeResidential Laundry Appliances : E1090.

E1010._ Vending EquipmentMoney Changing Machines

1112011120

IncludesCoin-operated equipment for dispensing various

DAR BEIRUT
DAR BEIRUT
Page 84
Page 85: UF98

Money Changing MachinesVending Machines

1112011120 foods, drinks, stamps, money, tickets, and other

items.

E1010._ Office Equipment 11680 IncludesComputers, printers, copiers, drafting equipment, plotters, carto-stereographs, and other equipment used in offices.

SeeOffice Furniture : E2020.

E1020 Institutional Equipment

E1020._ Ecclesiastical EquipmentBaptisteriesChancel Fittings

110401104011040

IncludesBuilt-in and free-standing religious equipment, including baptistery and chancel fittings.

SeeFixed Pews : E2010.

E1020._ Library EquipmentAutomated Book Storage and Retrieval SystemsBook Theft Protection EquipmentLibrary Stack SystemsBook DepositoriesStudy Carrels

11050

1105011050110501105012560

IncludesEquipment related to libraries.

SeeMobile Storage Systems : C1030.Library Casework and Shelving : E2010.Library Furniture : E2020.

E1020._ Theater and Stage EquipmentStage CurtainsRigging Systems and ControlsAcoustical ShellsFolding and Portable Stages

1106011060110601106011060

IncludesEquipment designed for support of theatrical, instrumental, and voice programs.

SeeInterior Operable Partitions : C1010.Stage and Orchestra Lifts : D1010.Stage Turntables : D1090.Theatrical Lighting : D5020.Public Address and Music Systems : D5030.Theater Seating : E2010.

E1020._ Instrumental EquipmentOrgansCarillonsBells

11070110701107011070

IncludesMusical instruments, including prefabricated and field assembled instruments.

E1020._ Audiovisual EquipmentProjection ScreensProjectorsLearning Laboratories

11130111301113011130

IncludesMovie, slide, overhead, and opaque projectors; fixed, portable, and rear projection screens; players and recorders.

E1020._ Detention Equipment 11190 IncludesCustom designed, manufactured, field assembled detention enclosures and equipment including detention furnishings and fittings.

SeeDetention Windows : B2020 and Detention Windows : C1010.Exterior Detention Doors : B2030 Interior Detention Doors : C1020.

E1020._ Laboratory Equipment 11600 IncludesEquipment for scientific use; including service fittings and accessories, fume hoods, incubators, sterilizers, refrigerators, and emergency safety appliances.

SeeFume Hood Exhaust Systems : D3040.(Air

DAR BEIRUT
Page 85
Page 86: UF98

Distribution Systems) andFume Hood Exhaust Systems : D3040 (Special Exhaust Systems)Laboratory Casework : E2010.

E1020._ Medical EquipmentMedical Sterilizing EquipmentExamination and TreatmentEquipmentPatient Care EquipmentDental EquipmentOptical EquipmentOperating Room EquipmentRadiology Equipment

1170011710

117201173011740117501176011770

IncludesSpecialized equipment for health care facilities for humans and animals.

SeeOperating Room and other Medical Lighting : D5020.Medical Casework : E2010.Radiation Protection : F1030.

E1020._ Mortuary Equipment 11780 IncludesSpecialized equipment for handling and preparation of cadavers, including refrigerators, crematorium equipment, and lifts.

SeeLaboratory Casework : E2010.

E1030 Vehicular Equipment

E1030._ Vehicle Service EquipmentVehicle Washing EquipmentFuel Dispensing EquipmentLubrication EquipmentCompressed Air EquipmentTire Changing Equipment

111401114011140111401114011140

IncludesEquipment associated with vehicle service facilities.

SeeVehicle Lifts : D1010.Vehicle Turntables : D1090.

E1030._ Parking Control EquipmentParking GatesTicket DispensersKey and Card Control UnitsCoin Machine Units

1115011150111501115011150

IncludesEquipment for parking control.

SeeSecurity Access and Surveillance : D5030.

E1030._ Loading Dock EquipmentDock LevelersDock LiftsPortable Ramps, Bridges, and PlatformsSeals and SheltersDock BumpersTruck Restraints

111601116011160

11160111601116011160

IncludesEquipment and material for the protection of service docks and for the loading and unloading of service vehicles.

SeeVehicle Lifts : D1010.

E1090 Other Equipment

E1090._ Maintenance EquipmentVacuum Cleaning SystemsWindow Washing EquipmentFloor and Wall Cleaning EquipmentHousekeeping Carts

1101011010110101101011010

IncludesBuilt-in and free-standing equipment for building maintenance.

SeeScaffolding D1090.

E1090._ Solid Waste Handling EquipmentPackaged IncineratorsWaste Compactors and DestructorsBinsPulping MachinesChutes and CollectorsPneumatic Waste Systems

11170111701117011170111701117011170

IncludesPackaged equipment involving the collection, shredding, compaction, removal and incineration of trash and other solid waste.

SeeSite Constructed Incinerators : F1040.

DAR BEIRUT
Page 86
Page 87: UF98

Recycling Equipment1117011170

E1090._ Food Service EquipmentFood Storage EquipmentFood Preparation EquipmentFood Delivery Carts and ConveyorsFood Cooking EquipmentHood and Ventilation EquipmentFood Dispensing EquipmentBar EquipmentSoda Fountain EquipmentService Line EquipmentIce MachinesCleaning and Disposal Equipment

114001140511410114151142011425114301143011430114301143511440

IncludesEquipment used for liquid and solid food storage, preparation, display, serving, and clean-up in commercial and institutional kitchens and bars. Garbage disposers and refrigerated cases.

SeeKitchen Hood Exhaust Systems : D3040.Hood Fire Protection Systems : D4090.

E1090._ Residential EquipmentResidential AppliancesResidential Kitchen EquipmentRetractable Stairs

11450114501145011450

IncludesBuilt-in and free-standing appliances and other components specifically for residential use.

SeeFireplaces and Stoves : C1030.Residential Casework : E2010.

E1090._ Unit Kitchens 11460 IncludesManufactured units incorporating kitchen fixtures and appliances.

SeeResidential Casework : E2010.

E1090._ Darkroom EquipmentTransfer CabinetsDarkroom Processing EquipmentRevolving Darkroom Doors

11470114701147011470

IncludesPhotographic film processing equipment and other products for darkroom use.

SeeDarkroom Lighting : D5020.Laboratory Casework : E2010.

E1090._ Athletic, Recreational, and Therapeutic EquipmentScoreboardsBackstopsGymnasium DividersBowling Alley EquipmentGymnasium EquipmentExercise EquipmentTherapeutic EquipmentShooting Range Equipment

114801148011480114801148011480114801148011480

IncludesEquipment for use in athletic, recreational, and therapeutic activities.

SeeGymnasium Partitions and Dividers : C1010.Resilient Wood Flooring Systems : C3020.Telescoping Bleachers and Chair Platforms : E2010.Grandstands and Bleachers : F1010.Athletic Rooms : F1020.Swimming Pools : F1040.Site Athletic and Recreational Equipment : G2040.

E1090._ Planetarium Equipment 11650 IncludesProjectors and related equipment unique to planetariums.

SeePlanetariums : F1020.

E1090._ Observatory Equipment 11660 IncludesTelescopes and related equipment unique to observatories.

SeePre-Engineered Observatories : F1010.

E1090._ Agricultural Equipment

11870 IncludesMilkers, stock feeders, stock waterers, and waste clean-up equipment.

SeeKennels and Animal Shelters : F1040.

DAR BEIRUT
Page 87
Page 88: UF98

E20 FURNISHINGS

E2010E2020

Fixed Furnishings Moveable Furnishings

NUMBER TITLE MF NUMBER EXPLANATION

E20 FURNISHINGSDivision 12

E2010 Fixed Furnishings

E2010._ Fixed ArtworkMuralsFixed Wall DecorationsFixed SculpturesFixed Ecclesiastic ArtArt Glass

121001211012120121401219012170

IncludesInterior and exterior fixed art objects.

SeeMoveable Artwork : E2020.

E2010._ Fixed Casework Bank CaseworkDental CaseworkDisplay CaseworkDormitory CaseworkEducational Facility CaseworkHospital CaseworkKitchen CaseworkLaboratory CaseworkLibrary CaseworkMedical CaseworkNurse Station CaseworkReligious CaseworkResidential Casework

06410, 1230006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 1235006410, 12350

IncludesCustom and manufactured stock design steel, wood, and laminate faced cabinets and other casework units. Countertops with integral sinks, fixtures and accessories.

SeeLockers : C1030.Storage Shelving : C1030.Library Equipment : E1020.Mercantile Equipment : E1010.Laboratory Equipment : E1020.Residential Appliances : E1090.Unit Kitchens : E1090.Systems Furniture : E2020.

E2010._ Window TreatmentsBlindsInterior ShuttersShadesSolar-Control FilmWindow Treatment HardwareCurtains and Drapes

12490124901249012490124901249012490

IncludesInterior window coverings and associated hardware and controls.

SeeWindows with Integral Blinds : B2020.Exterior Protection Devices for Openings : B2010.

E2010._ Fixed Floor Grilles and MatsFixed Floor MatsFixed Foot Grilles

124801248012480

IncludesFixed foot grilles, gratings, floor grid systems, and entrance mats; recessed mat frames; and entrance tile.

SeeMoveable Rugs and Mats : E2020.

E2010._ Fixed Multiple SeatingFixed Audience SeatingFixed Stadium and Arena SeatingFixed Booths and TablesFixed Multiple-Use Fixed SeatingTelescoping StandsFixed Pews and BenchesFixed Seat and Table Assemblies

1260012610126301264012650126601267012680

IncludesFixed, and telescoping seating for theaters, auditoriums, lecture halls, stadiums, arenas, gymnasiums, religious buildings, restaurants, and other facilities where multiple seating is required.

SeeMoveable Multiple Seating : E2020.Grandstands and Bleachers : F1010.

E2010._ Fixed Interior LandscapingFixed Interior PlantersFixed Interior Live PlantsFixed Artificial PlantsFixed Landscape Accessories

1280012830128101282012840

IncludesFixed live and artificial plants, planters, accessories, soil, and fertilizer for interior planting.

SeeMoveable Interior Landscaping : E2020.

DAR BEIRUT
Page 88
Page 89: UF98

E2020 Moveable Furnishings

E2020._ Moveable ArtworkMoveable Wall DecorationsMoveable SculpturesMoveable Ecclesiastical Art

12100121201214012190

IncludesInterior and exterior moveable art objects such as paintings, and sculpture.

SeeFixed Artwork : E2010.

E2020._ Furniture and AccessoriesPortable Partitions, Screens and PanelsSystems Furniture

Panel-Hung Component System FurnitureFree-Standing Component System FurnitureBeam System FurnitureDesk System Furniture

FurnitureFurnishings and Accessories

Office AccessoriesTable AccessoriesPortable LampsBath FurnishingsBedroom FurnishingsFurnishing Accessories

12500

1063012700

12710

1272012730127401250012400124101242012430124401245012460

IncludesItems of moveable furniture and furnishing accessories. Furniture for a variety of uses including classroom, dormitory, ecclesiastical, hotel and motel, laboratory, library, lounge, medical, office, restaurant, and residential.

SeeInterior Demountable Partitions : C1010.Storage Shelving : C1030.Library Study Carrels : E1020.

E2020._ Moveable Rugs and MatsRugsMoveable Floor MatsMoveable Chair PadsMoveable Floor Runners

1248012480124801248012480

IncludesLoose rugs, chair pads, entrance mats; and surface mat frames. Constructed of a variety of materials, including rubber, vinyl, carpet, cocoa fiber, aluminum, and stainless steel.

SeeCarpet Flooring : C3020.Fixed Floor Grilles and Mats : E2010.

E2020._ Moveable Multiple SeatingPortable Audience SeatingPortable Multiple Use SeatingPortable BenchesPortable Seat and Table Assemblies

1260012620

1267012680

IncludesPortable seating for auditoriums, lecture halls, stadiums, arenas, gymnasiums, religious buildings, restaurants, and other facilities where multiple seating is required.

SeeFixed Multiple Seating : E2010.Grandstands and Bleachers : F1010.

E2020._ Moveable Interior LandscapingMoveable Interior PlantersMoveable Interior Live PlantsMoveable Artificial PlantsMoveable Interior Landscape Accessories

12800128301281012820

12840

IncludesMoveable live and artificial plants, planters, and accessories for interior planting.

SeeFixed Interior Landscaping : E2010.

DAR BEIRUT
Page 89
Page 90: UF98

UniFormat™ - Element F SPECIAL CONSTRUCTION and DEMOLITION

F10 SPECIAL CONSTRUCTIONF1010 Special StructuresF1020 Integrated ConstructionF1030 Special Construction SystemsF1040 Special Facilities F1050 Special Controls and Instrumentation

F20 SELECTIVE DEMOLITION

NUMBER TITLE MF NUMBER EXPLANATION

F10 SPECIAL CONSTRUCTION

F1010 Special Structures

F1010._ Air-Supported Structures 13010 IncludesPrefabricated, pre-engineered, pneumatically supported single and multiple wall enclosures and shelters of flexible materials.

SeeObservatory Equipment : E1090.

F1010._ Pre-Engineered StructuresPre-Engineered BuildingsMetal Building SystemsGlazed Structures

GreenhousesSolariumsSwimming Pool Enclosures

Portable and Mobile BuildingsGrandstands and BleachersObservatoriesPrefabricated Dome StructuresCable Supported StructuresFabric StructuresLog Structures

13120131201312013120

13120131201312013120131201312006130

IncludesPrefabricated, pre-engineered buildings and structures assembled on temporary and permanent foundations.

SeeModular Mezzanines : B1010.Planetarium Equipment : E1090.Telescoping Stands : E2010.Aquatic Facilities : F1040.Covers and Shelters : G2040.

F1010._ Other Special Structures IncludesOther special structures in addition to those listed above.

F1020 Integrated Construction

F1020._ Integrated AssembliesIntegrated Ceilings

1302009545

IncludesPrefabricated and pre-engineered assemblies of two or more related components.

SeeInterior Ceiling Finishes : C3030.HVAC Air Outlets and Inlets : D3040.Interior Lighting : D5020.

F1020._ Special Purpose RoomsAthletic RoomsSound-Conditioned RoomsClean RoomsCold Storage RoomsHyperbaric Rooms

1303013030130301303013030

IncludesPrefabricated and pre-engineered rooms designed and constructed to meet critical performance requirements of environmental control, dimensional tolerances, sound control, fire protection, and other special conditions.

See

DAR BEIRUT
Page 90
Page 91: UF98

Insulated RoomsOffice Shelters and BoothsPlanetariumsPrefabricated RoomsSaunasSteam BathsVaultsPaint Booths

130301303013030130301303013030130301303013030

SeeInterior Special Use Doors : C1020.Resilient Wood Flooring Systems : C3020.Paint Booth Exhaust Systems : D3040.Security and Vault Equipment : E1010.Athletic, Recreational, and Therapeutic Equipment : E1090.Planetarium Equipment : E1090.Aquatic Facilities : F1040.Covers and Shelters : G2040.

F1020._ Other Integrated Construction IncludesOther special construction systems in addition to those listed above.

F1030 Special Construction Systems

F1030._ Sound and Vibration Control 13080 IncludesManufactured components for the reduction of undesirable sound and vibration within a structure.

SeeAcoustical Wall Treatment : C3010.Acoustical Ceiling Treatment : C3030.Plumbing Systems, Sound, Vibration, and Seismic Control : D20.HVAC Systems Sound, Vibration, and Seismic Control : D30.Fire Protection Systems Sound, Vibration, and Seismic Control : D40.

F1030._ Seismic Control Systems 13080 IncludesManufactured components for the control of seismic loads on a structure.

SeePlumbing Systems Sound, Vibration, and Seismic Control : D20.HVAC Systems Sound, Vibration, and Seismic Control : D30.Fire Protection Systems Sound, Vibration, and Seismic Control : D40.

F1030._ Radiation Protection 13090 IncludesRadiation shielding components and structures for protection against radio frequency, x-ray, and nuclear radiation.

F1030._ Special Security SystemsExterior Wall Security Fencing

13700 IncludesEquipment and systems for high level security, including bullet and blast resistant products and construction, special barriers, and identification and monitoring systems. Fencing system installed around and adjacent to perimeter of exterior wall for security purposes.

SeeExterior Protection Devices for Openings : B2010.

F1030._ Other Special Construction Systems

IncludesOther special construction systems in addition to those listed above.

DAR BEIRUT
Page 91
Page 92: UF98

F1040 Special Facilities

F1040._ Aquatic FacilitiesElevated Swimming PoolsAquariumsAquatic Park FacilitiesTubs and Pools

1315013150131601316513170

IncludesPrefabricated and pre-engineered components, field assembled for aquatic sport, recreation, and health purposes.

SeeSwimming Pool Equipment : D2090.Swimming Pool Enclosures : F1010.

F1040._ Ice Rinks 13175 IncludesFreezing equipment, piping, floor systems, and surrounding enclosures for ice rinks.

F1040._ Site-Constructed IncineratorsSludge IncineratorsSolid Waste Incinerators

131901319013190

IncludesField constructed waste disposal incinerators.

SeePackaged Incinerators : E1090.

F1040._ Kennels and Animal Shelters 13185 IncludesEnclosures, gates, and feeding devices for kennels and animal shelters.

SeeAgricultural Equipment : E1090.Fences and Gates : G2040.

F1040._ Liquid and GasGround Storage TanksElevated Storage TanksUnderground Storage TanksTank LiningTank Cleaning Procedures

132001320013200132001320013200

IncludesTanks for storage of liquids and gases. Prestressed concrete, glass fiber, bolted, and welded steel tanks.

F1040._ Other Special Facilities IncludesOther special facilities in addition to those listed above.

F1050 Special Controls and Instrumentation

F1050._ Recording InstrumentationStress InstrumentationSeismic InstrumentationMeteorological Instrumentation

13500135101352013530

IncludesPermanently installed equipment for measuring and recording phenomena such as stresses in structures, solar and wind energy, and effects of earthquakes.

F1050._ Building Automation SystemsEnergy Monitoring and ControlEnvironmental ControlCommunicationsSecurity Access and SurveillanceClock ControlElevator Monitoring and ControlEscalators and Moving WalksDetection and AlarmDoor Control

13800138001380016700137001380013800138001385013800

IncludesEngineered systems which automatically monitor and control equipment and devices specified primarily in Divisions 11, 13, 14, 15, and 16 of the MasterFormat™ . Energy used for generation can be fossil, fuel, geothermal, wind, and solar.

SeeHVAC Instrumentation and Controls : D3060.Detection and Alarm : D5030.

F1050._ Other Special Controls and Instrumentation

IncludesOther special controls and instrumentation in addition to those listed above.

DAR BEIRUT
Page 92
Page 93: UF98

F20 SELECTIVE BUILDING DEMOLITION

F2010F2020

Building Elements Demolition Hazardous Components Abatement

NUMBER TITLE MF NUMBER EXPLANATION

F20 SELECTIVE BUILDING DEMOLITION

F2010 Building Elements Demolition 02200

F2010._ Minor Demolition for Remodeling

IncludesDemolition of parts of structures.

SeeBuilding Demolition : G1020.

F2010._ Selective Structural Demolition

F2020 Hazardous Components Abatement 01900

IncludesRemoval and abatement of hazardous components and materials.

SeeHazardous Waste Remediation : G1040.

DAR BEIRUT
Page 93
Page 94: UF98

UniFormat™ - Element G BUILDING SITEWORKG10 SITE PREPARATION

G1010 Site ClearingG1020 Site Demolition and RelocationsG1030 Site Earthwork G1040 Hazardous Waste Remediation

G20 SITE IMPROVEMENTS

G30 SITE CIVIL/MECHANICAL UTILITIES

G40 SITE ELECTRICAL UTILITIES

G90 OTHER SITE CONSTRUCTION

NUMBER TITLE MF NUMBER EXPLANATION

G10 SITE PREPARATION 02200

G1010 Site Clearing 02230

G1010._ Sod Stripping 02230 IncludesRemoval of sod for reuse.

G1010._ Clearing and Grubbing 02230 IncludesRemoval of vegetation including roots.

G1010._ Shrub and Tree Removal and Trimming 02230

IncludesRemoval or trimming of trees and shrubs. Root removal.

SeeShrub and Tree Transplanting : G2050.Temporary Tree and Plant Protection : Z1030.

G1010._ Stripping and Stockpiling of Soil 02230

IncludesRemoval of soil for reuse.

G1020 Site Demolition and Relocations

G1020._ Building Demolition 02220 IncludesDemolition of complete structures.

SeeBuilding Elements Demolition : F2010.

G1020._ Site Elements Demolition 02220 IncludesRemoval of above and below grade site improvements.

G1020._ Structure Moving 02990 IncludesRemoval of structures with purpose of reuse at another location.

G1020._ Utility Relocation IncludesRelocation of utility systems.

G1030 Site Earthwork 02300

G1030._ GradingRough Grading 02310

IncludesMoving earth to establish new contours and

DAR BEIRUT
DAR BEIRUT
Page 94
Page 95: UF98

Rough GradingFinish Grading

0231002310 elevations.

SeeFoundation Excavation, Backfill, and Compaction : A1010.Basement Excavation, Backfill, and Compaction : A2010.

G1030._ Excavating, Backfilling, and CompactingBorrowEmbankmentRock RemovalDewatering

0231502330

IncludesRemoval of earth and backfill or fill to establish design elevations.

SeeFoundation Excavation, Backfill, and Compaction : A1010.Basement Excavation, Backfill, and Compaction : A2010.

G1030._ Soil StabilizationAsphalt Soil StabilizationCement Soil StabilizationGeotextile Soil StabilizationLime Soil StabilizationLime Slurry Soil StabilizationPressure Grouting Soil StabilizationVibroflotation and Densification

02340

02250

IncludesMethods to increase stability of soils.

G1030._ Slope Protection and Erosion ControlErosion Control Blankets and MatsGabionsGeogridsMulch Control NettingRiprap and Rock LiningRock BarriersRock Energy DissipatorsSlope PavingTurf Reinforcement MatsSheet Piling

02370

IncludesMethods to erosion at sloped conditions. Permanent sedimentation control.

SeeTemporary Erosion and Sediment Control : Z1030.

G1030._ Earth Dams 02330 IncludesDams constructed of earth.

SeeStorm Water Ponds and Reservoirs : G3030.

G1040 Hazardous Waste Remediation 13280

IncludesRemoval and restoration of contaminated soil.

SeeHazardous Building Components Abatement : F2020.

DAR BEIRUT
DAR BEIRUT
Page 95
Page 96: UF98

G20 SITE IMPROVEMENTS

G2010G2020G2030G2040G2050

Roadways Parking Lots Pedestrian Paving Site Development Landscaping

NUMBER TITLE MF NUMBER EXPLANATION

G20 SITE IMPROVEMENTS IncludesRoadway pavements.

SeeRoadway Lighting : G4020.

G2010 Roadways

G2010._ Roadway Base CoursesAsphalt Base CoursesCaliche Base CoursesGranular Base CoursesLimerock Base CoursesSand Clay Base CoursesShell Base CoursesSoil Cement Base CoursesSubsoil Base Courses

02710 IncludesPrepared and compacted soil and granular layers placed before installation of roadway pavement.

SeeParking Lot Base Courses : G2020.Pedestrian Pavement Base Courses : G2030.

G2010._ Flexible Roadway PavementAggregate SurfacingFlexible PavementFlexible Pavement Coating and Micro- Surfacing

0273002740

02785

IncludesFinished roadway pavement of granular and asphaltic materials. Seal coats and restoration of existing pavements.

SeeFlexible Parking Lot Pavement : G2020.Flexible Pedestrian Pavement : G2030.

G2010._ Roadway Unit PaversAsphalt Block PaversBrick PaversConcrete PaversStone Pavers

02780 IncludesBlocks or tiles used for roadway pavement. Unit pavers set in mastic, sand, or mortar.

SeeParking Lot Unit Pavers : G2020.Pedestrian Unit Pavers : G2030.

G2010._ Rigid Roadway PavementRigid Pavement

02750 IncludesFinished roadway pavement with high bending resistance, usually of concrete.

SeeRigid Parking Lot Pavement : G2020.Rigid Pedestrian Pavement : G2030.

G2010._ Roadway Curbs and GuttersPrecast Concrete CurbsBituminous Concrete CurbsPortland Cement Concrete Curbs and GuttersStone Curbs

02770 IncludesConstruction at perimeter of roadway pavements to separate pavements from adjacent surfaces, provide vehicular restraint, and facilitate drainage.

SeeParking Lot Curbs and Gutters : G2020.Pedestrian Pavement Curbs and Gutters : G2030.

G2010._ Roadway AppurtenancesMedian BarriersCrash BarriersTraffic Signs and Signals

02840

02890

IncludesAccessories for roadway construction.

SeeParking Lot Appurtenances : G2020.

DAR BEIRUT
Page 96
Page 97: UF98

Traffic Signs and SignalsPavement MarkingsGuide Rails

02760

G2020 Parking Lots

G2020._ Parking Lot Base CoursesAsphalt Base CoursesCaliche Base CoursesGranular Base CoursesLimerock Base CoursesSand Clay Base CoursesShell Base CoursesSoil Cement Base CoursesSubsoil Base Courses

02710 IncludesPrepared and compacted soil and granular layers placed prior to installation of parking lot pavement.

SeeRoadway Base Courses : G2010.Pedestrian Pavement Base Courses : G2030.

G2020._ Flexible Parking Lot PavementAggregate SurfacingFlexible PavementFlexible Pavement Coating and Micro-SurfacingPavement Markings

0273002740

0278502760

IncludesFinished parking lot pavement of granular and asphaltic materials.

SeeFlexible Roadway Pavement : G2010.Flexible Pedestrian Pavement : G2030.

G2020._ Parking Lot Unit PaversAsphaltic Block PaversBrick PaversConcrete PaversStone Pavers

02780 IncludesBlocks or tiles used for parking lot pavement. Unit pavers set in mastic, sand, or mortar.

SeeRoadway Unit Pavers : G2010.Pedestrian Unit Pavers : G2030.

G2020._ Rigid Parking Lot PavementRigid Pavement 02750

IncludesFinished parking lot pavement with high bending resistance, usually of concrete.

SeeRigid Roadway Pavement : G2010.Rigid Pedestrian Pavement : G2030.

G2020._ Parking Lot Curbs and GuttersBituminous Concrete CurbsPortland Cement Concrete Curbs and GuttersStone CurbsPrecast Concrete Curbs

02770IncludesConstruction at perimeter of parking lot pavement to separate pavement from adjacent surfaces, provide vehicular restraint, and facilitate drainage.

SeeRoadway Curbs and Gutters : G2010.Pedestrian Pavement Curbs and Gutters : G2030.

G2020._ Parking Lot AppurtenancesTraffic BarriersParking BumpersParking Lot SignsPavement Markings

02840028400289002760

IncludesAccessories for parking lot construction.

SeeRoadway Appurtenances : G2010.Bicycle Racks : G2040.

G2020._ Parking Booths and EquipmentAttendant BoothsKey and Card Control UnitsParking GatesTicket Dispensers

13120111501115011150

IncludesManufactured structures and equipment for parking access control. HVAC and lighting supplied with the structures.

G2030 Pedestrian Paving

G2030._ Pedestrian Pavement Base Includes

DAR BEIRUT
Page 97
Page 98: UF98

G2030._ Pedestrian Pavement Base CoursesAsphalt Base CoursesCaliche Base CoursesGranular Base CoursesLimerock Base CoursesSand Clay Base CoursesShell Base CoursesSoil Cement Base CoursesSubsoil Base Courses

02710 Prepared and compacted soil and granular layers placed before installation of pedestrian pavement.

SeeRoadway Base Courses : G2010.Parking Lot Base Courses : G2020.

G2030._ Flexible Pedestrian PavementAggregate SurfacingFlexible PavementFlexible Pavement Coating and Micro-SurfacingPavement Markings

0273002740

0278502760

IncludesFinished pedestrian pavement of granular and asphaltic materials.

SeeFlexible Roadway Pavement : G2010.Flexible Parking Lot Pavement : G2020.Athletic and Recreational Surfaces : G2040.

G2030._ Pedestrian Unit PaversAsphalt Block PaversBrick PaversConcrete PaversStone Pavers

02780 IncludesBlocks or tiles used for pedestrian pavement. Unit pavers which may be set in mastic, sand, or mortar.

SeeRoadway Unit Pavers : G2010.Parking Lot Unit Pavers : G2020.

G2030._ Rigid Pedestrian PavementRigid PavementPavement Markings

0275002760

IncludesFinished pedestrian pavement with high bending resistance, usually of concrete.

SeeRigid Roadway Pavement : G2010.Rigid Parking Lot Pavement : G2020.Athletic and Recreational Surfaces : G2040.

G2030._ Pedestrian Pavement Curbs and GuttersWood CurbsBituminous Concrete CurbsPortland Cement Concrete Curbs and GuttersStone CurbsPrecast Concrete Curbs

02770

IncludesConstruction at perimeter of pedestrian pavements to separate pavement from adjacent surfaces and facilitate drainage.

SeeRoadway Curbs and Gutters : G2010.Parking Lot Curbs and Gutters : G2020.

G2030._ Exterior Steps and RampsCast-in-Place Concrete StepsPrecast Concrete StepsMetal StepsWood StepsMetal Handrails and RailingsOrnamental Handrails and RailingsWood Handrails and RailingsStair Treads and Nosings

0330003400055000620005520057200620005550

IncludesSteps and ramps in exterior locations including applied finishes such as coatings and tile.

SeeExterior Stairs : B1010.Interior Stair Construction : C2010.

G2040 Site Development 02800

G2040._ Fountains 02815 IncludesExterior fountains.

SeeFountain Equipment : D2090.

G2040._ Fences and GatesChain Link Fences and GatesOrnamental Metal Fences and GatesPlastic Fences and GatesWire Fences and Gates

02820 IncludesExterior fences and gates.

SeeExterior Gates : B2030.Interior Gates : C1020.

DAR BEIRUT
Page 98
Page 99: UF98

Wood Fences and Gates

G2040._ Athletic and Recreational SurfacesSports SurfacingResilient MatsSynthetic Grass SurfacingAggregate SurfacingFlexible PavementUnit PaversRigid Pavement

02790027900279002730027400278002750

IncludesExterior surfacing for athletic and recreational and activities.

G2040._ Athletic and Recreational EquipmentPlay-Field Equipment and Structures

Athletic or Recreational ScreeningPlayground EquipmentPlay StructuresSports Goals and Equipment

Fences and GatesSports Lighting

02880

0282016520

IncludesExterior equipment for athletic and recreational activities.

G2040._ Site and Street FurnishingsSeatingTablesTrash and Litter ReceptaclesBicycle Racks

02870028700287002870

IncludesManufactured site furniture and fixtures.

SeePlanting Accessories : G2050.Tree Grates : G2050.

G2040._ Exterior SignsDimensional Letter SignsIlluminated Exterior SignsNon-illuminated Exterior SignsPost and Panel/Pylon Exterior SignsElectronic Message Signs

10430 IncludesExterior signs with the exception of roadway and parking lot signage.

SeeRoadway Signs : G2010.Parking Lot Signs : G2020.

G2040._ Footbridges and UnderpassesPrefabricated BridgesUnderpasses

02850IncludesPedestrian bridges and underpasses of various materials. Railings and accessories.

G2040._ FlagpolesGround Set FlagpolesWall Mounted FlagpolesAutomatic FlagpolesNautical Flagpoles

10350 IncludesFlagpoles of metal, wood, and fiberglass, including concrete bases and accessories.

G2040._ Covers and SheltersWalkway CoveringsCar SheltersBus Stops

10530

02875

IncludesManufactured covers and shelters.

SeeParking Lot Booths and Equipment : G2020.

G2040._ Site Equipment IncludesEquipment located on the site, such as car washing, banking, theater equipment, and other freestanding equipment.

G2040._ Retaining WallsCast-in-Place ConcreteInterlocking Block MasonryPrecast ConcreteTimber

02830 IncludesRetaining walls associated with site construction.

G2050 Landscaping

DAR BEIRUT
Page 99
Page 100: UF98

G2050._ Irrigation Systems 02810 IncludesExcavation and backfill, piping, equipment, and accessories.

SeeSite Domestic Water Distribution : G3010.

G2050._ Shrub and Tree Transplanting 02905 IncludesRelocation of existing shrubs and trees including excavation and replanting.

SeeShrub and Tree Removal : G1010.Temporary Tree and Plant Protection : Z1030.

G2050._ Soil Preparation 02910 IncludesPreparation of soil for planting including soil amendments and topsoil.

G2050._ Lawns and GrassesHydro-MulchingPluggingSeedingSoddingSpriggingStolonizing

02920 IncludesLawns and grasses including seeding and sodding.

G2050._ Trees, Plants and Ground CoversGround CoversPlants and BulbsShrubsTrees

02930

IncludesGround covers, plants and bulbs, shrubs, and trees. Planting accessories such as tree grates and prefabricated planters.

G2050._ Plant MaintenanceFertilizingLimingMowingPruningWatering

02935 IncludesMaintenance activities during the construction period for new exterior plants.

SeeMaintenance and protection of existing plants : Z1030.

G2050._ Planting AccessoriesLandscape EdgingLandscape TimbersPlantersTree GratesTree Grids

02945 IncludesAccessories to separate and protect exterior plants.

DAR BEIRUT
Page 100
Page 101: UF98

G30 SITE CIVIL/MECHANICAL UTILITIES

G3010G3020G3030G3040G3050G3060G3090

Water Supply Sanitary Sewer Storm Sewer Heating Distribution Cooling Distribution Fuel Distribution Other Site Mechanical Utilities

NUMBER TITLE MF NUMBER EXPLANATION

G30 SITE CIVIL/MECHANICAL

UTILITIES

G3010 Water Supply

G3010._ Water WellsTest WellsWell Drilling and Casing

02520 IncludesDigging, drilling, and jetting of water wells. Well head pumps.

G3010._ Site Domestic Water Distribution 02510

IncludesSystems for transmission and distribution of domestic water outside the building. Utility piping materials, utility structures, valves, hydrants, excavation, bedding, backfill, and compaction. Testing and disinfection.

SeeBuilding Domestic Water Distribution : D2020.

G3010._ Site Fire Protection Water Distribution 02510

IncludesSystems for transmission and distribution of fire protection water outside the building. Utility piping materials, utility structures, valves, hydrants, excavation, bedding, backfill, and compaction. Testing and flushing.

SeeBuilding Sprinklers : D4010.Building Standpipes : D4020.

G3020 Sanitary Sewer

G3020._ Sanitary Sewage Collection 02530 IncludesSystems for transmission of sewage outside the building. Utility piping materials, utility structures, cleanouts, manholes, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Sanitary Waste : D2030.

G3020._ Septic SystemsDrainage FieldLeaching CesspoolsSand FilterSeptic TankSiphon Tank

02540 IncludesSystems for collecting sanitary waste on-site. Piping materials, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Sanitary Waste : D2030.

G3020._ Sanitary Sewage EquipmentLift StationsGrease InterceptorsPackage Sewage Treatment Plants

025300254011390

IncludesEquipment for site sanitary sewerage systems. Piping materials, excavation, bedding, backfill, and compaction. Testing.

DAR BEIRUT
Page 101
Page 102: UF98

Package Sewage Treatment Plants 11390SeeBuilding Sanitary Waste : D2030.

G3020._ Sewage PondsSewage LagoonsPond and Reservoir LinersPond and Reservoir Covers

026600266002660

IncludesExcavating and grading to form sewage ponds.

G3030 Storm Sewer

G3030._ Storm Water Collection 02630 IncludesSystems for collecting and transmitting water from subdrainage system and building rain water system Utility piping materials, utility structures, cleanouts, manholes, catch basins, culverts, curb inlets, french drains, trench drains, excavation, bedding, backfill, and compaction. Testing.

SeeSubdrainage Systems : A1030.Building Rain Water Drainage : D2040.

G3030._ Storm Water Equipment IncludesEquipment for site Storm Sewerage system. Lift stations.

G3030._ Storm Water Ponds and ReservoirsPonds and ReservoirsPond and Reservoir LinersPond and Reservoir Covers

026600266002660

IncludesExcavating and grading to form storm water ponds and reservoirs.

SeeEarth Dams : G1030.

G3040 Heating Distribution

G3040._ Site Steam Distribution 02550 IncludesSystems for transmission and distribution of steam supply and condensate return. Piping materials, valves, tanks, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Steam Distribution Systems : D3040.

G3040._ Site Hot Water Distribution 02550 IncludesSystems for transmission and distribution of hot water. Piping materials, valves, tanks, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Hot Water Distribution : D3040.

G3050 Cooling Distribution

G3050._ Chilled Water Distribution 02550 IncludesSystems for transmission and distribution of chilled water. Piping materials, valves, tanks, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Chilled Water Distribution : D3040.

DAR BEIRUT
Page 102
Page 103: UF98

G3060 Fuel Distribution 02550

G3060._ Gas Distribution Natural Gas DistributionLiquified Petroleum Gas Distribution

0255002550

IncludesSystems for transmission and distribution of fuel gases. Piping materials, valves, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Gas Supply Systems : D3010.

G3060._ Oil Distribution 02550 IncludesSystems for transmission and distribution of fuel oil. Piping materials, valves, excavation, bedding, backfill, and compaction. Testing.

SeeBuilding Oil Supply Systems : D3010.

G3060._ Other Fuel Distribution Systems

IncludesSystems for transmission and distribution of other fuels such as gasoline, kerosene, and diesel oil. Piping materials, valves, excavation, bedding, backfill, and compaction. Dispensing equipment.

G3060._ Fuel Storage Tanks 13200 IncludesTanks for storage of liquid and gas fuels.

G3060._ Fuel Dispensing Equipment 11140 IncludesEquipment for dispensing liquid and gas fuels.

G3090 Other Site Mechanical Utilities

IncludesSite systems for transmission and distribution of other liquids and gases. Piping materials, valves, excavation, bedding, backfill, and compaction.

SeeOther Building Piping Systems : D2090.

G3090._ Industrial Waste Systems IncludesSystems for transmission of industrial waste. Utility piping materials, utility structures, cleanouts, manholes, tanks, separators, equipment including lift stations, excavation, bedding, backfill, and compaction.

SeeBuilding Acid Waste Systems : D2090.

G3090._ Petroleum Oil and Lubricants Distribution

IncludesSite systems for transmission and distribution of petroleum oil and lubricants. Piping materials, valves, tanks, excavation, bedding, backfill, and compaction.

SeeOther Building Plumbing Systems : D2090.

DAR BEIRUT
Page 103
Page 104: UF98

G40 SITE ELECTRICAL UTILITIES

G4010G4020G4030G4090

Electrical Distribution Site Lighting Site Communications and Security Other Site Electrical Utilities

NUMBER TITLE MF NUMBER EXPLANATION

G40 SITE ELECTRICAL UTILITIES

G4010 Electrical Distribution 16300

G4010._ Electrical SubstationsUnit SubstationsTransformers

1636016270

IncludesEquipment and related facilities for site transformation from site service voltage to site distribution voltage, including unit substations, transformers, circuit breakers, interrupter switches, cutouts and fuses, associated switchgear and accessories, concrete foundations, metal framing, fence enclosures, line structures, surface pavement, insulators, lightning arrestors, and grounding systems.

SeeBuilding Electrical Service and Distribution : D5010.Demonstration and Training : Z1040.Startup and Adjusting : Z1040.

G4010._ Electrical Power Distribution LinesTransmission and Distribution Accessories

16310

IncludesUnderground and overhead electric power site distribution lines. Wire, conduits, ductbanks, manholes, poles, excavation, backfilling, and compaction.

SeeBuilding Electrical Service and Distribution : D5010.

G4010._ Electrical Power Distribution Equipment

IncludesEquipment for site distribution of electric power including transformers, switchboards, circuit breakers, reclosers, interrupter switches, fuses, converters, and grounding systems.

G4020 Site Lighting

G4020._ Area LightingExterior LuminairesLighting Poles and Standards

1652002580

IncludesExterior area lighting systems for roadways, parking lots, and pedestrian walkways. Underground and overhead electric feeders and branch circuits. Transformers, wire, conduits, ductbanks, manholes, poles, luminaires, controls, grounding system, excavation, backfilling, and compaction.

SeeInterior Lighting : D5020.Exterior Building Lighting : D5020.Sports Lighting : G2040.

G4020._ Feature LightingExterior Luminaires 16520

IncludesExterior lighting for site features such as sculptures, pools, fountains, stairs, and ramps.

DAR BEIRUT
Page 104
Page 105: UF98

Special-Purpose Lighting1652016550 sculptures, pools, fountains, stairs, and ramps.

Transformers, wire, conduits, ductbanks, manholes, poles, luminaires, controls, grounding system, excavation, backfilling, and compaction. Underwater lighting.

SeeInterior Lighting : D5020.Sports Lighting : G2040.

G4020._ Building IlluminationExterior Luminaires

16520 IncludesExterior lighting to illuminate a building. Transformers, wire, conduits, ductbanks, manholes, poles, luminaires, controls, grounding system, excavation, backfilling, and compaction.

SeeExterior Building Lighting : D5020.

G4020._ Landscape LightingExterior Luminaires

16520 IncludesExterior lighting to illuminate feature planting areas. Transformers, wire, conduits, ductbanks, manholes, poles, luminaires, controls, grounding system, excavation, backfilling, and compaction.

G4020._ Other Site Lighting IncludesSite lighting systems in addition to those listed above.

G4030 Site Communications and Security

G4030._ Site Detection and AlarmSecurity Access and Surveillance

Intrusion DetectionSecurity AccessVideo Surveillance

1385013700

IncludesSite fire alarm, gas detection, leak detection, and other security and alarm systems. Wire, conduits, ductbanks, manholes, poles, excavation, backfilling, and compaction.

SeeBuilding Detection and Alarm : D5030.Special Security Systems : F1030.Building Automation Systems : F1050.

G4030._ Site Voice and Data CommunicationsTelevision Equipment

1670016850

IncludesTelephone, television, data, local area network, microwave and radio, and other communication systems to connect facilities on a single site. Wire, conduits, ductbanks, manholes, poles, excavation, backfilling, and compaction.

SeeBuilding Voice and Data Systems : D5030.

G4030._ Site Communications ReceptionBroadcast Transmission and Reception

EquipmentMicrowave Transmission and Reception

Equipment

16780

16790

IncludesExterior equipment for receiving electromagnetic communication signals. Wire, conduits, ductbanks, manholes, poles, excavation, backfilling, and compaction.

SeeBuilding Television Systems : D5030.

G4030._ Other Site Communications and Security

IncludesSite communication and security systems in addition to those listed above.

G4090 Other Site Electrical

DAR BEIRUT
Page 105
Page 106: UF98

Utilities

G4090._ Cathodic ProtectionSacrificial Anode SystemInduced Current System

13110 IncludesSystems to protect piping and tanks from electrolytic corrosion.

SeeCathodic Protection in Buildings : D5090.

DAR BEIRUT
Page 106
Page 107: UF98

G90 OTHER SITE CONSTRUCTION

G9010G9090

Service Tunnels Other Site Systems

NUMBER TITLE MF NUMBER EXPLANATION

G90 OTHER SITE CONSTRUCTION

G9010 Service Tunnels IncludesTunnels to house utility systems and to connect different facilities on site. Excavation, concrete and masonry construction, lighting, dampproofing, waterproofing, backfilling, and compaction.

G9090 Other Site Systems IncludesSite systems and equipment in addition to those listed above.

DAR BEIRUT
Page 107
Page 108: UF98

UniFormat™ - Element Z GENERALZ10 GENERAL REQUIREMENTS

Z1010 AdministrationZ1020 Quality RequirementsZ1030 Temporary FacilitiesZ1040 Project CloseoutZ1050 Permits, Insurance, and BondsZ1060 Fee

Z20 CONTINGENCIES

NUMBER TITLE MF NUMBER EXPLANATION

Z10 GENERAL REQUIREMENTS

Z1010 Administration Construction administration requirements. Home office and field office administration.

Z1010._ Project ManagementPayment Procedures

0131001200

Administration of construction contracts.

Z1010._ Project CoordinationProject MeetingsProject Schedules

013100131001320

Coordination and scheduling of various parts of the work among the contractors and subcontractors.

Z1010._ Design SubmittalsCode AnalysisDesign DataPreliminary Design DocumentsDesign Development DocumentsConstruction Documents

01330 General procedures and requirements for submittals during the project design process.

Z1010._ Modification SubmittalsChange Order RequestsChange Order ProposalsChange OrdersRequests for Interpretation

0090000930009300093000930

General procedures and requirements for change proposal submittals affecting the price or time of the contract.

Z1010._ Construction SubmittalsCertificatesShop DrawingsSamplesProduct DataManufacturer's Installation InstructionsInformational Submittals

013300133001330013300133001330

General procedures and requirements for submittals required during construction.

Z1020 Quality Requirements Quality requirements for the project.

Z1020._ Manufacturer's Field ServicesManufacturer's Field ObservationManufacturer's Field SupervisionManufacturer's Field Demonstration and Training

014300143001430

01430

Field observations, supervision, tests, and reports provided by manufacturer's representatives during installation, start-up, commissioning, demonstration, and training.

Z1020._ Quality Assurance and ControlRegulatory RequirementsQuality AssuranceQuality Control

01400014100143001450

Procedures to measure and report the quality and performance of construction. Qualifications for fabricators, installers, manufacturers testing agencies and others involved in the construction. Field and source quality control.

DAR BEIRUT
DAR BEIRUT
Page 108
Page 109: UF98

Field Samples and Mockups0145001450

Z1020._ Field EngineeringField SurveyControl Points and Benchmarks

017200172001720

Requirements for measurement and layout.

Z1020._ Testing and Inspection 01450 Field and laboratory testing, inspection, and reporting services to monitor quality of construction.

Z1030 Temporary Facilities Requirements for installation, maintenance, and removal of temporary utilities, controls, and construction aids during construction.

Z1030._ Temporary UtilitiesTemporary ElectricityTemporary Fire ProtectionTemporary Fuel SupplyTemporary Heating, Ventilating, and Air ConditioningTemporary LightingTemporary TelephoneTemporary Water

01510015100151001510

01510015100151001510

Requirements for utilities used on site during construction.

Z1030._ Construction FacilitiesField Offices and Sheds

0152001520

Requirements for facilities used on site during construction.

Z1030._ Construction AidsConstruction Elevators, Cranes and HoistsScaffolding and PlatformsSwing Staging

01540

015400154001540

Requirements for and procedures related to using tools and equipment during construction.

Z1030._ Temporary Site Access and ParkingTemporary BridgesTemporary OverpassesTemporary RampsTemporary RoadsTemporary Access RoadsTemporary Parking Areas

01530015500153001530015300155001550

Requirements for facilities to accommodate construction personnel and operations, owner's operations, and public access to the site during construction.

Z1030._ Temporary Barriers and EnclosuresBarricadesBarriersConstruction FenceProtective WalkwaysSecurity MeasuresTree and Plant Protection

01560015600156001560015600156001560

Requirements and procedures for protection of occupants or existing facilities during construction.

Z1030._ Temporary ControlsErosion and Sediment ControlPest Control

015700157001570

Site or environment controls required to allow construction to proceed.

Z1030._ Project IdentificationProject Signs

0158001580

Signage identifying the project and the project team.

Z1040 Project Closeout Requirements for final acceptance of project by the Owner.

Z1040._ Cleaning 01740 Requirements for maintaining the site in a neat

DAR BEIRUT
Page 109
Page 110: UF98

Z1040._ CleaningProgress CleaningFinal CleaningSite Maintenance

01740017400174001740

condition during construction.

Z1040._ Startup and Adjusting 01750 Checkout and startup procedures, and initial adjusting to ensure safe operation in preparation for acceptance testing and commissioning.

Z1040._ Completion InspectionsSubstantial Completion InspectionFinal Completion Inspection

017700177001770

Requirements for final completion inspections.

Z1040._ Closeout SubmittalsFinal Site SurveyMaintenance ContractsMaintenance DataMaintenance MaterialsOperation DataPreventive Maintenance InstructionsWarrantiesProject Record DocumentsSpare Parts

01780017800178001780017800178001780017800178001780

Requirements and procedures for closeout submittals, revised project documents, and delivery and distribution of spare parts and maintenance materials.

Z1040._ CommissioningSystem Performance Acceptance TestingTesting, Adjusting, and Balancing

01810

0181001810

Requirements for demonstrating systems of facilities comply with contract performance requirements.

Z1040._ Demonstration and Training 01820 Requirements and procedures for demonstration of the products and systems of the facility and training the owner's operating and maintenance personnel.

Z1040._ Operation and Maintenance 01830 Requirements and procedures for operating the facility after commissioning. Contract maintenance provisions that extend beyond the date of substantial completion.

Z1050 Permits Insurance and Bonds

Includes permits, insurance, and bonds required for construction.

Z1050._ Permits and ApprovalsBuilding PermitsEnvironmental PermitsZoning Board ApprovalPlanning Board ApprovalDesign Review Board ApprovalHistoric District Approval

008900089000890

Permits and approvals required for design and construction.

Z1050._ InsuranceDesigner's InsuranceContractor's InsuranceOwner's Insurance

00800

00800

Insurance required for design, construction and ownership.

Z1050._ BondsLien BondsPerformance BondsMaterial and Payment BondsMaintenance BondsWarranty Bonds

006000061000610006100061000610

Bonds required of the contractor. Consent of surety for contractors release.

Z1060 Fee Contractor's fee for constructing the project.

DAR BEIRUT
Page 110
Page 111: UF98

Z20 CONTINGENCIES

Z2010Z2020Z2030

Design Contingency Escalation Contingency Construction Contingency

NUMBER TITLE MF NUMBER EXPLANATION

Z20 CONTINGENCIES

Z2010 Design Contingency Risk factor applied to the project budget, cost estimate, or contract to compensate for extent of available design definition.

Z2020 Escalation Contingency Risk factor applied to the project budget, cost estimate, or contract to compensate for the change in monetary value during time between the preparation of the estimate and the scheduled start of construction.

Z2030 Construction Contingency Risk factor applied to the project budget, cost estimate, or contract to compensate for degree of unknown or unforeseeable construction conditions.

DAR BEIRUT
Page 111
Page 112: UF98

Footnote 1:

The term project manual is defined in CSI Manual of Practice, Chapter FF/030

Footnote 2:

The 16-Division format is discussed in CSI Manual of Practice, Chapter FF/070

Footnote 3:

The term construction documents is defined in CSI Manual of Practice, ChapterFF/030.

Footnote 4:

Royal Institute of Chartered Surveyors, Standard Form of Cost Analysis. 1969,reprinted 1995, London.

Footnote 5:Canadian Institute of Quantity Surveyors, Elemental Cost Analysis Method ofMeasurement and Pricing. Toronto, Ontario, Canada: CIQS, first issued 1972,revised 1990.

Footnote 6:Committee E6-Building Performance, Subcommittee E06.81-Building Economics.

DAR BEIRUT
Page 112
DAR BEIRUT
Heat Generating Systems Titles in parentheses under category D - Services are ASTM perferred terminology. Titles presented above them are the current industry terms used throughout Uniformat.
DAR BEIRUT
Heat Generating Systems Cooling Generation Distribution Systems Terminal and Package Units