Sno Activity Status Owner Under Guidance
0.1 Meeting with all the selected Enrolment Agencies for the District/Municipal Corporation
along with Nodal Officers
Dist. Collector/
Mun.Comm
29
0.2 Discuss the calendar of events mention in following stages and prepare the Enrolment
action plan for the district/municipal corporation capturing plan for the whole district andAgencies readiness
Dist. Collector/
Mun.Comm
29
0.3 Distribute work among Selected Agencies in Municipal Corporation through draw of lots
and identify single point of contract from the Enrolment Agency at the District Level
Dist. Collector/
Mun.Comm
29
1.1 Conduct District/Corporation Level Workshop for Tahsildars, Nodal Officers, Ward
Officers etc along with Enrolment Agencies
Dist. Collector/
Mun.Comm
4t
1.2 Identify and Appoint Introducers and verifiers along with Enrolment Agencies Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
29
1.3 Conduct Press Conference to announce kick start of Enrolment Operations at
District/Mun.Corpn level
Dist. Collector/
Mun.Comm
4t
1.4 Conduct Taluka/Ward level training sessions for Introducers and verifiers along
with Agencies
Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
6t
2.1 Prepare Taluka/Municipal level Enrolment Calendar along with Enrolment Agencies
having village and ward level enrolment dates and other details
Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
6t
2.2 Issue circular/order to all the introducers and verifiers regarding the enrolment calendar
and their presence at the enrolment centres during the date of enrolment as per enrolment
calendar- village/ward wise
Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
6t
2.2 Identify places to set up Enrolment Stations as per the Enrolment Calendar along with
Enrolment Agencies
Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
6t
2.3 Review set up of Enrolment Stations as per the Enrolment Calendar along with Enrolment
Agencies
Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
6t
2.4 Commence Enrolment process Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
10
2.5 First enrolment of Introducers and Verifiers as per the Enrolment Calendar Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
10
2.6 Dry run (enrol local admin personnel) Tahsildar/Ward
Officers
Dist. Collector/
Mun.Comm
11
2.7 Execution of local awareness campaign Dist. Collector/
Mun.Comm
Go-Live Dist. Collector/
Mun.Comm
12
Enrolment Ready Checklist
Stage 0: Review meeting with Enrolment Agency
Stage 1: Workshop
Stage 2: Enrolment Calendar and Centre readiness
8/4/2019 UID Project Plan-V2
2/17
Comments/Remarks
The list of Schedules-v4 and selected
agencies mailed and uploaded in website
The Action plan would contain details
viz. plan to cover all the tehsils in thedistrict, phase wise deployment of kits,
manpower, target enrolment to be
covered. Format attachedNumber of equal segments to be made
has been intimated vide Dec 22nd Letter-
to all MC- Annexure-A and uploaded in
the website
Workshop/Training session PPT would
be shared by the department by 1st Jan
both in English and Marathi
Enrolment Agencies has been asked to
support the task. Identify them on
priority basis for villages and wards
where work to be initiated at first
The draft Press note, Ads,videos, audio
clips and other publicity materials would
be uploaded in website and would be
intimated soonWorkshop/Training session PPT would
be shared by the department
Enrolment Agencies has been asked to
support the task
Enrolment Agencies has been asked to
support the task
refer Aadhaar Registrar Handbook to
ensure set up of Stations as per UIDAIguidelines
Publicity materials for awareness
campaign would be uploaded in the
website and intimated soon
8/4/2019 UID Project Plan-V2
3/17
Schedule No. Name of the Tehsil/Mun. Corpn Name of the Agency Areas allocatedIndicativePopulation
This plan is fo
plaName of the District/Municipal Corpn.
District/Mun.Co
8/4/2019 UID Project Plan-V2
4/17
Tentative timeline to
cover the respectiveschedule
Total
Stationsrequired
Kits availableat present
Phase-1 Phase-2 Phase-3 Phase-4
whole of District/Mun.Corp.This plan should capture details till the level of Tehsil/ward for each
ned for each tehsil/Ward (village wise and ward wise) should be captured in Enrolment Calendar
rp Enrolment Action Plan
Phase wise number of Stations to be activewith Kits
8/4/2019 UID Project Plan-V2
5/17
Weekly Targets for the
entiredistrict/Mun.corpn.
gency. Further detailed
-Tehsil/Ward
8/4/2019 UID Project Plan-V2
6/17
Schedule No. Name of the Village /Ward Name of the Agency Areas allocated
Indicative
Population
Enrolment Calendar- Tehsil/Ward ( Village
Name of the District/Municipal Corpn.
This plan i
Name of the Tehsil/Ward/Division
8/4/2019 UID Project Plan-V2
7/17
period of enrolment
( dd/mm to dd/mm )
Total Stations
planned Weekly Targets
Tentative timeline to
cover the respective
village/ward
Phase-1 Phase-2
ise-ward wise)
s for Tehsil/Ward level. This plan should capture details till the lowest level viz.
village/ward for each agency with period of enrolment
Phase wise number of
Stations to be active
8/4/2019 UID Project Plan-V2
8/17
1
2
3
4
5
6
7
8
9
Rural Urban Rural Urban Rural Urban
Area1 0 0
Area2 0 0
Area3 0 0
Area4 0 0
Area5 0 0
Area6 0 0
Area7 0 0
Area8 0 0
Area9 0 0
Area10 0 0
Area11 0 0
Area12 0 0
Area13 0 0
Area14 0 0
Area15 0 0
Area16 0 0
Area17 0 0
Area18 0 0
Area19 0 0
Area20 0 0
Area21 0 0
Area22 0 0
Total
District/
State 0 0 0 0
Total Rural
o a
Stationary
Area wise
population
Population
density/sq km Target population
Number of enrolments per ES per year (stationary)
Duration of the project in months
Average number of enrolments per ES during proje
Target enrolments as % of populationor o e t e num er o enro ments per ay
number of enrolments per day for Stationary ES
Registrar shall fill in the below details.
eg strar s a n t e e ow eta s. e
Minimum number of days for Stationary Enrolment
Number of enrolments per day per ES (Stationary)
Number of enrolments per day per ES (Mobile)*
Maximum distance between 2 stationary ES in kilom
No. of working days in a year
8/4/2019 UID Project Plan-V2
9/17
egen
10 Values to be filled in by the Registrar
60 Calculated values
45
2
280
16800
12
16800
100%
Stationary Mobile Stationary Mobile
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 Total Urban 0
0 Total Mobile 0
ES Rural ES Urban
t duration (stationary)
recommen e at 75 % o t e
au t va ues are prov e ere.
tation (ES) at a location
eters
8/4/2019 UID Project Plan-V2
10/17
Name of the District
Contact Number Contact Number
( Mobile) (landline)
1
23
4
Signature of District Collector/Municipal Corpn. /Authorised representative
Nodal Officer List- District/Municipal Corpn.
Sno. Name of the Nodal OfficDesignation
8/4/2019 UID Project Plan-V2
11/17
Email ID
8/4/2019 UID Project Plan-V2
12/17
Name of the District
Name of the Tehsil/Municipal Corpn.
Contact Number Contact Number
( Mobile) ( landline)1
2
3
4
5
6
7
8
9
1011
12
13
14
15
16
17
18
19
2021
22
Signature of Tahsildar/Ward Officer
Signature of District Collector/Municipal Commissioner/Authorised Representative
Introducers List-District/Municipal Corporation
Sno Name of the Introducer Designation
8/4/2019 UID Project Plan-V2
13/17
Village/Ward name
8/4/2019 UID Project Plan-V2
14/17
Name of the District
Name of the Tehsil/Municipal Corpn.
Contact Number Contact Number
( Mobile) ( landline)1
2
3
4
5
6
7
8
9
1011
12
13
14
15
16
17
18
19
2021
22
Signature of Tahsildar/Ward Officer
Signature of District Collector/Municipal Commissioner/Authorised Representative
Verifiers List-District/Municipal Corporation
Sno Name of the Verifier Designation
8/4/2019 UID Project Plan-V2
15/17
Village/Ward name
8/4/2019 UID Project Plan-V2
16/17
Name of the Enrolment
Agency
Contact Number
( Mobile)
12
3
4
Single Point of Contact- Enrolment Agency for each level of operation
Sno.
Name of the Single
point of Contact
District/Municipal
Corporation
Level in charge viz.
State/Dist./Taluka
8/4/2019 UID Project Plan-V2
17/17
Contact Number
(landline) Email ID