Ministry of Power, Coal and New & Renewable Energy
1ACHIEVEMENTS AND
INITIATIVES OF
GOVERNMENT OF INDIA
YEAR
ST
2Record breaking progress towards fulfilling Honble Prime Minister Shri Narendra Modis vision of...
POWER FOR ALL24X7
A Year which started the journey towards Year Round Power for All
3
4ACHIEVEMENTS
3.6%
22,566 MW
22,100 ckm
65,554 MVA
Power deficit reduced to
the lowest ever
Highest ever generation capacity addition
Highest ever increase in Transmission lines
Highest ever increase inSub-station capacity
5
`3.35 LAKH Cr.
Highest coal production growth
in 23 years
8.3%
8.4%Power Generation Growth
(Highest in 20 years)
of potential revenues to coal bearing states through transparent coal e-auctions & allotments
A Year which surpassed past records
First time ever,
exceeded renewable capacity addition targets in solar, wind, small hydro etc.
Over
6TARGETS
100 Cr.tonnes/year by 2020
Doubling Coal Indias production to
50%by 2020
Power Generation to increase by
>5 Times1,75,000 MW
10%
by 2022
increase in renewable capacity to
of current consumption
Energy saving to increase to
7
MISSION
BY 2019POWER FOR ALL24X7
8
BY 2019POWER FOR ALL24X7
9
FRO
MDA
RK
NES
STO
LI
GH
T
POWER IS DELIVERED THROUGH A CHAIN OF ACTIVITIESA chain is only as strong as the weakest link
FUEL GENERATION
Annual production growth of Coal only 1.5% between 2010-14
Loss of ` 1.86 lakh Cr. estimated by CAG in Coal allocation
>24,000 MW of power capacity idle due to lack of fuel
Less than 1% of solar potential realized
Power generation exceeds 1 lakh Cr. units for the first time
Plans to increase solar capacity by > 30 times
Highest coal production growth in 23 years
Increased coal & gas availability to revive stalled projects
10
TRANSMISSION DISTRIBUTION CONSUMPTION
Measures to build an exceptionally strong power delivery chain are on and are showing results
Discoms losing `70,000 Cr. annually
and accumulated losses of > `2,50,000 Cr.
Spiralling consumer tariffs
Lack of focused energy conservation efforts
28 Cr. people without access to power
Largest power outage in history with 62 Cr. people in darkness in 2012
Approved new schemes for investment of `1.09 lakh Cr. in
Discoms
Overall energy deficit down to 3.6%, the lowest ever
Highest ever increase in Transmission lines & sub station capacity (22,100 ckm and 65,559 MVA respectively)
11
12 13
COALTAINT
CLEANING
REMOVING THE
COALTAINT
CLEANING
REMOVING THE
ENERGY EMPLOYMENTShutdown of plants dependant on cancelled coal mines
Livelihood of thousands of workers endangered
Crisis averted by focused action through implementation of transparent e-auction process in just four months
14
ECONOMY
Cancellation of 204 coal blocks by Supreme Court presented a potential grave crisis of:
Economic activity halts, NPAs mount
15
REGIONAL DEVELOPMENTCoal bearing states like Jharkhand, Chhattisgarh, Odisha, West Bengal, Madhya Pradesh, Maharashtra and Telangana to get potential revenue (including auction proceeds and royalties) of
over the lifetime of the mines
From auction of 29 Coal blocks & allotments of 38 coal blocks to states/PSUs
`3.35 lakh Cr.
Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to
Legislation Enabledenable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas
16
REJUVENATED ECONOMYReduced import potential and generated momentum for Make in India
`3.35 lakh Cr.
Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to
Legislation Enabledenable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas
17
18
PRODUCTIONIMPROVEMENT
INCREASINGTHROUGH EFFICIENCY
RFID/GPS tagging
Reduced Transportation Cost
Reduction in coal theft using
Coal linkage rationalization to reduce transportation costs and save environment
19
Coal Project Monitoring Portal
Improved coal quality
for quicker decision making, faster dispute resolution and accelerated removal of bottlenecks
using compulsory crushing, washing and third party sampling
20
100 Cr. Tonnes
by 2020
Double coal production to
21
DOUBLINGCOAL INDIAPRODUCTIONIN 5 YEARS
Better evacuation of coal planned by investing massively in new railway rakes, expediting railway lines, modern equipment and mechanization
Partnership between Railways,coal-bearing states and Coal India to strengthen infrastructure creation. Signed MoUs with Odisha and Jharkhand
Trebling exploration activities for enhancing coal production
Over 60 new mines to be opened
22
7,900 Cr. units of power 24,150 MW of
Innovative and transparent new scheme for making gas available for power generation and generating
over the next two years from
gas based capacity
SUPPLY RESUMED23
Gas BasedPowerPlants
Reviving these
will reduce peak load shortages in summer and ensure grid stability.
Below` 4.70/unit
First round of auctionhas resulted in power
Many of the stranded gas based power projects are located in the Southern region which is power deficit due to transmission constraints
RAPID INCREASE INGENERATION CAPACITY
5 NEW Ultra Mega Power Projects of
20,000 MW to be setup inplug-and-play mode attracting an investment of
> ` 1 LAKH Cr.
24
RAPID INCREASE INGENERATION CAPACITY
GENERATION
All clearances and linkages will be in place before the project is awarded by a transparent system
Old plants to be upgraded to enhance capacity and reduce emission
Agreement signed for expansion of Patratu Thermal Power Station, Jharkhand to
4,000 MW
25
GENERATION
MORE THAN
32,000 MW to 1,75,000 MW5 TIMES
India is running the largest renewable capacity expansion
program in the world
Increasing the overall renewable capacity target by
Opportunity for unemployed graduates & farmers to
become solar enterpreneures
from
by 2022
Green Generation for Clean & Energy
Secure India
100,000 MW of Solar and 60,000 MW of Wind capacity
Renewable Purchase Obligation (RPO) and Renewable Generation
Obligation ( RGO) to boost renewable energy
26
GENERATIONRE-Invest
2015
Financing Green Energy
Worlds largest renewable energy financing meet. Commitments of
of renewable manufacturing commitment
of renewable financing commitment
62,000 MW1187
exhibitors from
countries 70,000 MW
2500 delegates200 globalinvestors &financiers 202 speakers including
Nearly
International speakers from 29 countries
from 32 countries
2,73,000 MW
27
RAPIDGREENPROGRESS
We are like tenant farmerschopping down the fence around our
house for fuel when we should be using Nature's inexhaustible sources of
energy sun, wind and tide.
Thomas Edison
28
1,112 MW42%Highest ever increase in
solar capacity of increase in solar capacity during
2014-15
` 50 to ` 200/tonnes
Coal cess quadrupled from
to help finance clean energy projects and Ganga rejuvenation
Accelerated depreciation restored for wind power
from July 2014 to help increase wind capacity
25solar parks
~1000 MW with capacity of
each planned
17solar parks
in 14 states have already
been approved
29
Tender by NTPC to setup
of Solar Projects2,170 MW
TRANSMITTING & DISTRIBUTING POWER POWERLESS TO POWERFUL
SMART GRIDNational Smart Grid Mission approved to bring efficiency in power supply network and facilitate reduction in losses & outages
SMARTGRID
30
GREEN ENERGY CORRIDOR` 38,000 Cr.projects being rolled out to ensure evacuation from renewable energy plants
CREATING COMPETITION
` 1 LAKH Cr.
Electricity Act being amended to give consumers a choice to choose and change power service provider like a mobile connection. Competition will lead to lower tariffs & better service
transmission projects to be bid out over the next year
Level playing field in transmission through seperation of POSOCO and POWERGRID
31
Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
` 63,027 Cr.Total Govt. expenditure
to rural homes, micro small and cottage industries
Feeder segregation for 24x7 power
Now small hamlets also covered
Adequate power to farmers
New transformers and upgradation
Remote Villages
of last mile infrastructure
to be covered: Off-grids and micro-grids
Solar Installationsby Discoms to promote clean and green energy
Total investment of `1.09 Lakh Cr.
32
(IPDS)
Total investment of `1.09 Lakh Cr. Integrated Power Development Scheme
` 45,816 Cr.
tamper-proof meters at homes
infrastructure upgradation in urban areas
Underground cabling and high tech GIS transformers in densely populated areas
IT implementation for better customer service
Solar installations like rooftop solar also covered
Total Govt. expenditure
Smart-metering for large consumers and
Comprehensive sub-transmission & distribution
An integrated scheme for urban areas covering:
33
34
ENERGY EFFICIENCY PROGRAMMES
TARGETTO SAVE 10% of CURRENT ENERGY CONSUMPTION
ENERGY EFFICIENCY PROGRAMMES
NATIONWIDE CAMPAIGNFOR ENERGY CONSERVATIONLAUNCHED
ENERGY EFFICIENCY:
POWER SAVEDIS WORTH 1.33 UNITS PRODUCED
ONE UNIT OF
35
(DELP) taken up in about 151 cities in 18 states to replace 20.45 Cr. bulbs in 6.3 Cr. households by 2016
Distribution of bulbs has already commenced in Andhra Pradesh where 45 Lakh LED bulbs have been distributed to about 22.5 Lakh consumers
ALL INCANDESCENT BULBS TO BE CHANGED TO LED IN THREE YEARS
CONSUMPTION36
DOMESTIC EFFICIENT LIGHTING PROGRAMME
Due to transparent procurement, price of LED has reduced by 74% from ` 310 in Feb 2014 to ` 82 in Mar 2015
` 310
` 204
`149` 104
` 82
Energy Efficient Street Lighting Programme to cover 251 municipalities across India to replace 90 lakh street lights by 2016
Installation of LED street lights has already been completed in Greater Vishakhapatnam Municipal Corporation and Jhalawar Municipal Corporation
CONSUMPTION
Feb-14 Aug-14 Nov-14 Feb-15 Mar-15
74% Reduction
37
LED PRICE
38
SABKA SAATH, SABKA VIKAS
39
Massive thrust to expedite projects in North East to overcome power shortages and increase prosperity. Investment of `9,865 Cr. for upgrading power systems in
8 North Eastern States (Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura)
For the first time, National State Power Ministers conference was held in Guwahati where Ministers & Officials from all over India converged in North East
24X7 power plans made for Andhra Pradesh and Rajasthan. Action plans for other states at advanced stage of finalization
Entire Coal auction revenue will go to coal bearing states especially under developed states of Eastern India like Jharkhand, Chhattisgarh, Odisha, West Bengal etc.
CO-OPERATIVE FEDERALISM
Massive thrust on renewables to increase share of clean energy
More than 1 lakh solar pumps sanctioned in the past year
40
Solar pumps helped lakhs of farmers increase output, income and also provide drinking water
Drinking water problem will be solved for more than 7.6 lakh families through solar pumps for drinking water
41
UNNAT CHULHA ABHIYAN provides improved cook stoves for clean cooking, thus saving the lives of our mothers and sisters. 3.5 lakh cook stoves were sanctioned last year
Compulsory crushing and washing of coal to reduce ash transport by linking plants to their closest mines
ZERO EFFECT ON ENVIRONMENT
42
o Massive thrust for MAKE IN INDIA program: Orders of more than ` 100,000 Cr. being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy
43
o Massive thrust for MAKE IN INDIA program: Orders of more than ` 100,000 Cr. being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy
o Domestic industry being encouraged to scale up and become more cost effective o 1000 MW of solar capacity to be setup by PSUs with solar cells made in India o Defence establishments will buy 300 MW solar plants o Similar initiatives across sectors
SwachhBharatThe PSUs under the three Ministries are committed to active involvement in this effort. As a first step, they are investing over
44
` 2,250 Cr. for over 1,25,000 toiletsseparately for boys and girls by 15th August, 2015 particularly in the needy states such as Bihar, Odisha, West Bengal, Jharkhand, Chhattisgarh, Andhra Pradesh and Rajasthan.
After construction, the PSUs will also maintain these toilets for a period of five years thus ensuring a complete sanitation programme.
Awareness is being created in local communities to improve over all sanitation.
45
46
National Transmission Asset Management Centre (NTAMC) to remotely monitor national power grid and help increase power availability
Optical fiber network to connect all high voltage substations thus reducing outages
47
TRANSPARENCY & EFFICIENCY in USING TECHNOLOGY
DIGITAL
Reduction in coal theft using RFID/GPS tagging
Coal project monitoring portal for quick decision making, faster dispute resolution and accelerated removal of bottlenecks
Smart Grid & Smart Metering to improve power availability
e-Office implemented in Ministries
TRANSPARENCY
48
TRANSPARENCY
Fully transparent and online process for coal auctions adopted
Support for restarting stranded gas-based power plants on the basis of reverse e-bidding process to discover lowest customer tariff
Reduced red-tape and paper-work through delegation of powers and expansion of online interface
49
50
24365
A GOVERNMENT WHICH CARES
51
RapidEmergencyResponse
Delhi: After transmission tower collapse in May 2014, central government worked day and night to restore power in 15 days which would have otherwise taken more than six months
Cyclone Hudhud: Central teams assigned to restore power in cyclone hit areas. Damaged streetlights converted to LED within six weeks to restore as well as improve lighting
J&K Floods: Special teams rushed to the state to restore power on war footing
Nepal: Helped Nepal's electricity grid come online after the earthquake and is now working towards rebuilding the distribution network
www.ujwalbharat.gov.in
Ministry of Power, Coal and New & Renewable Energy
GOVERNMENT OF INDIA
UjwalBharat2015@UjwalBharat
Prime Minister Narendra Modiat RE-Invest 2015
India has now graduated from megawatts to
gigawatts in terms of renewable energy production.