Page 1: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 2: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Kulhal HEP November 2014 Page 1

Chapter 1. Annual Report on Technical Performance of Kulhal HEP

1.1 Overview

1.1.1 The petitioner in compliance of the Regulations 12 and 13 of UERC (Terms and

Conditions for determination of Tariff) Regulations, 2011 is providing

information with regard to the operational performance related to technical

parameters of Kulhal Hydro Power Station.

1.1.2 The information provided in this chapter relates to actual and expected

performance in FY 2011-12, FY 2012-13, FY 2013-14, FY 2014-15 & FY 2015-16.

The operational parameters considered are:

(a) Gross generation

(b) Auxiliary consumption and Transformation losses

(c) Plant Availability factor (PAF)

1.2 Power Station Description

1.2.1.1 The Kulhal Power Station with an installed capacity of 30 MW (3X10 MW) is

located on the downstream of the Asan Barrage at a distance of 4.0 km on the

power channel which takes off from the Asan Barrage. The Power Station was

commissioned in the year 1975. The surface Power Station comprising 3 units

of 10 MW each with Kaplan turbines is located on the power channel which

terminates in 39.2 m wide and 6.9 m deep fore bay. There are three 30 m long

and 4.5 m dia. steel lined penstocks, one for each unit. In case of tripping of

machines full discharge gets bye-passed through a 21m wide gated bye pass

channel. The water from the tail race flows towards Khara Power Station in UP.

The Kulhal Power Station is a low head scheme located on power channel with

a design head of 18 m and design discharge of 198 cum.

1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled

with synchronous generator. The turbine output is 10.4 MW for a rated net

head of 18 m. The generators are designed for a nominal output of 11.1 MVA

with lagging power factor of 0.9 and class “B” insulation.

Page 3: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Kulhal HEP November 2014 Page 2

1.2.1.3 This Power Station was commissioned in the year 1975. Due to continuous

operations of machines for past 38 years, efficiency of machines has substantially

decreased despite the regular and timely maintenance of the machine by

Petitioner.

1.2.2 Salient features of the Power Station are provided in form F 2.3 of this petition.

1.3 Energy Generation

1.3.1 The actual Gross and Net Energy generated in FY 2011-12, FY 2012-13 & FY

2013-14 is given in the table below:

Table 1:- Actual Generation

Particulars Norms 2011-12 2012-13 2013-14

Design Energy /Actual

Generation (MU)

153.91

157.84

158.08

178.52

Auxiliary Cons. 0.2% 0.3% 0.3% 2.43%

Transformation/ other

losses and

consumption (%)

0.5 % (Tr.

losses)

2.5% 2.1%

Net Saleable Energy

(MU)

152.83 153.48

154.28 174.18

1.3.2 The Gross and Net Energy expected to be generated in FY 2014-15 and FY

2015-16 is given in the table below:

Table 2:- Expected Generation

Particulars Norms 2014-15 (Estimated)

2015-16 (Projected)

Design Energy / Actual

Generation (MU)

153.91

161.79 149.93

Auxiliary Cons. and

Transformation losses (%)

0.7 2.43 2.43

Net Saleable Energy (MU) 152.83 157.85 146.28

Page 4: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Kulhal HEP November 2014 Page 3

1.3.3 From the above table it is evident that gross generation in the FY 2014-15 is

expected to be more than the design energy of the Power Station but it is

expected to be marginally less than DE in 2015-16.

1.3.4 The auxiliary and transformation losses in FY 2014-15 are expected to be more

than the normative level. However, the petitioner is investigating the reasons

for higher losses and will take appropriate steps to bring them to the

normative level.

1.4 Plant Availability Factor

1.4.1 The recovery of the Annual Fixed Charges is dependent on the Plant

Availability achieved by the Power Station. The principle for recovery of fixed

charges on the basis of the availability achieved by the plant has been

introduced by the Hon’ble Commission by its regulations UERC (Terms and

Conditions for Determination of tariff) Regulations, 2011 from the FY 2013-14.

The petitioner has started computing this factor as per the provisions of the

above regulations from FY 2013-14

Table 3:- Plant Availability Factor

Particulars Norms 2011-12 2012-13 2013-14 2014-15

(Expected)

2015-16

(Projected)

NAPAF / PAFM

(%)

65

NA

NA

77.98 72.98 69.62

Planned Outages

(Hrs)

NA 2942 2598 2543 0* -

Forced Outages

(Hrs)

NA 53 410 9 1.5* -

*Upto September 2014

1.4.2 PAFM: Kulhal Hydro Power Station is likely to achieve the normative plant

availability factor determined by the Hon’ble Commission for the FY 2014-15

and FY 2015-16 as well.

The PAFM fixed by Hon’ble UERC during FY 2013-14 could be achieved

through optimum availability of water in the river and performance of Ichari

Page 5: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Kulhal HEP November 2014 Page 4

dam,Dakpathar Barrage & Asan Barrage and no major problems faced in the

machines resulting in better availability of machines.

The Petitioner does not seek any deviation in NAPAF from the norms as

determined by Hon’ble Commission in its order dated 03.09.2013.

Table : Average PAFM from 2008-09 to 2015-16

SI.No. Year Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Average

1 2008-09 6.89 68.92 75.89 77.26 96.02 97.44 90.43 66.22 56.34 33.01 29.88 26.24 60.38

2 2009-10 34.22 49.46 54.00 80.97 87.42 88.78 60.65 51.11 29.68 26.13 30.83 30.32 51.96

3 2010-11 39.00 58.82 68.33 91.08 72.90 71.56 99.46 79.78 66.56 61.61 56.66 56.66 68.54

4 2011-12 53.00 79.68 87.44 95.38 90.11 99.44 86.99 65.56 52.58 45.91 41.15 51.72 70.75

5 2012-13 30.67 65.27 70.78 86.88 94.14 98.44 82.74 59.78 42.58 36.67 66.19 81.94 68.01

6 2013-14 65.79 74.61 70.27 99.08 97.78 99.50 93.23 73.07 59.45 62.91 67.14 72.88 77.98

Avg. 2008-09 to 2012-13 32.76 64.43 71.29 86.31 88.12 91.13 84.05 64.49 49.55 40.67 44.94 49.38 63.93

Avg. 2008-09 to 2013-14 38.26 66.13 71.12 88.44 89.73 92.53 85.58 65.92 51.20 44.37 48.64 53.29 66.27

Expected for FY 2014-15 72.84 81.21 89.46 96.05 94.62 92.53 85.58 65.92 51.20 44.37 48.64 53.29 72.98

Expected for FY 2015-16 55.55 73.67 80.29 92.25 92.17 92.53 85.58 65.92 51.20 44.37 48.64 53.29 69.62

1.4.3 Outages: During FY 2013-14 Machines of Kulhal Power Station remained in

forced outage for 9 hrs only due to best maintenance efforts and expected to

remain within this range for FY 2014-15.

Page 6: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 7: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

S. No. Description Voucher No. & Date

Particulars of Asset

Capitalisa-

tion

Work Order / P.O.

No. & DateName of Supplier / Contractor

Amount Capita-

lised

Date/

Month of

Capitalisa-

tion

Original Date/

Month of Capitalisa-

tion

Need/ Urgency of CapexHow the Capex has improved

performance of plant/life enhancement

Bill No Bill date

Add cap

3 Rain coat KHL/ME-9 T&P- Others 14/6/2013 M/S Shanu Garments 1269 14/6/2013 3972.50 14/6/2013 14/6/2013 For operation & maintenance

works at site in rainy season.

Working efficiency improved.

7 Nokia KHL/ME-2 T&P- Others 03-01-2013 Virmani Communicatoin 15438 03-01-2013 4000.00 03-01-2013 03-01-2013 To strengthen the

communication facility.

Improving the communication between

different controlling agencies.

8 Nokia KHL/ME-5 T&P- Others 17/10/2013 Sethi Communication 15547 17/10/2013 1400.00 17/10/2013 17/10/2013 To strengthen the

communication facility.

Improving the communication between

different controlling agencies.

9,372.50

Bill No. & Date

Plant& Machinery

Total add cap of Plant & Machinery

ADDITIONAL CAPITALIZATION FOR FY 2013-14 KULHAL

Page 8: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Details of capital Expenditure for FY 2014-15 (1.4.2014 to 30.9.2014)

Name of Poiwer Station:- Kulhal Power House

Sl no

Description Voucher No

Particulars of Asset Capitalization

P/O No Name of supplier

Amount capatilised

Date/Month of

Capitalization

Original date of

Capitalization

Need How the

capex has

improved

1. Nil Nil Nil Nil Nil Nil Nil Nil

Nrapendra kumar Executive Engineer Kulhal Power House

Page 9: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Details of tentative capital Expenditure for FY 2014-15 (1.10.2014 to 31.3.2015)

Name of Power Station:- Kulhal Power House

Sl no

Description Voucher No

Particulars of Asset Capitalization

P/O No Name of supplier

Amount capitalized

Date/Month of

Capitalization

Original date of

Capitalization

Need How the

capex has

improved

1. Godrej make furniture for inspection

house

Nil Nil Nil Nil 3.00 lac Nil Nil

Note: - Above information can be changed subject to start of RMU works at Kulhal Power House

Nrapendra kumar Executive Engineer Kulhal Power House

Page 10: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 11: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 12: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 13: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 14: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 15: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 16: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 17: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 18: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 19: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 20: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 21: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 22: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 23: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 24: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 25: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 26: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 27: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 28: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 29: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 30: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 31: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 32: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 33: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 34: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 35: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 36: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 37: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 38: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 39: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 40: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 41: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 42: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 43: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 44: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 45: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 46: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 47: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 48: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 49: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 50: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 51: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous
Page 52: UJVNL Tariff Petitionuerc.gov.in/ordersPetitions/Petitions/2015-16/UJVN... · 1.2.1.2 There are three generating units having vertical Kaplan turbine directly coupled with synchronous

Recommended