UK Content – Opportunities in Offshore O&M Alun Roberts, BVG Associates
Agenda
1. Costs of offshore O&M 2. Contracting and the supply
chain 3. UK content and opportunities 4. Northern Ireland and the Irish
Sea projects
2 © BVG Associates 2013
BVG Associates
Market analysis & business development • Supply chain development • Economic impact assessment • Support to industrialisation
Technical innovation & engineering analysis • Support to investment in technology • R&D programme management • Design and engineering services
Project implementation • FIT project development (UK only) • SCADA & condition monitoring • O&M technical support
Technical education
3 © BVG Associates 2013
4 © BVG Associates 2013
5 © BVG Associates 2013
The O&M supply chain
Wind farm asset owner
Turbine maintenance
Equipment, tools
Transmission maintenance
Service vessels
Operating locally
Operating anywhere
Jack-up vessels
Specialist services Port Replacement
parts
Wind farm operator
OFTO
6 © BVG Associates 2013
Frequency vs specialist - local opportunities
7 © BVG Associates 2013
How
freq
uent
Vessel operation
How specialist
Turbine maintenance
Cable repair Onshore
admin services
Where does the money go
• Typical costs = £80-100k/MW/year for a near-shore project
8 © BVG Associates 2013
Wind turbine OMS
Balance of plant OMSMarine operations
Environmental surveys
Overheads
Fees
Measuring UK content
• The percentage of the total undiscounted expenditure by the wind farm asset owner on a wind farm that is ultimately spent through contracts awarded to companies operating in the UK
• Excludes the value of contracts to UK companies that is spent on subcontracts to companies not operating in the UK
• Includes the value of contracts to non-UK companies that is spent on subcontracts to companies operating in the UK
9 © BVG Associates 2013
Wind farm expenditure
Cost of contracts to UK-based companies
Cost of imported components and
services UK Content
Cost of contracts to overseas companies
Cost of UK exported components or services
(subsequently reimported)
Overseas content
Local and UK content in turbine maintenance
10 © BVG Associates 2013
Local49%
Other UK22%
Overseas29%
Turbine maintenance
Turbine manufacturer’s international resource Replacement components
Turbine manufacturer’s national resource Health and safety Equipment
Turbine maintenance supply chain opportunities
• Third party service providers
• Turbine technicians • Logistics, distribution of
spares and consumables • Health and safety training
and equipment • Blade inspection and repair • SCADA and condition
monitoring
11 © BVG Associates 2013
Local and UK content in balance of plant maintenance
12 © BVG Associates 2013
Substation maintenance Foundation maintenance Cable survey and repair Substation maintenance General imported costs
Local26%
Other UK76%
Overseas12%
Balance of plant supply chain opportunities
• High and medium voltage services
• Foundations – repairs and scour and structural monitoring
• Transition piece cleaning/coatings
• Cable route surveys • Cable re-burial, repair,
protection • Substation maintenance
(onshore and offshore)
13 © BVG Associates 2013
Local and UK content in marine operations
14 © BVG Associates 2013
Crew transfer vessel manufacture Jack-up manufacture and charter
Local76%
Other UK16%
Overseas23%
Crew transfer vessel operation Local port Fuel Crew transfer vessel manufacture Turbine access system Jack-up charter
Marine operations supply chain opportunities
• Vessel manufacture or conversion
• Vessel (or helicopter) maintenance and operation
• Fuel • Pontoon supply and
maintenance • Access systems • Marine navigation tools
15 © BVG Associates 2013
Local and UK content in environmental surveys
16 © BVG Associates 2013
Vessels and equipment
Surveys Onshore logistics Surveys (specialist) Local
51%
Other UK55%
Overseas15%
Environmental surveys supply chain opportunities
• Environmental consultancies • Monitoring:
• Sea mammals • Birds • Fishes
• Vessels and equipment
17 © BVG Associates 2013
Local and UK content in overheads
18 © BVG Associates 2013
Owners HQ Insurance
Local administration and services Owners HQ Insurance Local
36%
Other UK32%
Overseas32%
Overheads supply chain opportunities
• Recruitment • IT • Facility management and
services • General office services –
printing, PR
19 © BVG Associates 2013
Local and UK content in fees
20 © BVG Associates 2013
Miscellaneous non-UK products and services
Local rent and rates Use of system charges Crown Estate rent
Local12%
Other UK83%
Overseas5%
Local opportunities in the Irish Sea
21 © BVG Associates 2013
First Flight
Robin Rigg
Celtic Array
Barrow cluster
Liverpool Bay cluster
Isle of Man?
How local is local?
22 © BVG Associates 2013
Distance from port Strategy
< 12nm Quayside onshore logistics base
Offshore logistics using workboats
12-40nm Quayside onshore logistics base
Offshore logistics using workboats with helicopter support
> 40nm Offshore logistics base (fixed or floating
Source: The Crown Estate, Scottish Enterprise: A Guide to UK Offshore Wind Operations and Maintenance
How local is NI?
23 © BVG Associates 2013
Kilkeel Belfast Barrow Mostyn Holyhead
First Flight
Barrow cluster
Celtic Array
Liverpool Bay cluster
<12nm
12-40nm
>40nm
Implications for Northern Ireland
• There is long term economic benefit from an offshore wind farm off the NI coast
• Local suppliers may not benefit automatically to a significant degree
• Owners have a greater incentive during O&M to develop a local supply chain than they do during construction
• Most Irish Sea projects can be operated from local ports. The exceptions are the Celtic Array projects
• Northern Ireland companies should look beyond the Irish sea market
24 © BVG Associates 2013