14
UK-V Meeting Paul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team UK-V Meeting, RAL 15th July 2003 • Latest News • Irradiation to date • 2003 schedule Contents
Transcript
Page 1: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

Irradiation's 2003 UpdatePaul Dervan

Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholsonand the irradiation team

UK-V Meeting, RAL15th July 2003

• Latest News• Irradiation to date• 2003 schedule

Contents

Page 2: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

New Irradiation Lab

• New lab on the ground floor of B.186 • New lab is up and running• All module tests can be carried out there:

Electrical Stand Temperature controlled freezer (to be done) Nitrogen Supply

This improves safety, by irradiated modules all being in the same, known place

Page 3: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

New Beam Target• New Rotary target robot• Just up-stream of cool box• Scintillators and films in 5 positions• Monitor the beam position by new Camera mounted on the ceiling of T7 (next slide)• No more doubts about beam position! (Not that there ever was!)• Also, prototype beam profile monitor in shuttle. Will be extended to SCT box after tests

Page 4: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

New Camera

• New camera in the area • Can be remotely moved on 3 axis• So beam can be seen on the scintillator on the front of the box and on the rotary target

Page 5: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

SchedulePeriod Dates # days

P1A 19/05/03 - 6/06/03 18

P1B 25/06/03 - 11/07/03 14

P2A 25/07/03 – 06/08/03 11

P2B 20/08/03 – 03/09/03 14

P3A 9/10/03 - 22/09/02 13

***

*** High fluence run (4 spills per cycle) for pixels

Page 6: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

P1A (19th May – 6th June)

Barrel 20220040200041 (from LBNL) Barrel 20220380200006 (from SCAND)

High gain spread chip Oscillates

Page 7: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

Fluence for P1A

Easy run. No major problems with the beam. 2 spills perSuper-cycle day/night. 20GeV beam due to broken transformer in the septum that extracts beam into the East Hall.

Page 8: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

Module Currents for P1A

Module B0041 tripped at about ½ fluence. Was unable to re-power it so it stayed un-powered but biased for the rest of the run.

Page 9: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

High Gain Spread Chip Study

Before Irradiation

After Irradiation

Page 10: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

High Gain Spread Chip StudyBefore After

Chip Gain RMS Gain RMS

M0 53.0 1.24 31.5 2.00

S1 52.1 1.08 31.8 1.48

S2 54.4 8.89 32.5 1.50

S3 52.3 1.36 27.6 1.63

S4 50.4 1.17 26.6 1.37

E5 50.7 1.47 28.3 1.90

M8 50.6 1.15 27.7 1.36

S9 48.9 1.12 29.6 1.76

S10 50.8 1.03 25.9 1.61

S11 48.5 1.31 20.9 1.26

S12 49.9 1.25 24.9 1.45

E13 54.0 1.06 27.9 2.16

Barrel 20220040200041 had a high gain spread chip (S2), before irradiation, 8.89

After Irradiation this had reduced to 1.50.

But only one module so far!

Another module with a highgain spread chip is being irradiated in P1B-P1C (now).

Both these modules will go into the next test-beam

Page 11: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

P1B-P1C (25th June – 11th July)

Barrel 20220040200018 (Oscillates)

Barrel 20220170200447 (Gain Spread)

Forward 2022013000002 Geneva

Page 12: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

Fluence for P1B-P1C

Not reached fluence yet. But lots of problems with the PS and accelerator complex. Only one spill for most of the run, until the

end where we got 2 to get us to target fluence.

Page 13: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

Module Currents for P1B-P1C

Currents look good. No problems with the modules in this run (so far).

Page 14: UK-V MeetingPaul John Dervan Irradiation's 2003 Update Paul Dervan Craig Buttar, Simon Dixon, Chris Grigson, Richard Nicholson and the irradiation team.

UK-V Meeting Paul John Dervan

Summary

• Annual service of T7 was done in January• New rotary target station installed and working• New Camera is installed and working well • New lab is ready• The high gain spread on chips seems to go away with irradiation. But only seen one module!• Oscillating modules will be studied as soon as possible• Third Irradiation of 2003 starts on 25th July.